Action Meeting   6/20/2002

Attachments
  • CTB APPROVES FINAL SIX-YEAR PROGRAM.pdf
  • COALFIELDS EXPRESSWAY TO RECEIVE CONNECTOR ROUTE TO KENTUCKY.pdf
    • SPEAKER_26
    • 00:00:03
      Commonwealth Transportation Board Meeting, June 20, 2002 Good morning.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:00:17
      Welcome everyone to our June meeting of the Commonwealth Transportation Board.
    • 00:00:28
      We had a very productive workshop session yesterday longer than usual that I believe and hope that we'll perhaps facilitate some of the items on the agenda today because of the preparation members of the CTB have had.
    • 00:00:52
      We do, though, want to allow public comment
    • 00:00:57
      even though we have had a series of public hearings prior to the adoption of the tentative six-year plan and then the two public hearings that followed the last month's adoption of that tentative plan.
    • 00:01:12
      In following the agenda, the first item is that period of public comment.
    • 00:01:18
      There are some rules that relate to
    • 00:01:23
      persons making appearances for the purpose of public comment we will review those rules it's not something I think that any of us feel particularly wedded to it's just to bring some some order and predictability to our schedule but we do have listed one individual Lauren
    • 00:01:48
      Allred, also, I believe, as a member of the Henrico County Board of Supervisors, Pat O'Bannon, who's also here.
    • 00:01:56
      So I'd like to give those two people an individual to speak.
    • 00:01:59
      I'd like to ask them, though, if they would limit their comments to three minutes or five minutes at the most, and I hope that that will be sufficient.
    • 00:02:09
      Then, after that, we will follow along the agenda as set out for us.
    • 00:02:16
      So, at this point, Lauren is already here.
    • 00:02:21
      Good morning.
    • SPEAKER_25
    • 00:02:23
      I'd like to thank the board for giving me a few minutes to address the board.
    • 00:02:27
      My name is Lauren Allred and I'm the president of the Pohick Village Homeowners Association and our property is in Morton, Virginia at the southern end of Fairfax County and it borders Route 1 on one side, the longest side of our project borders Route 1 and we've been directly affected by one of the
    • 00:02:50
      Project, which is the widening of Route 1 between Telegraph Road and Lorton Road.
    • 00:02:57
      I believe it's Project 12-9-06, I think is the right project for that.
    • 00:03:04
      The purpose of me taking just a couple of minutes this morning is to express our community's concerns about the delays in the project.
    • 00:03:11
      Just to give you a real quick update on the project, if you're not all familiar with it, many of you I'm sure are.
    • 00:03:16
      The project was begun a couple of years ago, and when they began the project, of course, they purchased some property.
    • 00:03:24
      They have since boarded up several buildings along Route 1 right across from the Povik Church, which is a historic church, and they've also purchased some of our property.
    • 00:03:36
      In so doing, the next phase in the project was to then relocate the utilities.
    • 00:03:44
      In relocating the utilities, they have removed what we had a natural sound barrier there and a natural visual barrier with trees and bushes and that has been removed from our property and that happened about a year ago.
    • 00:03:59
      And of course with the shortfalls in the budget, I know that there are shortfalls and everyone across the Commonwealth has been affected.
    • 00:04:08
      With these shortfalls, our project has also been put on hold.
    • 00:04:10
      And one of the reasons was because Fort Belvoir didn't give them permission to do part of the project in a fashion, soon enough fashion so it was put on hold and we got thrown back in the hopper with all the other projects that were hit by the shortfalls in the budget.
    • 00:04:28
      We have a couple of compelling reasons why we are asking the board to give highest priority to the completion of this project.
    • 00:04:37
      And there's one page handout that came out to you, and I just want to go through those just really quickly.
    • 00:04:45
      The first reason is we feel like we've been left somewhat hanging.
    • 00:04:49
      And we've lost our sound barrier.
    • 00:04:52
      We've lost our visual barrier.
    • 00:04:53
      Now our homes along the longest edge of our property are now exposed to the heavy traffic on Route 1.
    • 00:05:01
      And we've had of course increased sound without the trees and the bushes there and also people can look right into our homes and right into our property along Route 1 because they relocated the utility poles and they had to take out a whole strip of trees and bushes.
    • 00:05:16
      The other issue has to do with the abandoned buildings that are adjacent to our property and straight across from the Povik Church.
    • 00:05:27
      I counted seven buildings.
    • 00:05:28
      These buildings have all been boarded up now and they're very unsightly.
    • 00:05:31
      It's an eyesore to the community.
    • 00:05:34
      We have a historic church just across the street from us there.
    • 00:05:37
      It's the Povik Church.
    • 00:05:40
      Many of you may know that
    • 00:05:42
      George Washington, George Mason, and George William Fairfax were all vestrymen at this church.
    • 00:05:49
      So it's an important historic site in Fairfax County.
    • 00:05:52
      And it's really unsightly to have these buildings, these boarded up buildings there just waiting for this construction to be completed.
    • 00:06:01
      And then the third reason I give here is of course that
    • 00:06:03
      The widening of Route 1 is important to provide an alternate traffic route for people whenever there's a problem on I-95 or a problem on Route 1.
    • 00:06:14
      It becomes a very important corridor there to get to the Pentagon and back and forth to Fort Belvoir.
    • 00:06:20
      So those are the reasons I have laid out here, and I did have one question.
    • 00:06:25
      I'm not sure exactly where we are in the process of prioritizing.
    • 00:06:28
      I know I went online last night.
    • 00:06:31
      Well, let me just say first, originally we were told by Art, the engineer that's over this project, Mr. Sheehan, one of VDOT's engineers, that the project had been postponed and we wouldn't have a bid on the rest of the construction.
    • 00:06:46
      until 2006, August of 2006, and we felt that that was far too long.
    • 00:06:52
      I do want to say I went online last night and checked the plan, very nice website, checked the plan, and it looks like this project is scheduled for 2003.
    • 00:07:03
      And I wasn't quite sure what that meant, so I did have a question.
    • 00:07:08
      What is, when it says 2003, is that it's been budgeted for 2003 or the project will be bid in 2003?
    • 00:07:14
      I wasn't sure about that.
    • 00:07:15
      And then the other question I had was, is there another chance that the project can be reprioritized and given even higher priority than it has been given in the plan?
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:07:28
      Mr. Allred, I think on page 134,
    • 00:07:33
      of the program before us.
    • 00:07:36
      It has reference to South Lorton Road, North Telegraph Road, with construction to commence this fall.
    • SPEAKER_25
    • 00:07:48
      Scheduled to start in October of this fall.
    • 00:07:50
      Well, good.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:07:51
      Maybe my... That just shows you how prescient we are.
    • 00:07:59
      That's good.
    • SPEAKER_25
    • 00:07:59
      So it is scheduled to begin construction in fall.
    • 00:08:02
      Does that mean that that's the time the bid will go out for the work?
    • 00:08:05
      They call it the advertisement, I guess.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:08:07
      And it should be complete in the winter of 04-05.
    • SPEAKER_25
    • 00:08:13
      Okay.
    • 00:08:13
      04-05, the winter.
    • 00:08:16
      But construction will resume or begin this fall, fall of 2002.
    • 00:08:24
      Should be before the end of the year.
    • 00:08:26
      Construction.
    • 00:08:27
      Well, good.
    • 00:08:28
      I appreciate that.
    • 00:08:28
      It looks like people looked at that and saw that the project had already begun and decided that was one of the priorities.
    • 00:08:35
      Thank you very much.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:08:36
      Thank you for making the trip.
    • 00:08:40
      Ms. O'Bannon.
    • SPEAKER_00
    • 00:08:47
      Good morning and thank you Secretary Clement.
    • 00:08:49
      I should point out that this morning as a result of several days worth of phone calls and emails and other reasons, I felt I was compelled to be here and I would say I thought I would be propelled here by my own constituents were I not to speak to this body.
    • 00:09:08
      I want to thank you for speaking with me already this morning because after a radio interview earlier today by one of the gentlemen sitting here, well, Mr. Kornblau, I received a bombarded, was bombarded already with phone calls this morning, so I appreciate you allowing me to speak.
    • 00:09:24
      Thank you very much.
    • 00:09:26
      I am Pat O'Bannon.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:09:28
      Yes, just a minute.
    • 00:09:30
      Yes, sir.
    • 00:09:30
      Please give us your name and your title for the record.
    • SPEAKER_00
    • 00:09:32
      I am Pat O'Bannon.
    • 00:09:34
      I am the Tuckahoe Magisterial District Representative on the Henrico County Board of Supervisors.
    • 00:09:40
      And the question always comes up, so I'll go ahead and say it.
    • 00:09:43
      My husband is Delegate John O'Bannon.
    • 00:09:46
      As you already know, in Henrico County, we're one of only two counties in the state that own, operate, and maintain our own road system.
    • 00:09:55
      And our system, by the way, is the third largest in the state.
    • 00:09:58
      First you have VDOT, then you have Virginia Beach, then you have Henrico County.
    • 00:10:02
      We're the third largest.
    • 00:10:04
      We have problems in our county, but when it's a county road and a county road, we can correct an intersection such as that.
    • 00:10:11
      Where we have our problems are with intersections with state primary roads.
    • 00:10:15
      We have no state secondary roads in our county.
    • 00:10:18
      The worst of these problems is at the intersection of Parham and Patterson, which is what has precipitated this request for me.
    • 00:10:27
      The citizens who use that intersection are the ones who have responded to this.
    • 00:10:31
      In surveys that have been taken, in traffic surveys that have been taken and so on, there have been many meetings up until now, this is a major concern for our entire area.
    • 00:10:40
      but for the many citizens not just in my district and not just in Henrico County but in the surrounding counties also considered this a major problem.
    • 00:10:50
      This private project, the improvement at Paramin Patterson's interchange had been allocated 30 million dollars with last year's General Assembly and this money has been removed with this session and this is very confusing to me because if that meant it was that significant a priority by the General Assembly
    • 00:11:09
      Then why is it not a priority now?
    • 00:11:11
      It is not on the list.
    • 00:11:14
      I realize that this type of planning isn't an exact science, but I also realize that this type of major project will take more than one or two years.
    • 00:11:22
      It is not on the plan for six years.
    • 00:11:25
      This is the major concern.
    • 00:11:28
      Param Road, by the way, holds the distinction of being part of the national highway system.
    • 00:11:33
      That puts it on a par, almost on a par, with the interstate system.
    • 00:11:37
      It takes a lot of traffic.
    • 00:11:39
      So we have this problem now at the intersection of a national highway system roadway and a state primary roadway.
    • 00:11:46
      and it is your responsibility to help us continue the process.
    • 00:11:50
      As I said, right now it's totally off the list.
    • 00:11:54
      This is why the phone calls I've received, the emails and so on, and as I said, my own constituents offered to drive me down here in Mass.
    • 00:12:02
      I said, no, that's okay, I can find my way.
    • 00:12:05
      But if we had to come through the intersection, I'd probably be about 20 minutes late.
    • 00:12:09
      So thank you very much and I appreciate your time.
    • 00:12:11
      I can answer any questions if you have them.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:12:16
      Any questions?
    • 00:12:19
      All right.
    • 00:12:19
      Thank you, Ms. O'Bannon, for taking the time to be with us.
    • 00:12:25
      The next item is the approval of the minutes of the May 16 meeting.
    • 00:12:30
      Do I have a motion to approve?
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 00:12:31
      So moved, Mr. Chairman.
    • 00:12:32
      Second.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:12:33
      It's been moved and seconded that we approve the minutes of May 16.
    • 00:12:35
      All in favor?
    • 00:12:36
      Any comment?
    • 00:12:37
      All in favor, please say aye.
    • 00:12:38
      Aye.
    • 00:12:39
      Any opposed?
    • 00:12:40
      Next item, committee reports.
    • 00:12:43
      First, I'd like to call on Barbara Reese on the Financial Planning and Debt Management Division.
    • Barbara W. ReeseChief Financial Officer
    • 00:12:54
      Good morning.
    • 00:12:54
      Behind tab four of your book is the resolution that would adopt the fiscal year 2002-2003 annual budget for the Virginia Department of Transportation.
    • 00:13:07
      I would hope that you would choose to do so.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:13:11
      So moved for approval, Mr. Chairman.
    • 00:13:13
      Then moved and seconded.
    • 00:13:15
      This is, of course, one of the items we went over in detail yesterday.
    • 00:13:18
      Any discussion on the motion?
    • 00:13:21
      All in favor, please say aye.
    • 00:13:23
      Aye.
    • 00:13:23
      Any opposed?
    • 00:13:24
      Thank you.
    • 00:13:24
      Thank you.
    • 00:13:26
      Next, Commissioner Shucet.
    • 00:13:29
      Action on the Six-Year Program.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:13:37
      Thank you, Mr. Secretary.
