Central Virginia
  • Commonwealth Transportation Board
  • Workshop Meeting 2/15/2012
  • Auto-scroll

Workshop Meeting   2/15/2012

Attachments
  • Workshop agenda.pdf
  • Workshop minutes.pdf
  • Bids.pdf
  • Fiscal Year 2012 budget _ actual performance through January 2012, Preliminary Fiscal Years 2013 - 18 Commonwealth Transportation Fund Six-Year Fina.pdf
  • Development of the Fiscal Years 2013 - 18 Six-Year Improvement Program.pdf
  • DBE_SWaM Program.pdf
  • Virginia Department of Transportation General Assembly update.pdf
  • 1. Virginia Port Authority Intermodal Movement

    • Intermodal movement to and from The Port of Virginia.pdf
  • 2. Financial Report

  • 3. Kick-off of the Six Year Program

  • 4. Southeast High Speed Corridor Tier II EIS Richmond to Raleigh Recommendation Report

    • Southeast High Speed Rail Tier II EIS draft recommendation report.pdf
  • 5. Wounded Veterans Program

    • Wounded Veterans Internship Program.pdf
  • 6. DBE/SWAM Program

  • 7. Transportation Enhancement Program Overview and Streamlining Opportunities

    • Transportation Enhancement Program Fiscal Year 2013 application update and streamlining opportunities.pdf
  • 8. Airport Access Policy Revision and Airport Access Program Guide

    • Airport access policy revision and airport access program guide.pdf
  • 9. Legislative Update

    • Department of Rail and Public Transportation legislative update.pdf
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:00:00
      I'd like to welcome everyone to this morning's Commonwealth Transportation Board Workshop.
    • 00:00:21
      Now I've gotten everyone to their seats.
    • 00:00:22
      I'd like to ask everyone to please stand and do the Pledge of Allegiance.
    • 00:00:26
      to the flag of the United States of America and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all.
    • 00:00:41
      Thank you very much and I'd like to welcome again everyone to this morning's workshop and we'll get right into the agenda.
    • 00:00:49
      It will be the first is
    • 00:00:51
      Actually, intermodal movements from the Virginia Port Authority, and we're pleased to have with us Jerry Bridges, who is the Executive Director, and Jeff Kiever, who is, where's Mr. Kiever, too?
    • 00:01:01
      You may see him running around doing it.
    • 00:01:05
      Mr. Bridges, welcome.
    • SPEAKER_00
    • 00:01:08
      Thank you, Mr. Secretary.
    • 00:01:09
      Good morning, everyone, and thank you for the opportunity to
    • 00:01:14
      Talk with you a little this morning about the Port of Virginia and our prospects on intermodalism and other growth opportunities.
    • 00:01:24
      First I want to just take an opportunity to introduce you somewhat to the Port.
    • 00:01:30
      I know that back in September or October you guys had a meeting in Hampton Roads and got a look at the terminals
    • 00:01:41
      Right there in the area, but just for your information, there are seven terminals within the BPA terminal complex.
    • 00:01:51
      Of course, our largest facility currently is the facility in Norfolk, the Norfolk International Terminal.
    • 00:02:00
      Ninety-nine percent of the business through there are containers moving.
    • 00:02:05
      We also have a significant operation across the Elizabeth River at the ATM terminal, which we engaged a 20-year lease of that facility about a year and a half ago now.
    • 00:02:22
      We also have a terminal in Portsmouth, Virginia, TMT, which we're currently transitioning that terminal from a containment facility to a roll-roll, break ball,
    • 00:02:33
      and other uses.
    • 00:02:36
      We have a terminal up in Front Royal, Virginia.
    • 00:02:42
      It's an intermodal terminal serviced by the Norfolk Southern Railroad.
    • 00:02:47
      It's about 300 miles from the port and we offer daily services to and from that site.
    • 00:02:56
      And, of course, our newest addition is our
    • 00:02:59
      arrangement with the Port of Richmond where Port of Richmond has come under the guidance and leadership of the VPA.
    • 00:03:09
      That happened about a year ago.
    • 00:03:11
      We're currently servicing that facility with barge service between Hampton Roads and Richmond.
    • 00:03:19
      We think that terminal shows a lot of potential going forward.
    • 00:03:24
      This is how we line up on the east coast of the United States.
    • 00:03:27
      We're solid number three.
    • 00:03:29
      are poured in the region behind Savannah and New York.
    • 00:03:36
      These numbers are, while they look impressive on a market share basis, these numbers will drastically improve over the next five to six years as we have made some significant capital investments and some strategic marketing and planning
    • 00:03:57
      to move us further up that chain.
    • 00:04:02
      This is the economic impact of the port, 41 billion dollars worth of cargo has moved through to more than 14,000 businesses in the 48 states, 343,000 jobs in the state of Virginia, 13.5 billion in income, total revenue of 41.1 billion.
    • 00:04:24
      This is a quick look at intermodal transportation.
    • 00:04:27
      Of the cargo that moves through our port, 66% of it moves out by truck.
    • 00:04:35
      That's a significant number.
    • 00:04:36
      I mean, when you think about over a million containers, 66% of them are moving out on truck.
    • 00:04:43
      That means that
    • 00:04:44
      The cargo that's currently coming through the port is principally for basically a local market or a market that is within a day's drive from the port.
    • 00:04:59
      And since we have 7.58 million citizens in the Commonwealth, it goes to show that if our port is going to grow, that growth is going to come from something other than
    • 00:05:13
      That truck market has to come via the rail.
    • 00:05:17
      And as you can see by this slide, 30% of the cargo that's moving through our port vacates the port by rail.
    • 00:05:27
      And we're currently serviced principally by the Norfolk Southern Railroad.
    • 00:05:33
      Just this month,
    • 00:05:34
      CSX Railroad started its intermodal services in a significant way by gaining access to the APM terminal with a contract with Merce Shipping.
    • 00:05:45
      So we now have services by both Class 1 railroads out of the port.
    • 00:05:54
      The rail portion of our business is growing faster than any other segment.
    • 00:05:58
      Another growing segment is the barge services.
    • 00:06:01
      We have barge services, I indicated earlier, to Richmond, which is a primary marine highway type of operation, but we also have barge services between the Port of Baltimore and the Port of Virginia via coastal barge services.
    • 00:06:19
      There was an experiment also with a barge between Philadelphia
    • 00:06:24
      and the Port of Virginia.
    • 00:06:27
      We think that those types of operations will be more frequent as the Panama Canal widens and opens.
    • 00:06:36
      We think that there will be more hove and spoke type operations up and down the coast.
    • 00:06:42
      And since we are the most prepared for the big shifts that draw deep water,
    • 00:06:47
      We think that we are ideally situated to take full advantage of that.
    • 00:06:51
      So you'll probably see more bar services and smaller vessels moving through the port.
    • 00:06:59
      This slide talks about the growth in the industry.
    • 00:07:02
      Generally, the containerized cargo volume grows at two and a half times the gross domestic product, which
    • 00:07:10
      If you look at this graph, the bottom line, the black line is the GDP.
    • 00:07:16
      The blue and the red line is the growth in TUs.
    • 00:07:21
      It's projected that TU growth in the United States will top 40 million TUs by 2022, which is a tremendous jump in the volumes moving through.
    • 00:07:33
      That's why we need to continually invest, not only in port facilities or what we call
    • 00:07:40
      This side of the water and water side investments but the investments that this board and VDOT engage in and the rail department engage in in terms of their investments in highways and rail facilities is very important to the overall growth in the movement and its freight through the Commonwealth and through the rest of the nation.
    • 00:08:08
      This slide
    • 00:08:10
      looks at the population center and where this cargo is going.
    • 00:08:13
      The star represents the state of Virginia, the Port of Virginia, and you can see the clusters there where the growth is happening.
    • 00:08:22
      You see in the southwest
    • 00:08:23
      There's quite a bit of growth going on in the Midwest of the United States.
    • 00:08:29
      Growth is there.
    • 00:08:29
      The red dots to the north of that blue star indicates that that's a very densely populated area already, but there's not a whole lot of growth happening in that area.
    • 00:08:40
      The growth is in the Southeast and in the Midwest somewhat.
    • 00:08:44
      So those are the sweet marketing spots for the Port of Virginia and those are the areas that we focus on as we
    • 00:08:52
      Go around the world talking to potential customers about locating distribution facilities or just using our port as a port of origin and discharge for the cargo workshop.
    • 00:09:05
      This is what it looks like in 2040.
    • 00:09:07
      Look at the big blue dots around that map and you can see that's where you're going to have the big population moves.
    • 00:09:18
      Panama Canal expansion is happening.
    • 00:09:21
      They are somewhat on schedule.
    • 00:09:23
      They scheduled to open in 2014.
    • 00:09:26
      There was some labor unrest there for a minute, but I think they've got that under control.
    • 00:09:32
      But they are currently projecting that the new locks will be ready for operation in 2014.
    • 00:09:41
      What that will do
    • 00:09:42
      is they will expand the locks to make it 400 feet longer, 70 feet wider, and 18 feet deep with these new locks.
    • 00:09:51
      That means the ships holding up to 18,000 TEUs will be able to traverse the canal.
    • 00:09:58
      Currently, ships of 4,000 TEUs can move through.
    • 00:10:02
      Now, a TEU
    • 00:10:04
      For those who don't know, it's a 20-foot equivalent unit.
    • 00:10:07
      That is what we use to measure our growth.
    • 00:10:10
      So when we say that the Port of Virginia has 1.8 million TUs, that's 1.9 million 20-foot trucks running around.
    • 00:10:21
      And look at this.
    • 00:10:22
      I mean, 18,000 of those things on one shift is just phenomenal.
    • 00:10:26
      You wonder how it stays afloat, but it does.
    • 00:10:31
      So that's what we have to look forward to in terms of timing and the reason we've made the investments that we've made.
    • 00:10:39
      But quite frankly, 2014 is just the start.
    • 00:10:42
      The switch is not going to flip, and on March 20th of 2014, all this cargo and all these big ships are going to start flooding the east coast of the United States.
    • 00:10:53
      Our competition on the west coast will not sit on their hands.
    • 00:10:57
      and do nothing to protect the business that they've enjoyed all these years.
    • 00:11:02
      And quite frankly, it's still five to six days quicker to land a box in LA and Long Beach than it would be to have an all-water service that comes through the Panama Canal and lands at a port on the East Coast.
    • 00:11:18
      So we've
    • 00:11:20
      On the positive side of that, though, with 18,000 PEU ships, the slot cost for each one of those containers is so reduced.
    • 00:11:28
      It's about $200 less expensive to move a box on a ship of that size than it is in the current evolution.
    • 00:11:35
      So when you look at 10, 15,000 PEUs times 200, that's a lot of money for the ocean carrier.
    • 00:11:43
      So we know that there will be more cargo moving to
    • 00:11:47
      The East Coast, we think it will happen in stages rather than one failed swoop because we've got to convince the ocean carrier that the East Coast can handle this business.
    • 00:12:00
      We have all the elements of success currently in Virginia.
    • 00:12:04
      We have unrestricted deep water.
    • 00:12:06
      We have the most efficient port infrastructure in the western hemisphere right now with the leasing of the APM terminal.
    • 00:12:18
      I think most of you have seen that facility.
    • 00:12:21
      It is the most technologically advanced terminal in the western hemisphere, we think, in the world, but for cautious reasons we just say the western hemisphere because we know that to be a fact.
    • 00:12:31
      We have efficient inland transportation systems.
    • 00:12:36
      Thelma and Kevin have done a good job of basically helping the railroads keep up with our freight needs.
    • 00:12:44
      There's more that can be done and we're doing those things and the railroads are doing those things in conjunction with the Secretary's Office and others.
    • 00:12:59
      Several competitive advantages over the other ports.
    • 00:13:02
      One of the fastest growing, the fastest growing port in the United States right now is the Georgia Port Authority, and they're growing at a tremendous rate, principally because of a strategy they put in place seven to eight years ago to attract big box retailers into Georgia.
    • 00:13:20
      They made land relatively cheaply, almost free,
    • 00:13:25
      And so they were able to attract a lot of retailers there.
    • 00:13:30
      And the ships go where the freight demands that it goes.
    • 00:13:32
      And so Savannah has grown for that reason.
    • 00:13:37
      But they have a big problem.
    • 00:13:39
      They have a huge problem in that they are currently at 40, 45 feet and deep as far as their channels are concerned.
    • 00:13:49
      Ships currently have to go in there on the top.
    • 00:13:53
      You know, they go in, they come out.
    • 00:13:55
      at Hot Tide.
    • 00:13:56
      So that's a very big restriction.
    • 00:13:58
      And even when the tide is up, they have 45 feet.
    • 00:14:04
      So at the end of the day, those big ships are not able to go in there.
    • 00:14:10
      You've probably seen recently a big fight going on between the Port of Georgia and the Port of South Carolina because they're both vying for those same ships, those same customers, and money is very tight.
    • 00:14:24
      to dredge Savannah to the depth that they need.
    • 00:14:29
      I think 48 feet is what they're going to try to get to.
    • 00:14:32
      They're not even authorized to 48 feet yet, so they're still in the permitting process.
    • 00:14:38
      But they're talking hundreds of millions of dollars to get to where they need to be.
    • 00:14:43
      The federal government clearly is not cooperating in terms of funding or permitting at this
    • 00:14:49
      So the state itself has said that they would kick in and dredge the channel itself.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:14:54
      Is there an environmental problem too with Atlantic Sturgeon that's stopping that dredging?
    • SPEAKER_00
    • 00:14:59
      They have brought that up as one of the issues that's standing in the front of the permitting process.
    • 00:15:05
      My friend and the executive director there tells me that that's sort of a red herring.
    • 00:15:13
      He says that they're going to overcome that as an issue, but still there are other environmental problems and as this competition between South Carolina and Georgia heats up, there will be more issues than you can imagine in terms of environmental and other
    • 00:15:33
      competitive issues that will come into the mix.
    • 00:15:37
      But let's face it, one of those two ports, and I would prefer it be Savannah, needs to get to a point where they can receive these big shifts because the economics of the shift says that it is very difficult for a ship to travel over 11,702 nautical miles
    • 00:16:01
      to make one port call on the coast.
    • 00:16:02
      That is just not a very desirable outcome for an ocean carrier.
    • 00:16:09
      So we need help.
    • 00:16:10
      And New York had a bigger problem.
    • 00:16:14
      New York, they're authorized to dig, to dredge to 50 feet.
    • 00:16:19
      They have obviously have the money or can get the money to get it done, but they have a tremendous problem in the Bayonne Bridge.
    • 00:16:27
      It's too low for the ships to travel underneath it.
    • 00:16:31
      And so there's currently a study being done to raise the bottom tier of that Bayonne Bridge to allow those ships to transit under.
    • 00:16:41
      And that's billions of dollars worth of engineering and construction to get that done and years to get it done.
    • 00:16:49
      So right now we have a very large competitive advantage.
    • 00:16:53
      And if we take full advantage of it early on,
    • 00:16:56
      We believe that it puts us in good stead even when these other ports catch up.
    • 00:17:02
      This is just a chart with the various depths and you can see I was talking about Savannah and Charleston.
    • 00:17:09
      Oh, there's another port in our region, the Port of Baltimore there.
    • 00:17:14
      It's already at 50 feet.
    • 00:17:15
      The problem in Baltimore from a competitive standpoint is they have one berth that can accommodate a ship and generally that is
    • 00:17:25
      Not a desirable situation because if there's conflicts, a ship has to go off and sit out at Anchorage and at $50,000, $60,000 a day in ship costs just to sit out at Anchorage.
    • 00:17:38
      They don't like to do that very often.
    • 00:17:41
      Also, as far as rail competitiveness, Baltimore doesn't have the reach that a Virginia would have in terms of its intermodal connections.
    • 00:17:52
      These are our gateways and you can see from this map we have tentacles to each one of these major hub areas and then the arrows from there is interchanged either by truck or by rail to get to even more further into the Midwest.
    • 00:18:11
      And since two-thirds of the nation's population is east of the Mississippi, this is a significant chart for us.
    • 00:18:18
      But this is where we're being fed.
    • 00:18:20
      We have the Panama Canal around the world services coming from the Panama Canal.
    • 00:18:27
      We have big partners in South America in both Chile and Brazil moving freight out of South America.
    • 00:18:35
      The Suez Canal is another canal situation, but it is already able to handle
    • 00:18:43
      The largest ships that are on the water right now and this since the manufacturing regions in the Far East is kind of shifting more to the Southeast Asia and India.
    • 00:18:54
      The Suez Canal is more of a player in terms of cargo to the East Coast of the United States and of course our biggest, one of our biggest partners traditionally has been Europe and that remains a very solid trading lane for the Port of Virginia.
    • 00:19:12
      As far as connecting to Chicago and the Midwest, Norfolk Southern and the Commonwealth partnered to finish off the Heartland Corridor.
    • 00:19:23
      You can see the routing right there.
    • 00:19:25
      Basically, that Heartland Corridor removed 234 rail miles from the network, increasing our ability to service Chicago second morning out of the Port of Virginia.
    • 00:19:42
      Also in the heartland right here in Columbus, Ohio, we have next day service to Columbus, Ohio, which is becoming a major retail distribution area for the Midwest.
    • 00:19:56
      So that heartland corridor is a tremendous opportunity for the Port of Virginia.
    • 00:20:02
      The heartland corridor is a Norfolk Southern project.
    • 00:20:05
      It is exclusively served through the Port of Virginia.
    • 00:20:11
      What they did was they had to raise, I think, 14 tunnels or something to allow double stack rail on that new route.
    • 00:20:25
      Here is the National Gateway.
    • 00:20:27
      This is a CFX project that will improve service both into the Midwest as well as on the southern route down through Atlanta.
    • 00:20:40
      And on that route we have the ability to service major commerce centers like Charlotte, Greensboro, and obviously into Atlanta.
    • 00:20:50
      And then if you look from Atlanta, this is another major corridor here between Atlanta and Memphis.
    • 00:20:57
      That will give us more direct service into those markets as well.
    • 00:21:03
      This is one of the key features of our terminals.
    • 00:21:09
      We have what is called on-dock rail capability.
    • 00:21:14
      In a lot of ports, New York, Baltimore, you have to dre a container away from the terminal out to the rail facilities before those containers are put on rail cars and ultimately get to their destination.
    • 00:21:31
      For us, we do this right on terminal.
    • 00:21:35
      This project was completed back in September.
    • 00:21:40
      It doubled our capacity to move rails through our terminal.
    • 00:21:45
      And the trains are already built when we use our rail locomotives to move those containers out to the Norfolk Southern main line.
    • 00:21:58
      This is a major, major competitive issue.
    • 00:22:01
      We can load a train.
    • 00:22:02
      A container comes off of the ship.
    • 00:22:06
      Our goal is to get that container loaded onto a train within 24 hours of it coming into the terminal.
    • 00:22:14
      A lot of times it's done quicker than that.
    • 00:22:17
      About 85% of those boxes get on the train within 24 hours.
    • 00:22:24
      About 12% of the 15 that's remaining is usually because of customs, holds, and other
    • 00:22:30
      governmental requirements that haven't been met when that ship arrived.
    • 00:22:34
      But this is a very large competitive advantage because even with the Heartland Corridor, it's still faster to get a box to Chicago when you discharge it in New York than it is to discharge it in
    • 00:22:46
      in Norfolk and get it to Chicago.
    • 00:22:50
      So we believe that this will be a difference maker for transit sensitive cargo and that we can get it on a train and out before in New York they can even get it on a train.
    • James L. KeenMember, Commonwealth Transportation Board
    • 00:23:08
      How frequent, watching that automated process of loading those containers just blows my mind.
    • 00:23:14
      And how frequent does the box get on the wrong frame, go to the wrong location, or does it ever happen?
    • SPEAKER_00
    • 00:23:20
      Well, that never happens in Virginia.
    • 00:23:25
      Seriously though, it's a very low frequency of that type of thing happening, even at our Norfolk International Terminal where it's more reliant on human intervention.
    • 00:23:41
      The system is so solid that unless the delivery order or the delivery receipt is put in the system inappropriately by the ocean carrier, it's almost impossible for us to miss route a box onto the wrong train.
    • 00:24:03
      And this is the second track for
    • 00:24:07
      For the median rail project, this rail line goes up 164 right in the middle of the highway.
    • 00:24:17
      We've got dual tracks there now so we can service trains in both directions.
    • 00:24:22
      It's a major efficiency move for the port, but it's also a very big safety issue for the city of Portsmouth.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 00:24:31
      I think there was 28 at grade crossings
    • SPEAKER_00
    • 00:24:35
      removed as this project went forward.
    • 00:24:38
      So this was a major community outreach and safety project for the Port and the Commonwealth, and we had good partnership with Thelma's group and with the Secretary's office to make this happen.
    • 00:24:57
      But it's done now, and the people who live next to those railroads are not very happy, but you know,
    • 00:25:05
      This is CSX.
    • 00:25:10
      I talked about them starting their rail services out of APM Terminal.
    • 00:25:17
      This area right here
    • 00:25:19
      is the on-dock rail area here.
    • 00:25:21
      We have the capability of moving about 150,000 boxes a year through that rail facility.
    • 00:25:29
      And you can see over here is the rail line.
    • 00:25:32
      That's how those boxes vacate the terminal and go up and get to the main line.
    • 00:25:37
      So we think that this terminal is going to be fantastic.
    • 00:25:43
      And now that we have both
    • 00:25:45
      railroads with access to this terminal.
    • 00:25:47
      We think that the competition for business in that spot will increase and just be good for the Commonwealth overall.
    • 00:25:57
      This facility here is the Rail Surf Virginia Inland Port.
    • 00:26:02
      It's about a mile from I-66 and five miles from Interstate 81.
    • 00:26:08
      One of the good things about most of the projects that the Port has engaged in
    • 00:26:13
      is the economic development aspects of it and for this particular project over 7,000 jobs was created in the middle of Warren County where it was somewhat depressed but we've had Red Bull put their distribution centers up there, we've got Home Depot with a major distribution centers and a number of other facilities that have opened up there simply because this facility was made available to them.
    • 00:26:40
      Again, this is all serviced by rail.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:26:44
      You've taken a lot of trucks off 66.
    • SPEAKER_00
    • 00:26:47
      Absolutely.
    • 00:26:48
      I appreciate that.
    • 00:26:49
      It's been great.
    • 00:26:50
      And for selfish reasons, this facility works for the port because it offers an alternative to cargo that was traditionally moving through Baltimore because the customers could discharge their cargo or load their cargo in Baltimore.
    • 00:27:11
      I don't know if it makes sense to us that they should be getting our business.
    • 00:27:14
      So back in the 80s, we decided to do this, and it's starting to pay dividends.
    • 00:27:20
      So that portion of I-66 from between 81 and Washington, DC, Baltimore area,
    • 00:27:29
      You should see virtually no trucks, no port trucks anywhere on that corridor headed to Baltimore because we can short-circuit them here.
    • 00:27:38
      We also help the truckers out because now truckers coming down 81 can jump off 81, drop their containers, pick up an import load and head back without coming all the way down to the port.
    • 00:27:56
      These are some of the truck numbers that
    • 00:27:59
      So on I-64 we have 3900 truck moves, about 268 of those are port moves.
    • 00:28:11
      On 460 we have 1800 total truck moves, 56 of those daily moves are with port trucks, and then you see Highway 58 at 2200 with 275 as port moves.
    • 00:28:28
      And this is inbound, outbound, daily train counts.
    • 00:28:33
      At NIT, we have five trains a day moving in and out of there.
    • 00:28:36
      And Jeff, you probably hear those every once in a while as they make their way in and out of the gate and cross Hampton Boulevard.
    • 00:28:45
      CSX and APM both have one each, trains moving in and out of there.
    • 00:28:49
      I think that number will increase drastically now that Maersk has their services off with CSX.
    • 00:28:59
      And this is a picture of the distribution centers around the Commonwealth.
    • 00:29:03
      You can see every portion of the Commonwealth is impacted by what happens at the Port of Virginia.
    • 00:29:10
      When we talk about Hampton Roads being the home of the Port of Virginia, that may be true.
    • 00:29:16
      That's where we are physically located for the most part.
    • 00:29:20
      But look at this map.
    • 00:29:21
      This is where that 343,000 jobs are coming from.
    • 00:29:26
      Every portion of this map, every portion of the Commonwealth has some distribution center, some manufacturing point that is affected by the port.
    • 00:29:36
      That's just the Virginia perspective.
    • 00:29:38
      If you look at the United States, we have, we touch all 48 contiguous states with cargo moving through our port.
    • 00:29:48
      Daily traffic counts, you know, there it is.
    • 00:29:52
      Here's what it is.
    • 00:29:54
      And these are the projects that are currently being considered in Hampton Roads at least for congestion relief.
    • 00:30:04
      And there are the rest of them.
    • 00:30:08
      The Highway 461, I wanted to make sure that that got on the screen here because that is one that our board has
    • 00:30:17
      approved the port's participation in and that whole economic corridor there I think will be a big boom for both the port and the Commonwealth once that's completed.
    • 00:30:29
      Okay and this is the proposed routing for the new U.S. Route 460 and that is all I have this morning but I am certainly happy
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:30:39
      To answer any question you might have.
    • 00:30:53
      Did you have, I know when we look at some of these economic initiatives, if we're going to do road, anything of that nature, through that, we're really looking at what is kind of the average income or the average salary that that provides, just to get a measure.
    • 00:31:08
      Where is it on the pay scale?
    • 00:31:09
      What is it going to be in terms of a return on the GDP?
    • 00:31:12
      Do you have that available?
    • 00:31:14
      You outlined, I think, 343,000 jobs, and that's the other part of it.
    • 00:31:18
      Are those kind of in some way tied to and influenced by the port or are those 343,000 jobs that are as a result, direct result, wouldn't be there if the port wasn't there?
    • SPEAKER_00
    • 00:31:32
      They're still the latter.
    • 00:31:34
      These aren't direct port jobs.
    • 00:31:37
      These are- They get spin-off.
    • 00:31:39
      Tertiaries.
    • 00:31:40
      Yeah.
    • 00:31:40
      Spin-off type jobs.
    • 00:31:42
      Most of the jobs that are created though are good paid jobs.
    • 00:31:46
      Some of the entry level jobs
    • 00:31:48
      If you're driving a forklift in a distribution center or something like that, you're getting a prevailing wage, but it's not.
    • 00:31:55
      To us, that's an entry-level job, and it's a springboard to do something bigger and better.
    • 00:32:01
      The majority of the jobs that we see directly related to the actual ship calling are the longshore jobs on the dock itself, where we employ about 2,000 longshoremen a day doing that, and those wages are very good wages.
    • 00:32:17
      Then the truck drivers that service the port and obviously the railroad people that impacts the work directly at the port.
