Citizens Transportation Advisory Committee (2013-2026) Meeting   11/20/2024

Attachments
  • 00 Agenda CAMPO CTAC Meeting November 20 2024.pdf
  • 3b September 18, 2024 Meeting Minutes.pdf
  • 4 SS4A Presentation - CTAC - 11.20.2024.pdf
  • 5a VDOT 1 SSVI 5th Street DDI Cost Estimate 10-23-2024.pdf
  • 5b VDOT 2 MPO Policy Board 10-23-24 - Ivy Corridor Update.pdf
  • 5c VDOT 3 STARS and Pipeline Studies - 10-23-2024.pdf
  • CAMPO CTAC Full Meeting Packet November 20, 2024.pdf
    • Gorjan GjorgjievskiStaff Member
    • 00:00:02
      Myra Spade is currently being recorded.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:00:04
      OK. Well, that will start with matters from the public.
    • Sarah SimbaStaff Member
    • 00:00:09
      Lee, can I go ahead and just call first?
    • 00:00:13
      Oh, go?
    • 00:00:15
      Yeah, go ahead.
    • 00:00:18
      Lee Kondor?
    • 00:00:19
      Yes.
    • 00:00:20
      Donna Chen?
    • 00:00:22
      Supposed to be here.
    • 00:00:23
      She's not here yet.
    • 00:00:24
      Stuart Gardner?
    • 00:00:25
      Yeah.
    • 00:00:27
      Jose Hernandez?
    • SPEAKER_00
    • 00:00:31
      There's a Jose Gomez, that would be me.
    • Sarah SimbaStaff Member
    • 00:00:34
      Jose Gomez, sorry.
    • SPEAKER_00
    • 00:00:36
      That's okay.
    • Sarah SimbaStaff Member
    • 00:00:37
      My hair got dizzy.
    • 00:00:40
      Patrick Healy.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:00:42
      Here.
    • Sarah SimbaStaff Member
    • 00:00:44
      Ethan Heil.
    • 00:00:46
      Heil.
    • 00:00:47
      Sara Medley, she had a conflict, she couldn't come.
    • 00:00:51
      Marty Meth.
    • SPEAKER_09
    • 00:00:54
      Here.
    • Sarah SimbaStaff Member
    • 00:00:55
      Oh, okay.
    • SPEAKER_09
    • 00:00:57
      On Zoom.
    • Sarah SimbaStaff Member
    • 00:00:58
      Nathan Moore.
    • 00:01:02
      Chapman Munn, Betty is replaced by Danny, I think.
    • 00:01:10
      Greg Weaver, Sandy is here, and Chuck Charles.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:01:23
      Yes, I'm here.
    • Sarah SimbaStaff Member
    • 00:01:32
      Now you're welcome to go ahead, Lee.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:01:37
      Yeah, since we don't have a quorum present, we can't include the people online as building members.
    • 00:01:45
      That's right.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:01:47
      That's all right.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:01:49
      So, matters from the public, it's all right.
    • 00:01:58
      Don't see anybody online.
    • 00:02:02
      Speak up now, forever hold your peace, okay.
    • 00:02:07
      All right.
    • 00:02:11
      Well, I guess we can review and accept the agenda.
    • 00:02:15
      I hope it doesn't take a vote, but it looks fine.
    • 00:02:19
      However, we can't approve the minutes from the September 18th meeting, but there was a correction that was noted.
    • 00:02:31
      Chuck wasn't included, so he already took care of that, or somebody took care of that.
    • Sarah SimbaStaff Member
    • 00:02:37
      Yes, said it, yeah.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:02:40
      All right.
    • 00:02:43
      So I guess we'll move on to new business, safe streets for all.
    • 00:02:48
      Sarah, you're up.
    • Sarah SimbaStaff Member
    • 00:02:50
      Yeah, it's going to be well again.
    • 00:02:52
      I'm going to share my screen.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:02:58
      I forgot which one is which.
    • Sarah SimbaStaff Member
    • 00:03:01
      Is that this one right?
    • Gorjan GjorgjievskiStaff Member
    • 00:03:17
      Alright, thank you.
    • 00:03:18
      My name is Gorjan Gjorgjievski, Regional Planner of TJPDC.
    • 00:03:23
      Today I'm going to be presenting about the Move Safely Blue Ridge, which is the region's plan to reduce roadway fatalities and serious injuries for all road users, no matter their choice of transportation.
    • 00:03:36
      I have to emphasize this is a regional project, so it covers all the localities within the TJPDC region, which is
    • 00:03:46
      Floanna Green, Louisa Nelson, as well as Albemarle Charlottesville.
    • 00:03:52
      Next slide please.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:03:59
      Click on the packet.
    • Gorjan GjorgjievskiStaff Member
    • 00:04:15
      This grant comes from the Safe Streets and Roads for All program, which is a federal program and supports the United States Department of Transportation National Roadway Strategy.
    • 00:04:29
      The long-term goal of this approach is zero fatalities and serious injuries using that safe system approach.
    • 00:04:41
      Next slide, please.
    • 00:04:43
      So for the project that we're doing, we're collecting data for the comprehensive safety action plan, which the data comes from VDOT and it's based on 13 emphasis areas.
    • 00:04:58
      Examples include roadway departure, speeding, impaired driving, not wearing a seatbelt, and then two new emphasis areas that were added to the project, work zones and farm vehicles.
    • 00:05:14
      Next slide, please.
    • 00:05:17
      It's important to note that these emphasis areas are the factors contributing to roadway fatalities and serious injuries, and they correspond with each other.
    • 00:05:29
      So what that means is that if someone was under the influence and was not wearing a seat belt, but also had a roadway departure, they will fall in all three categories.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:05:42
      So some are more than counted once.
    • Gorjan GjorgjievskiStaff Member
    • 00:05:45
      Exactly.
    • 00:05:45
      Next slide, please.
    • 00:05:53
      A safety action plan includes key components which were identified at the beginning of the project.
    • 00:06:02
      This includes strong leadership,
    • 00:06:04
      and oversight group for development and monitoring, thorough safety data analysis, active public stakeholders engagement and inclusive planning process.
    • 00:06:18
      But we also prioritize evaluating processes and policies, identifying key projects and strategies and maintaining ongoing monitoring and reporting to ensure continuous improvement.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:06:32
      Next slide please.
    • Gorjan GjorgjievskiStaff Member
    • 00:06:34
      A little bit about the funding for this project.
    • 00:06:37
      So the total for this project is a little bit over $1 million from which $857,000 come from the federal grant or FHWA, Federal Administration to around $214,000 come from the localities.
    • 00:07:00
      and the comprehensive structure supports various regional components assessed on per capita basis.
    • 00:07:10
      That ensures equitable distribution aligned with each jurisdiction scope of work.
    • 00:07:17
      Just to look at the specific components for Albemarle and Charlottesville, for Albemarle is 84,000 from which 33
    • 00:07:27
      are for public engagement where Charlottesville 205,000 from which 121 is estimated for a charrette and project design demo as well as public engagement.
    • 00:07:42
      I also added the other localities components here just for your reference.
    • 00:07:52
      The solutions for this safety action plan are integrated across the 4Es safety system approach.
    • 00:08:01
      That is designing safer facilities through engineering, building a culture of traffic safety through education, reinforcing safe travel behaviors through enforcement and saving lives through emergency response.
    • 00:08:20
      The process is divided into four steps.
    • 00:08:24
      The first step is identifying issues and opportunities.
    • 00:08:28
      So during the spring of this year, we completed this step through extensive public engagement.
    • 00:08:34
      We conducted a survey that allowed residents of the jurisdiction to share their specific transportation concerns.
    • 00:08:43
      Step two consists of gathering data from site visits which we conducted in each jurisdiction and that was completed in September of this year so just recently and now we're asking the public for feedback once more but I will talk about this a little more in the next slides
    • 00:09:09
      Step three will consist of development of targeted safety strategies based on the identified priorities in collaboration with jurisdictions.
    • 00:09:22
      So these strategies will serve as the foundation for the final step, which is the development of a comprehensive safety action plan, which will outline specific actions and measures to enhance transportation safety in the region.
    • 00:09:39
      Next slide, please.
    • 00:09:43
      So in round one of engagement, in addition to the survey, we held 16-person public meetings, one in each jurisdiction, one virtual meeting for all jurisdictions.
    • 00:09:56
      We organized 21 pop-up events across the jurisdictions.
    • 00:10:00
      and as well as the site visits where we observed and collected crash data from various locations within the specific jurisdictions and that data was based on the Heinjuri network.
    • 00:10:15
      Next slide please.
    • 00:10:17
      Just a little bit about the survey results.
    • 00:10:20
      that we had over 300 plus responses.
    • 00:10:25
      We learned that the driver behavior is a concern.
    • 00:10:30
      I have to say this overlaps with what was heard at the Governor's Transportation Conference in Norfolk by various experts that they agreed driver behavior is one of the biggest concerns for safety in transportation.
    • 00:10:49
      I'm not gonna go through the rest of the survey data, but it is included for your reference in this presentation.
    • 00:10:59
      You can just go to the next slide.
    • 00:11:02
      So we have survey results, overviews, response highlights for Albemarle and Charlottesville as well.