    • 00:13:38
      Good morning.
    • 00:13:39
      It's good to see everybody again.
    • 00:13:42
      Behind tab 5 is the resolution to adopt the Six-Year Program.
    • 00:13:48
      I know this has been a somewhat tiring, somewhat aggravating process for everybody here.
    • 00:13:56
      We've had to remove $3 billion worth of projects
    • 00:14:02
      In this program, 166 projects.
    • 00:14:06
      The simple truth is that $3 billion was never there.
    • 00:14:11
      It's been painful.
    • 00:14:13
      A lot of people
    • 00:14:14
      are making a lot of sacrifices in terms of projects that have been removed from the program.
    • 00:14:20
      However, it's my pleasure to recommend to you the adoption of the resolution behind tab 5 for the Six-Year Program.
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 00:14:31
      Move for approval, Mr. Chairman.
    • 00:14:32
      Second.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:14:33
      Been moved and seconded.
    • 00:14:35
      We adopt the Six-Year Plan in final form.
    • 00:14:38
      Any discussion?
    • SPEAKER_09
    • 00:14:40
      Mr. Kornblau.
    • 00:14:42
      While I support the plan and its form today and as we talked about yesterday it being austere in nature, as I look out into the fifth and sixth year of our program in the Richmond District,
    • 00:15:00
      There are no projects that are scheduled to happen in the fifth and sixth year in our district.
    • 00:15:07
      We will continue to pay off projects that are being done now because we don't have the funds to pay for them now.
    • 00:15:14
      It's painful.
    • 00:15:16
      It's been painful for me.
    • 00:15:17
      It's been painful for the constituents in the Richmond District.
    • 00:15:22
      The Patterson and Parham intersection
    • 00:15:26
      360 widening projects, they're all gone and it's painful, but this is something that we have to do.
    • 00:15:35
      We have to provide a doable plan and I'm all for it and I just wanted to make those comments.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:15:41
      Thank you.
    • SPEAKER_28
    • 00:15:43
      And I'd like to say that I wanted to thank you, Commissioner Shugrat, for the hard work that you've put into this plan.
    • 00:15:52
      And if people want more projects, there's going to have to be an income stream coming in to transportation.
    • 00:16:03
      Because if you don't have the money, you can't fund it.
    • 00:16:08
      And I don't know where the income stream's gonna come from, but unless revenue goes up, and it's certainly everything that I've seen from DMV, it's coming down, unless it goes up, people are gonna want more and more projects in these areas.
    • 00:16:26
      We really need some more money in order to do these, or maybe to take some of these off the shelf.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:16:36
      Mr. Kerr.
    • SPEAKER_13
    • 00:16:39
      I'm going to support the Six-Year Plan.
    • 00:16:42
      As the folks that were here speaking about their projects, their respective areas, I'm sure each and every one of us could have brought busloads of people in to
    • 00:16:53
      to get there at that podium and express concern over projects that have been eliminated or delayed or whatever all over the state.
    • 00:17:04
      I really believe that we're at a time and we need our General Assembly, we need our Transportation Board, our Secretary, our Commissioner,
    • 00:17:16
      They're going to have to take a hard look at this debt service on these frands.
    • 00:17:20
      We can't keep going this route, in my opinion.
    • 00:17:24
      What it does to the individual districts, something's got to change here.
    • 00:17:30
      And obviously we do need some other revenue streams out there to help us.
    • 00:17:35
      And Secretary Clement, Commissioner
    • 00:17:39
      I would call upon y'all and Barbara and whatnot to take a hard look at our cash balances from the reports that I saw yesterday.
    • 00:17:48
      They look fairly good to me.
    • 00:17:50
      And I guess what I'm looking at is we're about 11 to 12 days away from the end of the fiscal year.
    • 00:17:56
      And if we have some maneuverability there in our cash and as you recreate the cash flow for the agency to make some changes, then I think we ought to look at it.
    • 00:18:08
      Thank you, sir.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:18:10
      Any other comments?
    • 00:18:11
      Any other discussion?
    • 00:18:12
      Motion is on the table to adopt the Six-Year Plan.
    • 00:18:15
      All in favor please say aye.
    • 00:18:16
      Aye.
    • 00:18:17
      Opposed?
    • 00:18:18
      Thank you.
    • 00:18:20
      Next from the Secondary Road Division, Jim Gibbons.
    • James S. GivensSecondary Roads Division Administrator
    • 00:18:27
      Thank you, Mr. Chairman.
    • 00:18:31
      Item tab 6 on your agenda is the action on additions and abandonments in the secondary system for the month of May.
    • 00:18:43
      I think the net change in the system was an additional 13.6 miles was added
    • SPEAKER_19
    • 00:18:57
      I move for approval.
    • 00:18:59
      Second.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:19:01
      Moved and seconded.
    • 00:19:02
      All in favor of the motion please say aye.
    • James S. GivensSecondary Roads Division Administrator
    • 00:19:06
      Aye.
    • 00:19:08
      The item number seven on the agenda, Mr. Chairman, is action on discontinuances in Spotsylvania, Shenandoah, and Warren Counties.
    • 00:19:22
      If there are any questions I'll try to answer those.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:19:25
      Move for approval.
    • 00:19:28
      Seconded to adopt the resolution in tab 7 on the discontinuance of certain roads in the secondary system.
    • 00:19:36
      Any discussion?
    • 00:19:37
      All in favor say aye.
    • 00:19:39
      Aye.
    • 00:19:39
      Any opposed?
    • James S. GivensSecondary Roads Division Administrator
    • 00:19:43
      The next item on the agenda, Mr. Chairman, is action on industrial access projects.
    • 00:19:49
      We have reviewed all of these projects with the Access and Ground Transportation Committee
    • 00:19:55
      We're recommending an industrial access allocation for the town of Withville.
    • 00:20:03
      Another industrial access allocation for James City County.
    • 00:20:09
      We're recommending a deallocation for the Walmart stores in Louisa County.
    • 00:20:18
      And we are recommending an allocation for Jefferson Supply in Louisa County.
    • 00:20:25
      I would point out that we plan to bring the Walmart allocation back at the next meeting.
    • 00:20:31
      There has been a change in the traffic impact analysis on that facility and we're not in a position to recommend the allocation at this point.
    • SPEAKER_19
    • 00:20:47
      Mr. Chairman, we discussed all these items this morning in the Access Roads Ground Transportation Committee.
    • 00:20:53
      Unless there's questions of Mr. Givens, I'd like to recommend that you take these as a block and I would make a motion for approval.
    • 00:21:02
      Second.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:21:03
      Been moved and seconded.
    • 00:21:05
      Any discussion on the motion?
    • 00:21:07
      All in favor of adopting the proposed resolution on industrial access projects, please say aye.
    • 00:21:14
      Aye.
    • 00:21:14
      Any opposed?
    • James S. GivensSecondary Roads Division Administrator
    • 00:21:17
      I'm going to ask Ms. Brown to do the revenue sharing applications.
    • SPEAKER_23
    • 00:21:25
      Good morning, Mr. Chairman, members of the board.
    • 00:21:28
      We have two items that we're requesting your approval of this morning, both relating to our revenue sharing program.
    • 00:21:35
      The first item is the Fiscal Year 2002 Supplemental Revenue Sharing Allocation.
    • 00:21:41
      Each year, after the third quarter, we assess whether or not all the localities that are participating will be able to utilize those funds, and those that are not will use that excess money.
    • 00:21:51
      We make it available to all localities that request at the maximum.
    • 00:21:55
      This request is for the 13 counties that expressed an interest in using the supplemental money and we are requesting your approval of the supplemental to those 13 counties.
    • SPEAKER_19
    • 00:22:07
      Moved for approval, Mr. Chairman.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:22:10
      Seconded.
    • 00:22:10
      The moved and seconded that we
    • 00:22:14
      Adopt that motion.
    • 00:22:16
      Resolution set forth there.
    • 00:22:17
      All in favor, please say aye.
    • 00:22:19
      Aye.
    • 00:22:19
      Any opposed?
    • SPEAKER_23
    • 00:22:21
      The second revenue sharing item is a revenue sharing reallocation.
    • 00:22:25
      Whenever a locality decides they want to switch the project that was identified for revenue sharing, it does require CTB approval.
    • 00:22:33
      So we have three counties that have expressed a need to change their projects, and we are asking your concurrence in reallocating for those three counties.
    • SPEAKER_13
    • 00:22:45
      Move approval.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:22:46
      Second.
    • 00:22:47
      Been moved and seconded.
    • 00:22:49
      All in favor of the motion please say aye.
    • 00:22:51
      Aye.
    • SPEAKER_23
    • 00:22:53
      Thank you.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:22:59
      Next, Traffic Engineering Division, Larry Caldwell.
    • SPEAKER_18
    • 00:23:07
      Good morning.
    • 00:23:08
      Traffic Engineering has four items for your consideration today.
    • 00:23:11
      These were reviewed this morning with the Access Roads and Ground Transportation Committee.
    • 00:23:17
      Agenda item 10 is a request to change the signing policy for right-of-way of pedestrians and crosswalks.
    • 00:23:24
      There already is a policy by the board that provides for signing for right-of-way of pedestrians in crosswalks and allows for the localities to install and maintain these signs as designated in the state code.
    • 00:23:40
      The legislature passed at this last session additional localities that are allowed to maintain these signs.
    • 00:23:48
      And in the new localities, VDOT maintains the roads.
    • 00:23:52
      So the requested change to the policy is for the localities to get a permit from VDOT before they install the sign.
    • SPEAKER_19
    • 00:24:07
      Mr. Chairman, you want to take these four items in the law?
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:24:11
      Yes, any questions on that presentation about signing?
    • SPEAKER_06
    • 00:24:15
      So the change you're saying is that you're going to require the localities to come to VDOT to get permission before they install these signs?
    • SPEAKER_18
    • 00:24:25
      Before they install sign on the VDOT maintain roads, they would get a permit from VDOT.
    • SPEAKER_06
    • 00:24:30
      That's not the current policy.
    • SPEAKER_18
    • 00:24:33
      The policy does not call for the permit today.
    • 00:24:36
      The localities that were allowed to install these signs were the City of Alexandria and Arlington County, which maintain their own roads.
    • 00:24:45
      And the counties or the localities that were added by the recent legislative action are Fairfax County, Loudoun County, and City of Fairfax.
    • 00:24:54
      So Fairfax County and Loudoun County, VDOT maintains those roads.
    • 00:24:58
      And we would like for them to get a permit before they install the signs.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:25:03
      Thank you, Mr. Chairman.
    • SPEAKER_13
    • 00:25:06
      How does this impact?
    • 00:25:07
      I was just reading the criteria about the population and whatnot.
    • 00:25:11
      How does this impact the small towns?
    • 00:25:13
      And what I'm getting at here, I live in a little town of Chatham, and we've got this little local deal that is a common courtesy.
    • 00:25:22
      If you come through town, the crossovers are there.
    • 00:25:25
      If somebody's there, you stop and let them go through.
    • 00:25:28
      How does that impact a small town?
    • 00:25:29
      They don't qualify for these
    • SPEAKER_18
    • 00:25:33
      The small towns do not qualify under the state code for this particular sign.
    • 00:25:38
      This sign is for motorists to yield to pedestrians in the crosswalk and it establishes the fine at between $100 and $500.
    • 00:25:47
      So the distinction on this is the sign with the fine.
    • SPEAKER_13
    • 00:25:53
      But it also says that
    • 00:25:57
      The governing body of any county having the county manager plan of government, which most of us have, most of them have, but it doesn't apply to the small towns.
    • SPEAKER_18
    • 00:26:11
      It's my understanding that it does not apply to the small towns as far as the county having the county manager plan of government.
    • 00:26:18
      It's my understanding that that particularly applies to Arlington County and they've added in the recent legislation counties that had the urban county executive form of government and that would be Fairfax County.
    • 00:26:34
      The recent legislation also specifically identified Loudoun County in the City of Fairfax.
    • SPEAKER_06
    • 00:26:40
      Okay, thank you.
    • 00:26:42
      And then why is the city of Fairfax included and not let's say the city of Manassas?
    • SPEAKER_02
    • 00:26:47
      Cause they didn't ask for it.
    • 00:26:48
      They didn't ask for it.
    • SPEAKER_18
    • 00:26:49
      The legislation passed in the last session specifically identified city of Fairfax, county of Loudoun, and county having the urban county executive forum.
    • 00:27:00
      That's how the legislation was worded.
    • SPEAKER_06
    • 00:27:04
      I thought every time I make a crosswalk across a
    • 00:27:08
      A street in the city of Manassas, they got signs there saying that, you know, yield to the pedestrians.
    • SPEAKER_18
    • 00:27:17
      The distinction on this one is that the fine is between $100 and $500.
    • 00:27:23
      Okay.