    • 00:32:28
      Now the Wal-Mart, the Targets, the dealers and all of these other places that basically their product, they wouldn't have product on the shelf if not for the port, then those numbers are also in that $343,000 mix.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:32:46
      Any other questions?
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 00:32:47
      Yes, Mr. Bridges, thank you.
    • 00:32:49
      Obviously, the combination of private investment, state investment, even local investment is important to the port, but federal investment's really important as well.
    • 00:33:01
      We're seeing different ideas about the federal budget's response to these infrastructure questions.
    • 00:33:07
      But I did note yesterday in a news article that the administration had announced
    • 00:33:15
      A small grant of $2.8 million to the Port of Savannah for them to continue to move forward with some of the activity there.
    • 00:33:23
      Are we dependent at our end, at our port, on federal action to carry through some of these plans and connections you're talking about?
    • 00:33:32
      And if so, are those jeopardized at all by the current budget difficulties?
    • SPEAKER_00
    • 00:33:37
      That's a very good question and the answer is we are not totally dependent on federal government for
    • 00:33:44
      That is a site where it requires dredge materials to be used to create 300 additional acres of marine terminal space.
    • 00:34:04
      The federal government in their normal duties to create
    • 00:34:11
      Channel Deepening and that type of infrastructure is partnered with the Port to provide 50% of the funding that is required to create the dikes and levees to build this new terminal.
    • 00:34:26
      That is, I think that the total keeps going up every day but as last check it was well over a half a billion dollars and they were going to pick up half of that money.
    • 00:34:41
      Committing to pick it up and actually appropriating the money is always a difficult task.
    • 00:34:48
      This year we were able to pick up $27 million this year in the President's budget and signed off by the other two houses.
    • 00:35:04
      This coming year we're going to have a challenge in getting money allocated to that project
    • 00:35:11
      And that's very dependent on the federal government because without their partnership we would not be able to complete that Cranny Allen project.
    • 00:35:22
      But it's in the federal interest to do it.
    • 00:35:25
      For every dollar the federal government put into the project there's an eight dollar return on that investment.
    • 00:35:31
      One of the problems though that the government is having
    • 00:35:34
      is that this 50-50 split is kind of new.
    • 00:35:39
      And we got it in the budget from Senator Warner, the first generation of Senator Warner, got it into the budget and the 50-50 split.
    • 00:35:52
      With the new administration, there is a controversy over that because they believe, the law says, that they only have to contribute 4% of the overall cost.
    • 00:36:02
      And at that basis, we're not able to do this project.
    • 00:36:05
      We can't afford it.
    • 00:36:06
      And I think the national interest would be hurt because by doing that expansion and creating the 600 additional acres of land, it prolongs the life of Cranny Island as a dredged disposal site, which is a critical need that the Corbin's years have.
    • 00:36:26
      So I think we will overcome that.
    • 00:36:28
      But the partnership with the federal government, as you can imagine,
    • 00:36:32
      is quite tenuous and it's very difficult to have a real comfortable feeling year over year that you're going to get the money that's required to keep the project going.
    • 00:36:42
      Our spend rate right now is somewhere in the range of $17 to $22 million a year on that and we think that as we get further into the development those numbers will escalate quite quickly until we get the land created.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 00:36:58
      I did a little quick research here and it turns out the Atlantic Sturgeon
    • 00:37:06
      can grow to 15 feet and can live 100 years.
    • 00:37:10
      That's a little bigger than a herring, right?
    • 00:37:12
      Herring's fit in those cans and stuff.
    • 00:37:16
      Thank you.
    • 00:37:17
      Thank you, sir.
    • 00:37:19
      Thank you.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:37:19
      That's of your knowledge is really sometimes quite obvious.
    • SPEAKER_00
    • 00:37:22
      See, that's the problem, Sean, with having these laptops in front of everybody.
    • 00:37:27
      Let me go back to you real quick.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 00:37:29
      Mr. Lane.
    • 00:37:30
      Mr. Bridges, thank you for your presentation.
    • 00:37:32
      You mentioned some of our competitive advantages.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:37:36
      Then you also talked about really what makes the difference is once the goods are landed, how long it takes to get from there to the ultimate user.
    • 00:37:45
      Can you speak a little bit about how we're positioned as a port in that infrastructure as compared to our competitors?
    • SPEAKER_00
    • 00:37:51
      Yeah, we are very well situated.
    • 00:37:54
      In fact, I think we have the best setup on any coach right now.
    • 00:38:00
      We're very similar to the way Los Angeles and Long Beach are set up in terms of their inner-modalism.
    • 00:38:10
      In fact, we're a little bit better than either LA or Long Beach.
    • 00:38:14
      While they have on-dock rail, they also have
    • 00:38:17
      A long way to go to get to the main line for either UP or BNSF.
    • 00:38:23
      They created a thing called the Heartland, not the Heartland, but the Alameda Corridor, which feeds the main yard for each BNSF and the UP.
    • 00:38:35
      And that mixing yard is where they build the trains to come into the Midwest of the United States.
    • 00:38:41
      So on the East Coast, we're unparalleled.
    • 00:38:45
      There's no other port that has
    • 00:38:48
      The on-dock rail capacity that we have in that daily service.
    • 00:38:53
      With Norfolk Southern we have five trains a day moving out of our port to Chicago, so we do very well in that area.
    • 00:39:01
      New York, once that cargo gets to the mixing yard, they have a pretty quick transit from New York into Chicago, but again,
    • 00:39:14
      It could take a few days to get it off the ship and to the rail yard before it starts to move.
    • 00:39:21
      Further south, in places like Florida, they have a pretty good short-line rail system there,
    • 00:39:32
      The two major East Coast railroads presence at a lot of those ports is missing so there's a long drive to get to the rail yard itself.
    • 00:39:40
      So right now we are very well situated to take full advantage of the Animoto Prospects.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:39:48
      Thank you, Mr. Burgess.
    • 00:39:53
      Jerry, you talked well about our strategic advantage
    • 00:39:59
      Which puts a lot of heat on y'all to produce.
    • 00:40:04
      What is it you need that you don't have to win, number one?
    • 00:40:11
      And number two, can you speak to, sort of, or be helpful to us, I think it'd be helpful to me, to see
    • 00:40:25
      Pretty hard projections, and I know that's hard to do, but pretty hard projections in terms of the TEUs that need to flow through the road system primarily, and whether the roads can handle that or not.
    • 00:40:41
      And sort of, when I ask the question, what do you need, what's the impact on our roads in Hampton Roads or other places, and how does 460 really play into that
    • 00:40:52
      When do you see the real need for that in terms of, you know, really being able to move freight and or people?
    • 00:41:02
      And is there some elasticity of demand in the tolling that we sort of looked at?
    • 00:41:08
      There have been some pretty big numbers on projected tolls on 460.
    • 00:41:12
      So I know that's sort of a cornucopia of questions, but can you help me with that?
    • SPEAKER_00
    • 00:41:16
      Yeah, there's a lot of questions in there.
    • 00:41:18
      Now, what do we need?
    • 00:41:20
      I think that primarily we need to have the, we've invested a lot on infrastructure inside of our gates.
    • 00:41:33
      We've got the biggest, the best, the fastest cranes in the world.
    • 00:41:37
      Obviously we have big terminals that can move cargo through the physical plant quite easily and effectively.
    • 00:41:48
      But the bottlenecks will happen right outside of our gates.
    • 00:41:52
      And so we need to continue to look for ways to disperse that cargo in as many directions as we possibly can move it.
    • 00:42:04
      That means that we not only need to look at
    • 00:42:07
      Highway 64, 58, and 460, but we have to look across the board at all the entry and exit points out of the port.
    • 00:42:19
      We also need, in order to win big, we need to, as well as we can,
    • 00:42:27
      emulate what has happened in Savannah in terms of creating those economic zones near the port that will create opportunities for automobile manufacturers and others to come into the state and create the type of jobs that we need to grow our population.
    • 00:42:46
      Because one of the things that is always important is how close is the population base to the entry port of the freight.
    • 00:42:57
      And, you know, Savannah has Atlanta in the easy reach.
    • 00:43:02
      So that makes it easy for an ocean carrier to say, I'm coming to Georgia because I can come there and I can discharge, you know, three-quarters of my cargo for local consumption versus the additional cost of putting it on the rail and moving it to some other point.
    • 00:43:20
      So we need
    • 00:43:23
      Road and rail connectivity to the port to continue to improve.
    • 00:43:28
      We need population growth in the local area to ensure that we have cargo that's moving to Virginia that can only come to Virginia because of the proximity of the population.
    • 00:43:41
      And the third, and I think somewhat important, is we need to have continual support
    • 00:43:48
      from regulators and people who make the decisions.
    • 00:43:53
      You talk about elasticity and the toll rates.
    • 00:43:56
      We don't know how much elasticity there is in that because we've never had a toll.
    • 00:44:01
      But I can tell you that from other experiences and just the basics in transportation, people will resist and they will tell you all kind of horror stories about the effects of tolls.
    • 00:44:18
      I got to tell you, I'm in New York a lot, and I know this may not sound right to you, but geez, there's a lot of tolls being paid for just passenger vehicles.
    • 00:44:35
      You triple that for 18-wheel containers and trucks, and then you get an order of magnitude of what these ocean carriers are paying in that market to move cargo
    • 00:44:48
      in and out of those ports.
    • 00:44:50
      So is there elasticity?
    • 00:44:52
      I think that there is some.
    • 00:44:54
      I think pricing it right is going to be most critical.
    • 00:44:58
      And any of my friends who are here who may be in the trucking community, please don't shoot me in the back.
    • 00:45:03
      But at some point, we've got to base our services around fees that make sense.
    • 00:45:09
      And we can't build it for free.
    • 00:45:12
      So we've got to figure out a way to make it work for everybody.
    • 00:45:16
      But there is some elasticity there.
    • SPEAKER_15
    • 00:45:18
      Thank you, Mr. Chairman.
    • 00:45:21
      Mr. Bridges, thank you for your comments.
    • 00:45:24
      A question, and you may have touched on this, and I dismissed it.
    • 00:45:29
      With the completion of the Panama Canal improvements, what do you expect to be the immediate transfer of TEUs from the West Coast ports to East Coast?
    • SPEAKER_00
    • 00:45:41
      That is the question that a tribe means solely.
    • 00:45:44
      It's hard to tell at this point, but the thing is the market continues to grow.
    • 00:45:54
      Right now the projection is that container market will grow by 6%.
    • 00:45:59
      And the beauty of the Panama Canal sequence is that the West Coast does not necessarily have to lose in order for other ports to win.
    • 00:46:09
      There's only a finite amount of terminal capacity, rail capacity, and the whole shooting match that moves currently over the West Coast.
    • 00:46:19
      As the market continues to grow, they're going to have to have another basket or another place to move that cargo.
    • 00:46:28
      I think that's where the real opportunity is going to come from.
    • 00:46:32
      I don't think that initially we would just rob the West Coast of this volume and have
    • 00:46:39
      That same cargo transfer from there to us.
    • 00:46:42
      The beauty is going to be that gradual approach that I talked about.
    • 00:46:46
      In 2014, we may see freight start to trickle through the Panama Canal to the East Coast.
    • 00:46:53
      But as volumes continue to build, and the West Coast ports generally operate up in the 80-82% range, and that's optimizing the facility.
    • 00:47:05
      If it gets much beyond that, I think that that will
    • 00:47:08
      The efficiency goes down to the point where it will force more cargo to other ports, and that's where I think that we will win.
    • 00:47:15
      But to nail down a specific percentage of growth in the short term is very difficult for us to project at this time.
    • SPEAKER_15
    • 00:47:23
      So the economics are not such that it becomes a foregone conclusion they're going to move from the West Coast?
    • SPEAKER_00
    • 00:47:29
      No, I think they'll move from the West Coast when the West Coast can no longer handle the volume.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:47:35
      Can you tell me what impact DOD spending has on the port and if we see a potential reduction there will that affect the port?
    • SPEAKER_00
    • 00:47:46
      Absolutely.
    • 00:47:47
      One of the things that we have worked in Washington to make sure that
    • 00:47:54
      What doesn't happen is that the DOT spending is cut to the point where they're not able to service the major interstates.
    • 00:48:04
      I mean, that is a major, major piece of our viability.
    • 00:48:13
      As far as the Department of Defense is concerned, there's very little direct impact to the port and its ability to maintain its infrastructure and that sort of thing.
    • 00:48:33
      With the exception of the United States Corps of Engineers budget, that is a tremendous impact because one of their core missions is to maintain
    • 00:48:43
      All the national and federal channels, and that has been an area of a big fight for years.
    • 00:48:51
      There's a thing called the Harbor Maintenance Tax Fund that is appropriated from the White House to the Corps of Engineers, and that fund is taking in about $1.6 billion a year, but they're only funding
    • 00:49:04
      or allowing about $800 million to come back to the ports to dredge their, to maintain their authorized depth.
    • 00:49:14
      This is not new construction like we have in Savannah or in Charleston at this point.
    • 00:49:19
      This is just to maintain the depth of the channels as they currently exist.
    • 00:49:24
      And that funding is very often cut and that affects ports overall.
    • 00:49:30
      But the DOD,
    • 00:49:32
      with their presence in our harbor with the Terrier groups and all of that.
    • 00:49:40
      We're in pretty good shape in terms of making sure that the Harbor State drags.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:49:45
      Can we go back to that element you talked about?
    • 00:49:47
      It's 1.5 is collected through the tax, but they're only returning 800,000?
    • 00:49:52
      Yes.
    • 00:49:52
      Where's the other 700,000, or 700 million I guess?
    • SPEAKER_00
    • 00:49:55
      It's in trust.
    • 00:49:56
      It just stays there.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:50:00
      It's on budget, so it's being used to offset the deficit.
    • 00:50:04
      Okay.
    • 00:50:05
      So right now I think the trust fund is up to what, $8 billion?
    • SPEAKER_00
    • 00:50:09
      It's like $8 billion surplus in it right now.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:50:13
      And right now that's just for maintenance stretching.
    • 00:50:16
      So the problem is we have, whether it's our port or other ports around the
    • 00:50:22
      It's the country that are silting up because they're not using the taxes actually collected on the cargo.
    • 00:50:31
      It's supposed to go towards dredging and only about 60% of it is actually used.
    • 00:50:38
      The rest of it is going in the offset deficit.
    • 00:50:41
      So you're having major problems throughout the country now with silting up.
    • 00:50:46
      The one slide that Mr. Bridges had about authorized, you know, what they're authorized at is not even necessarily the depth they're getting to and even the maintenance of what they say they're at.
    • 00:50:59
      It's causing enormous problems throughout the country.
    • 00:51:04
      Mr. Bridges, could you just go back to slide 15?
    • 00:51:06
      I'm sorry, our slide, I think it's 15, 16.
    • 00:51:10
      It shows the truck and the train counts.
    • 00:51:13
      I'm sorry, I have to get back to...
    • 00:51:20
      I'm just interested in the numbers.
    • 00:51:22
      Our presentation is slide 16 together, but didn't show up with the daily... What's that?
    • 00:51:33
      Yeah, I think it's slide 16.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:51:39
      We didn't have that.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:51:41
      Yeah.
    • Dana M. MartinMember, Commonwealth Transportation Board
    • 00:51:43
      No, you go back.
    • 00:51:45
      Right there, right there.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:51:47
      Yeah, our slide, it combined the truck and train counts.
    • 00:51:51
      So I'm sorry, those numbers there.
    • 00:51:56
      These are total.
    • 00:51:59
      Now, is this a long haul truck or is it drainage trucks as well?
    • SPEAKER_00
    • 00:52:05
      The dredge trucks are the bottom number that says port.
    • 00:52:10
      The total number is the number on the top that include any truck that's transiting on those particular corridors.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:52:21
      And that is both BTLE, I mean, so it's the average of seven days a week.
    • SPEAKER_00
    • 00:52:25
      Yes, sir.
    • 00:52:26
      Seven, it's an average.
    • 00:52:28
      And so, obviously, during a
    • 00:52:31
      weekday, those numbers would be significantly higher than that because it's virtually no truck movements to speak of over the weekend on those particular parts.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:52:46
      And one of the, I'm sorry, so when the, the port itself, what's the busiest day?
    • SPEAKER_00
    • 00:52:53
      Our busiest day for discharging and loading ships would be
    • 00:53:00
      Thursday, Friday, Saturday.
    • 00:53:03
      Now, as far as putting cargo on the road, it would be Monday, Tuesday, Monday, Tuesday timeframe.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:53:13
      One last question.
    • 00:53:14
      One last question.
    • 00:53:16
      On this bridge, the 460-port truck, the 56 jumps out at you versus 64 and 58.
    • 00:53:25
      Most of us who spend any time on Hampton Roads know that 460, particularly going in the early stages, has a bunch of traffic lights and little towns and so forth.
    • 00:53:41
      And really, but oftentimes, the transit time from the port to Richmond of 64 is no better and often worse
    • 00:53:53
      for a passenger vehicle anyway than it is to go 460.
    • 00:53:59
      A lot of people in Richmond, going to Richmond or coming from Richmond will take 460 now because sort of the certainty of the time, even if it's on average a little bit longer, you don't have these big spikes of time when you're hung up on 64.
    • 00:54:15
      So I'm a little bit curious why you think that more trucks don't take that as well.
    • 00:54:22
      The passengers are starting to take that.
    • 00:54:25
      I mean, particularly on the weekends, particularly on busy times, people coming from Richmond saying, I'm not doing 64 in the tunnel.
    • 00:54:32
      I'm coming down 460, because I know it might take 10 or 12, 15 minutes longer, but that's what it's going to take.
    • SPEAKER_00
    • 00:54:39
      We're starting to see more trucks use a 460, but I think it's the reason that you articulated.
    • 00:54:45
      It's the fact that starting and stopping is very difficult on a
    • 00:54:50
      18-wheeler.
    • 00:54:51
      So these guys like to go in long stretches without having to change gears much.
    • 00:54:58
      But the flip of that coin is like you said, on 64 they're just sitting.
    • 00:55:05
      Exactly.
    • 00:55:05
      But it's programmed on 460 with the lights.
    • 00:55:09
      That's why we think that the real alignment with truck lanes and that sort of stuff would be very attractive to
    • 00:55:16
      A trucker that's making efficiency and cost savings because they can get to roll and just keep going.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:55:23
      And just as sort of a follow-up point for my colleagues who were down at what we call the Marist Terminal over in Portland, which is the big terminal, if you will, the one that can load more stuff faster than any of the rest of the terminals in Hampton Roads.
    • 00:55:44
      It becomes sort of obvious why 460, if you just look at the map, why 460 becomes a pretty important issue in terms of getting out of Hampton Roads because you don't have to go through tunnels, you don't have to go through sort of city traffic, and yet 460 is a rural road in many ways because of all the little towns and stoplights.
    • 00:56:08
      So if that was a, if we had good throughput there,
    • 00:56:13
      It would be a very attractive place, a very attractive route to get to 95 more north.
    • 00:56:21
      It sort of becomes obvious why that's so important.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:56:25
      Just a quick follow-up.
    • 00:56:26
      Jay, do we have any traffic, any significance going up 17 over the, or 13 over the Chesapeake-Gingrich Tunnel?
    • SPEAKER_00
    • 00:56:34
      There are some, but it's not significant from the Port's perspective.
    • 00:56:38
      It's any cargo that's
    • 00:56:42
      One question I have, not really highlighting it on the slide here, and I know this would
    • 00:57:11
      That traffic is starting to pick up, and we see that as an opportunity because we're serving quite a bit of northeast North Carolina through our port.
    • 00:57:37
      North Carolina continue to pick up these economic development projects where they've got some light manufacturing and other products moving into that furniture business, the log business, all of that is happening in North Carolina.
    • 00:57:52
      So we see that traffic starting to pick up.
    • 00:57:56
      And in response to that, we partnered with North and Southern Railroad to open rail services between the Port of Virginia and Greensboro, North Carolina.
    • 00:58:06
      So that we can move those containers via the rail down to Greensboro and then disperse them back into the hinterlands from there.
    • 00:58:16
      But that business is really picking up forth.
    • 00:58:18
      I think we're currently moving about 300 containers a week now.
    • 00:58:25
      And we just started the service maybe two months ago.
    • 00:58:28
      So that is really starting to build momentum.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:58:33
      Mr. Bridges, I appreciate very much you being here.
    • 00:58:35
      Yes, sir.
    • 00:58:36
      Thank you very much.
    • 00:58:37
      That's exactly what the CTB is looking for.
    • 00:58:39
      Appreciate it.
    • 00:58:40
      Appreciate everything you're doing.
    • SPEAKER_00
    • 00:58:42
      Thank you, sir.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:58:44
      Next is a report by Mr. Lawson.
    • 00:58:47
      Are you going to give us good news or bad news?
    • John W. LawsonChief Financial Officer
    • 00:58:51
      Good news.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:58:52
      Good news.
    • John W. LawsonChief Financial Officer
    • 00:58:54
      While I'm getting this to come up, just wanted to share some good news.
    • 00:58:59
      It's February the 1st.
    • 00:59:03
      February 1st, we priced a refunding for a series 2001-2002 bond related to the NBTD Route 58.
    • 00:59:23
      You may have seen the press release that came out on that, but it was a very positive outcome.
    • 00:59:30
      We refunded
    • 00:59:31
      $137 million of the bonds, par value bonds, by selling $124 million in bonds.
    • 00:59:44
      The true interest cost on the deal was a record for us, 1.38%.
    • 00:59:52
      The short term, the only average life is just under six years.
    • 00:59:56
      Still, the action took
    • 00:59:59
      represents about a 19% savings over the course of about $25 million.
    • 01:00:05
      It was a very, very well worthwhile effort.
    • 01:00:10
      We're also working toward a refunding for Route 28, some bonds for that program as well, and having to work through some issues there with the localities, but it'll probably be late April, early May before we do that refunding.
    • 01:00:30
      and also in the bond market yesterday and today we are in the market with the first Garvey issue.
    • 01:00:39
      We had retail pricing yesterday.
    • 01:00:40
      This Garvey issue is being done as a negotiated sale.
    • 01:00:44
      We took retail orders yesterday.
    • 01:00:46
      We're in the institutional market this morning and hopefully before the meeting is over today I'll be able to share with you the results of that transaction.
    • 01:00:59
      Okay, turning to current activity.
    • 01:01:05
      In terms of year-to-date revenue collections, we are about 3% ahead of where we were last fiscal year, which is better than the 2.2% growth rate that is forecasted for the year.
    • 01:01:18
      We'll point out that the December revenue forecast was reduced slightly, the projected growth
    • 01:01:27
      That prior to that was 2.6%.
    • 01:01:29
      So we're looking at a 2.2% growth.
    • 01:01:32
      It's about a $10 million difference is all that it equates to.
    • 01:01:36
      And that $10 million reduction in projected revenue is reflected in our fiscal 14 budget projections.
    • 01:01:45
      In terms of the big performer continues to be motor vehicle sales.
    • 01:01:52
      We are looking at year-to-date growth of almost 9%.
    • 01:01:56
      versus the forecasted growth of about 4%.
    • 01:02:00
      Motor fuel tax collections are down just over 1% from last fiscal year.
    • 01:02:09
      That was one of the main areas of adjustment in the December forecast where they reduced the projected growth of almost 3% to a projected decline of just over 1%.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:02:25
      Do you have any knowledge if that's from increased gas mileage for vehicles or decreased travel miles due to gas price?
    • 01:02:32
      Anything to get your hand around that?
    • John W. LawsonChief Financial Officer
    • 01:02:35
      Well, again, in this area, what we're seeing from the data we get from taxation is just reduced levels of VMT.
    • 01:02:43
      VMT is not rebounding as fast as we would have expected.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:02:48
      What about the gas, the motor fuels?
    • John W. LawsonChief Financial Officer
    • 01:02:50
      The sales, the motor vehicle sales?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:02:52
      A lot of that is in the gas tax collection.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:02:55
      Is that the gas tax?
    • John W. LawsonChief Financial Officer
    • 01:02:58
      The gas tax collections.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:02:59
      We don't have any idea if it's people traveling fewer miles or people getting better gas miles.
    • John W. LawsonChief Financial Officer
    • 01:03:05
      It's reductions in VMT.
    • 01:03:08
      It's vehicle miles traveled.
    • 01:03:09
      Yes, sir.
    • 01:03:10
      It's just not rebounding as quickly as anticipated.
    • 01:03:13
      In terms of the state sales and use tax,
    • 01:03:20
      That continues to perform well.
    • 01:03:24
      Growth is just over 5%, slightly behind, about a half a percentage point behind forecast at this point.
    • 01:03:33
      This chart is just a detailed chart that shows you by major source what the collections are compared to the estimate and compared to last fiscal year and the change and the growth that is expected.
    • 01:03:48
      and by the forecast.
    • 01:03:50
      These are all done prepared by the Department of Taxation.
    • 01:03:55
      In terms of federal revenue, based on our numbers, we are tracking just behind where we were in last fiscal year, although there are some unposted receipts from the end of January that we had
    • 01:04:16
      looked at that once they are posted, it will actually bring us about 20 million ahead of where we were last school year.
    • 01:04:23
      But in terms of where those revenues are coming in, we are seeing less activity in the construction program with offset by increased activity in the maintenance program.
    • 01:04:34
      As I go through, you'll see that the maintenance program, activity within the maintenance program is greatly increased over last year.
    • 01:04:45
      In terms of spending, we spent $2.3 billion through January.
    • 01:04:50
      That's $300 million ahead of where we were this time last year.
    • 01:04:58
      Fifty-three percent of that spending is related to maintenance activities, whether it's including locality maintenance payments.
    • 01:05:07
      We just looked at VDOT maintenance about 45 percent.
    • 01:05:12
      Construction, including our project activity represents...
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:05:15
      I'm sorry, Mr. Lawson, just before you go on, the federal revenue?
    • John W. LawsonChief Financial Officer
    • 01:05:21
      Yes, sir.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 01:05:22
      I'm sorry, I lost visibility on this issue.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:05:25
      Has anything developed about them trying to change the dates on the spending of the error of money?
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:05:32
      Mr. Chairman, the dates have not changed, but they are still asking for information.
    • 01:05:39
      They, being the federal government, are asking for information as of our expenditures as of September 13th.
    • 01:05:49
      So they are encouraging us to complete these projects by September 13th, the auto projects.
    • 01:05:55
      But we have contracts that extend past September 13th.
    • 01:06:00
      We believe we will probably have most of the expenditures incurred with the exception of maybe $30 million or so spent by September 13th.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:06:13
      Just to make the Board aware, we started getting inquiries from the federal government that they were trying to push up
    • 01:06:27
      by September 30th of this year.
    • 01:06:29
      I don't know what's going on this fall, but apparently they want us to try to speed up all the spending before an election.
    • 01:06:39
      Well, it happens to be a coincidence, I'm sure.
    • 01:06:43
      The problem, obviously, is that the bigger projects we're doing had our money on it.