    • 00:11:10
      Keep going to one more slide, one more.
    • 00:11:18
      Yeah, thank you.
    • 00:11:21
      So I mentioned in September, we conducted six site visits, one per jurisdiction.
    • 00:11:27
      We observed multiple locations in the jurisdiction where we gathered crash data from the Heinz German network.
    • 00:11:35
      We took that data to identify potential solutions based on those findings, and we currently launched
    • 00:11:44
      Round 2 of engagement where we're asking the public for their opinion once more.
    • 00:11:50
      The key here is what are the types of projects they think will help improve roadway safety in the community.
    • 00:12:00
      This is again done through pop-up events that are conducted within the jurisdictions and we're doing them from November 11 to November 23rd and the feedback is also gathered through a survey but the survey is open until December 6th.
    • 00:12:20
      I highly encourage each and every one of you to take time and fill out the survey, but also share that survey with anybody that you know that lives or commutes, not just in Charlottesville or Albemarle, but within the TJPDC region.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:12:40
      Next slide, please.
    • 00:12:43
      Give me the URL of that survey link.
    • Gorjan GjorgjievskiStaff Member
    • 00:12:48
      Yes, what I can do is I can post it in the chat.
    • Sarah SimbaStaff Member
    • 00:12:55
      Would you be able to send it out?
    • 00:12:57
      It's attached to the document too.
    • Gorjan GjorgjievskiStaff Member
    • 00:12:59
      Yeah, we can definitely send it out.
    • Sarah SimbaStaff Member
    • 00:13:01
      But it is attached to the PDF.
    • 00:13:06
      Right, that one is correct, yeah.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:13:07
      If you don't mind, it could be helpful to, if we're going to share it with folks on the networks, having something that's like packaged, like a blurb or something.
    • Gorjan GjorgjievskiStaff Member
    • 00:13:15
      Sure, we had a social media post from TJPDC, so perhaps that could be the... Sure, yeah, thank you.
    • 00:13:24
      Awesome, thank you.
    • 00:13:27
      All right, so a little bit about the technical stuff of the project.
    • 00:13:33
      So the hindering network highlights roadway segments with disproportionately high number of severe crashes.
    • 00:13:43
      For example, in the region, 70% of fatal crashes and serious injuries occur on just 6% of the roadway mileage.
    • 00:13:55
      This analysis breaks roadway segments into 0.1 mile segments.
    • 00:14:01
      but also uses a sliding window analysis that evaluates 0.5 mile segments that meet minimum crash criteria.
    • 00:14:11
      This jurisdiction had a customized approach to identify this high injury segment.
    • 00:14:18
      So in the next slides, I'm going to talk about specifically about Albemarle and Charlottesville.
    • 00:14:28
      But before that, I want to talk about what the terms mean.
    • 00:14:33
      So the terms that you see on the screen is 2K as well.
    • 00:14:37
      It's a little bit... You can't really see it well, but the terms are 2K, 3K, and then there's 2KAB and 3KAB.
    • 00:14:54
      What those terms mean is they refer to different criteria used to classify the severity of the crash in the Heinzier network.
    • 00:15:05
      What they generally mean is 2K crashes includes K, fatal, and A, severe injury crash that involves at least two or more crashes within a mild segment.
    • 00:15:20
      This represents broader and more inclusive network where more crashes are counted.
    • 00:15:27
      3KA includes K fatal, a severe injury crash, but limits the focus to three or more crashes within a segment.
    • 00:15:37
      This represents a more narrowly defined network focusing on areas with a higher concentration of severe crashes.
    • 00:15:46
      The same goes for 2KAB crashes.
    • 00:15:50
      and 3KAB crashes, but in this case, the B represents minor injuries.
    • 00:15:57
      At the end of all this, 3KA is a smaller subset of high injury areas, including more precise locations with very frequent and severe crashes, while 2KA is a broader set of location with slightly less stringent crash frequency criteria.
    • 00:16:20
      Next slide, please.
    • 00:16:24
      So we can look at the example for Albemarle County, which 3KA covers 3% of the roadway but accounts for 47% of the crashes, while 2KA covers 7% of the roadway but accounts for 72% of the crashes.
    • 00:16:50
      Next slide, please.
    • 00:16:53
      Charlottesville is a little bit different.
    • 00:16:55
      It does not have a 3KA.
    • 00:16:57
      It has 2K, but also has 3KAB.
    • 00:17:01
      In this case, 14%, for 2K, 14% of the road accounts for 77% of the crashes, while 3KAB covers 17% of the road, but contributes to 84% of the crashes.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:17:18
      I was not part of those meetings but Sarah was.
    • Gorjan GjorgjievskiStaff Member
    • 00:17:31
      Those meetings were done with each jurisdiction separately where both TJPDC, our consultant, and jurisdictions agreed on which criteria they would use.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:17:45
      So in the Charlottesville case, is there any overlap for segments that are both 2KA and 3KAB?
    • 00:17:53
      Because it seems like there could be segments that qualify for both of these categories, right?
    • 00:17:58
      They're not mutually exclusive.
    • Gorjan GjorgjievskiStaff Member
    • 00:18:01
      Yeah, they're not exclusive.
    • 00:18:03
      They do overlap.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:18:06
      But then what color would they have encoded?
    • 00:18:08
      You know what I'm saying?
    • Gorjan GjorgjievskiStaff Member
    • 00:18:10
      Yeah, that is a good question.
    • 00:18:11
      Unfortunately, I don't have the answer at the moment, but I can definitely follow up on that.
    • Sandy ShackelfordStaff Member
    • 00:18:19
      Well, all three KAD crashes would be two KAD crashes.
    • 00:18:24
      Well, not that I don't think that would be, so this is not a very informative thought.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:18:30
      Yeah, you're right.
    • 00:18:32
      I mean, like we're going to have to report metrics, like percentage crashes, it seems like, but this is not like a good capture of that because it's like
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:18:42
      If it didn't have the B, it would.
    • Sandy ShackelfordStaff Member
    • 00:18:44
      Yeah, that's right.
    • Gorjan GjorgjievskiStaff Member
    • 00:18:52
      Well, yeah, I'll follow up on that question a little bit in more details.
    • 00:19:02
      Were there any other questions in the meantime?
    • Sandy ShackelfordStaff Member
    • 00:19:05
      Well, I have a lot of the same ones, too, because some of the segments on Drupal, I'll have the only B, like if they had only B.
    • Gorjan GjorgjievskiStaff Member
    • 00:19:11
      In the site visits that we did, a lot of the data that happened or a lot of the data that we collected overlapped with each other.
    • 00:19:26
      For example, at the same location there was multiple 2KAs or 3KAs.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:19:34
      How is this used in practice?
    • 00:19:36
      It sounds like Albemarle at some point decided 3KA was a more informative metric and Charlottesville stakeholders decided to add the B. I guess I'm just curious, how do you turn this into action planning?
    • Sarah SimbaStaff Member
    • 00:19:54
      It would be good for them to say how they end up there.
    • 00:19:59
      Did you hear what I said?
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:20:01
      Yeah, exactly.
    • 00:20:02
      I would agree it would be helpful because maybe in the context of Charlottesville minor injuries are more indicative of, I don't know, is this informing where you do infrastructure investment and things like that?
    • 00:20:14
      Just because I guess we tend to have lower speeds.
    • Gorjan GjorgjievskiStaff Member
    • 00:20:17
      Thank you.
    • 00:20:23
      Yeah, I can definitely follow up on those questions.
    • 00:20:27
      I don't have that information right now We can move on to the next slide
    • 00:20:39
      So just a brief overview of the plan development and engagement that we're using.
    • 00:20:44
      We have four segments of plan development in which we're collecting and analyzing data, conducting site visits, prioritize strategies and projects, and draft and revise the safety action plan.
    • 00:21:01
      So these four segments are supported by three rounds of public engagement, where we ask feedback from various groups of people, like the public and the jurisdictional leadership.
    • 00:21:19
      Next slide.
    • 00:21:21
      That's all I had on the presentation.
    • 00:21:23
      I'll be happy to take any additional questions.
    • SPEAKER_07
    • 00:21:32
      On one of the earlier slides, it mentions, I'm just going to point out Charlottesville, because that's what I'm most familiar with, 121,000 estimated for Charette and project of design demonstration.
    • 00:21:42
      I'm curious about the project design demonstration.
    • Gorjan GjorgjievskiStaff Member
    • 00:21:45
      So that is a great question.
    • 00:21:47
      That is ongoing currently, but I believe there hasn't been any decision made in how that's going to look like.
    • 00:21:56
      But I think we are in the final steps of
    • 00:22:01
      discussing that.
    • 00:22:03
      I'll be happy to.
    • SPEAKER_07
    • 00:22:05
      So this is the idea.
    • 00:22:07
      It's going to be like an on the ground pilot to try something out and see how it goes.
    • Gorjan GjorgjievskiStaff Member
    • 00:22:15
      Yes.
    • 00:22:17
      I had the feeling that it's going to be more like a public meeting rather than like a pilot on the ground.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:22:29
      Also on that slide,
    • 00:22:35
      Kappeter, or proportionality in the assessments.
    • 00:22:40
      And Charlottesville was way ahead in money spent.
    • 00:22:45
      So was that just a choice by city council?
