Note: The following text was automatically generated from old images of the meeting minutes. It contains typographical errors from the conversion. It might not include all of the meeting minutes. 8-4-55. Minutes of the Meeting. of :the State Highway Commission of Virginia, Held in Richmond, August 4, 3.955. At 9:00 o clock Thursday, August 4, the Commission met in the Central Office Building, Richmond, Virginia. The following members were present: Messrs. E. P. Barrow, S. S. Flythe, S. Do May, S. W. Rawls, Tucker C. Watkins, Jr., William A. Wright and J. A. Anderson. The meeting was called to order by the Chairman. The Chairman dispensed with the reading of the minutes of the last meeting they having been mailed to the members. On motion made and seconded the minutes of the May 4-6 meeting were approved, Moved by Mr. Rawls, seconded by Mr. May, that the permits issued from the May 4-6 meeting to date, inclusive, as recorded in the Auditing Division, be approved. Motion carried. Moved by Mr. May, seconded by Mr. Barrow that the permits cancelled by the Commissioner from the May 4-6 meeting to August 4, inclusive, as authorized June 25, 1947, and recorded in the Auditing Division, be approved. Motion carried, Moved by Mr. Barrow, seconded by Mr. Watkins, that the following RESOLUTION OF THE HIGHWAY COMMiSSION, adopted In June by letter ballot be confirmed. Whereas Burton Marye, Jr., Deputy Commissioner and Chief Engineer of the Department of Highways, has tendered his resignation effective July 1, 1955, to accept the position of General Manager, Richmond-Petersburg Toll Road Authority, and whereas during his 30 years of service with the Department he has displayed exceptional ability and has gained national recognition as one of the Nation s leading highway engineers and highway administrators, and whereas in the capacities of Traffic RC Planning Engineer, Assistant Chief Engineer, and Deputy Commissioner and Chief Engineer his keen knowledge of highway engineering and finance has contributed greatly toward the development of Virginia s Highway System; Resolved that the State Highway Commission accept, with profound regret, the resignation of this outstanding Highway Engineer-resolved further, that this Commission extend to Mr. Marye its wishes for much happiness and success in his new undertaking-.4t is ordered that a copy of this resolution be given to Mr. Marye and that a copy be spread on the records of the Virginia Highway Commission. Motion carried. 8-4-55. The Commission was advised of a number of changes made in the organization as of July 1, some of which are as follows: Mr. F. A. Davis, promoted to Deputy Commissioner and Chief Engineer; replacing Mr. Burton Marye, Jr., resigned. Mr. G. L. Nunnally, promoted to Purchasing Agent. Mr. T. A. Newby, promoted to Assistant Purchasing Agent. Mr. Melvin G. Lyell, promoted to Safety Engineer. Mr. Frank H. Blackwell, promoted to Assistant Safety Engineer. The following changes to be effective September 1, 1955: Mr: R. H. Ingle,- Resident Engineer, transferred to Louisa. Mr. G. P. Bozel, Resident Engineer, transferred to Culpeper. Mr. J. L. Parker, Resident Engineer, transferred to Dillwyn. Moved by Mr. Watkins, seconded by Mr, Flythe, that the Commission confirm award of contract on bids received May 18 for the construction of Project 1864-70-72, Route 17-A, Int. Route 17 (High Street) - Int, Route 337 (Gosport Road), City of Portsmouth, to the low bidder, T, E. Ritter Corporation, Norfolk, Va., at the bid of $535,258.33; that 109 additional be set aside to cover the cost of engineering and additional work; $14,981,10 for Surveys and Plans; `,196,600.00 for Right of Way; 0,53,256.00 for work by the Railroad and 1704,00 for work by State Forces, making a total of approximately A854,350,00 chargeable to this project. Motion carried. Moved by Mr. Flythe, seconded by Senator Wright, that the Commission confirm award of contract on bids received May 18 for the construction of Project 5404-02•.03, Route 153, 0.189 Mile S. of Int. Route 708 - 0.511 Mile N. of Int. Route 708, Amelia County, to the low bidder, W. H. Scott, Inc., Franklin, Va., at the bid of ,79,944.87; that 10% additional be set aside to cover the cost of engineering and additional work and 1!Z,167.00 for work by State Forces, making a total of approximately 490,100.00 chargeable to this project. Motion