    • 01:06:51
      We're going to spend it in accordance with the original deadlines.
    • 01:06:55
      But there are some very big projects that have our money.
    • 01:06:59
      And we were concerned that this would pull the rug out from several of these projects.
    • 01:07:05
      So we just have to watch this.
    • 01:07:10
      I'm sorry, Mr. Lawson, go back.
    • John W. LawsonChief Financial Officer
    • 01:07:12
      Sure, no problem.
    • 01:07:15
      Moving on to the next slide, this is just the graphical depiction of the year over year spending of the major programs.
    • 01:07:22
      And you noticed from top to bottom,
    • 01:07:25
      For the most part, the year-over-year spending is pretty consistent with last fiscal year with the exception of highway system maintenance.
    • 01:07:36
      So looking at maintenance a little deeper, through January we are 41 percent spent, we spent 41 percent more than we had expended last year.
    • 01:07:47
      We spent just over a billion dollars compared to about 740 through last fiscal year.
    • 01:07:55
      This heightened spending is clearly a result of the focus that we put on getting the contracts out last year and the work that's underway on those projects.
    • 01:08:11
      We are looking at, based on spending today and our outlook for the rest of the year, ending the year with an unspent allocation balance of about $200 million.
    • 01:08:22
      We have to remember that is a tremendous reduction considering we ended last fiscal year with a balance of $485 million.
    • 01:08:31
      So we have taken tremendous steps in bringing that down.
    • 01:08:36
      And that $200 million is largely identifiable when we look at some of the issues or items that will not be expended.
    • 01:08:44
      There's about $50 million
    • 01:08:47
      between some reserves and disaster snow-type monies that at this point we're underspending.
    • 01:08:55
      There's $40 million of bonus obligation authority allocations in here that were just added into the budget at the beginning in September that will not be expended this year, even though planned will not actually get expended during the year.
    • 01:09:10
      And then there's probably about $100 million
    • 01:09:13
      related to projects that were started this year that just won't get expanded through until December, the period of the contract are allowed.
    • 01:09:22
      I think you had asked before the question about last year's activity, the projects from last year.
    • 01:09:29
      Commissioner, you may have to help me with the numbers, but of the projects that were actually awarded, contracts that were actually awarded last year, about 95 percent of them were completed by the due date in December.
    • 01:09:43
      So it's only about $10 million of the amounts programmed for those major projects that were not spent by the end of the contract period.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:09:55
      Mr. Chairman?
    • 01:09:56
      Yes.
    • 01:09:57
      Mr. Lawson, I understand what I'll call the snow money.
    • 01:10:06
      And that's a good thing.
    • 01:10:07
      It's a good thing we didn't spend that much.
    • 01:10:09
      First, can you tell us about what our process is?
    • 01:10:14
      When do we pull the trigger on reprogramming that money and how do we do that?
    • 01:10:19
      And the second piece would be even extracting out the $30 million or so that was in that number, I think you're still at $1.50, and how to regress first and say,
    • 01:10:33
      You all did a heck of a lot better job than had been done before, and I congratulate everybody that's part of that team for doing that.
    • 01:10:42
      Notwithstanding that, you said in your budget, there's another $150 million that you expected to spend, and we didn't spend it.
    • 01:10:52
      We didn't spend it in this year.
    • 01:10:54
      So I get the snow money thing.
    • 01:10:59
      What happened, you know, what did we learn, or what are we learning?
    • 01:11:04
      As it relates to the $150 million that we expected to spend, even though we did a heck of a lot better, we still expected this $150 million to be spent.
    • 01:11:13
      So I didn't really understand your explanation as to why it wasn't spent when we expected it to be.
    • John W. LawsonChief Financial Officer
    • 01:11:21
      Okay.
    • 01:11:22
      Again, another $40 million of it is the bonus, additional funding from Federal Highway related bonus obligation authority.
    • 01:11:29
      So we didn't actually know about that until August.
    • 01:11:33
      So when we were notified by Federal Highway, that increase was provided to the maintenance program.
    • 01:11:40
      Projects are identified to use those funds, but not- It sort of dropped in our lap without any planning on our part.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:11:46
      Correct.
    • 01:11:47
      So now you're at 70.
    • John W. LawsonChief Financial Officer
    • 01:11:49
      So now we're roughly at that 100 point that I was saying is related to when we look at the projects that we put out to be expended over the, and the contracts are really a calendar contract, and we have to kind of
    • 01:12:03
      Look at what's going to get spent from March, April when the contract season starts through December when the contract period ends.
    • 01:12:12
      We try to determine what the contractor is going to do because we're not dictating to him where he's going to go.
    • 01:12:22
      Based on where we are today, we're thinking that about $100 million of what we thought would have been expended through June will not get expended until the latter part of the summer.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:12:33
      So it's basically a 20th is what we sort of didn't do as well as we thought we'd do with.
    • 01:12:43
      So it's really 5%, which is a heck of a lot better than where we've been before.
    • 01:12:49
      Thank you.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:12:50
      So the contractors are the ones, you know, you said you can't, they didn't react.
    • 01:13:00
      Even with the warm weather, they're not able to, they're not flexible enough to react to moving things up.
    • 01:13:06
      I'm just trying to understand that.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:13:10
      Mr. Chairman, I think the contractors did a,
    • 01:13:16
      Real good job this year in getting the funds done.
    • 01:13:19
      I mean, getting the projects done.
    • 01:13:21
      They did about 95% of the work.
    • 01:13:25
      And, you know, we're still trying to learn how to project from a cash flow perspective
    • 01:13:34
      How much we will actually spend a year.
    • 01:13:36
      Of course, a number of years before, we've been using an allocation base and not really trying to match our budget and contract with what we expect to spend.
    • 01:13:48
      And I think we're still in this learning curve.
    • 01:13:50
      I think we did a lot better this year.
    • 01:13:52
      I project that we will probably do better the following year.
    • 01:13:57
      In terms of, Mr. Miller, your question about when will we
    • 01:14:03
      Look at our surpluses or savings and try to put new contracts out.
    • 01:14:10
      I've authorized yesterday to put out another $55 million in contracts.
    • 01:14:16
      So we are trying to be aggressive, but I would say the biggest part to your answer to your question is we're still learning how to get these projections just right.
    • 01:14:29
      And I will also say that those who did not meet their deadline in December, liquidated damages will be started on December 1.
    • 01:14:39
      They will probably go through December 10.
    • 01:14:42
      We shut down the season because of the paving season because of weather.
    • 01:14:47
      As soon as the weather gets warmer in March, we'll start the season back, but then liquidated damage will start for those couple contractors on the first day that we said it's okay to go back and pay.
    • 01:15:02
      And I think those liquidated damages will encourage them to get their work done on time.
    • 01:15:09
      Another part of trying to estimate this cost, we've tried to be flexible with the contract.
    • 01:15:16
      And that is because as John mentioned, these contracts cross fiscal years and we try not to tell them, spend an X amount by June 30th and then spend the balance by the next part of the year.
    • 01:15:30
      We try to give them the flexibility.
    • 01:15:32
      So we're always estimating and we use a factor of about 20%.
    • 01:15:37
      When we let a contract in December, or I'm sorry, we let a contract for paving in January or February, we estimate that they will spend about 20% of that contract in the current fiscal year.
    • 01:15:51
      The 80% will be spent the following fiscal year.
    • 01:15:55
      And we try to project our expenditures accordingly.
    • 01:15:58
      And we're still working on trying to perfect that.
    • James L. KeenMember, Commonwealth Transportation Board
    • 01:16:01
      So you're pretty happy with the execution.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:16:03
      It's really just how we are tracking it in terms of projecting it.
    • 01:16:06
      Yes, I'm pretty happy with the execution.
    • 01:16:08
      Those contractors that didn't make it were really isolated to two contractors who didn't make it.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:16:16
      And Mr. Worley, in my world you got a 95 out of 100.
    • 01:16:22
      And so I think we need to not lose sight of that.
    • 01:16:25
      I mean, we've been pushing.
    • 01:16:27
      I know you all have been pushing harder than we've been pushing you, but I think it's a pretty darn good job if you get 95 out of 100.
    • 01:16:34
      So I congratulate you for that.
    • John W. LawsonChief Financial Officer
    • 01:16:42
      I'm moving on to construction.
    • 01:16:43
      Construction spending is up slightly from last year.
    • 01:16:49
      Again, we are working hard on the R program, having spent $120 million this fiscal year.
    • 01:17:04
      We do have some reductions in the other programs.
    • 01:17:07
      Again, I mentioned to you earlier in the year that we had some major projects
    • 01:17:12
      and Northern Virginia and Hampton Roads that had kind of come to completion at the beginning of the year that we kind of saw fall off.
    • 01:17:20
      We are, as you can see, seeing some increased activity in primary area.
    • 01:17:29
      This is the anticipated spending chart that we started showing you this year.
    • 01:17:33
      In grand total, we were about 180 million behind where we thought we would be at this time.
    • 01:17:42
      There are a lot of smaller pluses and minuses, but it basically comes back to about $180 million that we're kind of behind in terms of the maintenance program we kind of talked about earlier.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:17:54
      Mr. Chairman, Mr. Lawson, back when your previous construction program spending slide, you changed your presentation from the maintenance slide.
    • 01:18:06
      It didn't show us what we expected to spend.
    • 01:18:08
      You just compared it to the year before.
    • 01:18:12
      Can you help me?
    • 01:18:14
      Am I reading that right?
    • 01:18:15
      I'm sorry?
    • 01:18:17
      Which one are you talking about?
    • 01:18:18
      This slide versus the previous slide.
    • 01:18:20
      In the maintenance slide, you showed us what we expected to spend.
    • 01:18:24
      Do I pick up the construction funding at 981 under adjusted forecast annual spending?
    • 01:18:52
      Is that what I'm comparing?
    • 01:18:54
      I'm trying to get the same answer.
    • 01:19:02
      I can't get there on construction.
    • John W. LawsonChief Financial Officer
    • 01:19:03
      Yes, sir.
    • 01:19:04
      You're correct.
    • 01:19:05
      From a construction spending perspective, it is what we are currently forecasting to spend on the construction.
    • 01:19:13
      In the construction funding, we break out construction separately here between the regular construction program and the bond finance projects.
    • 01:19:20
      So you can see there.
    • 01:19:22
      Where we began in terms of a budget and what the original forecast was, as you can see, we've adjusted the forecast to anticipating greater spending in the construction funding category and reduced levels of spending in the bond finance projects, some of the bond projects that we were planning on a little slower getting started, so we've reduced that level of spending.
    • 01:19:47
      So carrying those across, you can see where
    • 01:19:50
      To date, we've actually expended about $63 million more in our construction funding category than we had anticipated, while we are slowed by about $50 million in terms of the bond finance projects.
    • 01:20:06
      So that's the comparison that you were looking for.
    • 01:20:09
      Thank you.
    • 01:20:14
      Comparing our work underway, as you can see here,
    • 01:20:20
      We're carrying a total contract value of about $2.4 billion to about a half a billion ahead of where we were last year.
    • 01:20:28
      Contract balances are about 11% greater than they were last year.
    • 01:20:32
      And you'll notice in the blue bar, the blue columns related to the maintenance contracts, we're at the point now you'll start to see those ramp up again.
    • 01:20:45
      During the next few months, as you can see on the far left of your column, as those contracts go out since the next coming year.
    • James L. KeenMember, Commonwealth Transportation Board
    • 01:20:55
      Is this maintenance contracts out there?
    • 01:20:59
      Is it primarily going to be the paving for the start of the spring?
    • John W. LawsonChief Financial Officer
    • 01:21:03
      Yes, sir.
    • 01:21:09
      In terms of cash, cash balance is about
    • 01:21:13
      Just over $300 billion less than we began the fiscal year.
    • 01:21:19
      That is largely attributable to reduction in the cash balance within the Highly Maintenance and Operating Fund and the expenditure of the bond funds you see on the bottom column.
    • 01:21:32
      The big increase is within the, the big decrease you see in the construction program is really offset by the transfer that we're
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:21:41
      I'm sorry, can I go back to the slide before the balances?
    • 01:21:51
      The cash slide or the previous one?
    • 01:21:52
      The previous one.
    • 01:21:54
      Okay.
    • 01:21:55
      I'm sorry, when you say construction balances, what does that mean?
    • John W. LawsonChief Financial Officer
    • 01:22:00
      The balance you see here, the columns represent the total value of the contract and the line represents the unspent balance of that contract.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:22:11
      So we've gone dramatically higher.
    • 01:22:16
      Lower.
    • 01:22:16
      Lower.
    • 01:22:19
      Why is that?
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:22:21
      We're lower.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:22:22
      No, no, no, no, the balance means that's cash that's in the construction fund that is essentially not been spent on construction projects, right?
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:22:34
      The contract value is up by 500 million, okay, which is about 20 some percent, 22 percent, and our contract balances are only up 11 percent.
    • 01:22:47
      So the spread between the 22 and the 11 is how much we've come down, is that correct?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:22:54
      No, no, no.
    • 01:22:54
      So we have right now, we'll have out 1.7 billion in construction contracts, but we'll be at almost 950 million in actual balance.
    • 01:23:12
      You should be only about
    • 01:23:14
      You're looking for cash to pay for that?
    • John W. LawsonChief Financial Officer
    • 01:23:25
      You have to recall so much of that is paid for by federal reimbursements that you would get as you expend, not necessarily pay for out of cash on hand.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:23:35
      When we looked at the audit, you all were at $500 million in balance.
    • 01:23:43
      With a book value or contract under contract of only... We had probably close to 120 days worth of reserve and cash.
    • 01:23:55
      So right now you're probably at what?
    • 01:23:57
      About 60.
    • 01:23:58
      60 with close to 950?
    • John W. LawsonChief Financial Officer
    • 01:24:03
      From a cash balance perspective.
    • 01:24:05
      Okay, you're looking at...
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:24:07
      Mr. Chairman, just what I was trying to look at was are we doing better at spending our money here even though if we doubled the amount of contracts we'd expect to have more money in the bank to pay for that and so what I was looking at was sort of the performance measure not how we're going to pay for it.
    • 01:24:33
      I was more getting at how much cash.
    • 01:24:36
      Right, where the cash is.
    • 01:24:37
      But am I right, Mr. Lawson, I'm trying to help you here.
    • 01:24:42
      Am I right that since we grew our contract value by $500 million, so we were at 1.9, we added 500 million, we're now at 2.4?
    • 01:24:53
      Correct.
    • 01:24:54
      That's approximately 22% increase in the contract values.
    • 01:25:01
      At the same time, the balances
    • 01:25:03
      See, my only issue is that, so if you look at this, if you're talking about 90 days, right, we were saying get it down to 60.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:25:34
      So if this is 60, so then it should be, we should have theoretically around, what, three billion in contracts.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:25:50
      So if you go to your construction expenditures on page, what's that, eight?
    • 01:25:58
      So you have about 768 million.
    • 01:26:02
      Let's go back to your cash balance.
    • 01:26:04
      which is slide 11 and your construction balance is $265 million, right?
    • 01:26:21
      So if I divide, what's it, seven months, seven months into 768 is about $110 million a month in expenditures.
    • 01:26:31
      You compare that to your cash balance, which is 260-some, so you got to buy two and a half months of cash.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 01:26:41
      You want to be at 60 days.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:26:42
      Yeah, you want to be somewhere around 60 days.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:26:47
      This slide is a little bit confusing when you start to look at construction balance because it says
    • 01:26:51
      I'm looking at a construction balance because your maintenance balance on this is the right maintenance balance, which is what you've been trying to get it to is leaving around $200 million a year for the crossover.
    • 01:27:03
      This shows, if you're looking at it, $950 million in construction cash sitting there, which if you're multiplying it by six times.
    • 01:27:15
      That should be roughly what your actual contract value is or whatever.
    • John W. LawsonChief Financial Officer
    • 01:27:26
      I'm just kind of wrapping up and summarizing what I've been saying earlier.
    • 01:27:30
      From a forecast perspective, state revenues are just slightly above forecast.
    • 01:27:37
      You know, spending, as we kind of talked about, fairly in line with what we anticipated, with the exception of maintenance.
    • 01:27:45
      But as we've talked, we've made significant concerns in that area, greatly reducing what we had as a balance last year and the year prior to that to a projected balance this year of only about 200 million.
    • 01:28:08
      I will quickly now just kind of have an addition to my monthly update just to kind of give you an outlook of the 2013-2018 financial plan as we are now getting underway and beginning the development of the new six-year program.
    • 01:28:27
      2013 through 2018 six-year financial plan looks to be about
    • 01:28:37
      On par with the last six-year plan, about $26.8 billion in total revenues over the period.
    • 01:28:46
      The financial plan is based on the December 2000, it should be 2011, official transportation revenue that's produced by the Department of Taxation.
    • 01:28:58
      It does not include any potential revenues that have come out of the General Assembly this year, so it's just based on revenues that are
    • 01:29:07
      known and dedicated to transportation.
    • 01:29:09
      We have continued to the planned use of the CPR bonds and the Garvey bonds as we had planned last year.
    • 01:29:19
      Federal revenues, we've based them upon the half year's worth of 2012 proportion that we have and we are continuing to watch the developments in Washington
    • 01:29:33
      To see if those levels will remain.
    • 01:29:37
      This chart just gives you a detailed illustration of the $26.8 billion.
    • 01:29:45
      You can see that about $18, almost $19 billion is from state sources, about 70% of the total.
    • 01:29:53
      The federal revenues represent about just over $6 billion of that.
    • 01:29:58
      And then you can see we've got about 1.7 billion in bond financing anticipated.
    • 01:30:08
      Just graphically, just shows you the kind of the significance of each of the sources.
    • 01:30:15
      Federal revenue being the single largest revenue source.
    • 01:30:19
      And then you notice the other columns have the different colors, the blues and the oranges.
    • 01:30:24
      The blue representing revenue, the portion of the revenue dedicated to the highly maintenance
    • 01:30:29
      An operating fund versus the orange being the trust fund revenues.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:30:37
      I noticed that the federal is greater than the state and, of course, is that anticipating the federal is going to raise?
    • 01:30:46
      Because we get about a billion dollars a year between now the federal and the state collections of motor fuel taxes each, right?
    • 01:30:54
      But now we show collecting more federal.
    • 01:30:58
      Are we anticipating a rate increase from the Fed?
    • John W. LawsonChief Financial Officer
    • 01:31:02
      Well, your federal has always been a little ahead.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:31:05
      Yeah, a little bit.
    • 01:31:07
      So that's all that is.
    • 01:31:07
      This relationship is keeping the same.
    • John W. LawsonChief Financial Officer
    • 01:31:10
      Yeah, we're not changing any bearings there.
    • 01:31:13
      Right, okay.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:31:13
      Before you leave that issue, what is our recovery rate from the federal government?
    • 01:31:18
      I mean, it's not federal funds.
    • 01:31:19
      It's money they take from us, and then they give us a portrait back.
    • 01:31:21
      What do we get back?
    • 01:31:22
      That's where all federal funds are.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 01:31:25
      Yeah.
    • 01:31:26
      Thank you.
    • 01:31:26
      We're going to do that as well.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:31:27
      Is it 93 percent?
    • John W. LawsonChief Financial Officer
    • 01:31:30
      92.
    • 01:31:30
      92 percent.
    • 01:31:32
      We're at that moment, excuse me, at that guaranteed equity point.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:31:36
      So eight percent of what the federal government takes from gas taxes in Virginia goes somewhere else?
    • 01:31:43
      Correct.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:31:44
      New York and California.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:31:46
      Well, actually Alaska.
    • John W. LawsonChief Financial Officer
    • 01:31:48
      Yeah, a lot of the Midwest states.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:31:50
      Sounds like Northern Virginia to me.
    • Dana M. MartinMember, Commonwealth Transportation Board
    • 01:31:54
      I don't know.
    • 01:31:54
      That's where I think it went.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:31:57
      Okay, next.
    • John W. LawsonChief Financial Officer
    • 01:31:59
      In terms of the distribution of those funds, this outlook shows the preliminary allocations of the $27 billion
    • 01:32:07
      And broken out into kind of the major categories that we look at the funds.
    • 01:32:12
      Again, this is the full Commonwealth Transportation Fund.
    • 01:32:15
      You'll notice the cut rows there for transit port and airport as well as the other columns that represent the funds.
    • 01:32:26
      You see here the growth.
    • 01:32:29
      in the debt service as it relates to the bonds as they are moving forward as well as the growth in the maintenance program, construction program over the time.
    • 01:32:47
      Looking at some of the program assumptions that kind of drive the revenues or drive the program amounts that you'll be working with in the six-year program.
    • 01:32:57
      In terms of the construction program, we have assumed full funding for the revenue sharing program.
    • 01:33:03
      So that's $200 million provided for revenue sharing in years 14 and out.
    • 01:33:12
      As Becky talked last month, we had a reduced, didn't quite have full subscription for 13, so we've reduced that planned funding.
    • 01:33:21
      And we've continued to use soft match as a major source of funding there, providing for the federal match on construction projects.
    • 01:33:32
      In terms of VDOT's maintenance program and maintenance payments to localities, we've made a little bit of a change here.
    • 01:33:41
      You'll recall in prior years we've had a kind of a set 4% growth factor that we've applied.
    • 01:33:48
      This year we decided to
    • 01:33:50
      to tag that to the projected growth in the producer price index as it relates to highway construction.
    • 01:33:57
      These numbers were provided to us by Department of Taxation and they average about 2.7% over the six years.
    • 01:34:06
      And we will be growing, we are growing the financial assistance payments to localities at the same growth rate as we use for VDOT's maintenance program.
    • 01:34:17
      Looking at the administrative programs, we have built in a
    • 01:34:20
      Two and a half percent increase in personal services.
    • 01:34:23
      This follows the projected or planned growth rate the Department of Planning and Budget uses for their long-range planning.
    • 01:34:30
      And we, for non-personal services in these programs, we actually tied this to the CPI, which averages about 2.3 percent over the period.
    • 01:34:43
      When you compare the six-year programs, excuse me, the six-year financial plans from 12 through 17 to 13 through 18,
    • 01:34:51
      You can see where there's only about $200 million difference in total between the two programs.
    • 01:34:58
      The differences, how the differences fall out when you look at it from a program by program basis.
    • 01:35:06
      Slight reduction in terms of maintenance program due to the growth factor changes.
    • 01:35:12
      We've got increases in construction.
    • 01:35:14
      A lot of that is related to the growth in the revenue sharing program.
    • 01:35:24
      Any, be glad to take any questions anyone might have.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:35:28
      Any questions?
    • 01:35:31
      Okay, perfect segue into the next presentation.
    • 01:35:34
      Thank you.
    • 01:35:35
      About the Secure Plan football.
    • SPEAKER_11
    • 01:35:53
      All right.
    • 01:35:54
      Good morning.
    • 01:35:57
      I'm here to present the development of the 2013 through 2018 program.
    • 01:36:02
      Rita couldn't be here today.
    • 01:36:04
      You had not heard.
    • 01:36:05
      She had an accident, broke her foot.
    • 01:36:07
      So I'm standing in for her.
    • 01:36:12
      This first slide is just a summary of the last couple of years of the Six-Year Program.
    • 01:36:17
      And you can see from back in 2010 where we went from a $7.4 billion program to a $10.6 billion program and also shows you the split between the highway side of the program as well as the rail and public transportation side.
    • 01:36:34
      And looking at the highway side, and this slide should be familiar to you, this breaks it down by the systems and the highway, and you can see the changes over the years in the system from 2010 to 2017.
    • 01:36:46
      I'm not going to bore you with looking at all those numbers, if so.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:36:53
      If those
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:37:12
      It's about $50 million for this biennium.
    • 01:37:16
      I mean, $50 million per year.
    • 01:37:18
      And that is dedicated specifically to maintenance.
    • 01:37:22
      So it won't have a major impact.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:37:24
      On the construction?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:37:26
      On maintenance.
    • 01:37:26
      And then it also offers up $50 million per year.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:37:30
      Because we've been transferring maintenance money into construction, or construction money into maintenance, would that relieve any of the pressure on it?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:37:38
      About $50 million per year.
    • 01:37:40
      It would be phased in over eight years.
    • 01:37:43
      So the first year would be 0.05 extra.
    • 01:37:48
      So we'd go up about 50 million per year.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:37:51
      The other one that's kind of impacting is this Yemen domain still, the constitutional
    • 01:37:59
      I'm not familiar with that.
    • SPEAKER_11
    • 01:38:13
      I don't know if...
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:38:14
      The number that's thrown out is like 40 million.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:38:17
      Forty million a year would be... Is that right, Ms. Maxwell?
    • SPEAKER_01
    • 01:38:28
      I think there's a fiscal impact out there now, prior to some changes that have just been made to the definition bill.
    • 01:38:37
      The previous impact statement estimated about $106 million for a three-year period.
    • 01:38:45
      Now, that was based on an assumption that had that particular bill been in place, that
    • 01:38:52
      For the last three years, that would be the impact.
    • 01:38:55
      Now there have been changes to the bills that we're seeing that more closely and narrowly define in particular lost profits, and so we think that's going to bring it down, but those estimates are still in the works.
    • SPEAKER_11
    • 01:39:08
      John's talked to you a little bit about some of the revenue outlook that will impact
    • 01:39:22
      updated the Six-Year Program.
    • 01:39:24
      Once again, to reiterate, it does not include any of the proposed funding that is currently in the General Assembly.
    • 01:39:31
      It does not include the request for the Virginia Transportation Infrastructure Grants and Loans.
    • 01:39:38
      John talked to you about the increasing the revenue sharing program to the $200 million a year level, which results in a net decrease in the statewide discretionary construction funds
    • James L. KeenMember, Commonwealth Transportation Board
    • 01:39:49
      and also calling for additional federal funds to be used for maintenance.
    • SPEAKER_11
    • 01:40:05
      I believe part of the first year is covering some of last year's grants that were made so if you remember last year the level was higher than what was available
    • 01:40:16
      So we use both 12 and 13 allocations for the revenue sharing, so we have to account for that part of the revenue sharing in 13.
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 01:40:31
      We had $132 million in new requests, and we have to cover roughly $53 million last year.
    • 01:40:39
      So it's about $185 million.
    • 01:40:41
      And then last month, he took action to deallocate $17 million, so we've accounted for that.
    • 01:40:45
      So the new number is $160 million.
    • 01:40:48
      So it's got to be funded this year to fund all the requests.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:40:52
      Chairman, I apologize for going in and out.
    • 01:40:55
      I've got a meeting over across the way.
    • 01:40:58
      And before I leave again, I just want to make a point.
    • 01:41:01
      I hope we will continue past practice between now and the end of March, that we sit down with the senior staff, with the members of CTB, to go over the six-year plan before we get too far down the road.
    • 01:41:15
      I think if we go down, we'll meet geographically.