    • 00:22:49
      Or because the population of Charlottesville was, I don't think, right in their bulk.
    • 00:22:56
      And yet the city had substantially more money on the table.
    • Gorjan GjorgjievskiStaff Member
    • 00:23:03
      That is a good question.
    • 00:23:07
      But I believe Sandy might have a better idea on how to... Are you talking about this slide right there where how much funding was contributed?
    • Sandy ShackelfordStaff Member
    • 00:23:18
      Yeah.
    • 00:23:19
      Yeah, that was a choice.
    • 00:23:19
      The city asked for specific components.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:23:22
      The city wants, for instance, this design program.
    • 00:23:27
      So it's okay.
    • Sandy ShackelfordStaff Member
    • 00:23:27
      So they put extra funding towards that.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:23:30
      Yeah.
    • 00:23:31
      So they would...
    • 00:23:34
      To meet criteria, they would have contributed a good bit less than they had.
    • 00:23:39
      But they, since they wanted these other things, they're paying for it.
    • Gorjan GjorgjievskiStaff Member
    • 00:23:47
      Thank you.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:23:49
      How much of this is driven, this framework is driven by like the funding?
    • 00:23:53
      You said this like to be, to qualify for
    • Gorjan GjorgjievskiStaff Member
    • 00:23:56
      So the goal for this is in the future to give opportunity for implementation grants based on the comprehensive safety action plan because at the end of this plan there is certain deadlines that we have to meet by the end of February we have to have the draft safety action plan completed
    • 00:24:19
      By the end of April, these have to be reviewed and finalized.
    • 00:24:24
      And then by June 30th, it has to be approved by the boards.
    • 00:24:29
      And then by September, end of September, we have to submit the final action plan to FHWA.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:24:37
      And a follow-up question, if you don't mind.
    • 00:24:39
      Sure.
    • 00:24:40
      With that in mind, how much does then this effort overlap with parallel efforts in each locality?
    • 00:24:48
      Or is this basically what carries the water for broader efforts to do Vision Zero type efforts and pedestrian safety and stuff like that?
    • 00:24:58
      Are those in parallel?
    • 00:25:00
      Is it like a Venn diagram?
    • 00:25:02
      Or does the other thing not happen?
    • Gorjan GjorgjievskiStaff Member
    • 00:25:05
      Well, this I think will focus less on like doing large projects that will require a lot of resources and time, but rather than implementing short, not short term, but long-term smaller solutions, for example, in some cases doing rumble strips or stuff like that.
    • Sandy ShackelfordStaff Member
    • 00:25:28
      That said, there is opportunity to carry the findings from this study into other efforts.
    • 00:25:33
      But like Gorjan said, the level of project design that's going to be available during this painting process is not going to be sufficient to apply for a lot of the VDOT grants.
    • 00:25:44
      But it could help identify priority locations where maybe a bigger study or effort might be needed.
    • 00:25:51
      So the goal would be not to repeat efforts, but to find how they dovetail together.
    • Gorjan GjorgjievskiStaff Member
    • 00:25:58
      Yeah, I think it's important for all the stakeholders to have that discussion so we can focus on different efforts so we don't have like repetition on work in time.
    • Sarah SimbaStaff Member
    • 00:26:14
      And that's how during the like high entry networks determination like city staff, VDOT, they have to talk and see
    • 00:26:25
      Why will this location be part of the network?
    • 00:26:28
      So it's to avoid the overlapping all the time.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:26:36
      Is there any plan to consider or to normalize the data for the accidents based on vehicle miles?
    • 00:26:50
      Because, you know, just looking at the map, I mean, obviously,
    • 00:26:54
      2974 and Route 20 have the most accidents, but they also have the most traffic.
    • 00:27:01
      So if you take accidents per vehicle mile, then maybe there are other trouble spots that this analysis might overlook.
    • 00:27:14
      In other words, if, well, I guess if you're trying to reduce absolute traffic
    • 00:27:23
      Fatalities and Serious Accidents focus on the most used roads but that's where the attention is going to be at least for the county is going to be on 29, 40, and 250 and 64.
    • Gorjan GjorgjievskiStaff Member
    • 00:27:43
      I'm in a lot of the
    • 00:27:45
      survey responses that we had in round one focused specifically on those roads by the by the public.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:27:54
      Well, that's because that's where people go.
    • Gorjan GjorgjievskiStaff Member
    • 00:27:57
      Yeah.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:27:58
      OK. All right.
    • Sandy ShackelfordStaff Member
    • 00:28:00
      Do you know, Corey, what do you think of the methodology of the overall number of crashes or the crash rate, you know?
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:28:06
      I don't know either of them.
    • 00:28:11
      I know.
    • 00:28:11
      It looks like it's crashes per mile of roadway for some people who want to travel.
    • Sarah SimbaStaff Member
    • 00:28:15
      Right.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:28:15
      Yeah.
    • 00:28:18
      Could you go back to whatever is the third slide, just the categories?
    • Gorjan GjorgjievskiStaff Member
    • 00:28:21
      The emphasis area?
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:28:28
      Here?
    • 00:28:29
      Yeah, just for a second, just curious.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:28:35
      I had a question about this too.
    • 00:28:37
      What are these used for?
    • 00:28:38
      Is it tracking?
    • Gorjan GjorgjievskiStaff Member
    • 00:28:43
      Yeah, so these areas were used for gathering data.
    • 00:28:50
      So we took these areas from 2018 to 2022, the data that VDOT had and to use it in this plan, because I don't think the data for 2023 was available at that time.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:29:05
      So you have the level of information in the database to basically inform whether
    • 00:29:12
      There was an aging road user.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:29:15
      These come from police crash reports.
    • 00:29:17
      All of the detail is collected on the vehicle and the occupants in that crash report.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:29:23
      Does that mean, in that particular case, where it's noted, it could inform the data, but there could be an omission?
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:29:30
      That's correct.
    • 00:29:32
      And there could also be, like not necessarily here, but so actually the injury severity is rated
    • 00:29:38
      at the time by whoever's taking the report.
    • 00:29:41
      So some things are obvious.
    • 00:29:42
      Someone passes away that's obvious, but the delineation between minor injury and major injury is sometimes like a judgment call.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:29:50
      It's also tough because intersections looks like the biggest for Albemarle, but it could be because someone was intoxicated and young.
    • 00:30:03
      Like, I don't see the full story necessarily.
    • 00:30:09
      It's difficult to try to measure what the leading audience is.
    • Gorjan GjorgjievskiStaff Member
    • 00:30:15
      Yeah, especially, as I said earlier, somebody that had fallen into three categories will be counted here.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:30:26
      It's interesting that some of these are modal.
    • 00:30:28
      A lot of them are behavioral.
    • 00:30:31
      Intersections is maybe only that's inside the infrastructure.
    • 00:30:38
      because it's on my mind.
    • 00:30:40
      One thing I think would be interesting would be something about level of infrastructure.
    • 00:30:44
      So particularly if you look at an overlay of bicyclists and pedestrians, like what is the level of infrastructure that was in place?
    • 00:30:54
      Like was there a bike lane?
    • 00:30:55
      Was there a sidewalk?
    • 00:31:00
      Again, if this is used to make informed decisions.
    • 00:31:04
      where that's an overlap to me again with screen like this is an area of need.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:31:11
      So I think all of this in the VDOT database is GIS coded.
    • 00:31:14
      So you could go in and say, here are all the bicyclist crashes.
    • 00:31:18
      If there's a cluster of them somewhere, you can go in and look at the type of infrastructure that is provided.
    • 00:31:22
      It's obviously not the purpose of this traffic, but I think that information is totally available.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:31:27
      That's what I was wondering.
    • 00:31:28
      Yeah.
    • 00:31:30
      And I mean, it's kind of all in the front of our minds like right now, right in the past month.
    • 00:31:34
      So it's kind of hard not to think about.
    • Sandy ShackelfordStaff Member
    • 00:31:36
      That's also something that would definitely be done when you're doing like a corridor study or another session study to do a safety improvement.
    • 00:31:43
      I don't know that anybody's quantifying it on a couple of inches.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:31:48
      Quite interesting that roadway departures are such a huge thing, especially in the county, in Alomar County.
    • 00:31:58
      I mean, that's a lot of
    • 00:32:00
      people running off the road.
    • 00:32:04
      I mean, that's clearly driver error 99% of the time.
    • Gorjan GjorgjievskiStaff Member
    • 00:32:09
      Yeah, I mean, I have to say for that one, there's also like running into animals included there, open departures, most of them will be because of deer probably.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:32:22
      Well, it's severe, but rather lice here.
    • 00:32:25
      Yeah, exactly.
    • 00:32:31
      almost half again as much as intersections is surprising.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:32:37
      And the thing that's missing here is distracted driving.
    • 00:32:41
      I can't remember the last time I didn't see someone texting while driving.
    • 00:32:46
      I don't know how you, you know.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:32:48
      Well, I could certainly run it, but I'll throw away the carcass too, yeah.
    • Sandy ShackelfordStaff Member
    • 00:32:52
      That's a subcategory that we're hearing in general.
    • 00:32:57
      Yeah, yeah.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:32:58
      That's the category.
    • 00:32:59
      It is a form of impairment.