carried. Moved by Senator Wright,, seconded by Mr. Rawls, that the Commission confirm award of contract on bids received May 18 for the construction of Project 1315-16, Route 7013 0,03 Mile E. of Int. Route 696 (E. of Castle Craig) - Int. Route 698 l S. of Int. Route 501), Campbell County, to the low bidder, Pioneer Construction Company, Inc., Roanoke, Va., at the bid of $35,925.65 and that 10g additional be set aside to cover the cost of engineering and additional work, making a total of approximately - 9#5W.00 chargeable to this project. Motion carried. Moved by Mr. Rawls, seconded by Mr. May, that the Commission confirm award of contract on bids received May 18 for the construction of Project 1371-25, Routes 683 649; Int. Route 832 (E. of Chatham) N. Int. Route 691 (E. of Sheva, Pittsylvania County, to the low bidder, Thompson-Arthur Paving Co., Greensboro, N. C., at the bid of %46,649,30 and that 10 additional be set aside to cover the cost of engineering and additional work, making a total of approximately $51, 300.00 chargeable to this project, Motion carried, 8-4-55. Moved by Mr, Barrow, seconded by Mr. Watkins, that the Commission confirm award of contract on bids received May 18 for the construction of Project 1381_15, Route 61 -, 0.06 Mile N. of Route 11 (Near Fairfield) - 1nt, Route 606 (W. of Raphine), Rockbridge County, to the low bidder, Pioneer Construction Co., Inc., Roanoke, Va., on REGULAR bid of 1,860.845 and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately A90,050.00 chargeable to this project. Motion carried. Moved by Mr, Watkins, seconded by Senator Wright, that the Commission confirm award of contract on bids received May 18 for the construction of Project 171?-05, Route 58, ECL Lawrenceville - 0.879 Mile E. of ECL Lawrenceville, Brunswick County, to the low bidder, Joe E. Taylor, Emporia, Va., at the bid of $23,635.75; that 10% additional be set aside to cover the cost of engineering and additional work and 1330.00 for work by State Forces, making a total of approximately $26,350.00 chargeable to this project. Additional $1,350.00 required to be provided from the Richmond District Reserve Fund. Motion carried. Moved by Mr. Flythe, seconded by Mr. Rawls, that the Commission confirm award of contract on bids received May 18 for the construction of Project 1368-09, Routes 643 and 638; 3.834 Miles E. of ECL Gordonsville - Int. Route 647, Orange County, to the low bidder, Moore Brothers Company, Inc., Verona, Va., on REGULAR bid of k71,251.25 and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately 7,350.00 chargeable to this project, Additional 4,253.O0 required to be financed from Orange County s Matched Secondary Federal Aid Funds for 1955-56. Motion carried. Moved by Mr. Rawls, seconded by Mr. Watkins, that the Commission confirm award of contract on bids received May 18 for the construction of Project 138114, Route 610, 0.028 Mile E. of Int. Route 155 (Spainville) - Int, of Route 61?, Nottoway County, to the low bidder J P. Harvey, Lynchburg, Va,, at the bid of $*,935.00 and that additional be set aside to cover the cost of engineering and additional work, making a total of approximately $25,250.00 chargeable to this project. Additional 4,965.00 required to be financed from Nottoway County s Matched Secondary Federal Aid Funds for 1.955-56. Motion carried. Moved by Mr. Watkins, seconded by Senator Wright, that the Commission confirm award of contract an bids received May 18 for the construction of Project 1365.09»10, Route 653, Bridge and Approaches Big Hounds Greek, Lunenburg County, to the low bidder, L. S. Abernathy & Co., Glen Allen, Va., at the bid of $43,654.50 and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately 8 000,04 chargeable to this project, Additional *15,609.00 to be provide from the Counts s Matched Secondary Federal Aid Funds for 1955-5 6! Motion carried. 8-4-55. Moved by Senator Wright,, seconded by Mr. Barrow, that the Commission confirm award of contract on bids received May 18 for the construction of Project 1. 