    • 01:41:17
      And then the at-large plans obviously need to be included.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:41:20
      If any At-Large member wants to help me get projects in the Fredericksburg District.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:41:34
      Based on this slide, when was the last time money went through the construction formula?
    • SPEAKER_11
    • 01:41:48
      I believe it was in 2009.
    • 01:41:51
      Yes, sir.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:41:54
      And is that projection that it won't go through the formula for the next six years?
    • 01:42:01
      Correct.
    • 01:42:03
      All right.
    • 01:42:05
      Thank you.
    • SPEAKER_11
    • 01:42:09
      So as Mr. Peake has already pointed out on the next bullet, the state funds, the funds that are no longer still not available.
    • 01:42:19
      Just to flow through the state allocation formula, we're continuing to use soft match or toll credits for the state match component of some of the federal funds, and we're also using the federal revenues to fund the Garvey bond debt service.
    • 01:42:36
      The priorities for the development of the program should look fairly familiar to you.
    • 01:42:41
      We're going to continue to fund the deficits on underway projects, maximize the use of our federal dollars.
    • 01:42:47
      Fund the underway phases as well as project phases that start in the current federal fiscal year.
    • 01:42:52
      We'll continue to fund efficient bridges and paving.
    • 01:42:58
      As we did last year, we'll continue to work on funding for preliminary engineering to make sure we have a pipeline of projects.
    • 01:43:05
      Additionally, we'll continue to support the development of the PPTAs.
    • 01:43:09
      We will support the Governor's initiative to move the Commonwealth's fleet to alternative domestic fuels.
    • 01:43:15
      We're looking at using some CMAC funding for that.
    • 01:43:20
      And we're also looking to continue our practice of allocating the funds consistent with how they will be obligated and expended as well as redirecting the inactive balances on projects to make sure our funding is working for us.
    • 01:43:34
      This is a tentative schedule for the update of the program.
    • 01:43:38
      We've received some priorities from Urban Bridge Paving and some others as well as we held a meeting last week with the MPAs and PDCs and we had requested regional priorities from them.
    • 01:43:53
      In March, the special fund programming will be due.
    • James L. KeenMember, Commonwealth Transportation Board
    • 01:43:57
      Mr. Chairman, I'd like to expand upon that model that's used there somewhat.
    • 01:44:06
      In the January, February work involving PDCs, and I'm real concerned that we're transferring to the PDCs things that they can't handle in terms of planning transportation for rural Virginia.
    • 01:44:20
      It may be different where you get your MPOs, it may be different for PDCs in Northern Virginia or East or somewhere else, but it's not in Southwest Virginia.
    • 01:44:29
      Where we have an under-financed, under-staffed, non-responsive group of people trying to plan transportation for a region and expect them to set priorities.
    • 01:44:43
      They can't coordinate with the counties and the counties that have Cole Hall.
    • 01:44:48
      I just don't see the PDCs functioning in rural Virginia, particularly in Southwest, with one in particular for Cumberland Plateau Planning District as one person.
    • 01:45:03
      The only thing they can do is make a wish list.
    • 01:45:07
      They don't have a model for
    • 01:45:08
      No model at all for prioritization and to expect them to prioritize within the district is one thing, but expect them to get together as a region and prioritize as total global non-functioning situations.
    • 01:45:23
      So it's extremely frustrating to think that we might be transferring to that particular group totally without adequate human resources, without adequate financial resources and above and beyond that.
    • 01:45:36
      They just don't have the recognition as a transportation group.
    • 01:45:39
      They call a meeting for a hearing and nobody shows up.
    • 01:45:43
      And so what I want to give a little dose of caution there as we look at that.
    • 01:45:49
      And I think, you know, the model we use where the CTB member sits with staff who coordinates with these counties and knows their needs, but more importantly knows the restraints on budget and that type of thing.
    • 01:46:00
      We've got to continue with that model.
    • 01:46:02
      They can be in the process.
    • 01:46:04
      But, you know, with one person totally unfunded and no clout, we just can't, you know, we've got to really evaluate that model before we start transferring responsibility to prioritization and or expecting them to conduct anything more than a wish list.
    • 01:46:18
      And I've talked with them and I've been there looking at their situation.
    • 01:46:22
      They can't do that.
    • 01:46:22
      And so I think the model, you know, involving CTB members with this planning process, along with staff at the district level,
    • 01:46:32
      And that's the process that's worked to come up with the program so far, and I think it's something we have to consider moving forward.
    • 01:46:41
      Mr. Chairman.
    • SPEAKER_12
    • 01:46:43
      Yes.
    • 01:46:44
      I share Mr.
    • 01:46:46
      Keen's concerns, but I'm not quite certain how the planning district committees got involved in the Six-Year Plan development.
    • 01:46:57
      It seems to me that the PDCs are meeting with VDOT staff at district and central levels, leaving Transportation Board members out of the loop.
    • 01:47:12
      At least that has happened in a couple of instances that we know of, and I'm not sure how that came about.
    • SPEAKER_11
    • 01:47:22
      In the request for priorities, we're just, we're trying to get some input from all the interested parties that are in the Six-Year Program, that are involved in the Six-Year Program.
    • 01:47:32
      The intent certainly is not to leave out the CTB members.
    • 01:47:35
      And there are VDOT planning processes that go on in the rural areas of the state also that could lead, that kind of feed what the priorities in the rural areas where there aren't MPOs
    • 01:47:49
      Well-staffed or big-staffed out in the rural areas that can assist with that too.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:47:57
      Mr. Chairman, Diane, where in this schedule then would the staff, the district administrators be meeting with the
    • SPEAKER_11
    • 01:48:06
      It will happen along the way because we do develop the draft six year program sort of by system so once we get the interstate system that will be sent to the district administrators to review with you and then once we get the primary and then the secondary and urban and we try to get that out to you as soon as possible before the draft but sometimes it is a bit of a crunch getting that information out to you as far in advance of the draft so that's a challenge.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:48:35
      There has been some concern that we obviously have had to deal with in the General Assembly about how do we include MPOs and PDCs and localities in the development of the Six-Year Plan.
    • 01:48:56
      One of the reasons we started this year in the fall is we started doing these outreach that essentially one was held I think in every single district.
    • 01:49:05
      to start to give the opportunity in front for everyone to give input to and start to get them to think about the fact that the Six-Year Plan is, I mean, it takes that long to get projects into the pipeline and develop.
    • 01:49:24
      I mean, staff is trying to be as inclusive as possible.
    • 01:49:29
      I think one of the reasons, I mean, when you look at that JLARC study and legislation was introduced, you know, attempting to actually mandate that, you know, or change the way we do our planning to almost more reflect the federal way of doing things.
    • 01:49:48
      which leaves a lot to be desired.
    • 01:49:50
      And so the staff is really trying to be as open and inclusive as possible and trying to get as many different data points.
    • 01:50:02
      So we don't have legislative action or other criticisms that we continue, we've gotten that we have not been as open in our process.
    • James L. KeenMember, Commonwealth Transportation Board
    • 01:50:11
      Mr. Chairman, I agree with the inclusiveness.
    • 01:50:15
      That certainly would be the intent with the PDCs, but you know, in rural areas, particularly the ones I'm working with, they just can't handle it.
    • 01:50:24
      But it's an additional comment concerning, you know, we're dealing a lot with federal money.
    • 01:50:30
      And if we dilute the VDOT and CTB role in planning by turning over the PDCs,
    • 01:50:38
      We are also looking at another deluded situation if we start looking at these congressional districts for CTB members.
    • 01:50:45
      All of a sudden, this is a lot of federal money used, and I can imagine congressmen beginning to look at this and say, well, look, I need to get in here and start planning utilization of these federal funds in my congressional district.
    • 01:50:56
      We set these CTB districts according to what the congressional district lines like the one House bill that's passed the House does.
    • 01:51:03
      So I just think that it's not good for my constituents, which is rural,
    • 01:51:07
      Virginia, and all of our constituents I think even throughout the coming, so I just wanted to throw that additional comment which is I think is a stump objection to that particular bill.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:51:20
      That bill did pass the House 5147 I believe.
    • 01:51:25
      I don't know what the status, is it past the Senate?
    • 01:51:31
      I don't know, it's true.
    • 01:51:33
      Do we have, does the administration have any opinion on the bill?
    • 01:51:40
      We've got lots of opinions.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 01:51:42
      We have a position.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:51:44
      I mean actually our position, we've made it quite clear that you know obviously for the most part the CTB districts which reflect the construction districts for VDOT
    • 01:51:59
      You know, are the 1932 congressional districts, and we do need to look at how do we become a little bit more reflective of population and all.
    • 01:52:12
      However, to do what they're doing raises an enormous amount of problems, particularly because the districts are aligned with the current CTB districts.
    • 01:52:27
      So we have urged both the House and the Senate to just kind of slow down and let us, you know, send it to us and let's sit down over next year and figure out what's the best way to do it.
    • 01:52:40
      Obviously there is, you know, the districts themselves, we have the at-large, we have the rural members, that, you know, there's obviously some concern from the General Assembly members about
    • 01:52:55
      who is and what is defined as rural versus urban and whichever.
    • 01:52:59
      So we hear them.
    • 01:53:00
      I mean, obviously there's a majority in the House and probably in the Senate to do something.
    • 01:53:06
      So if there is a majority in the General Assembly to do something, we got to make sure we come up with something that really is, you know,
    • 01:53:17
      I'm going to say addresses their concerns, but also that will not become an administrative nightmare for us.
    • 01:53:23
      If you just think about it, just think about Northern Virginia will have poor Garrett Moore, we love Garrett Moore, but he'll then have four different CTB members.
    • 01:53:35
      Fairfax County would be completely divided up if you're looking at it.
    • 01:53:40
      They point to Fairfax as the example in this largest jurisdiction, but think about this then, yeah, you get four, it would be four representatives, but then on the other hand, that county will be chopped up by, so does that make sense?
    • 01:53:58
      I mean, it's things like that they haven't really thought through.
    • 01:54:02
      And so this is why we're recommending that they send it back to us.
    • 01:54:10
      We'll sit down and
    • 01:54:12
      Really trying to do a robust study, come back some recommendations.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:54:17
      I mean, the federal congressional districting process has worked so well in solving the nation's fiscal issues.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:54:25
      Be careful what you ask for.
    • 01:54:31
      Thank you, that was an excellent point.
    • 01:54:36
      I didn't open anything.
    • 01:54:41
      He's the one.
    • 01:54:42
      I did ask if you had a question.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:54:44
      I know in the bill there's also references to sort of certain CTB members having a particular focus on the sort of four areas, one being the port, port, one being airports, transit, and rail.
    • 01:55:03
      Do you have any sense of what that is about?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:55:07
      These are not obviously our bills.
    • 01:55:12
      I think what they did was they looked at where does the money from the CTB go to.
    • 01:55:17
      So you'll have quote unquote champions for each one of these within the quote unquote CTB.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:55:28
      As I look at it, the only concern I have is that you do, and you mentioned it with Fairfax County, you start to divide some communities up, which can become somewhat of a problem, and you can divide MPOs up.
    • 01:55:42
      In other words, MPO is part one district, part another district, and how do you really address that?
    • 01:55:49
      I mean, we're trying to bring the MPOs more into the planning process.
    • 01:55:53
      Dividing them up amongst a variety of transportation districts can be a little bit complicated of that process.
    • 01:56:03
      I'm not saying there's not a better way, but I think that that needs to be considered.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 01:56:09
      Mr. Chairman, I know my colleagues have heard me talk to this topic.
    • 01:56:13
      I think there's really two questions.
    • 01:56:15
      One is a basic fairness and balance question.
    • 01:56:20
      Which simply reflects the changes that occur in a state the size of Virginia over time.
    • 01:56:26
      And we don't do very well when we don't change and update ourselves on a regular basis.
    • 01:56:33
      Because then suddenly the change becomes big, difficult, the transition issues are huge.
    • 01:56:42
      But deep down I think I know the people who have been involved from Northern Virginia in that legislation, championing it and so forth.
    • 01:56:49
      You know, their motive is really to feel like the region has its share of the say in the way funds are allocated and decisions are made.
    • 01:57:03
      You know, my preference, to be honest, as a policy person would be that there would be fewer districts, not more,
    • 01:57:10
      That they would be larger and therefore force members to focus on regional connectivity issues instead of small localized decisions because that's really what we're missing in the state is the connectivity within our regions.
    • 01:57:27
      The interstate highway system and other modes are taking care of connectivity between the regions.
    • 01:57:34
      But the second question is really the one that's confounding, and that's how can we continue to function on all lines that were drawn 80 years ago?
    • 01:57:49
      It makes no sense.
    • 01:57:50
      I mean, whether the congressional district solution is the solution really isn't the point.
    • 01:57:57
      It's that we need to learn better how to anticipate
    • 01:58:01
      What we're going to need to be, what shape we're going to need to take, what representation our people and our interests are going to need to be effective.
    • 01:58:10
      I don't know if the answer that's being proposed is the single answer.
    • 01:58:18
      But I do think that this body and everyone else in the General Assembly of the Administration should take it seriously that these are the kind of adjustments that the Commonwealth needs to make on a more regular basis.
    • 01:58:33
      And we need to build in the ability to make the adjustments as opposed to be frozen in time.
    • 01:58:39
      And that's where I think we are now.
    • 01:58:41
      We're frozen in time.
    • 01:58:45
      I would like to make is these issues are theoretical and philosophical and policy issues in normal circumstances.
    • 01:58:53
      But now when we're suspending formulas and we're creating special funds and we're making more direct allocation decisions as a board, they do become more important.
    • 01:59:05
      And if people feel like there's only a limited pot of money going forward and how you wrestle for it is going to be the way
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:59:12
      that decisions are made, then yeah, everybody wants to have more people on their tag team.
    • 01:59:31
      We, you have to worry about, you get the same emails I get.
    • 01:59:34
      I've noticed that people complain about my street hasn't been paid, repaved in the last 20 years and it's really bad.
    • 01:59:43
      I'm sitting here going, we're dealing with big issues and then in Northern Virginia and the same people who are saying we want
    • 01:59:52
      I mean, it's obvious I wasn't here in the 30s when these districts were done.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:00:08
      And so I don't know the evolution of the seats, okay, the congressional seats back in the 30s, and I understand that, but we have these at-large seats.
    • 02:00:17
      It's always been my understanding they got added.
    • 02:00:19
      as a result of kind of trying to address this over time, not that we're stuck in the 30s, but that there has been some effort on the part of the Commonwealth to address sort of the demographic population issues through the addition of the at-large seats, which give, okay, urban areas now more as a result of the populations that are shipped there.
    • 02:00:41
      Isn't that not the mechanism that is a little bit
    • 02:00:46
      The ability to address the issue without, again, the part I'm concerned about is dividing up communities, dividing up districts where, or MPOs, where essentially if you look at the congressional approach, man, those are not easy to track.
    • 02:01:02
      I'll guarantee that if it goes that route, you're going to be trying to figure out, okay, is it in my district or is this in the guy's, I mean, it's just across the street.
    • 02:01:09
      Whereas now, if you know the county or you know the city, you know whose district it's in.
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:01:14
      Mr. Chairman, I apologize for getting us off of the schedule.
    • 02:01:19
      Mitchell, you might want to sit down.
    • 02:01:21
      I got what we're going for on this topic, of course.
    • 02:01:24
      Is there a plan to revise this part of March, or any revisions to this schedule, or is it just going to wait and hand us a draft in an April?
    • SPEAKER_11
    • 02:01:33
      Like I said, we'll give you some preliminary drafts as we finish the systems, but the formal drafts will be coming out in April for the public.
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:01:40
      But the CTB will be working with the districts or anybody in any of this planning at all?
    • 02:01:45
      We just get the draft.
    • SPEAKER_11
    • 02:01:48
      Well, we're developing the program based off of the priorities that I had on the previous slide, so we will
    • 02:01:58
      provide you those preliminary drafts and take your comments back and make adjustments as we're able to within the priorities.
    • 02:02:11
      The priorities for the development of the program, I'm sorry I wasn't clear about that.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:02:17
      I just wanted to bring a point out here.
    • 02:02:20
      You mentioned about big issues.
    • 02:02:22
      What we're dealing with in Hampton Roads is the downtown, midtown tunnel project.
    • 02:02:27
      Mr. Hollis and Mr. Miller and I have been in discussions with the Commissioner here in regards of all that rhetoric around particularly
    • 02:02:37
      One of the things the Commissioner has been working on is getting that resolved.
    • 02:02:47
      And one issue that's come up is that the City of Portsmouth has asked
    • 02:02:51
      VDOT, and I guess it'll come through us, to consider, I guess, forgiving some revolving loan funds that were originally planned that are going to be paid back through the urban match, which no longer comes, we're not getting there, but have been upset by this project.
    • 02:03:16
      The Commissioner has said he wants to put them in the Six-Year Plan.
    • 02:03:22
      I believe that's the right place to put them, being able to use federal monies and stuff.
    • 02:03:26
      I just wanted to bring it up, and Mr. Miller and Mr. Hollis may want to say something additional about it, but to let you guys know that that's how we're sort of dealing with the issue down there.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 02:03:37
      It's like 22 million boxes?
    • 02:03:39
      It's 28 million dollars.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:03:41
      It's 23 million, yeah.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 02:03:46
      So I will, Mr. Chairman, when we are preparing the program, we will try to update the program to reflect that.
    • 02:03:59
      This project, the Pennant Point project, is still a federal project.
    • 02:04:03
      We'll probably be able to convert a portion of that project to be reimbursed through the federal government if we handle it this way through the program.
    • 02:04:15
      So I think we'll try to work that into a six-year program.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:04:20
      Thank you.
    • 02:04:21
      Excellent.
    • 02:04:23
      Alrighty.
    • 02:04:24
      Excellent.
    • 02:04:25
      Let's move.
    • 02:04:26
      You want to grab sandwiches and come back?
    • 02:04:29
      I'm going to read the entire 114 pages.
    • 02:04:39
      Excellent.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 02:04:39
      How does that sound?
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:04:42
      Alright Mr.
    • Kevin B. PageChief of Rail Transportation
    • 02:04:50
      Page, go ahead.
    • 02:04:54
      Let me see if I can get the right agenda item up here now.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:04:59
      Ah, here we go.
    • Kevin B. PageChief of Rail Transportation
    • 02:05:10
      All right, Mr. Chairman, members of the board, please continue to eat, which I know you will.
    • 02:05:14
      And I promise not to read the 114-page document, which will put you to sleep before you finish eating.
    • 02:05:20
      While we're here today to present to the Commonwealth Transportation Board is the next iterative step of our
    • 02:05:26
      Southeast High Speed Rail Corridor, Tier 2 EIS.
    • 02:05:29
      Just gotta get this to work.
    • 02:05:32
      Guys, what's the trick on this?
    • 02:05:36
      Yeah, that's probably what it is.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:05:40
      Something's not working on this contraption.
    • 02:05:43
      Let me see, can up and down work here?
    • 02:05:58
      All right.
    • Kevin B. PageChief of Rail Transportation
    • 02:06:08
      Very good.
    • 02:06:11
      Thank you.
    • 02:06:13
      All right.
    • 02:06:13
      We had a healing moment there.
    • 02:06:14
      Thank you.
    • 02:06:16
      All right.
    • 02:06:16
      So what we're here to talk about today is the next step in the Tier 2 EIS document that we are in the process and have been for many years putting together with North Carolina DOT.
    • 02:06:26
      As this board may recall, as far back as 1992, the Southeast High Street rail corridor was designated by Congress.
    • 02:06:32
      If you look down there towards Savannah and Jacksonville, you see those little thin lines.
    • 02:06:35
      That's what this entire corridor used to look like in 1992.
    • 02:06:38
      In 1994, we came together as a group of states.
    • 02:06:42
      from Virginia all the way down to Florida and FHWA and FRA inside a memorandum of understanding that we will start to collectively work together both in units or in separate initiatives to develop this corridor.
    • 02:06:54
      And as you can see, it's starting to light up like a Christmas tree where we have all the little small projects that are working both between states, inside states, and states in cooperation with each other.
    • 02:07:04
      As we went forward with this project in 1998,
    • 02:07:07
      Virginia sat down with NCDOT and said, okay, now we need to start thinking about how we develop this corridor from Charlotte all the way to Washington, D.C. As you all know, if you've seen the America 2050, as well as some of the other long-range projections and reports for population, you will notice that Charlotte all the way to Washington, D.C. is part of a kind of a connected mega-region of the Eastern Seaboard.
    • 02:07:30
      In 1995, our agency, the Department of Rail and Public Transportation,
    • 02:07:33
      Requested of the Federal Railroad Administration's administrator to administratively add Hampton Roads to the Southeast Highspeed corridor.
    • 02:07:41
      And that's how that extension to Hampton Roads was born was through the request of our agency, DRPT, and the full cooperation of that time, Julie Molitoris, who was the F.R.A.
    • 02:07:49
      administrator.
    • 02:07:50
      So we can thank Shaleen for that.
    • 02:07:52
      Our Tier 2, Tier 1 EIS, which is the very first part of this, and that's where you basically identify the corridor, it was set out, studied, and a record of decision was decided and handed back to the states of Virginia and North Carolina in 2002.
    • 02:08:06
      Following that, we've moved forward over that eight-year period until 2010, where we've developed a Tier 2 EIS utilizing both State of Virginia and North Carolina DOT funds to develop that document and report.
    • 02:08:20
      As this board may notice, we've brought this report to you all back in 2010 and now we're coming forward with a recommendation report for the rail alignment in this corridor.
    • 02:08:29
      Kind of gone through this already as you see, but one of the items I want to be very clear with this board about is that the iterative step from Richmond to Hampton Roads, our passenger rail project, is a separate environmental document and also a separate state initiative to introduce Amtrak service to Hampton Roads, Norfolk as early as December of 2012.
    • 02:08:50
      That's our goal.
    • 02:08:53
      We have 26 different sections from Richmond, Virginia, all the way down to Raleigh, North Carolina.
    • 02:08:59
      For those of you who want to know what the definition of Richmond, Virginia is, just need to hear about two and a half blocks is the former Main Street Station, which is now back in Amtrak service.
    • 02:09:08
      Former being that it was the former station for the Seaboard Airlines Railroad and the Chesapeake and Ohio Railroad many years ago.
    • 02:09:14
      It is now serving the Newport News Line only two trains a day.
    • 02:09:18
      Our ultimate goal under the federal program is to connect the capitals downtown of Main Street Station Richmond and then downtown Raleigh with this high-speed corridor, as well as the Norfolk trains will eventually as well come through this station terminal as it's developed.
    • 02:09:33
      In Virginia, of the 26 sections that were identified, 16 of those sections lie in Virginia, as you will find in the report that I've provided you a copy of.
    • 02:09:41
      The alternatives have common section breaks, which means the alignments come together at one point and then they go back out again.
    • 02:09:48
      So when we make section breaks, we can make decisions within each section and also not have an impact of that decision on one particular section, have an adverse alternative towards the following section.
    • 02:09:59
      So there's some commonalities there at the break points.
    • 02:10:02
      So we begin to work through this process.
    • 02:10:05
      We went out for our public meetings and this is the type of public information that you would have seen if you attended one of our public meetings.
    • 02:10:13
      Most of our sections had three alternatives, especially south of Petersburg, Virginia.
    • 02:10:18
      You would see that we would have one alternative that showed a better rail alignment but higher impacts and adverse conditions to the roads or to some other historic property or people who actually lived in the community.
    • 02:10:30
      So we went forward with the three sections.
    • 02:10:32
      We actually held eight comprehensive public information meetings.
    • 02:10:36
      As you can see here, the photograph on the top was one that we held down at the community college down in McKinney, Virginia.
    • 02:10:42
      The one on the bottom is our public meeting that we held over in the Union Station in downtown Petersburg, Virginia.
    • 02:10:49
      You can see that these meetings were very well attended.
    • 02:10:52
      In Virginia, we had very few adverse complaints or comments that came forward with this project.
    • 02:10:59
      We were very open.
    • 02:11:01
      Thelma Drake, our agency director, attended these meetings.
    • 02:11:03
      She actually gave the presentation down in North Carolina.
    • 02:11:07
      It was a little bit more challenging because North Carolina handles their public information process a little bit differently.
    • 02:11:12
      But I want the board to understand that as we went through this process, there was extreme interaction with the public and extreme comments that came back from the public as well.
    • 02:11:21
      We had 1850 individuals and also 50 agencies involved in this recommendation report and providing input to our project team.
    • 02:11:29
      And this is what has brought us forward now after we spent from May 2010 to September 2010 through this public information process.
    • 02:11:36
      We then have developed this final alternative document to recommend to the public and this Commonwealth Transportation Board for adoption of the Virginia sections.
    • 02:11:46
      The report that I have also provided to you in hard copy, it is on our website, www.drpt.virginia.gov.
    • 02:11:54
      In this recommendation report,
    • 02:11:56
      You will find that all of the sections are also provided to you in detail by alternative and narrative.
    • 02:12:02
      We also identify the impacts in narrative as well as the alternatives in the appendices show a map, a physical map of each section and also the impact and potential cost of each of the three alternatives.
    • 02:12:17
      What you'll find highlighted in yellow in the back in the appendices is the recommended alternative for each section.
    • 02:12:22
      So we're moving through that.
    • 02:12:23
      We have the document.
    • 02:12:25
      We need to get this recommendation report out for 30 days.
    • 02:12:28
      So this is a pre-briefing presentation.
    • 02:12:31
      We will then receive from the Commonwealth Transportation Board and the public any comments and I will come back to you, this board, through Thelma Drake at the next meeting, give you an update on where we are in the public input process and also any alterations or adjustments that need to be made either through the Commonwealth Transportation Board comments or through the public comments that we need to bring to your attention.
    • 02:12:53
      Then we will go forward with an adoption of the recommendation report as North Carolina is following on a parallel route in their state for their impacted areas.
    • 02:13:02
      Remember, we have 16 of the 26 sections here in Virginia.
    • 02:13:05
      The remaining sections are in North Carolina.
    • 02:13:09
      This is very busy, but just to show you kind of a summary of the alternatives by section by section in the document you have before you.
    • 02:13:16
      I will say from Main Street Station all the way to South Petersburg, Virginia, all of the sections are what we refer to as common alignment.
    • 02:13:24
      They're basically going to parallel CSX transportation tracks that are there today.
    • 02:13:29
      It was a great opportunity for us to work with CSX to put together an operating plan for this piece of railroad that plans for all tracks improvements to be used both by passenger and freight operations.
    • 02:13:42
      Very similar to the same approach we have on our Richmond to Washington line and also our Richmond to Norfolk improvements as well.
    • 02:13:50
      So it's a great opportunity for us again on that section to utilize the existing rail footprint and make improvements.
    • 02:13:56
      Our final EIS, the goal of that, which is the final document we're shooting for in this calendar year, probably by December, we'll work through the recommendation report, make highway adjustments, draft the final EIS, and ship that to, back out for some comments as well as get that to FRA and EPA for release to the public.
