Central Virginia
Thomas Jefferson Planning District Commission
MPO Policy Board Meeting 12/6/2022
Auto-scroll
MPO Policy Board Meeting
12/6/2022
Attachments
MPO Policy Board Packet - December 6 2022.pdf
SPEAKER_04
00:00:00
And the first item here because number two matters from the public.
00:00:17
And do we have anyone here who wishes to speak to that?
00:00:26
We have one taker.
00:00:27
Okay, please come forward and state your name, and you will have three minutes to address the board.
00:00:33
And the hours or the microphones, it's a good point to remind everyone to make sure you use an outside voice so that those online participating can hear what we're saying.
SPEAKER_01
00:00:44
Thank you.
00:00:44
That does look like an office.
00:00:47
It's called a mountain.
00:00:49
I know.
00:00:49
Well, Mr. Al.
00:00:50
Good evening policy board, fellow planners and advocates.
00:00:55
My name is Peter Cress from the Piedmont Environmental Council.
00:00:59
For 50 years, PSC has been a voice for well-planned communities and intelligent transportation solutions across our nine county region.
00:01:09
We have supported SmartScale since its adoption and we think it's an important tool because it uses data instead of
00:01:18
frankly politics to decide which transportation project should happen.
00:01:24
Like many of you, we are concerned about the cost estimates for the latest round of applications from the Charlottesville, Albemarle, MPO area.
00:01:35
Frankly, they're shocking and in some cases double what we have expected.
00:01:40
Take for example, the MPO's 5th Street multimodal proposal
00:01:46
which is actually a fairly modest project.
00:01:50
Between inflation and various contingencies, the cost is nearly double what we have expected.
00:02:00
Projects of such modest ambition is the shipment cost $45 million a month.
00:02:06
I'm not sure how we're gonna name transportation planning if that's the new reality.
00:02:11
I mentioned inflation and contingency together because they are related
00:02:16
and some interesting ways.
00:02:18
And there may actually be a bit of a loop of uncertainty created between the two forms of uncertainty.
00:02:28
Clearly we're in an inflationary environment.
00:02:31
I watched the CTV presentation and I understand the reasons.
00:02:36
And I know enough about economics to be dangerous, but I will say that these numbers appear to be worst case.
00:02:44
We might just have to wait and see, but I really hope this grim scenario does not become some kind of new normal scenario.
00:02:54
The contingency numbers are also wild, sometimes approaching 50%.
00:03:01
This doesn't really reflect a very high confidence in the underlying estimates.
00:03:07
Projects certainly vary, but
00:03:09
At least as of today, the SmartScale portal is reporting that most projects in our residency are actually on budget.
00:03:18
It'll be interesting to see the statewide numbers and how this all shapes out.
00:03:23
If we're subject to this degree of handicapping, it goes without saying that that same standard needs to apply across all districts.
00:03:34
I look forward to seeing the full discussion beginning in 2023 and what happens next.
00:03:40
Perhaps there could be a re-examination of the formulas or some kind of positive hedge, such as a wait list in case things actually get better than we expect.
00:03:52
In the meantime, I also look forward to watching your own deliberations and hearing the update about my small scale of this presentation.
00:04:00
And I always appreciate your steadfast work to make the community better for everyone.
00:04:06
Thank you.
SPEAKER_04
00:04:14
Thank you.
00:04:15
We will close matters from the public.
00:04:17
And that will take us to item number three.
00:04:22
So this is review and acceptance of the agenda.
00:04:25
Do we have any changes to be made to the agenda today?
SPEAKER_09
00:04:29
Mr. Galloway, did you recall that Mr. Meyers is not able to participate?
00:04:37
Unfortunately, I have said that I actually didn't see you meeting today, so I'm about to move back as we're there and posted right after January.
SPEAKER_04
00:04:45
So that is number five on the agenda.
SPEAKER_05
00:04:49
Any other changes?
SPEAKER_04
00:04:53
Is there a motion to approve as amended?
00:04:56
Second.
00:04:58
All those in favor say aye.
00:04:59
Aye.
00:05:00
Opposed?
00:05:04
Thank you.
00:05:05
And then we also have the September 28, 2022 meeting minutes.
00:05:11
Any
00:05:11
Changes are as needed to those that are calling for a Dr. Matt Chance for review.
00:05:22
I'll second that.
00:05:24
All right.
00:05:25
All in favor, please say aye.
00:05:28
Aye.
00:05:28
Opposed?
00:05:30
The minutes are approved.
00:05:32
Thank you.
00:05:33
That will take us to number four.
SPEAKER_09
00:05:36
This is just an appointment for the slate of policy board members who will recommend officers for consideration to serve in January.
00:05:56
Traditionally, there's been an alteration back and forth between
00:06:02
the city of the county serving as the chair and vice chair.
00:06:05
So currently Mr. Gallaway for Albemarle County is serving as the chair.
00:06:09
So traditionally it would be the city's chair to serve as chair next.
00:06:13
But among every shelter of the people, Mr.
00:06:16
Reap and Ms. Monteith and Mr. Nelson have all agreed to serve as a property company.
SPEAKER_08
00:06:23
If Mr. Gallaway would like to formally address.
SPEAKER_05
00:06:27
I'm still trying to hold my iron grip on power.
SPEAKER_04
00:06:32
Very good.
00:06:34
Does that take an action to the board?
SPEAKER_09
00:06:37
You just get to include your item number right there.
SPEAKER_04
00:06:41
It's open December.
00:06:44
Are there any objections to the nomination?
00:06:48
Folks being appointed to the nomination, you know?
00:06:51
All right, we were so appointed.
SPEAKER_08
00:06:55
I urge you to call Mr. Pinkston.
SPEAKER_05
00:06:59
It's his turn.
00:07:00
Tell him that.
SPEAKER_04
00:07:02
So that will take us past number five, which we removed, to number six, which is one of our first presentations.
00:07:17
The title of our sixth class, Ms. Shannon, will begin on that one today.
SPEAKER_08
00:07:25
I'm just going to share my screen.
SPEAKER_05
00:07:30
Yes.
00:07:39
Yes.
00:07:46
Yes.
00:07:49
Yes.
SPEAKER_09
00:07:53
Yes.
00:07:56
Yes.
SPEAKER_05
00:07:59
Mr. Leek, Mr. Monteith, Mr. Williams, Mr. Hudson, Mr. Long, Mr. Gondor, also online, and that was Jacobs.
SPEAKER_07
00:08:34
So the Title VI implementation plan for the Metropolitan Planning Organization needed to be updated and we decided to make a Title VI plan that covers all of the federally funded programs for the TJPPC.
00:08:50
So one of the changes to updates was that it's now the TJPPC Title VI implementation plan as opposed to just the MPO.
00:08:59
We've made substantial changes to this plan according to some of the updates and requirements.
00:09:07
And the purpose of the TJPDC's Title VI implementation plan is to describe the measures that the TJPDC adopts to ensure compliance with the Title VI Act of 1964, which prohibits discrimination on the basis of race, color, or national origin.
00:09:28
and the plan applies to the Charlottesville FPO and several other TJPEC programs.
00:09:36
So the TJPEC is the contractual administrator for the Charlottesville Albemarle FPO and it's also the administrator for the Charlottesville Regional Home Consortium and several other programs that are listed on this slide.
00:09:53
The updates to the TJPDC implementation plan include posting the Title VI implementation plan on the TJPDC and FBO websites, including non-discrimination notices with our contracting materials when we contract programs out, including offers for interpretation and translation services with public notices and public meetings.
00:10:17
Updating, we updated the platform and developed procedures that would help
00:10:23
the person filling out the complaint form to understand the process that we go through with the complaint that we received before.
00:10:32
And we posted those on the website and posted notices in the Office of Strategic Agency in the public area, notifying people of those options.
00:10:45
So for the MPO engagement plan, the TJPEC had a public contact period for 15 days, which is the requirement from October 24th to November 15th.
00:10:57
The draft plan was announced publicly and shared with the TJPEC staff, the MPO technical committee.
00:11:06
It was emailed to community stakeholders, posted in social media,
00:11:11
posted in the TJPDC office at the Water Street Center and on the website.
00:11:19
And we also translated the announcements into Spanish at Farsi.
00:11:24
And there were no public comments received.
00:11:27
It's kind of a drive.
00:11:34
So the staff recommends that the policy board vote to approve the use of the updated Title VI
00:11:42
TJ Peterson, Final Six implementation plan for the Charlottesville metropolitan planning organization.
00:11:50
And also VDOT has approved it.
SPEAKER_05
00:11:56
I'm sorry, what did you just say, VDOT?
SPEAKER_07
00:11:59
So yeah, VDOT reviewed and approved the plan.
SPEAKER_04
00:12:05
I wanted to ask you a question.
00:12:05
It said that the Chief Operating Officer is the one who saw that the PDC within some work with the managers here at the PDC or the VDOT civil rights committee?
00:12:17
Medical programs to make sure they're implementing Type 6 within the EEC or any federally funded programs.
00:12:22
So somebody holds that kind of responsibility for each program.
00:12:29
Is this something that's done every five years happening or?
SPEAKER_07
00:12:34
Yeah, I think it's every three years they will be updated.
00:12:38
Typically the updates are looking at the demographics for the area and understanding if there is a large percentage of non-English speaking populations that are affected by our programs.
00:12:55
And if they are, then we work to translate, to have extra outreach in the transcript materials for the sort of language.
SPEAKER_05
00:13:06
The motion is on the screen if someone would like to take that question.
SPEAKER_04
00:13:24
I move to approve the use of the updated TJPPC.06
00:13:30
And what notation, like Michelle, so Albemarle, Metropolitan Planning Organization.
00:13:39
All those in favor, please say aye.
00:13:42
Aye.
SPEAKER_05
00:13:42
Opposed?
00:13:43
All right.
00:13:48
All right.
SPEAKER_04
00:13:51
The next item, number six, Regional Transit Division Planning and Government Study.
00:13:56
Michelle, you are still on.
