Action Meeting   11/20/2003

Attachments
  • Meeting minutes.pdf
  • Asset management study.pdf
  • Funding Hurricane Isabel and other budget adjustments.pdf
  • Virginia’s Highway Safety Corridor Program.pdf
  • Debt capacity policy and model for federal highway reimbursement anticipation notes.pdf
  • Transportation planning for Jamestown 2007.pdf
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:00:01
      Thank you, Mr. Secretary, members of the board.
    • 00:00:03
      Before we start, I'd like to recognize Ray Pethpell, who's in the audience today, former commissioner.
    • 00:00:10
      Ray actually got to spend some money on construction projects when he was here.
    • 00:00:17
      You're very fortunate in that regard, but it's always good to see Ray.
    • 00:00:22
      He had many great years of service to Virginia, not just at VDOT, but also in other functions as well.
    • 00:00:31
      Before we get started, let you know that right now there's about 200 roads closed in Virginia because of high water.
    • 00:00:39
      That's 200 roads in three districts out west.
    • 00:00:42
      130 roads closed in the Bristol districts.
    • 00:00:45
      Flash flood watch in 37 counties.
    • 00:00:48
      So we're continuing a trend of...
    • 00:00:51
      This is real time.
    • 00:00:53
      Oh, this is real time as of a few minutes ago.
    • 00:00:58
      Just continue to be challenged in our quest to spend or not spend money.
    • 00:01:08
      Since we met last, we've done considerable work in developing some necessary strategies to basically retain cash between now and the end of the fiscal year that's needed to address
    • 00:01:24
      In addition to the hurricane damage in September, we also identified some maintenance needs at our tunnels, water as well as mountain tunnels.
    • 00:01:45
      And we've also found it necessary to make some adjustments in the current fiscal year budget for snow removal in order to make sure that we don't end up at another bad place in the spring.
    • 00:01:57
      If you recall that last year we needed to make some 90 million dollars worth of adjustments because of snow, 40 million of which came from the construction program.
    • 00:02:08
      The direct cost associated with the cleanup and repair of damage by Isabelle is at $70 million.
    • 00:02:17
      You will note that on the good news side, that is a down from the $100 million that we initially anticipated.
    • 00:02:25
      Why is that down?
    • 00:02:26
      It's because we now have in-damage assessment reports for, we say here I see more than $800, actually it's almost 900 projects, $874 if you want to count them.
    • 00:02:38
      So the $70 million total is based on the actual damage assessment reports from those estimates.
    • 00:02:45
      Looking at slide 4, going beyond Isabelle, we'll all recall the flooding in the Midtown Tunnel.
    • 00:02:54
      Because of events that were associated with the Midtown Tunnel, specifically
    • 00:02:59
      that became the light at the Hampton Roads Bridge Tunnel, Jack Rolison and myself spent a pleasant Sunday reviewing several thousand pages of tunnel maintenance documents and determined that there are some immediate needs
    • 00:03:15
      associated with our tunnels across the state, particularly as it pertains to fire suppression systems, as well as the operation of the floodgates.
    • 00:03:27
      We need to make allowances for another $5 million worth of repair work this fiscal year.
    • 00:03:34
      As far as snow, we want to add $22 million to our snow budget.
    • 00:03:42
      That will bring us up to the five-year average of actual snow expenditures.
    • 00:03:51
      All of our other contingencies for maintenance emergencies, about $16 million, has been depleted.
    • 00:04:01
      I do not want to find us back here again in the spring with severe
    • 00:04:09
      adjustments to our snow budget.
    • 00:04:11
      Of course, the weather is going to have something to say for that, but by adding some money to our snow budget, then requiring the districts to budget accordingly, will be covered for the five-year running average of actual snow expenditures.
    • 00:04:26
      So if you look at the $70 million from Isbell, $5 million from Tunnels, $22 million for snow, that gets us to a $97 million figure.
    • 00:04:38
      that need to be incorporated into our, considered into our current budget.
    • 00:04:49
      The funding for this comes from three sources, additional state and federal revenues that will review some debt service savings through some restructuring, some FRAN notes, and also reductions and deferrals of certain VDOT operations.
    • 00:05:05
      On the revenue side,
    • 00:05:07
      The $15.5 million from the accelerated sales tax was unforecasted during the fourth quarter.
