Workshop Meeting   4/20/2011

Attachments
  • Workshop agenda.pdf
  • Workshop minutes.pdf
  • Bids.pdf
  • Emergency response to April 16, 2011, tornado in Middlesex and Gloucester counties.pdf
  • 2011 General Assembly session.pdf
  • Maintenance and operations program (700 KB).pdf
  • Fiscal Year 2011 budget _ actual performance through March 2011 _ Fiscal Year 2012 _ 17 outlook.pdf
  • 1. General Assembly Wrap Up

  • 2. Maintenance and Operations on Secondary Roads

  • 3. Revenue Sharing Program Guidelines Update

    • Fiscal Year 2012 Revenue Sharing Program update.pdf
    • Revenue Sharing Program guidelines.pdf
  • 4. Financial Report Monthly Update

  • 5. Draft Six Year Improvement Program

    • VDOT_ Draft Fiscal Year 2012 - 17 Six-Year Improvement Program.pdf
    • DRPT_ Draft Six-Year Improvement Program Fiscal Years 2012 - 17.pdf
  • 6. Hampton Roads Bridge Tunnel PPTA

    • Hampton Roads-Bridge Tunnel unsolicited conceptual PPTA proposals.pdf
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:00:04
      Good morning, everyone.
    • 00:00:08
      Welcome to this morning's work session of the Commonwealth Transportation Board.
    • 00:00:13
      If I could ask everyone, please take their seats.
    • 00:00:15
      I appreciate that.
    • 00:00:17
      And if you take your seats, I'm going to ask everyone then to please stand to say a pleasure.
    • SPEAKER_10
    • 00:00:22
      Thank you all very much.
    • 00:00:41
      I appreciate it.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:00:47
      We are going to have a few modifications to the workshop agenda that was actually put out.
    • 00:00:57
      The first is we're going to start out with the Commissioner thought that it's appropriate to maybe give an update to the Commonwealth Transportation Board on
    • 00:01:08
      The recent weather incidents, particularly that in Gloucester and Middlesex.
    • 00:01:12
      And so, is Quentin Eley here, or who's here?
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 00:01:14
      Marcia Parker.
    • 00:01:17
      Marcia is the Assistant District Administrator for Maintenance in the Fredericksburg District.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:01:22
      Marcia, thank you very much for being here.
    • 00:01:24
      Before we start, there was one other modification.
    • 00:01:28
      We did have on here for the workshop as the fifth agenda item, the presentation of a six-year plan.
    • 00:01:36
      That's actually going to be delayed until after one o'clock.
    • 00:01:40
      The governor will be joining the CTB and to actually make that presentation to the CTB.
    • 00:01:49
      Since then, that six-year plan is the project list and recommended schedule for the projects that were being funded by the governor's transportation package that he signed into law on Monday.
    • 00:02:04
      So we will hold off on that presentation on the Six-Year Plan until after the Governor's presentation.
    • 00:02:12
      So with that, Marcia, thank you very much.
    • SPEAKER_01
    • 00:02:15
      Okay, good morning.
    • 00:02:16
      As Commissioner Whirley has said, my name is Marcie Parker.
    • 00:02:19
      I'm the Assistant District Administrator for Maintenance in the Fredericksburg District.
    • 00:02:23
      We just wanted to give you a little update on what happened over the weekend and what we've been doing since then to clean up after the tornadoes.
    • 00:02:32
      So Saturday evening,
    • 00:02:34
      We had an EF-3 tornado which struck the Koch area of Gloucester, then moved on to the Wernick area.
    • 00:02:42
      Only a few minutes later, an EF-2 tornado struck in Middlesex County in the Deltaville area.
    • 00:02:49
      This is a map that is depicting the path of the tornado across the Middle Peninsula, a simplified map.
    • 00:02:57
      And here we have some pictures of just how devastating the tornado was and how powerful.
    • 00:03:02
      This is the sanctuary of Zor Baptist Church in Deltaville.
    • 00:03:05
      You can see the front of the building is still standing and the back of the building is still standing, but the tornado took out the entire center of it.
    • 00:03:13
      This is a home destroyed on Deagles Road in Deltaville.
    • 00:03:18
      This is the Deltaville Community Center.
    • 00:03:20
      It's directly next door to the Zora Baptist Church.
    • 00:03:23
      So you can see it went through the church, but yet only tore the metal roof off of the community center, as well as many of the trees in the surrounding area.
    • 00:03:31
      The fence around the tennis court is just a lot of damage in that area.
    • 00:03:36
      Trees and debris along Route 33 in Deltaville.
    • 00:03:42
      Here's an aerial of the Deltaville where it came through and you can see at the top is the church and then some of the houses and the community center.
    • 00:03:54
      Just pretty widespread right there.
    • 00:03:56
      Then we move into Gloucester and in the Koch area we had a home on Hickory Fork.
    • 00:04:01
      That's some of the damage to the trees there.
    • 00:04:04
      More pictures of Hickory Fork and you'll notice in the bottom picture
    • 00:04:08
      On the right-hand side, you'll see some Dominion Power crews.
    • 00:04:12
      And you may or may not be able to see, as you get down further, the truck that's parked across the road is actually VDOT equipment through there.
    • 00:04:19
      And that's just kind of to show you all of the complexity that we had with the utility companies who work with Dominion Power, Cox Communications, Verizon.
    • 00:04:28
      They all had to get into the same area that we had to get into.
    • 00:04:31
      and our crews much of the time were working very closely together.
    • 00:04:35
      It took a great amount of coordination to get this cleanup complete.
    • 00:04:40
      Another picture of Hickory Fork and some of the damage, you see the power company again trying to restore power to the area.
    • 00:04:48
      This is a picture of Page Middle School.
    • 00:04:50
      This has been on the news everywhere.
    • 00:04:52
      You've probably seen it.
    • 00:04:53
      They lost over a third of the building to the tornado.
    • 00:04:56
      They lost several buses.
    • 00:04:58
      Their bus depot is behind the building.
    • 00:05:01
      The school, from what I understand, has been condemned, and they are now going to be shipping those children to the other middle school in the county, and they're having a split shift where the Peaslee Middle School students go to school from 7 to 1245.
    • 00:05:13
      The Page Middle School kids go to school
    • 00:05:17
      from 1 to 6.30 p.m.
    • 00:05:19
      So that's causing us some traffic issues, which we'll get into in a little bit.
    • 00:05:25
      So the VDOT response.
    • 00:05:28
      On Saturday evening, Sean Trepanney, who's the residency maintenance manager, was notified around 7.15 that there was
    • 00:05:35
      A possible tornado was down on Route 17, and the 17 was blocked due to downed power lines and maybe pieces of the school.
    • 00:05:44
      At the same time, the superintendent for the Gloucester area headquarters and the Middlesex area headquarters were notified by their local sheriff's offices that there was damage in the different areas of the county.
    • 00:05:54
      So everybody mobilized.
    • 00:05:56
      We did work with emergency services, and we opened all the roads that we could overnight to at least emergency services in one lane of traffic.
    • 00:06:06
      And then overnight, the residency staff arranged for crews from the Fredericksburg District as well as a bunch of contract crews to be able to mobilize Sunrise on Sunday.
    • 00:06:18
      We were able to assemble 18 crews overnight.
    • 00:06:20
      We did only take them from the Fredericksburg District.
    • 00:06:23
      Because news reports were showing that Hampton Roads had sustained some damage.
    • 00:06:28
      Richmond District had sustained some damage.
    • 00:06:31
      We had a little bit of damage in some of the other residencies within the district.
    • 00:06:35
      So we did not reach out to other districts at this time because we just weren't sure what their conditions were.
    • 00:06:42
      So Sunday morning, bright and early, we started with debris removal, and that remains underway still today.
    • 00:06:49
      We have completed Middlesex County, so we are concentrating on Gloucester County right now.
    • 00:06:54
      Some of the roads that were affected in Middlesex Route 33 in the Deltaville area, that is the only way in and out for thousands of homes and boats, so that is a pretty
    • 00:07:06
      important roadway through there.
    • 00:07:07
      The fishing bay area has marinas and many expensive homes down there on the water, and so there were some people who might have been blocked in by that area.
    • 00:07:16
      In Gloucester, we had Route 17 closed only for Saturday night due to the school issues.
    • 00:07:22
      Hickory Fork, Cedarbush Road, and several other Wernick Roads were all closed.
    • 00:07:27
      And Hickory Fork Road is the
    • 00:07:29
      Highest volume secondary road in Gloucester County.
    • 00:07:31
      And it was closest to Route 17 where it has its highest volume.
    • 00:07:36
      So that was a significant impact on the county.
    • 00:07:38
      We needed to get in there and get that cleaned up as soon as we could.
    • 00:07:40
      Here are a few maps.
    • 00:07:43
      The red lines are indicating where the tornado went through just so you could see what roads were affected.
    • SPEAKER_10
    • 00:07:50
      I thought we had a pointer here.
    • SPEAKER_01
    • 00:07:53
      So you can see just in the Deltaville area
    • 00:07:57
      There are the roads, this is the fishing bay area, and then just that little section of 33, and there's one little secondary up there.
    • 00:08:04
      In Gloucester, there were two locations for the tornado, the first one being down in the Koch area, and this is the Koch area, and Hickory Fork runs right through here.
    • 00:08:13
      Here is Page Middle School, and it kind of picked up.
    • 00:08:17
      And either the same one or a different one sat down over here and went through the wear neck area and did not hit along Route 3 and 14 but did hit all these secondaries.
    • 00:08:26
      And you can see it's the only way in and out for the homes that are down here on the water.
    • 00:08:30
      So a lot of people were trapped and we needed to act as quickly as we could.
    • 00:08:34
      So what was the equipment and personnel that we used for the response?
    • 00:08:40
      State equipment and personnel.
    • 00:08:42
      We had brought in, you can see on the slide, a lot of excavators, loaders, dump trucks.
    • 00:08:46
      We had 58 dump trucks in, estate forces.
    • 00:08:48
      We used 112 VDOT employees.
    • 00:08:51
      That was drawn from 16 of the 18 Fredericksburg District Area headquarters.
    • 00:08:56
      We had 70 personnel from the Saluda Residency working, which is the residency that covers both of these counties, and 42 personnel from the other area headquarters within the district.
    • 00:09:07
      We also had brought in seven different contracting companies that were able to provide us with excavators, loaders, dump trucks, 39 employees of them, and one tub grinder that we're using to dispose of the material with.
    • 00:09:22
      We have a lot of challenges in this one.
    • 00:09:25
      Down in Saluda, we are used to work in the hurricanes.
    • 00:09:27
      We've worked several of them, but tornadoes, this was probably the first in a long time.
    • 00:09:32
      Unlike a hurricane which has widespread devastation, the tornado was very narrow in where its devastation was.
    • 00:09:39
      So we had multiple responders working in very tight spaces on two-lane secondary roads that were covered with trees, debris, and downed power lines.
    • 00:09:47
      And VDOT cannot remove these trees or debris until the power lines are either de-energized or removed completely.
    • 00:09:53
      So we were kind of limited.
    • 00:09:54
      We had to hop around.
    • 00:09:56
      and follow the power company because we couldn't touch things that have power lines in them because we had no idea if they were alive or dead.
    • 00:10:03
      The state police had to provide traffic control because we had a lot of interference from the public that wanted to tour the damaged areas, a lot of sight seers coming in so we didn't have to close down Route 33 and we had to close down Hickory Fork and the only way you got in was if your driver's license or you proved that you lived along that section of road.
    • 00:10:22
      If not, you were turned around and sent somewhere else.
    • 00:10:25
      And that went through until yesterday.
    • 00:10:28
      Today I don't think we have any of the roads really closed off with state police.
    • 00:10:32
      And due to the size, a lot of this equipment is very large and all these oversized work vehicles and equipment from all these different agencies and power companies and insurance adjusters and everybody else, they all had to take turns maneuvering through these confined spaces.
    • 00:10:46
      I know Monday when I was down there,
    • 00:10:48
      I was on Cedarbush Road.
    • 00:10:50
      We had three VDOT operations going on as well as one power company operation.
    • 00:10:54
      And it took me 40 minutes just to get off the road, to get out of the road to head back to the district because I had to go through two different VDOT sites and you had to wait for the truck to move out of your way.
    • 00:11:05
      So it took a long time there.
    • 00:11:09
      So here are
    • 00:11:11
      Some of the pictures, this one shows just how narrow the roads are that we were working on.
    • 00:11:15
      This was Cedarbush and you took up the whole road because the truck had to be in the right location for the excavator to be able to load it up.
    • 00:11:24
      Then we have how much space we were taking in Fishing Bay Road down on the left-hand bottom side, and that road is almost complete in that photo, so you can see how much we cleared of that.
    • 00:11:35
      Route 33 in Deltaville, you would think, well, you know, it's pretty wide.
    • 00:11:38
      It's Curb and Gutter.
    • 00:11:38
      It's got parking on both sides, but you can see from this photo that we're still taking up the majority of the road because a lot of the debris was out in the road, plus the power company was down there, as well as Verizon and Cox and the other utilities.
    • 00:11:52
      This is in the Ware Neck area.
    • 00:11:53
      You can see after we had cut the road open during the emergency on Saturday night that there's still a lot of debris that needed to be removed from there.
    • 00:12:03
      So down to the left-hand picture, you can see that the grapplers were able to tear up a lot of and bust up a lot of the limbs and trees.
    • 00:12:11
      However, we still had to use the guys with the chainsaws to cut it up to make sure that we could fit it into the truck safely to carry it over to our disposal site.
    • 00:12:19
      So this is a photo of one of our gentlemen, David Clements from the Gloucester area headquarters cutting down trees so that then we could pick them up and load them into the trucks.
    • 00:12:28
      This is a photo of our debris site.
    • 00:12:31
      Like I said, we were able to contract with one tub grinder, so they're bringing everything into this site in Gloucester and they're grinding it up, making a mulch pile.
    • 00:12:39
      Once this site is closed up, we'll be moving that tub grinder up the middle steps to the site and doing the same operation up there.
    • 00:12:47
      So initial damage assessments, FEMA and VDIMM, they come in really quick, so you gotta have numbers for them.
    • 00:12:53
      So our initial assessments that we've submitted in Gloucester, we anticipate just the VDOT expenses will be $252,000, Middlesex expenses around $80,000.
    • 00:13:03
      As for how much debris do we anticipate we're going to be picking up in Gloucester, we say we're estimating 5,200 cubic yards of debris and a Middlesex 1,600 cubic yards.
    • 00:13:15
      In this photo, earlier you saw one of the photos of the house collapse on Deagle Road
    • 00:13:20
      This is actually a photo of all its installations that is blew up against the trees along Fishing Bay Road.
    • 00:13:25
      So it's just the power of it was just amazing.
    • 00:13:28
      This is actually the house that had the, from the previous slide.
    • 00:13:31
      So where are we now?
    • 00:13:33
      Well, in Middlesex, we have completed our debris removal, so we are 100% complete.
    • 00:13:38
      We've moved all those crews that were up there.
    • 00:13:40
      We redeployed those to Gloucester County.
    • 00:13:43
      As of yesterday afternoon, quitting time, we were about 70% complete in Gloucester County, and we estimate that we will complete by Friday, if not sooner, for all the debris removal along the roads.
    • 00:13:54
      One big challenge that we have, like I had mentioned with the school, they're moving the students to one middle school of the two, and now we're going to have signal timing issues.
    • 00:14:06
      So for the next three days, our signal crew will be at the intersection of Route 17 and Arc Road, coordinating the arrival and dismissal times of the new school day at Peaslee Middle School.
    • 00:14:17
      and we're typically, you know, everybody goes one direction in the morning to school and everybody goes one, the opposite direction in the afternoon.
    • 00:14:24
      Now with the change in the middle of the day, we're gonna have traffic going both directions and we anticipate a lot of traffic issues.
    • 00:14:31
      So we have message boards out there right now alerting people of the traffic and like I said, our signal crew's been out there since this morning and they're gonna spend the next three days tweaking that signal to be able to accommodate all the traffic, the additional traffic that it's gonna take.
    • 00:14:47
      So a few people we wanted to thank.
    • 00:14:49
      We did want to thank the Saluda Residency and the Fredericksburg District employees for all the time that they've been working.
    • 00:14:55
      We've been working 16-hour days since daybreak on Sunday.
    • 00:14:58
      We wanted to thank Commissioner Whirley and Deputy Commissioner Kilpatrick for coming out to visit on Sunday and stopping by the cruise.
    • 00:15:05
      It was much appreciated.
    • 00:15:06
      The guys were very happy to see you.
    • 00:15:10
      We did want to also thank our Central Region Traffic Operations Center and Signal Crew
    • 00:15:15
      Our Traffic Operations Center, they really took the heat off of us in the residency in the district by providing the updated information to the citizens via 511 and also taking some phone calls.
    • 00:15:26
      And our signal crew, they had a hard time on Sunday trying to maintain the power.
    • 00:15:30
      The battery backups on these signals only last for about 16 hours, so we were without power much longer than that, and they helped us with getting generators out there and charging up the battery backups.
    • 00:15:41
      They really put in a lot of time.
    • 00:15:44
      We also want to thank the Virginia State Police, the Virginia Marine Resource Commission, and local area law enforcement.
    • 00:15:49
      Without them, we would not have been able to work as safely as we could or to coordinate as many crews out there with the utility companies and the VDOT crews.
    • 00:15:57
      And we'd also like to thank Al Covey, who provided many of the photos for this presentation.
    • 00:16:02
      And I think the guys were very pleased to see him on Monday also, because they were going to be in pictures.
    • 00:16:09
      You know, it's a stressful time out there when you're working 16-hour days, so anything helps.
    • 00:16:14
      And they do like to see people.
    • 00:16:16
      So we did want to thank all those people.
    • 00:16:18
      And if anybody has any questions, I did bring Mr. Tripani with me, who led the effort.
    • 00:16:23
      And if anybody had any specific questions, then Sean, if you just want to wave your hand there so everybody could see him.
    • 00:16:35
      So that's all I had.
    • 00:16:36
      If you had any questions.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:16:38
      The damage that we're looking at are the costs, the expenses.
    • 00:16:42
      It's all going to be maintenance-type activities.
    • 00:16:44
      There's no structural damage to roadways or bridges that we've seen at this time?
    • SPEAKER_01
    • 00:16:48
      Correct.
    • 00:16:48
      There is no structural damage to any roadways, bridges, or traffic signals.
    • 00:16:52
      It's all debris removal.
    • 00:16:54
      We had no damage to any VDOT offices or anything.
    • 00:16:58
      We actually only had one employee who had severe damage to his home, and the rest of our employees went on skates.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 00:17:06
      Ms. White?
    • 00:17:07
      And Mr. Chairman, I was telling Mr. Sterling before, the pictures we don't do a good job of describing how widespread, particularly the timber damages in the area.
    • 00:17:17
      We have personal and business interests in that area and that was up there on Monday afternoon.
    • 00:17:22
      And of course a lot of the work has been done, but I do know the residents were very thankful for all the work done by VDOT because they were cleared in over and over again.
    • 00:17:32
      But there's gonna be a long effort up there to get the remaining timber.
    • 00:17:36
      I want to pass on, people were very, very happy with the response from VDOT.
    • 00:17:50
      We don't get, you should get to know that there's a lot of good news and we always get the bad side of it.
    • James E. RichMember, Commonwealth Transportation Board
    • 00:17:56
      Thank you very much.
    • SPEAKER_10
    • 00:17:58
      My question relates to how much of our pre-planning that we've done for these exact types of things actually worked here.
    • 00:18:08
      For example, did you have the disposal site pre-identified and sort of this is where we would go?
    • 00:18:15
      Yes, we did.
    • 00:18:16
      Was the coordination team actually
    • 00:18:19
      Will you talk about that in advance so it fell into place pretty well or that sort of emerged from the nature of the tornado damage itself?
    • SPEAKER_01
    • 00:18:28
      We have some preset things because we work emergencies all the time.
    • 00:18:31
      So we have a very good relationship with local law enforcement, sheriff's offices, also with Dominion Power.
    • 00:18:37
      They have a facility there in Gloucester.
    • 00:18:40
      So anytime any storms come up, we have a local representative that we work with.
    • 00:18:45
      They actually assigned a crew with us Saturday night to help us cut these roads open that went along to make sure that the lines were de-energized before we were able to remove trees.
    • 00:18:56
      So we do have the relationships built.
    • 00:18:58
      We did have the disposal sites.
    • 00:18:59
      These are disposal sites that we use for routine maintenance operations.
    • 00:19:03
      We also maintain a listing of contractors.
    • 00:19:07
      The largest contractor that contributed equipment and time to us
    • 00:19:12
      There were actually two.
    • 00:19:13
      One is currently on contract with us to perform maintenance operations.
    • 00:19:17
      The other one is a snow vendor.
    • 00:19:18
      So we use them a lot for snow removal.
    • 00:19:21
      So it's not uncommon.
    • 00:19:22
      And when you're in the rural areas, the contractors really step up and they come to you.
    • 00:19:27
      But we do keep a listing of who we've called in the past and who we know is out there.
    • 00:19:31
      And they're the ones that we call.
    • 00:19:32
      And like I said, all that coordination was done overnight in the midnight hours.
    • 00:19:36
      So I think that was a great feat just to get all those crews and contractors on board in the middle of the night.
    • SPEAKER_10
    • 00:19:42
      Thank you.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:19:44
      Mr. Chairman, if a large tree falls from my property across a state road, who's responsible for it?
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:19:54
      The state?
    • 00:19:55
      I've always been told that if there's an act of God, where it goes in, you're not necessarily, but that's what I've been told.
    • 00:20:02
      I'm not wrong.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:20:03
      I mean, I've had it happen a lot.
    • 00:20:04
      I have a lot of property in Middlesex County, and the hurricanes put a lot of trees in the road, not one even in town.
    • 00:20:10
      And I got back, they're all cut up, it's nice, you know, there's still trees, places, stuff on my property, but all the roads cleared, the stuff is gone, I sort of went, hmm.
    • 00:20:19
      I wonder if I had any responsibility for that.
    • 00:20:22
      Nobody ever called, so I didn't call.
    • 00:20:24
      I'm just sort of curious as a landowner, do I have any responsibility?
    • 00:20:29
      You can get a bill now.
    • SPEAKER_10
    • 00:20:30
      I sold that property long ago.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:20:35
      Commissioner?
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 00:20:36
      We will remove all the trees from the roadway up to the right way.
    • 00:20:41
      And then if there's any trees on your personal property, we will not be going across the right way.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:20:47
      Right, I understand that, but I guess my point is the state sort of assumes that liability and the property owner doesn't.
    • SPEAKER_10
    • 00:20:55
      Well, I guess as a practical matter, you've got to get the roads clear, right?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:21:03
      So stop pushing those trees.
    • SPEAKER_10
    • 00:21:06
      Any other questions?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:21:10
      I just want to say really an outstanding job from everyone involved.
    • 00:21:15
      I had gotten votes from the governor, a couple of other cabinet members who were down there, as well as from the local authorities who did nothing but rave about the efforts of everyone involved from VDOT.
    • 00:21:29
      So I just really appreciate that.
    • 00:21:30
      Everyone did a great, great job.
    • 00:21:33
      And it's one of the things that, again, I don't think we're always necessarily good at advertising about all the different functions that VDOT does, all the response work and helping communities like this.
    • 00:21:47
      And it's one of these things that the Commissioner and I have had discussions before about is how do we let people know about these incredible efforts that the men and women of VDOT put in 24-7.
    • 00:22:00
      Thank you very much.
    • SPEAKER_01
    • 00:22:04
      We'll pass that on to the crews.
    • 00:22:06
      They'll appreciate that.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:22:07
      Excellent.
    • 00:22:08
      Thank you.
    • 00:22:09
      Okay.
    • 00:22:12
      Now onto something just as exciting, the General Assembly report.
    • 00:22:17
      Mr. Wall?
    • SPEAKER_10
    • 00:22:20
      Another cyclone hit town.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:22:31
      Good morning.
    • 00:22:41
      The General Assembly adjourned, came back for their veto session or now into their redistricting session.
    • 00:22:51
      We'll be back on Monday to take up redistricting once again.
    • 00:22:56
      We'll see how that works out.
    • 00:22:59
      Anyway, for the 2011 regular session, there were 2,692 bills introduced.
    • 00:23:07
      We tracked 226 bills.
    • 00:23:09
      The VDOT transportation legislative package included 23 pieces of legislation, 12 of those were governor's bills.
    • 00:23:17
      I heard the secretary mention a couple of days ago that from his secretariat there were 54 pieces of legislation that were introduced.
    • 00:23:27
      Of the 23 in the VDOT package, 20 of those passed.
    • 00:23:31
      You can see the categories in which the legislation fell, which I'll go into in a little more detail.
    • 00:23:38
      The first one, the Governor's Bills, amends a provision of the code dealing with notification to the Transportation Board when a city wants to become part of the First Cities Initiative.
    • 00:23:54
      The city had to give a year's notice prior to July 1, one year to be July 1 the following year.
    • 00:24:01
      Now they have up to December 31 to then become a member, so it shortens the timeframe by six months.
    • 00:24:07
      The next two deal with our Rural Rustic Road Program, which is a very popular program.
    • 00:24:13
      We've made improvements to over 650 roads around the Commonwealth, and it saved approximately $200 million.
    • 00:24:22
      in paving these unpaved roads using the rural rustic road standards.
    • 00:24:27
      One of the concerns we had is that the Department of Conservation and Recreation is adopting new erosion and sedimentation control and storm water management regulations that could have impacted the program and would have greatly impacted the number of roads that would come in as rural rustic roads.
    • 00:24:44
      In working with them,
    • 00:24:45
      We came up with a method of being able to treat these as routine maintenance, not requiring a lot of other improvements, which would impact the trees and other vegetation along the roadway.
    • 00:24:58
      And then finally, there's a provision in this bill dealing with emergency paving.
    • 00:25:04
      Previously the law required a public hearing for an emergency, which obviously didn't make
    • 00:25:09
      to have to go through a 30-day public hearing when you need to do emergency paving.
    • 00:25:14
      So that was amended to, now the local government has 72 hours to concur, tell us that they don't want us to do the emergency paving.
    • James E. RichMember, Commonwealth Transportation Board
    • 00:25:22
      Yes?
    • 00:25:23
      How do you define emergency in this case?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:25:27
      Flood washes out a roadway.