    • SPEAKER_06
    • 00:27:27
      Thank you, Mr. Chairman.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:27:29
      Alright, we'll take them in the block if there's no objection.
    • 00:27:32
      Next one is action on through truck restrictions.
    • SPEAKER_18
    • 00:27:36
      This is a request by Fairfax County to restrict through traffic by trucks on Route 6055, which is Flat Rock Road.
    • 00:27:45
      It is a quarter mile in length.
    • 00:27:48
      The alternate route is 54 hundredths of a mile and would take an additional 21 seconds to drive the
    • 00:27:59
      County held public hearing.
    • 00:28:01
      Public notice was published.
    • 00:28:03
      We received two comments in support.
    • 00:28:06
      No comments were opposing the truck restriction.
    • 00:28:10
      The Virginia Trucking Association was contacted but had no comment on this.
    • 00:28:17
      The board has five criteria that they consider in establishing truck restrictions and prefer that three, at least three are met and in this case four are met.
    • 00:28:29
      Is there any questions?
    • 00:28:33
      Okay, next one, number 12.
    • 00:28:36
      Agenda item 12A is a request from the town of Occoquan to establish one-way travel on certain streets and provide for angled parking on portions of Mill, Ellicott, Commerce Union, and Washington streets.
    • 00:28:53
      The town had a shortage of parking spaces in this area.
    • 00:28:57
      They hired a consultant to study the best way to expand parking.
    • 00:29:00
      They held public meetings, have made this proposal.
    • 00:29:04
      It's been endorsed by Prince William County Board of Supervisors.
    • 00:29:07
      It's been reviewed by VDOT district and central office traffic engineering staff and we endorse it as well.
    • 00:29:16
      Just a question on that.
    • 00:29:17
      How many more parking spaces did it give them?
    • 00:29:20
      It depends on the final design.
    • 00:29:22
      We expect it to be between 100 to 150 spaces.
    • 00:29:27
      Additional spaces in that block area.
    • 00:29:37
      Item 12B is a request from York County to be able to restrict parking on designated secondary highways.
    • 00:29:46
      Under section 46.2-1222 of the state code, York County, among certain other counties, are authorized by ordinance to restrict parking on secondary highways, provided that approval has been obtained from Commonwealth Transportation Board.
    • 00:30:03
      VDOT has worked with the county to develop the zoning ordinance, and York County did adopt the ordinance on June 4th of this year.
    • 00:30:16
      The ordinances contained in your packet, it identifies designated roadways where parking would be restricted to commercial, certain passenger-carrying vehicles.
    • 00:30:34
      Any change to the ordinance would have to come back to the Commonwealth Transportation Board.
    • SPEAKER_19
    • 00:30:41
      We've been discussing and working on this with York County for the past three months in the Access Roads and Grand Transportation Committee and Larry and staff has done a really good job working with them on this and so it's my pleasure to move that we approve all four items.
    • 00:31:02
      I second.
    • 00:31:02
      We present.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:31:03
      I move and second in discussion.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 00:31:09
      12A.
    • 00:31:11
      This is an incredible increase in parking using really the same parameters of area that they had before.
    • 00:31:18
      There is no destruction of the streets.
    • 00:31:20
      It's a matter of re-striping the roads and doing some minor changes to that as well.
    • SPEAKER_18
    • 00:31:25
      It also involves changing from two-way to one-way traffic on certain roads so that you can get the angle parking in.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 00:31:31
      No, but I applaud this concept.
    • 00:31:34
      There's no reason why, frankly, we don't look at this as an opportunity, especially when you try to do these urban areas.
    • 00:31:43
      Rather than take more land, create more parking here, we've got a good solution here if I'm looking at this right.
    • 00:31:49
      Especially when you get in these historic areas or frankly why don't you even do new areas as a standard.
    • 00:31:55
      So I hope that we see more of this in the future and try to get people to do this more often because it does seem to work.
    • 00:32:04
      One way traffic is not bad.
    • 00:32:05
      I understand it has its issues but this is a great increasing something by that amount of parking spaces without having, if you had to put 100 to 150 parking spaces you'd need acres of land to do that.
    • 00:32:18
      It's a great solution here.
    • 00:32:22
      It was a statement more than a question.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:32:27
      Okay, any further discussion?
    • 00:32:28
      All in favor of adopting the four proposed resolutions from the Traffic Engineering Division, please signify by saying aye.
    • 00:32:38
      Aye.
    • 00:32:38
      Any opposed?
    • 00:32:40
      Thank you.
    • 00:32:42
      Turning to page four on the agenda, item 13 on action on surplus property, Rosemary Jones.
    • SPEAKER_23
    • 00:32:50
      We have four items on the agenda this morning.
    • 00:32:53
      All four items are very routine.
    • 00:32:57
      They're conveyances to adjacent property owners, and we therefore recommend your approval.
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 00:33:03
      Mr. Chairman, I move that we take these four items as a block.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:33:07
      I move for your approval.
    • 00:33:10
      Been moved and seconded.
    • 00:33:12
      We take these four
    • 00:33:15
      different parcels in a block on the resolution, on the proposed resolution.
    • 00:33:21
      All in favor, please signify by saying aye.
    • 00:33:24
      Aye.
    • 00:33:24
      Any opposed?
    • SPEAKER_12
    • 00:33:25
      Thank you.
    • 00:33:26
      Thank you.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:33:27
      Charlie Rastin from the Urban Division on quarterly street mileage payments.
    • SPEAKER_17
    • 00:33:34
      Mr. Chairman, members of the board, you have in item 14 the changes for the urban street mileage in the towns of Abington, Ashland, Bridgewater, Grottoes, Herndon, and Vienna, and in the cities of Chesapeake, Danville, Emporia, Lynchburg, Martinsville, Newport News, Norfolk,
    • 00:33:55
      Portsmouth, Roanoke, Stanton, and Virginia Beach.
    • 00:33:59
      These are routine changes that we make to the urban inventory based upon either additions from subdivision streets or project adjustments once a project is in place and we recommend your approval of these urban system changes.
    • SPEAKER_28
    • 00:34:13
      Moved and approved.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:34:14
      Second.
    • 00:34:15
      Been moved and seconded that we adopt the resolution.
    • 00:34:22
      They're all separate resolutions on these quarterly street mileage names.
    • 00:34:25
      All in favor please say aye.
    • 00:34:27
      Aye.
    • 00:34:27
      Any opposed?
    • 00:34:30
      Next, Phil Baker, Environmental Division, action on Virginia Byways designation.
    • SPEAKER_18
    • 00:34:39
      Good morning.
    • 00:34:40
      For Route 721 in King Queen and Caroline Counties, all procedures have been followed in accordance with 33.1-62 of the code.
    • 00:34:50
      A resolution of support was received from both of those localities and so therefore I'm asking the board to include Route 721 into the Virginia Byway system.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:35:02
      You want to do these?
    • 00:35:05
      Is that the only one?
    • 00:35:07
      Yes.
    • 00:35:07
      Okay, they move to second.
    • 00:35:08
      Any discussion?
    • 00:35:10
      All in favor of the motion to adopt Route 1021 byways.
    • 00:35:16
      All in favor please say aye.
    • 00:35:18
      Aye.
    • 00:35:18
      Any opposed?
    • 00:35:20
      Thank you.
    • 00:35:22
      Next, Frank Gee, Acting Chief Engineer on this.
    • C. Frank GeeActing Chief Engineer
    • 00:35:28
      Thank you, Mr. Chairman, commissioners, members of the board.
    • 00:35:30
      I have 22 contracts at an approximate value of $29 million for your consideration this morning, and I'll run through the pages for you and point out some things associated with some of them.
    • 00:35:44
      On page one is the primary system.
    • 00:35:46
      You note we didn't have any interstate projects this month.
    • 00:35:49
      Page one and two are the primary system.
    • 00:35:53
      All those on page one, we recommend the ward.
    • 00:35:56
      On page two, I would point out that this was a coal severance funded project.
    • 00:36:02
      And as you recall, yesterday we had been advised by Buckhannon County that they did not have the funds available to fund this particular project and asked that we reject all bids.
    • 00:36:12
      When they do have funds, they will come back to us and we will re-advertise this particular project.
    • 00:36:19
      Pages 2 and 4 are the secondary projects.
    • 00:36:24
      It's nothing unusual on page 3.
    • 00:36:28
      On page 4, I would point out that the project at the top of the page, J90, this is the second time that we had advertised for bids, and we have a $347,000 savings over this time, over last time when we had bids.
    • 00:36:47
      We are recommending an award of it at this time because it is within our price estimate.
    • 00:36:52
      The last two projects on this page are also projects that are similar to the first one in the primary system.
    • 00:36:59
      They were coal severance funds from Buckhannon County and the county advised us that they would ask that we would delay that because of not having the funds available.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:37:08
      Frank, I probably should have asked you this before, but if I don't do it now, I'll forget.
    • 00:37:14
      Is there something we can do to better anticipate these situations?
    • 00:37:20
      I mean, it costs us money to advertise and accept bids and reject bids.
    • 00:37:27
      Is there some line of communication?
    • 00:37:30
      Maybe we could do a little Yes, we can work on it.
    • C. Frank GeeActing Chief Engineer
    • 00:37:33
      The county at the time that asked us to proceed felt like they would have the funding, but of course when they started seeing what their revenue were, they did not realize they did not have enough dollars coming in to fund these.
    • 00:37:46
      Thank you.
    • SPEAKER_13
    • 00:37:48
      Frank, I want to thank you and the department, Mr. Secretary.
    • 00:37:52
      These two items, they're on the first page in Pennsylvania County.
    • 00:37:56
      Four turning lanes and crossovers there in the county.
    • 00:38:00
      Broswell Volunteer Fire Department, the New Blouse Volunteer Fire Department.
    • 00:38:07
      Those four little things are nothing more than just examples of little small things in the community that kind of bind the community together.
    • 00:38:15
      And I want to tell you, these folks appreciate that
    • 00:38:19
      Small allocation, but in my opinion it makes a big difference in a community.
    • C. Frank GeeActing Chief Engineer
    • 00:38:26
      Page 5 is the One Urban Project with the City of Portsmouth.
    • 00:38:30
      We recommend an award of that contract.
    • 00:38:34
      Page 6 are two miscellaneous contracts.
    • 00:38:37
      We recommend award of the first one, but we recommend rejection of the second one.
    • 00:38:42
      That is a bridge painting contract.
    • 00:38:44
      This is the second time we've advertised it.
    • 00:38:47
      We still feel like the bids are too high.
    • 00:38:49
      In looking at the contract and how we developed it, you'll see that it involves six counties.
    • 00:38:55
      We want to go back and repackage the contract to put it in either two counties or three counties as either two or three contracts with the hope that we can get better bids since the contractor will not have to move to many locations and hopefully the moving costs will be minimized and that we'll get better prices on it.
    • 00:39:12
      So we intend to go back out with that contract very quickly.
    • 00:39:15
      Page 7 is what I
    • 00:39:22
      Think, I said this last month, is the last contract that was held over from the contracts that we were holding back in December, January, and February.
    • 00:39:33
      You see the bids were received December the 18th.
    • 00:39:36
      This particular contractor advised us because of our delay in executing the contract, he did not feel like he could hold his prices.
    • 00:39:43
      So therefore, we are recommending we rescind the award that was made in December.
    • 00:39:48
      and then that we reject all bids because the other bidders are not within what we feel like appropriate prices.
    • 00:39:54
      We intend to re-advertise this in July to get it back in place and I think this is the last one in which is associated with those 140 some projects that we delayed at one point in time.
    • 00:40:09
      On page 8 is a contract that the Capital Regional Airport Commission took in bids on.
    • 00:40:16
      You'll note that they took in bids on June 29, 2000.
    • 00:40:19
      The Airport Commission has been holding for some time to resolve some issues.
    • 00:40:25
      There are only $900,000 of VDOT funds associated with this $4.8 million contract, but they still need our concurrence in order to proceed with the award, and we would ask they have worked out the issues that they needed to work out
    • 00:40:39
      I want to ask for your concurrence in proceeding with the award of that contract.
    • 00:40:44
      Page 9 is a contract that the Tanner-Reed bill took in bids on.
    • 00:40:49
      We recommend award of that contract.
    • 00:40:53
      Page 10 is a contract that the City of Portsmouth took in bids on on April 25, 2002.
    • 00:41:01
      We recommend award of that contract.
    • 00:41:05
      Page 11 of bids that the City of Richmond took in bids on May 2.
    • 00:41:11
      We recommend award of that contract.
    • 00:41:15
      Page 12 is bids that the town of Mount Jackson, Virginia took in bids on on May 9, 2002.
    • 00:41:22
      I would point out that of that $1.8 million contract, there are only $267,000 of VDOT funds associated with it.
    • 00:41:31
      The remainder of the funds are coming from other sources for the Tourist and Welcome Center, but we would recommend the award of that contract.