    • 00:05:15
      That's on the plus side of the ledger.
    • 00:05:18
      Also, we anticipate $15 million in revenue collections or cash from FHWA and FEMA this fiscal year related to our reimbursements from Hurricane Isabel.
    • 00:05:31
      We can also delay the planned fall FRAN sale.
    • 00:05:37
      That's $11.9 million that we can gain this fiscal year by delaying that sale for later in 2004.
    • 00:05:48
      If you look to $15.5 million from the accelerated sales tax, $15 million, and $11.9 million from the FRAN debt sales, that totals some, on slide nine, that totals some $42.4 million.
    • 00:06:03
      That leaves us $54.6 million of needed funding from other reductions and deferrals.
    • 00:06:10
      We looked at three options that we'll review quickly.
    • 00:06:13
      And those options all look at reductions or deferrals in the maintenance program, the administrative and agency-wide activities or administration, and construction.
    • 00:06:28
      The three options
    • 00:06:30
      And really this slide 10 sums up everything.
    • 00:06:34
      The three options look like this with option one, 37.9 from maintenance, 16.7 from administration, nothing from construction and I'll say something about that in a minute.
    • 00:06:48
      Options two and three, the administration actions stay constant with the difference being
    • 00:06:55
      reduced impact on maintenance and increased impact on construction.
    • 00:07:01
      I'll tell you right now that option one is my recommendation and my strong recommendation.
    • 00:07:09
      The pie chart on slide 11 just shows graphically the reductions maintenance operations and agency-wide.
    • 00:07:18
      While the graph says construction program reduction 0%, I will remind you that in fiscal year 2002, we reduced our construction program by nearly $3 billion.
    • 00:07:30
      We later reduced our construction program by some $40 million to account for the snows of last winter.
    • 00:07:38
      And in this year's six-year program, we have assumed a $420 million reduction of our construction program to fund maintenance.
    • 00:07:50
      So the construction program has been impacted to the tune of about $3.5 billion already.
    • 00:08:01
      Option one, the spending adjustments, 37.9 million.
    • 00:08:06
      About 40 percent of that would come from the deferral of equipment purchases, such as trucks, dump trucks, graders.
    • 00:08:12
      Also, the deferral of roadside improvements, such as guardrail upgrades and slope repairs.
    • 00:08:18
      Now, use the word deferral because we're not talking about not doing this maintenance.
    • 00:08:22
      We're talking about deferring it to the next fiscal year, which means that we'll add expenses to next fiscal years.
    • 00:08:31
      The remainder of option one in terms of the maintenance reductions comes from the delay and some routine maintenance activities, landscaping, litter pickup, mowing, other operations, things that the public will see are not occurring.
    • 00:08:49
      The map on slide 14 just for your information shows a geographical display of the maintenance deferrals from the various construction districts.
    • 00:09:11
      On the administrative side, the staff worked hard at determining what the types of administration actions that we could take in order to impact maintenance as little as necessary.
    • 00:09:29
      And we've come up with another 16.7 million.
    • 00:09:34
      Those actions primarily result in a strict limit on hiring to maintain us at a 95% level of our maximum employment level.
    • 00:09:49
      That's about 550 positions and we'll save about $6.7 million.
    • 00:09:56
      We'll also strictly limit the use of contract and wage employees.
    • 00:10:01
      These are people who are working at VDOT who aren't full-time VDOT employees, save about another $6 million.
    • 00:10:14
      Yes, and recall Mr. Watson that we're talking about deferring these activities to next year.
    • 00:10:29
      And you'll see that these activities maintain some, or these actions maintain, continue to maintain certain services that are very important to me in terms of the paper.
    • 00:10:41
      But we're in a real bind.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:10:44
      We're in real behind.
    • 00:10:52
      Mr. Chairman, Mr. McCarthy, in my opinion, no it does not.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:11:07
      Again, it goes to some extent how you define maintenance.
    • 00:11:12
      That's a very broad umbrella, and these are very targeted reductions or deferrals within the maintenance program, but not in the protection, preservation of the infrastructure itself.
    • 00:11:26
      And you'd say that's accurate, Philip?
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:11:28
      I would say that's accurate, Mr. Secretary.