525-08, Route 670, 0.032 Mile W. of Int. Route 600 (S. of Birchleaf) - Int. Route 661 (Counts), Dickenson County, to the low bidder,, James A. McQuail Construction Co., Bluefield, Va., at the bid of °475,555.190 and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately X82,900.00 chargeable to this project. Additional `65,175.00 required to be provided from the County s Matched Secondary Federal Aid Funds for 1955..56. Motion carried. Moved by Mr. Flythe, seconded by Mr. May, that the Commission confirm award of contract on bias received May 18 for the construction of Project 11;02-17, Route 620, Int. Route 795 (Slate Hill) - int. Route 618 (Woodridge), Albemarle County, to the Low bidder, A. B. Torrence & Co., Inc., Elkton, Va., at the bid of 167,061.44 and that 100 additional be set aside to cover the cost of engineering and additional work, making a total of approximately 473,750.00 chargeable to this project. Additional °x,53,428.00 required to be financed from the County s Matched Secondary Federal Aid Funds for 1955-56, Motion carried. Moved by Mr. May, seconded by Senator Wright, that the Commission confirm award of contract on bids received May 18 for the construction of Project 1306-12, Route 608 0.028 Mile E. of Int. Route 26 (at Oakville) - Route 657 (West of Vera i, Appomattox County, to the low bidder, D. W. Winkelman Carolina Co., Greensboro, N. C., at the bid of 446,039.40 and that 1C additional be set aside to cover the cost of engineering and additional work, making a total of approximately p50,650.00 chargeable to this project. Additional $32,093.00 required to be financed from the Matched Secondary Federal Aid Funds of 1955-56 to Appomattox County. Motion carried. Moved by Mr. Rawls, seconded by Mr. Barrow, that the Commission confirm award of contract on bids received May 18 for the construction of Project 1963.03, Route 33, Bridge over Pamunkey River at West Point--Contracts 2 and $--King William and New Kent Counties, to the low bidder, Diamond Construction Co., Savannah, Georgia, at the bid of X1.,106,266.?? and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately 1,216,900.00 chargeable to this project. Additional *69,974.00 of Richmond District s share of 4k674,350.00 to be provided in the 1956-1957 allocations; Fredericksburg District s share being available. Motion carried, Moved by Mr. Barrow, seconded by Mr. Watkins, that the Commission confirm REJECTION of all bids received May 18 for the construction of Project 1360-07-09, Route 603, Int, of Route 460 So, of Blacksburg ,- 0.073 Mile E. of Int. Route 64? (W. of Ellett), Montgomery County, the low bid being 78.8% over estimate; and readvertise. Motion carried. 8-4-55. Moved by Mr. Watkins, seconded by Senator Wright, that the Commission confirm REJECTION of all bids received May 18 for the construction of Project 1381-14, Route 631, 0,432 Mile E. of Int. Route 6215 (4. of Kerr s Creek) - 0.019 Mile W. of Int. Route 600 (N. of Lexington), Rockbridge County, the low bid being 31.4% over estimate; and readvertise. Motion carried. Moved by Mr. Rawls, seconded by Mr, Barrow, that the Commission confirm -aid- of contract on -birds received June 15 for the construction of Project 5599-01, Contract No. 1, Route 173, ?,?500 Miles E. l at. Route 17 - 4,649 Miles E. of Int. Route 17 (Industrial Development at Goodwin Neck), York County, to the low bidder, E. V4 Williams Co. Inc., Norfolk, Va., at the bid of $90,803.03, that 10% additional be set aside to cover the cost of engineering and additional work and 472,38 for work by State Forces, making a total of approximately *100,350.00 chargeable to this project. Motion carried. Moved by Mr. Flythe, seconded by Mr. May, that the Commission confirm award of contract on bids received June 15 for the construction of Projects 3269-07.08; 5282.»01, Route 340, 3.315 Miles N. of NCL Elkton - °5.049 Miles N. of NCL Elkton, Page and Rockingham Counties; to the low bidder, Moore Brothers Co., Inc., Verona, Va., at the bid of $68,201.48, that 10% additional be set aside to cover the cost of engineering and additional work, $56,100.00 for Right of Way and $1,542.00 for work by State Forces, making a total of approximately $132,450.00 chargeable to this project. Motion carried. Moved by Mr. May, seconded by Mr. Rawls, that the Commission confirm award of contract on bids received June 15 for the construction of Project 2573-C2, Route 4560, 0.262 Mile E. of NEW Overpass (Near Meherrin) - 4.548 Miles W, of Nottoway County Line, Prince Edward County, to the low bidder, Talbott-.Marks Co., Inc., Clarksville, Va., at the REGULAR BID of $68,334.46, that 10% additional be set aside to cover the cost of engineering and additional