    • 00:25:31
      That's currently a gravel road.
    • 00:25:33
      That's current, or any road.
    • 00:25:35
      Any road that's currently there, it deals with paving.
    • 00:25:38
      So it would be emergency paving of a road that washes out.
    • 00:25:41
      I guess it could be gravel and it's determined in moving forward that it should be paved because it could have been the gravel nature of what may have led to it being washed away.
    • 00:25:51
      But in most instances it is a paved road that because of a tornado or a hurricane or flooding more than likely
    • 00:25:58
      There's been damage to that roadway that we need to get in and repave on emergency days.
    • James E. RichMember, Commonwealth Transportation Board
    • 00:26:03
      But it doesn't mean you have to actually pave a dirt road in an emergency, right?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:26:12
      Not necessarily, and that's the reason that we work with the local government.
    • 00:26:16
      They are given time if the local government comes in and wants us to do it a certain way.
    • 00:26:19
      We obviously listen to them and how they want the road replaced.
    • 00:26:25
      Okay, thank you.
    • 00:26:27
      Governor's bill deals with the commissioner.
    • 00:26:31
      His title is being changed from Commonwealth Transportation Commissioner to Commissioner of Highways.
    • 00:26:37
      A second provision actually eliminates my job in the code.
    • 00:26:43
      The third provision deals with the transfer, abandonment, and discontinuance of roads in both the primary and the secondary system due to construction when the chief engineer recommends
    • 00:26:56
      to the commissioner, many situations where a road is straightened out and there's a little curve area that a landowner wants.
    • 00:27:03
      Now we work the whole process, come to the transportation board in the future, the commissioner will have the ability to do those transfers, those abandonments and those discontinuances.
    • 00:27:13
      Following on that also is we're eliminating the requirement for the board to declare excess right-of-way as surplus before the commissioner can sell that property.
    • 00:27:25
      and finally, this code provision will allow us to issue one comprehensive report by November 30th of each year as opposed to the six or seven different reports that we filed today.
    • 00:27:40
      The next... Mr. Chairman.
    • James L. KeenMember, Commonwealth Transportation Board
    • 00:27:43
      Yes, Ms. King.
    • 00:27:44
      That section, Rick, references and is in reference to
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:27:52
      Well, today when we acquire property for a project and the commissioner certifies to the board that the property is no longer needed for that project, the CTB passes a resolution authorizing the commissioner to convey that property.
    • 00:28:18
      We're eliminating that process so that now the Commissioner will still make the certification so we have a public record that is not needed for the system, but then the Commissioner is given the authority to convey that surplus right of way.
    • James L. KeenMember, Commonwealth Transportation Board
    • 00:28:33
      That has nothing to do with an abandoned section of a road.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:28:38
      Mr. Chairman, if you have a section of roadway
    • 00:28:44
      that he abandons, and then someone comes in and wants that conveyed to them, then yes, it would cover that situation as well.
    • James L. KeenMember, Commonwealth Transportation Board
    • 00:28:52
      Mr. Chairman, this goes beyond abanding a roadway that we might have because we straightened out a piece of road.
    • 00:29:00
      This could go to a three-acre section of property that we purchased where we thought we were going to put a road, but we didn't.
    • 00:29:07
      And now we've declared surplus, or it's declared surplus,
    • 00:29:10
      So the commissioner will sell that now without coming before the board for approval of that?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:29:15
      That's correct.
    • James L. KeenMember, Commonwealth Transportation Board
    • 00:29:18
      Mr. Chairman, I can remember through the years we've had some issues on the model that's used for the disposal of that.
    • 00:29:28
      So we have an adopted model of getting estimates and evaluating that property and that type thing and then going to abandon, I mean to the original landowner and that type thing for the disposal of that property under this news?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:29:42
      We are not changing any of the policies that the Department uses in disposing a property.
    • 00:29:48
      We classify a property in various classifications depending on whether it has independent utility
    • 00:29:54
      Whether it's just a strip that only has value to the adjoining property owner, as a general rule when we abandon property or when we sell surplus property, we sell it to the adjoining property owner because normally that's the only one that has an interest in the property.
    • 00:30:09
      But if property is independently developable, then that's something that we would put out to bid and take the highest bid on the property.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:30:23
      Doesn't our policy, our VDOT policy, isn't there some, or is there some requirement that if I acquire that land from you, particularly under condemnation, that, and then I declare it surplus and want to sell it, you get the first right?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:30:44
      Mr. Chairman, there's a provision in the code that deals with advance acquisition
    • 00:30:49
      That if we acquire a piece of property as an advance acquisition and we don't build the project within a 20-year window, and that can be extended by litigation, then the landowner from whom we acquire the property can make a request to have the property conveyed back to that property owner for the price we actually paid 20 years previously.
    • 00:31:14
      So they have that right of first refusal, so to speak.
    • 00:31:18
      If they decide they don't want to purchase it, then we can put it out on the open market and get fair market value for it based on the present day value.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:31:29
      Mr. Chairman, without the Board acting on these anymore, is there any public disclosure requirement for these transactions going forward?
    • 00:31:45
      Will anyone be able to find out if this has happened?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:31:52
      Mr. McCarthy, today, 90% of these is where the property owner approaches us.
    • 00:31:59
      about acquiring the excess right-of-way, and if we do have a public sale, then that is done publicly, so the public does know if we're actually putting property up for sale.
    • 00:32:11
      I say 90, and it could even be greater than that, of the resolutions we bring to you today is where the adjoining property owners approach us about acquiring that property.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:32:23
      Exactly, but it's done in a public meeting.
    • 00:32:26
      I'm just wondering if it's no longer going to happen in a public meeting.
    • 00:32:30
      Are there any disclosure requirements?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:32:33
      I don't believe there are any.
    • SPEAKER_10
    • 00:32:39
      Mr. Chairman?
    • 00:32:39
      Yes.
    • 00:32:40
      I'm hearing that the requirement is now gone.
    • 00:32:44
      But it's still a matter if the board decides to have some type of administrative requirement for the commissioner that we could ask for for those of a certain size or a certain value or maybe in a certain location tied to some other larger set of issues.
    • 00:33:05
      So I don't think this precludes us from reviewing the ones we may want to review.
    • 00:33:09
      It just says you don't have to bring every little one through the CTB.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:33:14
      I mean, if there's a particular property that you're interested in here clearly, that's something that we can discuss.
    • 00:33:24
      Next on the powers of this board, the code has been amended to clarify that this board does not have to approve location decisions for local roads.
    • 00:33:36
      That would be urban streets, roads in Arlington and Henrico County.
    • 00:33:41
      It does increase the value of contracts that the VDOT commissioner and the director of DRPT may award from $2 million to $5 million and explicitly states that localities who are administering their own contracts do not need to come to the board for approval of those contracts.
    • 00:34:03
      And then finally, it eliminates a provision on the CTB regulating outdoor theaters
    • 00:34:09
      which I'm not sure there are any outdoor theaters still left today or very few.
    • SPEAKER_10
    • 00:34:14
      Mr. Chairman.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:34:17
      Yes.
    • SPEAKER_10
    • 00:34:19
      Just a quick question on the first item.
    • 00:34:22
      It says that any county has resumed full authority.
    • 00:34:27
      Is that assumed or resumed because it indicates that they had it, gave it up and then took it back.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:34:35
      Well, this would be a situation under our devolution statute.
    • 00:34:40
      You know, there is a provision where a county can come in and request to take over its local road system.
    • 00:34:46
      And so it would cover that situation as well where they would resume full responsibility for their local road system.
    • James L. KeenMember, Commonwealth Transportation Board
    • 00:34:52
      They would be initially assuming that, not resuming it.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:34:56
      Well, actually if you go back to 1931, the counties did have all these roads and we took them over so they'd be actually taking them back.
    • 00:35:03
      Okay.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 00:35:03
      That's why.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:35:08
      Finally, with that bill, it amends a code provision dealing with the statewide transportation plan that's going to be updated every four years rather than the current five-year schedule, and then it goes on to state that the next plan will be updated and presented to the Governor and the General Assembly later in December of 2013 and the subsequent plan later in December 1, 2015.
    • 00:35:31
      And then finally, it eliminates a provision about designating employees as police.
    • 00:35:37
      since the board no longer enforces traffic regulations.
    • 00:35:42
      The next bill deals with inmates in rest areas.
    • 00:35:45
      Again, it allows for the Department of Corrections, persons sentenced to the Department of Corrections to be used for the maintenance of rest areas provided such maintenance activities are approved by corrections in VDOT taking into account the safety of the traveling public.
    • 00:36:03
      Probably the most important bill of the session
    • 00:36:06
      deals with transportation funding, creates a Virginia Infrastructure Bank, which is going to be managed by the Virginia Resources Authority pursuant to a management agreement between the authority of the Secretary of Finance and this board.
    • 00:36:20
      It authorizes this board to issue up to $1.2 billion in Garvey's to help pay for specific projects as designated by the board.
    • 00:36:31
      It also authorizes this board to issue transportation capital project revenue bonds not to exceed $3 billion provided the aggregate annual and physical year shall not exceed $300 million with two exceptions in fiscal year 2012 and 2013.
    • 00:36:47
      The annual limitation is increased by $200 million and $300 million prospectually.
    • 00:36:54
      The practical effect of that is that we will be issuing $600 million in this fiscal year, $600 million in the next fiscal year, and $600 million in the following fiscal year for a total of $1.8 billion.
    • 00:37:07
      This also changes the revenue sharing program, increases the maximum state match from $1 million to $10 million, removes the priority levels that were established for project allocation previously.
    • 00:37:19
      and increases the maximum allocation of the program from $50 million to $200 million.
    • 00:37:26
      The next bill dealing with fees and rates amends the section of the code to exempt VDOT and DRPT from having to pay fees for remote access to land records.
    • 00:37:35
      This has a potential savings of about $161,000 to the agencies.
    • 00:37:41
      It also amends the code
    • 00:37:43
      to establish in general law the mechanism on determining annual maintenance payments to cities, Arlington and Henrico, something that's been in the Appropriation Act for a number of years will now be in the general law.
    • 00:37:59
      There's also a provision dealing with payback.
    • 00:38:02
      Today in a city, if a city councils a project, they're required to pay back the money that VDOT has invested.
    • 00:38:08
      This would make it also applicable to counties if a county councils a project.
    • 00:38:12
      They would need to reimburse VDOT the funds that had been invested in that project.
    • 00:38:18
      And then finally, there was a little code cleanup dealing with refundings that used to limit the timing of a refunding.
    • 00:38:25
      It's now eliminated that provision.
    • 00:38:30
      There was an amendment to the Procurement Act, which increases the duration of certain contracts from a year to two years.
    • 00:38:37
      clarifies that each contract term, the amount in the term cannot exceed $5 million, and then a separate enactment clause was added where the commissioner is going to impanel a committee to make recommendations to the commissioner on raising the contract limits for which performance and payment bonds are required.
    • 00:38:59
      As far as VDOT bills are concerned, there are four on this page, first dealing with eminent domain of waiver appraisals.
    • 00:39:07
      The code requires generally that an appraisal be prepared before negotiations are begun with the property owner.
    • 00:39:15
      It does allow for this not to be done previously if the value of the property was $10,000 or less that VDOT could then look at other land records and things of that nature and making that valuation determination.
    • 00:39:29
      That's now been raised to $25,000 which is consistent with federal regulations in this area.
    • 00:39:35
      The next bill deals with bridge vertical clearances.
    • 00:39:39
      Previously, the commissioner was responsible for posting of bridges in cities.
    • 00:39:44
      This now makes it clear that cities are responsible for posting the bridges in their jurisdictions.
    • 00:39:50
      The next deals with certified letters and having to send certified letters to property owners of our intent to enter their property.
    • 00:39:58
      For many years, we did that by regular mail about four years ago.
    • 00:40:02
      The General Assembly passed a provision that requires to do it by certified mail.
    • 00:40:07
      We spent about $150,000 and a large majority of these are returned unanswered or unreceived.
    • 00:40:16
      Finally, and this is the Secretary's favorite bill of the session dealing with golf carts,
    • 00:40:21
      removes an exemption in the code that would allow the golf cart to travel on a 55-mile-an-hour highway.
    • 00:40:26
      It would be probably interesting driving, but this makes it clear that it's only allowed on those roads with a speed limit of 35 miles an hour or less.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:40:37
      I wanted to have a special signing term.
    • 00:40:40
      The governor just wouldn't buy it then.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:40:44
      The next couple are actually code cleanups.
    • 00:40:46
      Chapter 428 actually deals with the Mariners Museum and Newport News, which has
    • 00:40:51
      have been established, so there's no need for this code provision.
    • 00:40:54
      The donation of capital stock with Turnpike or Ferry Corporation, we do not have any Turnpike or Ferry Corporations for which it would be applicable, so this provision was eliminated.
    • 00:41:05
      Same with the next one on state municipal Turnpike projects.
    • 00:41:09
      These code sections were never used.
    • 00:41:11
      It was part of code cleanup.
    • 00:41:12
      And then finally, the I-66 Economic Development Program was put into code when the Disney American project was alive and well.
    • 00:41:20
      up in the Secretary's old neighborhood, and I believe he was probably on the Board of Supervisors when that was going on up in the hay market.
    • 00:41:30
      So we eliminated that provision.
    • 00:41:32
      Some budget amendments that are first one dealing with the revenue sharing program, as we mentioned, moves the amount from $15 up to $200 million.
    • 00:41:43
      It also, there was a reduction in the general fund appropriation to the State Infrastructure
    • 00:41:50
      from 150 to 32.7 million so that there will be a total of $283 million capitalizing the State Infrastructure Bank when it begins July 1st.
    • 00:42:01
      There is also a provision regarding VRS and state employees paying towards their retirement, which will go into effect beginning in June.
    • 00:42:12
      And then there in the domain, there was one bill introduced dealing with appraisals and
    • 00:42:19
      in eminent domain that's applicable to all condemners, railroads, public utility companies, cities, and VDOT dealing with providing all copies of all written appraisals that have prepared as well as a written statement setting forth the public use under which the property is being required.
    • 00:42:38
      There was also a constitutional amendment passed which will need to be passed again after this fall's elections.
    • 00:42:46
      I won't go into all the details, but basically the General Assembly would be establishing or defining what are lost profits and lost access, which will be compensable if this constitutional amendment should pass.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:43:00
      Rick, on that one, because I've heard a little bit about it, you said the General Assembly is going to determine what the, in each case they'll go to the General Assembly and they'll determine, okay, here's the lost profit.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:43:12
      No, no, they will define that in general law.
    • 00:43:15
      You know, I think they'll wait.
    • 00:43:17
      If the constitutional amendment passes, then the General Assembly will put a definition in the general law as to what qualifies
    • 00:43:24
      as lost profits and what qualifies as lost access.
    • 00:43:29
      Well, Delegate Armstrong had a bill for several years that dealt with if you could no longer have full access, if you were on a two-lane road and you can make a right or a left now, if we made it a four-lane road where you can only make a right and then you have to go make a U-turn to go the other way, that would be a loss of access and that would be compensable.
    • 00:43:49
      So I don't know how specific they will get, but they'll just define it in general law
    • 00:43:55
      as to what would qualify in those two areas.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:43:57
      The overall cost to the program won't be known until they do those definitions.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:44:01
      Correct.
    • 00:44:07
      Motorcycles, if you have a motorcycle or a bicycle, this next bill will give you the opportunity to run a red light.
    • 00:44:14
      You have to sit there through two cycles or two minutes, which should be interesting to enforce, but we'll see how that works out.
    • 00:44:24
      Minor change to the noise abatement provision, striking the word landscaping and inserting vegetative screenings such as planning of appropriate conifers.
    • 00:44:35
      There was a sort of codifying of existing law dealing with the status of a discontinued secondary road.
    • 00:44:41
      Today, by operational law when it's discontinued, it's still a public road.
    • 00:44:45
      It's just not part of VDOT's system.
    • 00:44:48
      This was a bill to codify that.
    • 00:44:50
      to make it clear that it still remains a public road until the local government decides otherwise.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:44:58
      I'm sorry, Mr. Walton, about the running the red light.
    • SPEAKER_10
    • 00:45:01
      So what is two complete cycles?
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:45:04
      It's red.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:45:05
      There's no cycle.
    • SPEAKER_10
    • 00:45:06
      There's no cycle through.
    • 00:45:07
      Yeah.
    • 00:45:07
      There must be traffic coming.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:45:08
      But if it turns green, then you're going to go through it.
    • 00:45:11
      So what does that mean?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:45:14
      I think the two complete cycles would be, as an example,
    • 00:45:19
      The motorcycle, and where we heard was the motorcycle's in the turn lane.
    • 00:45:23
      And the straight lane goes through several cycles, but the turn lane doesn't turn with the green arrow.
    • 00:45:30
      So what the motorcyclist testified to is they'd have to come up into the through lane, take a right, get back into that lane to then go across instead of being able to make a left turn.
    • 00:45:45
      So those were the examples given that the cycle would be the cycle of the lights for two minutes.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 00:45:53
      Or two minutes, safety concern on that?
    • 00:45:55
      Yeah, so we make them wear helmets but they can go run across the red lights and get hit by an oncoming bike.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:46:00
      There was a lot of testimony from motorcyclists and bicyclists where they had to sit there and the thing would never turn even though
    • 00:46:12
      and Connie can tell you there are loop detectors, there are metal detectors, there are all sorts of detectors of detecting and some of the more modern detectors will detect metal.
    • 00:46:22
      So if the motorcycle or the bicyclist is there, it should be able to detect that they're in that lane.
    • 00:46:26
      But again, the motorcycle's lined up at the committee meeting and that, you know, they'd have to take somebody to pull in behind them before we trip the line.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:46:35
      That was really only on a left turn
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:46:41
      Well, it's on any area.
    • 00:46:44
      And although most of the concern expressed were in the more rural areas, the patron of the bill was from Northern Virginia.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:46:52
      So the theory was that it wasn't tripping the signal.
    • 00:46:58
      Right.
    • 00:46:59
      Right.
    • 00:47:03
      Does that include three-wheel motorcycles or not?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:47:07
      Well, it's a motorcycle, but not a moped.
    • 00:47:10
      Sounds like it also could include a straight phase also if he's going straight through the light and he's queued back two cycles.
    • 00:47:18
      He could just run right through the light.
    • 00:47:20
      That's why, again, the enforcement's going to be the key is someone saying, hey, you didn't wait.
    • 00:47:26
      You went through it one cycle or you only waited a minute, 30 seconds.
    • 00:47:30
      I doubt you're going to have a lot of enforcement in that area.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:47:33
      Well, the thing is, the way this thing has been publicized,
    • 00:47:38
      I mean, people are going to run down the middle of the lane or on the shoulder and run lights because the way it's been presented is they can go through, but they can't go and essentially go down the median or they can't go down the shoulder.
    • 00:47:53
      This is going to be a mess.
    • 00:47:54
      Who is the sponsor of this?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:47:57
      Delegate Gleason.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:48:00
      Are you going to seek golf cart permission to do this?
    • James E. RichMember, Commonwealth Transportation Board
    • 00:48:04
      I never put it past any creative plaintiff's lawyer for any theory but again this was more of a state police
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:48:32
      related issue, more of a safety issue than a VDOT issue.
    • 00:48:37
      Like I said, there was a lot of support from the motorcycle and the biking community for this bill.
    • 00:48:46
      In the land use area, there were two bills that does impact the traffic impact analysis.
    • 00:48:52
      The first one would eliminate that requirement on subdivision site plans.
    • 00:48:59
      It requires us to amend our regulations
    • 00:49:02
      Dealing with requiring traffic impact analysis for subdivision site plans.
    • 00:49:06
      And then the second deals with rezoning.
    • 00:49:10
      If property has already been looked at in a comprehensive plan review or update, there should be a lesser review when that property is going through a rezoning.
    • 00:49:20
      And then the third matter, which actually will probably incorporate the first two on this page, requires that VDOT and the CTB
    • 00:49:30
      Review the appropriate revisions that were made to three regulations, one dealing with secondary street acceptance, one dealing with access management, and the third dealing with traffic impact access regulations.
    • 00:49:44
      We have to review these and make a report by December to the effect of January of next year.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:49:57
      Ms. McCarthy, there have been concerns raised by several interest groups as to the impact that these
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:50:24
      regulations have had on their industry.
    • 00:50:28
      The home builders, the realtors have raised concerns with the secondary street acceptance requirements on connectivity, on traffic impacts.
    • 00:50:40
      I mean the cost can be from $20,000 to $200,000, so it is a cost on the developer
    • 00:50:47
      and they've raised these issues.
    • 00:50:49
      So the legislation doesn't require us to do anything.
    • 00:50:53
      It just requires us to review.
    • 00:50:56
      It doesn't dictate a specific outcome.
    • 00:50:59
      There will be an opportunity for those groups as well as other groups that are also interested in the outcome to sit down, to go through, to see in the two or three years they've been in effect what hasn't worked, what's worked.
    • 00:51:13
      You know, we heard a lot of concerns again from the rural areas.
    • 00:51:16
      of some of the connectivity requirements being almost impossible to meet in the more rural areas of the state.
    • 00:51:22
      So this will just give us an opportunity to have all those folks sit down in a room, work through it, make recommendations, and then I'm assuming if there are some recommendations that certain parties don't like, we'll probably see legislation at the 2012 session.
    • 00:51:44
      There's also the creation of an Office of the Inspector General.
    • 00:51:48
      VDOT is one of about four agencies that does have an Inspector General.
    • 00:51:53
      That position will be merged or consolidated into the state office, and it is effective on July 1 of 2012.
    • 00:52:01
      Overweight vehicles.
    • 00:52:05
      There was a little code cleanup on farm machinery and agricultural drying units.
    • 00:52:10
      But then there was also a bill that requests the DMV commissioner in consultation with a number of parties to develop a uniform system of permitting overweight and oversized vehicles.
    • 00:52:23
      And in this presentation we made to the Joint Commission on Transportation Accountability by December 15th.
    • 00:52:30
      There's a meeting scheduled for next Tuesday, a kickoff meeting at DMV with the various interest groups associated with this initiative.
    • 00:52:38
      to move something forward, to come up with a uniform system of dealing with overweight permits.
    • James L. KeenMember, Commonwealth Transportation Board
    • 00:52:47
      Mr. Chairman, do we have any idea that all the stakeholders concerned with this type of thing are going to be included and involved in this process?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:52:59
      Mr. Chairman, Ms.
    • 00:53:00
      Keen, all I can tell you is I think DMV has reached out to Del Bennett from the Trucking Association and others
    • 00:53:08
      If for some reason you have a particular industry that you believe needs to be represented, let me know and I'll pass it on the DMV.
    • 00:53:21
      There was also a bill dealing with the Patriots Crossing, similar to the bill from previous year dealing with the Hampton Roads Bridge Tunnel, which sets out a timetable for receiving PPTA proposals for the Patriots Crossing project.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 00:53:38
      They were unsolicited proposals.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:53:47
      A bill dealing with conveyance of some property down the Roanoke area, I think Mr. Martin is familiar with, with Monell Milling.
    • 00:53:53
      This is the second time that they've done a property exchange with VDOT.
    • 00:53:57
      It's a huge economic issue for, I think it's about the time of Roanoke, maybe Roanoke County.
    • 00:54:06
      Quiet Pavement, there was a bill for us to look at Quiet Pavement.
    • 00:54:11
      There are five projects out on the street, bids coming in I think next month dealing with Quiet Pavement technology in various parts of the state to look at that so we can make the reports about the due dates.
    • 00:54:27
      And then there's a study of the Route 1 corridor that's really in DRPT's area.
    • 00:54:32
      to look at public transportation services at Valois and at Quantico.
    • SPEAKER_10
    • 00:54:39
      Rick, just back to that pavement, is that being done for our research unit or is that being done through our new products division or exactly where will that end up?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:54:53
      Well, we've been working with both the industry as well as the research folks as well as our materials folks.
    • 00:55:01
      have all been working together on this.
    • 00:55:04
      We're basically putting out five, one's 288, I think you're in Richmond, one up in Northern Virginia, I can't remember where exactly, but five of these so we can look at the technology.
    • 00:55:18
      And again, it'll be the research folks, the materials folks, and the industry all looking at this and see if it makes sense to move forward with this on a broader basis.
    • 00:55:33
      Speed limits, Delegate Stolle had a bill down in Virginia Beach, I think focusing more on that shore drive section between Great Neck and down at where Atlantic comes in with speed limit goes from like I think 35, 45 to 55 down to 25 in a short period of time and I think there have been some serious incidents right around Great Neck.
    • 00:55:54
      This would give the beach the ability to establish variable speed limits based on time of day, weather conditions,
    • 00:56:00
      because I think certain times of the day they want it low but other times of the day they're looking at having a higher speed limit so this gives Virginia Beach the authority to do that.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 00:56:08
      Is there a time limit or the number of changes they can make?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:56:11
      No, there's nothing in the law that addresses that.
    • 00:56:18
      There was also a bill that was introduced on behalf of Loudoun County dealing with I think the town, which town up there wants to be able to set
    • 00:56:28
      its own speed limits and be able to increase and decrease those within the town.
    • 00:56:34
      Finally, there were amendments to the tolling provisions dealing with photo enforcement and video enforcement where again the industry working with DMV, VDOT, and the Attorney General's office were able to come up with recommendations that
    • 00:56:52
      hopefully will result in a successful tolling scheme for our new facilities coming along with all electronic tolling, in particular down at the Midtown downtown tunnel, hot lanes, and so are the PPTAs.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:57:08
      Mr. Sterling.
    • 00:57:12
      $25 is what someone would pay if they violate the toll.
    • 00:57:16
      So if you get on one of the hot lanes, your fine would be $25.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:57:21
      Not to exceed.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:57:23
      Not to exceed $25, but today it's what, $500?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:57:25
      No, no, this is administrative fee.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 00:57:29
      So there'd be a fine on top of this, or?
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:57:31
      There are civil penalties associated with the hot lanes because the civil penalties go to the operator of the facility.
    • 00:57:39
      They don't go into the literary fund.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:57:41
      All right, thank you.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 00:57:42
      Mr. Chairman.
    • 00:57:42
      Yes, Mr. Kelly.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 00:57:43
      I would just opine just for the benefit of my colleagues.
    • 00:57:51
      And talking to some of the folks that run those tolling companies or the private systems that have tolls that are not the state system of privacy, they tell me that like 30, 25 to 30% of the vehicles that go through run the toll.