    • 02:14:17
      We also will be looking for a record of decision probably in early next calendar year as we move forward with this project.
    • 02:14:24
      Now I want to put into kind of context with the board, Mr. Chairman and members, is that this is one of many projects in this corridor.
    • 02:14:33
      In order for us to develop from Richmond to Raleigh, we have to have some significant track improvements in capacity to also accommodate trains north of Main Street Station.
    • 02:14:43
      We also have a very important project with us, and that's the Richmond to Hampton Roads High Speed Rail Corridor as well.
    • 02:14:50
      So we have a lot of work to do,
    • 02:14:52
      Before we can really start talking about the next steps of how we handle Richmond to Raleigh after we get the tier two record of decision.
    • 02:15:01
      So as you run through this slide here, as you can see before you, we have to work through Washington to Richmond, Richmond to Petersburg.
    • 02:15:08
      We're now about to make the split to Norfolk at that location and also how we get to Raleigh.
    • 02:15:13
      So all of this is subject to funding.
    • 02:15:16
      The coordination has to be critical with Amtrak, the Federal Railroad Administration, our federal funding partners,
    • 02:15:22
      The property owners and our local governments that will be impacted.
    • 02:15:25
      Local governments in this case not only enjoy and understand the opportunities that this brings to them, to the table, but we also have, like in Petersburg, Virginia, identified four locations that the region needs to make a decision on as to where the future Amtrak train service will be served.
    • 02:15:43
      We currently have Ettrick Train Station in Petersburg that is a station that has been up and running for many years but it is not very well served and suited into the transportation network of interstate highway access.
    • 02:15:56
      So we've identified four locations in Petersburg for future train station development and as Ms. Drake has said many times and as those of you in the Norfolk area know as well, train station development is a local option opportunity for the locality and the regions to make those decisions.
    • 02:16:12
      So we want to move forward with that as well in collaboration with the Tri-Cities MPO.
    • 02:16:17
      So we have this out for a 30-day public comment period.
    • 02:16:20
      Members of the board, feel free to come back to us at DRPT or Thelma Drake to work through any comments you may have in this report.
    • 02:16:27
      If you have any questions or need clarification, please don't hesitate to contact us.
    • 02:16:31
      We'll be coming back March 21st.
    • 02:16:33
      I'll be standing back before you with a summary report.
    • 02:16:36
      An update of where we are in the comments, and then also ask the CTB to make an adoption of the report document as we move forward.
    • 02:16:45
      Mr. Chairman, I'm going to turn the floor back over to you, sir, for any questions that the board may have at this time.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:16:49
      Mr. Chairman?
    • 02:16:50
      Yes, sir.
    • SPEAKER_12
    • 02:16:52
      The study is for a high speed.
    • 02:16:55
      Will a high speed be the same for freight as a passenger?
    • Kevin B. PageChief of Rail Transportation
    • 02:17:00
      Mr. Good, it's a very good question.
    • 02:17:02
      Thank you for it.
    • 02:17:03
      From Petersburg, Virginia, to North Carolina, there's a 110-mile-an-hour high-speed quarter plan.
    • 02:17:09
      There will be no freight on that operation at that speed.
    • 02:17:12
      What you will find is, as I was mentioning the common alignments, that term I used, from Petersburg to Richmond will be 90 miles an hour would be the maximum speed, and CSX Transportation will allow trains to operate those freight and passenger at that level.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:17:27
      Thank you.
    • 02:17:28
      The VRE is extending its current track down into Spotsylvania County.
    • 02:17:36
      Is this going to be a part of that or is it related to it?
    • Kevin B. PageChief of Rail Transportation
    • 02:17:39
      Yes, Mr. Chairman, Mr. Sterling, that's a very good question.
    • 02:17:42
      This gets back to the comment that I was making in a previous slide, which is how the system is integrated as a whole.
    • 02:17:48
      As this board knows under the VTA, Virginia Transportation Act of 2000, some funds were made available for six major projects in the VRE corridor.
    • 02:17:57
      for third-track improvements.
    • 02:17:59
      We have a commuter rail commitment since 1992 that a third track will be built from Fredericksburg to Washington, D.C. to replace the capacity that VRE is using today from CSX that was not provided to start the service.
    • 02:18:13
      As part of that, we've built almost 18 miles plus the 2.6, which is a crossroads extension you're asking about, Mr. Sterling, has to be part of the integrated systems to accommodate
    • 02:18:24
      The high-speed quarter when it's built.
    • 02:18:27
      Like if you go to Franconia Hill today, that third track has concrete railroad ties because it's set up for a 90-mile-an-hour railroad.
    • 02:18:34
      So this will be part of the integrated third track system to VRE.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:18:38
      But my understanding here is going out to contractors, they're looking at not going with the concrete ties, not building this extension to the extent that would be necessary to tie in.
    • 02:18:50
      Is that correct?
    • Kevin B. PageChief of Rail Transportation
    • 02:18:51
      Mr. Sterling, under the $20 million application that VRE submitted, concrete ties in the crossovers was not a part of that, which I will go on record that we are in discussions with VRE and CSX as to how we'll find a way through that discussion because we don't want to be investing precious and limited state dollars on a project that doesn't have integration, you know, future integration for the high-speed corridor development.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:19:14
      But VRE is a contracting authority in this case, so we've got to get them to actually build this to the standard that's necessary to accommodate what we need.
    • Kevin B. PageChief of Rail Transportation
    • 02:19:22
      That is correct.
    • 02:19:23
      Under the six-year program resolution, Thelma Drake holds the power of the pin for the agreement.
    • 02:19:29
      We do not have an agreement yet, Mr. Sterling, on that.
    • 02:19:32
      And we will continue to develop this as a high-speed corridor, understanding that it's a commuter rail project with a future third-track benefit for interface for the entire corridor use.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:19:41
      Let me know if there's anything you need.
    • Kevin B. PageChief of Rail Transportation
    • 02:19:42
      All right, thank you.
    • 02:19:44
      This study, sir, I will tell you, we just picked up another $4 million from FRA to North Carolina.
    • 02:19:56
      We have about $3 million of rail enhancement funds in this last go-round of funding as well.
    • 02:20:03
      These are not inexpensive studies.
    • 02:20:04
      It's a very long corridor.
    • 02:20:06
      This is a 158-mile corridor.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:20:08
      I'm sorry, but I know, but $7 million.
    • 02:20:09
      $7 million?
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 02:20:11
      No.
    • 02:20:12
      No, it's more than that.
    • Kevin B. PageChief of Rail Transportation
    • 02:20:14
      It's more than the seven, sir.
    • 02:20:15
      We're pushing probably, at best, we're running now about 14 million on this, including North Carolina's share.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:20:21
      On the study alone.
    • 02:20:23
      And we're not, right now, it would be just in the existing right of way, right?
    • Kevin B. PageChief of Rail Transportation
    • 02:20:28
      Yes, sir.
    • 02:20:28
      Let me clarify that if I may, Mr. Chairman.
    • 02:20:31
      We're going to use existing right of way from Richmond to Petersburg.
    • 02:20:34
      From Petersburg to North Carolina, we'll use about 40 to 50 percent of the best line current.
    • 02:20:39
      That means we're stepping off of that right of way in order to achieve the speeds of 110 miles per hour.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:20:44
      I see some of it used to be that way, right?
    • Kevin B. PageChief of Rail Transportation
    • 02:20:49
      That is correct.
    • 02:20:50
      We are re-establishing a former railroad that was there up until 1989.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:20:54
      So far we have spent $14 million for a study that tells us to choose the goods people want.
    • Kevin B. PageChief of Rail Transportation
    • 02:21:02
      That is correct.
    • 02:21:02
      And it also gives us the environmental clearance to go build the project.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:21:05
      I am just going.
    • 02:21:06
      Yes, sir.
    • 02:21:07
      The amount of money that has to go in.
    • 02:21:11
      I mean, I know how much VDOT spends.
    • 02:21:13
      Something like this where
    • 02:21:15
      You have this essentially a national priority and say we're going to do all this and we want people to get on trains and then we have to spend millions of dollars instead of really looking at trying to extend the service.
    • 02:21:25
      I mean we can't even get the money to build a third line and we have to go though instead spend money on studies like we did on that one and they don't want you to go board infrastructure.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 02:21:39
      They are good, but the award that we've just gotten for D.C. to Richmond to take us from a Tier 1 to a Tier 2 is $44 million.
    • 02:21:52
      So I would think this study in totality to get to a Tier 2 has got to be more similar to that, unless it was just years ago.
    • 02:22:01
      But at the same time, I do want you to know that Chairman Micah
    • 02:22:04
      If we can ever get a reauthorization bill, it's trying to loosen those regulations in existing right of way.
    • 02:22:13
      He agrees that this is ridiculous.
    • 02:22:16
      And time.
    • 02:22:16
      Look at the time.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:22:17
      Eight years.
    • 02:22:18
      Eight years.
    • Kevin B. PageChief of Rail Transportation
    • 02:22:19
      That is correct.
    • 02:22:20
      Mr. Chairman, the $44.3 million we were just awarded by FRA includes design and some engineering on this project, as Director Drake has said as well.
    • 02:22:29
      The unfortunate part of I think where we are on this Tier 2 to Raleigh is that in order for us to run a train over that railroad, we need to make significant improvements north of Petersburg.
    • 02:22:37
      and North of Richmond.
    • 02:22:39
      And we under the tier two EIS from Richmond to Washington is 44 million, but we'll have a go build document that'll be a lot more robust than where we are with about 14 we've spent with North Carolina.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 02:22:51
      Also, one more thing, Mr. Chairman.
    • 02:22:54
      The whole issue of eminent domain and lost profits and definitions, there is a lot of property in this corridor because CSX sold off some of that right of way.
    • 02:23:05
      Some is CFX-owned and three miles of it has been sold off.
    • 02:23:09
      In addition to the great separations that would come.
    • 02:23:12
      The eminent domain issue is going to really hit in this one.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:23:16
      It's just one of these things where you hear the politicians, particularly in Washington, who talk about how we're losing our competitive edge and countries like the Chinese are able to build things in years.
    • 02:23:28
      They don't want to look in the mirror and see what's the cause, a handful of our problems.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:23:35
      Mr. Miller.
    • 02:23:36
      Mr.
    • 02:23:36
      Page, when the Norfolk Spur, or the Hampton Roads Spur effect, called the Norfolk Spur, was added administratively, is that treated any differently than any other part of this line?
    • Kevin B. PageChief of Rail Transportation
    • 02:23:55
      No sir, it's not.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:23:56
      It's a very good question.
    • 02:23:56
      No cons, no differences.
    • Kevin B. PageChief of Rail Transportation
    • 02:23:59
      Right.
    • 02:23:59
      Thank you, Mr.
    • 02:24:00
      Chair and Mr. Miller.
    • 02:24:01
      To answer your question, when the quarter is administratively extended off of the corridor, one of the challenges we had when we were having discussions with FRA over the whole $8 billion first round of funding was
    • 02:24:15
      said FRA was trying to concentrate more on the spine of the southeast quarter.
    • 02:24:20
      But we dug our heels in as well and then pointed out that there is a large population concentration in the Hampton Roads region that had to be surfed.
    • 02:24:28
      And we did make a very vocal, loud record of comment on that.
    • 02:24:35
      And Mr. Miller as well is that what we're doing going to Norfolk with the Amtrak Intercity Train Service in December, that's our goal,
    • 02:24:43
      Is that we're now creating an emerging high-speed corridor.
    • 02:24:47
      Not only do we have a corridor that's been established and extended on the books, we now have train service in it.
    • 02:24:54
      Currently today, this corridor to Raleigh does not have train service over from Petersburg to Raleigh.
    • 02:24:59
      So there's a competitive edge that puts you in a better place at Hampton Roads.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:25:03
      Is that just psychological or is there some scoring that puts it in a better place?
    • Kevin B. PageChief of Rail Transportation
    • 02:25:07
      When you already have Amtrak service and you're enhancing that passenger rail service to higher speeds, you have a better competitive edge for funding because you're improving an existing quarter that's serving the population.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:25:18
      Any other questions?
    • 02:25:21
      Just an administrative one.
    • 02:25:22
      Is our next meeting the 21st or the 14th of March?
    • 02:25:25
      I'll have to check.
    • 02:25:26
      I'll make sure I'm on the 14th.
    • 02:25:28
      It's the 14th.
    • 02:25:29
      I apologize.
    • 02:25:29
      Back seven days off.
    • Dana M. MartinMember, Commonwealth Transportation Board
    • 02:25:30
      Here, I just want to make sure ahead of time.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:25:34
      Give me a long meeting.
    • 02:25:35
      I just have one last question.
    • 02:25:37
      I know that when all the other board members, you go to answer their questions, you always say,
    • 02:25:43
      That's a very good question.
    • 02:25:47
      But when I ask the question, you never say that.
    • Kevin B. PageChief of Rail Transportation
    • 02:25:52
      Mr. Chairman, sir, all your questions are excellent questions.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:25:59
      It goes without saying, sir.
    • SPEAKER_09
    • 02:26:14
      Could one of my wounded veterans help me technically, please?
    • 02:26:32
      Good afternoon.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:26:32
      Good afternoon.
    • SPEAKER_09
    • 02:26:37
      I am very pleased to be here this afternoon to talk about two of my favorite subjects, wounded veterans.
    • 02:26:44
      This is a program that I am very pleased.
    • 02:26:52
      Obviously, I needed more information.
    • John W. LawsonChief Financial Officer
    • 02:26:54
      First of all, I would like for all the wounded veterans who are here to stand up.
    • SPEAKER_09
    • 02:27:11
      And as you will notice, there have been two who have been working with you on the meeting and been assisting us with technical challenges.
    • 02:27:19
      We have Kenyon Moore, Eric Steely, Steve Davis, Steve McAlpin, Bill Lamberts, Jeanette Epps, and David Calhoun, who's the program coordinator.
    • 02:27:31
      Thank you guys.
    • 02:27:36
      The Wounded Veteran Program was initiated and funded in 2006.
    • 02:27:41
      Our initial grant was $250,000, and in 2009 we received $1.2 million.
    • 02:27:49
      Right now, if you look at our budget, we have enough money to last us through probably mid-year of 2013.
    • 02:27:59
      We're going to be going in to add Federal Highway Administration for another grant.
    • 02:28:07
      This was the first State Department of Transportation in the nation to create a Wounded Veterans Program.
    • 02:28:14
      The program focuses on, but is not limited to, disabled veterans returning from Afghanistan and Iraq.
    • 02:28:21
      We have had a couple from the Vietnam era.
    • 02:28:25
      The program works with a number of veteran services, and we attempt to place people in the right job
    • 02:28:36
      with the right supervisor, the right mentor, and we assess them to be able to put them in these positions.
    • 02:28:45
      Internship placement depends on aptitude and interest.
    • 02:28:49
      Could be areas such as planning, finance, project management.
    • 02:28:53
      They're normally for one year.
    • 02:28:55
      We normally extend them for an additional year.
    • 02:28:58
      And each intern is an hourly employee.
    • 02:29:06
      The program goes, we allow them to revamp their old skills, develop new skills, meet the desires and needs of the wounded veterans, and prepare them to go back out into the world to make a great living for themselves.
    • 02:29:23
      When they come in, we try to work with them with individual development plans.
    • 02:29:32
      We work with them with individual development plans
    • 02:29:35
      We have quarterly workshops.
    • 02:29:39
      There are conference calls every two months, but we work with them and to try to meet the needs for VDOT and meet the needs of the wounded veterans.
    • 02:29:54
      The quarterly workshops include things like job performance, your development plan, resume development, interviewing skills,
    • 02:30:03
      and other pertinent items that the wounded veterans may say that they need.
    • 02:30:08
      Now we have, going through this program, as I said, we extend them for two years.
    • 02:30:16
      In 2010, we had a wounded veteran from the Bristol district who graduated with a degree in civil engineering.
    • 02:30:26
      Now when he first started working with us, he had no idea he wanted to be a civil engineer.
    • 02:30:32
      But working with the Bristol administration, we extended his internship for three years.
    • 02:30:38
      That was an exception.
    • 02:30:40
      And this gentleman was able to get a degree in civil engineering.
    • 02:30:45
      And to me, guys, that is a great success story.
    • 02:30:49
      And for those of you who live in the Richmond district, I don't know if you saw on the TV a couple of weeks ago,
    • 02:30:57
      But there was a dog that, I think it was a pit bull that was loose and attacked a female.
    • 02:31:05
      And when the dog was out and was attacking the female and her dog, you know, we always see things going on and we hear things we may not pay attention.
    • 02:31:17
      But one of our former wounded veterans, and when I say former, he graduated out of the program and he's now a full-time classified
    • 02:31:27
      employee in civil rights, he heard the commotion, he came out, and as the newspaper said, he did a choke hold on the pit bull.
    • 02:31:40
      And there was a story about him on the TV, and I would like for him to stand.
    • 02:31:44
      He is a graduate, Jonathan Singleton.
    • 02:31:51
      Now this is the caliber of the individuals that we have.
    • 02:31:56
      They come to us with very good skills, and we allow them the opportunity to just enhance their skills and to prepare them for the next step.
    • 02:32:11
      We've had a total of 59 wounded veterans since 2007, 35 have graduated, eight accepted full-time positions with VDOT,
    • 02:32:22
      and 17 graduated or obtained full-time position in the private sector.
    • 02:32:28
      Two returned to college at full-time students.
    • 02:32:34
      Right now we have 17 currently enrolled and eight in central office, one in Richmond, two in Fredericksburg, two in Hampton Roads, one in Lynchburg, one in Bristol and two in the Nova District.
    • 02:32:52
      Are there any questions?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:32:56
      Great program.
    • 02:32:59
      Any questions?
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 02:33:01
      Just a comment, Mr. Chairman.
    • 02:33:03
      Thank you very much.
    • 02:33:03
      You know, one of the things about this program is its successes as opposed to its entry points.
    • 02:33:15
      And I want to thank you and I want to thank all those who have been
    • 02:33:18
      involved in making sure these things work, that they're not just a program, but they're actually having impact.
    • 02:33:27
      Many of our companies are engaged in the same type of activity, and I can tell you it's easy to get distracted, it's easy to lose the focus, so I applaud the focus you've given and the successes, and I hope we can keep this moving forward.
    • 02:33:42
      It's the least we can do.
    • SPEAKER_09
    • 02:33:44
      Well, thank you, sir.
    • 02:33:45
      When we submit our grant application, I would be more than happy if you would submit a letter of recommendation to accompany us.
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:33:54
      I like that.
    • 02:33:56
      But he wanted the guy that had the, the gentleman back there who had the pit bull to be the legislative liaison.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:34:05
      I'll hire him right now.
    • SPEAKER_09
    • 02:34:11
      But this program could not be successful without the commitment from the top, and we did have the commitment from the commissioner and from the secretary.
    • 02:34:21
      So thank you for supporting this, and I would like you to give the Wounded Veterans one more hand, please.
    • 02:34:32
      Now our Wounded Veterans coordinator, David Calhoun, ensures that we do not forget this program,
    • 02:34:40
      He is and he's always bringing up new ideas.
    • 02:34:44
      He's always pushing me to do more.
    • 02:34:47
      So I would like to thank you very much, David.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:34:54
      I find that very hard to believe that you have to be pushed to do more.
    • 02:35:01
      Talk about putting a pit bull in the headlock.
    • 02:35:07
      Mr. Chairman, let's hear about SWAM VBE.
    • SPEAKER_09
    • 02:35:09
      If I can, I need assistance, please.
    • 02:35:11
      Yes, sir.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:35:13
      Chairman, just one quick question, Ms. Johnson.
    • 02:35:16
      Is there any minimum disability, anything that you have to add?
    • SPEAKER_09
    • 02:35:19
      There is an assessment process that you have to go through.
    • 02:35:23
      David, would you like to address that?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:35:26
      Yes, in order to be eligible for the program, veterans have to, as long as a veteran, have 10% or more raised from the Fox Federal Affairs and be a resident of the Commonwealth.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 02:35:48
      And we gather their D-214, resume, stay outpatient, and review to make sure that they are eligible, and then we start the process of getting the outpatient.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:35:52
      I apologize for missing a lot of this, but I did read your briefing on it.
    • 02:35:58
      I really appreciate you all bringing this before us.
    • 02:36:02
      It's a great thing.
    • 02:36:05
      We do internships.
    • 02:36:06
      Do we employ these people permanently, too?
    • 02:36:09
      I mean, internship is one thing, but do we have permanent jobs?
    • SPEAKER_09
    • 02:36:13
      We do try to.
    • 02:36:14
      Being in the program will not guarantee you a job, but if there is an opening, we prepare the wounded veterans to apply for the openings, and we have hired about eight of them so far.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:36:26
      Keep hiring more.
    • SPEAKER_09
    • 02:36:28
      We will try, sir.
    • 02:36:33
      All right, my next favorite subject is the DBE SWAM program, of which I'm not shy about.
    • 02:36:40
      SWAM is an acronym for Small Women and Minority-Owned Businesses.
    • 02:36:45
      Small businesses are 51% independently owned, has 250 or fewer employees, or average annual gross receipts of 10 million.
    • 02:36:56
      Businesses that fit this profile are not least owned by one or more women or minorities.
    • 02:37:02
      Individuals are referred to as women-owned or minority-owned.
    • 02:37:06
      There are 560,000 small businesses in the Commonwealth.
    • 02:37:11
      And as we all hear, the small businesses are the backbone of our economy.
    • 02:37:17
      So the program enhances their vitality.
    • 02:37:25
      Under the SWAM program, target spending of 40% of discretionary spending to meet the goal of Executive Order 33.
    • 02:37:36
      SWAM was developed under Executive Order 33.
    • 02:37:39
      It was first established in 2005 by Governor Warner.
    • 02:37:47
      Governor King kept it and so did Governor McDonald.
    • 02:37:51
      and Governor McDonald does support this program because he has sent me out many times, especially to the NAACP and a few other organizations to talk about his commitment for this program.
    • 02:38:06
      We advertise upcoming contract opportunities in advance through EVA.
    • 02:38:11
      We conduct outreach activities to locate SWAM vendors.
    • 02:38:16
      and we work with other government agencies and the private sector to communicate to businesses the opportunities.
    • 02:38:26
      You hear SWAM and DBE.
    • 02:38:28
      SWAM is a state certification.
    • 02:38:30
      DBE is a federal certification and it's established on the 49th Code of Federal Regulations 26th, Participation by Disadvantaged Business Enterprises.
    • 02:38:41
      All FHWA recipients that lack DOT-assisted contracts must have a DBE goal.
    • 02:38:49
      We review all contracts to see if we will establish a DBE goal.
    • 02:38:56
      Recipients are required to set the overall goal for DBE participation and federally-assisted contracts.
    • 02:39:05
      To be a DBE, you must be at least 51 percent owned by one or more individuals who are both socially and economically disadvantaged and whose management and daily business operations are controlled by one or more of the socially and economic disadvantaged individuals.
    • 02:39:24
      This could be Hispanic American, Native American, Asian Pacific, subcontinent Asian American, and women.
    • 02:39:33
      DBEs are SWAMs, but not all SWAMs are DBEs.
    • 02:39:41
      Just to take a look at our participation, from FY06, we went from 11.6% to where we are now.
    • 02:39:51
      We finished fiscal year 11 with 43.8%.
    • 02:39:55
      But we did not get to that easily.
    • 02:39:57
      The easiest thing that we can do for any contractor is to get them a contract.
    • 02:40:04
      But after we get them the contract, we have to help them to keep that contract.
    • 02:40:10
      Shaye Ponconette, who runs the Bow Center and is the Acting Civil Rights Division Administrator, is the one who runs this program.
    • 02:40:21
      And she has quarterly workshops every quarter.
    • 02:40:26
      We had a workshop in Portsmouth about a month ago for the downtown-midtown tunnel.
    • 02:40:32
      And this workshop was on teaming.
    • 02:40:35
      And we collected teaming because you're going to have a $2.1 billion project in Hampton Roads.
    • 02:40:42
      Small businesses, if they are to compete, they need to be able to work with groups.
    • 02:40:48
      So we had an attorney, we had some consultants, we had other business owners there to work with our DBE and SWAM firms.
    • 02:40:57
      We had over 150 firms participate in that workshop.
    • 02:41:02
      So that's why I say we also help them to keep the contract.
    • 02:41:06
      We also work with them on supportive services, the back end operations.
    • 02:41:12
      Most of the small businesses are very capable of doing the work.
    • 02:41:16
      There's no question about that technical capacity.
    • 02:41:19
      But when you're a small business and you're working on a shoestring, you need access to capital.
    • 02:41:25
      You may need someone to help you with your labor reporting or your bookkeeping.
    • 02:41:29
      So these are services that we try to provide to the small businesses.
    • 02:41:35
      We also have engineering consultants who will go out on site just to review what they are doing to be sure that they are doing what they're supposed to do when they're on point.
    • 02:41:45
      So here at VDOT, we don't just only get you a contract.
    • 02:41:48
      We also put things in place to help you to keep that contract.
    • 02:41:52
      And that's what allowed our numbers to go from 11.62% to 43.8%.
    • 02:41:55
      It's 11.62% of what?
    • 02:42:05
      Discretionary spending.
    • 02:42:06
      And let me go back.
    • 02:42:07
      I don't have a slide with the total dollars on it, but it's discretionary spending which takes out your fixed costs.
    • 02:42:17
      So it would not be on utilities and VDOT.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:42:21
      Okay, so it'd be 11.62%.
    • 02:42:25
      Thank you.
    • 02:42:27
      It's in 06, but 43.8 in 11.
    • 02:42:32
      In 11.
    • SPEAKER_09
    • 02:42:33
      And as I said earlier, the SWAM program started in 2005.
    • 02:42:38
      So incrementally, we have been doing better every year.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:42:43
      Is there a sort of a goal?
    • 02:42:48
      What's Utopia?
    • SPEAKER_09
    • 02:42:49
      Executive Order 33 says 40% of all discretionary spending.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:42:55
      But internally you've exceeded that and I presume you're not stopping.
    • 02:42:58
      So do we have a different role internally?
    • SPEAKER_09
    • 02:43:02
      No, we strive for the 40%.
    • 02:43:04
      It's just that maybe some of the programs we've put in place are really working.
    • 02:43:08
      But no, we just strive for the 40%.
    • 02:43:15
      And the discretion for FY11 was $1.9 billion.
    • 02:43:23
      And the last picture here is our workshop that we had enforcement from the downtown-midtown tunnel.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:43:30
      Are there any questions about the DBE swear program?
    • 02:43:34
      Any other questions?
    • 02:43:35
      Mr. Chairman?
    • 02:43:36
      Yes, Cole.
    • SPEAKER_15
    • 02:43:37
      Thank you, Ms. Johnson.