work, $80,000.00 for Right of gay and $4F,950.00 for work by State Forces, making a total of approximately $532,100.00 chargeable to this project. Motion carried. Moved by Mr. Rawls, seconded by Mr, Watkins, that the Commission confirm award of contract on bids received June 15 for the construction of Project 1915.05-06-10.11, Route 460,, 2.950 Miles E. of Int. Route 501-2.270 Miles W. of N&W Underpass at Concord, Campbell County, to the low bidder, Talbott-Marks Co,, Inc,, Clarksville, Va., at the bid of $512,790.72, that 10% additional be set aside to cover the cost of engineering and additional work; 4155 ,626.00 four Right of Way; ! .52,919.00 for work by State Forays and $] 896,0 for work by the Railroad, making a total 9F approximately $ 745, 500.00 chargeable to this project. Motion carried,, 1 6. 8-4-55. Moved by Mr. Watkins, seconded by Senator Wright, that the Commission confirm award of contract on bids received June 15 for the construction of Project 1832-07, Route 15, 0,751 Mile S. of Raccoon Creek-0.777 Mile N. of Raccoon Creek, Fluvanna County, to the low bidder, H. W. Babcock, Contractor, Amherst, Va., on REGULAR MID of 80,997.24, that 109 additional be set aside to cover the cost of engineering and additional work and $8,434.00 for work by State Forces, making a total of approximately 475,550.00 chargeable to this project. Motion carried. Moved by Senator Wright, seconded by Mr. Barrow, that the Coined anion confirm award of contract on bids received June 15 for the construction of Project 3$46_07, Route 611, Int. Route 641 (Ballards Crossroad) - Int. Route 652 (E. of Boaz), Isle of Wight County, to the low bidder, D. W. Winkelman Carolina Co., Inc., Greensboro, N. C., on REGULAR BID of 67,190,84 and that 109 additional be set aside to cover the cost of engineering and additional work, making a total of approximately $13,900.00 chargeable to this project, Motion carried. Moved by Mr. Barrow, seconded by Mr. Flythe, that the Commission confirm award of contract on bids received June 15 for the construction of Project l34?-1?, Routes 615,645 and 605, Int. Route 606 (Studley)-S. End of Bridge over Pamunkey River at King William County Line, Hanover County, to the low bidder, Bishop k Settle Construction Co., Lawrenceville, Va,, at the bid of $25,602.4$ and that 109 additional be set aside to cover the cost of engineering and additional work, making a total of approximately $W..150.00 chargeable to this project. Motion carried. Moved by Mr. Flythe, seconded by Mr. May, that the Commission confirm award of contract on bids received June 15 for Painting James River Bridge, Route 17, City of Warwick, to the low bidder, Paint Products Co„ Newport News, Va., at the Net Total of $94,300.00. Motion carried. Moved by Mr. May, seconded by Mr. Rawls, that the Commission confirm award of contract on bids received June 15 for the construction of Projects 2893 -06; 2654-11; ?621-06, Routes 340 and 522: 1.293 Miles S. of Warren-Clarke County Line - 1.79? Miles S. Int. Routes 340 and 277 (Double Toll Gate), Frederick, Clarke and Warren Counties; to the low bidder, Moore Brothers Co., Inc., Verona, Va., at the bid of $184, 509.95, that lC additional be set aside to cover the cost of engineering and additional work, •15,662.00 for Right of way and $12,142.00 for work by State Forces, making a total of approximately 4280,550.00 chargeable to this project. Additional funds required to be provided from the Staunton District Reserve Fund. Motion carried. 8-4-55. Moved by Mr. Rawls, seconded by Mr. Watkins, that the Commission confirm award of contract on bids received June 15 for the construction of Project 1681-72-17, Route 11-A,30.105 Mile S. of S. 1 d Maury River Bridge-Int. Existing Route 11 S. of Lexington (Lexington Distribution Road) Town of Lexington and Rockbridge County, to the low bidder, Adams Construction Company, Roanoke, Va„ at the bid of *168,673.60, that 10% additional be set aside to cover the cost of engineering and additional work and !65,385.00 for work by State Forces, making a total of approximately $190,950.00 chargeable to this project; to be financed *109,615.00 Federal, *16,655.00 State and *4,680,00 Lexington. Motion carried. Moved by Mr. Watkins, seconded by Senator Wright, that the Commission confirm award of contract on bids received June 15 for the construction of Project 1398-10-1l, Route 