    • 00:41:40
      Page 13 is a contract that our Administrative Services Division took in bids on involving a roadway weather information system, and we would recommend award of that particular contract.
    • 00:41:53
      It's in the Stanton District for the Stanton District.
    • 00:41:58
      Page 14 is a contract that the Bristol District took in bids on for replacement of some components for overhead message signs.
    • 00:42:07
      And since that's coming out of construction dollars, it needs your concurrence in the award, and we'll recommend award of that contract.
    • 00:42:15
      Page 15 is a contract that the Administrative Service Division through the Bristol District took in bids on for hired equipment to do, to supplement state equipment in doing small incidental construction, some maintenance jobs, and some revenue sharing projects on a per hour basis.
    • 00:42:35
      And page 16 is a project that the Cape Charles Historical Society, the town of Cape Charles, took in bids on.
    • SPEAKER_04
    • 00:42:44
      We would recommend an award of that particular contract.
    • C. Frank GeeActing Chief Engineer
    • 00:42:49
      In addition, there's one other item, if you recall, I mentioned yesterday at the workshop concerning a design-build contract called the New Kent Rest Area.
    • 00:42:57
      I handed out a sheet yesterday associated with that particular contract recommending the award of that particular contract to W.C. English Incorporated for $6,980,000.
    • 00:43:13
      Since this is a design-bill contract and I felt like you may desire some additional information, I have Cindy Ward here from a maintenance division with a photograph of what it looks like and will be happy to answer any questions that you may have concerning it, if you do have questions.
    • 00:43:29
      But we would recommend a ward of that particular contract.
    • SPEAKER_06
    • 00:43:32
      Between this and the item on Mount Jackson, is there an appreciable difference between the two designs?
    • 00:43:45
      I see that this is a welcome center at
    • 00:43:50
      The new item that you walked on, and this is a tourist and welcome center at Mount Jackson.
    • 00:43:58
      Are they similar?
    • C. Frank GeeActing Chief Engineer
    • 00:44:00
      I think that this is a much larger facility with significant, and I'll let Cindy answer that question.
    • SPEAKER_01
    • 00:44:08
      Currently in Virginia, we have 10 facilities that are combined with rest areas that are speed operated and state maintained facilities that are operated through the Virginia Tourism Corporation.
    • 00:44:22
      I believe the project that you're speaking of, the Mount Jackson Visitor Center, is a local visitor center.
    • 00:44:29
      They're handled differently and they're operated locally, and some even have regional centers.
    • SPEAKER_06
    • 00:44:36
      This one, okay, so it's different.
    • 00:44:39
      This is a VDOT design.
    • SPEAKER_01
    • 00:44:41
      This is a VDOT-designed, state-maintained facility.
    • SPEAKER_06
    • 00:44:44
      And the one that's in Mount Jackson is a local design.
    • SPEAKER_28
    • 00:44:46
      It's a local facility, locally operated.
    • 00:44:53
      That's ice tea money that I have given them over a couple of years, and a lot of private money has been put into the visitor center and the tourist center.
    • 00:45:03
      At Mt.
    • 00:45:03
      Jackson.
    • 00:45:04
      At Mt.
    • 00:45:04
      Jackson, but this is for the rest areas.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 00:45:08
      Okay, very good.
    • 00:45:10
      Hobie?
    • 00:45:10
      I was just scratching my mouth.
    • 00:45:11
      Actually, I might as well.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:45:14
      Well, you know, I just sort of, I don't like to go by you without record.
    • SPEAKER_09
    • 00:45:22
      Actually, you know what?
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 00:45:23
      Kenny remembers these discussions and ideas about how we deal with these rest areas.
    • 00:45:27
      I know there's some procurement issues and legal issues as it relates to this, but privatizing some of these kind of rest areas along interstate routes, much like what Delaware, New Jersey, and other states do for not only using as a revenue source rather than an expense.
    • 00:45:48
      So I hope one day we get back to that discussion and look at the opportunities to explore that concept and I think that the quality of service you'll find will be pretty high and the service you get there for people and it becomes more of a revenue source for the state rather than an expense to the state too.
    • 00:46:08
      I appreciate you.
    • 00:46:10
      I'll have to remember that.
    • SPEAKER_06
    • 00:46:13
      Thank you, Mr. Chairman.
    • 00:46:16
      Before I was rudely interrupted by my colleague over there, I'd like to complete my final question.
    • 00:46:24
      Bottom line was, are these on the shelf?
    • 00:46:28
      Aren't they already designed?
    • SPEAKER_01
    • 00:46:31
      No, actually the design-build process that we're utilizing, the design is part of the evaluation.
    • 00:46:39
      They have a list of architectural criteria that they must meet, minimum requirements for square footage of specific room sizes and amenities that they have to meet.
    • 00:46:50
      But the actual artist's rendering is individual per team.
    • SPEAKER_06
    • 00:46:54
      I thought they were on the shelf and all we had to do was pull one off the shelf and go ahead and do it.
    • SPEAKER_01
    • 00:46:59
      Actually what we are hoping to be able to do is we have the Mecklenburg project which we just completed which is a rest area and state welcome center.
    • 00:47:10
      The new Kent facility is only a rest area and small information available center.
    • 00:47:17
      It's just general information.
    • 00:47:19
      We're hoping to be able in the future depending upon the size
    • 00:47:23
      to use these as prototypes.
    • 00:47:25
      That way we would already have the benefit of the design.
    • SPEAKER_06
    • 00:47:29
      That was where I was headed with that, Mr. Commissioner.
    • 00:47:36
      Thank you very much.
    • SPEAKER_09
    • 00:47:37
      We used the design-build method in Bracy also, didn't we?
    • 00:47:42
      Yes, we did.
    • 00:47:43
      It worked out real well, didn't it?
    • 00:47:44
      Yes, it did.
    • 00:47:46
      This project is sorely needed and it is funded in the Six-Year Plan.
    • 00:47:49
      It's definitely supported.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:47:52
      Any other questions?
    • 00:47:54
      Do I have a motion to accept these recommendations in block?
    • 00:47:58
      Moved and seconded that we accept the recommendations both with respect to accept, reject, and rescind as has been recommended.
    • 00:48:09
      All in favor please say aye.
    • 00:48:11
      Aye.
    • 00:48:11
      Any opposed?
    • C. Frank GeeActing Chief Engineer
    • 00:48:13
      Thank you, Mr. Chairman.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:48:14
      Item 17, Action on Consultant Agreements, Peyton Barney.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 00:48:24
      Mr. Secretary, I'll have to make sure that if you ever go to an auction that you're not the caller, so I scratch my nose.
    • 00:48:29
      I got a bit there.
    • SPEAKER_03
    • 00:48:33
      Good morning.
    • 00:48:35
      Item 17A is the Penners Point Technical Consultant Engineering Inspection Contract with the firm of Parsons Brinklehoff deferred from the May meeting which will provide inspection of items associated with the Penners Point Interchange
    • 00:48:50
      the Midtown Tunnel and the Hampton Road Smart Traffic Center.
    • 00:48:55
      Under the existing Pinner's Point construction contract inspection includes the closed circuit television surveillance camera, gate systems, variable message signs, fiber optic cabling, the electronic components associated with the truck weigh station and the computer control lane use signals.
    • 00:49:15
      Under the Pinner's Point hardware software
    • 00:49:18
      The inspection team will provide assurances that the hardware and software provided will accommodate the various systems
    • 00:49:29
      being installed by the Penner's Point construction contract.
    • 00:49:33
      This inspection team will monitor the equipment installation schedule of each contract including coordinating with the existing system integrator for the SMART Traffic Center.
    • 00:49:46
      Also included in this contract is a review of shop drawings and catalog cuts for the field equipment provided
    • 00:49:52
      Review of test procedures and specified documentation, attending factory demonstration tests and monitoring of all required testing.
    • 00:50:03
      The district inspection staff nor the existing district-wide consultant roadway construction inspection contract staff possess the expertise required for the inspection of the components,
    • 00:50:16
      associated with the Hampton Roads Intelligent Transportation System or the Midtown Tunnel Facility.
    • 00:50:23
      Inspection of roadway items associated with the Pinner's Point contract is provided primarily by the department inspection staff, supplemented by the district's existing construction inspection contract.
    • 00:50:36
      This is a cost plus net fee contract having a maximum compensation of $1,954,551 providing one senior inspector and two regular inspectors.
    • 00:50:50
      The percent of construction costs provided in your contract information packet is based on the cost of the intelligent transportation system and tunnel related items associated with the existing Pennant Point construction contract and the anticipated cost of the hardware and software contract to be advertised in July 2003.
    • 00:51:15
      With the involvement of the central office and district staffs doing contract negotiations for this contract, a total of 12,153 work hours were reduced from the contract's original proposal.
    • 00:51:30
      And if you have any questions, I'll be glad to answer them.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:51:33
      Mr. Secretary, if you all recall, we, including myself, had some questions about this contract at last month's meeting.
    • 00:51:40
      I met with Mr. Carney and reviewed
    • 00:51:44
      I want to talk about some details, scope of work, as well as our negotiations and satisfied.
    • 00:51:51
      First of all, we do not have this expertise in-house, and it's not expertise that's coming through the contract for the hardware and software.
    • 00:52:02
      We need the inspection services to make sure that this system not just works at Penners Point but works with the total integrated traffic management system in the Hampton Roads area.
    • 00:52:13
      The negotiations, I think of myself as a pretty tough negotiator and I was very pleased to see how we had negotiated the scope down to the minimum that was required and the appropriate price along with that and
    • 00:52:29
      I would urge you to consider positively the request to approve this agreement.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:52:37
      I move to approve this agreement.
    • 00:52:39
      We take this separately.
    • 00:52:40
      Been moved.
    • 00:52:41
      Do we have a second?
    • 00:52:43
      Second.
    • 00:52:44
      Any further discussion on the proposed resolution to enter this conference?
    • 00:52:49
      All in favor, please say aye.
    • 00:52:51
      Aye.
    • 00:52:51
      Any opposed?
    • SPEAKER_03
    • 00:52:53
      Item 17B is a fixed billable rate consultant inspection contract with the firm of Dewberry & Davis, providing technical inspection services for various projects throughout the Northern Virginia District.
    • 00:53:08
      This contract is for a period of three years and has a maximum compensation of $5 million.
    • 00:53:15
      This fixed billable rate on-call contract provides for a maximum of five senior inspectors and 13 regular inspectors to impede construction operations, again providing an expertise the district inspection staff does not possess in the inspection of intelligent transportation systems and related components.
    • 00:53:36
      Additional services to be provided when requested by the department may be the review of shop drawings, notice of intent analysis, and CPM review.
    • 00:53:45
      It is anticipated that various regional signal systems, upgrade projects, upgrades to the existing traffic management systems in Northern Virginia and the intelligent transportation system associated with Woodrow Wilson Bridge will be assigned to this contract.
    • 00:54:03
      Any questions?
    • SPEAKER_28
    • 00:54:06
      Mr. Commissioner, did you review that one too?
    • 00:54:09
      That's $5 million.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:54:10
      Yes, I did.
    • 00:54:11
      This is on-call services, Ms. Welch, which means that we are able to basically procure the capability and availability of these services.
    • 00:54:25
      when and where we need them, and also gives us the ability to negotiate scope and price on sort of a work order task-corrector basis.
    • 00:54:36
      This does not mean that somebody has a blank check to spend $5 million.
    • SPEAKER_20
    • 00:54:42
      Mr. Chairman, I move that we approve it.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:54:48
      Second.
    • 00:54:48
      We moved and seconded.
    • 00:54:51
      Any further discussion on this consultant agreement?
    • 00:54:57
      All in favor of the proposed resolution, please say aye.
    • 00:55:00
      Aye.
    • 00:55:00
      Any opposed?
    • 00:55:02
      Thank you.
    • 00:55:02
      Thank you.
    • 00:55:02
      Thank you.
    • 00:55:04
      Next, now affirmative on the instruction bridge division.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:55:09
      Good morning.
    • 00:55:10
      I have one contract for you today.
    • 00:55:12
      It's for the design of two bridges at the interchange of I-64 and I-295 in western Henrico County.
    • 00:55:22
      The estimated cost is $12.6 million.
    • 00:55:26
      The successful consultant is Dem Jim Harris, and the maximum compensation is $1,721,000.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:55:35
      So moved, Mr. Chairman.
    • 00:55:38
      I've been moved and seconded.
    • 00:55:39
      Any discussion on the adoption of this proposed resolution from the structure and bridge division?
    • 00:55:49
      All in favor say aye.
    • 00:55:51
      Aye.
    • SPEAKER_20
    • 00:55:51
      Any opposed?
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 00:55:56
      Thank you.
    • 00:55:56
      Item 19 on the agenda, Ken Lance with the Transportation Planning Division.
    • SPEAKER_15
    • 00:56:04
      Good morning.