    • 00:11:30
      I would also reiterate that we have, as you'll see in the other two options,
    • 00:11:37
      The additional impact on the construction program is severe to an industry that, I tell you, we have just about crippled as badly as we can.
    • 00:11:52
      Further actions in that area are going to cost us money in the long run, and we'll talk about that a bit.
    • 00:12:01
      The balance of option one- Ken- Mr. McCarthy- Phillip, just a minute.
    • 00:12:05
      Yes, I'm sorry.
    • 00:12:05
      Ken White.
    • 00:12:06
      Yes.
    • 00:12:06
      Go ahead and finish with him.
    • 00:12:07
      No, I just want- no, I wanted to make sure that I did with Mr. McCarthy, excuse me.
    • SPEAKER_04
    • 00:12:11
      Phillip, maybe you're coming to this, and if you are, just tell me, but in terms of the 70 million in hurricane damage, how much of that is covered by federal disaster relief, and when will that money be coming to us?
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:12:24
      Well, we anticipate, Mr. Chairman, Mr. White, we anticipate, we anticipate that we'll get about
    • 00:12:31
      $15 million this year, in this fiscal year.
    • 00:12:37
      But, historically speaking, somewhere between 25 and 30 percent is about the best that we can anticipate to recover.
    • SPEAKER_04
    • 00:12:48
      So that'll be all of it.
    • 00:12:49
      That's basically everything we'll get.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:12:51
      There won't be a whole lot more.
    • SPEAKER_04
    • 00:12:53
      But we'll get that this fiscal year.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:12:55
      We expect, based on the damage assessment reports and a severe discipline among ourselves to get these damage assessment reports into FEMA, we've estimated that we could pull in $15 million in cash this year.
    • SPEAKER_04
    • 00:13:14
      Will the California disaster have any impact on that in terms of
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:13:19
      I'm not sure if anybody we're talking to understands FIFO or LIFO, but I'm not sure, Barbara.
    • 00:13:32
      Now, for Federal Highway Administration, the Federal Highway Administration right now is about $200 million behind in making payments that they have approved.
    • 00:13:45
      I'm not sure about FEMA, Barbara.
    • Barbara W. ReeseChief Financial Officer
    • 00:13:46
      Thank you Barbara.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:14:15
      The remainder of option one is some physical plant repairs, capital outlay, types of upgrades that we can postpone.
    • 00:14:25
      Option 2 includes, you recall I said the 16.7 in slide 17, the 16.7 administrative actions remain constant.
    • 00:14:38
      Maintenance operations impact down to 27.8 million with a 10 million dollar impact on the construction program.
    • 00:14:47
      I'm going to go to slide 19, which talks about the construction program that would be impacted in Option 2.
    • 00:14:57
      We would delay advertisement and right-of-way acquisition for some state-funded projects for the remainder of the year.
    • 00:15:04
      This means that we would delay work that's ready to be advertised and moved to construction.
    • 00:15:10
      We would delay about $40 million worth of work to get $10 million this fiscal year.
    • 00:15:20
      These are mainly secondary and urban projects.
    • 00:15:23
      Over 60% of them are alone.
    • 00:15:27
      The Interstate 81 corridor, I can tell you that by further delaying construction work beyond the start of the construction season, we're going to increase the cost of this work when it is ultimately awarded for construction.
    • 00:15:46
      I do not suggest that we do that.
    • 00:15:51
      Option, there's another map in here that shows the dispersion of option two as well.
    • 00:15:59
      Option three, the administrative actions once again remain constant.
    • 00:16:09
      The maintenance reductions are down, if you look at slide 22, to $6.9 million.
    • 00:16:18
      The construction
    • 00:16:22
      Impacts in Option 3 include the 10.1 from Option 2.
    • 00:16:28
      An additional $20.9 million this fiscal year would be required.
    • 00:16:33
      This would require us to impose some mandatory shutdowns on jobs that are already under construction.
    • 00:16:40
      To cancel some projects that are already active in the construction project, in the construction program, and to delay right-of-way acquisitions causing further delays to the construction schedule.
    • 00:16:55
      I believe option three may very well cost us more in future years than it would save in
    • 00:17:02
      Just stacking them up, this chart is pretty obvious based on what we talked about in terms of the maintenance operations, the administrative operations, and construction operations.