    • 02:43:39
      I've had the pleasure, I guess, of chairing the Governor's Small Business Advisory Board over the last couple of years.
    • 02:43:46
      I can't say that we've had meetings at some point in the meeting.
    • 02:43:50
      We haven't discussed the definition of small business.
    • 02:43:54
      Does the department have an opinion?
    • 02:43:56
      There are so many definitions of small business out there federally, not just in terms of SWAM and DDE, but is that a subject that you all have explored?
    • SPEAKER_09
    • 02:44:08
      Not really, sir, because the SWAM program is a program that is initiated by DGS.
    • 02:44:15
      We just basically follow their rules.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 02:44:20
      Thank you.
    • 02:44:22
      Chairman, I think the Department of Minority Business Enterprise is the one who actually... You're correct, sir.
    • SPEAKER_09
    • 02:44:29
      It's the Department of Minority Business Enterprise.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 02:44:32
      And the Department of General Services issues a rule as it relates to procurement for a small business.
    • SPEAKER_09
    • 02:44:38
      Yes, sir.
    • 02:44:39
      Thank you for the clarification.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 02:44:41
      Mr. Chairman.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:44:42
      Yes, Mr. Johnson.
    • 02:44:44
      As far as the participation comparison, do you have a number for the actual BBEs as far as the percentage?
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 02:44:52
      Yes, sir.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:44:53
      Okay.
    • SPEAKER_09
    • 02:44:53
      I don't have that with me, but I can get that information for you.
    • 02:45:00
      Okay.
    • 02:45:01
      Any other questions?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:45:03
      Johnson, thank you very much.
    • SPEAKER_09
    • 02:45:04
      Thank you, and I really appreciate your support for these two programs.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:45:10
      Okay.
    • 02:45:12
      Transportation enhancement program.
    • 02:45:17
      Mr. DeBruhl, otherwise known as the Dev Show.
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:45:23
      That will probably haunt me for the rest of my career.
    • 02:45:26
      Each of you at your seats should have a brightly colored folder.
    • 02:45:31
      It is our favorite time of the year with the enhancement program where we start talking about the applications we've received and selecting projects for funding in the upcoming fiscal year.
    • 02:45:41
      So I'm going to give you an update on that today and also talk to you a little bit about the program as a whole and where we're going with some streamlining opportunities and ways to improve program delivery.
    • 02:45:52
      In the way of a little bit of background, the Transportation Enhancement Program is a federal program.
    • 02:45:57
      It is a mandatory 10% set aside from the Federal Surface Transportation Program.
    • 02:46:02
      It's been in place since the passage of IC in 1991.
    • 02:46:06
      We did our first allocations actually in 1993.
    • 02:46:10
      The board through policy has determined how we're going to allocate those funds.
    • 02:46:15
      The most recent policy was adopted by this board in December of 2010.
    • 02:46:21
      In terms of allocation, what does that mean for this year and how we're going to fund projects?
    • 02:46:25
      In order of how the funds are going to be allocated, the first $4 million available goes to high priority statewide initiatives.
    • 02:46:34
      75% of the remaining allocations is divided up amongst the nine district members, and then the rest is distributed to the five at-large members.
    • 02:46:44
      In terms of funding requirements, in order to select a project, you have to fund a minimum of 50% of the requested amount, and if the selection is a small project requesting less than $200,000 and it's going to fully fund a project or a phase to select that project, you need to fully fund it.
    • 02:47:03
      The eligible categories are established by federal law.
    • 02:47:06
      Those are listed on the screen.
    • 02:47:08
      There are 12 categories and they must all have a tie to surface transportation in order to be eligible.
    • 02:47:14
      We do work closely with the Federal Highway Administration in terms of determining eligibility on any applications that maybe don't clearly meet those eligibility categories or if there's any question if it's eligible for funding.
    • 02:47:28
      Specifically looking at the FY13 applications, we received applications on November 1st.
    • 02:47:34
      We received 114 applications of which you have 105 in your package that are available for you to select and fund that total about $48 million.
    • 02:47:45
      Right now we anticipate having about $22 million available.
    • 02:47:49
      Those are still preliminary numbers, but we'll be working to finalize those in the coming weeks.
    • 02:47:55
      And that number also does not include any potential deallocations that you may have available within your district.
    • 02:48:01
      So that when you break it down in accordance with the CTB policy, that means each district member will have about a million and a half dollars to allocate to projects.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:48:09
      Mr. Chairman.
    • 02:48:11
      Yes.
    • 02:48:11
      Can you do the math for me on the at-large members?
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:48:14
      The at-large members, Mr. Chairman and Mr. Miller.
    • 02:48:17
      At-large members work collectively as a group to address statewide priorities to help fill funding gaps and fully fund projects to completion.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:48:26
      And then the other $4 million you get is kind of at-large state applications as well.
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:48:33
      Those are for high priority statewide initiatives that have funded things like
    • 02:48:41
      Items related to the centennial of the Civil War, the Gateway Project on I-95 here in Richmond, and others.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:48:48
      And things like purchasing land in the Frederickburg District, and soon the purchasing land in the Richmond District?
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:48:55
      But it would be safe to say that about 8.5 is dedicated to statewide projects.
    • 02:49:02
      And they may be in specific areas, but they're of statewide significance.
    • 02:49:06
      Correct.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:49:09
      By the way, if any of you stopped, I mean, we saw the presentation on the kois.
    • 02:49:17
      If anybody stopped and actually, we had the Virginia Tourism came here, which we paid for out of there for the looking at wine and Civil War tourism.
    • 02:49:25
      It was so exceptional.
    • 02:49:25
      I've seen people waiting in line.
    • 02:49:27
      You stopped here at the one at Duke Kent.
    • 02:49:29
      There were people waiting in line to use those things.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:49:33
      Should I check them out?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:49:36
      It was out of there waiting for the bathroom, but you know what?
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:49:38
      Mr. Chairman.
    • 02:49:40
      Yes.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:49:41
      Ms. Jennifer, is there a reason why we're in eligible categories?
    • 02:49:46
      We're not matching the governor's initiative about the fleet of the hybrid vehicles.
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:49:53
      Okay, so we're kicking off the process today with the district members.
    • 02:50:22
      You'll have your list
    • 02:50:23
      For your individual districts, that one and a half million dollar allocation and your selections are due back to us on March 12th so that we can then begin the process with the at-large numbers.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:50:33
      Mr. Chairman?
    • 02:50:34
      Yes.
    • 02:50:35
      Are you all going to schedule a meeting so this collective body of five can collectively do their thing?
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:50:41
      Mr. Chairman, Mr. Miller, of course.
    • 02:50:42
      We will be doing that later in the spring.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:50:45
      Great.
    • 02:50:46
      Thank you.
    • 02:50:47
      What's the date we're coming back here?
    • 02:50:52
      In March?
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:50:56
      It would not be in conjunction with your March meeting.
    • 02:50:58
      It would probably be April because we will take the information we received from the district members and we will work through that and make recommendations.
    • 02:51:08
      We'll give you some time to look at it.
    • 02:51:11
      In terms of looking at the projects in accordance with your policy, we do score all projects that we receive applications on that are eligible.
    • 02:51:19
      That scoring criteria has been in effect basically since 2006 with a few minor tweaks and all projects receive a rating between 0 and 100.
    • 02:51:28
      A change that we made in 2010 was to look at the existing projects, ones that had already received funding and were in the pipeline and give them a priority ranking.
    • 02:51:36
      based on where they were in project development, how quickly they could use the funds that could be made available through that request and give you an indication of how ready that project is to move forward quickly and get to fruition.
    • 02:51:52
      Those rankings you'll also see in your selection package for those projects that already are in the pipeline.
    • 02:51:58
      If you look at the history of the program,
    • 02:52:02
      A couple of things.
    • 02:52:03
      I've hit on existing projects and I've talked about trying to fully fund requests a couple of times.
    • 02:52:08
      Historically, that hasn't always been the case with this program, but if you look over the past few years and the past couple of rounds of selections, we've been putting increasing emphasis on funding projects that are already in the pipeline and trying to fully fund requests so that we can see those projects to come to fruition quickly, and you'll see that in that slide.
    • 02:52:28
      Also in your packet, you'll each have, for the district members, you have a summary of all of the projects that have received allocations in your district since the beginning of the program in 1993, and also a summary of the statewide projects.
    • 02:52:41
      For the at-large members, you'll have actually copies of everything, all nine districts and the statewide selection.
    • 02:52:47
      That summary is color-coded.
    • 02:52:49
      It'll show you the projects and their current status, whether they're completed, under construction, or they have an agreement pending, which means that they haven't yet started.
    • 02:52:57
      That summary's also going to tell you how long that project has been receiving allocations, how many allocations have been provided to that project, and how much has been reimbursed to the project sponsor, which is also an indication of the project's progress over time.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 02:53:11
      But the new ones aren't in there, right?
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:53:13
      No.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 02:53:14
      When will we get those?
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:53:16
      Once the selections are made, they'll be included in the next round of district summaries.
    • 02:53:23
      The final column in that summary also includes
    • 02:53:26
      Some notes about where projects are in terms of board policy, if a project is on your list for selection this year or if the project is subject to deallocation.
    • 02:53:37
      In terms of deallocation, we've been looking, we look periodically on a pretty routine basis at all active projects to ensure that projects are moving forward, that money is being spent and they're making the progress that we expect.
    • 02:53:52
      Those projects that aren't doing that are put on a deallocation list
    • 02:53:56
      for potential revocation of the fund.
    • 02:53:59
      The policy was formalized.
    • 02:54:01
      That policy was formalized by this board in December of 2010, but we've really been working on that process since 2007.
    • 02:54:07
      And in that time, we've deallocated funding for totally about $20 million from projects that were either complete or had not progressed.
    • 02:54:17
      About $13 million of that has already been reallocated by the CTB, so they're still a little bit in limbo.
    • 02:54:23
      As you look at that summary and that column that shows you at the end, somebody's received a 45-day letter.
    • 02:54:29
      Those 45-day letters put them on notice that they are not progressing as we expect.
    • 02:54:33
      We're looking for a response within 45 days of their intentions on that project.
    • 02:54:38
      Once we hear back from those about 15 projects that are currently in that process, we'll be reaching out to the district CTB members that have those projects to see what they want to do with those projects, and that could potentially free up additional money for you to allocate as part of the selection process.
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:54:54
      Mr. Chairman, before we get to the review, I guess I'd like to mention, do we have a plan to address the snail's pace of progress for those that are not up for the allocation?
    • 02:55:11
      And projects that are in the system, many of them laying in design and they're too long, and have we specifically identified the problem there?
    • 02:55:21
      Is it the recipients are not certified, they can't handle it, or do we need
    • 02:55:26
      A certification process that these people can handle it and can move forward, or do we need to do something on the window of time that something can lay in design, or what kind of policies can we do to enhance this thing, move it along, and get this money to moving dirt and accomplishing things within the program?
    • 02:55:46
      Because I think that pace is a little too slow for the progress that we need out of the program.
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 02:55:51
      If I can get through one more slide, I've actually got five or six slides to go through that cover just that topic.
    • 02:56:00
      In wrapping up your selection process and your packet that you have in front of you, you've got a number of things.
    • 02:56:04
      You've got a summary page that goes through the applications, the process, and it shows you by district how much you currently have based on allocation and then the allocations that have already been, have gone through the approval process to allocate.
    • 02:56:18
      You've got that application listing with the scores.
    • 02:56:21
      You've got a list of those ineligible and canceled applications of which there were seven ineligible and two that were canceled.
    • 02:56:28
      Copy the CTB policy, copy the deallocation process, and those district summaries and our staff contact list.
    • 02:56:35
      So as you look at what you have available in your districts to choose from, if you have questions, feel free to contact me or a member of our staff.
    • 02:56:42
      We'll be glad to help you in any way we can as we work towards getting the selections made and back to this board in June for approval.
    • 02:56:50
      Switching gears just a little bit, Mr.
    • 02:56:53
      Keen back in December brought up his concern to the board about the snail's pace of enhancement projects.
    • 02:57:00
      And it's something that we've talked about over the years.
    • 02:57:02
      It's a concern that we share.
    • 02:57:05
      And what I've got for you is a few slides on some things that we've already done to try to improve project delivery and then also some recommendations on some things that we can do moving forward to also assist in improving project delivery.
    • 02:57:18
      Mr.
    • 02:57:18
      Keen did a good job of kind of hitting on some of the things that we hear anecdotally that are concerns with delivering these types of projects, but what we've done is we really see three key things that impact the ability for enhancement projects to move forward quickly.
    • 02:57:33
      One is then how we choose to fund those projects through our funding policy.
    • 02:57:38
      Two, how VDOT provides oversight and assistance to those project sponsors as they're delivering the project.
    • 02:57:43
      And third, how the project sponsors actually implement the projects once they receive funding.
    • 02:57:48
      And as I mentioned, we've taken actions in each one of those areas, but as always, there's room for improvement, additional things that we can do to help things work better.
    • 02:57:57
      Start with funding policy.
    • 02:57:58
      I've hit on the CTB's policy from December 2010 a couple of times, but that policy really changed a couple of key things that have helped, and we're seeing the statistics now show us that that helped increase our rate of program expenditure,
    • 02:58:14
      increase the number of projects that are either in construction or completed and reduce the number of projects through the pipeline.
    • 02:58:20
      And we were able to do that through the funding policy by focusing our funding on existing projects and establishing those higher funding thresholds to get a project approved or to select a project for funding.
    • 02:58:33
      Secondly, we started with the program summary that you see.
    • 02:58:37
      We've kept at a staff level for a long time, keeping information on the program instead of looking at them.
    • 02:58:41
      to see where things were going.
    • 02:58:43
      We started sharing this with the board members a couple of years ago.
    • 02:58:46
      We try to share them with you a couple of times of the year so that you can see where the project in your district and what the program looks like as you're working with sponsors and local governments throughout the course of the year.
    • 02:58:59
      We do think there are some additional actions that we could take that would help expedite projects.
    • 02:59:04
      One is to consider looking at that deallocation policy.
    • 02:59:08
      It's informally been in effect since 2007, formally since
    • 02:59:11
      2010, and it does put pressure on those project sponsors to deliver projects within a four-year time limit.
    • 02:59:19
      The way the policy is structured right now is we don't look at them, we don't give them a letter or put them on notice until that four-year time window passes.
    • 02:59:28
      So there is an opportunity to either shorten that time or have to take some intermediate actions to put a little bit more pressure on that project sponsor to deliver in a shorter timeframe.
    • 02:59:41
      Our current process also continues to extend that four-year time limit every time that sponsor comes back and asks for and receives an additional allocation.
    • 02:59:49
      So if you look at some of the projects in the summary list, some of them have received allocations over eight, nine, ten years, and that timeline just keeps pushing out.
    • 02:59:58
      So we do have some opportunities to tighten up the timeframes in that deallocation process and move projects through the pipeline a little faster.
    • 03:00:07
      Second thing in terms of a suggestion is that we could also revisit our policy in terms of how we fund requests.
    • 03:00:14
      We have always communicated through our applicant workshops to potential project sponsors that they need to be looking for funding sources beyond transportation enhancement, especially if they have large projects.
    • 03:00:24
      And we do have a number of projects that are very large and very expensive.
    • 03:00:30
      The board could consider setting a cap, a lifetime cap for a project of a certain amount so that we are focusing on
    • 03:00:37
      Manageable chunks of projects that can be delivered instead of seeing eight, $10 million potentially go to one large project.
    • 03:00:44
      So again, those are just suggestions that could help on the funding side.
    • 03:00:51
      In terms of VDOT oversight, for every one of these enhancement projects, there's somebody on the VDOT staff that's identified to work directly with that project sponsor to help them, provide them guidance, provide oversight, any reviews that they need, help them through the process.
    • 03:01:07
      That is something that takes time and effort on our staff's part, and we've taken some actions over the past couple of years to try to expedite things on our side.
    • 03:01:16
      First of which, a couple of years ago, we heard from a lot of the sponsors.
    • 03:01:21
      They were having trouble in the environmental process.
    • 03:01:23
      They were paying consultants a significant amount of money and losing a lot of time in environmental for something that VDOT with our staff can do fairly quickly.
    • 03:01:33
      preparing NEPA documents for their projects.
    • 03:01:36
      And so a couple years ago we agreed to take on that function for the project sponsors to help save time, save money, and also ensure that we were complying with all environmental laws.
    • 03:01:46
      Secondly, those VDOT project coordinators, a lot of them are new to that role.
    • 03:01:50
      The approach to locally administered projects is different than delivering a VDOT administered project.
    • 03:01:55
      So we've got a learning curve there.
    • 03:01:56
      So we've been providing tools to help assist them in being effective in working with locally administered projects.
    • 03:02:02
      We did a series of project coordinator workshops last fall to educate them.
    • 03:02:06
      We've enhanced our written guidance, all trying to bring new folks up to speed in terms of what's expected to try to expedite these projects.
    • 03:02:14
      In terms of our staff and looking at getting good projects in the pipeline, we've implemented, and I call it an informal two-step application process.
    • 03:02:22
      Right now there's one application process that's due to us on November 1st, but we've invested more time
    • 03:02:28
      And as part of the thought of moving that deadline up a month was to invest a little bit more time in making sure that the projects that you see and come to you for funding have a reasonable scope associated with them and have a reasonable estimate in terms of how much a project's gonna cost so that what you see is a viable project for selection.
    • 03:02:48
      And finally, each district has an enhancement coordinator now.
    • 03:02:51
      That's one point of contact that may not be touching every single project but is engaged at the program level with the enhancement
    • 03:02:58
      Program and theirs to be a facilitator.
    • 03:03:00
      That action used to be in our office here in Richmond and so putting that function out in the district gets that closer to the localities and the sponsors that are doing projects.
    • 03:03:10
      We've got lots we can do in this arena too to try to streamline project delivery.
    • 03:03:15
      We still have training needs.
    • 03:03:18
      We have kind of looked at it from a broad brush perspective and treated everybody the same way.
    • 03:03:23
      We do have some statistics on the program and we've been able to target some specific
    • 03:03:27
      District needs in terms of training.
    • 03:03:29
      We're actively working on that right now.
    • 03:03:31
      We're also actively working on a comprehensive workshop for VDOT staff and also local government staff for this fall.
    • 03:03:38
      We also want to try to take better advantage of some streamlining measures FHWA has already made available to us.
    • 03:03:44
      It's a change.
    • 03:03:45
      Most of the time we kind of look at things in a similar manner, but because most of these projects are off the system right away, they're exempted by federal highway from many federal requirements that we could also exempt our project sponsors from.
    • 03:03:56
      We've also, in the past, and we continue to look for ways to streamline things like plan reviews, DBE and pre-award audit processes that the sponsors, when they send us a package and they're ready to go, they're waiting on us to get a response back to them.
    • 03:04:11
      We're also looking at formalizing that two-step application process.
    • 03:04:15
      We think that would help get you, again, more viable, realistic projects before you that are ready to go with a good scope and a good budget before you put the first dollar on them for implementation.
    • 03:04:28
      And finally, the third facet is our sponsors.
    • 03:04:32
      Pretty much 99% of the enhancement projects are being delivered by a locality and most of them have some kind of project sponsor, nonprofit, a garden club that's actually delivering the work of the project.
    • 03:04:44
      The level of expertise, the level of experience of our project sponsors varies greatly.
    • 03:04:49
      So we've taken a number of actions over time to make sure that they have training and outreach so they know what they're getting into before they ask for money
    • 03:04:58
      And they know what they need to do once the projects are funded.
    • 03:05:01
      We've done online training modules.
    • 03:05:03
      We've modified our sponsor workshops to give them more tailored and specific training for where they are in project delivery.
    • 03:05:10
      We've enhanced our guidance.
    • 03:05:12
      We've even surveyed them to ask them what they need us to give them in terms of training and outreach.
    • 03:05:18
      And we've changed our approach based on that feedback we received.
    • 03:05:22
      Within the last couple of years, we've implemented quarterly reporting for project sponsors, so we have that regular periodic dialogue with where projects are in the pipeline.
    • 03:05:30
      That's only as good as the information we receive and the project sponsors following through and submitting them.
    • 03:05:36
      But that is out there.
    • 03:05:37
      That's a tool for us and a tool for us to give you good information.
    • 03:05:40
      And we've also implemented the deallocation process, which as I said, it puts a little pressure on for those localities to move the projects forward quickly.
    • 03:05:49
      We have additional work that we want to do and are starting to do in the sponsor delivery arena as well.
    • 03:05:57
      As I mentioned, we did a survey to get their information or their input on our training and outreach to them.
    • 03:06:05
      We're looking to do the same thing to say what out there is really having the greatest impact on your ability to deliver projects so that we can then target our streamlining efforts on things that are of the greatest value to the project sponsors.
    • 03:06:18
      We're already planning a comprehensive workshop for local and VDOT staff for later this year to get out what is exactly required, what our expectations are and to help ease some of the things that might be causing delays in project delivery.
    • 03:06:34
      And we also want to place additional emphasis on quarterly reporting and results.
    • 03:06:38
      We've gone through a lot of transition with our project coordinators and our district enhancement coordinators, but as that starts to settle down,
    • 03:06:44
      It's our hope that those folks are going to have that regular dialogue to ensure that those quarterly reports are coming in and are being tracked and issues are identified early rather than waiting until something shows up on the deallocation list.
    • 03:06:59
      I would be remiss in talking about the enhancement program if I didn't talk a little bit about the future of the enhancement program.
    • 03:07:04
      And right now that future is a little bit cloudy.
    • 03:07:07
      In terms of federal programs, enhancement programs have been around for 20 years, basically in the same form that it is today.
    • 03:07:14
      which is a little unusual for federal programs.
    • 03:07:17
      We don't see them stick around and kind of stay somewhat stagnant for that period of time typically.
    • 03:07:23
      We are hearing and we have been hearing for some time that the future transportation bill could significantly modify how the enhancement program is administered, how it's managed or whether it even exists.
    • 03:07:35
      So we're already looking forward to say, well, what if?
    • 03:07:38
      What are the different what if scenarios and how do we adjust to it?
    • 03:07:42
      In terms of looking at that, if you look at just the existing projects that are shown in your district summaries and you come up with a cost to complete, our existing projects that are already in the pipeline represent a funding gap in excess of $140 million.
    • 03:07:58
      That's to fund out everything to its full scope and scale.
    • 03:08:02
      Depending on what happens with the program, the timing of what happens with the program, we have to look at each project individually to get to a logical point of completion.
    • 03:08:12
      The ultimate cost would not be $140 million, but there would be a significant amount of work in terms of determining what could be done within the confines of the program.
    • 03:08:21
      So that's the big question mark that surrounds the program and why you hear me emphasizing so much the existing projects.
    • 03:08:28
      In terms of next steps, we're going to continue to work as we have over the past couple of years to implement the streamlining opportunities available.
    • 03:08:36
      We'll do that survey to get some information both from our sponsors and from our district coordinators on what they see as the hiccups in the process.
    • 03:08:45
      We're going to provide that enhanced targeted training this fall to hopefully get things moving and keep folks up to date on what their expectations are.
    • 03:08:55
      And we're also considering coming back to you with some of those policy revisions that we discussed about how we could approach the allocation and funding in the future to try to bring down that cost to complete.
    • James L. KeenMember, Commonwealth Transportation Board
    • 03:09:07
      Mr. Chairman, one thing I think we might add to that policy issue to look at is what steps can we identify that could be labored?
    • 03:09:17
      Especially on small projects.
    • 03:09:19
      I understand maybe some states do have waivers in place.
    • 03:09:22
      It just doesn't make sense to spend a million dollars to get ready for a project that you're going to spend $200,000 on to do.
    • 03:09:29
      That's maybe an exaggeration, but some of that's taking place.
    • 03:09:34
      See if we could come up with a good waiver program that on small projects we can waive a lot of these things up front and let the money go actually toward enhancement side of it.
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 03:09:46
      We can definitely look at the extent to which we can do that and look at other states as well.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:09:59
      A couple of different elements.
    • 03:10:01
      One of the criteria that we don't really have is on the score.
    • 03:10:07
      Each of these outline various scores that they've got as they've gone through a staff review process.
    • 03:10:12
      and some of them I see have a score, there's two that have a score as low as 23 and then the highest is being 73.
    • 03:10:20
      I'm not judging on how this point takes place but one of the complaints and I think it's led to some of the legislation that you see at the federal level that could eliminate the program
    • 03:10:32
      As I understand it, it really only eliminates the requirement for this amount to be set aside.
    • 03:10:36
      It would still give us discretion if we decided to fund that by-pass or that museum or whatever.
    • 03:10:42
      I think we'd still have that authority.
    • 03:10:44
      Is that correct on that $140 million?
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 03:10:47
      It takes away the mandatory set-aside.
    • 03:10:49
      Whether or not it takes away the 12 eligible categories, I'm not exactly certain.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:10:53
      Even if it did, if those are considered transportation, we would have some flexibility.
    • 03:10:58
      Setting all that aside, you look at the scoring.
    • 03:11:02
      I get the question.
    • 03:11:03
      We've never really had a discussion about this since I've been here, but shouldn't we have a minimum score that a project should have in order to be awarded funding?
    • 03:11:12
      I mean, part of the problem is we're giving funding to a project, and I'm going to assume a score of 23 represents a project that's not very good.
    • 03:11:20
      You can look at that as a bridge to nowhere or something of that nature.
    • 03:11:24
      I don't know what those particular projects are.
    • 03:11:26
      I didn't go into detail, but when the public
    • 03:11:29
      is caught up in congestion on the roads, and then they see money going towards something that didn't score well because it may not be seen as valued.
    • 03:11:39
      That takes a little bit of the credibility away from the program.
    • 03:11:42
      So we've never really had a discussion on should one of our criteria, you know, we say, hey, 50%.
    • 03:11:48
      I would rather spend 25% on a project that scores an 80 or a 73 than 50% on a project that scores a 23.
    • 03:11:56
      Twenty-three out of a hundred is an 80.
    • 03:12:00
      My children are going to be in a lot of trouble if they bring that home in the report card.
    • 03:12:05
      I guess I'm throwing it out for discussion item.
    • 03:12:06
      What is everyone's thoughts about putting in some sort of minimum score for us to award funding for it to ensure that we're getting quality projects?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:12:18
      The only thing I'm going to throw out is sort of counter that.
    • 03:12:24
      I don't understand what you're saying.
    • 03:12:26
      No, no, but here's your problem.
    • 03:12:27
      I mean, there are scores.
    • 03:12:30
      You'll get some projects that are great scores, but then when you start looking and go, it's going to be 10 years before they build up the money, and you'll have ones with lower scores that you can put, and you'll get something right away.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:12:42
      Well, we shouldn't have to be part of the scoring process in terms of time for delivering.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:12:47
      I think the key part is what you said earlier, which is we don't really know what the scoring process is.