    • 00:56:05
      I'd like to ask for your approval this morning of a contract to conduct a study to assess transportation improvements needed to the I-95 corridor beginning with the interchange of Route 95 and 802 in Hanover County through the I-95 Route 54 interchange in the town of Ashland and ending with the interchanges of 95 and 30 in Hanover County.
    • 00:56:25
      The proposed contract with the firm of Kimley, Horn & Associates has a maximum compensation of $499,990.61 and a net fee of $24,465.17.
    • 00:56:36
      The contract, which will be administered by State Planning and Research Funds, which are federal funds administered by the Transportation Planning Division, is for the purpose of examining existing traffic conditions along this corridor
    • 00:56:52
      developing and analyzing future traffic year conditions considering proposed land use around the interchanges, making recommendations for operational and capacity improvements, and preparing conceptual plan drawings and cost estimates for planning purposes.
    • 00:57:07
      I'll be glad to answer any questions.
    • SPEAKER_09
    • 00:57:12
      Mr. Kornblau.
    • 00:57:13
      This isn't program money then?
    • SPEAKER_15
    • 00:57:16
      That's correct.
    • 00:57:17
      These are planning funds that are for the specific purpose of planning that cannot be used for actual design and construction.
    • SPEAKER_09
    • 00:57:25
      But as we all know, when we start planning something and we start studying something, expectations are raised.
    • 00:57:35
      When I was first appointed on the board, I was on a committee studying the Bryant Park interchange in that whole area on 95.
    • 00:57:42
      I mean, is this something that is going to raise expectations, possibly in Hanover County, of an imminent project?
    • SPEAKER_15
    • 00:57:50
      Mr. Kornblau, I think that the benefit, the purpose of this is more to allow us to work with the local governments to identify the needed improvements that will be necessary in order to accommodate the development that we know is going to take place around here.
    • 00:58:07
      and hopefully this will serve number one as a guide to the local governments, allow them to work with us in terms of establishing zoning and land use around the interchanges and secondly to help perhaps establish some very preliminary estimates on the scope and the cost of the improvements such that as funds become available down the road it will be there.
    • 00:58:30
      So that it is a two-edged sword, but I think we do a disservice to the public if we don't you know I think it's very important for them to
    • SPEAKER_09
    • 00:58:41
      I think we need to be very realistic in that regard as we go through this process and emphasize that
    • SPEAKER_15
    • 00:59:00
      although we will be working with a consultant assuming this is approved to develop these plans that it will be some time before they will come to fruition.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 00:59:11
      Mr. Secretary, I would urge us following Mr. Kornblau's comment, I would urge us to
    • 00:59:20
      to make sure we carry that message in all of our planning work.
    • 00:59:27
      Obviously you have to plan, so is it going to raise expectations?
    • 00:59:32
      It's going to move them from zero to something.
    • 00:59:36
      It's incumbent on us and the people that we hire to work for us to clearly
    • 00:59:44
      communicate and not become advocates for doing something at a particular time.
    • 00:59:54
      I mean this is a conceptual needs assessment basically.
    • 00:59:58
      Let's just be sure we clearly communicate that.
    • 01:00:00
      Thank you sir.
    • SPEAKER_13
    • 01:00:02
      This is all federal money too, isn't it?
    • SPEAKER_15
    • 01:00:04
      Right, these are federal state planning and research, SPR funds.
    • 01:00:07
      Right.
    • 01:00:09
      I move for approval.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:00:12
      I've been moved to have seconded.
    • 01:00:14
      I've been seconded for further discussion.
    • 01:00:16
      I just, where is, what road is 802?
    • 01:00:21
      Where is that?
    • SPEAKER_15
    • 01:00:23
      802 I believe is the one just north of 295.
    • 01:00:29
      I think it's Lewistown.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:00:34
      Lewistown Road.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:00:39
      Any further discussion?
    • 01:00:41
      All in favor of the motion to adopt the resolution to enter that consultive agreement.
    • 01:00:50
      All in favor say aye.
    • 01:00:51
      Aye.
    • 01:00:52
      Any opposed.
    • 01:00:53
      Thank you.
    • 01:00:55
      Next, Calvin Bowles, Location and Design Projects, Action on the L&D Projects.
    • SPEAKER_28
    • 01:01:03
      Mr. Secretary, may I ask a question?
    • 01:01:05
      Yes.
    • 01:01:05
      We got a, or I got a letter, and I know some other people got a letter from Mr. Davies that he wouldn't be here.
    • 01:01:13
      And I don't know, was this part of that, Mr. Bailey, on what he asked?
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 01:01:21
      Yes, it was.
    • 01:01:22
      It was?
    • 01:01:23
      Yes.
    • SPEAKER_28
    • 01:01:24
      I just want to make sure that we don't do something he doesn't want us to do.
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 01:01:30
      Right.
    • 01:01:35
      I can't speak to that.
    • SPEAKER_28
    • 01:01:36
      Well, I know I got one.
    • 01:01:38
      I don't know who else got one.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:01:40
      Mike, Mr. Bowles.
    • SPEAKER_02
    • 01:01:46
      We have six projects today.
    • 01:01:48
      The first one is Route 3 in Culpepper County at Stevensburg.
    • 01:01:57
      The corridor from Fredericksburg to Culpapa has been approved for the four-laning.
    • 01:02:04
      In the process of doing that, the board instructed us to go back and study the area around Stevensburg.
    • 01:02:13
      And we did so.
    • 01:02:14
      We came up with two alternatives for the project at Stevensburg.
    • 01:02:21
      The first alternative, number one, provides four lanes
    • 01:02:26
      for 12-foot lanes with 40-foot graded median on a new location passing around the north side of the existing town.
    • 01:02:37
      The alternate number two would widen the existing road to provide ultimately four 12-foot lanes widening to the north side of the existing pavement and this would follow the existing alignment through the town.
    • 01:02:54
      The Location and Design hearing was held in May 2001 at the District Office.
    • 01:03:01
      Thirty-five citizens attended the hearing.
    • 01:03:04
      We had twenty-eight comments in favor of alternate number one, and we have a resolution from the County Board of Supervisors supporting alternate number one.
    • 01:03:17
      There were seven comments in favor of alternate number two.
    • 01:03:23
      The average daily traffic is 6,500 vehicles per day.
    • 01:03:28
      For the design year, this is expected to increase to 11,000 vehicles per day.
    • 01:03:36
      There are no families, businesses, or nonprofit organizations displaced by either alternative.
    • 01:03:42
      There are no significant environmental impacts.
    • 01:03:46
      However, one property on
    • 01:03:49
      Alternate number two would be in agriculture and forestry districts.
    • 01:03:56
      The construction cost of this project is estimated to be almost nine million dollars.
    • 01:04:05
      The project would be ready for advertisement in 2007.
    • 01:04:11
      In the current six-year plan, this is shown in the development portion with funding for PE and right-of-way, no funding for construction.
    • 01:04:23
      As mentioned earlier, we do have a resolution supporting alternate one from the Board of Supervisors.
    • 01:04:29
      Staff recommends approval of the location and major design features alternate number one.
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 01:04:39
      Mr. Chairman, I'd just like to comment.
    • 01:04:43
      This is in Mr. Davies' area, but that Route 3 corridor, as most of you all know, greatly affects Fredericksburg.
    • 01:04:51
      As a matter of fact, we're hoping when financial and fiscal times are a little bit better,
    • 01:04:56
      that the widening of Route 3 coming on back a little bit closer to Fredericksburg past the spots of annual mall heading in that direction will be able to be looked upon maybe with this esteemed group a little bit more favorably hopefully in the future but I'm hoping that you all can recommend for the approval of recommendation number one for this one.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:05:19
      Okay, second.
    • 01:05:20
      Alright, what's the entertainment block?
    • 01:05:22
      Next.
    • SPEAKER_02
    • 01:05:23
      The second project is the intersection of Road 29 Business and Road 29 in Chatham, Pennsylvania County.
    • 01:05:33
      The purpose of this project is to replace an existing loop ramp from the east side of the interchange to replace that with two new ramps to facilitate operations of the interchange.
    • 01:05:48
      The Combined Location and Design Hearing was held in January of 2002 at the Central Middle School.
    • 01:05:55
      We had 19 citizens attend, received three written comments.
    • 01:06:01
      The estimated construction cost for the project is about a million and a quarter dollars.
    • 01:06:09
      Leaving the Six-Year Plan, it now shows advertisement early in 2004.
    • 01:06:16
      The right-of-way will replace one family but will not displace any businesses or nonprofit organizations.
    • 01:06:25
      The project will provide 16-foot travel way on each of the ramps with a 6-foot shoulder on the left and 11-foot shoulder on the right.
    • 01:06:38
      The projected traffic for the ramps is approximately 520 vehicles per day in 2023.
    • 01:06:45
      Staff recommends approval of the location and major design features as they were presented at the public hearing.
    • SPEAKER_13
    • 01:06:55
      For the board's information, if you look at your map, it's a little more than just being the upgrade or whatnot.
    • 01:07:04
      If you look where the north indicator is there, just to the west of it, that's a proposed industrial park, Pennsylvania County there, that will be built with tobacco fund monies that have been proposed to the tobacco commission.
    • 01:07:19
      This property and now the state has the Department of Economic Development's long viewed it as prime industrial site with a rail siding and all that's in there.
    • 01:07:30
      It's been on Pennsylvania County's scope for many years to develop this piece of property out there.
    • 01:07:36
      The western project of the diamond interchange there, this project before you today is phase two.
    • 01:07:47
      Phase one was done about three or four years ago, so we've been working on this thing for about eight or nine years to bring it into play for an industrial park, and that's what it is, is completing phase two of this proposed development thing.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:08:04
      I think you're going to take each of the block, I think.
    • SPEAKER_02
    • 01:08:10
      The next project is Route 220 in Bodytide County.
    • 01:08:15
      This is a section between Iron Gate and Eagle Rock.
    • 01:08:18
      The purpose of the project is to continue the dual laning of Route 220.
    • 01:08:25
      A combined L&D hearing was held in January 2002 at the Eagle Rock Elementary School.
    • 01:08:31
      38 individuals appeared.
    • 01:08:34
      We had four verbal and seven written comments.
    • 01:08:39
      This particular project is contained in the development portion of the Six-Year Plan.
    • 01:08:44
      It's funded for PE only at this time.
    • 01:08:48
      The preliminary engineering cost is about three and a half million dollars, spread over three sections or three projects.
    • 01:08:58
      The first of these could be ready to advertise for construction by mid-2006.
    • 01:09:05
      As proposed, there are no families, businesses, or nonprofit organizations that will be displaced by the projects.
    • 01:09:15
      Basically, on each end of this segment, we have
    • 01:09:20
      four 12-foot lanes with a graded median in between.
    • 01:09:25
      The middle section would have five 12-foot lanes with curb and gun.
    • 01:09:31
      The center lane would serve as a turn lane.
    • 01:09:34
      The average daily traffic volume for 2000 is approximately 6,000 vehicles per day, and this is expected to increase to approximately 9,000 by 2026.
    • 01:09:48
      The Potatot County Board of Supervisors has passed a resolution in support of the location and major design features of this project and staff recommends approval of the location and major design features as they were presented at the public hearing.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:10:10
      The next project is Route 231.
    • SPEAKER_02
    • 01:10:19
      It's a bridge replacement of a white oak run in Madison County.
    • 01:10:25
      The bridge, the proposed bridge, will be shifted just to the east of the existing one to facilitate maintenance of traffic during construction.
    • 01:10:36
      The location and design hearing was held in March of 2002 at the Madison County High School.
    • 01:10:44
      Ten citizens attended.
    • 01:10:45
      We received four verbal and five written comments.
    • 01:10:50
      The estimated construction cost is about a million and a quarter dollars.
    • 01:10:56
      This should be ready for advertisement by late 2003.
    • 01:11:03
      There are no families, businesses, or nonprofit organizations displaced by the project.
    • 01:11:09
      When constructed, it will provide two 12-foot lanes with eight-foot shelves.
    • 01:11:15
      The current traffic count is about 3,800 vehicles per day.
    • 01:11:19
      This is expected to increase to roughly 6,350 by 2026.
    • 01:11:28
      Staff recommends approval of the location and major design features as presented at the public hearing.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:11:35
      Any questions?
    • SPEAKER_02
    • 01:11:39
      The next project
    • 01:11:41
      is Route 460 in Prince George County.
    • 01:11:46
      This is a widening of the existing road just east of the intersection of 460 and 295.
    • 01:11:54
      The purpose is to provide a fifth lane so that the center lane can be used for left turns.
    • 01:12:03
      The location and design hearing was held in January 2002 at the Prince George County Building.
    • 01:12:10
      Nine citizens attended.
    • 01:12:12
      There were four written and no oral comments.
    • 01:12:17
      The project construction cost is estimated at a little over a million dollars.