    • 00:58:10
      It's a high number.
    • 00:58:12
      And it's a very difficult process for them to go get, go to court.
    • 00:58:18
      Go out to those folks, get their money, it's a laborious process, and they were trying to get some code changes and allow them to sort of skip through some of those administrative hoops and basically have a finding without going through a huge process.
    • 00:58:32
      But it's amazing to me, and I'm sure the state, I'm sure it's consistent across the board, but it's like 25%.
    • James A. DavisMember, Commonwealth Transportation Board
    • 00:58:40
      Mr. Chairman, there's also a serious problem with malfunctioning equipment as well.
    • 00:58:50
      That's a huge part of that and I would hate to see this thing go too far because the equipment could be malfunctioning for a couple of days.
    • 00:59:00
      A lot of people would go through and have their tags photographed and have no recourse.
    • 00:59:06
      Mr. Lane.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 00:59:08
      Isn't this state, are we working on coordination with other states?
    • 00:59:15
      A lot of this has to do with, just take a picture, the automatic tolling.
    • 00:59:21
      Are we working with other states to get those in place, those agreements where
    • 00:59:26
      If somebody from another state runs it, we have the ability to go through that state.
    • 00:59:30
      Is that process going forward?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:59:32
      So the EZ Pass?
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 00:59:34
      Yes, we're working with the, we're members of the EZ Pass group, and we coordinate with them for the collection of those tolls going back and forth.
    • 00:59:45
      So we are working with them and the DMVs for the collection of those who would violate.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 00:59:52
      So theoretically, somebody runs it, they don't get their license renewed in another state unless they settle up with us.
    • 00:59:57
      I mean, I think that's the theory behind that.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 00:59:59
      And that's what the easy path is to have the multi-state.
    • 01:00:01
      I mean, the challenge, obviously, for us is, I mean, in places like the Midtown Tunnel, downtown tunnel, when that project moves forward, it's all going to be open, open toll, open road tolling.
    • 01:00:14
      We're not going to have any booths.
    • 01:00:15
      And the only way that we're going to be able to ensure people
    • 01:00:19
      On the other hand, we also have to be cognizant of the fact, and this is trying to find a middle ground on this, that these are all fines that normally would go to a general district court.
    • 01:00:39
      I mean, we're looking at when the hot lanes,
    • 01:00:43
      I forgot the number they ended up telling me, but to go along with the number of violators, the hot lanes up just on the beltway, they're expecting like 10,000 violators a month or something like that.
    • 01:00:55
      It's a huge number.
    • 01:00:56
      It essentially would overwhelm Fairfax District Court.
    • 01:01:00
      So we have to find a way to make this work within our system, make sure people have due process, but also to make sure that we collect the revenues that are necessary to build these facilities in the first place.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 01:01:12
      The way the legislation is written, it allows an administrative settlement for the parties to try to work out a resolution, but because of the numbers that Mr. Miller mentioned,
    • 01:01:25
      You know, a huge issue is keeping the toll down to a level that's affordable.
    • 01:01:29
      And in order to do that, you've got to have good enforcement, people pay.
    • 01:01:34
      The more people avoid paying, then your toll's got to be higher to make up the difference.
    • 01:01:38
      So that's a huge issue in keeping the toll rates down to an affordable level is being able to have that good enforcement mechanism.
    • F. Gary GarczynskiMember, Commonwealth Transportation Board
    • 01:01:47
      Secretary?
    • 01:01:48
      Yes.
    • 01:01:48
      One question on the Governor's package.
    • 01:01:52
      The statewide mitigation bank is a significant component of the package.
    • 01:01:58
      Could we request a staff for maybe next month or the following month a little primer on how that exactly is going to work on the distribution, et cetera, and the functioning of that mitigation bank?
    • 01:02:10
      I'd appreciate it.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:02:11
      The mitigation bank?
    • 01:02:13
      The infrastructure bank.
    • 01:02:15
      Oh, the infrastructure bank.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:02:18
      Sorry.
    • 01:02:19
      On the Infrastructure Bank, we are hopeful to bring a set of draft procedures to you in the May meeting with action for you to take action on those in June.
    • 01:02:34
      Thank you, Mr. Commissioner.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:02:34
      Appreciate that.
    • SPEAKER_10
    • 01:02:35
      All right, Mr. Chairman.
    • 01:02:37
      Yes, Mr. Chairman.
    • 01:02:37
      One quick question.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:02:39
      On the non-Garvey bonds, the debt is essentially financed by the current general revenues coming in the Commonwealth, correct?
    • 01:02:48
      Is that what that means?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:02:49
      No, that's not correct.
    • 01:02:50
      There's no general revenues going in.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:02:53
      Well, what are they based on when you say revenue bonds?
    • 01:02:55
      What provides the foundation for that yet?
    • SPEAKER_10
    • 01:03:00
      Let me get it up.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 01:03:11
      You're talking about the CPR bonds?
    • SPEAKER_10
    • 01:03:14
      Yeah.
    • 01:03:17
      Could you repeat the question?
    • James E. RichMember, Commonwealth Transportation Board
    • 01:03:24
      What is the underpinning revenue source?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:03:28
      The insurance tax proceeds and that was our go into the Commonwealth, our priority transportation fund which right now is being used to pay off our friends
    • 01:03:40
      and those now will be used to pay off the CPR bonds.
    • 01:03:57
      Yes, that's the revenue.
    • 01:04:02
      That's dedicated by law by the General Assembly back in 2007.
    • 01:04:11
      That's the revenue.
    • 01:04:20
      Mr. Lawson, can I say it right?
    • 01:04:21
      Any other questions?
    • 01:04:25
      Mr. Walton?
    • 01:04:26
      Well, thank you very much.
    • 01:04:27
      We're going to get to maintenance and operations on secondary roads.
    • 01:04:31
      Ms. Sorrell.
    • Constance S. SorrellChief of System Operations
    • 01:04:32
      Good morning.
    • 01:04:34
      Well, you get to see a little bit of what some of the maintenance on our system looks like with the tremendous job our crews did.
    • 01:04:43
      Just to follow up one brief note on our emergency operations, we do have regular drills and we do have
    • 01:04:52
      Within each of the district groups of incident management that we work together in task forces with the state police and local law enforcement.
    • 01:05:05
      On the ground we have troops that are constantly in touch with each other.
    • 01:05:10
      They all have their telephone numbers.
    • 01:05:13
      We work very closely together almost all the time.
    • 01:05:19
      The reason for the response might change from time to time.
    • 01:05:22
      Actually, the response itself is generally pretty similar.
    • 01:05:26
      People often forget that really our first call is emergency response, and VDOT is the one emergency organization that the governor has and the secretary at their disposal to deploy anytime, anywhere around the Commonwealth.
    • 01:05:46
      We're very proud of the work we do there.
    • 01:05:48
      I was also down there during the Sunday and got to see some of the damage in the work of our crews.
    • 01:05:54
      It's really very rewarding to think about the risk that they put themselves in for the benefit of the rest of us.
    • 01:06:00
      So thank you for all your support for the maintenance crews.
    • 01:06:05
      I'm going to give just a very quick overview.
    • 01:06:07
      This is a presentation that is being given at the request of a couple of board members from last meeting and talk just briefly about what are the code requirements and sort of what is the focus and the overarching goals of maintenance and operations and a little bit
    • 01:06:25
      So just very briefly, the code requires us to report every two years about the condition of needs for maintaining the existing system.
    • 01:06:48
      This legislative session, all of our reports are now going to be standardized so that they'll be given on November the 30th, so instead of September the 15th.
    • 01:07:00
      So we will be doing an update when the last one we did was September of 2009.
    • 01:07:05
      So this fall we'll have an updated version.
    • 01:07:10
      In the code, it requires us to use an asset management approach to operate our maintenance program.
    • 01:07:25
      There's actually a definition of asset management as a systematic process for operating and maintaining the system by combining engineering practices and analysis with sound business practices and economic theory to achieve cost-effective outcomes.
    • 01:07:38
      So obviously a lot of this is based on life cycle costs, for example, and deterioration rates on pavements and those kinds of analyses.
    • 01:07:51
      Actually the Auditor of Public Accounts recently did a review of all of our methodologies.
    • 01:07:56
      on how we come up with what the needs are and we got a very good report from what an objective analytical methodology we have and so they didn't recommend any changes to it quite frankly which was a nice thing to have from the auditors.
    • James L. KeenMember, Commonwealth Transportation Board
    • 01:08:20
      Well, that process and the model we use is inspection, for example, pavement.
    • 01:08:26
      Yes.
    • 01:08:27
      We do that on every mile of the secondary road.
    • Constance S. SorrellChief of System Operations
    • 01:08:30
      On the interstate and primary, we do analyze every mile every year.
    • 01:08:38
      On the secondary system, we're doing somewhere between 20 and 25 percent a year.
    • 01:08:43
      So we have a contract with a company called Roadware that does the analysis and provides it to us.
    • 01:08:50
      So over a four-year period, we would have done 100% of the secondary system.
    • 01:08:56
      But a 25% review each year is a pretty good sample of the condition of the secondary system.
    • 01:09:03
      And I'll talk a little bit more about that as we get into the presentation, Mr. Secretary.
    • 01:09:08
      So the other section here pertains to payment to localities and includes requirements for localities to report their expenditures and give performance on their local roads.
    • 01:09:23
      So just a real brief picture sometimes tells a story, kind of like these two pictures here.
    • 01:09:30
      The first one is really what is maintenance and this is the focus on the physical assets of the roadway itself and the roadside and all the drainage.
    • 01:09:38
      and so all of our activities around pavements, bridges, tunnels, rest areas and the various roadsides and emergency operations that go on to protect our physical assets really is what we think of as maintenance.
    • 01:09:56
      And on the operations side of the house, really we're talking about the movement of traffic.
    • 01:10:01
      And so most of the activities here involve our operation centers, which are sort of the heartbeat of the organization.
    • 01:10:09
      They have a very serious incident management emergency response.
    • 01:10:14
      function and they work on a daily basis with state and local police in each of their regions to maintain situational awareness and to keep the roads as clear as possible so that we don't have any more secondary accidents that we need to have.
    • 01:10:30
      They also input the data into the system that feeds the 511 traffic information system that is highly valued by the people who use it.
    • 01:10:44
      And then they also are responsible for managing and maintaining our cameras, our dynamic message boards.
    • 01:10:51
      We have over 5,000 signals and talking about
    • 01:10:54
      Motorcycles at Signals, I would guess the vast majority of signals are operated by cities around the Commonwealth, but we do operate all the signal systems in the major urban counties like Prince William and Fairfax, Loudoun, Chesterfield, James City County, so we do have a pretty significant
    • 01:11:16
      S. responsibility and obviously we have a very important incident management responsibility and a lot of traveler information systems that are a part of our program.
    • 01:11:29
      As a quick overview, the major program goals that we use to drive the budget includes delivering emergency and safety services to efficiently operate the system, so making sure that first and foremost we have the funds budgeted for emergency response, incident management,
    • 01:11:49
      operating on a day-to-day, our 24-hour facilities like the tunnels, the ferries, the rest areas, then comes maintaining our ordinary maintenance to make sure that roadways are free of debris and we're doing all the things that need to be done on every day, sort of housekeeping, keeping drainage in good shape, those sorts of things, and responding to calls from citizens for service.
    • 01:12:18
      and then to maintain and extend the useful life of core assets performing corrective, restorative and rehabilitation functions for particularly bridges and pavements and other major repairs and equipment repairs and replacements like message boards and traffic signals and controllers and all that electronic equipment that
    • 01:12:41
      has a limited life cycle, so we keep all of that maintained and operating.
    • 01:12:51
      This is a summary slide from an earlier presentation I had made on the last year's budget in 2011 based on the needs assessment that was last done in the fall of 2009, the needs for investments in pavements, bridges,
    • 01:13:11
      tunnels and services was estimated to be in the neighborhood of $1.9 billion.
    • 01:13:17
      The budget for 2011 is $1.3 billion, and you can see that the vast majority of the needs are in secondary pavements.
    • 01:13:29
      and then to a lesser degree our traffic and safety assets where re-striping, replacing signs, other kinds of guard rail is an ongoing challenge with the inventory we have to keep up with that.
    • James A. DavisMember, Commonwealth Transportation Board
    • 01:13:48
      So... Mr. Chairman, Connie, as I read this, I'm fully aware of the difficulty
    • 01:13:56
      funding secondary pavement issues, but also appreciative of the efforts that have been made recently to try to address some of those needs.
    • 01:14:06
      So when I look at this, it would appear to me that the Commonwealth Transportation Board is endorsing a state policy that accepts the fact that about 90% of the interstate pavement needs are being met.
    • 01:14:22
      I'm just doing a rough number, 60% of the primary pavement and as low as 20 or 25% of the secondary roads.
    • 01:14:30
      And it would seem to me that it's worth conversation for us to say, is that what we want to say is our policy and the allocation of funds that come through the CTB?
    • 01:14:43
      I don't think it's reasonable to say that that's good state policy.
    • 01:14:47
      Now, I understand how we got there.
    • 01:14:50
      But I still think we as a board should be talking about how we're going to correct that going forward to have a more equitable balance in the way we address our three primary, our three distinctive road categories.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:15:06
      I'd like to second with Dr. Davis, and I mean this is kind of shocking.
    • 01:15:13
      And I wonder if this should be our policy, but as I understand the statutory requirements, and I may be wrong on this, I think the statute says you must take care of all maintenance issues before you can do anything else.
    • 01:15:26
      How is there under law a dichotomy in figures here?
    • 01:15:31
      Are we in violation of the statute requiring that we must maintain before we do anything else?
    • 01:15:39
      I don't see how we're in compliance with the code.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 01:15:46
      Mr. Davis said that the money might be spent on the interstate.
    • 01:15:50
      I'm not sure the needs are being taken care of because the Virginia pilot ran this morning the headlines of the deterioration of the interstates around the bridges and tunnels
    • 01:15:59
      And so I guess I'm coming to agree, are we really funding other things before we're taking care of this?
    • 01:16:06
      Now, one question might be that these are cement interstates, right?
    • 01:16:11
      And we're just talking about paving, and maybe that falls into the construction program.
    • 01:16:15
      But the bottom line is, is that these interstates, and particularly the secondary and primary, are not being taken care of.
    • 01:16:24
      And so I guess I'm thirding my colleagues here is,
    • 01:16:29
      Why are we letting this happen?
    • James A. DavisMember, Commonwealth Transportation Board
    • 01:16:30
      Mr. Chairman, I preface my remarks by saying I know how we got there and that was trying to make our federal match and try to adjust from where we were to where we are and I also recognize that some of the recent funds have been restored to secondary roads and I'm very appreciative of all that but I still think as far as statewide policy goes
    • 01:16:53
      There needs to be a better balance somehow as we go forward.
    • 01:16:57
      That's what I'm suggesting, not blaming anybody because I think I understand how we got there.
    • James L. KeenMember, Commonwealth Transportation Board
    • 01:17:03
      Mr. Chairman, I think Dr. Davis is right on target with 37,000 miles off of, maybe 37,000 of the 51,000 miles that we have that are secondary roads.
    • 01:17:16
      We got a, we got a
    • 01:17:19
      The deterioration has taken place on secondary roads that is existing throughout the state, particularly in rural areas, where one of the major problems is drainage.
    • 01:17:31
      And when you examine the drainage issue, you find that, and as I understand it, they have a local budget that they'll set aside so much money for drainage, and they will only get to work certain sections
    • 01:17:43
      of the county, for example, and there are roads that go years that never have a dollar spent on preventative maintenance in terms of the drainage, keeping the water off the road, which leads to additional deterioration.
    • 01:17:59
      So it's a preventative side that saves us money on the long haul because we're having to ignore drainage in secondary roads in rural Virginia because it's not in the budget.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:18:11
      Mr. Sorrell.
    • 01:18:12
      Mr. Chairman, I would say that on page seven, it's probably not the best page to look to determine the breakdown between the interstate primary and secondary.
    • 01:18:22
      I think a better breakdown of that would probably
    • 01:18:25
      on page nine if you're looking at the balance of where the funding is going between the different systems.
    • 01:18:35
      I'm not saying this corrects the situation, but I think this would demonstrate that from the, Mr. King, you will see that we would be taking care of some of those roadsides.
    • 01:18:49
      and in fact in the secondary system on the roadside would be more than that would be in the interstate and primary.
    • 01:18:57
      I'm not saying that's the right balance but it kind of gives you a better picture of the balance of the distribution of funds.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:19:03
      Mr. Sorrell, I'm sorry.
    • 01:19:06
      This slide.
    • 01:19:08
      When it says 2011 budget, does this include the ARRA projects?
    • Constance S. SorrellChief of System Operations
    • 01:19:14
      No, it doesn't.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:19:18
      That's the first thing.
    • 01:19:19
      So this is misleading, how much we actually are putting out there.
    • 01:19:23
      The second thing, this slide doesn't mean it, doesn't reflect the fact that, I mean, we have right now money that was budgeted in 2010 that we're only pushing out the door today to do these various projects.
    • 01:19:40
      Is that correct?
    • Constance S. SorrellChief of System Operations
    • 01:19:41
      That is correct.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:19:42
      So when this slide, to be
    • 01:19:46
      So you're telling me that I'm looking at these numbers, just as an example,
    • 01:20:14
      That right now for fiscal year in the budget fiscal year 2011 budget 345 million dollars we have increased over the last two years by a hundred and close to sixty, seventy million dollars money going interstate maintenance yet we're only using 92 million in the budget to pay?
    • Constance S. SorrellChief of System Operations
    • 01:20:40
      So where's that money going?
    • 01:20:42
      The interstate maintenance work, well, about $80 million of it is in the TAMS contracts.
    • 01:20:49
      There's also all the money on interstate maintenance that it goes to fund the rest areas.
    • 01:20:54
      So all the money that goes to- It increased the budget.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:20:59
      I mean, the board has increased the budget on interstate maintenance by $170 million over the last two years.
    • 01:21:06
      Yet, we're only using, according to this budget numbers, 92 million for payment.
    • Constance S. SorrellChief of System Operations
    • 01:21:13
      For this fiscal year, yes.
    • 01:21:15
      There are funds from other fiscal years that are...
    • 01:21:18
      I'm looking at primary maintenance.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:21:19
      Yes.
    • 01:21:20
      It has increased by 100, over 100 million dollars.
    • 01:21:25
      Yes.
    • 01:21:26
      Yeah.
    • 01:21:28
      And again, only 164 million is going to payment.
    • John W. LawsonChief Financial Officer
    • 01:21:32
      Correct.
    • SPEAKER_10
    • 01:21:33
      Well, why?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:21:34
      So where is the other money?
    • 01:21:36
      I mean, these are some fairly large increases in the budget going to these maintenance programs.
    • Constance S. SorrellChief of System Operations
    • 01:21:41
      They are, a large part of them have to do with emergency management.
    • 01:21:47
      Another part of them have to do with just all the...
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:21:51
      These are budget numbers.
    • Constance S. SorrellChief of System Operations
    • 01:21:52
      We have increased the budget for snow operations by over $20 million this fiscal year.
    • 01:22:06
      The operations
    • 01:22:12
      Not all the emergency funding is not all in there.
    • 01:22:16
      The snow removal is divided up among these various functions.
    • 01:22:22
      When it's broken down this way between interstate, primary, and secondary, it includes everything, not only the asset, the paving work, but it includes bridges, the bridge work.
    • 01:22:35
      All of our personnel costs, all of our contract costs, so yes, I can give you a further breakdown of these numbers in terms of the categories.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:22:48
      I'm looking at number seven, and this is a bullshit slide.
    • 01:22:52
      This is misleading, and it completely is inaccurate as to how much we're actually spending.
    • 01:22:57
      I mean, it's just this.
    • SPEAKER_10
    • 01:23:00
      Mr. Chairman, can I clarify, is number seven what you reported to the General Assembly about your pavement conditions?
    • 01:23:09
      So this is just a subsection of your total budget.
    • Constance S. SorrellChief of System Operations
    • 01:23:13
      Yes, this is only a small, you know, the entire budget that is passed by the General Assembly includes the money that goes into the construction six-year plan each year as well as the administrative overhead budgets and all the other budgets of the department that make up the total revenues and, you know, that are budgeted to the various programs.
    • 01:23:34
      And so, you know, what this is is just, you know, this was just a snapshot in time for what this current fiscal year's
    • 01:23:42
      budget is.
    • 01:23:43
      So it doesn't include all the funds and other programs.
    • 01:23:48
      Yes, that's true.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 01:23:50
      I was going to wait until we got to slide A, but it's up there.
    • 01:23:53
      Can you just tell me why there's 300, we broke the million three down differently on slide A.
    • 01:23:59
      We've got $345 million going to interstate maintenance, yet our budget only shows 92.6.
    • 01:24:05
      Now I understand that's got operations, but where is the difference going?
    • Constance S. SorrellChief of System Operations
    • 01:24:11
      On page seven, it's only pavement, interstate pavement.
    • 01:24:17
      So what this has done, slide seven is broken down by program areas.
    • 01:24:22
      First the investment area and then second what we call the services area.
    • 01:24:27
      And so if you take all those various program areas and you slice the whole budget just on the basis of the five budget programs that you would see in the budget bill, the Appropriations Act, these are the numbers that you would see.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 01:24:43
      I got it, but it goes back to the Secretary's question.
    • 01:24:45
      We've gone up almost $100 million in that program, and yet it doesn't show that we're spending it in the actual interstate.
    • 01:24:52
      So is it going to things we shouldn't be spending it on?
    • 01:24:54
      We are spending it.
    • 01:24:55
      We should not spend it on paper.
    • 01:24:56
      It's just not on paper.
    • 01:24:57
      So maybe, where are we spending it on?
    • Constance S. SorrellChief of System Operations
    • 01:24:59
      Well, we're spending it on emergency management, incident response, snow removal, drainage.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 01:25:08
      But it's a budget.
    • 01:25:09
      I mean, I guess I'm saying the same thing over again.
    • 01:25:13
      It seems to me that our priorities are not right.
    • 01:25:17
      In other words, why wouldn't we be putting on the hard pavement instead of the soft program, is my point.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:25:21
      Well, the numbers, well, one of the problems is just as I'm coming to talk to this, Mr. Sterling, I mean, my problem with Seth, Connie, is just basically this.
    • 01:25:34
      You lay this out, here's our needs, and you compare it to the budget.
    • 01:25:39
      And that looks all nice and it raises all these flags and we all, you know, get concerned but then the budget number is not really expenditures because we are spending money on these needs that are not reflected.
    • 01:25:55
      There's more money, a lot more money that's going to address the needs that were not included in the budget because we came from other sources.
    • Constance S. SorrellChief of System Operations
    • 01:26:04
      That's correct.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:26:05
      That's my problem with this line.
    • Constance S. SorrellChief of System Operations
    • 01:26:07
      And there are also needs that aren't reflected in this because we don't identify bridge replacement needs because bridge replacement isn't considered maintenance.
    • 01:26:18
      So you're correct.
    • 01:26:20
      It only tells a partial story.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:26:23
      I want to follow on the point you're making regarding the needs and the budget.
    • 01:26:27
      If you go back into the American Recovery and Reinvestment, that portion of our six-year plan that's got all the previous allocations
    • 01:26:37
      Much if not most of those are resurfacing, reconstruction, quite a bit of things.
    • 01:26:43
      The needs that we're looking at FY11, that's all funding sources.
    • 01:26:48
      This is what we need to put into the on-pavement for these categories, whether interstate, primary, secondary.
    • 01:26:54
      That needs to be reflective of the repaving efforts.
    • 01:26:58
      So we call them inclusive of the budget.
    • 01:27:00
      is not all-inclusive but the HR?
    • 01:27:03
      Is it possible then to get this chart updated and sent to us if the needs column is right, if you were to go in, it's all previous allocations, it's all FY11, I'm assuming money in here for all these resurfacing projects, can you update the budget with all these figures to incorporate these numbers that are in the other categories?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:27:27
      And more importantly, it's not the budget.
    • 01:27:29
      needs and expenditures.
    • 01:27:32
      This is how we got into trouble to begin with on our whole maintenance program where this money all got caught up.
    • 01:27:40
      We kept on passing a budget and we were looking at budget numbers and we weren't looking at expenditure numbers.
    • Constance S. SorrellChief of System Operations
    • 01:27:46
      Yes, well we do have some of those and Mr. Lawson has been also reporting some of those in his financial reports about where we stand with getting the carry forward expended.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:27:59
      Yeah, I think this is a good request.
    • 01:28:04
      I mean we need to get the real numbers before and let's get the people with the green eye shades out there.
    • 01:28:11
      We really need to know the bottom line is are the needs being met.
    • SPEAKER_10
    • 01:28:16
      But if the other sources are these one-time influxes of money like this stimulus thing that's not going to happen again, I mean that doesn't solve the problem either.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:28:31
      We really need to know because I think the law requires us to take care of maintenance first.
    • 01:28:37
      So we really need some solid numbers.
    • 01:28:39
      I'm not an accountant.
    • 01:28:41
      I'm hearing all this stuff back and forth.
    • 01:28:42
      All I want to know is
    • 01:28:44
      Are we meeting the needs for Makers?
    • 01:28:47
      And so we've really got to get a handle on it.
    • 01:28:51
      I'm being asked, when I go out into my district, I'm being asked about that.
    • 01:28:55
      Some of the people don't think we are, and I don't really have any numbers to really answer it, other than I see the roads are fouled up.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:29:03
      Mr. Chairman, what I would suggest is somewhat to what we did before and working with Mr. Layne and looking at the financial statements, maybe what we can do is just meet with Mr. Sterling or Mr. Rich or someone else and just look at what would be a better way to present the data.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:29:28
      I'm fine with what the Secretary expressed.
    • 01:29:31
      It's just so that we see here's what the needs are and here's what we're spending.
    • 01:29:34
      I use budget because to me that would incorporate all sources of funding that's going into it, whether it's the regular budget, stimulus money, or otherwise.
    • 01:29:44
      Just somehow that we've got, okay, here's what's required and here's what we're spending to meet that requirement.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:29:50
      Yeah, the one time influx.
    • 01:29:52
      And also we ought not to forget about these bridges.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:29:55
      It isn't per se, it's the impact of the one-time influx.
    • 01:30:08
      The commissioner and I have had some animated conversations about this regarding the overall needs of the Commonwealth because what we seem to do is we do this accumulative numbers.