SPEAKER_07
00:14:01
So who here has not seen the Regional Transit Vision Plan presentation?
00:14:19
So we did the plan.
00:14:21
It was a 28 month plan of $350,000 and it was supported by DRPT, the City of Charlottesville in Albemarle County.
00:14:31
We did a lot of public engagement.
00:14:33
We came up with two service networks, the administrative and the string.
00:14:40
We have a final report.
00:14:42
One of the ventures that we looked at was the access to jobs, which also has access to shopping and other amenities because people left jobs going, but this is people's shops.
00:14:57
So there's the baseline of the constraint would increase accessibility by transit by 33% and the up constraint would be avoid increased by 40%.
00:15:10
And then the next steps are to do transit governance study to communicate and organize around a regional authority, long-term planning, coordination between land use and transportation,
00:15:24
help the transit agencies find more drivers, implement guidelines and track service improvements, and build consensus around bus traffic transport improvements.
00:15:38
So based on those recommendations, we started the Regional Transit Government Study for Region 10.
00:15:49
I know.
00:15:51
Who here has not seen a presentation about the governance study?
SPEAKER_08
00:15:57
This is with the consultants.
00:15:59
There's one, there's one, whatever, and they will get about that later.
SPEAKER_04
00:16:03
I want to go into the slides briefly.
SPEAKER_07
00:16:06
OK. Yeah, so this study is building on previous studies.
00:16:14
So there's the Transit Authority Study in 2009.
00:16:19
And then there was legislation passed in, sorry, the study was in 2008.
00:16:24
In 2009, the General Assembly passed legislation for a transit authority for the region.
00:16:32
However, it's not funded.
00:16:33
There was no funding mechanism.
00:16:35
And then the Regional Transit Partnership formed in 2017
00:16:40
which also was kind of like a precursor to an authority.
00:16:44
And in 2022, we had the Albemarle Transit Expansion Study at the Regional Transit Division 10.
00:16:49
So we're kind of building multiple studies and we've talked with other authorities in the region or in the state and they take about 10 years to pull them.
00:17:00
So we're right on track.
00:17:05
So the study goals,
00:17:10
are to, I'm sorry, what slide is that?
00:17:16
Okay, got it.
00:17:21
To develop two service scenarios, sorry.
00:17:32
Well, the study goals are to develop a,
00:17:38
a mechanism for bringing in revenue for transit services and then governing that revenue and being accountable for that revenue and having it be something that the region would feel comfortable with and enough to enable some kind of additional revenue source for transit.
00:17:58
So the approach of the study is we have a kickoff meeting and we're working on existing conditions.
00:18:05
So we're looking at
00:18:08
how transit is governed right now, how we make decisions around funding for transit and the accountability for that funding.
00:18:18
And then we'll do a peer regional transit study and look at how other regions are making decisions around transit and bringing in additional revenue.
00:18:29
managing it.
00:18:31
We'll look at potential revenue sources for our area and what works for our area and come up with a list of sources and work with the stakeholder committee which represents the regional jurisdictions to form some sort of consensus around the potential revenue generation mechanism and then we'll develop a scenario of
00:18:56
governance and funding allocations, like a system that allocate those funds based on, again, working with the jurisdictions to make sure that there's agreement and consensus on that.
00:19:09
And then there'll be a recommendation from consultants.
00:19:14
So there will be extensive stakeholder engagement to make sure that we can build a consensus.
00:19:20
The steering committee is representatives from each of the jurisdictions from region 10 that will also be working with transit partners.
00:19:28
You are met with all of them.
00:19:32
And the project team is TJP and CSAF, the AECOM Consultants, the City of Charlottesville, Albemarle County, and TRPT.
00:19:42
So this slide on the top, you can see these are the phases that I just went over.
00:19:47
And this, again, just kind of
00:19:49
shows how much engagement we'll have with all of the stakeholders in order to form that consensus.
00:19:58
And so what we're looking for are, again, the funding sources, what uses the funding to be used for, and how they would be allocated, and questions.
SPEAKER_05
00:20:12
Questions?
SPEAKER_08
00:20:15
I guess when this was attacked back in 2005, it was called the Transportation Working Group.
00:20:21
And I'm sure there's a big pile of papers on one of your shelves back there.
00:20:25
And it was the decision making, which was the stuff.
00:20:29
We had five options.
00:20:30
We could have put up a legislature for different options for funding, but if there is going to be decision ability spread amongst the jurisdictions, then everybody was going to survive.
00:20:41
Other questions or comments?
SPEAKER_02
00:20:44
Next, a follow-up question on that, just for our notes.
00:21:00
Are you saying that there was no research around who would make the decisions about the funding
00:21:09
There was no agreement in who would make the decisions.
SPEAKER_08
00:21:15
There was no willingness on the part of the city at that time, I think a whole bunch of castle players to believe in the total control of who was going to be born.
00:21:25
And so that's sort of the sitting part of the authority that has been quasi-dependent or so.
00:21:33
And I think originally it's not a fiction, but they don't get an element from the decision.
SPEAKER_07
00:21:38
So are you talking about the decisions of like what how CAT is administered and CAT services or the decisions on the funding?
SPEAKER_08
00:21:50
Well I think it'd rather be in transit than all the other parts because I assume I'm looking after this rather than just what CAT is doing.
00:21:57
Then that bigger one, that's what that is, it's an analysis of the water zone
00:22:05
Those taxes were lent to the General Assembly.
00:22:10
Darren could come down and ask for money, but we had no other way to make such a difference.
00:22:18
But as I said, the Southern Bloc was not worried about money.
00:22:21
It was how we allocated the money to that.
SPEAKER_05
00:22:28
Very good.
00:22:28
Any other comments?
SPEAKER_04
00:22:38
Okay, check for room number seven in the long-range transportation plan.
SPEAKER_09
00:22:43
Yeah, we're a little ahead of schedule, so I didn't even think of it.
00:22:46
Earlier, we had a really robust conversation around long-range transportation plans.
00:22:50
I'll leave that up to you there.
00:22:53
So just to give you a little bit of an update on where we are with long-range transportation plans, I know we don't have a whole lot to look for on GDS, but we have to work on it.
00:23:01
So, so far, based on the recommendation from CTAC, one of the comments they made is that it's still a really technical document, maybe we need to think of something else to call it, such as an offer and transportation plan to get people to feel like they can engage in that.
00:23:16
So, I will reveal it for you in just a minute.
00:23:19
We've built a lot to deal with our staff and have developed a non-technical name for it.
00:23:25
We've developed some draft website content, so we'll hopefully have a draft website set up soon.
00:23:33
We procured consultants to provide some technical support for our staff.
00:23:38
Again, this is still going to be very much staff-driven, but if not, we have a small staff and we have an opportunity to get some additional technical support.
00:23:46
We were able to procure the EPR and the ORAS consultants to provide a single process.
00:23:54
We're about 80% of the way through our demographic analysis based on the five-year ACS data.
00:24:00
There are some data gaps where the data is not available at a block or block group level.
00:24:06
So that's something that we're going to continue to monitor and possibly later this winter or early spring we'll have some better data that we could at least go back and review what those gaps are and see if they provide any additional information that we're not able to clean.
00:24:24
We've done a preliminary crash safety data analysis, so we looked at where the major crash incidences are located.
00:24:36
I have not gotten back in touch with VDOT, but we should be prepared to run the model pretty shortly.
00:24:43
So between the crash data and the modeling, that will give us a pretty good overview of the existing system operations once we're able to get that information.
00:24:53
We conducted a high level review of related plans, as you recall.
00:24:58
One of the tasks that we were completing was to review other related plans, including looking at other former studies, comprehensive plans, small area plans, TDP as well, but we wanted to reach back out to get those updated TDPs, but we've been working on going through all of those related documents, including things that are a little bit more adjacent to transportation, not directly related things like that.
00:25:22
We have developed a draft rules and objectives for the conversation and then based on some consultive feedback we have developed some revised public engagement strategies out there every year this afternoon and then in progress we're still developing our project for organization
00:25:45
So we've been able to incorporate a lot of the feedback that we got through the MPX Technical Committee of CTAC into developing and refining some of our performance measures, or measures that we use.
00:25:59
Alright, so the big reveal, the name of the Londrey Transportation Plan is, maybe for 2015.
00:26:06
So,
00:26:07
So we have this little logo that we developed and we hope that this will help make engagement more comfortable and inviting for the general public and make it feel a little bit less comfortable.
00:26:22
Alright, so the public engagement process has changed just a little bit from what I presented to you all initially.
00:26:29
My initial thought is that we would sort of have the draft rules and objectives and go out for broad public feedback and that would be a separate, expensive public thinking process from the prioritizing the system needs and then going back through and prioritizing the projects.
00:26:48
So I researched this a little bit based on having some discussions with our consultants, which I think will give us
00:26:55
more comprehensive public feedback on the Josh holes and objectives prior to putting that out before the public at large.
00:27:06
And then looking at what some of the other MPOs have done for their home race transportation plan, it did make sense that we could combine that effort to
00:27:19
link the goals against each other, prioritize the various goals against each other along with collecting the public public understand what the system needs are and the same engagement process.
00:27:30
So instead of doing those separate processes in order to maintain the overall project timeline, I can find that goal prioritization and need identification into one set of public engagement activities.
00:27:44
So that's where we're going to start the broader public engagement
00:27:48
So there are really four different steps in this process and while these are four different phases, that's not to minimize the amount of effort that's put into each of those.
00:28:15
Imagine that each of these is going to be really extensive.
00:28:20
So the public engagement strategy is what we talked about is that there are a number of stakeholders that are not engaged through this MPO.
00:28:29
We're one of the MPO committees that have really important perspectives on the transportation system needs.
00:28:36
And so, thinking about how this would come across to the public and how it would be expensive to sort of get some of this really important stakeholder feedback early enough in the process and how to easily inform the way the rest of the process would hold, the consultant suggested that it might be helpful to have some really early stakeholder meetings with some key community representatives that can speak from the perspective of
00:29:06
There were a couple of reasons that they suggested this.