600, 0,256 Mile E. of 1nt. Route 202 (S. of Templeman) Int. Route 621 (W. of Neenah), Westmoreland County, to the low bidder, Taylor Construction Co., Hague, Va., at the bid of *49,282.42 and that 1C% additional be set aside to cover the cost of engineering and additional work, making a total of approximately $54,200,00 chargeable to this project. Additional $26,507.00 required to be provided in the Westmoreland County s 1955-1956 Matched Secondary Federal Aid Funds. Motion carried. Moved by Senator Wright, seconded by Mr. Barrow, that the Commission confirm award of contract on bids received June 15 for the construction of Project 1,356-08, Route 607, Int. Route 678 (N.. of Brightwood) - Int. Route 609, Madison County, to the low bidder, Carlton A. Crider, Chatham, Va., at the bid of *,685.10 and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately *40,°350,C0 chargeable to this project, Additional *10,103.00 required to be provided in the county s 1955-1956 Matched Secondary Federal Aid Funds. Motion carried. Moved by Mr. Barrow, seconded by Mr. Flythe, that the Commission confirm award of contract on bids received June 15 for the construction of Project 1844-70-15, Route 220, 0.610 Mile N. of SCL Martinsville-0.15? Mile S. of SCL Martinsville, Henry CountY, to the low bidder, Thompson-Arthur Paving Co., Inc., Greensboro, N. C., on ALTERNATE HID of $169,537,85, that 101 additional be set aside to cover the cost of engineering and additional work, *10,000.00 for Right of Way, $2,925.92 for Surveys and *2,411.00 for work by State Forces, making a total of approximately $201,850.00 chargeable to this project; to be financed: *.96,200,00 Federal, *52,875.00 State and *52,775.00 Martinsville. Motion carried. Moved by Mr. Flythe, seconded by Mr. May, that the Commission confirm award of contract on bids received June 15 for the construction of Project 1654.06, Route 11, NCL Middletown-SCL Middletown, Frederick County, to the low bidder, Carlton A. Crider, Chatham, Va., at the bid of $66,888,25, that 109 additional be set aside to cover the cost of engineering and additional work and $?50.00 for work by State Forces, making a total of approximately *75,900.00 chargeable to this project; to be financed $35,893.00 Federal; * 55,895.00 State and $2,114.00 Middletown. } Motion carried. 8-4-55. 8. Moved by Mr. May, seconded by Mr. Rawls, that the Commission confirm award of contract on bids received June 15 for the construction of Project 1 8 -14-18-19, Route 865, Bridges and Approaches South and North Rivers (Port Republic), Rockingham County, to the low bidder, Vecellio Construction Company, Salem, Va., at the bid of $292,336.83 and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately 321,&00.00 chargeable to this project. Additional ?6 ,894.00 required to be provided in the county s 1955-1956 Matched Secondary Federal Aid Funds. Motion carried. Moved by Mr. Rawls, seconded by Mr. Watkins, that the Commission confirm REJECTION of bids received June 15 for the construction of Project 3246-12, Route 258, Repairs to Cypress Creek Bridge at Smithfield, Isle of Wight County, the low bid being 42.5 over estimate; and readvertise. Motion carried. Moved by Mr. Watkins, seconded by Senator Wright, that the Commission confirm REJECTION of bids received June 15 for the construction of Project x4380-70-01, Route 24, 0.038 Mile W. of RoanokeVinton Corporate Limits-0,039 Mile E. of Roanoke-Vinton Corporate Limits, City of Roanoke and Town of Vinton, the low bid being 12.41° over estimate, and readvertise. Motion carried. Moved by Senator Wright, seconded by Mr. Barrow, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type T-3, Schedule 104-55, Bristol District, to the low bidder, R. G. Pope Construction, Bristol, Va., at the bid of X63,804.00, that lam additional be set aside to cover the cost of engineering and additional work, and U,116.00 for work by State Forces, making a total of approximately X76,300.00 chargeable to this project. Additional %l,300..00 required to be provided from the Bristol District Reserve Construction Funds. Motion carried. Moved by Mr. Barrow, seconded by Mr. Flythe, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type 1-3, Schedule 20?