    • 01:30:19
      and that we say, oh, if we didn't do X work in year one, then we then therefore add to it in year two and add to it in year three and the number keeps on getting bigger.
    • 01:30:33
      When in reality, when we spend some money on the stimulus, it ends up lowering the overall need because it puts off the maintenance by a certain number of years.
    • 01:30:44
      So if you're smart with how you spend even these chunks of change, you then lower the overall need because you essentially have averted some of these costs.
    • 01:30:57
      The thing is is that, I mean, when we approve the budget, it's a snapshot.
    • 01:31:05
      But the thing is that money we're essentially going to approve starting this six-year plan, starting July 1st, is really, at least for paving,
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 01:31:16
      Most of it's for next year.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:31:18
      So there is also this problem where, again, budget is meaningless to us, per se.
    • 01:31:26
      In this context, though, we need to see the actual expenditures.
    • 01:31:30
      This is what got us in the trouble before.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:31:32
      Mike Walker.
    • 01:31:32
      Mr. Chairman, what we'll do is try to take this slide and try to look at the expenditures across programs as to how it would be addressing the needs, and maybe we can present it again next month.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:31:46
      And it's overall expenditures, not just the money we specifically budgeted for in this year.
    • 01:31:51
      If you're telling us that these are the needs for the Commonwealth in 2011, then we need to understand how much are we actually spending to meet those needs, not just simply what we budgeted.
    • 01:32:05
      I'm sorry, Dr. Davis, I'll come back to you.
    • James A. DavisMember, Commonwealth Transportation Board
    • 01:32:07
      In all fairness to Connie, as I see the slide number eight, I see a much different picture and I want to make sure that I've lit that because
    • 01:32:16
      I understand now that was just pavement, and when you add in bridge construction, repairs and whatever, and other expenses in the secondary maintenance, that gives up $345 million in 2011.
    • 01:32:28
      So there is a different picture there, and I see it.
    • 01:32:31
      I was just concerned when I saw the other one for the reasons you raised, but I think in
    • 01:32:38
      There is a better picture when you show what was actually expended totally.
    • 01:32:41
      Okay, Connie, why don't we just rip out slide seven.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:32:45
      Yes, sir.
    • 01:32:46
      Mr. Chairman, let me go from there.
    • 01:32:48
      Originally, I thought that, but the 1345.3 that you're looking at total on slide eight is reflective of your total between investment and services, so I'm not sure you're necessarily representing additive amounts.
    • 01:33:03
      That's true.
    • 01:33:05
      Thank you sir.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 01:33:10
      The presentation obviously of the information is difficult to understand and I think Mr. Whirley's suggestion that we sort of define how we want this data presented to us so we can understand it before he goes through cranking a lot of numbers and giving us and you know going through an iteration
    • 01:33:30
      Perhaps there's others here that might, I'd be happy to give you my input offline and how I'd like to see it, but I'm used to, in my businesses, having sort of a dashboard snapshot of key information that we would follow, that we'd have goals and objectives, and we'd follow that monthly or quarterly or annual basis just to understand how we're proceeding.
    • 01:33:53
      And I look at needs, I don't know what the policies behind the needs are, for example,
    • 01:34:00
      Is this need reflective of 70% saving or some condition of roads or whatever it is?
    • 01:34:08
      I think we start with that and here are the policies, here are the goals, whatever you want to call them.
    • 01:34:14
      That generates a certain amount of need.
    • 01:34:18
      We spend a certain amount of money and we budget a certain amount of money.
    • 01:34:21
      For me, both numbers are useful.
    • 01:34:23
      One without the other I think leaves something to be desired.
    • 01:34:27
      because even if I budgeted money, just like you said, you alluded to before, if I budgeted money but I haven't spent it, I'm not meeting my needs but at least I have it to do it and that's a different problem than if I never budgeted the money and I didn't spend it.
    • 01:34:45
      So all three numbers are important to me when I look at something.
    • 01:34:49
      And I'd like to see us over time have sort of a dashboard that would be important things that this board would like to see happen, and then we could keep up with them.
    • 01:34:57
      Because it's just too difficult, and we're obviously spending a lot of time talking about it here today, but it's too difficult to wade through this information.
    • 01:35:05
      There's so much to get down to those key things that we want to see happen.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 01:35:10
      I just want to get back to the point and follow up Mr. Miller's comment here.
    • 01:35:15
      If you go back and look at our budget, we've put in a couple hundred million dollars in the last couple of years, yet our road pavement conditions continue to decline.
    • 01:35:24
      My point is is that I think we also need to look at where we're spending the money.
    • 01:35:28
      Our services are going up, and yet it looks to me the hard costs on pavement.
    • 01:35:33
      I think we've got to get the numbers.
    • 01:35:34
      So that's my only point is is that you are right.
    • 01:35:37
      We've spent a couple hundred million, and our roads continue to decline.
    • 01:35:41
      So it's not only the amount of money but the efficiency that I'm also questioning is how are we arresting this problem because that's what really is the answer.
    • 01:35:51
      Are our roads getting better or are they getting worse?
    • 01:35:54
      And despite our efforts, they continue to decline, it appears.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:35:58
      I'm sorry, I think Mr. Rich, then Mr. McCarthy.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:36:00
      Chairman, I think some good suggestions have come up from Mr. Lane, Mr. Miller, and others.
    • 01:36:06
      I don't think we, I'm not trying to blame the Secretary, Commissioner, or Connie, because I think the problem lies in the General Assembly, frankly, to be quite honest.
    • 01:36:16
      You're looking at me?
    • 01:36:17
      You're looking at me?
    • 01:36:21
      But I think we really need to know.
    • 01:36:24
      I would like to know how we certify now that we're in compliance with the law.
    • 01:36:28
      I'm not asking for answers now.
    • 01:36:29
      The law says we must take care of maintenance.
    • 01:36:32
      I'd like to know how we know that we've done that and whether we're in violation of that.
    • 01:36:37
      I think the General Assembly needs to know this information.
    • 01:36:41
      And so if we can come up with that.
    • 01:36:44
      If we're sued, I mean,
    • 01:36:46
      What will we show in court of how we've complied?
    • James A. DavisMember, Commonwealth Transportation Board
    • 01:36:50
      Mr. Rich, I'm very comfortable with that myself.
    • 01:36:53
      I make my own judgment based on the information that's provided.
    • 01:36:56
      And if you need more information, we can ask for it.
    • 01:36:58
      But our job is overall policy and guidance.
    • 01:37:01
      It's not to get down into the minute details.
    • 01:37:04
      And we let our staff do that for us.
    • 01:37:06
      And we share back whether we think we're in the right direction.
    • 01:37:10
      The reason I raised the question in the very beginning was because it appeared to be a trend
    • 01:37:15
      that I didn't think was healthy, but when you see additional information, you see the trend line goes a different way.
    • 01:37:21
      So I'd love for us to stay up on the upper end of this rather than try to get down into the details and try to understand every decision that's made about the allocation of dollars.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 01:37:35
      Mr. McCarthy?
    • 01:37:48
      All three, seven, eight, and nine, come down to the same bottom line of $1.345 billion budget.
    • 01:37:55
      It's not spent.
    • 01:37:58
      I like the idea that Mr. Layne brought up about how do we know we're actually affecting results that the budget seems to suggest we're getting.
    • 01:38:07
      I think you need to have a
    • 01:38:12
      A breakdown of slides that perhaps starts with this one that says here's how we plan on spending money across the different interstate, primary, secondary, and so forth.
    • 01:38:24
      If the first number you saw on secondary was 345,
    • 01:38:28
      Instead of a smaller number that we saw back on number seven, maybe this conversation would have taken a little different direction.
    • 01:38:35
      I don't know.
    • 01:38:36
      But the fact is, it would be nice to know these top line numbers and then break them down and then say, and here's what we're actually spending.
    • 01:38:45
      You know, you can amortize that over the course of
    • 01:38:50
      And then there is, with due respect to Dr. Davis, the fact is we are a fix-it-first state by law.
    • 01:39:05
      We do, by hook or by crook, make decisions about how much money we put into the construction budget and how much we put into the maintenance budget.
    • 01:39:16
      I know there are complaints on both sides of that decision.
    • 01:39:20
      People who want construction dollars feel we steal too much from that for maintenance, but we are a fix-it-first state and we have to have a fix-it-first program.
    • 01:39:33
      That big picture is also helpful to know.
    • 01:39:36
      This is our budget for maintenance.
    • 01:39:39
      This is how we break it down and this is how we spend it.
    • Constance S. SorrellChief of System Operations
    • 01:39:46
      That's what would be helpful.
    • 01:39:52
      Let me just say that I don't want to belabor this point.
    • 01:40:00
      I just want to make it.
    • 01:40:02
      So just on the bottom of page eight are some different numbers, and that is the percentage of lane mileage we have in each of the systems, and you'll see that only about 22 percent of the lane miles are on the interstate and primary.
    • 01:40:15
      This is not center line miles, this is lane miles.
    • 01:40:18
      We have 126,000 lane miles in the Commonwealth, and as you can see, the vast majority of them are in the secondary.
    • 01:40:24
      But if you look at traffic, only 23% of the traffic of the entire Commonwealth is on the secondary system, and if we moved a few secondaries that maybe ought to be in the primary, they would be even smaller.
    • 01:40:38
      So you're talking about, you've got 26,000
    • 01:40:41
      2% of the system that carries 77% of the traffic and so our focus has been on trying to make those pavements particularly in the primary and interstate which is where all of our freight traffic is and the vast majority of vehicles safer.
    • 01:40:59
      And we will be getting in the next couple of months, we've gotten in the raw data, we're doing the quality assurance on it now, the 2011 numbers.
    • 01:41:08
      and I am going to be happy to report that there are improvements in both the interstate and private pavements and you are going to be able to start seeing good progress back toward meeting the 82% target.
    • 01:41:21
      So, you know, unfortunately, you know, the numbers weren't available today but by June I would hope to have the numbers for the interstate and the primary and of course
    • 01:41:35
      So what we had stated last year in the budget presentations that based on the funding that we have plus other funding like the ARRA project that we have put into our models that we expected to get back to 82% by 2012 by the payment report at 2012 and on the primary by 2013.
    • 01:41:57
      So we are making significant progress in getting those payments back.
    • SPEAKER_10
    • 01:42:05
      No, can I just go to the slide you had?
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:42:09
      I think that's the more important chart than any.
    • 01:42:12
      We're looking at inputs, and inputs are relatively relevant.
    • 01:42:15
      This is the output.
    • 01:42:16
      It does show a declining trend.
    • 01:42:18
      What you're saying is that the budget that we have before us, if I understand it, coupled with the previous 2011 total expenditures,
    • 01:42:27
      Yes.
    • 01:42:27
      That trend is going to reverse and go up to the 82% by your estimation.
    • 01:42:31
      I mean, this is the actual...
    • Constance S. SorrellChief of System Operations
    • 01:42:33
      Absolutely.
    • 01:42:34
      Absolutely.
    • 01:42:34
      ... on the ground test.
    • 01:42:35
      Absolutely.
    • 01:42:36
      You know, I was told by my staff not to say what they think that the number is for 2011 for interstate, but I would tell you that it's going to be estimates at least 80%.
    • 01:42:48
      So, you know, we are definitely reversing the trend and...
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:42:53
      It's our 789.
    • 01:42:54
      Yeah.
    • 01:42:54
      It all gets all the way to stick with 10.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:42:56
      Now we'll get to another thing that I get a little pissy about is how we do these assessments, right?
    • 01:43:09
      You know what I'm going to raise is the fact that these assessments that we do or you're doing right now, we won't get to under our current system for another year, year and a half.
    • 01:43:21
      Is that correct?
    • Constance S. SorrellChief of System Operations
    • 01:43:22
      Well, we are moving up the assessments so that they're done earlier.
    • 01:43:26
      But yes, the assessments that were done on the paving that ended in November and December doesn't come in until June or July, you know, really in June.
    • 01:43:37
      So there is about a six-month lag and the volume of information that we get is just...
    • 01:43:45
      But we're always behind a year.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:43:48
      I mean, how do we, and make it, here's the issue.
    • 01:43:52
      We can project it.
    • 01:43:53
      Well, I mean, it's about doing a quantum call where they can do a volume contract and then go tell them where to pay in that specific season.
    • 01:44:04
      I mean, here's the issue.
    • 01:44:06
      They go out, you drive every interstate, every primary, every primary, and then 20 to 25% of secondaries every spring.
    • Constance S. SorrellChief of System Operations
    • 01:44:17
      Every winter, actually.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:44:18
      Every winter, then you provide the information, but by then, the information doesn't come in until the budget has already been, and the money has already been allocated to paving for that paving season.
    • 01:44:34
      So we don't really get to, you may, let's just say 2010, November, you've determined that this is a bad pavement.
    • 01:44:44
      We will not likely, under our current system, not get to paving it.
    • 01:44:50
      The earliest potentially is spring of 2012.
    • Constance S. SorrellChief of System Operations
    • 01:44:57
      The other point to consider is that these ratings don't change dramatically from one year to the other and so while one of the things that really contributes to the field knowing which payments to program
    • 01:45:15
      Basically, there are two things.
    • 01:45:17
      One is the trend around a pavement and its condition, as well as its most recent condition.
    • 01:45:24
      One of the things that we're doing in the model is we're trying to say, based on the needs, what are the most cost-effective, least cost, most effective things that you can do.
    • 01:45:36
      It's not just about fixing the worst pavement, but also doing preventative
    • 01:45:41
      Pavement treatments at a particular life cycle in a pavement that's the most cost-effective thing you can do to extend the life of that pavement.
    • 01:45:50
      So it's not just worst first.
    • 01:45:53
      It's trying to balance, making sure you're making good expenditures.
    • 01:45:57
      Don't get me going down this road.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:45:59
      Because I'm going to tell you, as you know, then we turn around and give it to the districts and they determine which ones go.
    • 01:46:07
      Not worst first or preventive.
    • 01:46:10
      We turn it around and send the money to the districts and the districts that make those determinations, is that correct?
    • Constance S. SorrellChief of System Operations
    • 01:46:16
      Yes, based on the data that we give them and the recommendation for each of the sections that we give them.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:46:21
      But they still can make it, this is why everywhere we go around the state, we will have people scream at us that, you know, they'll go into, as an example, Culpepper, and payments are good in another place due to the size and the types of conditions or whatever.
    • 01:46:39
      roads may be in a different district, let's say Richmond, being worse.
    • 01:46:42
      I mean, it creates these perception issues for us because we don't go worse first, and we don't, but that's just me.
    • 01:46:48
      I'm sorry, I'm on a roll.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:46:50
      So, Mr. Chairman, I do think that there can be some timing differences in terms of when we rate the roads and when we actually get the work done, but as Connie indicated,
    • 01:47:02
      There's probably not going to be a lot of change from year to year if we are implementing our program in a timely way.
    • 01:47:10
      Now, we also have some expenditures or budgets, budget numbers that we did not spend quickly in year past, either 2010 or 2009.
    • 01:47:24
      That has an impact on the rating of our roads, because if we hadn't done more, then our ratings won't be as good.
    • 01:47:33
      And I think if you go to page 11, slide 11, you'll notice that, particularly in the secondary system, if you look at the miles paved, lane miles paved compared to 2010,
    • 01:47:48
      You would see that we are getting more of that work done.
    • 01:47:53
      Actually, you can look at all the systems between interstate, primary, and secondary.
    • 01:48:01
      Actually getting that work done, you can see, as Connie indicated, you will start to see an improvement in those ratings.
    • 01:48:08
      Now, I would respond to the question about how do we know that we've satisfied our responsibility as a board member
    • 01:48:17
      Well, we set those targets.
    • 01:48:19
      And when we're not meeting those targets, then there will have to be some actions to make that so that we can meet them.
    • 01:48:27
      And I believe that we are now on a path to start meeting those targets.
    • 01:48:31
      As Connie indicated, we think in the 12, you will see those numbers come up secondary.
    • 01:48:39
      We'll actually be there in interstate and primary.
    • 01:48:42
      secondary, we never set a hard target.
    • Constance S. SorrellChief of System Operations
    • 01:48:48
      Connie, the number was simply no worse than... Well, for the secondary system, it was to maintain the current condition.
    • 01:48:56
      And that was at about what, 34%?
    • 01:49:00
      Well, it was about 65% good condition, very good.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:49:04
      So, and I think that if you look at this, we are making progress, and I think if you look at the number of contracts that we've put out lately, that kind of goes to the next slide, which is slide 12.
    • 01:49:19
      We think that, I'll kind of let you take this over, but I think that based on the spending that we are doing now in FY11, we've put out a lot more contracts, paving contracts,
    • 01:49:33
      I think you can see substantial improvement in our numbers.
    • Constance S. SorrellChief of System Operations
    • 01:49:41
      Yes, so just to close on the maintenance spending, as you may recall, the audit indicated that there was a large cash balance, and just to point out that more than $318 million of that was actually work that had been contracted.
    • 01:49:56
      The rest of it were contracts that were still sort of in the process of getting out the door, but the good news is that we have
    • 01:50:04
      We've got all that backlog of contracting out and that most of that work is going to be done during this coming summer and fall, so the expenditures aren't going to come down quite as quickly as we would like, but we shouldn't have a carryover in excess of 400 million this year.
    • 01:50:21
      It should be somewhere at that level or lower, hopefully, just at this point where
    • 01:50:27
      at the mercy of the contracting companies and the weatherman that it doesn't rain too much and that this pavement can get down.
    • 01:50:35
      And so all of our indications with our spend plans and budgets, the projections are that back in FY12 will be down below $100 million, which is around 8% of the budget.
    • 01:50:50
      And that's really where we think is a reasonable place to be.
    • 01:50:54
      That would be $100 million of work that would be under contract.
    • F. Gary GarczynskiMember, Commonwealth Transportation Board
    • 01:50:57
      but just $100 million of cash not having gone out the door yet.
    • 01:51:10
      You mentioned secondary roads, primary roads, and I have heard from people in the Northern Virginia area, and I'm sure my brethren have heard, that there are a number of secondary roads that should be really primary.
    • 01:51:26
      When do we address that?
    • 01:51:28
      Because it does have a bearing on where the allocations are going and what our targets are and where the money's being spent.
    • 01:51:38
      Is there a time and place, Mr. Commissioner, where that is addressed?
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:51:43
      That is something we will look at.
    • 01:51:46
      I don't have the time schedule to give you at this point.
    • 01:51:50
      We did a lot of work on that in, I guess it was October, November of last year, looking at some of those roads when we looked at our formula.
    • 01:52:03
      and I think we will pick that up again probably late this summer and look at some of those roads.
    • F. Gary GarczynskiMember, Commonwealth Transportation Board
    • 01:52:11
      Will there be a point in time where either your staff will make a determination or it will come to the CTB to be deliberated on that in every one of the different jurisdictions there's X number of roads that should be labeled primary
    • 01:52:33
      That we endorse as primary.
    • 01:52:35
      I mean, are we going to get to that point of action?
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:52:38
      We could.
    • 01:52:39
      That's a pleasure to board.
    • 01:52:42
      We could make that recommendation.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:52:45
      Mr. Chairman?
    • SPEAKER_10
    • 01:52:45
      Yes, sir.
    • James E. RichMember, Commonwealth Transportation Board
    • 01:52:46
      I guess the bottom line is we're always going to kind of be behind the eight ball on secondary roads because we just don't look at them very often.
    • 01:52:54
      We're kind of eyeballing.
    • 01:52:55
      It's only, what, 25 percent?
    • 01:52:58
      each time, and I think we may need to look at these more often.
    • 01:53:01
      I understand what you're saying about throughput, about, you know, we're taking care of where most of the people are, but if you're talking to a mother with two kids in the car and everybody gets killed because of a maintenance problem on a rural road in Rappahannock County, I don't think that argument goes too far.
    • 01:53:17
      So maybe we need to step up our review when we look at secondary rates.
    • SPEAKER_10
    • 01:53:25
      Mr. Chairman.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 01:53:25
      It might be the policy of looking at only 25% a year.
    • 01:53:31
      I'd hazard to guess that the residency, the district administrators, 95% of the calls they get
    • 01:53:38
      All of our superintendents are required to be looking at all of their roads and making assessments, so even though we don't have-
    • Constance S. SorrellChief of System Operations
    • 01:53:56
      But they should be driving all of their roads in their areas and the residency staff as well.
    • 01:54:01
      They have, I think, a very good day-to-day handle on what the situation is in their roadways.
    • James L. KeenMember, Commonwealth Transportation Board
    • 01:54:09
      Mr. Chairman, just a quick question, just for information points from my perspective, being a new member.
    • 01:54:16
      Is an upgrade from a secondary to a primary mainly driven by traffic count?
    • 01:54:24
      I mean, is that determined anyway there?
    • SPEAKER_10
    • 01:54:27
      And corollary with that is that if you have a primary road and because of another road going in and it takes traffic off of that or lessens the importance of that, does it then get downgraded to a secondary road?
    • Constance S. SorrellChief of System Operations
    • 01:54:42
      There is a state policy, there is a board policy actually on taking roads into the primary system and it does have to do with volumes and particularly volumes of truck traffic as well as total traffic.
    • 01:54:58
      There are a number of criteria and I'll be happy to make sure the board gets a copy of that.
    • 01:55:04
      I think it's a part of the transportation planning division's functions to evaluate
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 01:55:11
      Well, I mean, then this actually raises one of the things.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:55:27
      I realize we had to get through the six-year plan process, but
    • 01:55:31
      I wanted to bring to the board, I mean, we have the power to administratively designate primary and secondary.
    • Constance S. SorrellChief of System Operations
    • 01:55:37
      Yes, you do.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:55:38
      And this has been a big bugaboo to many parts of, well, particularly Northern Virginia.
    • 01:55:44
      I mean, I think still the Fairfax County Parkway is the secondary.
    • Constance S. SorrellChief of System Operations
    • 01:55:49
      That's correct.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:55:50
      So Fairfax County Parkway, Prince William Parkway.
    • Constance S. SorrellChief of System Operations
    • 01:55:53
      Prince William County Parkway.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:55:54
      Are all secondary roads.
    • 01:55:56
      That's correct.
    • 01:55:56
      And that's just crazy.
    • 01:55:58
      And we, I thought this year we actually were preparing legislation to allow us to do it and then we realized that we actually do have the authority to do that.
    • 01:56:09
      And we were going to recommend that we come back and do a whole effort to look at those criteria, look at the vehicle miles, everything and say,
    • 01:56:21
      Fairfax County Parkway, which carries a couple hundred thousand cars a day, should not be a secondary road, and make this much more honest.
    • 01:56:33
      I mean, one of the problems I think we do have is the constant issue of people just don't necessarily trust some of the things we say, because how do you sit there and say, retreat Fairfax County Parkway to secondary roads when it isn't?
    • 01:56:48
      I mean, it just isn't, and we have other roads that
    • James E. RichMember, Commonwealth Transportation Board
    • 01:56:51
      So we have to reclassify these roads and we have to undertake a real effort to do it, both going up and going down.
    • Constance S. SorrellChief of System Operations
    • 01:57:16
      Well, I appreciate that and I think that one of the important keys, as the Secretary mentioned, is that you really do have to look at the program holistically because obviously the construction program does add value and help to sustain our assets and we're working hard to try and figure out how to quantify those to put those together, so thank you.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 01:57:39
      Thank you.
    • 01:57:42
      Thanks, Connie.
    • 01:57:43
      All right, revenue sharing.
    • 01:57:45
      Mr. Estes.
    • 01:57:48
      Yes, sir, Mr. Chairman.
    • 01:57:49
      Members of the board.
    • 01:57:50
      Now that we're riled up, Mr. Estes.
    • Michael A. EstesLocal Assistance Division Administrator
    • 01:57:51
      Yeah, so glad to be up here today.
    • 01:57:55
      I'll be brief, Mr. Chairman.
    • 01:57:57
      We've been talking about the revenue sharing program a great deal in front of this board, so the first couple of slides that are in the PowerPoint, we've already seen, we've already discussed, but I think it's important to kind of keep that dialogue going.
    • 01:58:08
      The real critical issue that I want to talk to the Board today about is on the policy side, the guidelines associated with the revenue sharing program.
    • 01:58:18
      As a reminder, Mr. Walton talked about the General Assembly updates to the program.
    • 01:58:24
      The law does require that the Board adopt the policy now, the guidelines formally.
    • 01:58:29
      Prior to this year,
    • 01:58:31
      We've had, like other special funded programs, a very high level CTB policy and then staff would take care of the detailed guidance document on how the day-to-day interaction of the program is.
    • 01:58:41
      We've now brought the formal guideline document to the board for approval.
    • 01:58:46
      I sent out, or Carol might have sent it out to all of you on April 1st, which is what I committed to at the last board meeting, the draft guidelines.
    • 01:58:56
      I just want to talk to you a little bit about the changes
    • 01:58:59
      For those who might have looked at the version that went out April 1st versus the one that's in front of you today, really if you look at the law change, the focus of the revenue sharing, kind of the direction from the code on how funds are allocated deal with two things.
    • 01:59:15
      It's really about accelerating projects is how the priority is supposed to be given to financing projects and either accelerating projects in the current VDOT Six-Year Improvement Program or a Locals Capital Program.
    • 01:59:28
      So what our focus has been on some debate, clarification, discussion on interpretation of the law to make sure we're clear on the prioritization of the project so we're in accordance with the law.
    • 01:59:39
      So the tweaks really that have been addressed since you saw it on April 1st was really just to clarify what that means for the setting of the priorities.
    • 01:59:50
      And what I want to do real quickly is talk about this right here.
    • 01:59:57
      The meat of what we talked about last time, and again, we've taken the law, and we're still, again, adhering to the law and the prioritization, but as we discussed, our proposal and the guidelines is to first focus on all requests up to the million dollars, because again, the big change is now local governments can request up to 10 million.
    • 02:00:20
      So to look at geographical distribution to make sure that small local governments, large local governments all have a good crack at the
    • 02:00:27
      First bite, as long as those projects are accelerating projects in a program, either a six-year plan or a capital local plan, those would be looked at first under the million.
    • 02:00:37
      Then we look at projects and localities requesting over the million, again, looking at projects that would be accelerated.
    • 02:00:44
      So that really is the meat of what the guidelines are.
    • 02:00:48
      I would say the biggest issue is from a policy perspective for the board is to, again, give us a nod
    • 02:00:55
      Hopefully later today at the action meeting that that's an appropriate policy and it's what's reflected in the guidelines you have.