00:29:10
One is that it helps us look at how we're creating this through different lenses and make sure that we're capturing all of these different perspectives up front and including all of those needs from the very beginning.
00:29:22
The second benefit for developing these stakeholder discussions very early in the process is that
00:29:29
We can use the involvement of some of these workers to help inform our public engagement process moving forward.
00:29:38
So they can provide that as an insight on how to engage some of the communities that they are involved with as we go through the process.
00:29:45
So there were really a couple of different benefits to doing this way.
00:29:48
It helps us get some additional perspectives embedded in the process early.
00:29:53
and then it helps us also be successful and reach out to all the populations that we want to reach through the implementation process.
00:30:02
So the idea would be that we will talk about the goals and objectives.
00:30:06
We'll have sort of a baseline of the draft rules and objectives and then we'll start scheduling some of these discussion groups with these stakeholder representatives from the community and then have a fairly open-ended discussion with them about
00:30:21
you know, what they might see as what they like or don't like or what's missing or what, you know, land doesn't land well.
00:30:29
I'll be working to develop sort of that framework for what those discussions will look like with the consultant.
00:30:37
Any questions on that report?
SPEAKER_08
00:30:38
A couple.
00:30:41
So I'm looking at the chart that you included in the packet that shows the five goals and then the groups down below.
00:30:48
It seems, and Sean please correct me if I'm wrong, but it seems like federal dollars are going to be saying, you don't get to put the environment at the bottom of the list.
00:30:58
So I guess the point of my question is, when we're asking the general public to prioritize things, I think we should be very careful about whether they have the ability to prioritize on a change they've already decided by others.
00:31:09
And so they don't just get mad.
00:31:11
Because that really makes people mad very fast, is when you ask them something and they don't pay any attention
00:31:17
It's not because we don't want to, it's because this is the way that our lives will go.
00:31:22
So I hope that that can be brought about when you go forward on this.
00:31:27
And also, I see in your groups, you pretty well sequestered everybody, but it would be helpful, I think, to have one person from each group listening in on the other.
00:31:40
so that there is a better, not necessarily that it sets out the day, but that people can hear what others are saying.
00:31:54
So that's a thought.
00:31:55
Each of us, I'm sure, would have some suggestions and proofs to add to your list, so you can send those in too.
SPEAKER_09
00:32:01
Thank you.
00:32:02
Well, yeah, maybe we can figure it out a little bit more in detail a little bit later.
00:32:07
But yeah, that, I mean, I can actually,
00:32:09
Do we want to make sure that our priorities align with, you know, other funding priorities or do we want to, you know,
00:32:33
I thought through a lot of this is that some of these goals and objectives, let me talk through this in a little bit more to tell us about, there are a lot of these
00:32:55
like evaluation systems that aren't necessarily confined to the goals and objectives.
00:32:59
So, you know, something like the environmental considerations are really being assessed throughout, you know, and dispersed throughout the goals and objectives themselves.
00:33:09
So part of this is how we're improving these and how we're prioritizing these.
00:33:13
But some of these things like the land use coordination metrics that we're using also support the environmental goals as well.
00:33:18
So that's going to be one of those things that we have to work through as well.
00:33:22
You know, how we are collecting the information in order to inform exactly how much different priorities will go through.
SPEAKER_05
00:33:29
And that's something that I hope that consultants will help us really dig through carefully.
00:33:37
Other questions on this topic?
SPEAKER_04
00:33:40
I'll just make a comment that I know that regional housing partnerships
00:33:51
The first time that I saw the value of going and getting that input now is a little different because some of it was, well, who the hell is the regional housing worker?
SPEAKER_05
00:34:00
Or somebody starts.
SPEAKER_04
00:34:02
So, you know, at this point we have somebody go, what's the MPO?
00:34:06
That can be very useful then in your next, your follow-up steps, which is what your point is.
00:34:12
So I think I appreciate that the group was kind of allowed.
00:34:18
As I had mentioned in a prior meeting, my citizen
00:34:21
My particular citizen advisory committee, the long range planning process and how it works and what it is, is just not, you know, in their brain.
00:34:31
It is a lead, it's on that team, and even it needs some involvement with CTAC.
00:34:35
So, you know, he'll help inform that particular group, but a group that's pretty engaged like that isn't even necessarily paying attention to that process, so.
00:34:47
Well, I think they would be,
00:34:51
because they're not necessarily the stakeholders on here.
00:34:54
I think there is some value in identifying specific stakeholders and getting their input, but then having to do that, of course, it worked well with regional housing partnerships.
00:35:03
So there is somewhat of a loop right here, but I think they have a lot of understanding that you described.
SPEAKER_09
00:35:08
Sure, and I will say for the CACs, or neighborhood associations, those type of things, those would be at the very beginning of the next more broadly public outreach, because I think it could also help
00:35:23
So in follow-up, actually, to tear down, like, will those conversations begin with
SPEAKER_02
00:35:39
Yeah, I think at a minimum that will have to be the very beginning of any sort of discussion that occurs and then, you know,
SPEAKER_09
00:36:00
Yeah, and then that can be more expensive.
00:36:03
And I hope that we can also build up the website to be informative but also accessible for people either not to feel like they already need to understand what a long-range transportation plan is in order to understand how a person can, why it's important and how they like them.
SPEAKER_04
00:36:19
I'd also suggest in your situation that sometimes the cross-pollination of these groups.
00:36:24
Again, why don't you break it down in this way from an organizing group and make it some way that's
00:36:30
but having access to the editors, even if there's one draft of all four, it's not necessarily an exception, but giving them the information, letting them respond could be useful there as well.
00:36:52
So the goals that we have, those are all good goals.
00:36:59
It sounds like those are sort of stats, best recommendations, as well as cross-checking or benchmarking or whatever with other fighting conditions, is that correct?
SPEAKER_09
00:37:14
Yes, and these have also been at least reviewed initially by SD-TAC and NPO-TAC, that's all.
SPEAKER_04
00:37:22
And then the groups that you're talking about reaching out to, those who like the groups,
00:37:29
I can't think of anyone else to add to that.
00:37:31
It sounds like this piece here is really trying to figure out how to engage those stakeholders in the most wholesome and complete way.
SPEAKER_05
00:37:42
Yeah.
SPEAKER_09
00:37:48
So then the next step is it will be like that broader ability engagement.
00:37:55
So we'll take the draft goals and objectives
00:37:58
will have been reviewed through their stakeholder discussion groups.
00:38:02
And then we'll assess what kind of feedback we get.
00:38:07
And then we'll have another conversation about finalizing the schools in the checklist prior to taking it out generally to the general public.
00:38:15
I was hoping that we would potentially be able to do this by our January meeting.
00:38:19
I mean, that's probably gonna be a little too ambitious.
00:38:22
So I would expect to bring that back to you while in March.
00:38:24
given that a lot of the celebration might be difficult to organize around.
00:38:30
But I'll get working on it the right way.
00:38:33
So then the next step is going to be that really big push.
00:38:37
So like I said, probably the Stacy's are going to be one of the first groups that I reach out to to start doing some of this awareness.
00:38:43
We'll also develop some general public meeting opportunities and look for other public intercept opportunities as well as conducting this survey online.
00:38:54
All of those, of course, will be vetted to the extent possible, but really we just want to make ourselves as available as we can to find the right opportunities to reach as many people as well as reaching out to the representatives that were participated in the stakeholder discussion groups to help us determine how we can engage with our communities more broadly.
00:39:19
So this will be sort of a, probably a debris of different sort of engagement opportunities.
00:39:25
And then of course, we'll just be tracking the feedback we have very carefully, regardless of what that format looks like.
00:39:33
My hope is that we would be able to be moving on this probably pretty soon after we have the goals and objectives and a final state, not necessarily for that change, but
00:39:47
but hopefully I will be able to start this probably in April or May.
SPEAKER_04
00:39:54
All right, so then the next step will be- Any questions on the phase two?
SPEAKER_08
00:40:04
Could you tell us just what you said something about when you started to start what part of January you got on March, which is- The discussion groups, the stakeholder discussion groups.
00:40:15
And after that in April comes
SPEAKER_09
00:40:17
Yeah, so what we're going to be doing during this, the space right here is we are going to be asking for feedback on how well these draft policies, or all these draft rules and objectives, how important are they relative to each other, how important is it for safety compared to equity compared to the environment, but there's several things, and not all of us start knowing how much weight to get to these different metrics that we're going to be evaluating as part of our process.
00:40:45
and then the other thing we're going to be asking is instead of going back and doing this analysis as I had originally intended to say okay these are the priorities that we've heard from you all and these are the system needs we're going to ask for feedback on the system needs for the reorganization process so what that means is that when we get to the point where we are starting to identify and prioritize the transportation system needs we're going to have two sets of data and we're going to have our quantitative analysis based on the
00:41:14
based on the weighted priorities or goals and objectives that we've heard public feedback on and then we're going to have public feedback on what the public perceives as being the needs and we're going to be able to look at both of those side by side and see where there might be some overlap and see where there might be some differences in those two approaches.
00:41:36
So we'll have two sets of data that will be overlaying together.
SPEAKER_04
00:41:44
I would just offer the CACs, just so we're clear, and I don't know the association in the city that equates to the same structures.
00:41:56
Our CACs are very defined, so it's a good jumping off point.
00:42:00
The HOAs, neighborhood, and community associations can still be an area to go after the public engagement, especially since you hear from them a lot when they're
00:42:14
But the CHC's would not replace that.
00:42:20
I want to be clear, the CHC is a very specifically value-driven commission.
00:42:27
Yeah, that's what we can just vote on.
00:42:31
It's the table.
00:42:33
That's saving grace.
SPEAKER_08
00:42:34
I was just referring to figure out.
00:42:36
I thought it was a good work week.
00:42:44
I don't want to miss that group.
SPEAKER_04
00:42:55
The CAC can be very helpful in getting two other folks to engage
00:43:14
But if you went and just said, well, we got feedback from the CDC, I wouldn't check the box, I'm just going to get you to create a public meeting.