    • 00:17:18
      Option one is recommended as the appropriate method of addressing the funding needs, the cash needs for the current fiscal year.
    • 00:17:32
      The actions we're taking do not compromise public safety.
    • 00:17:38
      They keep our commitment, Mr. Watson, to pavement maintenance.
    • 00:17:44
      We do limit service level reductions to the deferral of certain routine maintenance activities, guardrail upgrades.
    • 00:17:52
      By guardrail upgrades, I'm not suggesting that we wouldn't replace a piece of guardrail that was taken out in an accident.
    • 00:17:59
      These are guardrail upgrades to new guardrail standards.
    • 00:18:02
      but also for slope repairs, landscaping, litter pickup, and mowing.
    • 00:18:09
      Option one does not further impact the construction program this fiscal year.
    • 00:18:18
      It does not further impact the construction program this fiscal year.
    • 00:18:24
      We are deferring maintenance activities that will need to be covered as part of next year's
    • 00:18:31
      Budget, when we may indeed be back again looking at our construction program.
    • 00:18:39
      The results of the option when you add up the additional revenue that we expect to take in and go through all the numbers, even though it's a decrease of maintenance activities, it's a net increase in the maintenance budget.
    • 00:18:57
      There are
    • 00:18:59
      Option one is what we will be presenting to you tomorrow.
    • 00:19:04
      There are a few additional adjustments that we would like to make in the budget for fiscal year 2004, kind of some cleanup things that I'm going to ask Barbara to review with you.
    • 00:19:20
      Yes, sir.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:19:21
      Jerry.
    • 00:19:22
      Before you step down, I just want to make sure I cleared your back, that slide, the results.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:19:29
      This slide.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:19:29
      The $54.2 million is what you need to find extra over and above what you cited several minutes ago.
    • 00:19:38
      And the program is mostly coming out of deferring to maintenance items this year and administrative reductions.
    • 00:19:46
      Yes.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:19:48
      Mr. Chairman, Mr. McCarthy, yes, that we would add the 37.9 maintenance reductions to the requirements for the maintenance budget for fiscal 05.
    • SPEAKER_01
    • 00:20:17
      In your limiting freezing hiring, I anticipate, I hope, that the engineers that you are advertising right now are not...
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:20:31
      Thank you, Ms. Connolly.
    • 00:20:32
      Mr. Chairman, Ms. Connolly, thank you for mentioning that.
    • 00:20:35
      The district administrator for the Culpeper district, district administrator for the Salem district,
    • 00:20:41
      The 50 professional engineers, the new facility manager for the Hampton Roads Bridge Tunnel, and we have a retiring director of our Human Resources Division.
    • 00:20:54
      Those positions will be filled.
    • 00:20:55
      Those positions will be filled.
    • 00:20:57
      Thank you very much for reminding me to mention that.
    • SPEAKER_01
    • 00:21:03
      Q.
    • 00:21:03
      You have restored some funding to that.
    • 00:21:09
      It is not the same amount that was spent last year, which we hope was a very unusual year.
    • 00:21:16
      Is it your standard operating procedure that a five-year
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:21:21
      Yes.
    • 00:21:22
      Actually, Mr.
    • 00:21:24
      Chair and Ms. Connally, for any of the four preceding years, we'd have a smidge left over.
    • 00:21:30
      Obviously, if we have a repeat winter, we're not going to get to $80 million and then say, well, school's out, we're not going to do anything else.
    • 00:21:39
      We will then be back here talking about other adjustments.
    • 00:21:44
      That's exactly correct.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:21:45
      Are we expecting a rougher winter maybe than last year?
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:21:48
      Well, Mr. Chairman, Mr. Bailey, I've actually got some indications that that may not be the case.
    • 00:21:56
      But being a tad bit superstitious, I don't want to talk about that too much.
    • 00:22:01
      So I hope not.
    • 00:22:03
      Whatever you think about at night before you go to sleep, think about no snow.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:22:10
      If it matches with the kind of rain you've had,
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:22:13
      Well, as I said, you know, it's difficult.
    • Barbara W. ReeseChief Financial Officer
    • 00:22:23
      Barbara?
    • 00:22:27
      Just to begin, you do have the actual, just two pages basically out of the annual budget document that do a summary of all the changes, including what the Commissioner's already spoken about.