    • 02:01:02
      A couple of other things that we gave you a track change document so you can kind of see the change from the existing guidelines that you see.
    • 02:01:08
      It wasn't a great deal of change except for that focus on the allocation.
    • 02:01:12
      We did take the opportunity to clean up some of the guidelines with this year's update.
    • 02:01:18
      We've changed some of the responsibilities through the blueprint.
    • 02:01:22
      Most of our previous guidelines had reference to resident engineer or residency administrator.
    • 02:01:26
      We've cleaned up some of that.
    • 02:01:28
      We've incorporated the first deallocation process that was enacted through the 2008 General Assembly.
    • 02:01:35
      That's now more formally shown in the guidelines and then just again taking the opportunity to clarify these processes in the guidelines.
    • 02:01:44
      So with that as a reminder is where we're going.
    • 02:01:48
      We'll be coming back to you this afternoon, asking you to adopt the guidelines, seeing what the dialogue is here this morning.
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:01:54
      Mr. Chairman, before you get into the program timeline and so forth, there's one thing that I might want to request a delay in adoption.
    • 02:02:05
      The simple reason, I think, is a section of the direct guidelines that we need to discuss and review that happens to be on page, I believe it's page five of the guidelines, or it's the
    • 02:02:16
      implementation section that has to do with the VDOT administrative work where we actually request 100% of the locality share up front.
    • 02:02:30
      And that could be an extended period of time before any actual work is done.
    • 02:02:35
      And that's tough on some of the counties out there in rural Virginia.
    • 02:02:40
      And it may be a disincentive to make an application for you and to participate in the program.
    • 02:02:45
      So I think we should look at that, and I believe we should amend that to be either 25% or 50% or something.
    • 02:02:54
      I know the need to be involved, you need to get some monies, but it doesn't, it's not realistic to say, send me 100%.
    • 02:03:01
      I think we need to look at that part of the draft and make some amendments there to help these counties.
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:03:18
      Mr. Chairman, Ms.
    • 02:03:19
      Keen, I think it's a great point and I appreciate you, I guess, to show my cards to the full board, you bringing that to my attention this morning and I did talk to staff about that and the one thing I do think there is
    • 02:03:30
      We believe enough flexibility to do some of what you're talking about in that current language where the estimated cost of work to be performed, we could work with that local government and define what that is.
    • 02:03:42
      The one cautionary note I would say, I think your point is extremely valid when we're getting into projects that are going to be over the million dollars, we get into larger projects, multi-year projects, we may not need that full dollar amount up front if we're administering the work.
    • 02:03:58
      We still have projects, though, for example, one we've already gotten in for this next round.
    • 02:04:03
      The local government's only asking for $167,000.
    • 02:04:05
      So I'd like to steer away from putting percentages in there where that may not work.
    • 02:04:11
      It may just be cleaner from an accounting and relationship with locals.
    • 02:04:14
      That $167,000, that would make sense for that all to come forward.
    • 02:04:17
      That's what the locals are used to.
    • 02:04:19
      But when we're getting to larger projects where we might want to do it by phase,
    • 02:04:23
      We think we have the flexibility and the guidance here that we could request just the money by the engineering phase, then the right-of-way phase, then the construction phase.
    • 02:04:32
      So I think we can accommodate your concern with the current guidelines, or we can strengthen it with another sentence before we come back this afternoon.
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:04:40
      Mr. Chairman, I can appreciate that, and that's your interpretation.
    • 02:04:46
      You know, three years from now, the interpretation is still going to be, if we write into the language, that you're going to send our share in.
    • 02:04:53
      You know, the low-couch is going to send its share of the estimated cost of the work to be performed.
    • 02:04:58
      And then the money collected prior to the beginning of the work is actually the language saying you're going to send me the money.
    • 02:05:05
      And while there might be some way to make some adjustments, I feel more comfortable if we would do something here while we're adopting this.
    • 02:05:14
      How about this, Mr. Chairman?
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:05:15
      Mr. King, it's okay.
    • 02:05:16
      I'll provide a draft of one sentence, and if it's appropriate, we can discuss it at the afternoon, or if we need to, we can
    • 02:05:23
      pushing back a month.
    • 02:05:24
      We are trying to be as aggressive as we can on the revenue sharing program to make sure we're in line with the fiscal year and getting this all approved before June.
    • 02:05:34
      But I think it's something we can accommodate.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:05:36
      Mr. Chairman?
    • 02:05:37
      I'm sorry, the, I'm going to come back.
    • 02:05:40
      I just want to, have we heard from anyone already?
    • 02:05:43
      I mean, we're only a couple weeks out.
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:05:44
      We're still a couple weeks out.
    • 02:05:46
      I'd say the interest is high.
    • 02:05:49
      I've heard
    • 02:05:50
      We've got quite a bit of interest.
    • 02:05:52
      We don't have the final full numbers in.
    • 02:05:54
      We won't know the final numbers until, I think the deadline is April 29th.
    • 02:05:58
      We plan to come to the board in May with the final numbers and requests for FY12.
    • 02:06:03
      Okay.
    • 02:06:03
      So, Mr. Charles?
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:06:04
      Sure.
    • 02:06:04
      It kind of goes to that point, but looking back last year, 15 was available.
    • 02:06:09
      We put out the full stations.
    • 02:06:12
      applicants came in, but because the requests were more than what was available, it got prorated to I think the maximum you'd end up with 460.
    • 02:06:22
      In these applications, the localities are sort of we put in a million, you put in a million.
    • 02:06:28
      In the end, it was we'll put in a million, we gave them 460,000.
    • 02:06:34
      How does that really, it's not really addressed in the policy, does that mean that hey, they still got to do the million plus the 540,
    • 02:06:41
      and the State's done the 460, does that mean that they can come back to, hey look, only 460 since that's what the State matched is what they put in and then now it's taken, applied for 540 and the State puts in 540.
    • 02:06:54
      How does that work?
    • 02:06:56
      I mean that's, I'm worried about that given that we have increased it.
    • 02:06:58
      If we over, if this gets oversubscribed in the future, which I will expect, it will see some pretty aggressive applications, what's gonna happen to the applicant?
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:07:09
      What is their commitment?
    • 02:07:11
      Mr. Chairman, I'll try to run through a quick scenario.
    • 02:07:13
      For example, we have 50 million budgeted currently for FY12.
    • 02:07:17
      And say we get $100 million worth of requests.
    • 02:07:22
      The way the process is set up in front of you is we're going to look at every request.
    • 02:07:25
      The new applications, we ask the locals to break out their request for everything up to a million and everything above a million up to 10 million.
    • 02:07:34
      So it gives us an opportunity to look at what can they do with that million dollars?
    • 02:07:37
      What can they produce with that million dollars?
    • 02:07:39
      So our focus will be on that first, and then we'll look at all the projects that have been applied for, and we'll look at, there's an opportunity for the local government to demonstrate that that revenue sharing money will accelerate a current project in a six-year plan or capital plan.
    • 02:07:52
      So those will rise to the top of the priority.
    • 02:07:55
      So in that scenario, only those projects that are up to a million that are accelerating existing projects will be considered, and then those would be prorated, like you said last year.
    • 02:08:06
      We're hopeful that it won't be the percentages we saw last year because we have at least 50 million budgeted.
    • 02:08:12
      But, for example, if a local government puts up a million, they may only get $800,000 in this scenario.
    • 02:08:18
      We do have the opportunity through the agreement process to re-scope the project.
    • 02:08:24
      For that scenario, $800,000, $800,000, so it would be the $1.6 million total project.
    • 02:08:28
      So we can reduce the scope.
    • 02:08:29
      We can have the opportunity for locals to agree to put in the additional money over and above what they may or are expecting to get from the state.
    • 02:08:38
      So there's some opportunity for some flexibility.
    • 02:08:40
      But without going through and ranking each project across the state,
    • 02:08:45
      We are looking to prorate evenly like we've always done.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:08:48
      And I understand that.
    • 02:08:49
      I guess I'm looking particularly if you go out and the policy as I understand it, the laws as I understand it, will go up to $10 million.
    • 02:08:57
      Let's say a Fairfax County says, hey, we're going to put in 10.
    • 02:09:00
      State, you put in 10.
    • 02:09:02
      It's so oversubscribed that year that the state can only put in one.
    • 02:09:05
      Now, it's Fairfax County then stuck in a position where they've got to put in 10 because they committed 10.
    • 02:09:10
      The state only gives one and they can't come back in future years and say, look, we put our 10 in.
    • 02:09:15
      You need, we want the other nine or, you know, we want the state to come forward with some more money.
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:09:20
      It's a good point, Mr. Allen.
    • 02:09:20
      We've tried to address our application to have a definitive line in the stand on that one million.
    • 02:09:26
      Put that this year.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:09:27
      The policy doesn't cover that.
    • 02:09:29
      management of it this year, I think it kind of goes to the point two years, three years from now, what is going to be the hard and fast practice, I won't say hard and fast, it changes, it can change, but I mean, what is the assumption?
    • 02:09:41
      This year, I understand because of the change, we're implementing new changes.
    • 02:09:45
      I would assume in two, three years, we won't have to do that one million, nine million, it'll be more of, here it is.
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:09:52
      Well, if we're fully funded, that issue goes away, like you said.
    • 02:09:55
      But we do plan, it is a policy request of the board that we're going to look at that million dollars every year.
    • 02:10:04
      Because we do think it's important that that example I gave, I've already got one in hand from the local government that's asking for $167,000.
    • 02:10:11
      We think it's important to try to give that local government a fair
    • 02:10:16
      shake at that same amount as someone asking for the 10 million.
    • 02:10:19
      So we're going to be looking at every local government every year for the up to a million dollars regardless of what the budget is to make sure those are covered first.
    • 02:10:26
      And that is what we're asking for from the policy.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:10:28
      Well, my scenario where Fairfax committed 10 and you gave them a million because it wasn't
    • 02:10:33
      Do they, the next year have to come up with the money?
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:10:35
      They're only on the hook for the, if they only get the million, they're only on the hook for the million.
    • 02:10:39
      Okay.
    • 02:10:39
      And again, the application is prescribed as such to where they can definitively break out.
    • 02:10:43
      Do they have a viable project if they only get a million dollars?
    • 02:10:46
      Because we've done a lot of communication with local governments, so they don't anticipate being on the hook for that whole nine million.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:10:54
      And they can come back in subsequent years, go nine and nine.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:10:56
      And they can come back in subsequent years.
    • 02:11:00
      Okay.
    • 02:11:00
      Mr. Chairman?
    • 02:11:00
      Yes.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:11:02
      Given that the max has changed from 1 to 10, and given whatever the subscription level has been historically, I don't have knowledge about, has it typically been fully subscribed over the last five years?
    • 02:11:18
      Is that the situation?
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:11:19
      Mr. Chairman, we've ranged in the $40 to $50 million dollar ranges and requests the last three years, and we're in that range.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:11:28
      And when we put out the letters, and our budget in those years was
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:11:32
      We've had 50 for a couple and then we went back to 15 last year, which is what?
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:11:37
      So functionally it's been close to fully subscribed historically with $1 million maximums.
    • 02:11:47
      That's correct.
    • 02:11:47
      So if we say we're going to first fund a million dollars or less.
    • 02:11:54
      And we have a $10 million maximum, and it's been fully subscribed historically, and this year it's 60, a little bit more than it was before.
    • 02:12:04
      Are we ever going to get to the point where we sort of get to the intent of legislation, which is to have projects that might be $10 million, or are we just sort of playing with that?
    • 02:12:16
      Well, Mr. Chairman, Mr. Miller, And I guess my suggestion is,
    • 02:12:21
      If we're not going to get there, and the intent of the legislation was for us to get there, then shouldn't we be looking at allocating a portion of our money to projects that are above a million dollars, some percentage of that, as opposed to fully funding only a million dollars or less?
    • 02:12:41
      Because if you follow that scenario, the ten million dollars is irrelevant, because we'll never get there.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:12:48
      Well, and Ms. Miller, you raise a great point.
    • 02:12:51
      I need to say this.
    • 02:12:52
      Part of me says that this is just a transition policy.
    • James L. KeenMember, Commonwealth Transportation Board
    • 02:12:56
      That's unlikely.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:12:57
      Okay, because this year we didn't budget into the six-year plan.
    • 02:13:03
      One of the reasons I'm pushing to ask them earlier, when did you originally ask them for levels of interest back in the fall?
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:13:10
      Back in the fall, yes, sir.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:13:12
      So the hope would be that for next year we'll go out and ask them in the fall
    • 02:13:18
      Then get what the range of projects are and then be able to put it into the next year's six-year plan process.
    • 02:13:28
      The problem is this year we only put in, because we had that legislation, $50 million.
    • 02:13:35
      So, I mean, maybe the issue really is to be kind of honest on this and that this kind of transition policy is really for this year.
    • 02:13:44
      I would recommend we come back next year, we go back out in
    • 02:13:48
      in the fall, get what the range is.
    • 02:13:52
      If we get $200 million worth of projects, that gets us $400 million worth of transportation improvements.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:13:59
      It's crazy that we should.
    • 02:14:00
      So you're suggesting maybe that we change in the outgoing, the out years, we would change the budget to match the request functions?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:14:10
      Yeah, in fact, that's why when we just started, well this year was first year, right, where we started asking way up front,
    • 02:14:17
      It's one of the reasons you went to 50 and then went back to 15 is that the one year you put 50 out and you only have 15 or so requests because of the downturn, right?
    • 02:14:28
      30, I think it was a little over 30.
    • 02:14:31
      But I mean we didn't know, because the way we did it previously, what the requests were going to be until we've already put together the six-year plan and the plan
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:14:42
      My follow-up question would be, do large municipalities or large counties typically have a number of projects that would meet the million dollars or less?
    • 02:15:09
      or do they typically have a lot more projects that are a lot more money so that if we focused our policy and said it's only a million dollars less, then what we're really doing is funneling this money disproportionately to smaller localities.
    • James A. DavisMember, Commonwealth Transportation Board
    • 02:15:29
      Is that the situation?
    • 02:15:32
      I don't know, I'm asking.
    • 02:15:36
      Mr. Chairman, it all started with the idea that, in my opinion, that this would be a large jurisdiction program to help them have more discretion to use some of their money to help move projects forward.
    • 02:15:51
      And as it all began to be talked about, it appeared that the smaller jurisdictions would have very little of any input because all the money would be given to the larger projects.
    • 02:16:00
      So we asked that we try to have a million dollars.
    • 02:16:04
      as a leveler to give everybody a chance to match it and move projects forward by getting those to match.
    • 02:16:10
      And I think it is a thing that's going to have to be monitored going forward to get the best benefit for the Commonwealth and yet channel this money to the localities and get the match because that's the benefit.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:16:22
      And what's interesting with what I've seen just in my short tenor here is it's actually the small localities who want to use it more for larger projects because
    • 02:16:33
      They got projects in their localities that will never, quite honestly, will most likely never fund because they don't meet when we look at congestion and costs and whatever.
    • 02:16:45
      So they're the ones who want
    • 02:16:47
      to be able to put in five or ten million dollars.
    • 02:16:50
      I think this is going to have to be, I mean the difficulty right now is this transition year for us and we'll have to figure this out but I would recommend that next year we revisit that we would go out not in the fall, ask for projects,
    • 02:17:10
      Then if they come back and say we have a universe of $180 or $150 million worth of requests, then we go back and try to get that into the Six-Year Plan because the whole reason for doing this is if we can get $2 worth of improvements for one state dollar, it's just for us not to do it.
    • 02:17:26
      Great.
    • 02:17:27
      Thank you.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 02:17:28
      So we want the maximum we can get, basically.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:17:30
      Yes.
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:17:31
      I do think, Mr. Chairman, to the final on that point, when
    • 02:17:34
      Rita has been talking about six-year planning numbers.
    • 02:17:36
      She has talked about that as being part of that, updated every year in the process, and we'll get back to, we actually, believe it or not, used to go out in the fall asking for these applications, and this has been a hot topic.
    • 02:17:47
      It's a session on a regular basis, so we haven't had a delay, and we're looking forward to getting back to getting out early with the local governments, and the large locals will adjust accordingly to whatever the rules are to make sure they maximize their participation.
    • 02:18:01
      So with that, Mr. Chairman, I think what I've got to do is to work on a little bit of an update to run by Mr.
    • 02:18:08
      Keen and hopefully the rest of the board this afternoon.
    • 02:18:10
      If not, we'll bring it back next month and take care of it.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:18:14
      Great.
    • 02:18:14
      Any other questions?
    • James E. RichMember, Commonwealth Transportation Board
    • 02:18:15
      One quick question.
    • 02:18:16
      Did we kind of run these proposals through the local governing bodies, which you have before us?
    • 02:18:23
      Did they have a chance to kind of look at these and give you some facts and input or whatever?
    • Michael A. EstesLocal Assistance Division Administrator
    • 02:18:29
      It's a great question, Mr. Ritz.
    • 02:18:31
      When we had this discussion during the session when this legislative changes were occurring, our intent of looking at the million dollars versus the 10 million was heavily discussed with local governments and other interested parties as to kind of the approach we would present to the board.
    • 02:18:47
      So that was more of the venue for the dialogue.
    • 02:18:50
      They haven't seen these proposals before us.
    • 02:18:54
      No, what they have seen though is when we've sent out numerous communications to all local governments on the kind of status of the program and when we send out the letters, the request for their applications, we've dialogued with them in those communications as to the intent and what we're planning to bring to the board and when they look at that application and that communication, it's stressed emphatically that it's the million dollar threshold and we've done a lot of outreach individually
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:19:21
      I think the more we can kind of consult with them on what we do, since they're the ones having it involved, the better.
    • 02:19:41
      Thank you.
    • 02:19:43
      Wherever lunches sit down, I'd like to start the meeting again at 1245.
    • 02:19:47
      Ms. Lawson, you think you can get through in 15 minutes?
    • SPEAKER_10
    • 02:19:55
      Absolutely.
    • 02:20:11
      Oh, yeah.
    • James E. RichMember, Commonwealth Transportation Board
    • 02:20:36
      Yeah, that's right.
    • SPEAKER_10
    • 02:20:37
      So what we were thinking of is the circumstances in which you wouldn't necessarily want...
    • 02:20:54
      Aaron Page,
    • 02:21:09
      Do we need a policy in writing?
    • 02:21:31
      Is that policy in writing now?
    • 02:21:32
      James A. Smith III,
    • 02:22:01
      Thank you, Sir.
    • 02:22:13
      I think we're in for a long one today.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 02:22:23
      I think we're in for a long one.
    • 02:22:25
      I'll spend the night.
    • 02:22:26
      I might want to go straight through.
    • 02:22:26
      I am.
    • 02:22:26
      I've got 10 minutes before the Governor comes to talk to us about his program.
    • 02:22:28
      We all voted for it.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 02:22:30
      No.
    • SPEAKER_10
    • 02:22:34
      No.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 02:22:35
      He's working with Lindsay, but I'll put his man right there.
    • 02:22:39
      Down there to either buy the thing back or if we're going to see it.
    • 02:22:45
      I don't know where we're going to go.
    • SPEAKER_10
    • 02:22:47
      If he sees my thing, it's pretty extraordinary.
    • 02:22:52
      All right.
    • 02:22:53
      Okay, what did he say?
    • 02:23:16
      Well, it's not quite the distance going down to Pearl River County, Mississippi, to probate the will to try to sell the property from that distance.
    • 02:23:19
      His children were young when he looked at will.
    • 02:23:20
      They're older now than they fully responsible for caving that period.
    • James E. RichMember, Commonwealth Transportation Board
    • 02:23:21
      Well, when the point of executive rule defines concern, then anybody can nominate.
    • SPEAKER_10
    • 02:23:35
      Three brothers of the system.
    • 02:23:37
      One of them is a pro spy and he'd be the logical one.
    • 02:24:05
      That's the rest of your weekend.
    • 02:24:06
      I'll be back Sunday night.
    • 02:24:08
      I think that's what makes sense.
    • 02:24:29
      South Carolina.
    • 02:24:29
      I've had a lot of experiences.
    • 02:24:30
      Well, it says 2500 miles in Colorado.
    • 02:24:31
      The slide shows the roadside and you have to come through all the way through.
    • 02:24:32
      It was a big deal.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 02:24:52
      It was on the first and second page.
    • 02:24:53
      It might have been early stuff.
    • 02:24:54
      That's been fairly typical over the last several years.
    • SPEAKER_10
    • 02:24:55
      All right.
    • 02:25:16
      Take your next one.
    • 02:25:16
      What is that stupid button for next year?
    • 02:25:17
      The wiring stamp is up.
    • 02:25:18
      We're going to find two that will get it out sometime in about a week.
    • 02:25:19
      We can get it out in about a week.
    • 02:25:20
      With that primer package, the files are going to close here.
    • 02:25:21
      It's a pleasure to have you all coming on next week, so it's not too late. It's the usual trip. It's a really good trip. It's a really good ride. It just gets in the way of the administrative detail. It's all right. It's all right here. It's not too late. It's a really good ride.
    • 02:25:50
      We're going to spend a little time with Ross and his friends, and then we're going to share all of the clues that they're going to pursue themselves.
    • F. Gary GarczynskiMember, Commonwealth Transportation Board
    • 02:26:03
      That gal from Fairfax is here today.
    • SPEAKER_10
    • 02:26:14
      Did they identify that already?
    • 02:26:22
      Hey, how you doing?
    • SPEAKER_17
    • 02:26:51
      I'm following you back.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:26:53
      Paul Regan, the day quit.
    • SPEAKER_10
    • 02:27:11
      Okay.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 02:27:15
      All right.
    • SPEAKER_10
    • 02:27:18
      We can ride the waves.
    • 02:27:26
      I mean, everybody's talking about rolling on them.
    • 02:27:42
      But right now I'm being a little cautious and I'm off the low ball.
    • 02:27:52
      I mean I put a bid in, I put a bid in on one.
    • 02:28:01
      and they never answered my bid.
    • 02:28:26
      They turned around and sold it.
    • 02:28:26
      First of all, really good.
    • 02:28:27
      $12.00 a question when I got the hold of it.
    • 02:28:28
      Well, in other case, somebody wants it.
    • 02:28:29
      So, buy them and rent them for a while and then sell them?
    • 02:28:46
      Or you just try to hold them for what they're called?
    • 02:28:47
      James A. Smith III, Thelma D. Smith III
    • 02:29:06
      I'm trying to do a celebrated property show.
    • 02:29:25
      I'll tell you the exact details.
    • 02:29:26
      You typically have a short period.
    • 02:29:27
      We're going to have the news to start with a big one.
    • 02:29:28
      I told you to return or something.
    • 02:29:29
      I'm proud to be with you this evening.
    • 02:29:47
      I'm glad to see you.
    • 02:29:48
      When you're gone, I'm glad to have you around.
    • 02:29:48
      I'm glad to see you.
    • 02:29:49
      I don't need to put a bid in it by the way, because I don't want to get tired of this property. I don't know how much you might want to turn it over and find a rep. Turn it over, suck it out. Put it in. I don't think so. I mean, I'd put it in. I don't know.
    • 02:30:09
      I mean, I'm not going to be interested.
    • 02:30:11
      It's good next year.
    • 02:30:14
      I'd like to get that on our agenda.
    • 02:30:32
      Rennell Raines, what are you thinking about now?
    • 02:30:54
      I think it's more specificity because people are thinking about Battlefield,
    • 02:30:57
      What the hell are you talking about?
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:31:20
      You're looking three miles away.
    • SPEAKER_10
    • 02:31:21
      What obstacles are in travel?
    • 02:31:22
      I can't think of a possible one.
    • 02:31:23
      Let's just oppose it and prove it.
    • 02:31:24
      I'm trying to keep them all close because I don't want to have a bunch of problems.
    • 02:31:40
      I was telling the doctor that 30 years ago
    • 02:32:08
      Jack Harry was the chairman of the Board of Supervisors Archives for something called the Green Field Bypass, which today is the Fairfax County Park West.
    • 02:32:23
      Now residents have asked them, they don't know how they could live without the person.
    • 02:32:44
      The only time I've been there is watching my TV.
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 02:33:03
      Greg, I called you to another email from my friend.
    • SPEAKER_10
    • 02:33:09
      I thought it was very interesting hearing you.
    • 02:33:14
      They'll be today while I'm here.
    • 02:33:17
      That's the pilot guy.
    • 02:33:19
      No, that's what I ruled.
    • 02:33:45
      I'll be pigging out in the weekend on the holidays.
    • 02:34:00
      I'm going down South after.
    • 02:34:04
      Is that roasted rabbit?
    • 02:34:11
      That's what that is.
    • F. Gary GarczynskiMember, Commonwealth Transportation Board
    • 02:34:15
      It looks like it's going to be a long, long week.
    • SPEAKER_10
    • 02:34:20
      It's a fun car.
    • 02:34:48
      I sit in the garage all day.
    • 02:34:53
      Well, what about me?
    • 02:34:55
      Somebody's deadbeat.
    • 02:34:56
      Not one.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:34:57
      They might be trying to get rid of hate.
    • 02:35:00
      Oh, my God.
    • 02:35:00
      I pulled in one day and he usually throws his stuff because he's beat up.
    • 02:35:07
      Well, I pulled in one day and it was a family day.
    • 02:35:10
      It's amazing how cautious you get about your parking and pulling in and avoiding to park next to you.
    • SPEAKER_10
    • 02:35:16
      I knew it was peace.
    • 02:35:17
      I had no idea you had that.
    • 02:35:21
      I'm glad to note it is some meeting.
    • 02:35:25
      I'm sorry about the fit.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:35:28
      The stock after the meeting gives me my insurance information.
    • SPEAKER_10
    • 02:35:36
      The fit goes to hockey.
    • 02:35:40
      It's different than the other ones.
    • 02:35:42
      You have two?
    • 02:35:43
      I have a piece of property that's been around for a quarter and twenty minutes.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:35:53
      Bently is eating roast right now.
    • 02:36:10
      We ought to do a big open round.
    • SPEAKER_10
    • 02:36:25
      The Rolls-Royce Corporation
    • 02:36:40
      It's an engine company, but it's starting to make its part.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:36:56
      And then it just leaked out.
    • SPEAKER_10
    • 02:36:56
      I told them you'd set a point, right?
    • 02:37:20
      No.
    • 02:37:20
      They can't do that, unless they leave the county.