SPEAKER_05
00:43:25
You also don't want to go out to the market.
SPEAKER_04
00:43:27
Sorry.
00:43:27
You can't have anything like that.
00:43:28
It's too much.
00:43:28
You can't work in the city, or not just the city, but the city and the county in terms of Ned's point about trying to
00:43:42
get as many as possible with neighborhood associations or equivalent of that in the county.
00:43:50
So are your neighborhood associations, those are just like a community association, are those specific entities of the city council?
00:43:59
They're not specific communities in the city council.
00:44:02
On our website, there's a list of the neighborhoods, you know, who's the chair of,
00:44:11
even by Friday Spring.
00:44:12
But it really varies across the city in terms of how engaged and how intentional.
00:44:20
And it's also like we're fighting with our car plan.
00:44:23
Some people in the neighborhood association have been there for a long time, and they'll get feedback that really is not at all aligned with the rest of how the neighborhood feels about things.
00:44:34
And so it is kind of tricky.
00:44:36
I'm assuming
00:44:39
I guess you've worked with folks in the city before, city staff, in terms of how to at least use that as a starting point to get into the neighborhoods?
SPEAKER_09
00:44:48
Yeah, I mean, I'll say yes.
00:44:50
I'll also say that that was our leader in the rest of that.
00:44:53
We just love that, a little bit different.
00:44:55
But yeah, I'll work with the city as well.
00:44:58
I think these representative groups will also be able to help us out.
00:45:03
How do we reach those populations?
00:45:05
What are the best formats out there to engage them?
00:45:11
to whoever is interested in trying to be proactive and making sure that people have the easy path and the opportunity to access, to join them.
SPEAKER_04
00:45:24
And I brought it up mainly to make sure that the CACs in the county are committees of the board, that they are very specific to geographic boundaries and not all community associations, HOAs,
00:45:44
in the county, so you want to make sure you're more inclusive than just going after our CACs.
00:45:49
The CACs, you're just going to probably have a different level of engagement probably because they are monthly, actively working with staff and supervisors and planning commissioners on a array of topics specific to that defined boundary area.
SPEAKER_05
00:46:07
Could you say a little more about the CACs?
SPEAKER_04
00:46:10
So it's a community advisory committee?
00:46:14
So it's a, and we have them set up where you have like a large, there's specific categories that your membership is made up of.
00:46:23
A school representative, a business representative, a small neighborhood, a large neighborhood.
00:46:28
And the idea is that, um, so any supervisor has their own standard on what you do, but mine keeps a watch list of items that are problematic.
00:46:39
So.
00:46:40
The Belvedere Drive, left-hand turn at Belvedere on Twilight Road, for example, is on the launch list.
00:46:48
And that's going through a smart-scale application, et cetera.
00:46:51
Bus activity in the center, because the center is within that particular CAC.
00:46:57
The Greenbrier-Hillsdale intersection is in the middle, so those objects are on the launch list.
00:47:06
that have a requirement to do a community meeting will often schedule a true CAC because it's on the calendar already so that they have to satisfy their public engagement piece.
00:47:18
They can go to the CAC, members of the public can attend.
00:47:21
If nobody does attend, they're at least going to be feedback with people from the CAC themselves.
00:47:28
And we often have staff, board and supervisor members, and planning commissioners of the liaisons too, not members of the board.
00:47:36
and obviously it's staffed by the by the county.
00:47:41
So, you know, like I know this, my particular CDC is giving presentations conversation with our review boards on entrance quarter requirements and things like that.
00:47:54
So, you know, just different presentations.
00:47:56
Mike, I didn't mean to go into that for everybody else.
00:48:01
But you're welcome to attend my second session.
00:48:06
They would love to have you there.
SPEAKER_08
00:48:13
And the president, as an example, has people from different neighborhoods.
00:48:19
There must be all sort of middle-sized down there.
00:48:22
A combination of a long, long time presidents and really just out here.
00:48:28
So it's a great place to have active debate.
SPEAKER_04
00:48:36
Happy to discuss more with someone else.
00:48:39
Thank you.
00:48:41
Appreciate that.
SPEAKER_08
00:48:42
I was just going to say, we were working early with all the city neighborhoods, which is either in the UVA context, so if I can be helpful in facilitating or clarifying for you, I'd be happy to help.
SPEAKER_05
00:48:56
Oh, thank you, Julia.
00:48:57
That was really great.
SPEAKER_02
00:49:02
Can I ask a question back to someone on the engagement?
00:49:05
with the groups that you came up with, if, I know at the end of this you're going to be asking for general consensus from the policy board, are we moving in the right direction?
00:49:13
If they think of another group that's not accountable, that can still be added.
SPEAKER_09
00:49:16
Yeah, these aren't, like, this is- Yeah, we were able to say this is it.
SPEAKER_02
00:49:21
Yeah.
00:49:21
So if you think of something like, oh, then please let us know so we can add that to this list.
00:49:26
Okay.
SPEAKER_04
00:49:28
What I would suggest for Charles was kind of an in-group
00:49:34
and definitely sort of on a progressive edge of some of these things.
00:49:39
I don't always agree with everything they say, but I think they do a pretty good job of its well-informed, thoughtful advocacy for the sorts of things that we want to do here.
00:49:53
And so I think that's
00:49:57
as opposed to just saying listen to Twitter or whatever.
00:50:00
It's a great way.
00:50:04
Listen to social media.
00:50:06
In other words, that group is a thoughtful group that I think is sort of on the leading edge of discussion about density, for example, or bucket pad and so forth.
SPEAKER_09
00:50:24
Yeah.
SPEAKER_03
00:50:24
I don't always agree with them, but they usually make me think, yeah.
SPEAKER_09
00:50:28
Well, it's sometimes important to have those people represented in the process because it's just here that early versus later in the process, right?
SPEAKER_04
00:50:35
I think most of what we want to do will be aligned with their goals, always, but it's definitely possible.
SPEAKER_08
00:50:43
And Sandy, I was just going to suggest that it's really demystified the name.
00:50:50
You might, in addition to talking about what an LRTP is, talk about what it does for them, and then there'd be some way to give concrete examples of what it yields and belong to them.
00:51:04
It might make it more, I believe for myself, I'm always trying to make that transference of what is in my head versus what's going to be useful to somebody
SPEAKER_02
00:51:17
Any other feedback on step two, Stacy?
SPEAKER_09
00:51:40
This will probably be the most substantive.
00:51:47
probably the longest, just because they want to again be available in as many ways as it makes sense.
SPEAKER_04
00:51:53
So I'm sorry, but I don't see CARS on there.
00:51:57
CARS?
SPEAKER_05
00:51:59
I don't think that can be used at all.
SPEAKER_08
00:52:06
Okay.
00:52:07
Okay.
SPEAKER_08
00:52:08
Okay.
00:52:09
Okay.
00:52:10
Okay.
00:52:10
Okay.
00:52:10
Okay.
00:52:11
Okay.
00:52:11
Okay.
SPEAKER_05
00:52:11
Okay.
00:52:14
Okay.
00:52:14
Okay.
00:52:15
Okay.
00:52:16
Okay.
00:52:16
Okay.
00:52:16
Okay.
SPEAKER_08
00:52:16
Okay.
SPEAKER_09
00:52:21
This third phase of public engagement is really going to be about reaching back out to a lot of the people that we heard from in the previous phase and saying, you know, this is kind of what we've done with the word comments and this is what it looks like our project priorities are now that we've heard what our overall goals and objective priorities should be.
00:52:46
Now we know what the system needs are.
00:52:47
This is what we've done with it.
00:52:48
Give us feedback.
00:52:50
Do you agree or disagree that this is the outcomes that should be based on the criteria?
00:52:55
Really give a chance for us all to start weighing what the outcomes are of the process that we've been working through against some of the public engagement.
00:53:06
I imagine that this is probably where we'll start getting into some more specific, regular discussions about specific projects.
00:53:14
This might be a fairly iterative process where we start looking at, you know, if we implement this sort of project, what will the outcomes be versus if we really have a difference of potential projects with our priorities.
00:53:26
But I want to build that time in to really
00:53:29
Good, give us some of what the public feedback is going to be for the final recommendation, to give us a little bit of back and forth.
00:53:37
Probably around this time is when we'll move to monthly meetings with the policy board and the NPO committees to start sort of working through more of the details of having more of an opportunity to have regular conversations about it.
00:53:55
But this is really just intended to be a sort of a check-in about what the potential opportunity could expect based on what our priorities are.
SPEAKER_05
00:54:06
Any questions on that?
SPEAKER_09
00:54:11
And in the final phase, this is just the required public hearing.
00:54:13
So again, this shouldn't be, you know, we hopefully by the time we get to this point, we've already heard the substantive feedback that we would expect to hear, and this is more of just the
00:54:24
administrative requirements.
00:54:25
But there will still be comments forward.
SPEAKER_05
00:54:29
This is when the plan will be assembled as a whole and everybody will have a chance to review it.
00:54:45
So if you wanted to, this is where you all are going.
SPEAKER_09
00:54:47
It's not been convenient at all, but these are the particular discussion groups.
00:54:52
We had a little bit of a discussion with, especially with NPO Tech, about whether it made sense to organize these around the type of stakeholder or whether it made more sense to organize these around the types of topics.
00:55:08
I think from my perspective, thinking about how organizing stakeholder discussion groups, you know, the
00:55:16
But the real idea is to have a pretty open-ended conversation.
00:55:20
So these aren't going to be necessarily, you know, I virtually remember calling them focus groups.
00:55:24
They're not really focus groups.
00:55:25
I don't have specific questions or specific, like, content I'm trying to get their feedback on.
00:55:31
Really, I wanted to see, like, what are the general perceptions of the draft rules and objectives that were put in before them?
00:55:36
What kind of feedback do they have?
00:55:38
What makes sense to them?
00:55:39
What doesn't make sense to them?
00:55:40
Those kinds of things.