    • 01:12:23
      This project is scheduled for advertisement early in 2004.
    • 01:12:28
      There are no residences, businesses, or non-profit organizations displaced by the project.
    • 01:12:35
      As I said earlier, this will provide essentially five 12-foot lanes using the center lane for turning.
    • 01:12:42
      There will be a 10-foot shoulder on the north side and gerbid gutter on the south side.
    • 01:12:50
      The average daily traffic in 1998 was 13,750.
    • 01:12:57
      and is anticipated to rise to 31,750 by 2022.
    • 01:13:02
      The department recommends approval of the location and design features as they were shown at the public hearing.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:13:15
      Any questions?
    • 01:13:17
      Let me ask you one thing.
    • 01:13:18
      In this particular proposal, you show that it's 80% federal, 20% regional STP funds, the funding source, but on some of these others, you don't mention it.
    • 01:13:30
      Is that because it's all state funds?
    • 01:13:33
      If there's no reference to the source of funding?
    • SPEAKER_02
    • 01:13:38
      No, sir.
    • 01:13:40
      Any questions?
    • 01:13:47
      Next?
    • 01:13:56
      The last project is Route 658, Scratch Gravel Road in Smith County.
    • 01:14:04
      The purpose of this project basically is to widen the pavement and shoulders and generally improve the drainage structures.
    • 01:14:13
      The work will follow the existing road location.
    • 01:14:17
      A combined hearing was held in April 2002 at the Marion High School.
    • 01:14:23
      Fifty citizens attended.
    • 01:14:25
      We received three verbal and six written comments.
    • 01:14:29
      The construction cost is estimated at two and a quarter million dollars.
    • 01:14:34
      However, it is not funded at the moment for right-of-way or construction.
    • 01:14:40
      An advertisement date will be determined when funding becomes available.
    • 01:14:45
      As currently proposed, the project would displace three families, no businesses, or non-profit organizations.
    • 01:14:54
      The project will provide two 12-foot lanes with five-foot shoulders.
    • 01:14:58
      The current traffic count is 1150 vehicles per day.
    • 01:15:04
      This is expected to increase to about 1950 vehicles today, per day, by 2015.
    • 01:15:13
      The Smith County Board of Supervisors continues to include this project in the Six-Year Plan and thus demonstrates their support for the project.
    • 01:15:23
      Staff recommends approval of the location and major design features of the project as they were presented at the public hearing.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:15:34
      Any questions on that?
    • SPEAKER_19
    • 01:15:35
      Mr. Chairman, I'd just like to thank staff for moving this forward.
    • 01:15:39
      Kevin, thank you all.
    • 01:15:41
      I noticed that the right-of-way is 50% of the construction cost.
    • SPEAKER_20
    • 01:15:49
      Is there something unusual with the right-of-way?
    • SPEAKER_02
    • 01:15:56
      It probably is a little more right-of-way impact than you might normally associate with this because essentially you're widening on each side of an existing roadway so you're climbing off the fronts of a number of properties as you go through there.
    • SPEAKER_19
    • 01:16:11
      And these residences sit, as a lot of them do on your narrow secondary roadway, sit close to the road and so you're displacing some
    • SPEAKER_02
    • 01:16:21
      And then Sir Gazer, you were getting this hefty glance and that type of thing.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 01:16:25
      Smith Canada real estate is expensive.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:16:29
      Okay, do we have a motion to adopt these?
    • 01:16:35
      So moved.
    • SPEAKER_09
    • 01:16:40
      Second.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:16:42
      Alright, it's been moved and seconded that we adopt these proposed resolutions in block.
    • 01:16:48
      Any further discussion?
    • 01:16:49
      All in favor say aye.
    • 01:16:51
      Aye.
    • 01:16:51
      Any opposed?
    • 01:16:52
      All right, thank you, sir.
    • 01:16:54
      Next, DRPT, Kevin Page on the rail industrial access projects, two of them.
    • Kevin B. PageChief of Rail Transportation
    • 01:17:02
      Thank you, Mr. Chairman, members of the board.
    • 01:17:03
      Good morning.
    • 01:17:05
      The first project applicant is Global Stone James River Incorporated.
    • 01:17:10
      The project will be located in Bonnetite County, Virginia.
    • 01:17:13
      The applicant is requesting assistance to help them in the construction of 300 track feet
    • 01:17:18
      three implant switches and rehabilitate about 1,700 feet of track at their James River quarry facility.
    • 01:17:25
      This is a plant expansion that will bring 2,500 annual carloads to a total of 7,000 plus for the year.
    • 01:17:34
      Six new jobs will be created, $2 million will be invested, and the request of DRPT and the Commonwealth Transportation Board is $300,000.
    • 01:17:42
      I'll turn the floor over to Mr. White, Chairman of the RTH.
    • SPEAKER_06
    • 01:17:44
      I would suggest you go on to the second one.
    • Kevin B. PageChief of Rail Transportation
    • 01:17:47
      Okay, doing a block.
    • 01:17:48
      Thank you, sir.
    • 01:17:48
      Our subsequent applicant is Owens-Brockway Plastic Products, Inc., located within the town of Alta Vista.
    • 01:17:56
      This project calls for the construction of 955-track feet at an estimated cost of $300,000.
    • 01:18:03
      This project is in concert with a plastics manufacturer generating 104 annual carloads.
    • 01:18:09
      30 jobs in a 6.6% unemployment area, and the request of the $14.5 million Capital Investment Day asking for $300,000 of DRPT Real Access Funds.
    • 01:18:21
      Mr. Chairman?
    • SPEAKER_06
    • 01:18:22
      Mr. Chairman, these were discussed this morning at the HOB Committee, and they are good projects, and I move that we approve them.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:18:34
      Second.
    • 01:18:34
      It has been moved and seconded.
    • 01:18:36
      Any discussion on those proposed resolutions for the rail industrial access funds?
    • 01:18:44
      All in favor of the motion, please say aye.
    • 01:18:46
      Aye.
    • SPEAKER_20
    • 01:18:46
      Be opposed.
    • 01:18:47
      Very good.
    • 01:18:48
      Thank you.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:18:49
      Thank you, Kevin.
    • 01:18:51
      Next is John Thaniel.
    • 01:18:54
      Action on the DRPT annual budget, which was presented yesterday in some detail.
    • SPEAKER_17
    • 01:19:02
      Yes, Mr. Chairman, board members, I would like to request your approval on action for the DRPT annual budget for fiscal year 2002-2003 as presented yesterday at the workshop.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:19:13
      So moved, Mr. Chairman.
    • 01:19:14
      Second.
    • 01:19:15
      Been moved and seconded.
    • 01:19:16
      Any discussion?
    • 01:19:18
      All in favor of the motion, please say aye.
    • 01:19:21
      Aye.
    • 01:19:21
      Any opposed?
    • 01:19:23
      Thank you.
    • SPEAKER_04
    • 01:19:24
      Next, Chip Badger.
    • 01:19:27
      Good morning again, Mr. Chairman, members of the board.
    • 01:19:31
      In an earlier action, you all approved the Six-Year Plan.
    • 01:19:33
      All the public transportation projects are in fact part of that.
    • 01:19:38
      This resolution, while it may seem a little bit redundant, does provide a specific documentation that we can show to the Federal Transit Administration that the board approves the federal grant, that it authorizes the director to submit the appropriate grant applications,
    • 01:19:51
      and that it also allows the director to amend the program during the year should it be necessary.
    • 01:19:56
      So we do ask for your approval of this resolution.
    • SPEAKER_06
    • 01:19:59
      Move for approval.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:20:01
      Moved and seconded.
    • 01:20:02
      Any discussion on the motion?
    • 01:20:04
      All in favor please say aye.
    • 01:20:06
      Aye.
    • 01:20:06
      Any opposed?
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 01:20:11
      Mr. Chairman, the Fredericksburg mass transit system, the Fred bus system, would like to thank Mr. Badger and his committee and his staff for all the work that they've done.
    • 01:20:22
      We're very proud of our very small but very beneficial mass transit system over the past four years.
    • 01:20:28
      And Mr. Badger, since I've been on board just in these past two and a half months, he's the first to come up and work with me to help better understand the funding and everything.
    • 01:20:36
      And that's fine.
    • 01:20:38
      I'd like to thank him and his staff for being
    • 01:20:40
      Any other business?
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:20:52
      I would just like to announce that this evening at 730 at the Northern Virginia Community College Annandale Campus there will be the final meeting of the Transportation Coordinating Council of Northern Virginia which goes out of business at the end of this month to be replaced by the Northern Virginia Transportation Authority.
    • 01:21:13
      The Commissioner is going to be our guest speaker and I understand, Mr. Commissioner, that Mr. Farley's office has been in touch and there's some context in regards now.
    • 01:21:28
      The TCC was sort of invented by Governor Wilder and Secretary John Milliken to be an unofficial non-legal MPO for the Northern Virginia region since we are part of the Washington DC MPO.
    • 01:21:50
      and it has acted for the last 11 years as an unofficial consensus body, so it will go out of existence, as I said, to be replaced on July 1 by the Northern Virginia Transportation Party.
    • 01:22:07
      Any of you all in the area, come by.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:22:11
      Also, Renee Lionberger is not here today with me.
    • 01:22:17
      There was a death in her family from one of her children's in-laws.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 01:22:23
      I'm sorry, Hobie.
    • 01:22:26
      I've been quiet today, actually, I think.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:22:28
      Well, that's a... That's a feather in his cap.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 01:22:32
      I was going to say, that's debatable.
    • 01:22:35
      But I frankly have been reflecting a lot over the last 24 hours about what we have done over the last four, five, six months.
    • 01:22:45
      I think that there's obviously been a lot of hard decisions to be made across the board.
    • 01:22:53
      I frankly think that the VDOT staff, the commissioner, the secretary, and everybody have done an outstanding job of not only getting the facts together,
    • 01:23:05
      getting them together for us so we can be involved, General Assembly members involved.
    • 01:23:09
      So I really applaud you for getting those things to us so we can become part of that process.
    • 01:23:17
      We talked a little bit yesterday, there's a lot of organizational things going on.
    • 01:23:21
      I think very positive things, the things I saw yesterday at lunch.
    • 01:23:25
      I see that you can build upon that so we can do some better ways of understanding how we do things and have it available to a lot more people.
    • 01:23:37
      There's a lot of short-term things that get fixed.
    • 01:23:40
      I still have some concerns on long-term
    • 01:23:43
      You know, we've gone through this budget process.
    • 01:23:47
      We looked at projects.
    • 01:23:50
      Talking with Roy last night, you know, we were talking about in his program, he's been doing a lot of the little things, but it's difficult to do the mega projects, I'll call it, and it's true in any district around the state.
    • 01:24:01
      The program that we have right now really keeps us, you know, above water, but it's really so important that some of the things that are coming up this November
    • 01:24:11
      Well, it's so important to things around the state, both in the Tidewater area, Northern Virginia area, and it's really all over the whole state.
    • 01:24:17
      Those decisions are so important for transportation issues around this state, quality of life issues, business growth.
    • 01:24:25
      And one thing I discovered as being on this board, you know, we tended to look at individual projects, but frankly, we need to look towards corridors.
    • 01:24:33
      and how they all work within inter-construction districts.
    • 01:24:36
      Route 29 is an example.
    • 01:24:39
      It goes on multiple districts.
    • 01:24:41
      The Route 28 project, when we first started looking at that, we were trying to fix interchanges here, but when you look at it, you see the things break down along the road.
    • 01:24:49
      So you really need to look at corridors and of course when you look at corridors you're talking about big dollars and I'm not sure that the program under the current revenue source can do that without going outside the box and looking for major sources of capital like the referendum issue does or other sources of new ideas we haven't thought about.
    • 01:25:09
      The use of FRANS is sort of fixed things on an errant basis, but it's a dangerous road to follow about doing things in the future with it, and I'm glad to see that at least we're taking a little more conservative route about not trying to use these things.
    • 01:25:26
      We do them now to fix the program, but there's a cost associated with it.
    • 01:25:30
      We can't do that in the future.
    • 01:25:32
      So I think it's imperative as us as a board to not only keep in touch with you with the organizational thing and help you along and get feedback, but I think it's also imperative as a board too to come up with some ideas about what are some things we haven't thought about to create some solutions.
    • 01:25:48
      Getting involved in these referendum issues is so important, not just in our individual district, but it has statewide implications.
    • 01:25:54
      If we can do some things to help North Virginia and the Tidewater area, maybe there's some things outside the box we can look at at I-81 or the Route 29s, go to the General Assembly to help let them understand where our needs are and help these funding sources.
    • 01:26:10
      There's a lot of unbelievable amount of work that's ahead and I hope I hear next month to continue with that and I appreciate working with this board and the staff especially.
    • 01:26:23
      Thank you.