    • 02:37:22
      You know, there's statistics like this.
    • 02:37:23
      You can take me and my kid if they didn't know what you were talking about.
    • 02:37:25
      Blondes, same line, you know.
    • 02:37:25
      Yes, this is, uh, a vanilla cone.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:37:26
      Okay.
    • SPEAKER_10
    • 02:37:42
      I'm going to be back in a minute.
    • 02:38:05
      Okay, thank you.
    • 02:38:27
      All right, about to come up.
    • 02:38:38
      Pass, everyone.
    • 02:38:59
      Please take their seats.
    • 02:39:04
      Mr. Lawson?
    • John W. LawsonChief Financial Officer
    • 02:39:10
      Good afternoon, Mr. Chairman and members of the board.
    • 02:39:14
      This morning, I'm going to give you a little bit of an update again on their budget actual performance through March.
    • 02:39:21
      And I also will give you a little overview of the financial plan for the 12 through 17, the kind of support and the basis for the Six-Year Improvement Program.
    • 02:39:32
      First, I want to start with a little good news.
    • 02:39:35
      The Treasury Board met this morning and approved the CPR sale.
    • 02:39:40
      has passed that hurdle.
    • 02:39:42
      Moving on with toward the issuance of our $600 of CPR bonds scheduled to be sold on May the 11th.
    • 02:39:51
      So we're moving on on track.
    • 02:39:53
      As you recall, you approved that issuance last month.
    • 02:40:07
      On one.
    • 02:40:14
      According to the revenues, revenues for this fiscal year are continuing to move well.
    • 02:40:21
      We are, through March, revenues of the CTF, major state revenues are still tracking above forecast.
    • 02:40:28
      We're about nine-tenths of a percent above the three percent forecast.
    • 02:40:32
      That's expected by the official forecast.
    • 02:40:36
      Motor field tax collections are lagging a bit.
    • 02:40:39
      Increased prices and fuel are certainly not helping in that area.
    • 02:40:43
      As strong points are coming in motor vehicle sales, they're still coming in strong, about 15, lower, better than 15%, which is more than double the estimated growth that was forecasted this year.
    • 02:40:56
      March was the 17th consecutive month of growth in this area, but as I reported last month, we are still in the levels of 2002 in terms of vehicle sales.
    • 02:41:10
      Motor Vehicle Licensees are also tracking ahead of the 2% estimate and we really do need to see a strong ending few months to keep the revenue forecast on track and hopefully the fuel prices won't deter fuel sales or automobile purchases too much.
    • 02:41:36
      This chart just gives you a detailed picture of my revenue source of each of the funds, and I'll just skip along for lack of time here today.
    • 02:41:46
      This chart just gives you a picture of how we're doing in terms of federal revenue collections.
    • 02:41:52
      We are about $145 million ahead of where we were last year.
    • 02:41:57
      Again, federal collections are reimbursable.
    • 02:41:59
      They're based on activity as we are building projects or performing maintenance work.
    • 02:42:05
      And you can see most of the increases in this activity are in the, well actually the largest one is with the auto program.
    • 02:42:13
      We talked about that earlier where we spent $94 million more this year on the auto program than years past as that program is definitely in swing.
    • 02:42:25
      Just looking to spending through March, our efforts to accelerate projects and maintenance work is continuing to show.
    • 02:42:36
      Through March, we have expended about $165 million more than we had spent through this time last fiscal year.
    • 02:42:45
      This represents about 60% of our $4.23 billion operating budget.
    • 02:42:52
      When you look at the spending this year between maintenance, VDOT maintenance, maintenance payments to localities, and their construction spending, those three categories comprise 85% of their total spending.
    • 02:43:09
      And this is just the graphic pictorial that I've been showing you, comparing the spending by major category to the, from last year to this year.
    • 02:43:20
      This is just a summary of the monthly report you should have as your seat.
    • 02:43:25
      They provide the details.
    • 02:43:29
      Turning to maintenance, just looking at the actual spending of maintenance.
    • 02:43:33
      Ms. Sorrell, I already talked to you a bit this morning about the maintenance program and the budgeting.
    • 02:43:38
      I just want to report that from a spending perspective, we spent about 6 percent more than we had spent last fiscal year.
    • 02:43:45
      $950 million has been spent through March.
    • 02:43:49
      And you see here by service area, each of the program areas in which the spending has actually taken place this year.
    • 02:44:03
      As you would expect, a large portion of the maintenance spending is on the paving area, paving and roadside activities, but 22% of the spending is related to actual contract paving work.
    • 02:44:16
      We air snow and icing activities this year.
    • 02:44:21
      We have overspent our budget, unfortunately, again this year, but it was much better than last year.
    • 02:44:31
      Construction spending highlights here by area.
    • 02:44:34
      You can see where the majority of the spending is taking place within the construction arena is in the interstate construction.
    • 02:44:45
      It clearly is the largest of the group.
    • 02:44:47
      You see here the decreases in the activity in primary, secondary, and urban.
    • 02:44:52
      And unfortunately, this is starting to show the impacts of no funds going through the construction formula over the last couple of years.
    • 02:45:03
      This chart just gives you the same chart I've been showing you the last few months of the air contract, contracts that are out and the amounts that are uncompleted at this point.
    • 02:45:14
      You see here the orange bar representing the maintenance.
    • 02:45:18
      You see the large jump between March and April representing all the contracts that were done this spring that are now on the street.
    • 02:45:30
      In addition to the
    • 02:45:32
      Highway or the road projects that our contractor showed in the previous slide, this just gives you that cumulative slide of all the contracts that are out related to construction, maintenance, and the air consultant contracts.
    • 02:45:47
      The question was asked last month about the consultant contracts and kind of the composition of that.
    • 02:45:54
      Of the consultant contracts, 54% are related to design work and the other
    • 02:46:00
      Another 34% is really related to inspection and operational activities.
    • 02:46:08
      From a cash perspective, this just shows you the changes in our current cash position from 2010 in-year balance.
    • 02:46:17
      That balance continues to work downward as we are spending and working down the balances from prior year.
    • 02:46:27
      Just a real quick summary, we have
    • 02:46:30
      Clearly we continue to work hard to move forward the program and the project and spend the dollars that have been budgeted this year as well as spend down the balances of the past.
    • 02:46:44
      There's a large increase in outstanding maintenance work and you probably already noticed a lot of the contracting work is getting going this spring.
    • 02:46:53
      And as Ms. Sorrell mentioned, the spending of that money will be largely dependent upon
    • 02:46:58
      The industry and weather.
    • 02:47:05
      Real quickly, I want to turn to the outlook for 2012 through 17.
    • 02:47:09
      This is based on our preliminary six-year financial plan.
    • 02:47:13
      This will be updated along with the program as we move forward toward June.
    • 02:47:19
      Looking at the 12 through 17 plan, we have total revenues of just shy of $27 billion.
    • 02:47:27
      That's all.
    • 02:47:28
      A little over three and a half million dollars greater than the 11 through 16 plan.
    • 02:47:33
      It does reflect the accelerated issues of CPR bonds and the Garvey bond sales that are authorized by the governor's on with plans.
    • 02:47:42
      It does also include a revision from the prior state revenue forecast of a little over $600 million.
    • 02:47:52
      In lieu of a new federal authorization, we have based
    • 02:47:56
      The federal revenue estimate on the final FY 2010 numbers and base growth on fuel consumption.
    • 02:48:05
      This chart just gives you an illustration of a major revenue source of the funding that is available to transportation over the next six years.
    • 02:48:17
      In terms of our allocation, they do reflect the planned use of the CPR and Garvey bonds
    • 02:48:23
      We'll hear more about that today, I guess, with the Six-Year Improvement Program.
    • 02:48:28
      We have continued to grow the maintenance program at 4%, which is a kind of a historical average of the producer price index related to maintenance and construction.
    • 02:48:39
      We have been consistent in continuing to grow the maintenance program or the maintenance payments to localities at the same rate of 4% that we use internally.
    • 02:48:48
      Included in the forecasted allocations are $10 million a year.
    • 02:48:53
      to support the implementation of research initiatives as recommended by the audit as well as $10 million annually to support planning and pre-scoping activities to help move projects along.
    • 02:49:05
      As Ms. Estes mentioned earlier this morning, we are forecasting a $50 million a year revenue sharing program in this preliminary draft and as the Secretary mentioned earlier, certainly we'll be looking at that going down the road to determine if those
    • 02:49:22
      Those out year allocations need to be adjusted.
    • 02:49:28
      This chart here just gives you a high level illustration of the use of the $26 million in allocations based on the main categories.
    • 02:49:39
      Debt service represents about 8.5% of the total funding.
    • 02:49:46
      The highway maintenance, about 43% of total funding.
    • 02:49:50
      And when you look at
    • 02:49:52
      Reports on public transportation and rail, just shy of 9%.
    • 02:49:57
      And if you look at construction as a combination of earmarks and special financing and highway system construction, the total there is about 28% of the funding.
    • Cord A. SterlingMember, Commonwealth Transportation Board
    • 02:50:08
      What is special financing?
    • 02:50:10
      I know what earmarks are generally, but what is special financing?
    • John W. LawsonChief Financial Officer
    • 02:50:13
      The special financing are programs like revenue sharing, which it's not considered a system construction.
    • 02:50:20
      Enhancement, revenue sharing, those things that have to go in this.
    • 02:50:25
      And that, I made it through 15 minutes, so.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 02:50:29
      Yes, Mr. Blaine.
    • 02:50:31
      Not to beat a topic to death that we've already talked about, but if you go to slide seven and you look at interstate maintenance.
    • SPEAKER_10
    • 02:50:38
      No more slide seven.
    • 02:50:43
      From six to eight.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 02:50:43
      We're still, you look at it and interstate maintenance in both in dollar spent and in percentage of our budget spent significantly lags the other categories.
    • 02:50:55
      So I'm just, again, you know, why is that, getting the money on the interstate seem to be more difficult than the other categories?
    • John W. LawsonChief Financial Officer
    • 02:51:04
      Well, you know, not to speak for Ms. Corral, I think a lot of what you're seeing in terms of, especially related to the maintenance interstate and primary, is so much of that work is contract work.
    • 02:51:18
      It is now on the street and will get expended as the spring months get going.
    • 02:51:23
      So I think that's probably a big portion of what you're seeing there.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:51:29
      When you used on slide, I think it's 15, the 16% greater comparison, meaning the $26.7 billion was 16% more than the previous five-year plan, is that in constant dollars?
    • John W. LawsonChief Financial Officer
    • 02:51:50
      That's a pure comparison of the last year's six-year plan was $23 billion.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:51:55
      So if you took the CPI and took that out, and you took the debt service out,
    • 02:52:02
      The increasing the debt service.
    • 02:52:04
      So we'd really look at what was happening in terms of operations and so forth.
    • John W. LawsonChief Financial Officer
    • 02:52:08
      Do you have any idea what that number would be?
    • 02:52:10
      I don't, but I can certainly compute that for you.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:52:13
      That's the real number.
    • 02:52:15
      I mean, obviously we're spending taxpayers' money to service debt, and that's important.
    • 02:52:21
      But in terms of what we're impacting.
    • John W. LawsonChief Financial Officer
    • 02:52:24
      Are you looking for the increase actually in the maintenance and construction area?
    • 02:52:27
      I'm looking for where the rubber meets the rug.
    • 02:52:29
      Absolutely.
    • 02:52:30
      I can get that to you.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:52:31
      You know, we've seen where these contracts are coming in well under.
    • James E. RichMember, Commonwealth Transportation Board
    • 02:52:42
      Where is that that we had budgeted?
    • 02:52:44
      How do you program that back into the system?
    • John W. LawsonChief Financial Officer
    • 02:52:47
      Well, the funds from a budgetary perspective are in the program, so the contract that was
    • 02:52:52
      To consume part of that fund was less than anticipated.
    • 02:52:55
      It just makes the funds available for additional contract work.
    • James E. RichMember, Commonwealth Transportation Board
    • 02:52:59
      Can you show us a figure on that, how much is going back in?
    • John W. LawsonChief Financial Officer
    • 02:53:05
      We can work to get that for you.
    • 02:53:06
      Okay, thanks.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:53:08
      The last part is I just want to go, I'm sorry, slide three.
    • 02:53:11
      One thing that's worrisome looking at the March receipts was even though all the revenues were up,
    • 02:53:19
      Motor Fuels was down, is that right?
    • John W. LawsonChief Financial Officer
    • 02:53:21
      Motor Fuels is down.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:53:22
      So, I mean, that, unfortunately, is an indication of some serious trouble for us as a leading indicator, because gas plane tax revenues are actually now, due to the higher prices, starting to go well below what we anticipated.
    • John W. LawsonChief Financial Officer
    • 02:53:39
      Is that correct?
    • 02:53:40
      Yeah, and they've actually tracked low all year.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 02:53:43
      Yep.
    • 02:53:44
      We've got less road miles traveled, too.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 02:53:47
      I was interested in the assumptions you were using for federal dollars considering the discussions that are going on.
    • SPEAKER_10
    • 02:54:08
      Is that a shared assessment that
    • 02:54:10
      Ladies and gentlemen, the Governor of the Commonwealth of Virginia, His Excellency,
    • SPEAKER_17
    • 02:54:54
      Thank you very much.
    • 02:54:57
      I appreciate it.
    • 02:54:58
      Hey, we've got some work for you to do.
    • 02:55:01
      Thank you very much, Mr. Secretary, Mr. Commissioner, Mr. Highway Commissioner, now.
    • 02:55:08
      Thank you very much for having me here today to be able to address you.
    • 02:55:12
      It's been a little over a year since I've actually had a chance to come and talk to you.
    • 02:55:16
      I want to say first and foremost, thanks for your work.
    • 02:55:19
      This is an awful lot of work, incredibly important work.
    • 02:55:22
      For our citizens to make the tough decisions about how we're going to provide the road and bridge and rail and other infrastructure that's necessary to get our citizens around in the fastest possible way and get goods to market as quickly and efficiently as possible.
    • 02:55:39
      And I know this is a lot of time.
    • 02:55:41
      All of you have busy jobs.
    • 02:55:43
      The pay's not great, but the benefits are good.
    • 02:55:45
      That's what we promised you, and I hope that's still your feeling.
    • 02:55:49
      Many of you have been serving on the boards.
    • 02:55:51
      Jeff, you agree with that?
    • 02:55:52
      I hope you agree with that after the many years you've served on here.
    • 02:55:57
      This is really an exciting time for us in Virginia with what we're going to be able to do for transportation infrastructure over the next few years.
    • 02:56:08
      It's sort of a historic meeting where you will act on these
    • 02:56:12
      900 projects that the Secretary and the Commissioner have recommended and the other Commissioners and Department Directors have recommended that you add.
    • 02:56:20
      I think the first time in years that projects have actually been added and will be able to be funded in the Commonwealth Transportation Board's Six-Year Plan for 2012 to 2017.
    • 02:56:30
      So I appreciate it.
    • 02:56:33
      More work to do, but this is what the citizens have been asking about for a while in improving our transportation infrastructure.
    • 02:56:41
      Creative package that the General Assembly got passed.
    • 02:56:43
      I hope you've had a chance to look through it because it's not just money.
    • 02:56:47
      It's also qualitative improvements.
    • 02:56:49
      It's more accountability for VDOT and other departments and really a team effort, a bipartisan effort by the House and the Senate, Republican and Democrat leaders to be able to get this bill done.
    • 02:57:03
      Now the last time I was here before I asked you to reopen the rest house.
    • 02:57:06
      Thanks for doing that.
    • 02:57:07
      Now I'm asking you to build roads and bridges and rail and I hope you'll
    • 02:57:11
      do that as well, but working together with our team and your leadership here at the CTB, a number of things have been done.
    • 02:57:18
      You did get the rest stops reopened.
    • 02:57:20
      We did get some creative ways to help fund those this year with inmate labor and now redoing some contracts, commercial advertising to drive those costs down to help save you some money for other things, so 70 mile an hour speed limit.
    • 02:57:35
      We did four audits of the Department of Transportation.
    • 02:57:39
      Commissioner Whirley is the most audited man in Richmond.
    • 02:57:42
      He did a few himself when he was in his previous job, but the good news out of all that is about $1.4 billion of money was found that we could deploy in more productive ways, and that's being done.
    • 02:57:53
      In fact, that's helping to capitalize the Virginia Transportation Infrastructure Bank that was created this year.
    • 02:57:59
      It also helped to push out $1.1 billion in new projects.
    • 02:58:05
      Last year, in fact, the first six months of the fiscal year, 11, almost twice as much was pushed out in the previous six months.
    • 02:58:15
      So that is progress, and that's the good news, and I've heard from a lot of the road contractors that they're thrilled to be getting people back to work, and they were the ones that were some of the hardest hit in 07, 08, 09, and now they're getting people back to work.
    • 02:58:28
      So it's real new jobs.
    • 02:58:31
      This bill, this transportation bill,
    • 02:58:33
      has been evaluated by Chamora Economics, and they believe the impact is as much as 100,000 new jobs, $13 billion in new revenues coming to the state.
    • 02:58:44
      That's real money in any economy, but that's how much $4 billion in transportation infrastructure can leverage over the next couple of years.
    • 02:58:53
      So we're very excited about what's going to happen.
    • 02:58:58
      There were other things that were done by the legislation in finding ways to streamline
    • 02:59:04
      The planning processes to create a multimodal PPTA office and many other things during the bill, some of which I want to mention specifically in a minute.
    • 02:59:15
      But I would like to, again, express my appreciation to Speaker Bill Howe as well as Senators Wampler and Senators Colgan.
    • 02:59:25
      That bipartisan effort between the key leaders, top leaders in both the House and the Senate led to good negotiation early on.
    • 02:59:34
      that led to this transportation bill getting passed with such significant support.
    • 02:59:41
      A couple of the other things that it does that impact you indirectly, and the money has been the biggest issue, and your vote on the six-year plan will primarily focus on money, but it also helps to streamline the project completion process, enables VDOT to submit just one comprehensive report.
    • 03:00:01
      We're trying to do everything we can to cut down administration bureaucracy across
    • 03:00:04
      State Government, that helps.
    • 03:00:06
      It, of course, gives the Commissioner a new title, back to his old title, the Commissioner of Highwares, and a lot more flexibility on how he can spend some money and do some things, frankly, without you having to give approval for everything that the Commissioner does, make him more effective in that regard, gives Commissioner Drake and DRPT greater flexibility in utilizing its resources, repeals a number of outdated laws and regulations, and of course,
    • 03:00:33
      First and foremost, it creates that framework for $4 billion of new resources for transportation over the next four years.
    • 03:00:43
      And you know how we got there.
    • 03:00:44
      You've got that presentation about a billionate in accelerated bonds.
    • 03:00:49
      And the reason we did that is really pretty evident, and that is we're getting some of the very best deals that we've seen in recent history because
    • 03:01:00
      of the competition among road contractors.
    • 03:01:02
      They want to get people back to work.
    • 03:01:04
      They want to have jobs, and they are incredibly competitive now with the rates.
    • 03:01:10
      With the stimulus money the Secretary pushed out the door with your help, you saw how those rates were coming in below the estimates, sometimes 10, 15, 20 percent below the estimates, so we actually had to rebid again with the money that was left over.
    • 03:01:22
      It's the same dynamic that we've got here with these transportation dollars.
    • 03:01:27
      It's a great time.
    • 03:01:29
      in recent time to actually build roads.
    • 03:01:32
      The interest rates, we got that AAA bond rating.
    • 03:01:34
      It's a great time to be able to utilize your AAA bond rating in your limited debt capacity of 5%.
    • 03:01:42
      We took leaders of both parties up to Wall Street back in January.
    • 03:01:47
      We met with the bond rating agencies.
    • 03:01:49
      They were very bullish on Virginia.
    • 03:01:51
      They were very appreciative of the fact that we're using creative financing, especially through our debt.
    • 03:01:58
      in order to build roads.
    • 03:02:00
      And frankly, it's things like the retirement system liabilities and road infrastructure that were the things that they had some questions about in Virginia.
    • 03:02:08
      So not only are they appreciative of the fact that we're building roads, but the fact that we're using it through our AAA bond rating that we've prized for over seven decades here in Virginia was one that met with some favor.
    • 03:02:21
      A billion won in GARVEE bonds.
    • 03:02:24
      I'm sure the commissioners explained how we're leveraging that federal money.
    • 03:02:27
      that's coming down, and then the infrastructure back.
    • 03:02:30
      I applaud the Commissioner and the Secretary for their leadership in devising that.
    • 03:02:34
      Other states have done it.
    • 03:02:35
      The federal government has done it to be able to help jumpstart some of these regional and local projects that had been unfunded or underfunded in the Six-Year Plan, but now with loans, loan guarantees, and in some cases grants that you may approve, you're going to be able to get a lot of those projects
    • 03:02:53
      jump-started locally, and that's a win-win for local government as well.
    • 03:02:58
      So overall, it's a good chunk of money.
    • 03:03:01
      We hope in the next couple of years with surpluses, and we hope to see another one this year based on the way revenues are growing in Virginia.
    • 03:03:09
      Overall, up 9 to 16 percent the last five months.
    • 03:03:12
      You've actually had an uptick in TTF revenues as well, even in the tough economy.
    • 03:03:17
      So that's obviously positive news for Virginia.
    • 03:03:22
      continue to record surpluses by statute and maybe by my direction we'll put more money into that transportation infrastructure bank with a goal of ultimately a billion dollars available, but we're starting with that 283 in capitalization.
    • 03:03:40
      The good news is there's a list of 900 projects that are before you today, and the Secretary and the Commissioner have spent a lot of time putting those together.
    • 03:03:51
      based on congestion relief, economic development, other factors that were critically important deciding which are the road projects that we need to go forward on.
    • 03:04:01
      And you all have been instrumental over the last couple of years in accumulating that list.
    • 03:04:05
      Well, now you get the money to go with the list and then add those projects to the list
    • 03:04:10
      that we're recommending to you today, and I think that's a significant step forward.
    • 03:04:16
      Let me just give you a couple ideas of what things you're looking at, because these are big ideas, big projects that will positively affect our citizens, whether it's Hampton Roads or Page County or Northern Virginia or Loudoun County.
    • 03:04:31
      I mean, everybody's going to get some piece
    • 03:04:34
      of this action.
    • 03:04:35
      Widening 66 from Gainesville to Haymarket.
    • 03:04:39
      Phase 2 of the Route 581 interchange in the Salem Roanoke District.
    • 03:04:45
      Widening I-64 from 288 to 623.
    • 03:04:49
      A number of primary road system projects like widening Route 7 and Route 123 inter-pringed projects in Northern Virginia.
    • 03:04:59
      Commissioner Rich, I know you'll like that one.
    • 03:05:03
      Route 17 in Fredericksburg, Route 58 corridor development in the Bristol and the Salem districts, widening Lynnhaven Parkway and replacing the Lesner Bridge in my old home of Virginia Beach, widening Route 711 along the Huguenot Trail corridor in Richmond.
    • 03:05:23
      Of course, some of my favorites, the Midtown Tunnel Project, the Martin Luther King Project,
    • 03:05:28
      I-95 hot lanes in Northern Virginia back on track, and then the Route 460 quarter in Hampton Roads, which I think is instrumental to the maintenance of the free world, as I've told the Commissioner on many occasions in creating that new route for the military hurricane evacuation economic development from Petersburg to Suffolk, a critically important project.
    • 03:05:49
      So these are real new projects with real new money.
    • 03:05:54
      that are going to affect real people's lives in the coming months and years as you get these projects going.
    • 03:06:03
      We also have significant investment in rail and transit.
    • 03:06:06
      In fact, a certain percentage by statute of those bonds must go to those projects, about 20%, 24%, 25%.
    • 03:06:15
      Overall those include things like improvement to the Norfolk Southern infrastructure along the 81 Crescent Quarter, replacing the VRE rail cars and extending the third track all the way to Spotsylvania.
    • 03:06:28
      Bus replacements for transit operators really across the continent.
    • 03:06:34
      So it's a big lift.
    • 03:06:35
      That's a handful of that 900, but they're big ideas and I'm glad to be able to come back to you this year with some good news.
    • 03:06:45
      We've got a lot more to do, and we're going to be looking for other opportunities over this next year to generate additional and perhaps even more reliable sources of revenue as you look at solving your transportation challenges.
    • 03:06:59
      I've told you all many times that my top priority is to create jobs and opportunity for our citizens.
    • 03:07:07
      Travel to California, New York, Illinois, and say you need to come to Virginia, or as I'm doing in a couple of weeks, going to China, Japan, Korea, later on to India, and say you need to invest in Virginia and you need to export more goods from Virginia to your country.
    • 03:07:22
      One of their questions always is, well, what's your quality of life?
    • 03:07:26
      How can we take advantage of everything from your education institutions to your transportation systems?
    • 03:07:34
      And that's why you saw this effort this year of transportation, higher education, job creation.
    • 03:07:39
      We want to become a magnet for economic development and growth.
    • 03:07:43
      We're coming out of this global economic downturn better than most states, as you see with these significant increases in revenues.
    • 03:07:49
      That's without tax increases.
    • 03:07:51
      It's sales tax revenue up.
    • 03:07:52
      It's income tax withholding up.
    • 03:07:54
      These are all very positive signs.
    • 03:07:57
      But for me to be able to tell the Virginians' story near and wide about why they need to invest here, we've got to have a solid
    • 03:08:04
      and reliable and sustainable transportation systems.
    • 03:08:07
      So it's good news.
    • 03:08:08
      I appreciate your service and your leadership here.
    • 03:08:12
      Again, this wouldn't have been possible without some incredible hard work and innovation by the Secretary.
    • 03:08:17
      We've had countless meetings over the last six months with he and his team of managers and directors to come up with the right ideas that make economic sense that were politically doable
    • 03:08:29
      And I think you saw by the vote on these bills and the General Assembly, I think we kind of found the right mix.
    • 03:08:36
      So keep up the good work.
    • 03:08:38
      Spend wisely, as you will.
    • 03:08:40
      Ask tough questions.
    • 03:08:42
      Don't take anything my team says for granted.
    • 03:08:44
      Make sure that you know they're giving you the right scoop, which I know they always do.
    • 03:08:48
      And that's your job.
    • 03:08:50
      You are the board of directors.
    • 03:08:53
      and for our management team and we really appreciate the partnership with you all using your considerable expertise on a volunteer basis to do good things for the people of Virginia.