00:55:42
So, of course, we'll work to structure and create a framework
00:55:45
But to me, thinking about how this would potentially be facilitated, it made a little bit more sense in organizing these by the type of representative and really going into this thing, like from a business perspective, this is what I see as being something that's missing from your goals and objectives, instead of focusing around, well, the economic development needs that are represented here are discussed in this.
00:56:15
So my hope was that each of these groups would be able to sort of speak to all of the goals and objectives through the lens that they're representing.
00:56:25
I hear what you're saying about the cross-pollination of the representatives in these discussions.
00:56:31
I think there could be an argument that maybe you don't separate them by the type of representative and maybe you just, all of them are mixed groups.
00:56:39
That could be an option where we're taking some people from each of these categories and putting them into a different group that can also be an option.
00:56:47
But my goal is really to have, to provide a forum to really have sort of a open discussion to take care of what kind of insight, what kind of feedback we get.
00:57:01
So with any of you guys, I've been reading down your suggestions so far for additional groups to include.
00:57:08
And the ones that are asterisked are ones that were added based on the recommendation by the FDA attack or CTAC.
00:57:14
So they're helping some additions and we'll see about that better than others.
00:57:18
So that's it.
SPEAKER_02
00:57:23
This is Blue Ridge Apartment Council and TDEC is now Blue Ridge Area Coalition for the Home, so that's B-R-A-E-C.
00:57:38
So there is the one.
SPEAKER_04
00:57:39
We could add them on there as well.
SPEAKER_08
00:57:42
Okay, that's just one with B-R-A-C. And a special interest might not be the right group for those anyway, but I wasn't sure where else it was.
SPEAKER_04
00:57:56
Yeah, we do have a Charlottesville area line, so we could add that as well.
00:58:11
That's a lot.
SPEAKER_09
00:58:12
Right, we don't have commitment from everybody, so this would be in the 2020 class.
00:58:18
So the reason there's four of them is that we probably want to keep the crews around, eat our stuff, and we want to make sure that there's an opportunity
00:58:26
you know, have these perspectives and probably need to plan at least for such a meeting.
00:58:31
A lot of people don't want to participate in that kind of work.
SPEAKER_04
00:58:35
You have, first, the Baptist Church.
00:58:37
Are you referring to the Church of the West's name, or the truth?
SPEAKER_09
00:58:42
Yeah, and they're not listed as a big name.
00:58:45
They're listed because they have an important neighborhood connection specifically to the Black community in Charlottesville, and they've supported like a transition there.
SPEAKER_05
00:58:54
I don't know if you have a contactor yet, but I can reach out to the city.
SPEAKER_04
00:59:22
The grounds are in, you can just go to the website and you know where Edward Edwards is.
SPEAKER_09
00:59:31
Any other feedback you have on the bird or a bird shoot?
00:59:43
Do you all have a strong sense that they should be mixed up?
SPEAKER_04
00:59:50
My own personal
00:59:51
So my personal feeling is I'm more interested in making sure we hear from as many of these folks as we can more than if they are in the same room.
00:59:59
I think it could be interesting once you hear from everybody to let them start reacting to one another.
01:00:06
Having them together would be interesting.
01:00:08
You get somebody from the business community that starts talking about equity items back and forth.
01:00:12
That can be interesting.
SPEAKER_08
01:00:18
There's a notion that whatever can be distributed and then people would be prepared and they can sort of be thinking about it.
01:00:28
But one thing that I think you mentioned, VBA and urban development, it might be sensible to have city and county reps individually because that's probably going to be more concrete as far as working from the dollar to be done in the partnerships, essentially the partnerships.
SPEAKER_09
01:00:45
Yeah, I actually did reach out to them to get their input on developing this list, but I cannot believe they would also like to be first depends on this discussion as well.
SPEAKER_05
01:01:07
If you're looking to take professionals and you've got police, you've got EMS, you've got fire departments,
SPEAKER_04
01:01:17
The Fire Department and the Rescue Squad are the ones who respond to accidents.
01:01:32
Well, Charlottesville has its own fire department, which has a headache and has a patch to it.
01:01:39
There's also the Rescue Squad, which is independent.
01:01:43
And the Fire Chief?
SPEAKER_08
01:02:06
No, under the safety professionals, I think the combined effort of police and mental health people now is, I don't know if it would be a way to have you be a someone like that in your safety profession.
SPEAKER_05
01:02:35
Alright.
01:02:35
So,
SPEAKER_09
01:02:36
Any other feedback on the discussion groups before I move on?
01:02:40
Okay.
01:02:40
All right, so the next thing that I want to review with you all then is just the draft rules and objectives.
01:02:48
And again, these are not intended to be necessarily the final versions.
01:02:52
They should be, hopefully, a jumping off point to have some really good conversations.
01:02:57
But I anticipate that these could be invested, especially once we have these stakeholder discussion groups.
01:03:03
So the first thing I want to start with is just to keep the end product that we're working to develop in mind.
01:03:09
So the required outcome of the long-range transportation plan.
01:03:13
Not to say this is the only thing that it can do, but the required outcome is that we have a list of prioritized projects that are based on what our estimated funding revenues are going to be for our projects.
01:03:26
So it's really a list of prioritized projects is the major outcome of this transportation plan that we have to work towards.
01:03:33
The goals and objectives are going to inform how we prioritize the different projects.
01:03:38
So the goals, when you think of the goals, these are our general value statements, these are the things that are important to us related to our transportation system.
01:03:45
And then the objectives are what can be measured, or what does it look like if we start achieving those goals?
01:03:51
So you think about safety as a pretty straightforward word, while we run our transportation things, some of that is safe, we want to reduce crashes.
01:03:58
So what it might look like for the objectives is that we're reducing the number of vehicle crashes and the severity of the vehicle crashes, and then we're also improving the safety and comfort of pedestrian and bicycle related instances.
01:04:13
So the objectives are the more specific and measurable outcomes that reflect what it looks like to achieve the goals.
01:04:21
And then the metrics are what we use
01:04:24
to assess how likely a project is to help us meet those goals.
01:04:29
So the metrics are really what we're doing, the quantitative process that we're using to evaluate how well a project or a need is going to help us determine how important a project should be compared to the other projects.
01:04:46
So it's possible that as we go through this public engagement, stakeholder engagement process, we might identify some objectives that
01:04:53
can't necessarily be quantitatively assessed.
01:04:56
And so if that's the case, we want to make sure that we are still considering those in the process, and we'll have to work to develop a methodology to make sure that we're incorporating those considerations into the process.
01:05:09
But our hope is that to the extent possible, we'll be able to create quantitative measures in order to help us determine whether our project is going to move us closer or farther away from our desired goals.
01:05:22
And this is consistent with the federal movement towards supporting the performance-based project for organization.
01:05:31
This really just gives us a starting point to have a conversation.
01:05:34
So this is there to help us say that based on our goals and objectives, when we run this analysis, these are where the important system needs are, and this is how well the projects that we have available to us are going to help us achieve our desired goals.
01:05:50
but that doesn't mean that we have to accept what comes out of that quantitative analysis.
01:05:55
That just gives us a place to start that conversation and then we'll have a larger conversation about whether or not that's the group that we want to move forward.
01:06:06
So again, the MPO committees as we're doing tonight are going to be vetting the goals and objectives and then we'll use the stakeholder discussion groups to help us determine whether or not there are things that we'll be seeing.
01:06:20
or other things that we should be adding to those.
01:06:24
So, in your packet, this is the list of draft goals and objectives as originally, or not quite as originally, but sort of the starting and launching out point for what this language is.
01:06:38
There were a couple of things that were changed or adjusted based on some conversations with MDOTech specifically.
01:06:45
There was more of an emphasis added to this efficiency
01:06:49
goal and objective language to better capture that we're looking not just at roadway efficiency improvements, but also looking at the functional improvements that we want to make to the multi-level system.
01:07:07
So the major goals and objectives, and again, these are based on looking at the previous Honors Transportation Plan goals and objectives,
01:07:15
benchmarking against other MPMs, Wal-Mart transportation plans, and then looking at what some of the emphasis areas have got from the local, state, and federal planning processes that have occurred since the last Wal-Mart transportation plan.
01:07:30
And so these are the five old categories that we pulled out and developed as a launching point for our discussion.
01:07:38
That includes safety, that includes the environment,
01:07:40
Equity and Accessibility, that one is really measuring access to jobs, and as Lucinda mentioned earlier, jobs also sort of can be a proxy for access to opportunities and services that are needed.
01:07:55
Then there's land use and economic development.
01:07:57
which is measuring how well different projects will help connect to other important community features.
01:08:04
So this is going to be measuring whether our project is going to support land use planning and having connections sort of these areas where there are more community assets that people want to function.
01:08:15
So things like, I don't like health care as listed, but things like grocery stores and parks and libraries and schools and things like that.
01:08:22
So to help sort of with that land use coordination piece.
01:08:25
And then the efficiency,
01:08:26
It's not measuring how reliable the system is operating.
01:08:34
Any questions or comments or additional feedback on these goals and objectives of accessibility?
SPEAKER_08
01:08:42
Yes.
01:08:43
There's a long list of projects that we've been carrying from RTP to RTP.
01:08:48
Where do those get?
01:08:50
I think the television plan was already said a lot.
01:08:55
We just haven't gotten there yet.
SPEAKER_09
01:08:56
Yeah, so we'll get to that.
01:09:00
You know, we're going to do this like draft rules and objectives process, and then we're going to prioritize where the system needs are.
01:09:06
So the first thing we do after we prioritize the system needs is we're going to look at what are the projects that have already been developed and where is the overlap between projects that are developed and where our most important safety or system needs are.
01:09:20
And that's going to help us give us a starting point for which projects we want to start with.
01:09:26
evaluating to start working towards a constraint project list.
01:09:31
It is possible that we might identify some really important system needs that we don't have any sort of pipeline projects in place for.
01:09:40
And so that will help point us towards, well, we're not ready to prioritize this project, but we really need to prioritize studying this area or developing some solutions in this area.