    • SPEAKER_13
    • 01:26:24
      I'd like to follow up just on a section of what Hobie said about looking at corridors.
    • 01:26:33
      As we've approved the six-year plan today in my district, the 29 corridor, we have a slight setback on the 29 corridor as a result of where we are.
    • 01:26:47
      but I recognize and I think everybody else recognizes it's one of those things that we're going to have to do right now for a while until we can regroup on what we need to do south of Lynchburg.
    • 01:26:58
      We don't have the money to do it.
    • 01:27:01
      It's not that we're not interested because I'm very much concerned about the 29th quarter but it's just one of those situations where you've just got to step back and take another look at it.
    • 01:27:13
      I want to thank the Commissioner.
    • 01:27:14
      I want to thank Whit.
    • 01:27:17
      Barbara, all the financial staff for the session yesterday.
    • 01:27:23
      It's always good to revisit
    • 01:27:25
      The statutes that drive this thing, and it helps each and every one of us to maybe remember what's going on there, and I think it serves another purpose, too, to help maybe Ed and Ambrose, the new board members come on to realize, to see where all of this formula and structure goes from, that plays a vital part in what we do here.
    • 01:27:50
      We may want to do something, but we're just prohibited from doing it.
    • 01:27:54
      But the last six months have been, in my opinion, have been a renewal of our efforts and education in this agency and the service that it provides out there to the state.
    • 01:28:11
      And while we're having to cut back and drop back, we all recognize the needs that are there that are what's got to be done in the future.
    • 01:28:22
      I'll shut up.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:28:24
      Thank you for those comments.
    • 01:28:29
      Anything else come before us today?
    • 01:28:34
      If not, we stand adjourned.
    • 01:28:36
      Thank you very much.
    • SPEAKER_26
    • 01:28:42
      June 19, 2002 Comprehensive Financial Overview
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:29:06
      Good morning.
    • 01:29:09
      I would like for us to go ahead and get started.
    • 01:29:14
      I want to thank those who have suggested that we meet earlier today than our usual two o'clock start so that we can delve deeper and make sure we have a good understanding of the financial budgetary situation
    • 01:29:37
      as laying the groundwork for our having a better understanding of the six-year program that we had tended to be adopted last month.
    • 01:29:47
      We've got the, everybody's got a copy of the agenda.
    • 01:29:51
      I'm going to call on our commissioner in a moment
    • 01:29:54
      to open things up, but I do want to welcome everybody here.
    • 01:29:59
      Glad we've got as many as you that we do.
    • 01:30:03
      I think we'll have some more coming in a little later.
    • 01:30:06
      As you'll note there, we'll expect to conclude around noon or so.
    • 01:30:11
      I'm actually going to have to slip out a little sooner, and then I will return.
    • 01:30:17
      We'll have box lunches here and then this afternoon.
    • 01:30:19
      We'll have the presentation of the annual budget from
    • 01:30:24
      DRPT and VDOT and then we will proceed with the agenda on the Six-Year Plan and Frank G.'s review of the contracts.
    • 01:30:38
      So, first item, and I also want to welcome, for those of you who might not know on the board, that we're very happy to have Barbara Reese back with VDOT, filling a very important slot.
    • 01:30:52
      She is, I think, born alone.
    • 01:30:56
      for the foreseeable future from the Senate Finance Committee.
    • 01:31:00
      We're very grateful for their cooperation in allowing Barbara to come and give us some of her expertise, which I hope you will find evident in the presentation this morning.
    • 01:31:17
      So with that, let me turn things over to Philip Shucet, Commissioner.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 01:31:32
      Thank you, Mr. Secretary, and good morning.
    • 01:31:34
      If I was more agile, I would demonstrate my excitement about having Barbara with us by turning a few cartwheels, but I would make a fool of myself and get hurt, so I won't do that.
    • 01:31:49
      But quite seriously, I have
    • 01:31:54
      I've greatly expanded my knowledge of our finances just in the past couple of days, to be quite frank about it, since Barbara has been here and helping us with our staff.
    • 01:32:10
      And I believe that today's presentation will continue to go a long way towards helping all of us.
    • 01:32:19
      I know that when we first talked about this, as Mr. Byrd suggested,
    • 01:32:23
      We were sort of looking at a full day and some pretty detailed types of issues.
    • 01:32:31
      In the intervening period, we've had some changes that
    • 01:32:37
      that I've caused on our side and as you know we delayed that meeting and we arranged this session today and also have taken the liberty quite frankly of changing the scope of it just a bit.
    • 01:32:52
      Our ability to discuss details needed to be tempered with the reality of where we were and what we're going to address this morning for you are four broad issues.
    • 01:33:07
      Where does the policy guidance come from that directs us in some of our deliberations on transportation issues, particularly resources?
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:33:18
      Philip, I want to let everybody know, you might want to refer to your books for those of you who don't have an open mic.
    • 01:33:28
      Thank you, Mr. Secretary.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 01:33:31
      Secondly, how do we determine how much money we have
    • 01:33:34
      How do we make decisions on how we plan to spend our money and what are the immediate financial management challenges facing you as a board and us as a department?
    • 01:33:50
      In talking to Barbara and her staff, I've clearly discovered that these issues are interrelated and somewhat complex at times.
    • 01:34:01
      We're going to spend basically the next four hours going through issues behind these four questions.
    • 01:34:08
      and I believe that will prepare us for a longer discussion that we'll have this afternoon about the final six-year program and we'll go through some changes there later on in the agenda.
    • 01:34:24
      So without any further ado, I'd like to ask Barbara Reese,
    • 01:34:27
      To get us started, and as the secretary pointed out, this presentation is in your book, and Barbara and her staff will be leading the discussion for the next couple hours.
    • Barbara W. ReeseChief Financial Officer
    • 01:34:40
      Good morning.
    • 01:34:43
      Just go ahead and start.
    • 01:34:44
      You can turn to page four to start.
    • 01:34:47
      First up, I want to say I'm going to be doing some of the talking up here for the first 45 minutes or so, but this work is not my work.
    • 01:34:56
      This is work of the finance staff that were already here at VDOT.
    • 01:35:00
      with just the broad parameters of the four questions and someone, a person that works in financial planning and debt management took the lead on getting this presentation put together, working with all the resources within the finance directorate.
    • 01:35:14
      This couldn't have been put together over the last week or so without them and they're the ones that will do the things.
    • 01:35:20
      So I hope sometime during this day you will take time to tell them thank you.
    • 01:35:24
      And we are trying to step back a little bit and begin by saying, what's the guidance that you receive in terms of allocating resources?
    • 01:35:33
      So in starting looking at page four, there's basically four major
    • 01:35:38
      sources of policy direction on the allocation and use of transportation revenues.
    • 01:35:43
      First, the Code of Virginia, and that's mainly in Title 33 and Title 58, the Appropriation Act, the Virginia Transportation Act of 2000, the VTA, and then federal law.
    • 01:35:55
      And we're going to walk through each of those fairly briefly, but trying to give you a sense of, we took this approach of what is the Commonwealth Transportation Board's role in these things and trying to give you some background.
    • 01:36:08
      If you look at Title 33.1-12, it lays out that the Commonwealth Transportation Board is responsible for allocating the transportation revenues in the Transportation Trust Fund.
    • 01:36:20
      It does not speak to the Highway Maintenance and Operating Fund and that is an important distinction.
    • 01:36:25
      If you look at it, it talks about the allocation of construction resources.
    • 01:36:29
      What the Title 33 also says from a broader policy perspective is that when either VDOT, the governor, or the Commonwealth Transportation Board looks at how you're going to budget resources, your first priority is highway maintenance, taking care of the existing infrastructure that you have.
    • 01:36:49
      Payments to localities, again, those localities use those payments primarily to deal with existing infrastructure.
    • 01:36:57
      The administration and operations of the department.
    • 01:37:00
      A lot of people have asked me, what do you mean by operations?
    • 01:37:03
      Operations are things like outdoor advertising, traffic engineering from the maintenance side of the house.
    • 01:37:10
      All those type of activities are outside of normal scope of maintenance and construction, but still a key and integral part of what VDOT does.
    • 01:37:18
      It used to also include truckway operations.
    • 01:37:21
      And then lastly, and that's the important point, lastly is highway construction.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:37:27
      The Appropriation Act Tell me again what payments to localities is
    • Barbara W. ReeseChief Financial Officer
    • 01:37:38
      Payments to localities was established in about 1985 where based on a formula, it's called the maintenance cost index, I think it was 85 or 86 is the baseline year for like cities that have to maintain their own streets, Henrico and Arlington County.
    • 01:37:54
      There was a base year established and then there through what's called the maintenance cost index.
    • 01:37:59
      Their payments to those localities for those services basically are updated based on that.
    • 01:38:05
      And that's what payments to localities are.
    • 01:38:08
      And many times when we talk about maintenance, we talk about both of them combined.
    • 01:38:12
      Our maintenance that VDOT employees and staff do and what localities take responsibility for.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:38:17
      So they're a subset of maintenance?
    • Barbara W. ReeseChief Financial Officer
    • 01:38:19
      In some ways.
    • 01:38:19
      I mean, they are a separate program within your budget and we'll walk through that later.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:38:24
      Yeah, but what do they include besides maintenance?
    • Barbara W. ReeseChief Financial Officer
    • 01:38:29
      that's it that's all right so there it's just another maintenance column right now there is authority within the code to allow them to use their maintenance payments to do some construction and also to finance some types of mass transit formula yes it's all formula
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 01:38:46
      Yes, Hobie?
    • 01:38:48
      Back on this Title 33, our responsibility as a budget, the maintenance program is nearly 50% of the total budget.
    • Barbara W. ReeseChief Financial Officer
    • 01:38:58
      That's right.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 01:39:00
      If you add what is the payments to localities, which is really a maintenance fund, what does that really entail as far as the total budget?
    • 01:39:08
      Is that now become, are they 10% of the budget?
    • Barbara W. ReeseChief Financial Officer
    • 01:39:11
      Financial assistance to localities is about 250 million for 03.
    • 01:39:15
      out of 3.1 billion basically, it's $2.50, and then VDOT maintenance is about almost $900 million with that.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 01:39:27
      So it's about a third of the money, maybe a little over a third of the money is really out of the control as far as policy decisions out of this board's realm.
    • Barbara W. ReeseChief Financial Officer
    • 01:39:38
      For the allocation of resources, yes.
    • 01:39:41
      Now I will, I mean, to be perfectly frank, the Board has always, the way that VDOT has operated in the past, and the Governor has allowed the Board to operate, when you adopt a budget tomorrow, you may make adjustments in maintenance spending.
    • 01:39:55
      Typically what those things are, for example, are there's a bonus pay plan within the Appropriation Act.
    • 01:40:02
      You adjust maintenance, you would look at the Appropriation Act, and that's actually included in your book.
    • 01:40:06
      and C. Maintenance is given this amount of money, appropriated this amount of money by the General Assembly.
    • 01:40:12
      But then there are adjustments that can occur and do occur by the Board for things like state police operations or for bonus payments to employees or pay raises and that kind of thing.
    • 01:40:26
      So there are some minor adjustments that are made but not, overall you don't have a lot of say over the maintenance program, yes, by law.
    • 01:40:35
      Turning to page six, if you look at the appropriation act, and I want to point out the appropriation act has been included in your binder as tab one.
    • 01:40:43
      This is the section from the Secretary of Transportation's office through every agency under his purview.
    • 01:40:49
      I wasn't sure if any of you have ever seen how the appropriation act is structured, so I have included that and I'm going to walk you through a couple of examples in a few minutes.
    • 01:40:58
      A couple key points about the Appropriation Act.
    • 01:41:02
      It overrides any other state law.
    • 01:41:05
      Doesn't matter what Title 33 or Title 58 says, if the General Assembly and the Governor signs, and it makes changes to that, the Appropriation Act takes precedence.
    • 01:41:17
      What the Appropriation Act does basically is it appropriates revenues for expenditure.
    • 01:41:22
      It's based on the official state revenue forecast for all funds.
    • 01:41:27
      It establishes the spending authority in broad terms for transportation programs.
    • 01:41:31
      It establishes the staffing levels that VDOT or DRPT or any other state agency is allowed to have.
    • 01:41:37
      and it sets forth policy direction on how resources must be spent and with that I'd like you to turn to tab one because I'm going to walk you through a couple of examples that are listed on page seven.
    • 01:41:48
      If you turn to the second page behind tab one and just for your information this is the appropriation act for the fiscal year 2003-04 biennium.
    • 01:42:00
      If you look at the first page which is page 371 at the top
    • 01:42:04
      This long A-1 paragraph that goes on for pages and pages is basically what integrates federal transportation funding requirements with state funding formulas.
    • 01:42:19
      Because the Code of Virginia, because federal law, and we'll talk about this later, changes every six years.
    • 01:42:24
      Dorn, reauthorization.