    • 03:09:03
      So keep up the good work.
    • 03:09:04
      We're going to continue to find those revenues and other ways to make our transportation systems work better and I appreciate to be here to share a little bit of good news and God bless you for your service to Virginia.
    • 03:09:14
      Thanks.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:09:41
      Okay, now to get into the details of the six-year, draft six-year plan that the Governor just presented.
    • 03:09:49
      And we have Ms. Busher, and also Mr.
    • Reta BusherChief of Planning and Programming
    • 03:10:34
      Mr. Chairman, members of the CTB, I have provided you in your notebooks around the room, the
    • 03:10:46
      Improvement Program Draft for fiscal years 2012 through 2017.
    • 03:10:53
      We're very pleased to present this program today.
    • 03:10:56
      If you will bear with me a moment, I do want to thank the programming team.
    • 03:11:06
      Diane Mitchell, the division administrator, Kim Spence, her assistant, and if the programming team staff would stand.
    • 03:11:16
      and be recognized.
    • 03:11:25
      Craig Allen, Bernie Campbell, Monique Bailey, Karen Smith, Karen Strigler, Laverne Dillard, Candace Harris, and Carol Gibson.
    • 03:11:36
      Thank you all very much.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 03:11:40
      Okay.
    • Reta BusherChief of Planning and Programming
    • 03:11:42
      This first slide is one that we
    • 03:11:46
      prepare and present each year showing the comparative value of the six-year program.
    • 03:11:53
      And in this, I have also stolen a number from Mr. Pittard so that I can show the total program, the highway and the rail for a total.
    • 03:12:04
      I'm showing the revised 9 through 14 program, the 10 through
    • 03:12:10
      15, the 11 through 16 and the proposed 12 through 17 and a change column for the 11 compared to the 12 programs.
    • 03:12:21
      A couple different things on this slide that you will see.
    • 03:12:25
      Highway construction is proposed at 8.1 billion over the six years 12 through 17 compared to 5.7 billion.
    • 03:12:36
      from 11 through 16, a change of approximately $2.4 billion.
    • 03:12:42
      Rail and public transportation change at $0.2 billion for a total program change of $2.6 billion or $10.4 billion over the six years.
    • 03:12:56
      Now, what's important to note on this slide are two additions.
    • 03:13:01
      The GARVEE bond proceeds and the CPR bond proceeds
    • 03:13:06
      are contained within the $2.6 billion change in the rail and highway construction program change between the two years.
    • 03:13:16
      But we've also put some federal revenue forward into the debt service fund labeled Garvey Debt.
    • 03:13:26
      And this future federal dollars support the debt service
    • 03:13:30
      for the issuance of the Garvey bonds, the $1.1 billion that was approved in the authorization and the Governor's funding package.
    • 03:13:40
      So over the six years, we're showing $0.5 billion in debt service for the Garvey's, and that's from federal revenue.
    • 03:13:48
      So I wanted to indicate that that is in fact part of the program, but those dollars are represented in the debt service budget.
    • 03:13:58
      The other item that at this point is being developed, the structure and the guidelines for the Virginia Transportation Infrastructure Bank or VTIB, I'm showing the 0.3 billion here or approximately the 283 million that the governor referenced as the initial capitalization of the VTIB bank.
    • 03:14:21
      Those dollars will actually be captured separate from the program and they will be consistent grants and loans to localities and other entities across the state.
    • 03:14:34
      But that value is .3 billion.
    • 03:14:37
      So those funding mechanisms in total represent a change from last year's program to this year of 3.4 billion.
    • 03:14:49
      The next slide for VDOT breaks it down by highway system, interstate, primary, secondary, and urban.
    • 03:14:57
      And you can see the change for each of those years.
    • 03:15:00
      Basically, we maintained the interstate funding from program to program.
    • 03:15:06
      But where you see some significant movement is in
    • 03:15:14
      The primary program has gone up .7 billion, the secondary about 100 million or .1 billion, and that was significant.
    • 03:15:23
      That was a conscious effort to look at the primary, secondary, and urban systems for which there has been no state
    • 03:15:30
      allocation formula available due to reduced state revenues.
    • 03:15:34
      So we focused some funding on the primary, secondary, and urban.
    • 03:15:40
      The urban went up about $5.5 billion over $0.3 billion from last year.
    • 03:15:47
      The federal maintenance column, and what that is is it represents funding over the six years using federal dollars on maintenance
    • 03:15:59
      projects in the Six-Year Program.
    • 03:16:02
      So a portion of the federal revenue that we receive go to maintenance projects in the construction program and that's level.
    • 03:16:10
      One of the things that I think is extremely important and we worked on this next item, the funding for the Metropolitan Planning Organizations we brought to you.
    • 03:16:22
      A proposal for some new guidelines with regard to CMAQ programming.
    • 03:16:30
      And what you see here is actually what appears to be a reduction in the MPO dollars from program to program.
    • 03:16:39
      But all that means is that the MPOs in fact did very well and programmed
    • 03:16:46
      All of their dollars over the six years.
    • 03:16:49
      Before, these were the funds that represented dollars that were not programmed over the six years.
    • 03:16:56
      Some of the MPOs were funding one year, two years, three years, four.
    • 03:16:59
      This represents the fact that 300 additional million dollars in this six-year program has been allocated to projects.
    • 03:17:09
      The next item, the safety enhancement rail and other, is actually where you will see the increases related to some CPR bond proceeds and GARBE proceeds that have been set aside in that category.
    • 03:17:29
      And a portion of that is for the PPTA program.
    • 03:17:35
      So that's representing the $2.4 billion change or increase from last year's program to this year for highway.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 03:17:45
      Yes, sir.
    • 03:17:47
      How much of that is for the PPTA program and how many PPTA projects does that encompass?
    • Reta BusherChief of Planning and Programming
    • 03:17:52
      That is approximately $1.4 billion for the PPTA program.
    • 03:17:57
      That represents Midtown, Downtown, Route 460, 95,
    • 03:18:06
      Project, and Coalfields Expressway, two components of Coalfields Expressway.
    • 03:18:16
      Some of the highway program facts or some enhancements that are represented by the 12-17 highway program is the fact that we funded an additional
    • 03:18:34
      $1.1 billion in 12 through 17 of CPR bonds.
    • 03:18:41
      This does not include DRPT's portion of the CPR bond.
    • 03:18:47
      And it also does not include in this, this represents 12 through 17, 600 million or this first bond issue that we're selling next month actually represents bond proceeds on projects from fiscal year 9 through 11.
    • 03:19:06
      The combination of DRPT's portion between 12 and 13, approximately 245 million, and the 12 through 17 component of 954, or 12 through 13 component of VDOT CPR bonds and the 600 million from the 11 back is your 1.8 billion.
    • 03:19:34
      We also have an audit finding where we wanted to institute the use, again, of our soft match credits.
    • 03:19:44
      And what we did, as you can see, we're no longer using CPR bonds to match federal dollars starting in 2012.
    • 03:19:53
      So you see a zero there.
    • 03:19:54
      Those bond proceeds were removed and we have replaced that with our soft match credits, which really allows us to use 100% of federal funds on projects versus requiring a 20% state match.
    • 03:20:11
      The soft match allows us to do that.
    • 03:20:17
      It's not money, but it allows us to use 100% federal funding on projects.
    • 03:20:22
      We also determined that we would program what we were calling the Federal Revenue Reserve.
    • 03:20:31
      We were concerned that with no reauthorization for the last couple of years we had set aside some federal funds just in case we did get an authorization that put us below what we had anticipated for federal revenue.
    • 03:20:49
      We released
    • 03:20:50
      Those reserves, as we felt, we were comfortable with what the federal year's allocations would be.
    • 03:20:58
      But we decided to program all six years of those dollars that we set aside.
    • 03:21:06
      And we will hopefully have a reauthorization in the next
    • 03:21:10
      18 months, 24 months, we'll see.
    • 03:21:14
      But for right now, we went ahead and programmed that reserve.
    • 03:21:18
      As we said earlier, the Garvey bonds programmed at 1.106.
    • 03:21:24
      And as John Lawson mentioned a few minutes ago, we've actually supplied some state funds for pre-scoping to each of the districts.
    • 03:21:37
      It's about 10 million a year, but it grows
    • 03:21:40
      with the growth factor in the program.
    • 03:21:43
      So it's approximately $64 million over the next six years.
    • 03:21:47
      So we thought that was a very good tool for getting some projects on the shelf and doing some pre-scoping so we could look at funding more people.
    • 03:22:00
      The last few times I've made presentations, or even I guess since last year, we've provided you with what we call the highway priorities that we use to develop the Six-Year Improvement Program.
    • 03:22:16
      Obviously, off the top we fund deficits on underway project phases.
    • 03:22:22
      We also will maximize the use of federal funds to meet federal strategy.
    • 03:22:27
      And what's very important is we will fund underway project phases as well as project phases that start in the federal fiscal year in which we're operating, and in this case, federal fiscal year 2011.
    • 03:22:41
      We have been very conscious of putting dollars on our infrastructure, so we've been funding as much as we can of deficient bridges and deficient pavements.
    • 03:22:54
      We did increase funding for preliminary engineering.
    • 03:22:58
      We fully funded some PE projects, some on the governor's list, some already in the program to bring projects, put them on the shelf so that they're available to bring down to move when additional funding is available.
    • 03:23:19
      We have set funding aside to support the development of the PPTA projects.
    • 03:23:27
      And basically what we've been able to do with this program is accelerate existing projects using the additional funds from the Governor's funding package.
    • 03:23:38
      We have been allocating funds consistent with how they will be obligated and expended.
    • 03:23:45
      Meaning the funding is spread out over the development process for a project for the PE period, the right-of-way period, and the construction period, making sure that the projects are fully funded no later than 12 months from the completion of the project.
    • 03:24:03
      And we've been very focused on making the best use and leveraging any balances on inactive projects.
    • 03:24:12
      and moving those balances to another project that can move forward or bringing that inactive project forward to be developed currently.
    • 03:24:28
      Some of the revenue components that we've talked about and have mentioned a couple of times here, so I won't spend a lot of time on them.
    • 03:24:38
      As we said before, we've programmed Federal Revenue Reserve for all six years.
    • 03:24:44
      We utilized our soft match or toll credits to match federal dollars.
    • 03:24:49
      We have programmed $1.8 billion of CPR bonds between VDOT and DRPT and $1.1 billion in Garvey bonds over the next three years.
    • 03:25:02
      We used federal revenue to fund the Garvey bond debt service.
    • 03:25:08
      Unfortunately, we have had to still continue the suspension of the state construction formula allocation.
    • 03:25:20
      As has been discussed a couple times earlier today as well, we've got a placeholder for revenue sharing in the 12 through 17 program of approximately 50 million a year.
    • 03:25:33
      Now that will hold true for 12, but as we speed up the application process for the revenue sharing program, we have a sense of what the interest is on an annual basis.
    • 03:25:46
      We'll reevaluate
    • 03:25:48
      Each year as we update the program, what that funding allocation should look like based on interest.
    • 03:25:54
      So right now, it's showing 50 million a year in the six-year program.
    • 03:26:00
      And as I mentioned before,
    • 03:26:02
      This program, you will not see the VTIB funding of 283 million programs at this point.
    • 03:26:10
      That will be revisited in July when that program is open and we'll talk about how we'll account for that separately.
    • 03:26:22
      The next slide you've seen before.
    • 03:26:25
      It again just repeats the definitions and the values of the three funding items in the Governor's package.
    • 03:26:37
      What's been changed on this slide, we now are representing the initial capitalization of the VTED Bank at $283 million.
    • 03:26:45
      That was the final total with the adoption by the General Assembly.
    • 03:26:51
      We also, as the Governor mentioned, we had an illustrative project list that was used in the development and update of this year's program.
    • 03:27:04
      And for the most part, the projects were already in the 2011 through 16 approved Six-Year Improvement Program.
    • 03:27:11
      And these projects just were at a standstill.
    • 03:27:14
      They were not able to move forward without additional funding.
    • 03:27:18
      The list does and did.
    • 03:27:21
      contain contingency projects which could be funded going forward in the event another project on the list could not advance or if we have the realization of what we're hoping are good bids and surplus or savings on projects and we will continue to cycle through some additional projects with those savings.
    • 03:27:44
      And the projects that were included on the list were selected using the following criteria.
    • 03:27:51
      Projects in the program already lacking sufficient funding, critical use of funding for bridge projects and structurally deficient pavement.
    • 03:28:05
      We looked at local and regional priorities.
    • 03:28:09
      One of the biggest factors, we were really interested in using these bond proceeds that are being advanced quickly and expected to, so we're looking at projects that were expected to start construction within three years.
    • 03:28:23
      and we also put together a possible list for loans and grants for projects through the Virginia Infrastructure Bank.
    • 03:28:35
      And again, we were looking to maximize federal strategy in this effort.
    • 03:28:40
      We received input from this board, the district administrators, regional entities and localities throughout the process.
    • 03:28:52
      As I mentioned a few minutes ago, we did enhance the CMAQ programming process.
    • 03:29:00
      And this process involved projects being selected by the CTB district member in consultation with the MPO, VDOT, and DRPT staff.
    • 03:29:13
      And the guidelines we used was to fully fund project phases according to current schedules and estimates.
    • 03:29:22
      We didn't want funding sitting on projects for a long period of time.
    • 03:29:27
      We wanted to make sure the funding allocations were spread over the six years of the program based on the development cycle of the particular projects in which the funds were being used.
    • 03:29:41
      Again, funding all six years of the allocations, the MPOs have done that.
    • 03:29:48
      We're very happy with that.
    • 03:29:50
      We were hoping to address the inactive projects where some of the CMAC and RCP funding had been sitting previously and the discussion with the CTB member and the MPOs and the VDOT and DRPT staff was to enhance the consistency of the project selected with the CTB and regional guidelines.
    • 03:30:17
      We will be making some adjustments to the draft six-year program related to some of the MPOC MAC projects that were selected using the new process.
    • 03:30:29
      We want to make some minor modifications that are required to more closely align the allocations to the above guidelines.
    • 03:30:37
      We still need to
    • 03:30:39
      Do a little spreading of the dollars on projects based on the schedules and estimates and look at a little bit more at some of the inactive projects.
    • 03:30:54
      What I have on the next four slides are some examples, some that have been mentioned, of projects that have been funded in some way in the program.
    • 03:31:08
      This page identifies some interstate project examples.
    • 03:31:13
      I'm showing I-81 Exit 14 ramp in Bristol, I-64 Zion's Cross Road in Culpeper,
    • 03:31:21
      The I-95 relocation of interchange at Route 630, Gainesville to Haymarket on I-66, the Lane addition.
    • 03:31:31
      The Governor mentioned the widening of I-64 from Route 288 to Route 623 in Richmond, the Valley View interchange on 581 in Salem, and the 64 exit 91 interchange and bridge improvements at Route 285 in Stanton.
    • 03:31:50
      Primary projects, I won't read the whole list.
    • 03:31:57
      I think you can see.
    • 03:31:58
      I tried to give you examples throughout the state.
    • 03:32:04
      Same thing with some secondary projects on the next slide.
    • 03:32:13
      And then some urban project examples throughout the state.
    • 03:32:21
      This April meeting represents presenting the draft program about a month earlier than we have done previously.
    • 03:32:32
      So we're presenting you the draft today in next week and through May we will have our public hearings and make any adjustments to the Six-Year Improvement Program as necessary.
    • 03:32:47
      As John mentioned, we will be getting some more information on state revenues in first part of May, mid-May timeframe.
    • 03:32:58
      We'll see if that requires any adjustments.
    • 03:33:01
      and then we will bring the final program to CTB for approval at the June meeting.
    • 03:33:07
      The public hearings are shown on this slide, the dates and the times.
    • 03:33:15
      I believe all of these except Hampton Roads are actually at the district office.
    • 03:33:22
      Hampton Roads I believe is at the PDC office if I'm not mistaken.
    • 03:33:29
      and that concludes my presentation.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:33:34
      Any questions, Ms. Busher?
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 03:33:36
      Ms. Layne?
    • 03:33:36
      Ms. Busher, at the December Transportation Conference, one of the big issues was the MPO programming of CMAQ and at that time, we thought it was a huge issue.
    • 03:33:45
      Now, we're saying that this has been resolved in terms of their programming out.
    • Reta BusherChief of Planning and Programming
    • 03:33:51
      I think we've made, we've improved the communication process.
    • 03:33:56
      I believe
    • 03:33:57
      The MPOs were very supportive and very much they programmed their allocations over the six years I think for the most part.
    • 03:34:07
      There is a little bit of money that is still sitting on some balance entries as you can see by the slides that they programmed
    • 03:34:17
      300 million more in RCP and CMAC than we had done previously.
    • 03:34:24
      It was a great effort on their part.
    • 03:34:27
      They didn't have a long turnaround time.
    • 03:34:29
      So I think we still have some, just a little bit of work on spreading out the funds a little bit, which we will work with them on between the draft and the final.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 03:34:40
      Mr. Chairman, I'd just like to commend the MPOs for their work, and Mr. Sterling, I know he led the effort to come up with this compromise, and thank you for your efforts in that.
    • 03:34:48
      Looks like we've gotten good results, so thank you.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:34:52
      Any other questions?
    • 03:34:55
      That's a pleasure.
    • 03:34:55
      Thank you very much.
    • 03:34:56
      Thanks for all the work that you've done.
    • 03:34:59
      Thank you.
    • Steve PittardChief Financial Officer
    • 03:35:24
      Thank you, Chairman, members of the board.
    • 03:35:27
      I'm going to take you all through our six-year program development process and then also what's actually in the draft program before you.
    • 03:35:34
      The first slide here is something you've seen before, but it does show the process, which began many months ago with our actual, and years ago, quite frankly, the planning process, different studies, both on the rail side, the transit side,
    • 03:35:53
      with those planning documents feeding into our applications that we've reviewed.
    • 03:35:58
      And we're here before you today in the middle, quite frankly, of the process presenting the draft.
    • 03:36:04
      And then obviously, as Ms. Busher said, we'll have the next two months to have debate about the draft and potentially make changes before we come back in June for our vote on a final program.
    • 03:36:19
      This slide just shows the DRPT program the last four years comparing the total six-year program.
    • 03:36:29
      And overall from the first year shown here, the 09-14 program to the current year, the biggest change, quite frankly, is the Dulles Quarter Metrorail Project.
    • 03:36:40
      Obviously, Metropolitan Washington Airports has already took over management of that project, so the funding moved to them rather than
    • 03:36:49
      on our six-year program.
    • 03:36:51
      Additionally, what I would like to focus here is on year-over-year changes for FY11 to FY12.
    • 03:37:00
      We did have increases in the Transportation Trust Fund revenues about 17 percent.
    • 03:37:07
      Also, the Rail Enhancement Fund showed a similar year-to-year increase and over the six-year period about 11 percent.
    • 03:37:14
      We have seen some improvement, as the governor mentioned, in the revenues in the last, really, year, six months to a year.
    • 03:37:23
      Recordation tax didn't quite follow that.
    • 03:37:26
      It did have a slight uptick, but at this point, nobody's really ready to go out on the limb and predict those out years showing any sort of recovery.
    • 03:37:36
      So we're still sitting at about half the revenue from when that source was dedicated to transit operations.
    • 03:37:43
      And finally the other source is federal and our bond funding are all flat with the prior years.
    • 03:37:51
      This slide I just wanted to touch on before I go into the details of the transit side and the rail side, just some of the items as I go through that I'm hopefully going to highlight throughout.
    • 03:38:02
      First item is we do still need, even though we did get past a passenger rail operating capital fund in the general assembly session,
    • 03:38:12
      which is great because it gives me a legal avenue to actually make expenditures without getting General Assembly earmarks on passenger operations for rail.
    • 03:38:23
      But the problem is there was no dedicated source of revenue provided.
    • 03:38:27
      So half the problem solved, we still have another half or maybe more than half to solve.
    • 03:38:36
      Another item, as I just mentioned, the revenue uptick in transit, it did allow the operating share to reverse a very bad trend that we've been seeing the last few years, where last year we were actually at our lowest operating share from the state perspective in history at 14%.
    • 03:38:54
      So we were able to improve that with the revenue increases to 17% in the current year program.
    • 03:39:01
      And as I mentioned, recordation tax is still lagging behind in that recovery process.
    • 03:39:08
      And one more point here, we all see the rise in gas prices.
    • 03:39:12
      And in our program, you know, we didn't really see in the application for the budgets for the coming year much impact.
    • 03:39:19
      I'm not saying there wasn't any, but it wasn't a significant impact overall.
    • 03:39:25
      And a lot of that has to do with
    • 03:39:27
      A lot of the providers have year, two-year, three-year contracts, and those contracts are going to start expiring, and we really think next year, when we're doing the budget for next year, we're going to see this as a big issue, unless, of course, I guess gasoline could retreat in price, but don't think we can count on that.
    • 03:39:48
      Finally, the last point as I go through, the transit capital project state match, we once again had a priority on replacement rolling stock.
    • 03:39:57
      We did add a category this year for grantees that don't accept federal dollars.
    • 03:40:03
      And then finally, all the other capital projects received a blended rate of the two different pots of capital funding that we have to work with.
    • James E. RichMember, Commonwealth Transportation Board
    • 03:40:12
      Right now I guess the toll road had been transferred to oversight of the Air Force Authority and that's essentially was the cash
    • Steve PittardChief Financial Officer
    • 03:40:41
      generator or revenue generator from the state's perspective for that project.
    • 03:40:49
      We did add two years ago there was $125 million of the CPR bond funding that was added and then also some highway funds, I think about $75 million of highway funds but we haven't added any further funding.
    • James L. KeenMember, Commonwealth Transportation Board
    • 03:41:07
      The only funding that's in this program before you is there's a six
    • Steve PittardChief Financial Officer
    • 03:41:11
      $0.5 million balance for bus service with Fairfax, bus rapid transit service that had been committed to for one last year.
    • 03:41:23
      So that's the only additional funding.
    • James E. RichMember, Commonwealth Transportation Board
    • 03:41:26
      So we don't anticipate any more funding from the Commonwealth and we don't have any role in the management of all the transfers.
    • Steve PittardChief Financial Officer
    • 03:41:37
      We do over, you know,
    • 03:41:39
      The actual agreements that were signed does afford the Commonwealth certain management prerogatives.
    • 03:41:47
      So I wouldn't say we have no management of the project.
    • 03:41:50
      The day in and day out management of that project is being handled by the Air Force Authority.
    • 03:41:55
      But because obviously we handed over the toll road, and really I believe it was a 50-year lease, so we didn't give it to them.
    • 03:42:03
      We leased it to them.
    • 03:42:04
      And there are certain provisions that could reverse
    • James E. RichMember, Commonwealth Transportation Board
    • 03:42:08
      So people come up to me, whether they're elected officials or whatever, and say, you need to do something here.
    • 03:42:14
      There's a sense of need.
    • 03:42:15
      No, I'm sorry.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:42:16
      This is not a conversation you should be responding to.
    • 03:42:21
      Okay?
    • 03:42:21
      Okay.
    • 03:42:22
      And, Mr. Rich, there's something we can talk about offline.
    • James E. RichMember, Commonwealth Transportation Board
    • 03:42:24
      Okay.
    • 03:42:25
      Sounds good.
    • 03:42:26
      I'm just trying to get a handle on the call.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:42:27
      Yeah, I understand.
    • 03:42:28
      I understand.
    • 03:42:28
      But there obviously is an issue that we are actively
    • Steve PittardChief Financial Officer
    • 03:42:33
      With that, on our transit side, I'm going to go into some more detail here.
    • 03:42:46
      These are the programming goals that you all have seen before, so I'm not going to just briefly go through them.
    • 03:42:51
      Obviously, state of good repair we've talked about, expanding capacity is obviously important, and we have several other items there.
    • 03:42:57
      As Mr. Busher said, we're trying to
    • 03:43:02
      The last three years pushed the projects that are actually ready to go.
    • 03:43:05
      So we're now looking at projects.
    • 03:43:10
      We don't want to put money on a project and it sits for three years.
    • 03:43:13
      We want projects that are actually, hopefully the contract, our goal now is within a year the contract has gone out the door from our agency to the grantee.
    • 03:43:22
      And obviously we'd like to maximize the use of federal funds also.
    • 03:43:28
      So particular as far as the assumptions go, the operating funding, we did have $17.5 million more of operating funding this year versus last year, which did have us end up with a 17.2% share of the total cost that the state is actually participating in.
    • 03:43:52
      We did add in about $4 million of deobligated balances, which is projects that
    • 03:43:57
      either didn't end up moving forward or ended up coming in under budget.
    • 03:44:03
      And as we spoke about, the rest of that increase was due to transportation trust fund revenue increases.
    • 03:44:10
      On the capital program, rolling stock at 80 percent.
    • 03:44:15
      The recipients that do not receive or do not accept federal dollars, we have chosen to give them 50 percent match using CPR bond funds.
    • 03:44:26
      and then all other projects were blended together for a blended rate of 54%.
    • 03:44:32
      And I guess not to get too detailed here but we have two different pots of capital funding and they each have their own different sets of rules so this blending is sort of our attempt to try to make those two pots of funding work together.
    • 03:44:48
      And finally, the last point here is we do have in the program, we've used the same percentage off the top of our funding sources for the administration of our programs, 2.5%.
    • 03:45:01
      We'll be completing our internal budget in the next few weeks.
    • 03:45:04
      So this, it may end up being the 2.5%, it may change between now and the final draft.
    • 03:45:12
      These next few slides are just graphical representations of what I've been talking about here.
    • 03:45:18
      Obviously we had that downward trend on the operating funding share and thankfully it has ticked back up in the current year.
    • 03:45:27
      This takes the operating funding and breaks it down between basically the bottom bar being fair box recovery or operating revenues and state share.
    • 03:45:38
      Federal share, and then local share, which basically fills the hole at the bottom, or in this case, the top of the chart.
    • 03:45:48
      And those items, as you can see, they've remained fairly consistent, except the state share had shown a declining trend, and maybe we've reversed that, and hopefully going back the other way.
    • 03:46:00
      This is a capital share chart.
    • 03:46:03
      The current year is 55% when you take that 50% funding and the 54% funding and the 80% funding and put the actual weighting of the total cost related to them, it ends up at a 55% share when you combine them all together.
    • 03:46:19
      And the main thing here is we're trying to push to where people have a reliable percentage that they can count on when they come to us.