    • Sandy ShackelfordStaff Member
    • 00:33:01
      I'm pretty sure that's where it's being tortured.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:33:04
      But again, like the police would have had to observe that habit versus cutting it off with their cash.
    • 00:33:11
      Yeah.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:33:15
      All right.
    • 00:33:16
      Well, thank you.
    • Gorjan GjorgjievskiStaff Member
    • 00:33:19
      Sorry, I was not able to answer all questions right now.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:33:24
      All right.
    • 00:33:24
      I guess Chuck, Sandy, you're up.
    • Sandy ShackelfordStaff Member
    • 00:33:28
      I love the bird, Chuck.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:33:42
      Go ahead Chuck, we see your screen.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:33:53
      Okay, I've got three different presentations.
    • 00:33:55
      The first one's on
    • 00:33:58
      This is STARS, hold on, let me see.
    • 00:34:01
      I'll do this one first.
    • 00:34:03
      Basically we've got STARS studies coming up and pipeline studies.
    • 00:34:07
      The STARS studies are just kicking off now.
    • 00:34:10
      The pipeline studies, we're still working on getting them approved.
    • 00:34:14
      So those will be coming probably starting in the spring.
    • 00:34:21
      Basically the program, give you a brief overview of the programs and the locations of each of the studies.
    • 00:34:28
      Basically, this is a comparison of the two different programs.
    • 00:34:33
      STARS has been around since the early 2000s.
    • 00:34:37
      We had some of the first ones in the district or in the state was on 53 and Route 20 north.
    • 00:34:45
      But basically, it looks at strategically targeted improvements for the roadway, as well as
    • 00:34:54
      intersection improvements, but basically it's a streamlined process that we've developed over time to go through and identify where their problems are, get feedback from the different
    • 00:35:10
      Stakeholders groups, whether it's the VDOT itself, the localities, law enforcement, transit agencies, the residency, the maintenance folks that are out there, and get feedback from everybody to come up with
    • 00:35:27
      what the problems are, and then identify solutions for those problems.
    • 00:35:31
      Basically, we have a kickoff meeting, which we're trying to work those out right now, where we flush out what the scope of the project's gonna be, or the scope of the study's gonna be, and sort of get a diagnosis of what the problems are out there.
    • 00:35:45
      And then we'll go through and do the study after that, once we flush out how the study's gonna go and what pieces need to be included.
    • 00:35:56
      We're working through those right now.
    • 00:35:58
      And the pipeline is sort of a rigid program that came about when OIP wanted to look at how to address, study the
    • 00:36:11
      VTRANS, tier one needs, which are our state highway plan.
    • 00:36:15
      And they wanted to identify, have a program to basically study those areas that were identified in the state highway plan as high priority needs.
    • 00:36:25
      So they developed this process from the STAR study.
    • 00:36:28
      And it's really similar.
    • 00:36:29
      They just break it down into three different sections.
    • 00:36:33
      The first one is your kickoff meeting where you're doing some
    • 00:36:37
      preliminary data collection, bouncing it off your stakeholders group.
    • 00:36:42
      And then the second phase is basically you look at alternatives.
    • 00:36:47
      And then the third phase is finalizing your alternative, your third alternative.
    • 00:36:53
      And through this process, we do have public outreach in two different areas.
    • 00:36:59
      Generally, it's in the beginning early on to get feedback on what the problems are.
    • 00:37:03
      And then
    • 00:37:05
      right before stage three or near the end of this STAR study where you're basically have your menagerie of alternatives and you want to try to get feedback on what is the preferred alternative and basically that's the two study programs.
    • 00:37:23
      Any questions about that?
    • 00:37:34
      Okay, currently we're looking at two studies, or three studies in the Charlottesville MPO area.
    • 00:37:41
      One of them is in the city, let me go down the list.
    • 00:37:46
      The first one is the Hydraulic 29 Emmett Street interchange.
    • 00:37:52
      right there where we basically haven't studied that it's been studied before but we didn't study it with the Solutions 29 package of projects so we're pulling that out as a separate study we're going to look at it to try to see what we can do to solve that issue at the interchange as well as we weren't able to
    • 00:38:17
      We had to pull the Angus Road intersection out of the previously funded study, so we're gonna look at that again, and we're also gonna look at hydraulic in 29.
    • 00:38:26
      We're also gonna look at that corridor from Barracks Road all the way through hydraulic.
    • 00:38:31
      That study shows up as a high safety need corridor, so we wanna look at that to see what we can do to try and address the multimodal aspects of that corridor to see if we can provide any recommendations for that, improvements to that corridor.
    • 00:38:47
      The second corridor is from Hydraulic North to Woodbrook.
    • 00:38:51
      Greenbrier and Woodbrook are two very high crash locations, as well as there's a number of high priority segments, high crash location segments on that corridor that we want to try to look at to see how we can come up with a method for improving that.
    • 00:39:11
      With the Solutions 29, we looked at Rio,
    • 00:39:15
      and we looked at from a high level.
    • 00:39:19
      the rest of the corridor but we didn't really get into the weeds as much as we would like to because we had a limited number amount of resources.
    • 00:39:26
      So what we're going to try to do here is do a more detailed look at this corridor to see if we can come up with solutions to address the issues on the corridor from a multimodal perspective to include transit and bike and pedestrian facilities.
    • 00:39:45
      on the last one is a city uh location in the city at Ridge and McIntyre and West Main Street
    • 00:39:52
      The city had looked at it before and submitted it for funding and then they pulled the project.
    • 00:39:57
      So we're going to relook at that.
    • 00:39:58
      We wanted to actually identify a location that's specifically in the city where we could develop the criteria for doing additional studies in the city with the city.
    • 00:40:09
      So that's what that intersection is there.
    • 00:40:11
      Sandy's taking charge on a number of these.
    • 00:40:14
      I'm going to work with her on the 29
    • 00:40:17
      Kordor, and she's going to focus on the Ridge-McEntire intersection specifically.
    • 00:40:23
      So any questions about those?
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:40:27
      I have a quick question.
    • 00:40:28
      How are these chosen?
    • 00:40:29
      Is it the localities proposed them?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:40:33
      We look at the data for mainly safety data.
    • 00:40:39
      But we're also looking at the congestion data and where the worst locations are and that's how they're come up with and then we work with the locality on making sure that they're on board with these corridors as locations for study.
    • Sandy ShackelfordStaff Member
    • 00:40:56
      We often review these against the long-range transportation plan to make sure that there were priorities that were identified on that plan.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:41:03
      Is there a direct way for the public to weigh in on this, or is it more derivative of these other studies?
    • Sandy ShackelfordStaff Member
    • 00:41:11
      You mean to weigh in on which locations are chosen?
    • 00:41:14
      Exactly.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:41:15
      To choose a different number two or a different number three.
    • Sandy ShackelfordStaff Member
    • 00:41:23
      That's not part of the process, Chuck.
    • 00:41:26
      Do you want to?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:41:27
      We looked at that.
    • 00:41:30
      Two and three were basically, three was, we weren't just talking to the city about that one, but it does show up as a high priority intersection location in the city.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:41:43
      Oh yeah, I didn't mean to suggest those weren't good.
    • 00:41:45
      I was just curious, you know, for example,
    • 00:41:48
      I agree with you on that.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:41:57
      We wanted to pick a location in the city where we could identify and work out the details on how we're going to do the studies.
    • 00:42:06
      And then in the next round, we'll come back and we'll look at other corridors.
    • 00:42:11
      on a larger scale because basically that section of I think it's Emma Street in the middle of UVA is probably one of the highest crash corridors in the city.
    • 00:42:26
      Basically from the railroad underpass east or west
    • 00:42:32
      So, I mean, we wanna look at some of those in the future, but right now we wanted to set up the guidelines for how we're gonna do some of these studies.
    • 00:42:39
      Cause they've been pretty much doing most of their own studies and we haven't been really participating in those very much.
    • 00:42:48
      So this is another funding stream that they can have access to, to do some of these studies and we can provide the consultant services to help them do that.
    • 00:42:56
      But we wanna make sure we're agreeable on the
    • 00:42:59
      methodology and the criteria that we're using for the study first.
    • Sandy ShackelfordStaff Member
    • 00:43:06
      Thank you.
    • 00:43:07
      But also to answer your question, that is something that's important to keep in mind when you're engaging in- I was gonna ask- Should lead it to- I was smart enough, I'm on Zoom.
    • SPEAKER_09
    • 00:43:16
      Why is it that 29 is a multimode?
    • 00:43:20
      Isn't it basically a traffic issue?
    • 00:43:24
      How does the multimode adding bikes make
    • 00:43:28
      It's any better because you don't see bikes here.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:43:31
      You don't see people walking.
    • 00:43:34
      That's going to be part of the discussion.
    • 00:43:36
      Do we want to consider multimodalism on that corridor?
    • 00:43:41
      I mean, we've got to figure out a way to get bikes and pedestrians across the corridor because it's a barrier right now.
    • 00:43:47
      How can we do that most efficiently and safely?
    • 00:43:51
      The other thing is, there's not a lot of corridors where we can have that occur.
    • 00:43:58
      And I think in the city's current plan, they were originally proposing a multimodal facility along the 29 corridor.