    • 00:22:40
      One of the opportunities, one of the pieces of good news about Hurricane Isabel, because we had to open the budget to make the revisions related to that, there were other, some routine budget adjustments that came up after you approved the budget last June that we would like to go ahead and get done as well because that just keeps us in line, particularly with the governor getting ready to introduce a biennial budget.
    • 00:23:01
      It just keeps everything in sync, both at the, our level as well as at the state level.
    • 00:23:06
      First off, last session there was a piece of legislation that transferred the oversize and overweight permit issuance program from VDOT to DMV.
    • 00:23:17
      What we needed to do as a result of that legislation and just simply got missed was to provide DMV a million dollars to support the legal presence implementation and $500,000 for upgrades as well as give them some revenue sources that now belong to them.
    • 00:23:36
      IT Transfers, I don't know how many of you have heard of the Virginia Information Technologies Agency, VITA for short, where the governor has a major initiative underway where all IT personnel, operational IT personnel will be consolidated under one umbrella organization
    • 00:23:56
      And that affects about 200 information technology employees here at VDOT or positions.
    • 00:24:02
      That transfer is scheduled to occur in January.
    • 00:24:05
      And in order to prepare for that transfer and make sure we had a very good handle on how much we were spending on those folks and their activities, we need to move and consolidate those.
    • 00:24:16
      And we've actually been doing some of that into one place in the budget.
    • 00:24:20
      And so that, the document proposes that change too.
    • 00:24:23
      That's at a $4.2 million
    • 00:24:26
      Internal Adjustment.
    • 00:24:29
      On page slide 29 is just a summary of all the various things that the Commissioner and I have talked about.
    • 00:24:37
      HMO revenues because of the DMV hauling permit issue are reduced by $1.8 million.
    • 00:24:43
      TTF revenues with the offsets are up about $18.5 million.
    • 00:24:49
      That relates to the accelerated sales tax.
    • 00:24:52
      Federal revenues, $15 million in total revenues.
    • 00:24:56
      If you look at how the program structure breaks down, the VDOT programs go up by, overall by the 31.1 million and our support to DMV goes up by about $690,000.
    • 00:25:12
      And tomorrow you will actually have two resolutions per the Attorney General's Office advice, legal advice on how it all has to be structured out.
    • 00:25:25
      And you will have those tomorrow because we continue to make adjustments to those two resolutions.
    • 00:25:30
      I'll be happy to answer any questions.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:25:34
      Any questions?
    • 00:25:35
      All right.
    • 00:25:35
      Thank you, Barbara.
    • 00:25:37
      I want to thank Barbara and Phillip and John Larson and others for their work on this.
    • 00:25:46
      It's been very difficult.
    • 00:25:48
      I think we are doing the right thing by going along with the Commissioner's recommendation for that option.
    • 00:25:56
      One, but I don't want to make sure we don't fool ourselves or others to think that we can
    • 00:26:02
      continue our road construction program to the same modest extent that we are growing accustomed to.
    • 00:26:10
      It will be some more difficult decisions down the road for us.
    • 00:26:15
      Okay, next is another very important matter and that is the report on asset management.
    • 00:26:27
      And we have again the Commissioner and Jim Smith, the Acting Director of Asset Management Division.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:26:36
      Thank you, Mr. Chairman.
    • 00:26:39
      Some time ago, the Department began a very serious business exercise regarding the development of an asset management program.
    • 00:26:50
      I want to paint the canvas just a bit for you to provide some context for what Jim Smith is going to review with you because there may be a few things in there that are cause for excitement.
    • 00:27:06
      First thing I would mention is that what you're going to hear from Jim is a status report on a multi-year exercise.
    • 00:27:15
      It's not a final program.
    • 00:27:18
      We are moving toward a true asset management program as opposed to the traditional maintenance program.
    • 00:27:30
      This effort began back about 18 months ago when we combined what was formerly the maintenance division and the equipment division into a single entity, what is now the asset management division.
    • 00:27:43
      It's a new way of doing business, I think a more appropriate way of doing business.
    • 00:27:50
      It's not the way we've operated previously when we finish.
    • 00:27:55
      And by that I mean that in the past our method has been
    • 00:28:02
      to decide to spend what money was in the maintenance budget as opposed to determining how much we need to maintain our assets.