-55 Salem District, to the low bidder, Robert T. Main Company, Salem, Va., at the bid of 47,110.50, that 10% additional be set aside to cover the cost of engineering and additional work, and t%006.40 for work by State Forces, making a total of approximately $53,800,00 chargeable to this project. Motion carried. Moved by Mr, Flythe, seconded by Mr. May, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type I-3 and 1-3 EXP, Schedule ?09-55 Salem District, to the low bidder, Virginia Asphalt Paving Co., Inc., Roanoke, Va., at the bid of 143,698.00, that 10% additional be set aside to cover the cost of engineering and additional work, and $3,300.00 for work by State Farces, making a total of approximateLy l,%50.00 chargeable to this project. Motion carried 8-4-55. Moved by Mr. May, seconded by Mr. Rawls, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type I-3 and I--5 ECP, Schedule 2O4-55, Salem District, to the low bidder, Adams Construction Company, Roanoke, Va., at the bid of $].7,001.50, that 10% additional be set aside to cover the cost of engineering and additional work and $1,100.00 for work by State Forces, making a total of approx.-mately $19,800.00 chargeable to this project. Additional ,566.00 required to be provided from the Salem District Reserve Construction Fund. Motion carried. Moved by Mr. Rawls, seconded by Mr. Watkins, that the Commission Confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type 1-5, Schedule 205-55, Salem District, to the low bidder, Robert T. Main Company, Salem, Va., at the bid of $79,01.1.10, that 10% additional be set aside to cover the cost of engineering and additional work and $6,600.00 for work by State Forces, making a total of approximately *96,500.00 chargeable to this project. Motion carried. Moved by Mr. Watkins, seconded by Senator Wright, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type I-S, schedule 206-55, Salem District, to the low bidder, Adams Construction Co., Roanoke, Vs., at the bid of 44,699.55 and that 1C% additional be set aside to cover the cost of engineering and additional work, making a total of approximately $5,150.00 chargeable to this project. Motion carried. Moved by Senator Wright, seconded by Mx. Barrow, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type Modified F-1, Schedule 405-55, Richmond District, to the low bidder, Atlantic Bitulithic Co., Inc., Richmond, Va., at the bid of $76,958.60, that 10% additional be set aside to cover the cost of engineering and additional work and $10,615,00 for work by State Forces, making a total of approximately 495,250.00 chargeable to this project, Motion carried. Moved by Mr. Barrow, seconded by Mr. Flythe, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type Modified F-1, Schedule 406.55, Richmond District, to the low bidder, Clyde R. Royals,., Hampton, Va., at the bid of $42,658.10, that 101, additional be set aside to cover the cost of engineering and additional work and $3,663,00 for work by State Forces, making a total of approximately $50,600.00 chargeable to this project. Additional 4600,00 required to be supplied from the Richmond District Reserve Fund. Motion carried, 8-4-55. 10. Moved by Mr. Flythe, seconded by Mr. May, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type Modified F-1, Schedule 407-55, Richmond District, to the low bidder, Short Paving Company, Inc., Petersburg, Va., at the bid of S 24,,076.00p that 10% additional be set aside to cover the cost of engineering and additional. work and *2,970.00 for work by State Forces, making a total of approximately ?9,450.00 Chargeable to this project. Motion carried. Moved by Mr. May, seconded by Mr. Rawls, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type Modified F-1 & H-1), Schedule 604-55, Fredericksburg District, to the low bidder, American Asphalt Products Co., Inc., Washington, D. C., at the bid of 8197,976.0.1., that 10% additional be set aside to cover the cost of engineering and additional work, and 116,676.00 for work by State Forces, making a total of approximately `%214,450.00 chargeable to this project. Notion carried. Moved by Mr. Rawls, seconded by Mr. Watkins, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type Modified F-1 or I-7, Schedule 709-55, Culpeper District, to the low bidder, Piedmont Asphalt Co., Inc., Alexandria, Va., at the bid of #10,572.38, that 109 additional be set aside to cover the cost of engineering and additional work, and *148.50 for work by State Forces, making a total of approximately *11,8(X.00 