    • 00:44:08
      Now there's been some discussion recently about possibly looking at other corridors, parallel corridors for that.
    • 00:44:14
      So that's going to be part of the discussion.
    • 00:44:19
      But the biggest thing is, I think we need to consider is transit and how we can maybe start to work on how BRT might be able to effectively work this corridor and is there anything that we can look at as we develop improvements for this corridor that could facilitate that future method of transportation along this corridor?
    • SPEAKER_09
    • 00:44:45
      Do you have, have you looked at micro transit and to see if that's reduced accidents?
    • 00:44:53
      Are they tracking what's happening with that on that corridor?
    • 00:44:56
      Cause that's a busy corridor.
    • 00:44:58
      Nice.
    • 00:44:59
      I haven't looked at that corridor.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:45:01
      I've only looked at the crash data.
    • 00:45:04
      Okay.
    • Sandy ShackelfordStaff Member
    • 00:45:07
      The crash probably doesn't include the timeframe then that micro transit has been implemented.
    • 00:45:17
      Next we start closing those years out and have access to that information.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:45:24
      OK, thank you.
    • 00:45:26
      We originally looked at the same data set that the Safe Streets for All looked at, the 22, 18 to 22 data.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:45:32
      So this entire process, the study process facing
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:45:43
      We're hoping to get it wrapped up before the next round of SMART SCALE so we can have applications for SMART SCALE if the locality wants to submit those.
    • 00:45:56
      So basically we're looking at about an 18-month schedule.
    • 00:46:06
      All right, now the pipeline studies.
    • 00:46:08
      Like I said, these are the locations that we have in the MPO area.
    • 00:46:14
      One of them is the 118 interchange.
    • 00:46:16
      We're starting to see issues with that now, whereas that southbound left-hand movement is queuing up.
    • 00:46:22
      and especially during the pm it backs up pretty significantly in the southbound direction in some instances almost all the way to old ivy road which is significant so we want to figure out how we can better solve that issue this is also one of the locations i think that the county was considering looking at safe streets for all
    • 00:46:48
      Grant, and in talking with them, they're mainly looking at more short-term, low-cost solutions where this would be more looking at the long-term interchange improvements that might be needed at this location to actually make it function better.
    • 00:47:04
      It's been looked at a couple of times.
    • 00:47:08
      We've funded it.
    • 00:47:12
      and broke it up into different pieces.
    • 00:47:14
      I think the original concept was looked at in round one, but the cost was like almost $200 million to do the interchange improvement.
    • 00:47:23
      So we want to relook at it to see if there's anything else we can do here that's less expensive and still provide us the same level of service that we can get out of that we've had in the past.
    • 00:47:35
      And then the other one is the Fifth Street Intersection Interchange.
    • 00:47:40
      It was submitted this round.
    • 00:47:43
      We're still going through the process of scoring it and validating the application.
    • 00:47:48
      The cost estimate was pretty high, and it ended up costing more than what we thought it was gonna be.
    • 00:47:55
      So we're concerned that it's not gonna get funded, so we wanted to relook at it.
    • 00:47:58
      We're also, the Fifth Street Station Intersection, that corridor just north into the city,
    • 00:48:05
      was submitted previously by the MPO, but it wasn't eligible for submission by the MPO this time because of changes in the SMART SCALE regulations.
    • 00:48:15
      So we want to relook at that.
    • 00:48:16
      The city is also looking at changing what they want to do on Fifth Street north of this study area.
    • 00:48:23
      So we want to make sure that what we're going to do for this portion of it is going to be reflective of what the city wants to do in their portion of it.
    • 00:48:30
      The Portion to the North.
    • 00:48:31
      So that's why that study's on there.
    • 00:48:33
      So those were the two locations in the MPO area that we're basically focusing our efforts on.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:48:40
      I have a quick question.
    • 00:48:41
      So for these, like, for example, the 5th Street, 5th Street Station, I-64 DDI, so that, like, the scope, the study area will just include that area, or would they consider
    • 00:48:57
      things that impact traffic patterns in that area beyond the box that's been drawn on this map.
    • 00:49:02
      So like here, a lot of this, a lot of the traffic on, it's Avon extended, right?
    • 00:49:07
      If they were trying to get on 54, they've got to come through the 5th Street Station shopping center, or what is it called?
    • 00:49:15
      I forget.
    • 00:49:15
      5th Street Station Street Parkway.
    • 00:49:18
      Part of that traffic is not necessarily like
    • 00:49:24
      That's been looked at in the past.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:49:35
      I know the MPO did a study probably 10 years ago.
    • 00:49:38
      They looked at three different corridors.
    • 00:49:40
      They looked at
    • 00:49:42
      The corridor that's currently there, they looked at Cherry Street, and they also looked at a corridor to the south.
    • 00:49:47
      The problem is there are very few connections between Avon Street and Fifth Street, and that's been a problem.
    • 00:49:55
      You've got the fire station on Monticello, across from Monticello High School, and it services all this whole area.
    • 00:50:04
      So they don't have a direct connection.
    • 00:50:07
      They have to basically go up to Route 20 and take the interstate over until this other connection was made.
    • 00:50:13
      Now they basically use that connection to get across to 5th Street.
    • 00:50:17
      So we weren't going to look at that as part of this.
    • 00:50:22
      We're mainly focused on the intersection itself because the Fishery Station intersection doesn't work at all.
    • 00:50:29
      And it's going to get worse over time.
    • 00:50:32
      So we're going to basically study from Harris Road, I think it is, which is just north of this intersection, all the way through the interchange.
    • 00:50:45
      But I understand what you're saying is that's more of a bigger study than what we were going to undertake with this.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:50:50
      Yeah, it seems like, especially with all that development on 812 Street extended, this isn't going to get any better because it's the only way we can get on.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:50:57
      Yeah, I mean there was a proposal to run, I think it's Mill Creek Parkway across
    • 00:51:03
      and tie-in to Fifth Street Station or Fifth Street further to the south.
    • 00:51:10
      I can't remember exactly where it had two locations it came out at.
    • 00:51:13
      One of them was opposite Sunset and I can't remember where the other one came out at.
    • 00:51:18
      But there's some plans that were sketched out at one point.
    • 00:51:24
      for several alternatives south of 64 for that to be a connection.
    • 00:51:29
      It's not something that the county pursued after they got the results of the study that the MPO did before.
    • 00:51:42
      Because right now, Mill Creek Parkway just goes down in dead ends.
    • 00:51:47
      So it can be extended across if the county wants to look at that as a future alternative connection across.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:52:02
      Are you considering any of the things that are in that part of the 5th Street corridor that relate to the city's recent up zone where things are like, you know,
    • 00:52:15
      Probably not immediately, but at some point in the future, things like small office part structures could become six or even eight story apartment buildings.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:52:29
      We'll have to cross that bridge when we get into a forecast.
    • 00:52:35
      We haven't really thought about that.
    • 00:52:38
      The main reason we're looking at this is because if we don't get the Fifth Street interchange funded, then we're going to have to look at an alternative, a different alternative.
    • 00:52:47
      And to do that, I need to update the study.
    • 00:52:52
      And the study's got a process it's got to go through that involves approval by FHWA.
    • 00:52:57
      So we're going to look at an alternative of the DDI without the shared use path.
    • 00:53:02
      We'll get into that when we get to the
    • 00:53:05
      divergent diamond portion of the one of the other presentations are going to be doing in a few minutes.
    • 00:53:14
      Where I'll get into the call, why we're looking at that.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:53:18
      I could be clear off base here, but could up zoning potentially reduce the impact of traffic here if you're moving people closer to their employment centers with, to me, both like the city is within the traffic issues here.
    • 00:53:32
      And so you bring more people
    • 00:53:34
      with again, within the intersection.
    • 00:53:35
      So then potentially a fewer people trying to leave the area, assuming you have an equal number of people employed in the city, you need to work there.
    • 00:53:43
      If you have more residents in the city that helps solve this issue.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:53:47
      That could happen, but here the horror does not happen.
    • 00:53:51
      So whether that trend continues or what you're suggesting.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:53:54
      Yeah, exactly.
    • 00:53:55
      Someone who knows more about this would need a forecast.
    • 00:53:58
      But I was just curious, like I wonder if you could go.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:53:59
      I live right there.
    • 00:54:04
      Wegmans is a regional draw, so it's going to get people not only from the area, but it's going to get people from all over the county.
    • 00:54:30
      And that trend may not continue.
    • 00:54:34
      But that's how it works pretty much every time.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:54:39
      Chuck, did you say you're considering doing away with the mixed-use path that was previously part of that area?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:54:49
      Not necessarily getting rid of it.
    • 00:54:51
      We're going to look at it as a separate structure.
    • Sandy ShackelfordStaff Member
    • 00:54:53
      Oh, the shared-use, yeah, the shared-use path, yeah.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:54:56
      Yeah, basically we put it on the structure and I mean I'll get to it when we do the other one but I'll give you a short scenario of what we're going to talk about.
    • 00:55:05
      Basically the cost of the structure went basically almost doubled or tripled the cost of the project.
    • 00:55:16
      Because we're basically having to replace the entire bridge.
    • 00:55:20
      If I had known we were going to have to replace the entire bridge earlier in the study, we would have done this before.