    • 00:28:16
      The work is being conducted in-house by staff within the Asset Management Division and throughout the department, staff that's currently incorporated within our administrative direct labor budget.
    • 00:28:30
      We plan, as you will see, for an incremental delivery of this system.
    • 00:28:35
      We will not be ready to implement this asset management system before fiscal year 06.
    • 00:28:43
      So not next fiscal year, not before the following fiscal year, fiscal year 06.
    • 00:28:49
      This is a first cut at some results.
    • 00:28:56
      The information needs to be refined.
    • 00:29:00
      It should just be viewed by you as an indicator
    • 00:29:05
      of where we are in terms of funding our maintenance needs.
    • 00:29:09
      Although you're going to hear a number, it's a number that was good at a point in time.
    • 00:29:15
      It will change consistently.
    • 00:29:19
      And we do realize that regardless of having part of an asset management system is determining how you maintain your assets over time.
    • 00:29:30
      It's not this is how much money we need next year to take care of everything.
    • 00:29:34
      If you owned 100 homes and leased them out, you wouldn't paint all 100 of them every year, I don't think.
    • 00:29:42
      The outcome will be an incremental reallocation of maintenance resources across assets, systems, and across all districts.
    • 00:29:51
      With that, I want to introduce Jim Smith and tell you that Jim Smith has pinched hit as the Director of Asset Management Division shortly after it was created because shortly after it was created, the Director of Asset Management was called up to active duty and we expect him to be back with us in December.
    • SPEAKER_05
    • 00:30:17
      Thank you, sir, Mr. Chairman and members of the board.
    • 00:30:21
      I might take the liberty to say that I do go to bed every night and pray for no snow.
    • 00:30:28
      Well, humor's good.
    • 00:30:30
      I'm here today to provide you with an update, a status report on VDOT's Asset Management Program, if I can learn how to work this.
    • 00:30:41
      I'm going to review with you our business needs, our goals and objectives, program benefits, VDOT's past approach, what we're doing differently, the program status, and the summary of our work to date.
    • 00:31:02
      We define our business needs as a need to manage VDOT's maintainable assets using a lifecycle approach.
    • 00:31:10
      We need to identify and prioritize statewide needs.
    • 00:31:15
      We need to provide adequate processes to plan, budget, implement, and monitor work efforts.
    • 00:31:21
      And, of course, we need to meet APA and JLOC recommendations.
    • 00:31:28
      I went too far.
    • 00:31:30
      Our goals and objectives are to collect and maintain asset inventory and condition information.
    • 00:31:36
      to develop best practices for maintenance and operations activities, to identify maintenance and operations needs, to measure and to track work accomplishments, and to determine the impact of deferred maintenance.
    • 00:31:53
      The benefits that we will derive from this program will be a system to collect, compile, and manage asset information
    • 00:32:02
      We'll have an objective assessment of maintenance and operations needs.
    • 00:32:06
      We will have resource allocation based on needs, improved efficiency of maintenance and operations activities, and probably most important, improved performance and life expectancy of VDOT assets.
    • 00:32:23
      VDOT's past approach has been an historically based maintenance budget, usually with an annual increase, with sometimes little regard for inventory increase, additional lane miles, and special needs, and limited consideration for asset conditions.
    • 00:32:45
      But VDOT's approach today, which we have recently embarked upon,
    • 00:32:50
      is an asset management approach, and it will lead us to a transition to a needs-based budget with incremental delivery of our system, and will provide a simple, easy-to-use decision tool for the field to use.
    • 00:33:07
      As you can see from this slide, our asset management system includes six modules,
    • 00:33:14
      Random Condition Assessment, Needs-Based Budget, Planning and Scheduling Module, Work Order, Accomplishment and Monitoring, Inventory, and Analysis Tools.
    • 00:33:29
      And as you can see on the bottom of the screen, we've completed the initial versions of the first two modules.
    • 00:33:36
      And we have a very aggressive delivery schedule for the remainder.
    • 00:33:43
      Now before I explain to you a random condition assessment piece that we used, I need to go digress just a little bit.
    • 00:33:51
      We have complete bridge data from our bridge management system.
    • 00:33:56
      We also have 100% inventory and condition information on our interstate and primary pavements and at least a 5% sampling on our secondary road pavements.