    • 03:46:30
      As you can see, there's been years where we were 20, 23% funding.
    • 03:46:34
      And if you're trying to manage a six-year capital program as a transit provider, it's kind of hard to time your applications to us or actually really manage your capital program when you don't know whether you're going to get 20 cents on the dollar from us or you're going to get 55 or 76 cents on the dollar.
    • 03:46:54
      There's a significant difference.
    • 03:46:55
      So we're looking to stabilize these matches so people know
    • 03:46:59
      What they're going to get from us and then they can properly plan from there.
    • 03:47:02
      And then where the money actually went in transit, state of good repair items, and these mirror a lot what the governor said earlier, replacement buses and vans.
    • 03:47:17
      We did fund 15 replacement rail cars for VRE.
    • 03:47:22
      The pre-matching funds for WMATA are funded again.
    • 03:47:26
      And then capacity expansion, we had 40 service expansion buses that are funded.
    • 03:47:32
      The amount of the money we spoke on, the Delos Metro Rail Project.
    • 03:47:37
      The final funding for the Tide, the Norfolk Light Rail Project.
    • 03:47:42
      Columbia Pike Streetcar Preliminary Engineering was also funded.
    • 03:47:46
      and finally facility construction across the state with some of those being preliminary engineering, some of them that are actually ready to be constructed.
    • 03:47:58
      And the last thing before I leave transit, I just want to touch on one other item that came out of the General Assembly session was a Senate Joint Resolution number 297 and this directs us to study transit related issues and it gives us four main areas to look at which are performance,
    • 03:48:17
      Prioritization, Stability, and Allocation.
    • 03:48:20
      And I guess for us, as I spoke on, we have these two capital funds that don't really work that well together.
    • 03:48:27
      We have an operating process that provides funding strictly based off of the total cost and your share of that total cost.
    • 03:48:38
      And so for our agency, this is something we think is very welcome and needed, a good review
    • 03:48:44
      the code section and the rules that we're following essentially because a lot of those rules were created in 1986 and I think today transit is a little more important than at that point in time so during the next we have to be done with this by November so for us it's one of the biggest projects in the agency in the coming year because what we hope to get out of this is consensus with our transit stakeholders
    • 03:49:10
      and then potentially go back to the General Assembly with a study that hopefully can make some good change in focusing on these areas that we've been directed to look at.
    • 03:49:22
      With that, I'll talk about rail for a little bit.
    • 03:49:24
      These are the same rail enhancement program goals you all have seen before.
    • 03:49:28
      It follows the CTB adopted policies.
    • 03:49:34
      Must be in regional plans.
    • 03:49:35
      We have a cost benefit measure that has to be followed.
    • 03:49:39
      and then obviously priority is given when a project is, the rail piece is part of a bigger project such as like a Port of Virginia type project or a partly quarter for example.
    • 03:49:52
      Some of the more detailed assumptions, spoke on earlier the operating costs for passenger rail.
    • 03:49:58
      You know we're $110 million funding gap in the program that's before you.
    • 03:50:03
      That's for the years 13 through 17.
    • 03:50:07
      Fiscal Year 12, we have the funding to cover Fiscal Year 12, which is essentially just the Richmond train and the Lynchburg train, potentially a portion of the Norfolk train.
    • 03:50:21
      The problem comes in the years after that, because as I said before, a fund was created, but no funding source.
    • 03:50:28
      The current code section and ability that CTB has to provide funding
    • 03:50:34
      is through code section 33-1-23-1, the last bullet on the slide.
    • 03:50:40
      And it basically states that the board may allocate up to 10% of highway funds to a rail project.
    • 03:50:48
      That's not our agency's proposed solution because obviously we'd be taken away from highway projects to do that.
    • 03:50:57
      But I bring it up because we
    • 03:51:00
      We got halfway there this year and in the coming General Assembly session we've got to find a permanent source of funding or I may be back here next year and we may be actually talking about this is the only avenue we have to fund that subsidy.
    • 03:51:16
      You know, we don't want to start these trains and turn around and stop them.
    • F. Gary GarczynskiMember, Commonwealth Transportation Board
    • 03:51:20
      Are these the lines that Amtrak is going to hand over to us?
    • 03:51:25
      Four of them.
    • 03:51:26
      Yes, four of them.
    • Steve PittardChief Financial Officer
    • 03:51:27
      Four of them.
    • 03:51:28
      Twelve is the, we started the Lynchburg train, we started the Richmond train, and then in thirteen we have the four, two from Newport News and two more from Richmond.
    • James E. RichMember, Commonwealth Transportation Board
    • 03:51:38
      Do we fund any of the metro systems that we give money to them too?
    • Steve PittardChief Financial Officer
    • 03:51:42
      Yes, the WMATA metro system is funded through the transit side.
    • 03:51:46
      And typically they get about half of the operating funding, which is a total of 120 million, so about 60 million there, and then a sizable amount of the, like I said, that match for the PREA, that's for WMATA, that's a $50 million match.
    • 03:52:04
      They get a large amount of the transit funding.
    • James E. RichMember, Commonwealth Transportation Board
    • 03:52:08
      Do we have somebody on there now, Mr. Secretary?
    • 03:52:10
      Four, I'm sorry.
    • 03:52:11
      That sits on there from the Commonwealth?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:52:13
      Uh, shortly we will.
    • 03:52:17
      Okay.
    • 03:52:18
      Thanks.
    • 03:52:20
      That was included in the budget bill that one of the primary seats from Northern Virginia Transportation Commission will be at a point deep in the state.
    • 03:52:33
      The Governor has not signed the budget bill yet, has he signed it?
    • 03:52:37
      But when he does, it's effective immediately.
    • Steve PittardChief Financial Officer
    • 03:52:41
      Right.
    • 03:52:42
      And then we have to work a transition, obviously, with 24 hours.
    • 03:52:51
      This is just a map of those trains that you inquired about, Mr. Chairman?
    • James L. KeenMember, Commonwealth Transportation Board
    • 03:52:57
      Steve, I guess my question is, the four trains that we're going to have to stop in 2013 if somebody doesn't identify operating revenue, is that a safe statement to say?
    • 03:53:12
      I mean, we're not going to have, under the present budget that you're presenting here, you haven't identified money to operate those trains.
    • Steve PittardChief Financial Officer
    • 03:53:21
      That's correct.
    • James L. KeenMember, Commonwealth Transportation Board
    • 03:53:22
      So shouldn't we be about identifying, working, looking at what are our alternatives?
    • 03:53:29
      Is that something that this board needs to be looking at?
    • Steve PittardChief Financial Officer
    • 03:53:32
      Yeah, that to me is why I put that on, you know, I don't, to me that's our only option today.
    • 03:53:38
      Twelve, we're okay, but next year we will, you know, if the General Assembly doesn't address this next year, we have to address it.
    • 03:53:49
      We don't like the idea of taking funds, and I'm not sure, y'all may not want to do that, but if not, then we have to talk about are we going to continue those trains?
    • James L. KeenMember, Commonwealth Transportation Board
    • 03:54:05
      Well, we just increased the traffic on the road, but we didn't fund the trains, so, you know, it's a catch-22.
    • 03:54:12
      We've got to find the revenue source, and that needs to be at the top of everybody's list, I think.
    • 03:54:17
      to look at this issue with the General Assembly back home all the way through to the next session.
    • Steve PittardChief Financial Officer
    • 03:54:25
      I concur.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:54:26
      Mr. Chairman, you're saying it's $110 million over the six-year period, so is it really $110 million over the five-year period?
    • Steve PittardChief Financial Officer
    • 03:54:40
      That's correct.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 03:54:41
      So $22 million a year, is it flat-lined?
    • Steve PittardChief Financial Officer
    • 03:54:44
      It actually goes up.
    • 03:54:48
      Thelma D. Young, Thelma D. Young
    • 03:55:11
      around that.
    • 03:55:13
      I think in our plan there, and Kevin you're here, you may correct me if I'm wrong on this, but I think in our plan we may have in the out years that there's a possible expansion of the Norfolk train we're starting to, we contracted with Norfolk Southern that we could have three trains.
    • 03:55:30
      So we were able to negotiate instead of just getting one, we said give us three slots.
    • 03:55:35
      Now they know and we know to start with we're only going to start with one train, but we
    • 03:55:39
      went ahead and got the capacity up front.
    • 03:55:42
      And I think in the plan we might be showing in 1617 a second or a third train for that service.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:55:55
      I'm sorry, so what is the status of the Norfolk train?
    • SPEAKER_14
    • 03:56:00
      We're very proud of the status of the Norfolk train, Mr. Secretary.
    • 03:56:04
      We are under contract with Norfolk Southern.
    • 03:56:06
      They have already started.
    • 03:56:07
      All the preliminary work and we're going to start doing monthly emails.
    • 03:56:13
      First one which will come out next week, by the end of next week to everyone involved so that they can follow along with going on.
    • 03:56:21
      So we're still on our same time frame that we were on before by 2013 or very early into 2013 to have service running.
    • 03:56:29
      Maybe sooner, maybe, but we know we can meet the 2013.
    • Steve PittardChief Financial Officer
    • 03:56:36
      And I guess just the last thoughts on rail.
    • 03:56:40
      We did utilize some accelerated bond funding on a couple of projects, which we reversed that acceleration in our out years in 16 and 17.
    • 03:56:50
      So in total, it doesn't show up.
    • 03:56:52
      But one of those projects was the VRE extension to Spotsylvania, the third track that's a requirement for that extension.
    • 03:57:00
      Also, this project is an advancement of our high-speed rail corridor from Richmond to Washington.
    • 03:57:08
      It is one of the 19 projects that were identified for the high-speed rail corridor there.
    • 03:57:13
      And then also, as I mentioned a few months back, the Kilby Support Yard, which is a key rail yard serving the Port of Virginia, that project, we were able to accelerate it also as it's ready to go.
    • 03:57:27
      The other points here, we did,
    • 03:57:31
      As Ms. Busher indicated, the rail program in particular, we are working towards changing our allocation process to try to match better up with when the actual expenditures will occur so we aren't sitting on large amounts of cash.
    • 03:57:46
      And then rail preservation program, we got the remaining grantees to work with us and get a six-year program implemented so that now that is completely a six-year process and once again,
    • 03:58:01
      The two rail funds, we have the estimated 2.5%.
    • 03:58:05
      And this last slide just mirrors what Ms. Busher had earlier about the process over the next two months.
    • 03:58:12
      And with that, if there are any more questions, I'll be glad to answer them.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 03:58:16
      Any further questions?
    • 03:58:18
      Ms. Koelemay?
    • 03:58:19
      Thank you.
    • SPEAKER_10
    • 03:58:20
      You played out an interesting mix of successes and uncertainties.
    • 03:58:25
      I have a question particularly about fuel price increases.
    • 03:58:30
      Utilities have built into their contract fuel surcharges.
    • 03:58:34
      Taxis in my region are adding fuel surcharges as the price of gasoline has gone up.
    • 03:58:40
      Where does that fuel cost increase over and above the estimates here play out?
    • 03:58:45
      For example, in your operations funding slide on page
    • 03:58:49
      For fiscal year 12, it's going to come out of the local portion.
    • Steve PittardChief Financial Officer
    • 03:59:04
      So that's somewhat the concern is, you know, were the budgets adjusted to take into account for it.
    • 03:59:12
      I think to a degree they were because this didn't happen overnight.
    • 03:59:16
      But I think we get to next year, a lot of those contracts that are there are going to be gone and then we're going to see a significant increase.
    • 03:59:24
      Then that's when the discussion has to be, Mr. Koelemay, what you're getting at is do we increase fares?
    • 03:59:31
      Does the state need to come in and help subsidize?
    • 03:59:34
      Where does that extra come from?
    • SPEAKER_10
    • 03:59:38
      Mr. Chairman, if I may, it sets up an interesting conundrum of where
    • 03:59:43
      Our state agencies and our public transit and rail facilities are having to pay more for fuel.
    • 03:59:51
      We have the capacity to get additional revenues ourselves to help support that, but we're sort of paralyzed our ability to do that.
    • 03:59:58
      So we're just suffering like everybody else, even though we have some capacity that we can bring to it.
    • Steve PittardChief Financial Officer
    • 04:00:04
      And I'll add to what you said, if I may.
    • 04:00:07
      It's also a time when gas is $4 a gallon.
    • 04:00:10
      It's a time when more and more people are willing to try transit and really the choice customers are thinking about trying transit.
    • 04:00:19
      And so if we can't do something, what might happen is we cut those services that those choice customers, like for instance, the Chesterfield Express, you know, it's a service that could
    • 04:00:32
      How is VRE doing?
    • 04:00:34
      Is the ridership going up and is it doing well as far as being on time and all that stuff?
    • 04:00:54
      The one time part I can't speak to.
    • 04:00:56
      I don't know if Mr. Drake, but the ridership is records.
    • 04:00:59
      It's too full.
    • 04:01:02
      There's people waiting on the platforms.
    • 04:01:06
      That's why these rail cars that were in the presentation are essentially, we'll get the whole fleet to double deck.
    • 04:01:14
      So that will help a little bit with capacity.
    • 04:01:17
      Then the next step would be to actually extend platforms to make longer trains.
    • 04:01:22
      They're basically maxed out on higher show.
    • 04:01:24
      Really?
    • 04:01:24
      That's great.
    • SPEAKER_14
    • 04:01:26
      Mr. Chairman, and if I can add to that, their original goal was 10,000 people a day.
    • 04:01:30
      They have broken 21,000.
    • 04:01:31
      Really?
    • 04:01:32
      So they're doing very, very well.
    • 04:01:36
      They have also funded some money to help people buy a step-up ticket to Amtrak.
    • 04:01:41
      which would be more like the express train than the commuter stops in order to help with their overcrowding.
    • SPEAKER_10
    • 04:01:48
      Parking is a huge issue.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:01:53
      Any further questions?
    • 04:01:56
      Thank you very much.
    • 04:01:59
      Now go to the Hampton Roads Bridge Tunnel.
    • SPEAKER_10
    • 04:02:09
      Thank you, Mr. Chairman.
    • SPEAKER_20
    • 04:02:22
      My presentation today is focused on recommendations that we need to provide to the CTB.
    • 04:02:27
      These recommendations are from the Virginia Department of Transportation, but the PPT office is going to provide them to you.
    • 04:02:35
      And they are required due to 2010 Acts of the General Assembly.
    • 04:02:43
      This first slide, everybody's familiar with the Hampton Roads, but what I wanted to try to identify here is there are five major tunnels in the Hampton Roads area.
    • 04:02:53
      And the Hampton Roads Bridge Tunnel, shown on here, Montremerrimack Bridge Tunnel.
    • 04:02:58
      Another PPTA that we're doing is the Midtown and the Downtown Tunnel.
    • 04:03:01
      Most are on, or three of them are on interstates and two of them are on primaries.
    • 04:03:05
      They are key elements of the transportation in the Hampton Roads area.
    • 04:03:12
      Now a little bit about the legislation.
    • 04:03:14
      The legislation was passed in 2010, General Assembly.
    • 04:03:18
      The legislation is project-specific legislation that applies to the Hampton Roads Bridge Tunnel.
    • 04:03:25
      I want to talk about five things that are required of VDOT as part of the legislation and
    • 04:03:30
      Mr. Walton talked about legislation similar to this that was passed this year on the Patriot's Crossing.
    • 04:03:36
      So we'll probably be going down the same process with Patriot's Crossing.
    • 04:03:40
      But what we had to do at Virginia Department of Transportation was make available information pertaining to the Hampton Roads Bridge Tunnel.
    • 04:03:47
      We were required to accept any unsolicited proposal that was submitted prior to September 30, 2010.
    • 04:03:54
      And then we were required to put it out for a 120-day competition period.
    • 04:04:01
      The reason that I'm here today is the fourth item on here, which is make recommendations to the CTB whether to advance no more than two proposals to an IRP, and we're making that prior to May 1st.
    • 04:04:12
      The last thing that is required by the Department is, and the staff will make this to the Commissioner, is make a recommendation by September 1st of whether to execute an interim agreement.
    • 04:04:22
      So those are the four things that are required by the legislation itself, and we're meeting one of the requirements with this presentation.
    • 04:04:31
      Current status of the procurement Hampton Roads Crossing, which the main developer in Hampton Roads Crossing is Skanska ID submitted an unsolicited proposal within the timeframe that was allotted under the law itself.
    • 04:04:44
      In fact, they were one day early.
    • 04:04:47
      Consistent with the law, VDOT accepted the HRC unsolicited proposal on October 28th, and we quickly posted it so that we could initiate the 120-day competition period.
    • 04:04:59
      Prior to the end of the competition period, Hampton Roads Mobility Group, which is the main developer of that one, is ACS Infrastructure Development, and Sentra Infrastructure submitted competing proposals, obviously prior to the ending of the competition period itself.
    • 04:05:18
      What we've done since we received those proposals, we've certainly evaluated each of the proposals submitted pursuant to the law itself.
    • 04:05:26
      And the recommendations that I'll give you today are consistent with the evaluation that we conducted.
    • 04:05:33
      Also other activities that we've been doing, we've started studies along the I-64 corridor.
    • 04:05:39
      Obviously to identify the need for transportation improvements along the corridor.
    • 04:05:43
      There are two adjacent environmental studies going along.
    • 04:05:46
      One is on the peninsula and that will go from Richmond, I-95 in Richmond, all the way down into Hampton and I-664.
    • 04:05:55
      And the second one is specific to the Hampton Roads Bridge Tunnel which goes from I-664 to I-564.
    • 04:06:03
      The first study is currently underway and the second one is going to get noticed to proceed, we believe, in the first part of May.
    • 04:06:11
      Goals for the environmental documents that are being created are to obviously get through the federal process, the federal NEPA process, but we also want to better identify what the risks are along the corridor for any type of project that we're going to develop and also identify and narrow a scope.
    • 04:06:30
      A well-defined scope is the best thing that we can do when
    • 04:06:33
      We're moving forward on a competitive procurement.
    • 04:06:38
      Again, this is just a map showing the two corridors.
    • 04:06:41
      The Hampton Roads Bridge Tunnel obviously is one of the main corridors of the studies.
    • 04:06:45
      I-64 you can see going up to the peninsula itself.
    • 04:06:48
      That's another one of the key areas of the studies that are going on.
    • 04:06:53
      And as you can see and as I stated earlier, bridges and tunnels are a key transportation element of the Hampton Roads area.
    • 04:07:01
      Now to the recommendations itself.
    • 04:07:03
      Recommendations that we have are focused on project development.
    • 04:07:08
      Our recommendation is to advance none of the three conceptual proposals to an IRP at this time.
    • 04:07:14
      And the specific elements of the law was that the recommendation was to identify whether we would advance any of them to an IRP.
    • 04:07:24
      We want to retain all three conceptual proposals that were submitted pursuant to the law itself
    • 04:07:29
      We want to continue the studies that are necessary to complete the environmental documentation process and for conclusion with an environmental impact statement.
    • 04:07:38
      And most importantly, we want to continue the project development work that will be going on in concert with the environmental documents.
    • 04:07:47
      And that's focused on high level and detailed level assessments of the different projects, value for money analysis, development of a risk management plan,
    • 04:07:57
      Development of a business case plan so that we can truly see that there's value for money, that there's cost benefit.
    • 04:08:05
      We'll do some high-level reviews of the costs associated with the project.
    • 04:08:11
      And most importantly, through this process of project development, we want to go out to the public.
    • 04:08:17
      We want to go out to the jurisdictions.
    • 04:08:18
      We want to talk to them about the project, and we want to involve the CTB members in the area.
    • 04:08:24
      To make sure that we've got a project that everybody is a proponent of so that we can make sure that it is something that these citizens along the corridor want to be a part of.
    • 04:08:40
      And also let them know what some of the financing is, what the tolls are.
    • 04:08:43
      Obviously with Midtown Tunnel we've got some discussion about tolls.
    • 04:08:47
      We want to put that up front and make sure that everybody knows what the tolls of the facility are.
    • 04:08:51
      Those are our recommendations, and with that, Mr. Secretary, I'll turn it back to you, or have any questions.
    • SPEAKER_10
    • 04:08:59
      Thank you, Ms. Paul.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:09:01
      Any questions?
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:09:02
      Thank you for the acronym, Ms. Butler.
    • 04:09:08
      IRB is not on it.
    • SPEAKER_20
    • 04:09:11
      That's an independent review panel.
    • 04:09:12
      Sorry, sir.
    • SPEAKER_10
    • 04:09:15
      Appreciate it.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:09:16
      I had it.
    • 04:09:18
      What does it really mean
    • 04:09:22
      If you had recommended to advance one or more of these to an IRP, what does that really mean in terms of the process and what does it mean by sort of not doing that?
    • 04:09:34
      I mean, obviously, you're sort of saying we're continuing to look at it, we're progressing on some other things that would have facilitated if we decided to do it.
    • 04:09:42
      Just a little bit of background on what an IRP is.
    • SPEAKER_20
    • 04:10:02
      It is a group that is impaneled by the Secretary of Transportation.
    • 04:10:06
      It usually involves CTB members, members of the Virginia Department of Transportation, community
    • 04:10:12
      members of the local MPO, different individuals that come together and that they assess each of the conceptual proposals that come in.
    • 04:10:21
      The focus of the conceptual proposals are specific to the qualifications and experience of the proposers, not necessarily a finance plan or a detailed review of how they're going to build the project or construction schedule or estimates or anything like that.
    • 04:10:37
      So it's a very high level review.
    • 04:10:41
      In place of the IRP under our new guidelines, we have public outreach and that's one of the things that we stress is that we want to go out to the jurisdictions, we want to talk to them, we want to talk to the citizens about the project and see how they feel about the project, see how they feel about
    • 04:10:57
      a preliminary finance plan.
    • 04:10:59
      So we're replacing the IRP process with a good transparent public outreach process.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:11:08
      But in some ways the statute and the proposals both on this and Patriot's cross-crossing are ahead of where we are right now.
    • 04:11:27
      because we haven't done the necessary environmental documents on either crossing in order for us to even empower an IRP to determine if any of the proposers can do either of those because we don't know what either of those are from a textbook.
    • 04:11:51
      So we need to get, I mean essentially we're holding this in sort of limbo right now.
    • 04:11:57
      Until we can get the necessary studies done so we know exactly what we should be looking for regarding this proposal.
    • 04:12:08
      And the same is going to happen with the Patriot's Crossing.
    • 04:12:11
      So next year when we finish with the, we'll finish with both the environmental documents for both of them around the same time?
    • SPEAKER_20
    • 04:12:18
      Well, the schedule for the environmental documents is about a two-and-a-half year period, so 2013 and 2014.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:12:25
      But we'll have a, I'm sorry, we'll have a draft.
    • SPEAKER_20
    • 04:12:28
      We'll have a draft, yes.
    • 04:12:29
      In late 2012, we'll have a draft.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:12:32
      And will it be done with the Patriots Crossing, at least that update around the same time?
    • Gregory A. Whirley Sr.Vice Chair, Commonwealth Transportation Board
    • 04:12:39
      I don't know.
    • Richard L. Walton Jr.Chief of Policy and Environment
    • 04:12:40
      My understanding, Mr. Secretary, the Patriots Crossing is,
    • 04:12:46
      is actually the third crossing on which we already have a record of decision.
    • 04:12:50
      So what we're doing now, we're going through a reevaluation process, which is a much shorter process.
    • 04:12:56
      We're not sure of the timing, but we're hoping we'll have that reevaluation done sometime next year.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:13:03
      So they're both going to be done around the same time?
    • 04:13:06
      Then we can go back and pull these back and so we know when we go to tell an IRP to look at these that we have the scoping documents that will allow us to, you know, an IRP to actually make a decision.
    • 04:13:20
      So this is just getting, I mean, we're not rejecting any proposals.
    • 04:13:24
      We're within the confines of this law and we'll be, first of all, the Patriots crossing, third crossing.
    • 04:13:30
      The issue for us is basically we need these documents, these necessary federal, not state, federal documents for us to be able to have a scope for us to be able to make any evaluation on these projects for the potential contractors.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:13:48
      And if you could, I don't want to pinch on everybody else's talking much, but if it went to an IRP,
    • 04:13:57
      Then the IRP, I presume, is that a step that has to be positive in order to move to the next level?
    • 04:14:05
      Does the IRP have to say yes, or is it just an advisory?
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:14:08
      No, the IRP makes a recommendation for the Commissioner, and the IRP can go and make a recommendation to the Commissioner, and what he would say is, well, we don't have necessary documents, so I can't move forward on anything.
    • 04:14:19
      So it's a chicken or the egg issue.
    • 04:14:21
      So we don't want to get that IRP impaneled to make a recommendation.
    • W. Sheppard Miller IIIMember, Commonwealth Transportation Board
    • 04:14:26
      But if they recommended yes, he could say no.
    • 04:14:29
      If they recommended no, he could say yes.
    • 04:14:32
      It's an advisory recommendation.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:14:34
      That's right.
    • 04:14:34
      But then the thing is we don't want an IRP.
    • 04:14:36
      Sure.
    • Aubrey L. Layne Jr.Member, Commonwealth Transportation Board
    • 04:14:37
      They don't have the stuff to do the final thing.
    • 04:14:40
      Mr. Layne.
    • 04:14:41
      I think this is a very wide way to approach this situation, obviously.
    • 04:14:45
      I would encourage us working with the MPO.
    • 04:14:47
      I know they're dealing with it too, so I think that'd be a great way to move forward, and I think it's very wise in which to do this.
    • SPEAKER_10
    • 04:14:55
      Mr. Chairman, could you plan on re-advertising, you know, the CTTA after the EIS is done, or are you just going to evaluate the existing proposals based upon what the EIS comes back with, and then make a determination at that point?
    • SPEAKER_20
    • 04:15:14
      Well, we haven't made a final decision on the procurement strategy that we're going to do because the environmental document may come back with a scope that's totally different from the proposals that have been submitted.
    • 04:15:24
      So we want to see and work in concert with the environmental document to create a procurement strategy that'll allow us to get the best competitive procurement when that time comes about.
    • 04:15:33
      Okay, so in a way it really was, came out on the street a little early, I guess you could say, you know, at that particular time.
    • 04:15:40
      And as we were required by the law, we just followed the provisions of the law.
    • Sean T. ConnaughtonChair, Commonwealth Transportation Board
    • 04:15:46
      Thank you very much.
    • 04:15:52
      That finishes our workshop agenda.