    • 00:55:26
      But we didn't find out until late in the process that it was going to require full bridge replacement.
    • 00:55:34
      So what we're going to try to do with this revised
    • 00:55:38
      Scenario is basically do minimal impacts to the bridge and put the shared use path on a separate structure just to the west of the bridge.
    • 00:55:52
      So hopefully we can bring down the cost of the application.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:55:57
      Like a consistent narrative is we have development and then the transportation systems are the ones cleaning up the mess as a result of
    • 00:56:07
      Building a huge shopping center with only really one or two ways to get into it.
    • 00:56:14
      And it's like we find another area and we build there, but then we don't take into consideration how people get there or get away from there.
    • 00:56:22
      We're not going to solve that right now, but it just seems like a consistent narrative.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 00:56:29
      Some regions do charge like a development fee tax on the developments because they're going to be generating the tax.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:56:36
      The county can do that to a certain extent.
    • 00:56:42
      I mean they do that for residential.
    • 00:56:44
      I think they do that commercial.
    • 00:56:46
      It's got to do with the proffers that they're allowed to
    • 00:56:51
      get from the developer but that's and we look at that they do traffic impact analysis when they first come in when there's a rezoning of the property but after that depending on how well we do on the identifying what the impacts are and it doesn't really look at
    • 00:57:18
      It does look at transit to a certain extent, but it's more of just a reduction in trips or diversion of trips.
    • 00:57:27
      It doesn't really get into, there's a lot of flaws in it, so to speak.
    • 00:57:34
      We do our best.
    • 00:57:35
      And they did come up with improvements for this corridor that they did provide and they did do the improvements at the intersection and built the roads into there and made the intersection improvements.
    • 00:57:50
      Beyond that, there's limits that we can, they're responsible for according to the current laws.
    • SPEAKER_07
    • 00:57:59
      Can I ask a question about the shared use path again?
    • 00:58:02
      So if that is split off into a separate bridge structure, would that then be split off into a separate project?
    • 00:58:09
      In other words, would that happen after this kind of interchange project or would that happen at the same time?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:58:17
      I'd want to keep it together because it would be harder to build it afterwards as a separate project.
    • 00:58:24
      So I want to basically just look at it as a separate alternative.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:58:29
      OK, thanks.
    • 00:58:32
      I know multiple people who want to bike from that side to the University of Virginia where they work, but it's too dangerous.
    • 00:58:40
      So I think that would help.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:58:43
      Oh yeah, this was identified several years ago in a previous study we did of the whole corridor, and getting across this structure was something that we addressed in both short term and long term.
    • 00:58:55
      The divergent diamond with the shared use path was the preferred alternative coming out of that study, and that's why we looked at that and submitted it as a SMART SCALE application this round.
    • 00:59:08
      It's just the cost is going to probably not make it fundable.
    • 00:59:12
      So we got to figure out a way to get the same improvement at a less cost.
    • 00:59:17
      And that's what this study is going to try to do.
    • 00:59:19
      I think that's it.
    • 00:59:28
      I think we went through.
    • 00:59:30
      Anybody got any other questions about this one?
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 00:59:35
      The shared piece, was it going to be west of the bridge?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 00:59:38
      Yeah, that's what we're looking at.
    • 00:59:39
      Right now it runs down the middle of the bridge, and the county's got a shared use path that's coming up on the north side that's coming across from Old Lynchburg Road.
    • 00:59:54
      and they're going to connect to the shared use path that we're going to build on that west side and then you can cross at the interchange.
    • 01:00:02
      And then on the south side, the facilities that we're tying into are on the west side of Fish Street.
    • 01:00:15
      So on the north, once we get to the north side of the bridge, we're going to have to cross the road and we'll cross at the interchange.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:00:28
      There is a current path down there on the east side of the bridge which connects to the land at the street station shopping center.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:00:45
      and we're going to basically tie there's a there's a trail that runs just north of the shopping center where the Holiday Inn is there's a trailhead that comes in there we're going to basically start there and go south then cross the road at the interchange and then cross the 64 on the west side and then continue south on the west side of the 5th street and that would be on grade or would you still be below grade there road grade you will be at the road grade
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:01:15
      okay yeah because those those the bathroom reference feeds three and potentially four major subdivisions yeah i'll jump to that as well as the presentation that's been around the park so that would be
    • 01:01:43
      Alright, let me find the other presentation.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:02:11
      I'll switch to that presentation so you can see the Fish Street.
    • 01:02:14
      It's just taking time for it to load.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:02:30
      There it goes.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:02:44
      Probably should have stopped sharing and then re-shared.
    • 01:02:59
      All right, can you see my screen again?
    • Sarah SimbaStaff Member
    • 01:03:00
      I can, Chuck.
    • SPEAKER_00
    • 01:03:12
      Okay.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:03:18
      All right, this is the cost estimate presentation we did for CTAC, or for the MPOTAC and MPO Policy Board.
    • 01:03:26
      It's the same material, I'll just, I'm presenting it.
    • 01:03:29
      Basically go through how the project was done, but we can also talk about the alternatives.
    • 01:03:37
      This is the process we went through, which is standard for a STAR-type study that we went through for this one.
    • 01:03:48
      We did a compressed schedule, and that's why one of the reasons we ended up not being able to look at a different alternative, because by the time we got to the cost estimate, it didn't have enough time to go back and make any changes to it at that time.
    • 01:04:04
      But basically everybody that's included, which is the same as what I outlined in the other studies.
    • 01:04:10
      Here are some of the issues that we identified was high crash location, long queues,
    • 01:04:16
      Operation concerns at the intersections, it was causing queuing back onto 64.
    • 01:04:20
      So the goal was to basically fix the safety and operations and also provide that multimodal access across the bridge for pedestrians.
    • 01:04:30
      We looked at the four different scenarios that you can see at the bottom during the study.
    • 01:04:42
      We had some changes.
    • 01:04:44
      Here are the different things that we looked at and the differences between the various alternatives that we looked at.
    • 01:04:51
      The divergent diamond was identified as the preferred alternative.
    • 01:04:56
      So that's the one we moved forward with.
    • 01:04:58
      And the bottom is the changes in the SMART SCALE scoring methodology from this round.
    • 01:05:05
      They changed it so we don't get land use score.
    • 01:05:07
      It's a multiplier.
    • 01:05:08
      So it doesn't have as much weight as it did before.
    • 01:05:12
      So the shared use multimodal effects aren't as impactful as they were previous to this.
    • 01:05:21
      Okay, here's the interchange, what was submitted.
    • 01:05:26
      As you can see, the shared use path runs along the bottom of the screen to the interchange, crosses the bridge in the middle of the bridge, center of the bridge, and then crosses and runs down the up north side of the road on the west side of the bridge.
    • 01:05:44
      Basically, what we're proposing to do is cross, instead of going down the middle, we'll just cross the interchange and then go down the west side of the bridge.
    • 01:05:55
      parallel to the bridge and by doing that we wouldn't have to do as much reconfiguration on the bridge itself and minimize the impacts to the existing bridge to almost a minimal impact.
    • 01:06:10
      We've done this in, I know when we did the bridge at Zions Crossroads, we basically did the interchange intersection modifications on either end, but we didn't even touch the bridges at all for that one.
    • 01:06:23
      And I'm hoping we can do the same thing here.
    • 01:06:25
      We might have to do a little bit of the median modification to allow for the crossing movements to occur at either end, but that's going to be about it.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:06:42
      How do you cross from one side to the other with the light?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:06:49
      There would be a signal at these locations, so you could cross at the signals.
    • 01:06:57
      Right now, it's signal on the top side, on both sides, but when the signal stops, everybody stops.
    • 01:07:07
      And we could put the phase in for that crossing movement.
    • 01:07:11
      We're both sides of the road.
    • 01:07:15
      So it would still be a two-stage crossing, but we can stage it so that you're crossing the, basically you have the control, you don't have to worry about traffic.
    • 01:07:31
      Does that make sense?
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:07:32
      Yeah, yeah.
    • 01:07:33
      And is there street lighting around there?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:07:36
      We will have street lighting included in the application.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:07:41
      Thank you.
    • 01:07:43
      And this is the plan that was put forth with the current bridge, but there'll be a new bridge.
    • 01:07:48
      Will that bridge be wired to a company to better accommodate these changes?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:07:56
      We're not going to put in this application is for this improvement.
    • 01:08:03
      If it's not funded, we're going to come back and resubmit it as a separate structure.
    • 01:08:11
      but we don't know how it's going to score and I don't want to wait and see how it's going to score before I start looking at how we can fix it because to do this I have to go to FHWA, I have to redo the framework document because it involves the interstate interchange and it's a long process and I don't want to have to wait to do that separately in the future.
    • 01:08:34
      I'd rather do it now and that way it gives me enough time to look at the alternative in detail and get FHWA to support and buy in on it.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:08:45
      And is that a shared use path?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:08:51
      Currently, it runs down the middle of the bridge and crosses on the west side and continues west and crosses on the east side and continues east.
    • 01:09:05
      And it ties into the existing, well, the proposed
    • 01:09:10
      shared use facility that's already funded and it's under designed is where we're basically tying into on the north side or east side.