01:09:50
So I can see that this was probably going to be divided into two different paths.
SPEAKER_04
01:10:01
I'm just going to say on the first one, you know, I hear and appreciate the quantitative and going after the quantitative.
01:10:08
But your objective under safety, improve comfort, comfort is a very subjective call to take a thing.
01:10:14
And just because I would be comfortable with a four-way stop doesn't mean I'm going to get a warning analysis that allows me a four-way stop.
01:10:22
Because I can think out of a lot of places in my district alone where people would be more comfortable and feel more safe with things that we're not going to get.
01:10:29
because the quantitative data says no.
01:10:33
So just be careful of that.
01:10:35
If you're really going after the quantitative period, then, I mean, measuring comfort and how to, if I say that we now improve comfort when people are going, you didn't give me what I want, let's not set that, you can set that dynamic up from the get-go.
SPEAKER_08
01:10:50
And if you're focusing on safer places to ride a bicycle, you need to work, which is then
SPEAKER_04
01:10:57
But that means, yeah, I think on these objectives where it was clear that these were just suggestions to get us going through the process, we may have a whole different set or a more nuanced set.
SPEAKER_09
01:11:18
Yeah, the other thing, and this just occurred to me after the MTO tech meetings and CTAC meetings, the other thing I was thinking about is I think there might be a desire to highlight some of these things that are interwoven throughout a lot of things that maybe aren't clear, you know, just looking through those list of goals and objectives.
01:11:38
So for example, to supervise our knowledge point earlier, I think there might be some things that we want to pull out as guiding principles that are saying overarching to the extent that
01:11:47
you know, we can, we are considering how environmental considerations can be integrated with any of these other metrics or project evaluation processes that we're using.
01:12:00
Same thing with, you know, equity, if I make sense to pull this out and say, you know, there's equity, equity is being considered throughout the way all of these other measures are occurring, not just, you know, within that one line item.
01:12:13
So I don't want to start with that necessarily.
01:12:16
I want to wait till we hear feedback, but I think that that might clarify some of the issues or the potential concerns that you all are bringing up.
SPEAKER_08
01:12:29
Any other financial feedback?
SPEAKER_05
01:12:32
I guess I'll just...
SPEAKER_04
01:12:36
I think with our Department of Transportation's Secretary of Transportation,
01:12:40
I think a bigger point that maybe we're thinking about as we go through this, I see in this community, if we go out and go, hey, bike lanes, everyone's like, yes,
01:13:11
But if you put bike instead of bike, and I'm thinking of the cost increase that we may begin to when we think of our bike head bridge and the explosion of the costs there, that if folks are talking about priorities of what they would want, it's really easy to go on with this, on with this, on with this, on with this.
01:13:27
But when you start giving them a cost per mile, while they might, by going either number one, they might say, well, wait a minute, per cost given, I'd rather have
01:13:37
I would hope that's a level of conversation we could perhaps get at.
01:13:44
The transportation secretary's comments aside, the bigger point is per mile, what can you get with the competition of dollars can change how somebody thinks of what their priorities are when they're thinking about actual products they put in place.
SPEAKER_08
01:14:03
We did the trade-offs on the mission plans.
01:14:08
We talked about, you know, you want this, we'll deal with that.
01:14:12
Yeah.
SPEAKER_09
01:14:14
That might be something you can integrate into a survey and then you can see that you needed that sticker.
01:14:21
I'll think about how, you know, what's happening, how we can present that information.
SPEAKER_04
01:14:27
Well, some communities what they do is they give people their projects, like so many dots.
01:14:36
I think that's kind of going to be your point.
01:14:37
If you really want to divide head things and take all your dots, you might not want to put all your dots in one place.
SPEAKER_05
01:14:46
Right.
SPEAKER_04
01:14:48
Not that kind of a dot, just stick a dot.
01:14:53
Well, it's important, it's a super resonance point of not setting up the public to do this work.
01:14:59
Those who engage will take it seriously.
01:15:03
to have them identify their priorities, but then none of them make it in.
01:15:08
Like, well, then why didn't we bother?
01:15:09
So we have to be mindful of that so that we don't set them up to build this franchise after investing time and effort in something that we want them to be in.
01:15:20
Yeah.
01:15:21
Which I know you do.
SPEAKER_09
01:15:22
Well, that is one of our goals for the public engagement is that we can make sure that any opportunity we have to get public engagement, there's a clear way that that is incorporated in there.
SPEAKER_05
01:15:32
You know, what kind of decision are you making?
01:15:36
I don't think the consultants could be helpful in trying to figure that stuff out.
SPEAKER_08
01:15:43
I got to Mr. Rake's suggestion, similar to the evaluations for restaurants where you have only three to four dollars, it seems like that should be
01:15:54
apply these choices because in this room, some number of years ago, I don't know if it was Christmas, maybe my phone was here, there was a group that came in and basically took over the whole of that process.
01:16:08
They had hundreds of people who all came and they had not been to anything else the whole series.
01:16:14
And it was just a BS term.
01:16:18
figuring out a way to calibrate that so that you actually get a bonafide, reasonable suggestion that you can use, as opposed to just somebody's sample of this will be really helpful for you all.
01:16:29
So all of us.
SPEAKER_09
01:16:32
On the plus side of the plus side, hundreds of people wanted to participate in the large.
01:16:38
Any other feedback on this?
01:16:45
Alright, so just so you all know, our media next steps then will be to start scheduling new stakeholder discussion groups and then one of the other suggestions from the consulting team was to start with review of previous public engagement that's related to the transportation plan, see what questions have already been asked, pull in the information that is up and available and then we can make sure that we're not duplicating any previous efforts.
SPEAKER_05
01:17:19
Thank you very much.
01:17:24
Thank you all.
SPEAKER_09
01:17:28
This isn't really something that I have a very specific request for, but I just wanted to make sure that you all have a chance to see these project cost estimates prior to
01:17:47
The CTB meeting in January raised to develop the staff-recommended projects to be funded.
01:17:57
So the important thing to think about through these project process that were developed through Smartscale is that when we were talking about a lot of these projects, we were really talking about the base process.
01:18:10
because they probably mean what it is and because of the complexity of some of these projects.
01:18:15
There ended up being some pretty high contingencies of inflation costs that were added to this project, which did increase the final price tag pretty significantly.
01:18:25
For some of these projects, you know, we'll just have to wait and see what the valuation looks like, what the sport looks like, and what this looks like across the state because, you know,
01:18:36
These test estimate inflationary factors should relate to pretty consistently should be applied to all the projects.
01:18:45
So what this means is that we probably won't get very many projects funded this round and hopefully we can use whatever feedback we do get based on the outcomes to inform and refine our scripts for projects moving forward.
01:18:59
But there might also be,
01:19:01
a desire or discussion we might have about whether or not there are opportunities to get some phases or some work with these projects funded separately in order to move the project forward, specifically thinking about the Rivera River back in the pedestrian bridge.
01:19:16
One of the reasons the final project was so expensive for this one is because it's a complicated project and we don't have a lot of answers to some of the questions that, as you well discussed, prior to submitting the Smartsville application.
01:19:29
So this could be an opportunity where we want to look at whether or not there might be another federal grant opportunity that we want to pursue since we've done significant amount of work to try to get some of this design work or answer some of those questions before we apply or resubmit.
01:19:45
For another application on the smart scale so that we can reduce some of the unknown information and hopefully reduce some of those contingency costs, it could also be that we want to
01:19:57
Look at how this project can be phased out separately.
01:20:01
There are some potential options to do that.
01:20:04
But I think as we move forward, there are two things to keep in mind.
01:20:07
When we talk about our project cost estimates for any of our long-range transportation plan, we want to make sure that we're also factoring in that there's going to be some additional cost besides just the base cost estimates as we're developing our constrained budget and our list of projects.
01:20:24
And the other thing to keep in mind is that we want to make sure that we're being really
01:20:28
A couple of, so he is the engineer, R.W.
01:20:37
is the writer, but it's he and his construction
SPEAKER_04
01:21:03
So the base cost estimates were put together by you all?
SPEAKER_09
01:21:12
I think a lot of these came out of the preliminary studies or other studies initially and then were reviewed by the odds to get an improvised cost based on whatever their estimates were.
SPEAKER_04
01:21:26
The concept is fine.
SPEAKER_03
01:21:41
So we have a pretty documented system of how we go about developing these applications.
01:22:09
On some of these projects, in particular, projects that have bridges, if you don't have gold rings, we don't know what we have to build a foundation.
01:22:19
So we are applying risk to these projects based on what we know at the time.
01:22:26
And quite frankly, a whole lot of the planning studies, we don't get some of the information we need to develop good estimates without that risk associated with it.
01:22:38
The inflation, and Chuck and Stacy and Mike, correct me if I'm wrong, the inflation was applied automatically in a smart scale pool in the application process.
01:22:47
So that is done consistently across the state.
01:22:51
The contingency should also be done consistently across the state because we now have a documented process.
01:22:57
As long as those engineers aren't looking at these projects objectively to make sure that the risk is being identified, you should see numbers like this across the state.
SPEAKER_04
01:23:08
Yeah, it's interesting.
01:23:09
It's helpful.
01:23:10
Thank you.
01:23:11
So often with the work that I'm in, we will include contingencies, which are to partly cover cost escalation and inflation.
01:23:25
But it sounds like you all are, you've got contingencies based off like risks, having to do with unknown, yes,
01:23:41
We've also put another factor along with just raw inflation on top of that.
SPEAKER_03
01:23:46
Based on when the project is potentially going to add.
SPEAKER_04
01:23:50
So, I think to your point, other jurisdictions and municipalities are going to be facing the same kind of thing.
01:24:02
I think this is going to affect everyone.
SPEAKER_03
01:24:04
I think we can get better.
01:24:08
And what this shows me, honestly,
01:24:11
is that some of these projects really weren't rated.
SPEAKER_04
01:24:16
It seems to me your risk aversion is almost as much as the base project.
01:24:21
It seems to me a engineering study might have based some of that because we're going to go ahead and ask for all this money because we don't know.