    • 03:12:55
      So let's assume it's really a good process.
    • 03:12:59
      Then I would agree with you.
    • 03:13:00
      Mr. Chairman?
    • 03:13:01
      If the scoring is not, you know, if we have some questions about the scoring process, not to denigrate it, but we have some questions about it,
    • 03:13:10
      And maybe we can fix it and make it better.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:13:14
      I generally look at the scoring sheets that the staff has done on the projects I'm looking at awarding funds to and go through that.
    • 03:13:20
      So we know what the scoring process is and we can see how they get there.
    • 03:13:23
      It's something I think I hope all members do that when they're awarding funds is look at those scoring.
    • 03:13:29
      But I think maybe that's the discussion point of are we scoring the right things, you know, time for delivery or time to actually... Well, we have the priority that gets into... That's where it is in the stage.
    • 03:13:40
      That's not necessarily...
    • 03:13:42
      But it's ready for construction.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:13:43
      Yeah.
    • 03:13:44
      Let Mr. Martin speak.
    • Dana M. MartinMember, Commonwealth Transportation Board
    • 03:13:46
      Yes.
    • 03:13:46
      There was a matrix and a presentation that we had a while back, and undoubtedly it's time to revisit that.
    • 03:13:58
      And personally, I had some issues with it that people told me had been addressed.
    • 03:14:05
      But we've never had a follow-up, so I've been trustworthy of that.
    • 03:14:10
      Pursuant to what Mr.
    • 03:14:11
      Keen said, though, there are two things I would recommend consideration, one being come as close as possible to making the workshop mandatory, maybe to the extent of making it to the score.
    • 03:14:27
      That's a project that did not have someone at the workshop,
    • 03:14:31
      It's going to score so low that it has to be super.
    • 03:14:34
      And second, to ensure that the workshop, that everyone who attended leaves with the rules, be it electronic, be it hard copy, whatever, but that they have, that you know that they've been at the workshop, they have the rules, which will go a long way toward addressing Mr.
    • 03:14:52
      Keen's issues.
    • 03:14:53
      And I'll give you a compliment while I'm at it.
    • 03:14:57
      My second or third year on this board, I was incensed
    • 03:15:01
      to find out I had recommended funding for an ineligible project.
    • 03:15:07
      February 3rd of this year, somebody sent me a letter pointing out that a project that people were asking about was ineligible.
    • 03:15:18
      So you think it's all in some embarrassment this year, Mr. Chairman?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:15:25
      Following up on Mr. Sterling's suggestion, where I see this as breaking it down
    • 03:15:31
      into two categories.
    • 03:15:33
      One, what are the criteria for scoring and then do you establish what I'll call a threshold, a target and a maximum with a group of score, you know, a score range in each and some don't make the cut and maybe the timing and the size of it go into the scoring but that's a project that I guess we have to ask
    • 03:15:57
      The secretary and the commissioner and Jennifer, if they want to take that on and come back to us with some recommendations if we want to give input to it.
    • 03:16:08
      But that would be an approach.
    • 03:16:12
      First, I want to thank Jennifer for all your work and your staff because I think you're doing a lot of good things here and making this clear, at least for me.
    • 03:16:20
      I appreciate that.
    • 03:16:22
      This is what Mr. Sterling says, I think there's no substitute for the good judgment of the members of this board to look at these projects and use your common sense.
    • 03:16:31
      I think that's probably the best way to do it.
    • 03:16:33
      The last point I want to make is really to emphasize what Mr.
    • 03:16:36
      Keen has said about waivers on some of these small projects.
    • 03:16:40
      You know, I had a little town in my district, and it took them two years to get a sidewalk in.
    • 03:16:45
      It was all this over-engineering they had to do, and that ain't too complicated to do a sidewalk.
    • 03:16:49
      It cost them a lot more money.
    • 03:16:52
      This go-around, they just gave up and said it'd be cheaper for us.
    • 03:16:57
      It took two years for the sidewalk.
    • 03:17:00
      We contracted on our own and we didn't have all these requirements and much cheaper, much, much cheaper.
    • 03:17:09
      And so if we can kind of exempt some of these smaller projects,
    • 03:17:13
      And I think sidewalks are a good thing.
    • 03:17:15
      If that isn't related to transportation, I don't know what it is, but we can try to help them out.
    • 03:17:20
      These towns, too, small towns have ADA problems.
    • 03:17:24
      If that can be waived, that would be helpful, too.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:17:33
      Thank you.
    • 03:17:33
      Mr. Chairman, just one quick one.
    • 03:17:35
      You sort of lamented about the $14 million we spent on the study.
    • 03:17:39
      And I would echo sort of Mr. Rich's remarks.
    • 03:17:43
      I've been involved in looking at a project that is ridiculously, it's not all state, a lot of it's the Fed, but it's ridiculously over-engineered, over-complicated, over whatever you want to call it.
    • 03:18:02
      And I applaud Jennifer and her group for
    • 03:18:06
      Sort of looking at how we can help these localities, and this wasn't a small town, this was a city, but how we can help these localities get there easier because I think the presumption before was it took people so long so it was their fault as opposed to they're struggling, we're struggling, let's find a way to quit struggling and get some damn results in here.
    • 03:18:29
      And, you know, that's what drives us crazy
    • 03:18:33
      The more we can do in that regard, and I know our hands are tied in some cases, but I looked at some regulations that related to a bike trail the other day and had to read through a book about like this, and that's what you have.
    • 03:18:45
      And they've got engineers and planners, and I'm thinking, oh my gosh, it's just a running trail, it's a bike trail.
    • 03:18:53
      But it's just absurd.
    • 03:18:55
      It's absolutely absurd, and I know it's not up, it's not always us, but the more we can do at our level to clear those decks, as long as the, you know, the main purposes are okay and we're not really hurting somebody by doing it, I think we ought to really push to do that.
    • 03:19:15
      And I congratulate you for what you've done so far.
    • SPEAKER_00
    • 03:19:19
      Okay.
    • 03:19:19
      All right.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:19:21
      Mr.
    • 03:19:21
      Whirl, do you want to go over
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 03:19:24
      We're going to switch gears from enhancements to airport access.
    • 03:19:30
      Just to give you a little bit of background, our airport access program is established by code.
    • 03:19:40
      We have a current airport access CTB policy that goes back to 1996, so it's been around for a while and it's a little dated.
    • 03:19:50
      The airport access program shares a $5.5 million annual budget with the economic development access program and the industrial rail access program.
    • 03:19:59
      And it's available for us to help improve road access to licensed public use airports.
    • 03:20:04
      And if you'll recall, this board made an allocation to James City County for such a purpose back in the fall of this year.
    • 03:20:11
      Our current CTB policy establishes a maximum allocation of $450,000 to any one airport in a fiscal year.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:20:18
      That's $300,000 unmatched and $150,000 matched and we partner with the Virginia Department of Aviation working on these projects.
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 03:20:39
      Ms. Sterling, that's part of the point of updating the policy is because that doesn't get you very much now compared to what it did get you in 1996.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:20:47
      And when we say it's shared with economic development, etc., is 450 our part?
    • 03:20:53
      They put in 450 or how is that shared?
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 03:20:57
      The 450,000 is per project.
    • 03:21:00
      The $5.5 million is the overall budget that's shared between Economic Development Access, Industrial Rail Access, and the Airport Access Program as a whole.
    • 03:21:07
      It's not divided up between those programs.
    • 03:21:10
      It's available for whichever projects come available within those programs that are eligible.
    • 03:21:18
      If you look back at the history of the Airport Access Program, over the past 20 years we've made 15 allocations to 12 projects.
    • 03:21:26
      It's not a very active program because by
    • 03:21:28
      In your nature, there's not a lot of new public use airports going into effect around the state, but it is a very valuable resource that is available for such situations as they do come up.
    • 03:21:40
      What we're bringing to you today is a briefing on a proposal that we'll bring to you for action next month to update the current CTD airport access policy and also to establish the first airport access guide by the CTB to give direction to applicants for the program.
    • 03:21:57
      The reasons for the policy update, well our current guidance is very antiquated and we want to modernize that and bring it up to reflect some changes that have happened in the code.
    • 03:22:07
      The Industrial Access Program was changed, the Economic Development Access Program a couple years back by legislation.
    • 03:22:13
      This board subsequently adopted a new Economic Development Access Road policy that increased the maximum funding for a project from $300,000 unmatched to $500,000 unmatched.
    • 03:22:27
      which gets to Mr. Sterling's point that you don't really get a whole lot for $300,000 when you're trying to provide road access.
    • 03:22:34
      The proposed policy would also direct the commissioner to establish an airport access guide.
    • 03:22:39
      I mean you have a copy of the draft policy in your package today.
    • 03:22:44
      The reason we're looking to do a separate airport access guide is right now what we do is we tell our applicants to look at the economic development access road guide and kind of use that as a
    • 03:22:54
      as the direction.
    • 03:22:55
      But there are some specific distinctions with the Airport Access Road Program.
    • 03:23:00
      There are some streamlining measures with that program that we're not taking full advantage of because we don't have a separate guide.
    • 03:23:06
      And so by issuing the separate guide we'll clarify those processes and procedures and also correct the name changes and funding limits that are reflected in the policy.
    • 03:23:17
      So in terms of next steps you have the draft policy and the draft guide today.
    • 03:23:21
      We are working with the Department of Aviation
    • 03:23:24
      on comments and we will incorporate those comments in what we bring to you for adoption next month in the form of an updated policy and also with the intent of finalizing the new guide by the end of next month.
    • 03:23:36
      And this item actually does tie directly to the department's business plan in terms of enhancing our intermodal connections and economic development.
    • 03:23:43
      So that's part of why we're bringing it to you now for consideration.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:23:49
      It's interesting that you bring that up because the James City County request was for a privately held airport that's available for public access.
    • Jennifer DeBruhlLocal Assistance Division Administrator
    • 03:24:12
      It's available for public use.
    • 03:24:13
      And so there's a distinction in there that it's got to be available for public use in order to receive funding under the program.
    • 03:24:19
      If it was purely a private airport that's for private use, it would not be eligible for funding under this program.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:24:25
      And I presume it would have to be reasonable access.
    • 03:24:27
      If I charge you a million dollars for land, that's not public access.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:24:39
      Any other questions?
    • Kevin B. PageChief of Rail Transportation
    • 03:24:41
      Well, thank you.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:24:44
      And now for the great summary of all the interesting things happening in the assembly, all the great news, Jo Anne Maxwell and Dan.
    • SPEAKER_01
    • 03:24:57
      Mr.
    • 03:24:57
      Chair, this is true.
    • 03:24:58
      If I don't talk fast enough, everything I say will probably be outdated.
    • 03:25:05
      I wanted to, again, right now things are currently, we're right at crossover, which means the House bills that are going to be considered by the House have to have been considered by today, and same for the Senate.
    • 03:25:18
      And then the House and the Senate will start considering each other's bills tomorrow.
    • 03:25:22
      So there's still a lot going on on the House floor, the Senate floor.
    • 03:25:25
      But bottom line, I believe, Carol, did you hand out the, there was a list, a table of the bills?
    • 03:25:34
      You all have been given a list of our table showing all of the bills that we've been tracking this session so far.
    • 03:25:41
      The list is divided up into two major categories.
    • 03:25:46
      Those bills at the front of the list are currently active.
    • 03:25:51
      They're still activity.
    • 03:25:52
      They've not been tabled or PBI'd.
    • 03:25:57
      Then, towards the back of the list, you'll see a caption that says carried over.
    • 03:26:01
      Those are bills that are technically not dead, but they're not going to be considered this year.
    • 03:26:05
      They're going to be carried over for possible consideration next year.
    • 03:26:09
      Then, there are bills that are PBI tabled.
    • 03:26:10
      They technically have been defeated or undoor, stricken by the patrons.
    • 03:26:17
      That being said, I wanted to point out to you just some of the more significant bills that we've been looking at and tracking this year.
    • 03:26:24
      One of those bills that obviously is the forefront of everybody's mind is the Governor's funding, transportation funding bill.
    • 03:26:32
      That bill was introduced as House Bill 1248 in the House, Senate Bill 639 in the Senate.
    • 03:26:42
      They've both undergone significant revisions.
    • 03:26:45
      I'm going to run through those very quickly, and again, this does not mean this is the way they're going to end up, but bottom line, I just try to run through these very quickly, very high level.
    • 03:26:55
      The Governor's introduced version, the bill would have dedicated at least 1% of general fund revenue growth above 5% to the TTF.
    • 03:27:05
      The House version still retains that provision, but it's increased the threshold to 8%.
    • 03:27:11
      So still 1% will be dedicated, but only once the general, the growth exceeds 8%.
    • 03:27:15
      The Senate has removed that provision from the bill.
    • 03:27:19
      The Governor's Bill also would have increased transportation share of year-end general fund surplus to 75%.
    • 03:27:25
      It's currently 66%.
    • 03:27:26
      The House version has retained that provision.
    • 03:27:31
      The Senate has removed it.
    • 03:27:34
      There's provision in the Governor's Bill that would provide for more stringent local transportation planning to ensure that the local plans and regional plans conform to the statewide transportation plan and the Six-Year Improvement Program.
    • 03:27:48
      The House has retained that provision with some minor modifications.
    • 03:27:52
      The Senate has removed it.
    • 03:27:54
      Bottom line, there is a process that would be established whereby the localities and or the regional planning body would submit to VDOT changes in their comprehensive plans, their local transportation plans.
    • 03:28:07
      to ensure that they conform with the statewide plan as well as the SIP.
    • 03:28:13
      And then if VDOT determines there is not conformity, they report that to this body.
    • 03:28:19
      This body would then notify the locality or the planning body and they would be provided an opportunity to conform.
    • 03:28:31
      If they turn, there's language now in the House version that would say the CTB may reallocate funding for the particular project that is involved.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:28:48
      Most localities when they do a rezoning and they do something they just change their comprehensive plan in that same fashion So how does this really affect anything if the locality will simply change your comprehensive plan?
    • SPEAKER_01
    • 03:29:02
      Mr.
    • 03:29:02
      Chair, I mean based on and you know, I'm not have not been tracking this bill with all the conversations but I think that they are to provide updates and
    • 03:29:12
      to VDOT and ultimately to CTB if there is non-conformance.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:29:21
      It actually makes them give us a transportation plan and if you go to change it, you've got to get us to say transportation.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:29:29
      If you change to transportation.
    • 03:29:31
      If you do amend it.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:29:33
      This all has to do with nothing against my former colleagues in the local government.
    • 03:29:40
      But as you know, they
    • 03:29:42
      I mean, here we spend all this time looking at these plans and the comprehensive plans.
    • 03:29:47
      We approve it, we give our advice.
    • 03:29:52
      It passes, and then later on, roads particularly come off the plans, but the houses still come.
    • 03:29:59
      And then we're stuck with the bill, as you can see.
    • 03:30:01
      And I always, my example, it's not Stafford County.
    • 03:30:06
      It's Loudoun County, where they've pulled off all these roads, which forces everybody on the Route 7,
    • 03:30:12
      Which is why everyone would now spend probably 250 million dollars to build grade separated interchanges all along Route 7 because everyone has to get to Route 7 now.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 03:30:25
      And I agree with you.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:30:26
      The question is, how do we make sure there's teeth in it because it will probably be implemented.
    • 03:30:33
      I guess I could look at it in more detail, but as I read it, it would simply be a matter of, okay, we'll find the comprehensive plan.
    • 03:30:40
      Here it is.
    • 03:30:40
      Now it conforms and it needs everything.
    • 03:30:43
      We're putting that road in or taking that road off.
    • 03:30:47
      We'll explore the rezoning as I've seen there.
    • 03:30:49
      Well, Mr.
    • SPEAKER_01
    • 03:30:54
      Chair, it's my understanding, and maybe I'm wrong about this, but I thought the comprehensive plan still had to comply with the statewide, I mean, when we say comprehensive plan, are you speaking of the statewide transportation plan, are you speaking of the locality?
    • 03:31:16
      Based on the language, I think that the House is inserted.
    • 03:31:20
      I think they make it clear that the comprehensive plan will have to be evaluated.
    • 03:31:25
      I think I can check on that, but I believe they did make a change with regard to comprehensive and add the word comprehensive to describe the plan.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:31:36
      I want to make sure that whatever it is, it's actually current.
    • 03:31:40
      It's not something that just...
    • 03:31:42
      Understood.
    • SPEAKER_01
    • 03:31:44
      Another interesting aspect of this bill, it amended 33.112, which is a significant portion of the law that provides authority for this body.
    • 03:31:58
      First of all, the government's bill amended this code section to authorize the sale of advertising, naming, and sponsoring rights for transportation infrastructure.
    • 03:32:08
      The House bill has retained that provision, but it has also been very careful.
    • 03:32:15
      The bill now requires guidelines to be enacted, and it requires that before those guidelines are actually finalized, etc., that they be reported to the transportation chairs.
    • 03:32:27
      The Senate version does not contain this provision.
    • 03:32:31
      There's another provision that allows
    • 03:32:38
      Localities, and the Governor's bill would have allowed localities to make contributions to projects that will be funded with tolls, to make contributions in an effort to minimize those tolls or the impact on the constituents of those localities.
    • 03:32:52
      Again, the project had to transverse across through that particular jurisdiction or locality.
    • 03:32:59
      That provision has been removed from both versions.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:33:03
      I take that back.
    • SPEAKER_01
    • 03:33:05
      It's still in the Senate version.
    • 03:33:07
      I take that back.
    • 03:33:07
      It's in the House.
    • 03:33:08
      It's out of the House, but it is in the Senate version.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:33:11
      So by striking that out of the bill, it says that if the locality wants to give the state some money to bite on the toll, then we won't take it.
    • SPEAKER_01
    • 03:33:28
      And even now, with the provisions, there are limitations.
    • 03:33:31
      I mean, they don't have carte blanche to just give us, to give the state money and say, now you've got to reduce the toll.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:33:37
      There are- This was a mechanism.
    • 03:33:40
      This was essentially just simply, because we've heard complaints about this in some localities, and then if they wanted to help subsidize the tolls for their citizens,
    • 03:33:51
      This was to set up a mechanism for them to do so.
    • 03:33:56
      If they wanted to, for their citizens, as we'll know with the transponders where they live, the subsidized, they now can't give us the money to do that.
    • 03:34:13
      Alright, Mr.
    • SPEAKER_01
    • 03:34:15
      Chair.
    • 03:34:16
      Another provision of the Governor's Bill added maintenance to the list of eligible projects that VDOT could use for revenue sharing or revenue sharing funds to be used for.
    • 03:34:27
      The amount was $5 million and it's capped at $5 million as opposed to the $10 million that's capped right now for a particular project in a locality.
    • 03:34:35
      Both House and Senate have retained that provision.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:34:43
      Can we give maintenance money to localities, cities, central and electric counties to do maintenance?
    • 03:34:50
      Can they use that to match or is this local funding generated at a local level that has to be used to match?
    • SPEAKER_01
    • 03:34:57
      Mr.
    • 03:34:57
      Chair, I'm not sure if the bill addresses that issue or that question.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:35:00
      No, it doesn't.
    • 03:35:00
      It just simply opens up revenue sharing.
    • 03:35:02
      But, I mean, would it be intended to be something above?
    • 03:35:05
      Okay.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:35:05
      So they can't use state money to match?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:35:10
      No.
    • 03:35:11
      Okay.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:35:13
      That was primarily aimed at the counties, but could also be for the cities.
    • SPEAKER_01
    • 03:35:21
      There's an amendment to, in the Governor's Bill, it amended Section 33.1.23.1 and provided that the CTB could allocate each year up to $500 million within the TTF for certain types of projects.
    • 03:35:37
      It could allocate 25% to bridge construction rehab, 25% to advancing high priority projects, 25% reconstructing.
    • 03:35:50
      Bottom line, the House version retained this provision with a slight modification and then the Senate has eliminated that provision.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:36:04
      And this was related to address the issue of
    • 03:36:07
      If we get $100 million to put in the formula, we really don't get anything for it.
    • 03:36:13
      Everyone gets little bits of money, so we're just trying to, until money at some point in the future gets big enough that it has an impact.
    • 03:36:24
      Without that point, let us try to focus on some of these projects, whether it's on paved roads, whether it's bridges.
    • 03:36:31
      Let's focus the money and get real projects done instead of sending all these little pots out to everybody that can't do anything with them.
    • SPEAKER_01
    • 03:36:48
      It's a long bill.
    • 03:36:49
      Another provision of the Governor's bill just clarified the Commissioner's authority to award contracts for interstate maintenance pursuant to changes made during the 2011 session saying that that has survived both versions.
    • 03:37:08
      There was a provision in the governor's bill that would have created in essence a transportation improvement district fund.
    • 03:37:19
      CTB basically would have declared the districts would have for particular projects that were built in those districts once the project was finished.
    • 03:37:29
      and operational, I think up to 25% of the tax revenue attributable to development and growth in those areas or in those districts would have come back for use in other transportation projects.
    • 03:37:47
      That's been removed from both bills.
    • 03:37:52
      The governor's bill also created a state or Virginia toll road authority.
    • 03:37:59
      This entity would have had the authority to build and construct projects.
    • 03:38:03
      CTB would have had authority to transfer projects to this entity.
    • 03:38:07
      It could sell bonds.
    • 03:38:08
      It could basically charge or implement tolls.
    • 03:38:14
      Both bills remove that provision.
    • 03:38:18
      It's gone.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:38:19
      And the issue here, everyone, was the ability to do bonds outside the debt of the Commonwealth.
    • 03:38:28
      That was the whole purpose of this.
    • SPEAKER_01
    • 03:38:31
      The governor's bill would have increased the amount of sales and use tax that goes to transportation for the next, it would have increased it by 0.25% gradually over the next, I think it was five to ten years, maybe eight to ten years.
    • 03:38:54
      The House Bill has retained that portion.
    • 03:38:57
      They've modified it slightly so that there's a clarification that the increases would not include sales tax or food tax revenues.
    • 03:39:09
      So they've basically retained that concept.
    • 03:39:11
      They've just clarified it slightly to make sure the cut does not include revenues from food tax.
    • 03:39:18
      The Senate Bill has removed that.
    • 03:39:23
      There were two enactment provisions on the Governor's Bill or enactment clauses.
    • 03:39:27
      One would have required the
    • 03:39:30
      The Secretary of Transportation to study efficacy and options for devolving or devolution, giving control to, back to counties, giving control of their roads, and that would have applied only to counties with populations greater than 200,000.
    • 03:39:49
      The House Bill has removed that provision, as has the Senate, so that's no longer there.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:39:54
      That's because it's going to be in the budget.
    • SPEAKER_01
    • 03:39:57
      Okay.
    • 03:39:59
      It's in the budget.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:40:00
      They're not doing studies as part of the enactment clauses this year.
    • 03:40:04
      They want to do these in actual, the budget bill stuff.
    • SPEAKER_01
    • 03:40:10
      Another enactment provision requires a secretary in coordination with the DRPT local government to look at the efficacy and feasibility of creating an independent Northern Virginia MPO.
    • 03:40:25
      Is that in the budget, Mr.
    • 03:40:26
      Chair, or has that?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:40:27
      Again, the studies will go into the budget.
    • SPEAKER_01
    • 03:40:31
      Okay.
    • 03:40:31
      As far as the Senate and House bills are concerned, those provisions have been removed.
    • 03:40:36
      The one thing, there are a couple of differences or add-ons that the House and Senate bill have accomplished.
    • 03:40:45
      The Senate has now added a provision that would index fuel tax.
    • 03:40:50
      They indexed it based on the PPEI, the Department of Labor's PPEI for other non-residential construction projects.
    • 03:41:00
      The bottom line is that Senateville now has basically an indexing provision for fuels tax.
    • 03:41:11
      The House version, they put an enacting clause in making it clear that VDOT was to adopt guidelines, et cetera, to govern the fees associated with the naming rights.
    • 03:41:26
      It was just a technical amendment to address the locality's initial amendments to its comprehensive plan, back to the planning provision.
    • 03:41:38
      That's the Governor's Funding Bill.
    • 03:41:40
      And again, as you can see, there are a lot of differences between the House and the Senate right now.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:41:45
      There was another element of the bill I really liked, but I remember you covering it.
    • 03:41:53
      It was the part about if a locality is supporting a project,
    • 03:41:59
      And then VDOT, the state has expended sums on it.
    • 03:42:02
      Then the locality decides, hey, we don't support the project.
    • 03:42:06
      Instead of the state having to reimburse the federal funds as currently required, it would pass that requirement for reimbursement to the locality that essentially stops it, or the MPO that essentially stops the project after we spend funds.
    • 03:42:19
      Is that still there?
    • SPEAKER_01
    • 03:42:20
      Yes, Mr.
    • 03:42:20
      Chair.
    • 03:42:21
      That is still there.
    • 03:42:22
      That was in the Governor's bill, and the House has retained it.
    • 03:42:25
      I'm not sure if the Senate has retained it.
    • 03:42:33
      Yeah, the House just retained it.
    • 03:42:35
      It's no longer the Senate version, but you're right.
    • 03:42:37
      It would do two big provisions, and again, this is amending 33.1.12.
    • 03:42:43
      Basically, if an NPO, even if they significantly alter a project and it's going to end up costing over 10% more than it was originally planned, this body may require the locality or the NPO to make up the difference.
    • 03:42:57
      Same thing with if there's a cancellation of a project, at the request of the MPO or the locality, this body has the authority to ask or require them to pay it back.
    • 03:43:08
      It doesn't say you have to, but it does give you, the House version says you may require them to pay it back.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:43:18
      If and when we do that, let's assume it passes.
    • 03:43:21
      I want to make sure we're not telling them, you've got to pay it back, but you're just paying it back out of other state funds that otherwise would have gone there.
    • 03:43:29
      And here's my point.
    • 03:43:32
      Nothing frustrates me more than localities doing rezonings, whatever the case may be, creating traffic problems.
    • 03:43:39
      VDOT then is trying to solve them based on a plan that the locality puts forward or improves, and then the locality backs out of it for whatever reason, and the state's not, under federal laws, having to reimburse the costs of all the ride over the
    • 03:43:54
      engineering and all the other elements that go into it.
    • 03:43:57
      I mean, no wonder the people in Virginia get frustrated if we're spending our money doing things, starting again, stopping again, starting again, stopping again, and sending money back to the federal government for this.
    • 03:44:07
      This is kind of an important thing.
    • 03:44:09
      If we're going to solve problems, we've got to get in, get it done, and move forward.
    • 03:44:12
      I hope the Senate will go with the House on this particular one.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:44:17
      Is Maxwell page two of the report that was distributed to us earlier as HB 477, which is a highway maintenance fund bill that Sulligan Outlaw put in?
    • 03:44:33
      The language says the board shall consider achieving a minimal level.
    • 03:44:39
      I'm not sure what that really means in terms of how it would impact us.