    • 01:09:32
      But like I said, when we started getting into the details of this project,
    • 01:09:38
      From the cost estimating standpoint, initially they were basically going to replace the deck, but once they started looking at the construction and the design of the existing structure, there's a
    • 01:09:56
      that runs down the middle of the bridge, the full length of the bridge.
    • 01:10:01
      And it was basically not going to allow us to put the shared use path in the middle of the bridge.
    • 01:10:06
      So basically to accommodate that, we actually have to replace the deck.
    • 01:10:10
      And then when we started looking at the substructure, it became apparent that any new deck would have to be integrated into the substructure.
    • 01:10:22
      So the substructure
    • 01:10:24
      had to be redesigned too and rebuilt.
    • 01:10:26
      So that meant a full bridge replacement, which is not what we expected at all when we started out down this path.
    • 01:10:38
      And this is the current estimate for the project, 179 million, which is way above what we thought it was gonna be.
    • 01:10:52
      just to incorporate the extra cost for the bridge replacement.
    • 01:11:05
      And like I said, when we went through this process, we went through
    • 01:11:09
      And this is sort of a timeline.
    • 01:11:13
      We started it in the fall and then we got to the preferred alternatives in the spring.
    • 01:11:18
      And then we started the final evaluation in late spring.
    • 01:11:22
      And by the time we got to the preferred, the cost estimate, we were already in July.
    • 01:11:27
      We didn't have enough time to go back and make the changes to the preferred alternative and get public buy-in.
    • 01:11:35
      So we basically are what we got is what we got.
    • 01:11:40
      So what I want to do is go back and look at another alternative for this bridge that would reduce the cost.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:12:00
      How common is it to put
    • 01:12:01
      The Maltese Path through the middle of the EDI.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:12:05
      When it was originally designed, the first one in the country in Missouri, that's where it was placed in the middle of the road.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:12:15
      I haven't ever been through one, but it strikes me I would probably prefer not to go down the middle if I was walking or biking.
    • 01:12:23
      I wonder if this alternative is maybe...
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:12:26
      It's got barrier on both sides.
    • 01:12:28
      So you've got jersey barrier on both sides.
    • 01:12:31
      So it's not just a sidewalk in the middle of the road.
    • 01:12:34
      It's basically you've got traffic, directional traffic on either side, but you've got a barrier between the traffic and the pedestrian facility.
    • 01:12:45
      It's a shared-use path.
    • Sandy ShackelfordStaff Member
    • 01:12:48
      It's really about crossing where the lights are versus on the free flow, like, operants that are coming around.
    • 01:12:55
      Like, that's the challenge of putting it all along the same side.
    • 01:12:58
      So you're right.
    • 01:12:58
      From the perspective of walking down the middle,
    • 01:13:02
      maybe doesn't feel as comfortable from a pedestrian perspective.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:13:05
      I think in a lot of applications, it is the most sensible.
    • 01:13:09
      And I don't know about the project in Missouri, but I do know about the Brooklyn Bridge, and it seems to work pretty well there as well.
    • 01:13:17
      So it just depends on where you are and what you're trying to do.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:13:26
      I basically was thinking we could just
    • 01:13:29
      shift the travel lanes a little bit on the structure and to make room for the facility in the middle but integrating the barrier into the bridge deck was a problem.
    • 01:13:43
      The other thing is there's drop inlets
    • 01:13:47
      that are in the edge of the travel lane.
    • 01:13:50
      So you've got like a six foot or five foot sidewalk.
    • 01:13:53
      And then you've got drop inlets that are in the travel, like right on the edge of the travel lane in front of the sidewalk.
    • 01:13:59
      So basically when you take out the sidewalk, you've got to basically relocate those drop inlets.
    • 01:14:06
      And then you've got to integrate those barrier in the bridge deck.
    • 01:14:11
      And then there's a joint that runs down the middle of the
    • 01:14:14
      across the entire length of the bridge.
    • 01:14:16
      So the combination of all three meant we had to replace the entire bridge deck.
    • 01:14:22
      And that was the first thing that was a problem.
    • 01:14:26
      And then once they started looking at how it's integrated into the piers, they couldn't redesign it to integrate it the way it was designed.
    • 01:14:35
      So they're going to have to replace the whole bridge.
    • 01:14:42
      So that's why we ended up where we're at.
    • 01:14:44
      Like I said, we didn't have enough time to go back because it takes like three months to get from a public outreach to the final cost estimate.
    • 01:14:59
      And so that's basically where we're at.
    • 01:15:03
      And like I said, we're gonna look at another alternative with the DDI, with a pedestrian bridge on a separate structure.
    • 01:15:12
      and go through and resubmit it and reanalyze it.
    • 01:15:15
      But that's a minor detail, but we still gotta go through FHWA and get their approval.
    • 01:15:21
      And that's gonna be the bigger thing.
    • 01:15:24
      Any questions other than what we talked about?
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:15:31
      This is off topic, but do you know when they're gonna complete the project down at Red Hill Road and Scottsdale Road?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:15:44
      I'm not sure which project is this?
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:15:47
      They're working on the bridge and the stream bank.
    • 01:15:52
      I guess that would be the hardware river there down on Route 20 south in Carvers Bridge area.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:16:01
      That might be a bridge project.
    • 01:16:02
      Are they doing the bridge?
    • 01:16:03
      That's a bridge project.
    • 01:16:04
      I'm not familiar with that project.
    • 01:16:07
      So I can't answer that question.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:16:09
      I just wondered.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:16:14
      They usually go pretty quick, but I don't know for sure how long that one's gonna take.
    • 01:16:19
      All right, I'll switch to the last presentation.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:16:24
      Hopefully it'll load quicker.
    • Sarah SimbaStaff Member
    • 01:16:39
      Ivy Road.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:16:43
      It's shorter, so hopefully it won't take as long to load.
    • 01:17:09
      All right.
    • 01:17:36
      Do you all see my screen?
    • 01:17:39
      OK. All right, this is the pipeline study that we're wrapping up.
    • 01:17:51
      We're still trying to finalize the final cost or the cost estimates, and then we should be wrapped up the study.
    • 01:17:57
      Basically, this is the preferred alternative that ended up coming out of the study.
    • 01:18:06
      Acell and Decell Lanes on the ramps on the north side of Old Ivy Road to facilitate the longer ramps so that we don't have queuing back out onto the mainline facility.
    • 01:18:23
      The other thing is we're looking at is a roundabout at Boar's Head and a roundabout at Canterbury and the Midway or
    • 01:18:36
      Market right there right next to the underpass.
    • 01:18:39
      And we're also going to put a median barrier between the roundabouts.
    • 01:18:43
      So we'll close off those access points and use the roundabouts for the U-turn movements at Boars Head from those businesses and residents on the north side.
    • 01:18:59
      The other thing it includes is a shared use path along Old Ivy Road.
    • 01:19:04
      I think it's on the south side.
    • 01:19:07
      It includes a bridge, a multimodal bridge across the bypass parallel to the existing bridge that's there.
    • 01:19:17
      And there's also some reconfiguration of the Franklin Street and the ramp and old Garth Road, Old Ivy Road.
    • 01:19:27
      So they're one-way streets instead of two-way.
    • 01:19:32
      The other last thing is we're looking at reconfiguring the underpass and putting a shared sidewalk, elevated sidewalk underneath the underpass on the east end.
    • 01:19:45
      so that you can get under there safely as a pedestrian and a bicyclist, but we're still gonna try to maintain two-way traffic to a signal.
    • 01:19:54
      We'll see how it goes.
    • 01:19:55
      There's some sight distance concerns there that have been raised by traffic engineering as well as us that we'll see if we can make it work.
    • 01:20:05
      If we can't, we may have to convert it to a one-way, but I,
    • 01:20:10
      We'll try it and see if it's gonna work first.
    • 01:20:13
      And that's the, this is basically the preferred package of improvements from the study.
    • 01:20:22
      Any questions about this?
    • 01:20:31
      All right, sorry to put you all to sleep, but we'll go on.
    • 01:20:38
      These are some alternatives that we looked at west of Boers Head that are going to be included as potential solutions that the locality may want to consider in the future if things start to become problematic at some of these locations.
    • 01:20:58
      Based on the public feedback and what we got from the recommendation from the stakeholder group.
    • 01:21:07
      But like I said, these are more long term solutions if we start to see issues with some of these locations.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:21:15
      I'm never out there.
    • 01:21:16
      Is there a lot of traffic out back?
    • 01:21:18
      It's bad.
    • 01:21:20
      It's bad.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:21:20
      Yeah, it's, I mean, you get a lot of, there's a lot of residential out this way, as well as commuters coming in from Crozet, but most of the traffic is probably, well, is mostly from this area or just west of this area, from Morgantown Road all the way in, Ivy and all that area.
    • 01:21:41
      There's a lot of residential development similar to this throughout this whole area that comes in and out this way.
    • 01:21:54
      So you do have that morning and evening peak hours, and it's pretty much directional.
    • 01:21:59
      We actually looked at, not with this study, in a previous study, we looked at reversible lane on this corridor.
    • 01:22:07
      It's just how to get it to work with the left turns is always an issue with doing some of that.
    • 01:22:13
      But that's something that we actually looked at at one point.