SPEAKER_03
01:24:31
That's what I'm saying.
01:24:32
The project may not have been fully rated during the planning study.
01:24:37
You get certain aspects of it, but you don't get some
01:24:40
Boring sort of went a long way.
01:24:42
So maybe we should have a PDE study before we submitted the application.
01:24:46
Or maybe even added that as a part of the study to capture that information.
01:24:50
Half of a percent of your cost is unknown.
01:24:56
In our normal project development, these risks are drawn down over the life cycle of the project.
01:25:02
So as we go out and get additional borings and get additional information, estimate will go down.
01:25:09
But for all of us in this room, if you don't ask for enough to cover based on what you know, who's on the hook for that when you get awarded the money and you start to figure out that, hey, guess what?
SPEAKER_05
01:25:22
18.8 isn't enough.
SPEAKER_03
01:25:30
So this is a newer methodology that you're doing here in terms of your... And in the past, and Stacy will mean, we had this issue in the town of Orange where
01:25:39
A revenue sharing project which is a 50-50 match between the department and locality.
01:25:45
An estimate went in that was a traffic engineering study estimate.
01:25:49
It did not go through the
01:25:50
Right disciplines to review an estimate and it was just put in the portal.
01:25:54
They got the funding and we get into it and it's down here like, was it eight or nine million dollars more?
SPEAKER_06
01:26:01
Yeah, more than double.
SPEAKER_04
01:26:03
So what happens in that circumstance?
01:26:04
You cut the project or you give them money?
SPEAKER_06
01:26:06
So they were funded in the first, the first time they applied for funds, they got what they, almost all of what they requested and now they have insufficient funds to cover the whole project.
01:26:22
I think it's important to note too that the old pre-smart scale way of developing projects is that we started with a throw something up against the wall budget that wasn't expected to cover everything.
01:26:50
So the augment were funded only for PE or only maybe for PE and right of way.
01:26:55
And we did that scoping, to your point, the scoping process happened after a project was identified and funded and actually in our program.
01:27:07
And we were then able to assess what those risks were and ask for additional funds from our CTV.
01:27:16
But now this process,
01:27:18
and the ability to look at projects without some of that political subjectivity piece of it means that we're doing a lot of that scoping up front before there's even the ability to fund that.
01:27:32
I mean, where do we even get the funds to do the forms and all that?
01:27:36
We're sort of in this, you know, this Catch-22 right now.
01:27:40
How do you, how do you funnel that?
01:27:41
And that's, you know, maybe to your point, Sandy, about doing some work outside of this process to get ready.
SPEAKER_04
01:27:47
With that old process work, we could start projects.
01:27:51
It took them a while, but there was a lot of money spent on engineering projects that really got to the scope.
01:27:56
It wasn't something they really wanted to do.
SPEAKER_03
01:28:02
So we've had its own problems of front-loading too much.
01:28:04
So you've got to find a new balance.
01:28:06
But I think we're in a unique situation here.
01:28:09
Out of that cost estimating office, they've taken a tool that was developed in Culpeper District for conceptual design estimates.
01:28:17
They literally took a workbook that staff in Culpeper District developed to utilize statewide as a tool.
01:28:24
So we've got good resources.
01:28:26
We just need to continue to work closely together in looking at round six.
01:28:31
There's things that we want to do.
01:28:33
Let's start having the conversation now to make sure we can get this risk down as much as possible.
01:28:38
So when our estimates come in, everybody is confident that we've got a good estimate to move forward.
SPEAKER_04
01:28:46
What does it cost to do the boringly necessary?
01:28:50
It depends on the project.
01:28:54
It's an access.
01:28:56
Like a thousand dollars.
SPEAKER_03
01:29:00
Yeah, I mean, I would have to talk to our materials people drink.
01:29:02
I mean, it's not like we actually have people that can do that work, too.
SPEAKER_04
01:29:06
We just... You're talking about 20,000 dollars or something?
SPEAKER_03
01:29:10
Yeah.
SPEAKER_04
01:29:10
Well, it's probably other parts of the design you want to nail down, too.
SPEAKER_03
01:29:15
But I mean, in particular, I mean, I think the biggest one here is the bridge.
01:29:19
I mean, if you've got a bridge, that's a big unknown.
01:29:22
So for most of our work, we don't really need a whole lot of that.
01:29:29
Well, for that project, a whole lot of that work was done up front through some kind of design build also.
01:29:38
So they're designing it and building it all at the same time.
01:29:44
He was talking about the hot lanes coming in front of the bridge.
01:29:55
Without having the geotechnical information,
01:29:57
Some type of geotechnical information is kind of hard for us to limit that risk.
SPEAKER_06
01:30:02
And without an alignment, or without alignment here, right?
01:30:05
That's the other piece of it.
SPEAKER_08
01:30:07
We didn't have a war in the geotechnical way.
01:30:11
It was supposed to be part of that first thing.
01:30:13
But the line that I remember is that it's a type of war which means spending 100 grand at a low-level value of money in the beginning to get this information.
01:30:23
or when you find out there's a possibility of getting funded by a big one in six years and then you go back and do it then, which is what we've done in East London Bridge.
01:30:32
We went back and said, okay, we're going to design it to get a better price.
SPEAKER_04
01:30:37
That makes total sense when it comes to the bridge.
01:30:40
I'm a little surprised, though, with the district avenue roundabout.
01:30:43
This is what I'm wondering about at the theater.
01:30:48
Right.
01:30:48
So I understand 10% were engineering contingencies.
01:30:52
and then you've got 30%, 40% right of way contingency and then you've got 50% of instruction.
01:31:10
I wouldn't have thought there'd be that much risk involved in that in terms of like
01:31:19
site conditions and things like that, where I can see inflation on the bottom.
SPEAKER_03
01:31:23
Well, I think probably your construction costs in risk there is probably with management of traffic.
01:31:31
And right away, some of the access issues that you may encounter there could be part of the race.
01:31:36
With me, I haven't looked at these.
01:31:38
That's what I would guess, why there's no matter where they are.
SPEAKER_04
01:31:42
OK.
01:31:42
But that's based on some sort of methodology, the culture.
01:31:44
Yeah.
01:31:45
So it's not just someone's holding something out of there.
01:31:48
No, no, no, no.
01:31:50
But I mean, to Mr. Kreb's point earlier, what happens with these things is you don't do projects because you have the contingency, the risk that you're trying to cover with contingency, and then the potential for inflation, and unfortunately, you don't even develop projects.
01:32:09
So what happens after this?
01:32:12
In other words, this goes to somebody in the state,
SPEAKER_03
01:32:18
Yeah, I mean it's going to get stolen.
01:32:20
So I mean they had a presentation today at the CTV talking about which projects went through validation and were moving forward.
01:32:29
Out of the state there were 411 total applications with a total of $7.6 billion in requests.
01:32:39
And what is that?
01:32:40
How much money is available?
01:32:42
How much money is available?
SPEAKER_04
01:32:44
I think there's about 29 million in our district fund, so there are two different funds.
SPEAKER_09
01:32:55
There's the Cool Pepper district on the phone fund for certain types of projects.
01:33:02
None of the projects that MPO submits are eligible for, but that gives you an idea for all Pepper district that's around, like somewhere around $29 million.
SPEAKER_04
01:33:11
So the next, you mentioned the word validation.
01:33:14
Have these been validated?
01:33:15
Yes.
01:33:17
Okay.
01:33:17
So you've got your bid and then it's been submitted to someone to be validated and then we'll wait to see how the scoring turns out?
01:33:24
Yep.
01:33:25
The scoring will happen in January.
SPEAKER_09
01:33:29
Okay.
01:33:30
I believe by our next policy board meeting in January, the CTP should have already received a staff report on the recommended funding based on their analysis and we may be able to
SPEAKER_04
01:33:42
What would a community do better on costs if they did all that up front work?
01:33:50
I mean, would you not?
01:33:51
So here's the question I have to ask the room.
SPEAKER_03
01:33:55
If it's a beneficial project and it's something you want, then yes.
01:34:00
If you got to score better.
01:34:02
Well, you would have all down the risk.
01:34:04
You would have assumed some of that cost, which I've heard localities say they can do achievement in us.
01:34:10
And if you can develop a project through people cheaper than us and get to a great estimate, we'll all afford it.
01:34:18
And we'll try to fund it right away in construction.
01:34:21
And it's not a full set, you don't have to go full set of plans.
SPEAKER_04
01:34:24
Get 30%.
01:34:26
Even that just is significant.
01:34:34
Maybe you're reduced to at risk by half, you might be in a better position to get your project.
01:34:39
and certainly the cost of that up-ground work isn't going to be $4 million, as you know.
01:34:44
Yeah, but if you say like the $4.7 million or the district, excuse me, $4.7 million, you know, if we had to spend a quarter of that, what is that, $400,000 or $400,000 split in account of the city,
01:35:04
200,000, that's actually, yeah, that's right on the border.
01:35:08
Each of us would be investing like $200,000 to get a really good set of plans that could be.
01:35:16
Then maybe the net result is all of our risk goes down so we can score better.
01:35:22
That's the kind of trade off you're talking about.
01:35:25
I don't know if we have that kind of funding available.
01:35:29
But you're also buying down the cost of the project, right?
01:35:33
These are a portion of one of the phases.
01:35:35
It helps you cross benefit ratio.
01:35:39
I mean, Albemarle last round through contributed significant dollars to some of the projects.
01:35:47
I mean, it can be done.
SPEAKER_09
01:35:56
I'll also mention that, well, you know, it's unlikely that we'll get all these projects funded.
01:36:01
We were very successful over the years for us in getting a lot of sort of pipeline projects that have been sitting on our list moved forward.
01:36:09
So I think this is just really good information to help us out how to be successful in the future around.
01:36:17
But we've still been successful at leveraging the smart scale resources well in the past.
01:36:22
And this is probably a conversation that is happening
01:36:25
and many others throughout the state right now.