    • 03:44:45
      Can you all help me with that in terms of... Mr.
    • 03:44:51
      Chair, we consider lots of things, but consideration doesn't mean we do it.
    • SPEAKER_01
    • 03:44:57
      Mr.
    • 03:44:57
      Chair, I see what you're
    • 03:45:01
      Where your question generates, and to put this in context, there were some bills that said, and that have been TBI'd or tabled, that said the board shall achieve a minimal level of disparities.
    • 03:45:13
      So in this case, they're basically asking you all to look at that issue.
    • 03:45:18
      And I think the other thing the bill does is it requires VDOT to take a look and to do some assessments, comparisons between
    • 03:45:27
      The way things are currently being done versus the way things would look if that particular standard was used.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:45:33
      Well, then my second part of that question goes to what does it mean in our nomenclature when we say specific asset performance?
    • 03:45:44
      I mean, we had lots of debate and discussion in the committee that met some months ago about return on investment and utilization and impact and so forth and so on.
    • 03:45:56
      and our policy that we adopted portends some of that thought.
    • 03:46:03
      Is this saying that that shouldn't be a consideration?
    • 03:46:05
      I don't know how to define specific asset performance in our normal literature here in VPN and VDOT, though it's CTB.
    • 03:46:14
      Does it mean pavements at X versus Y?
    • 03:46:19
      What does specific asset performance mean?
    • SPEAKER_01
    • 03:46:23
      If I'm not at this point, I think that there is some leeway in interpreting the legislation.
    • 03:46:30
      I don't think, you know, unless something that the CTB were to do would be flagged directly in contradiction, I think there is some leeway.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 03:46:39
      Mr. Chairman, I think what you're saying is that when you look at our needs assessment and we look at the needs for all districts and all areas,
    • 03:46:53
      And then once we determine that we compare that to have we met the targets, performance targets in those areas or not as it relates to pavement, let's say, then the question becomes, a few years ago,
    • 03:47:11
      We had a policy where we said we will hold a district harmless.
    • 03:47:16
      Even though they met their payment or performance targets, we never reduced the amount of allocation that they got, but we just held them harmless.
    • 03:47:26
      What this says is if you met your performance criteria, then we'll shift the money to the areas that need more money to help meet their targets.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:47:40
      And I would add to that, which I was trying to be clear about earlier, the committee recommended, and it's not as clear, unfortunately, in the policy as it was in the language in the committee, but the committee recommended that we also consider going back to my illustration of a road that's much less important than another road in terms of
    • 03:48:09
      All sorts of things, if that be a piece of our consideration.
    • 03:48:14
      So even though a road in Norfolk, to use where I live, didn't meet the performance criteria and we have limited amounts of money, if a road somewhere else was much more important, the money would go there first and to Norfolk second.
    • 03:48:28
      That was what the policy called for.
    • 03:48:30
      So does this
    • 03:48:31
      No, I think we could consider that.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 03:48:34
      I don't think the bill got into those types of specifics and we had the leeway.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:48:43
      Well, it says based entirely, entirely on specific asset performance things.
    • 03:48:51
      Entirely means, to me, those other considerations can't be a part of
    • 03:48:58
      So to me it's five in the face of exactly what we were trying to do.
    • 03:49:06
      Although that is obviously that's mitigated by the phrase that says shall consider achieving.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 03:49:16
      I will do some checking into that, but that was my understanding that we were in support of that because we thought that allowed us to do what the Board wanted to do.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:49:27
      So I'll do some more checking into that.
    • 03:49:30
      No, I think we do.
    • 03:49:33
      That was all, Mr.
    • SPEAKER_01
    • 03:49:34
      Chair.
    • 03:49:34
      A couple of other bills.
    • 03:49:35
      There was another governor's bill that had an impact on VDOT.
    • 03:49:39
      It was
    • 03:49:41
      Senate Bill 679, House Bill 1295 just dealt with eliminating numerous local mandates, one of which was VDOT approval back when they implemented or enacted the law allowing for photo red enforcement and installation of those systems by localities.
    • 03:49:59
      VDOT, the General Assembly asked or required that VDOT approve all the lists at the localities where they were putting these lights up or these cameras up.
    • 03:50:09
      That provision has now been removed and so VDOT will no longer be approving those.
    • 03:50:15
      There were four, in essence, VDOT bills this year.
    • 03:50:18
      One was House Bill 466, companion with Senate Bill 408.
    • 03:50:24
      That was basically a technical amendment we made to the ABC code that clarified and cleaned up some language from last year dealing with a modification of the advertising requirements or responsibilities on ABC.
    • 03:50:41
      The bill just, what we do is we make it clear that notwithstanding anything that ABC does with regard to alcohol advertising, everything still has to comply with VDOT advertising requirements, etc., so we don't risk losing federal funds.
    • 03:50:56
      House Bill 646 is a reform of VDOT's billboard permitting process, in essence.
    • 03:51:02
      What we did was we restructured the permit fee basis and modified the fee amount and we made a couple of other changes to streamline the process but what that does overall is we anticipate that
    • 03:51:20
      Right now the program costs about $500,000 to administer.
    • 03:51:24
      We anticipate that right now we are only pulling in revenues of about $130,000.
    • 03:51:31
      We think this bill will help bridge that gap and bring more money into that program so that it becomes close to being self-sufficient, not quite that close.
    • 03:51:41
      House Bill 545 and Senate Bill 315.
    • 03:51:45
      Our incident management bills, we just basically have given VDOT the authority to, without the direction of law enforcement, their safety service patrols, when there's an incident, they can drive off the road and get to the accident more quickly and hopefully clear it up.
    • 03:52:00
      It's sort of a congestion management.
    • 03:52:03
      House Bill 945 was a bill that would increase the threshold requirement for bonds for transportation construction contracts.
    • 03:52:16
      The bill that was introduced would have increased the bond threshold to $500,000 so that a contract under that threshold amount, the offeror, bidder, contractor would not have to get big bonds or performance bonds.
    • 03:52:31
      That bill was amended in the House so that now the current threshold is $250,000.
    • 03:52:39
      The House amended it so that now it requires a bond below $250,000.
    • 03:52:47
      You can waive the bond requirement between $250,000 and the $350,000 threshold.
    • 03:52:55
      But the contractor has to basically prove for performance bonds that they could not get a bid bond.
    • 03:53:04
      And then it also authorizes or requires those entities to go participate in a program that's been established by Treasury whereby in essence Treasury is buying the bonds.
    • 03:53:14
      So the bill's been modified and we're still reviewing and researching the issues and what issues it might present in its current form.
    • 03:53:24
      Somebody mentioned eminent domain bills earlier.
    • 03:53:27
      Right now we've got basically three categories of the eminent domain bills.
    • 03:53:32
      The resolutions that call for the constitutional amendment.
    • 03:53:39
      Set in their second year, basically in order to amend the Constitution, you have to do a resolution in one General Assembly.
    • 03:53:48
      There has to be an election.
    • 03:53:49
      You have to have another resolution, verbatim, in the next General Assembly.
    • 03:53:53
      Once that happens, basically there has to be a voter referendum asking for the constitutional amendment.
    • 03:53:59
      So right now we're looking at resolutions that would basically call for this constitutional amendment a second time.
    • 03:54:08
      The amendment basically modifies what is deemed to be compensation or just compensation for takings or eminent domain proceedings.
    • 03:54:20
      The bill also impacts the definition of public use and what is or is not public use.
    • 03:54:29
      Those two right now, Senate joint resolution and House joint resolution are identical.
    • 03:54:33
      It looks like they will probably make it through.
    • 03:54:36
      Then there are also, there's a House Bill 5, which would be, and I believe it's Senate Bill 240, that calls for putting the question on the ballot, just the question of whether or not the amendment should be, the constitutional amendment should be enacted.
    • 03:54:53
      Those bills look like they are pretty set.
    • 03:54:57
      The final group of bills deal with, under the Constitutional Amendment, it leads to the General Assembly to find two aspects of what's considered just compensation.
    • 03:55:08
      That's lost profits, lost access.
    • 03:55:11
      The General Assembly, these last group of bills, House Bill 1035, Senate Bill 437, you'll see them on your list, they basically are attempting to define lost access and lost profits.
    • 03:55:25
      The introduced version of those bills, we did a fiscal impact that's out on the system and basically the estimate is it would cost about $108.6 million.
    • 03:55:36
      I think I said $106 million before, but $108.6 million if those bills had been in effect over starting with this year and going forward based on the projects that we have in the pipeline based on circumstances that we are aware of now.
    • 03:55:52
      They have since, they're now working to refine the definitions in these bills.
    • 03:55:58
      They were somewhat broad, and I think folks are understanding that they need to be more definitive about what they consider to be just compensation.
    • 03:56:07
      So they're going back and sort of narrowing these definitions, and we think that's going to have an effect of decreasing the monetary impact of these bills.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:56:20
      One element of this, I've talked to my legislators on it, I worry about speculators getting into it.
    • 03:56:29
      Federal requirements being what they are, you've got to design the roads, you're publishing that, then you can start to begin your right-of-way acquisition.
    • 03:56:38
      Well, everybody knows what the design is.
    • 03:56:40
      I worry about somebody going in and they buy the property and then they declare, oh, well, we were going to build a 50-story office building whenever the zoning's arranged.
    • 03:56:49
      Tightening up of this, is that going to ensure that you have to actually demonstrate previous receipts, things of that nature, and so that speculators aren't jumping into the game just to basically gorge themselves at the expense of taxpayers?
    • SPEAKER_01
    • 03:57:04
      Mr.
    • 03:57:04
      Chair, yeah, the way the bills now would define or seem to be heading in the direction of defining lost profits in particular, they are requiring that the entity claiming lost profits provide tax returns for the enterprise that is purportedly being impacted by the project or the eminent domain the taking.
    • 03:57:27
      They are also limiting, I believe at this point, the lost profits to the period of time that I think from the point of the taking, going forward, they're limiting that amount of time and only for the duration of the project.
    • 03:57:44
      So they are seeing, they did understand and appreciate that they seem, I think more importantly, they realize even entities that might be incurring lost profits, there seem to be just
    • 03:57:54
      And so, you know, it could have gone into perpetuity.
    • 03:57:57
      And so, they seem to be pulling that, narrowing that in.
    • 03:58:00
      And then, again, the tax returns and those issues, I think they're requiring these entities to at least show or demonstrate to the court, if nothing else, that they've had a history of profits.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:58:13
      Yes.
    • 03:58:14
      Or one thing this doesn't do, though, is the classic where you're rehabilitating an area
    • 03:58:22
      and you can't do it all at once.
    • 03:58:25
      So you start the rehabilitation and then the speculators come in to buy the property that's gonna be rehabilitated and as you rehabilitate the area, the area gets more valuable.
    • 03:58:39
      It takes you three or four, five or six or seven years.
    • 03:58:42
      So they just play off that value game and say, okay, well now my property's worth X because the state spent all this money to make it worth X and I want my share of it.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 03:58:52
      Well, that raises an interesting question.
    • 03:58:55
      Okay.
    • 03:58:56
      If you put an interchange or you put a road access in a point, that increases the value.
    • 03:59:02
      I'm assuming lost profits doesn't assume, well, if that access was there that you're building and that therefore you're taking my land for.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:59:09
      No, but the value of the property is greater now.
    • 03:59:12
      That's not the only piece of it.
    • 03:59:13
      It's not just lost access.
    • 03:59:15
      It's not just lost profits.
    • 03:59:16
      That's now added into the intrinsic value of the property.
    • 03:59:20
      Once you put that in, now the property is worth more money, so pay me more money.
    • 03:59:26
      Even though I did it,
    • 03:59:27
      within the timeframe of the planning of the project, et cetera, et cetera, et cetera.
    • 03:59:33
      So that's the way that it works in practice.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 03:59:36
      Mr.
    • SPEAKER_01
    • 03:59:36
      Chair, I would agree.
    • 03:59:39
      I mean, there are situations where folks have been able to capitalize on projects or the knowledge that projects are, but at the end of the day, that's an issue for the court and the courts are deciding.
    • 03:59:53
      But again, I don't think this bill would address that particular issue.
    • 03:59:58
      So those are the eminent domain bills.
    • 04:00:01
      Again, they're in a state of flux.
    • 04:00:04
      Also, there were a couple of bills that were seeking to minimize VDOT.
    • 04:00:10
      Redundancies and reviews, etc., that's Senate Bill 230 and House Bill 1164.
    • 04:00:16
      Bottom line, I think there's been some concern, particularly on the part of localities, that sometimes when VDOT districts approve a particular project or plan, it then has to come to Central and they're complaining that it takes a while.
    • 04:00:30
      So these two bills are asking us to look at that issue a little more closely.
    • 04:00:34
      and to address it.
    • 04:00:35
      One of the bills also would provide or encourage VDOT to train localities in certifying for locally administered projects under the certification program in Jennifer's area.
    • 04:00:48
      So the bill is just simply encouraging us to go forward with that program.
    • 04:00:55
      CTB bills, I know we've talked about the composition bills.
    • 04:00:59
      Right now,
    • 04:01:00
      It looks like there are two allies.
    • 04:01:02
      They're left.
    • 04:01:04
      For the most part, all the others, the Senate has basically said they're going to carry these bills over and study CTB composition and those issues.
    • 04:01:14
      We've got two House bills that are probably being heard as we speak right now in Senate transportation.
    • 04:01:20
      One is Delegate Russ' bill that addresses not only, it would change the composition to the congressional district set up, and also he addresses the MPO versus the Metropolitan Standard Area.
    • 04:01:36
      Then there's another bill that adjusts, I think that's House Bill 262, that just deals with the MPO versus Metropolitan Statistical Planning Area.
    • 04:01:47
      That's where those bills stand.
    • 04:01:50
      Again, if the Senate Transportation Committee is true to form, they may be.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 04:01:55
      I think I just got a note that the Senate Transportation Committee over the bill creating the representation by congressional districts.
    • SPEAKER_01
    • 04:02:02
      Okay, so that would be 864, so that's Delegate Rust's bill.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:02:06
      What did they do on character?
    • 04:02:07
      Carried it over.
    • 04:02:08
      Carried it over.
    • SPEAKER_01
    • 04:02:08
      It means that, yeah, to be continued, but in the meantime, they're going to study it.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:02:13
      They're writing a letter to me saying study it, weren't you?
    • 04:02:17
      Back with a recommendation.
    • 04:02:20
      Okay.
    • SPEAKER_01
    • 04:02:20
      Those are the highlights.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:02:22
      It's from...
    • SPEAKER_01
    • 04:02:23
      If there are any questions you all have or particular bills that have sparked an interest, just let us know.
    • 04:02:33
      We're going to do a final presentation after the session is over just to let you know what transpired and what has actually become law.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:02:42
      Well, that's true.
    • SPEAKER_01
    • 04:02:46
      We probably should wait until the governor signs.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:02:50
      They're supposed to be out March 11th, right?
    • 04:02:54
      Yes, yes.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 04:03:00
      Proceeds to go to the Commonwealth Transportation Fund.
    • 04:03:04
      No, HMO app, or?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:03:05
      Thank you very much.
    • 04:03:13
      All right.
    • 04:03:16
      We will now
    • 04:03:19
      We are much smaller, so we don't have as much to talk about.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:03:26
      I'll just go through them quickly.
    • 04:03:29
      Mr. Chairman, thank you, members of the board.
    • 04:03:31
      Our first one, and actually I've got a presentation, but I don't know how to get to it, and I don't think ... Yeah, you have it in your computer.
    • 04:03:39
      But our first one is House Bill 601, Delegate Lamonion's Bill.
    • 04:03:45
      You'll remember last year in the budget the governor achieved the goal of being able to appoint a board member for the Washington Metro Area Transit Authority.
    • 04:03:57
      Jim Dyke is serving in that role now.
    • 04:03:59
      What this bill does is codifies that position.
    • 04:04:03
      The second thing that the bill does is it takes a year's worth of work from the governor's level, the secretary level, and certainly at the DRPT level.
    • 04:04:12
      Working with Maryland and D.C. and using the four studies that were done.
    • 04:04:29
      But there were four studies done in 2010 looking at the metro system in D.C.
    • 04:04:34
      So those governance issues over this year's time were pulled out and put into this legislation, things like making it a four-year term instead of a one-year term on the WMATA board, that there be a term limit of two terms, coming under the Conflict of Interest Act, reporting to the secretary about meetings that you've attended,
    • 04:04:58
      and some qualifications for being a board member and the governors and mayors speaking about that, trying to have a more balanced board with transportation background, land use, finance, law, regional involvement, things like that.
    • 04:05:12
      It has passed the House sitting in the Senate right now.
    • 04:05:16
      There was not a Senate companion bill.
    • 04:05:18
      The next one was House Bill 1291, Delegate Gilbert.
    • 04:05:24
      This is the Governor's Consolidation Bill and in that bill was a section that would have consolidated Northern Virginia Transportation Commission and Northern Virginia Transportation Authority into one.
    • 04:05:37
      The bill was delayed until July of 2013.
    • 04:05:41
      to give us a year to work out all the details on that.
    • 04:05:45
      And the goal, of course, was to have one transportation entity responsible for transportation in Northern Virginia to have more of a regional perspective and a more balance on that board.
    • 04:05:58
      There is substitute language that has passed the House, and what that language says is it gives, puts NVTA as the group responsible and directs the
    • 04:06:09
      NVTA, Northern Virginia Transportation Authority, NVTC, and the NVRC, which is their regional commission, to meet with stakeholders and have recommendations by December 1 of this year.
    • 04:06:23
      So shorter time frame, but not a designated outcome.
    • 04:06:28
      The next one, House Bill 1245, and oh, this is not in the Senate bill.
    • 04:06:33
      It was taken out of the Senate resolution, but it does remain in the House bill.
    • 04:06:37
      There were two bills for the Metropolitan Washington Airport Authority.
    • 04:06:42
      This is the one that conforms with federal law.
    • 04:06:45
      That was Congressman Frank Wolf's bill that was passed recently, already signed by President Obama, that increases the number of Virginia board seats from five to seven and also says you cannot serve beyond your term.
    • 04:06:58
      It brings us in compliance with federal law.
    • 04:07:01
      It has passed the bodies, but without the emergency clause that would have put it into effect right away and to allow Virginia
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 04:07:08
      To have more control over the airports that are in our state.
    • 04:07:18
      Is that the one where I think there's somebody that's been on it for a couple of years, they've been under house arrest in some other country?
    • 04:07:27
      That's actually the airport authority.
    • 04:07:30
      Both of them have similar problems.
    • 04:07:32
      So are we going to try to make sure the person under house arrest actually attends these meetings?
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:07:36
      Well, it gives the process to remove someone from the WMATA board and to fill vacancies in the event
    • 04:07:44
      because there was a real history, not from Virginia, but from other states, well, another state, that people were not attending the board meetings.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:07:54
      So... By the way, the record has to be correct.
    • 04:07:56
      I said he was under house arrest.
    • 04:07:57
      Apparently, he was actually not permitted to leave the country and they had to use his passport.
    • 04:08:03
      So technically, he wasn't under house arrest.
    • 04:08:05
      He just had to stay in the country.
    • 04:08:06
      He just couldn't go home.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:08:09
      He just couldn't leave the country.
    • 04:08:14
      There were several bills in both bodies dealing with the project labor agreement.
    • 04:08:19
      There is actually a statewide bill that is very specific that you cannot have a project labor agreement in place as part of the bid.
    • 04:08:28
      It could go into place after there is a successful bidder.
    • 04:08:31
      Delegate Comstock and Senator Obenshain, those bills are both moving forward.
    • 04:08:37
      It just prohibits it prior to the bid process.
    • 04:08:40
      Next one, Telework used to come under DRPT.
    • 04:08:44
      It has now become a tax credit.
    • 04:08:46
      It was passed last year.
    • 04:08:47
      This is an extension.
    • 04:08:49
      It's the first time I've seen the assembly give the patron of the bill more than they asked for.
    • 04:08:54
      They asked for a two-year extension of this bill.
    • 04:08:59
      It's a $1 million cap, up to $50,000 per company that they can qualify for.
    • 04:09:07
      The Senate is doing five-year tax credit extensions, but at the end of four, you've got to come in and show the results, and then they're going to make a decision if it should continue or not.
    • 04:09:18
      House Bill 1000, Delegate Ramadan, actually increased that to $75,000, and the total amount to $1.5 million, but that was carried over.
    • 04:09:30
      We do have some budget amendments that are significant.
    • 04:09:33
      We had an issue in the Fredericksburg area.
    • 04:09:36
      Thank you, Mr. Sterling, in working with us on that.
    • 04:09:40
      It fixes an existing problem over the storage of hazardous materials.
    • 04:09:44
      This budget language is actually really the work of the community, the railroad, and everyone working together to come up with a solution.
    • 04:09:53
      There also were several amendments regarding the Dulles Project.
    • 04:09:58
      There were also corresponding House bills.
    • 04:10:01
      I think the one that's continuing is about no project labor agreement.
    • 04:10:08
      The others, things like complying with FOIA or audit by APA or VDOT, those bills have died in the House.
    • 04:10:17
      I don't know if there were Senate ones, but the ones certainly died in the House.
    • 04:10:21
      Another one, and this has been tabled in the House as well, would not have allowed any of the toll road revenues to be used for the construction of the Dulles Project, and that's certainly in violation of all the agreements that the Commonwealth has in place, but again, it's been tabled.
    • 04:10:41
      Some of the other kind of earmarks we'll call them.
    • 04:10:44
      One is $350 million to the Dulles project to buy down the toll increases.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 04:10:49
      I can't get past this.
    • 04:10:50
      They just tell us we can't take money from localities to buy down toll increases.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:10:55
      That's done.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:10:57
      That's right.
    • 04:10:58
      Right.
    • 04:10:59
      This is actually more money than we have in all of public transportation for the Commonwealth of Virginia.
    • 04:11:04
      But they said transportation projects.
    • 04:11:07
      They weren't limiting it just to DRPT.
    • 04:11:09
      There's also one that deals with the issue you've been reading about.
    • 04:11:14
      That's in the Dulles Corridor.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:11:16
      Where is this budget?
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:11:19
      It's a transportation project.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:11:21
      What's the reality of this?
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:11:26
      The budget will be out on Sunday.
    • 04:11:31
      It's an amendment, so the House Appropriations Committee, it is a House budget, will decide if it's going in the budget for Sunday.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:11:38
      So if that passes and is signed, then that means ... All comes out of Hampton Roads funding.
    • 04:11:44
      I'm going to out-large them.
    • 04:11:47
      Our guys are probably voting with them, aren't they?
    • 04:11:51
      I'm going to out-large them.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:11:53
      Both of these create a real issue for us because
    • 04:11:57
      The money that we use for funding transit is by code and it's formula driven.
    • 04:12:03
      So instead, you're altering that.
    • 04:12:05
      We're only doing it about 17% right now, subsidy for transit.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:12:10
      Does this come out of the transit budget?
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:12:13
      It says transportation project, so I really don't know.
    • 04:12:16
      But it is bigger than our entire public transportation budget.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:12:20
      So like, who's the patron?
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:12:22
      Delegate Plum and Delegate Rust from Northern Virginia.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:12:26
      And Janet Allen.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:12:28
      And Janet on the Santa, okay.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:12:29
      It would be a riot.
    • 04:12:32
      No, no, don't worry, we have half a billion going to Midtown Tunnel.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:12:36
      They've mentioned that, by the way.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 04:12:39
      In fact, Mr. Chairman, the explanation of the need for this budget amendment, that's item number one, the Hampton Roads Ridge Tunnel Project.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:12:56
      They forget about the fact that on Dulles Rail, they put 275 and the whole Dulles phase two
    • 04:13:04
      The state's contribution was supposed to be the toll roads.
    • 04:13:07
      And now we're putting the 150 in and so now they want to match what we're doing in down at Hampton Roads.
    • 04:13:19
      But we have the roads in one project.
    • 04:13:22
      I mean we put 275
    • 04:13:24
      of Phase I, now 150, plus we put 400.
    • 04:13:28
      How much we put on the, how much went on to the, on the 495 hotlines?
    • 04:13:35
      400 million?
    • 04:13:38
      Yeah, that's 400 million.
    • J. Douglas KoelemayMember, Commonwealth Transportation Board
    • 04:13:40
      Do we get the toll road back?
    • 04:13:42
      And 100 million for 95.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:13:45
      You know, you spent your 1.8 million.
    • 04:13:50
      But you know, we're the economic edge of the state right here.
    • 04:13:54
      Is that right, Mr. Garczynski?
    • 04:13:56
      That's exactly right.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:13:59
      And the other one that's also near Mark.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:14:01
      Exclamation point.
    • 04:14:03
      Don't we ever forget it.
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:14:05
      It's to run this Chesterfield Bus Service.
    • 04:14:09
      This is a service that's been funded for a good while now through other pots of money.
    • 04:14:14
      So what Senator Watkins does do in that amendment is make them pay 50% of it.
    • 04:14:19
      But again, it goes back to everyone else is getting 17%.
    • 04:14:24
      This is from the Mass Transit Trust Fund funding.
    • 04:14:28
      So it would create a situation where next year everyone's going to want that for their own localities.
    • 04:14:37
      So we have concerns and we've shared those concerns.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 04:14:42
      This was addressing the state legislation.
    • 04:14:45
      We talked on the enhancement program changes, but obviously at the federal level when it comes to transit, there's a little bit of debate on the federal transportation bill as it relates.
    • 04:14:57
      Can you go into that a little bit?
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:14:58
      There's a lot of debate on a lot of issues, and the most significant one I'm sure that you're referring to is the one
    • 04:15:07
      that taking transit 2.3% out of gas tax would go strictly to highways.
    • 04:15:13
      I have made some phone calls up there and here's how they explain it.
    • 04:15:18
      They want this 2.3% gas tax revenue back into highways and bridges because of the gas they're dealing with there.
    • 04:15:26
      The $40 billion they say will cover this five years of transit and keep transit whole, and during that five-year window, they will create a dedicated revenue source for transit so that you're keeping gas tax strictly for roads and bridges.
    • 04:15:42
      They'll be a new funding source.
    • 04:15:43
      The problem is they're saying to everyone, trust us, and nobody does, so there's a problem.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 04:15:50
      When they say it'll go into roads and bridges, does it go into roads and bridges or does it just remove the requirement it goes to transit and therefore it would fall to the state or localities to actually identify, well, we're going to put this in roads or maybe it wants to go to transit?
    • Thelma D. DrakeMember, Commonwealth Transportation Board
    • 04:16:05
      The explanation that I was given by a really good office up there was
    • 04:16:11
      that it would go to roads and bridges because they're trying to figure out how to fill that gap and they felt that gas tax should be used where people use gas and that's roads and bridges.
    • 04:16:23
      That's the explanation but they haven't done a good job of telling people that.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:16:28
      Thank you, Mr. Chairman.