chargeable to this project. Motion carried. Moved by Mr. Watkins, seconded by Senator Wright, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type F-1 or I-19, Schedule 710..55, Culpeper District, to the low bidder, J. R. Ford Company, Inc., Lynchburg, Va., at the bid of $19,065.65, and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately $20,950.00, chargeable to this project. Motion carried. Moved by Senator Wright, seconded by Mr. Barrow, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type Modified F-1 or I-5, Schedule 711-55, Culpeper District, to the low bidder, Arlington Asphalt Company, Arlington, Va., at the bid of *48, 0+57.04 and that 10% additional be got aside to cover the cost of engineering and additional work, making a total of approximateLy X50,650,-00 chargeable to this project. Motion carried, 8-4-55. 11. Moved by Mr. Barrow, seconded by Mr. Flythe, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type 15, Schedule 802-55, Staunton District, to the low bidder, Adams Construction Co., Roanoke, Va., at the bid of $55,,249.17, that 10% additional be set aside to cover the cost of engineering and additional work, and 42,200.00 for work by State Forces, making a total of approximately $61,950.00 chargeable to this project. Motion carried. Moved by Mr. Flythe, seconded by Mr. May, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type I-3, Schedule 80R-55, Staunton District, to the low bidder, M. A. Layman & Sons, Inc., Harrisonburg, Va., at the bid of *13,930.20, that 10% additional be set aside to cover the cost of engineering and additional work, and $1,617,00 for work by rate Forces, making a total of approximately 416,950.00 chargeable to this project. Motion carried. Moved by Mr. May, seconded by Mr. Rawls, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type I-3, Schedule 804-55, Staunton District, to the low bidder, Va. Asphalt Paving Co., Roanoke, Va., at the bid of $57,126.75, that 10% additional be set aside to cover the cost of engineering and additional work, and $5,445.00 for work by State Forces, making a total of approximately $68,!00,00 chargeable to this project. Motion carried. Moved by Mr. Rawls, seconded by Mr. Watkins, that the Ccmmission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type 1 ,15,, Schedule 805-55, Staunton District, to the low bidder, BuckleyLages, Inc., Winchester, Va., at the bid of $16,649.28 and that 10% additional be set aside to cover the cost of engineering and additional work, making a total of approximately $18,500.00 chargeable to this project. Additional $00.00 required to be provided from the Staunton District Construction Reserve Fund. Motion carried, Moved by Mr. Watkins, seconded by Senator Wright, that the Commission confirm award of contract on bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material Type H-2, Schedule 106-55, Bristol District, to the low bidder, Holston River Quarry, Inc., Marion, Va., at the bid of $10,967,87 and that 1C% additional be set aside to cover the cost of engineering and additional work, making a total of approximately $1,050.00 chargeable to this project. Motion carried, Moved by Senator Wright, seconded by Mr, Barrow, that the Commission confirm REJECTION of all bids received June 15 for Furnishing, Delivering and Applying Plant Mixed Bituminous Material, Schedule 105-55, Bristol District, the low bid being 10.4` over our estimate. Motion carried, -14 8-4-55. Moved by Mr. Rawls, seconded by Mr. flythe, that the Commission confirm award of contract on bids received July 20 for the construction of Project 1865.-06-07-08, Route 13, Int. Alt. 13 S. of Bayview - 3.609 Mi. N. of NCL Eastville: SCL to NCL Cheriton: SCL to NCL Eastville, Northampton County, to the low bidder, Clyde R. Royals, Hampton, Va., at the bid of $103,064.70, that is additional be set aside to cover the cost of engineering and additional work and *8,610.00 for work by State Forces, making a total of approximately *122,00.00 chargeable to this project. Motion carried. Moved by Mr. Flythe, seconded by Senator Wright, that the Commission confirm award of contract on bids received July 20 for the construction of Projects 1741-26, 1771-19, Route 58, 2.634 Mi. W. of Turbeville P. 0. - 1.518 Mi. E. of Pittsylvania County Line AND 2.210 Mi. E. of ECL Danville - 0.012 Mi. E. of ECL Danville, Halifax & Pittsylvania Counties