SPEAKER_08
01:36:28
Well, I'm personally very grateful that VDOT has taken the leadership to make sure that there is sort of fair, documented approach to rural jurisdictions, because that was some hard work.
01:36:39
We don't have anything to go through again to see how that was and what it used to be like now.
SPEAKER_05
01:36:47
So that's where it happened.
SPEAKER_04
01:36:48
So I have two basic questions.
01:36:52
So the methodology for the contingency
SPEAKER_03
01:36:57
It's risk-based, so we've got an entire manual that talks about how you calculate this risk-based, continuous based on the type of project and the risks that are associated with the project.
SPEAKER_04
01:37:09
So for right-of-way, for example, is that just a flat?
SPEAKER_03
01:37:12
I don't think it's a flat.
01:37:13
I think it's best based on the situation and then our right-of-way engineers work with to figure out what that risk should be.
SPEAKER_04
01:37:19
There's a range based on the complexity of the project.
01:37:21
So for complex, you might be at a higher contingency range
01:37:27
Some sort of project lower end, and then there are other elements that can raise or lower that number.
01:37:33
So let's say you're at 30% on a fairly separate project, you might go up or down for certain elements that are at risk.
SPEAKER_03
01:37:41
And I mean, I guess one thing too is all the documentation for these estimates have to be uploaded into the portal.
01:37:48
So that documentation that is there, that is developed, that came from these estimates is uploaded in the portal of documentation.
SPEAKER_04
01:37:56
And then I guess one last thing is the Cost Estimation Office is sampling 10% of all projects and looking at our estimates and trying to find places where we maybe missed something and we're, I think, trying to warm between the rest of the states.
01:38:15
So this manual that explains the methodology, which sounds like a very effective
SPEAKER_05
01:38:20
You don't want to read.
SPEAKER_03
01:38:28
But if you all would like to have a structure to face my last reading, we can get to that.
01:38:34
But your question is, can you see if the document can get a lick?
SPEAKER_04
01:38:37
We can get to that.
01:38:38
I mean, I've got it up now.
01:38:40
Part of trying to understand this well enough to then turn around and explain it to folks, that is what it takes for me to help try to understand it.
01:38:50
play out a real world scenario here about the base cost.
01:38:54
I mean, inflation ultimately is just base cost.
01:38:56
So I appreciate this Peterborough, I'm not here just to be able to look at these different inflation numbers.
01:39:01
But using this scenario of how it was built and accounted for, can you use the, you ran into the runaway truck issue with the Crozet railway project.
01:39:15
That sounds to me like to correct and do the,
01:39:19
That sounds to me like a contingency that would have come up.
01:39:27
So it was the contingency funds used to pay for that?
SPEAKER_03
01:39:32
There were no contingencies.
01:39:33
That was a different set of funds to address the issue that everybody agreed with.
01:39:37
It was the right thing to do.
01:39:38
But it wasn't sort of scale without change.
01:39:43
We use ASEP funds for that, wasn't it?
01:39:48
No.
01:39:48
No.
01:39:49
So the contingencies, there were no contingencies.
01:39:52
There were, but it was not enough to account for the additional work there that was needed for that.
SPEAKER_04
01:39:57
So that would be a case like for a tree here, there was a contingency number attached to it.
01:40:03
It just wasn't enough to cover the contingency to top that off.
01:40:06
Because it was not a risk that was even thought.
01:40:10
Yes.
01:40:14
So then the reverse to Mr. Craig's point is that the worst case scenario, you would hope the contingency rights end up being a lot worse.
SPEAKER_03
01:40:24
Yes, and like I indicated before, as you go through the product development process, that contingency goes down as you have more loans.
SPEAKER_04
01:40:33
There was money left over for the Billsdale connector from Hydraulic up to
01:40:41
True there.
01:40:42
Is that how that had leftover monies, that there was unused contingency funds?
SPEAKER_03
01:40:48
Potentially.
01:40:48
I mean, we do have one sort of project where we don't use contingency funds, and it just goes back into the pump.
SPEAKER_04
01:40:56
Because we had the opportunity to retain some of that, so it wouldn't just go back in, but it could still be through, and that was applied to another project.
01:41:05
That was revenue sharing, I believe.
SPEAKER_06
01:41:11
There's a six month window after the completion of a project that if that locality makes the transfer onto another revenue sharing project, the state funds, not just the localities, money with the state funds can go with it otherwise.
SPEAKER_04
01:41:27
So how do you use the
01:41:30
So these projects would be high priority projects and it would go back into a statewide pot.
SPEAKER_06
01:41:43
If it's a county project or a city project that's funded through the district grant program, it comes back into the Culpeper pot that's available for either overruns on other projects or for the next round.
SPEAKER_08
01:42:03
We need to talk especially about the previous vote to use the color of the billionaire and billionaire to put something together.
01:42:11
And every year we will be using much of our show's pedigree partly.
01:42:15
Which is a perfect example of Michael saying he should put in 1.5 billion for 15 years before he gets voted for.
01:42:21
That's right, Ned.
SPEAKER_04
01:42:25
Any questions or comments here?
01:42:28
Thank you.
01:42:31
Is there any final things actually?
01:42:38
All right.
01:42:39
Next item, number nine, our round table updates.
01:42:44
And why don't we give the panelists a round of applause.
01:42:50
Christine, any other things you want to provide?
SPEAKER_05
01:42:54
Julia, any other updates?
SPEAKER_08
01:43:01
Actually a couple of pages.
01:43:05
So, some projects that we've been working on that we submitted or we can't do communities grant application through FHWA recently and you can find out in January or February that's done from it.
01:43:19
We are doing some conceptual design for our project as well.
01:43:24
We've been interested in those three years laying projects to explore transitioning that roadway to either one way south to unpack it only or closing it to vehicles entirely.
01:43:36
We have two concept ideas from our consultant and we're going to be taking those to the FSCA team in January.
01:43:45
And then I can just briefly speak about our talk plan.
01:43:48
We're wrapping up phase one, and we're moving to phase two, and there's going to be a presentation to the board at the end of the day, right?
SPEAKER_04
01:43:59
Thank you.
01:44:01
Gentlemen, any updates?
01:44:04
I don't have anything to say, but I think the thing is that updated is probably just me.
01:44:08
I'm still chambers on the defense creation plan.
01:44:15
I have not heard any issues thus far, so that is a good thing.
SPEAKER_03
01:44:44
Still working on the truck arrest where I'm trying to get that thing finalized so that we can start to work on that.
01:44:50
The right-of-way was going well, so that's a good thing.
01:44:53
We'll probably have that project finished up this spring because the pages are going to stop us from completing those plans.
01:45:01
On the DDI, it's not in the final configuration.
01:45:05
So I know we've had issues with traffic through there coming through laptops.
01:45:10
try to adjust the timing as much as possible, actually, for some drones to try to help us look at it.
01:45:16
Where the traffic is to help us time the signal a little bit better.
01:45:19
Contractors hoping to try to get there and pave this week to try to get the additional lanes open to be at full capacity based on the weather it was looking like.
01:45:27
It does not look like that it's going to happen.
01:45:30
So as soon as we can find a window to pave at night, we will do that to try to get those lanes back open so things can flow through that area a little bit better.
01:45:39
And then last thing, the hydraulic bundle.
01:45:44
They're proprietary meetings for the short list of firms on this Thursday.
01:45:48
Open to work today to have that contract awarded so that we can start to work on that.
SPEAKER_08
01:45:56
The short list is, I love her hybrid version of where it comes.
SPEAKER_04
01:46:13
I haven't worked with that SparkScout if we talk about that enough.
01:46:30
Any updates over there?
01:46:34
Mr. Williams, Darnell, any updates today?
SPEAKER_08
01:46:36
No updates today.
SPEAKER_04
01:46:39
Thank you, sir.
01:46:41
Mr. Conroy, anything from T-TEC?
SPEAKER_05
01:46:44
No, nothing from CTAC.
SPEAKER_04
01:46:47
Thank you, sir.
01:46:52
What is on Mr. Hudson?
01:46:53
Well, Mr. Hudson, I didn't see his name.
01:46:55
Any updates, Mr. Hudson?
SPEAKER_00
01:46:57
Sure, I have a couple of quick updates.
01:47:00
First off is the DRPT grant season, open December 1st, and will close on February 1st.
01:47:07
This includes our capital, operating, technical assistance, demo project, and intern slash workforce programs.
01:47:15
Our TAM plan is available online through our DRPT's open data portal.
01:47:22
All MPOs should have received revised transit asset management performance targets for inclusion in the TIP and STIP.
01:47:33
Well, not STIP, excuse me.
01:47:35
On the tip front, MPOs should be working closely with transit agencies, in this case CAT and Jaunt, on identifying transit projects for the new updated tips.
01:47:51
If there are questions about the tips, please reach out to me in this case if it's a transit project.
01:47:59
And that is all I have.
SPEAKER_05
01:48:13
I think the room has been muted.
01:48:15
We can't hear you guys online.
SPEAKER_04
01:48:27
Yes.
01:48:29
I do appreciate the update from the 124 and the construction going on over there.
01:48:52
It's not happening right now.
01:48:55
In the county, we are, as I imagine, this is the same city here.
01:49:00
We've got the budget time.
01:49:01
See, I know the front there is operational and all that, so we have a joint meeting with our school board tomorrow, so I know we'll all go away for the holiday, but come back in the midst of a budget time.
01:49:15
Are there any updates, Andy, as well?
01:49:19
Any others?
SPEAKER_05
01:49:28
Any additional comments or takers for public comment?
SPEAKER_04
01:49:36
Alright, we will close matters for the public.
01:49:40
Our next meeting date will be January 25th, 2023.
01:49:44
I hope you all enjoy a wonderful holiday and a happy new year and I will take motion to adjourn.
01:49:58
All right, all in favor say aye.
01:50:01
Aye.
01:50:01
Opposed?
01:50:02
Very good.
01:50:03
Nice job.
01:50:04
Thank you.
01:50:05
Ned, what was that date?
01:50:08
The date?
01:50:09
25th, January 25th.