00:11:23
And so this kind of breaks down a little bit more into the steps that we go through in terms of characterizing the watershed, accounting for both those point and non-point sources, as I mentioned, looking at those potential model loadings, calculating those reductions, and then allocating that and using that margin of safety as we both determine what should be in a wasteland allocation to go into a permit, as well as be carried forward for load allocation and implementation planning.