    • 00:34:08
      But in addition to that, we needed some way
    • 00:34:12
      to inventory and rate our other assets.
    • 00:34:15
      So that's where we use a random condition assessment.
    • 00:34:19
      It's a statistically based sampling of asset inventory and condition.
    • 00:34:25
      The development of the application was in-house with VDOT employees.
    • 00:34:29
      We sampled over 9,000 one-tenth of a mile segments statewide across systems and districts.
    • 00:34:37
      And the first assessment was completed by state forces in about three months.
    • 00:34:41
      And we will do follow-up assessments to collect more data.
    • 00:34:47
      From our needs-based module, we have some initial findings.
    • 00:34:53
      Using the bridge management system data and the pavement data that I already talked to you about,
    • 00:35:00
      And extrapolating inventory and condition data from the sample sites that I mentioned, we were able to, and then taking that information and developing, we developed and applied business models to the data for selected assets.
    • 00:35:17
      The output of that exercise is that we identified up to approximately $890 million of needed work.
    • 00:35:25
      I'm sorry, did I say differently?
    • 00:35:30
      $890 million.
    • 00:35:33
      Let me explain that number just a little bit.
    • 00:35:36
      As we move toward an asset management system over the next several fiscal years, early indications are that about $890 million of additional maintenance work is needed in future years.
    • 00:35:50
      In fact, that number is going to go up and down
    • 00:35:55
      As we continue to work out the asset management system, those needs are over and above what's in the maintenance program, and that work does not need to be accomplished now or right away, but rather over a number of years.
    • 00:36:11
      The $890 million, as you can see on the slide, is made up of about 55% of that's for pavement work, about 29 to 30% is for bridges, and then other assets have lesser amounts.
    • SPEAKER_01
    • 00:36:25
      Yes, Judy?
    • 00:36:26
      Could you clarify that as a one-time infusion of capital, with 894, do you see that as an annual?
    • SPEAKER_05
    • 00:36:36
      No, certainly not annual, no, no, certainly not annual, and certainly not a one-time infusion.
    • 00:36:42
      It's work that should be scheduled over many years to improve the condition of our assets.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:36:49
      Jerry?
    • 00:36:52
      First of all, Mr. Chairman, Mr. Commissioner, we are struggling.
    • 00:36:57
      We're doing well actually in Richmond District, but Jim is on loan from the Richmond District.
    • 00:37:02
      I know he's doing a great job for you, but don't keep him forever, okay?
    • 00:37:09
      Can you explain to me, I know you can.
    • 00:37:11
      What I would like you to do is explain to me, you said that $890 million is over and above
    • 00:37:19
      An ongoing maintenance annual budget which is about that same number as I recall.
    • 00:37:27
      So it's one year's maintenance, which in a six-year plan is not awful, but what is this exactly that's over and above annual more or less program routine maintenance that we spend that $890 million on?
    • 00:37:44
      I don't quite get how the word asset is defined relative to the maintenance program on an ongoing basis.
    • SPEAKER_05
    • 00:37:53
      All right, let me see if I can explain, and my numbers might be a little off, but of $890 million, about 55% is identified as pavement work that's needed.
    • 00:38:05
      Now, that's already taken into consideration the amount of money, the cost of the pavement work that we do in the current fiscal year.
    • 00:38:14
      So this is pavement work that we've identified that should be done over some period of time to lessen the overall cost of your asset maintenance.
    • 00:38:24
      For instance, we can identify segments of pavement that have reached the threshold of cracking.
    • 00:38:34
      and we should do some crack sealing for preventative maintenance.
    • 00:38:38
      But we're not able to do all of those in the current program because we have to prioritize.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:38:45
      Does that make... Mr. Chairman, I think, Jim, it would be good to do the arithmetic and you correct me if I'm wrong.
    • 00:38:51
      Okay.
    • 00:38:51
      Through the random condition assessment and some other data collection needs, looking at, remember, one point in time, total up all those needs,
    • 00:39:02
      and it was about $1.7 billion, about $1.7 billion.
    • 00:39:10
      Subtracted from that, last fiscal year's maintenance budget, the remainder was $890 million.
    • 00:39:22
      Now, some of those, some of that $890 million worth of needs
    • 00:39:31
      would be programmed in future fiscal year maintenance budgets.