    • 01:22:21
      All right, and then on the east end,
    • 01:22:26
      Let's see, long term for the middle of the corridor?
    • 01:22:29
      Basically this is
    • 01:22:33
      In the future, based on some previous modeling that the MPO did for their long-range plan, the bypass starts to see significant growth in traffic volume.
    • 01:22:46
      So to the point where as we may need to look at widening the bypass to accommodate the additional traffic from Barracks Road south to the interstate.
    • 01:22:57
      If we have to do that,
    • 01:22:58
      We may have to look at replacing all these bridges and lengthening them so we can accommodate that widening.
    • 01:23:06
      And that's just what this is.
    • 01:23:08
      And this is like a very long term type of
    • 01:23:11
      Solution for the center.
    • 01:23:13
      It also, since the current railroad bridge is integrated into the actually roadway bridge, we would have to lengthen that, replace that bridge also, which would require us double tracking the railroad, which would mean we'd end up replacing the underpasses on both ends.
    • 01:23:34
      which may be beneficial because we could dress the issues that we have at both ends now.
    • 01:23:40
      But this is a really long-term solution for these if we need to widen the road.
    • 01:23:47
      And then this is the other section east of the interchange where we had some potential locations for improvements at several of these locations before you get to Old Ivy Road intersection.
    • 01:24:02
      And again, like the Westside, this is more of a, yeah, if you want to consider it, these are some solutions that had good support by the public, but they're not really enough needs out there right now that we would currently recommend submitting them for funding.
    • 01:24:24
      And that's pretty much it.
    • 01:24:26
      Like I said, right now we're trying to wrap up the study.
    • 01:24:29
      We're doing some planning level cost estimates.
    • 01:24:31
      I mean, once we get those in and get those, we'll finalize the report and we'll be done.
    • 01:24:38
      Any questions?
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:24:41
      So then once the converted scenarios are selected, then does this have to be submitted for funding somewhere in order for it to be actually put in place?
    • 01:24:50
      Okay.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:24:52
      Yeah, for SMART SCALE or something like that.
    • 01:24:55
      The thing about it is, because of the changes in the regulations for SMART SCALE, the regional bodies are, they can only submit interchange projects, capacity and expansion projects, or the entire recommendations of a study.
    • 01:25:15
      So we wanted to try to craft the recommendations so that it would be something that the MPO would be eligible to submit.
    • 01:25:21
      And it wouldn't be too costly for them to submit it.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:25:29
      Do you say there was a multi-use path?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:25:32
      Correct.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:25:35
      Oh yes, I got that.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:25:37
      It goes, it runs along, it's this dotted line in the middle of the screen.
    • 01:25:43
      It runs along Old Ivy Road.
    • 01:25:45
      from the underpass at Ivy Road on the east end all the way to Old Garth Road intersection.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:25:53
      So, okay, in the long term, I'm just curious about the long term recommendations on either side of that.
    • 01:26:00
      Did that include tying in multi-use paths?
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:26:07
      We just looked at this portion of it.
    • 01:26:09
      There's with the three notch trail study, I'm not even sure where they're going to run the trail.
    • 01:26:15
      So I didn't want to put too much in not knowing where they wanted to run the trail.
    • 01:26:20
      Because once you get to the other side of start to go to the west, you could have a different alignment than what we would choose.
    • 01:26:37
      The east end is going to tie into the existing sidewalk and I don't know if there's bike lanes on Ivy Road or what's on Ivy Road there to the east but the underpass has only got a six foot wide sidewalk I think is what was proposed because that's all we can fit underneath the underpass on the east end.
    • 01:27:10
      Once you get underneath the underpass, you can share the road, I think, or there might be even bike lanes.
    • 01:27:17
      Off the top of my head, I don't recall.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:27:21
      There's bike lanes on that portion of I-V toward the University.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:27:24
      I'm kind of seeing new hospitals.
    • 01:27:26
      There's the Orthopedic Center and this entire one.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:27:28
      That's before the intersection of old I-V and I-V.
    • Ethan HeilMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:27:32
      Right.
    • 01:27:33
      I'm trying to remember if the bike lanes...
    • 01:27:36
      They do.
    • 01:27:36
      Okay.
    • 01:27:37
      Yeah.
    • Chuck ProctorNon-Voting Member, Citizens Transportation Advisory Committee (2013-2026)
    • 01:27:38
      If you get the signal, you can cross the road.
    • 01:27:40
      So you can get to the other side of the bike lanes on the other side of the road.
    • 01:27:43
      All right, any questions?
    • 01:27:55
      That's pretty much it for me.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:27:56
      All right.
    • 01:27:59
      Well, thank you, Chuck.
    • 01:28:02
      We'll move on to any final comments from the first members of the committee.
    • Gorjan GjorgjievskiStaff Member
    • 01:28:10
      If not, I have just one reminder about the Move Safely Blue Ridge survey.
    • 01:28:17
      It was covered on the 29 News as well.
    • 01:28:21
      I can provide the link in the chat for that as well.
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:28:27
      Do you have any other email on the chat?
    • Sarah SimbaStaff Member
    • 01:28:32
      Sure, yeah.
    • 01:28:33
      I can send that in an email tomorrow.
    • 01:28:36
      Yeah.
    • 01:28:38
      with the Facebook post for the survey.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:28:43
      Any matters from the public?
    • 01:28:47
      I don't see any members of the public online, but nobody here.
    • Sarah SimbaStaff Member
    • 01:28:54
      You skipped one item.
    • 01:28:55
      I think item six before the roundtable.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:28:59
      Well, no, we did roundtable.
    • Sarah SimbaStaff Member
    • 01:29:03
      And the numbers are off.
    • 01:29:07
      Supposed to be seven and eight.
    • 01:29:09
      Yeah, I guess the one sentence is the federal functional classification, the policy board approved last October, last month, the proposed changes to the functional classification.
    • 01:29:24
      That means it's in the hands of FHWA.
    • 01:29:29
      Just for the record.
    • 01:29:31
      And your next meeting,
    • 01:29:32
      So the CTAC will be January 22nd.
    • 01:29:36
      This will be an all virtual meeting we talked about last time.
    • 01:29:39
      Yeah.
    • Patrick HealyMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:29:42
      With Donna's arrival, are we warmed up?
    • 01:29:47
      No.
    • Sarah SimbaStaff Member
    • 01:29:48
      Sadly.
    • 01:29:48
      That's all I got.
    • 01:29:51
      Hopefully next meeting.
    • Stuart GardnerMember, Citizens Transportation Advisory Committee (2013-2026)
    • 01:29:53
      All right, next.
    • 01:29:56
      Meeting virtual?
    • 01:29:57
      Yes.
    • 01:29:58
      That's meeting virtual.
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:30:00
      We just decided to do it.
    • 01:30:03
      Because it's January because it's dark and cold.
    • 01:30:08
      Good question.
    • 01:30:09
      Yeah, we're allowed up to 50% per year.
    • 01:30:13
      So we decided to take that one at least because it's not a pleasant time to come here.
    • 01:30:20
      All right.
    • 01:30:21
      So I think with that, we are adjourned.
    • Sarah SimbaStaff Member
    • 01:30:24
      Oh, there's nothing to go around the table?
    • Lee KondorChair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:30:29
      No, it has to.
    • Sarah SimbaStaff Member
    • 01:30:31
      Wonderful.
    • Sandy ShackelfordStaff Member
    • 01:30:32
      I actually have a follow-up resources for both of you.
    • 01:30:40
      The state has vulnerable road users.
    • 01:30:42
      That's not something, and I couldn't remember, but it does have very high level analysis of the infrastructure that the person with the highest risk to pedestrian and bicycle vulnerable road user.
    • 01:30:55
      So it would be like,
    • 01:30:57
      I have like some sort of like algorithm when I assess
    • Donna ChenVice-Chair, Citizens Transportation Advisory Committee (2013-2026)
    • 01:31:04
      There's also, Doug has this thing called the, it used to be called the pedestrian safety action plan, but now I think it's called the pedestrian bicycle safety action plan.
    • 01:31:13
      It's a vulnerable road user.
    • 01:31:14
      Oh, it's changed again, okay.
    • 01:31:16
      So there's a whole, like it explains the process of how they did it and then it shows you all maps for the priority locations.
    • Sandy ShackelfordStaff Member
    • 01:31:22
      So I can, I can email this to the staff and they can send it out.
    • 01:31:26
      And then the other thing that might be coming in the PDSD is
    • 01:31:30
      Safety Action Plan, that the State Highway Safety Action Plan does, that they do the cross tab table with all of the different emphasis areas to show where there's correlation between not wearing a seat belt and at an intersection.
    • Sarah SimbaStaff Member
    • 01:31:44
      Sandy, do you want to share your screen so folks on Zoom can see or you can't?
    • Sandy ShackelfordStaff Member
    • 01:31:47
      Well, I mean, I can email this to you as well to send it out to everybody.
    • Sarah SimbaStaff Member
    • 01:31:53
      OK.
    • Sandy ShackelfordStaff Member
    • 01:31:53
      I mean, yeah.
    • 01:31:55
      I mean, the meeting was already adjourned, sorry.
    • 01:31:57
      I was just wondering if there was specific questions.
    • Sarah SimbaStaff Member
    • 01:31:59
      Thank you.