    • 00:39:36
      In other words, I don't think we'll ever be at the point where in one fiscal year, we'll go out and take care of every single dollar of maintenance needs that we have in the state, and in the next year, I'm not sure what we will do.
    • 00:39:51
      So that's the arithmetic
    • 00:39:54
      that got to the $890 million.
    • 00:39:58
      As we complete our asset management system and determine from an asset management business point of view the frequency with which various assets need to be maintained, we can begin to build a needs-based budget to address those additional maintenance needs.
    • 00:40:24
      Over what will be an appropriate period of time.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:40:28
      For example, you've got a lot of snow removal equipment.
    • 00:40:32
      Would that be part of the assets we're talking about that need to be maintained, periodically replaced, et cetera, et cetera, et cetera?
    • SPEAKER_05
    • 00:40:42
      That's certainly an asset, and that's covered in the asset management work that we do.
    • Gerald P. McCarthyMember, Commonwealth Transportation Board
    • 00:40:46
      Because, you know, I mean, I could envision a situation where you buy one of these things and you program it to last for 10 years.
    • 00:40:54
      And while you're coming to year 10 and things still chugging along pretty good, well, you know, maybe you can defer that for a year.
    • 00:41:02
      Is that what you're talking about?
    • 00:41:04
      Well, that's, Mr. Chairman, that's part of it.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:41:08
      For setting priorities among the annual maintenance?
    • 00:41:11
      Absolutely, that's part of it.
    • 00:41:12
      Maintenance of equipment, maintenance of roadways, maintenance of signs, signposts, guardrails,
    • 00:41:19
      Let me ask you a different way.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:41:25
      Unless we approach maintaining our assets differently, is it not so that if we don't do something differently next year, even though some of this is programmed in,
    • 00:41:41
      There are other needs that will come in.
    • 00:41:45
      And so unless we do something differently, we will, if you accept these figures, we will always be about $890 million less than what we should be doing.
    • SPEAKER_05
    • 00:41:57
      Give or take.
    • 00:41:58
      That $890 million is a moving target.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:42:01
      And we won't improve upon it the way we're going.
    • SPEAKER_05
    • 00:42:05
      Yes, sir.
    • 00:42:08
      Does that answer your question, sir?
    • 00:42:12
      Whoops, I went too far.
    • 00:42:14
      It's important for us to note that of the $890 million of needed work,
    • 00:42:19
      Certainly we've not neglected any safety issues.
    • 00:42:21
      All known safety issues have been prioritized and addressed in the current program.
    • 00:42:27
      And lower performance standards would reduce the short-term maintenance costs, but they will increase long-term maintenance needs.
    • 00:42:35
      So it's a pay me now, pay me later, over time.
    • 00:42:39
      Maintenance needs should be addressed over a period of time, over some number of years.
    • 00:42:45
      The outcome of this will be
    • 00:42:47
      An incremental reallocation of maintenance resources across assets, systems, and districts.
    • 00:42:56
      Our next steps in this are to validate our early findings, to collect more data by collecting more data, by refining our decision models.
    • 00:43:07
      And we hope to begin addressing these needs in FY06.
    • 00:43:11
      Mr. Chairman, that concludes my presentation.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:43:15
      Also might remind the committee, the board, that already we're using, in the current six-year program, we have had to take 400 and some million out of the Transportation Trust Fund, earmarked for road construction.
    • 00:43:32
      for maintenance.
    • 00:43:34
      We've gone through this crossover period for the first time since 1986 when the TTF was established, and so we will continue on that path to a greater extent in the future, it looks like.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:43:50
      Mr. Chairman, if you might permit me just to wrap up with where we started.
    • 00:43:56
      This is a status report.
    • 00:43:58
      It's not a finished product.
    • 00:44:01
      It's a disciplined step to a true asset management needs-based system as opposed to saying last year was 800, what's 800 times 1.04, this year, but it's a step toward that.
    • 00:44:23
      We will not be there in fiscal 05.
    • 00:44:28
      The earliest we'll be there to do this responsibly is fiscal 06.
    • 00:44:33
      It's a tremendous amount of work and we make, frankly, more progress than I would have expected thanks to Jim, Rob Hansen, and a lot of folks in the Asset Management Division that have taken this assignment quite seriously.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:44:52
      Jim, thank you.
    • 00:44:53
      Let me ask