    • 01:42:26
      The policy has always been is that the Appropriation Act merges those two so that every six years you wouldn't have to recodify the statute.
    • 01:42:35
      It's done in the Appropriation Act.
    • 01:42:36
      That sets the policy for that and how that is done.
    • 01:42:40
      Those of you who were on the board back when T21 was first reauthorized, I'm sure you remember
    • 01:42:45
      Jim Atwell at the time going through all those policy choices that were embedded in how T-21 was implemented here in the department and in DRPT and other places.
    • 01:42:56
      If you recall since then the appropriation act made a significant change
    • 01:43:00
      In that, and I don't remember, several years ago the General Assembly said we want to make sure that mass transit receives additional funding guaranteed every year so for the surface transportation program there was a set-aside specifically made for mass transit out of some discretionary cuts and we'll talk a little bit more about that later.
    • 01:43:21
      If you look at page 382 of that you would see the Route 58 Development Fund.
    • 01:43:28
      and how that program and how that money can be spent and what money has to go into that fund.
    • SPEAKER_12
    • 01:43:33
      Same thing for Northern Virginia Transportation District Program.
    • Barbara W. ReeseChief Financial Officer
    • 01:43:36
      All that is laid out in the Appropriation Act.
    • 01:43:39
      So this is a critical document when the financial staff here are trying to merge everything together and come out with a six-year financial plan and a six-year program as well as DRPT.
    • 01:43:51
      It directs how things have to happen.
    • 01:43:57
      If you turn to page 8, I'm going to talk a little bit about the Virginia Transportation Act of 2000.
    • 01:44:02
      As you know, it was enacted by the 2000 General Assembly.
    • 01:44:08
      And the reason it was enacted at the time was to address project deficits and funding gaps in the 2006-year program.
    • 01:44:15
      It was based on a funding snapshot.
    • 01:44:17
      If you go back and think two, two and a half years ago, really almost three now,
    • 01:44:22
      That was when the first rumblings of a cash problem started, where there was concerns about cash flow and whether or not the department had enough resources cashed to manage and to continue to do its work.
    • 01:44:36
      And the General Assembly was aware of that and started to try to work on addressing those funding gaps.
    • 01:44:44
      It was based, just like anything else, on a snapshot in time, which was the program that had been adopted
    • 01:44:51
      in 1999 by the Board.
    • 01:44:55
      The VTA established the Priority Transportation Fund, a lot of times called the PTF, with certain revenue sources deposited to it, tax at the RAC, which was a change that was enacted during the session about how motor fuels are collected, one-third of the estimated revenue from the insurance license tax, which up until that time was all a general fund revenue resource, and then actual revenues above forecast in both the Highway Maintenance and Operating Fund and the Construction Fund.
    • 01:45:24
      The General Assembly also has the authority to appropriate other funding to the Priority Transportation Fund.
    • 01:45:30
      The Commonwealth Transportation Board does not have the authority to deposit money into the Priority Transportation Fund by an action by the Board.
    • 01:45:38
      It is only the General Assembly who has that authority.
    • 01:45:42
      At that time in 2000, the VTA also authorized, as all of you know, $800 million in federal revenue anticipation notes or FRANs that can be outstanding at any one time to complete the next phase of financing on 121 specific projects.
    • 01:45:59
      I know in the past it's been talked about these were new projects to the program.
    • 01:46:04
      In many cases, that was not the case.
    • 01:46:06
      In fact, they were funding needs that were identified to get to a next point
    • 01:46:10
      by VDOT, DRPT, local governments, NPOs, whatnot.
    • 01:46:16
      If you went and looked at the list for Northern Virginia Hampton Roads and those kind of things, a lot of those things you would see in their 2020 plans.
    • 01:46:23
      And the VTA also said that for both of the project lists, the general fund money that was there to try to address cash deficits and problems in the 2000 program as well as what was in the Priority Transportation Fund in the France could be
    • 01:46:38
      modified or moved around within the list and within the district to address cash flow needs.
    • 01:46:46
      And just to point out a couple projects, I wanted to give you a couple good examples of that.
    • 01:46:49
      The Harrisonburg Southeast Bypass up in Mrs. Welsh's area.
    • 01:46:56
      That project in the VTA, which is behind Tab 2, by the way, the actual law is behind Tab 2 of your book,
    • 01:47:02
      has $20 million identified for that project.
    • 01:47:05
      That number came directly from a letter that Dennis Morrison, the VDOT administrator in that area, had written about what would it cost to get through PE for that project.
    • 01:47:15
      That's how the $20 million was identified.
    • 01:47:18
      If you look at the high-speed rail funding that's in each district in Northern Virginia, Fredericksburg, and Richmond, at the time DRPT had an analysis
    • 01:47:29
      The money was done of what was needed in each area on certain pieces of track within the rail corridor within those three districts.
    • 01:47:36
      The money was divvied up between those three districts based on the work that DRPT had done at the time and what those cost estimates were.
    • 01:47:43
      So there was some method to the madness.
    • 01:47:45
      Not to say it wasn't all, it was all clear, but there was a method at the time.
    • 01:47:49
      On page 10, though, there's a couple key policy points about the VTA.
    • 01:47:54
      In fact, Anne Omen of House Appropriations staff several weeks ago brought this up to the new legislative group that's been formed to look at funding formulas.
    • 01:48:03
      The first one being the distribution of projects that are in the VTA was not based on existing allocation formulae.
    • 01:48:09
      It wasn't even part of the mindset at the time.
    • 01:48:12
      It was rather based on perceived funding gaps and needs around the state.
    • 01:48:16
      It had nothing to do, no one looked at the funding formula and says, well how much does Bristol get, or how much does Stanton get, or how much does Richmond get?
    • 01:48:22
      That wasn't even part of the discussions by the legislature when they were developing the project list.
    • 01:48:29
      It also represents a legislative consensus on where funding should be directed in transportation, new funding at the time as they had hoped.
    • 01:48:37
      It looked at mass transit, rail, ports, and highway projects as one mobility issue.
    • 01:48:43
      It did not look at them as individual, well, how much are we given to highways?
    • 01:48:46
      How much are we given to mass transit?
    • 01:48:48
      How much are we given to rail or ports?
    • 01:48:49
      That was not, again, part of the conversation.
    • 01:48:51
      It was more about what do we need to address from a total transportation perspective.
    • SPEAKER_12
    • 01:48:58
      back on page nine I just need a clarification on the for both projects list spending could be modified within the list and within the district to address cash flow needs so when you're the second list that's referred to there the spending could be adjusted for
    • 01:49:21
      Only among the prioritized list, not any other projects in the book.
    • Barbara W. ReeseChief Financial Officer
    • 01:49:29
      That authority was not granted within the VTA.
    • 01:49:32
      It had to be within the list.
    • 01:49:34
      If you looked at Bristol District, for example, Coalfields Expressway got money, Route 58 got money.
    • 01:49:43
      Let's say there was a Route 58 project in Bristol District at the time that was under construction and needed more money than what was shown for Route 58, then yes, the Commonwealth Transportation Board has the authority to say, well, rather than give Coalfields Expressway, and I know you wouldn't do this, I'm just using this as an example,
    • 01:50:01
      The dollars identified for it, you could use that in Route 58, again, to address cash flow needs.
    • 01:50:07
      Again, you've got to go back to the purpose of VTA in part was to address what the General Assembly recognized at the time was starting to be just lack of resources at VDOT and DRPT to do what they needed to be done.
    • SPEAKER_12
    • 01:50:19
      Well, the reason I bring this up, Barbara, is because at one point, oh, excuse me, I'm sorry.
    • 01:50:30
      At one time, a statement was made that a question was asked about projects that were existing in the Six-Year Plan that were not lifted up in the VTA, what was going to happen to them.
    • 01:50:48
      And assurance was given that the VTA was going to bring money to the entire plan so that everything could move forward.
    • 01:51:00
      Very few short months later, we saw that those projects that were existing in the Six-Year Plan had moved to the very bottom of the ladder, and in all reality, as the next 24 months went by, those projects basically have been, they've gone away.
    • Barbara W. ReeseChief Financial Officer
    • 01:51:19
      And my understanding, Mrs. Lionberger, was there was a policy decision made by the last administration that the VTA project list suddenly became the priority for all construction funding, in particular around the state.
    • 01:51:33
      That is not what the VTA says, and that was not, if you go back and look at all the materials that were developed during the deliberations about the VTA, the purpose was to, one, address funding gaps and projects that were currently underway,
    • 01:51:47
      And two, for those 121 projects, I'm not going to say all of them, but for the most part, those were to get them to the next stage or to an additional point of work.
    • 01:51:58
      It was not to get them complete, necessarily.
    • 01:52:01
      And the Harrisonburg bypass is an excellent example of that.
    • 01:52:04
      That was simply to pay for PE.
    • 01:52:07
      Certainly the money that was put on high-speed rail, for example, does not pay for all the track improvement, but it did get it started or initiated in certain key projects.
    • 01:52:16
      on those track improvements.
    • 01:52:18
      And that was the way the General Assembly, that was their choice.
    • 01:52:23
      That's not how it was interpreted, I don't think.
    • 01:52:25
      And I mean, those conversations occurred several years ago, but we didn't get anywhere with those conversations either, the General Assembly meeting.
    • SPEAKER_12
    • 01:52:34
      Well, but I think in all fairness there was an understanding certainly by myself as an individual board member that members of the General Assembly were looking at where the money was going and they expected to see it on BTA.
    • 01:52:48
      The additional money, yes, I would say that's true.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:52:52
      Okay.
    • 01:52:53
      Can we go back to page 8?
    • 01:52:57
      Part of the establishment of the BTA
    • 01:53:03
      We've all revolved around providing some additional general fund revenues towards funding some of these plans.
    • 01:53:14
      And you've listed two of them here.
    • 01:53:16
      One is tax at the rack.
    • 01:53:18
      Did that survive the last budget?
    • Barbara W. ReeseChief Financial Officer
    • 01:53:20
      Tax at the RAC was always transportation revenue.
    • 01:53:24
      There was an incremental amount at the time DMV said I want to say it was around $25 million in additional revenues that would be coming in as a result of collecting the tax at the RAC versus at retail level.
    • 01:53:38
      Some of that has materialized and some has not.
    • 01:53:40
      But that has always been a transportation revenue.
    • 01:53:42
      It was sort of taking
    • 01:53:44
      basically cutting off all the additional revenue that they were anticipating to put into the priority transportation fund.
    • 01:53:51
      But the insurance premium, yes, very clearly has always, up until this point, was a general fund revenue source.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:53:58
      And that was estimated to be $100 million a year, is that correct?
    • 01:54:01
      Yes, right around $100 million a year.
    • 01:54:04
      What happened in this budget?
    • Barbara W. ReeseChief Financial Officer
    • 01:54:06
      In this budget, in FY03, if you look in the appropriation part, it is back on page
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:54:15
      What's our interest?
    • Barbara W. ReeseChief Financial Officer
    • 01:54:17
      $386, $106 million was deposited at what traditionally would be thought of as general, well, out of the general fund into the priority transportation fund and in 04, $33 million.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:54:30
      Okay, so beyond that, though, the commitment that was made in VTA 2000 is a year-to-year thing, is that correct?
    • Barbara W. ReeseChief Financial Officer
    • 01:54:42
      J. T.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:54:55
      When the original budgets were put in, the $100 million a year was removed, isn't that correct?
    • 01:55:02
      And it was restored in the Appropriations Act?
    • 01:55:05
      Yes, that is correct.
    • Barbara W. ReeseChief Financial Officer
    • 01:55:07
      Governor Gilmore's introduced budget in December did not include the general fund deposit to the priority transportation fund in either year.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:55:16
      Barbara, let me
    • 01:55:21
      Same area, slightly different question.
    • 01:55:25
      The VTA statutorily lists projects that are to be included in the six-year, that revise a six-year plan as a six-year plan existed in 2000.
    • 01:55:41
      And that's very plainly stated in the VTA.
    • Barbara W. ReeseChief Financial Officer
    • 01:55:44
      That was the general fund list, yes.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:55:47
      Yes, what you just said,
    • 01:55:51
      That's in the new Appropriations Act on page 386.
    • 01:55:54
      Is that what allows us to essentially to ignore what's in the code?
    • Barbara W. ReeseChief Financial Officer
    • 01:56:00
      And I was going to talk about that later, yes.
    • 01:56:02
      A key point about the VTA...
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:56:05
      But you've still got the projects that are listed.
    • 01:56:08
      You've got different money amounts.
    • 01:56:10
      Is our six-year plan that we're going to vote on tomorrow consistent with the VTA as amended by the Appropriations Act?
    • Barbara W. ReeseChief Financial Officer
    • 01:56:20
      Yes, except for debt service which we'll talk about later.
    • 01:56:24
      But I would make a key point about the VTA too.
    • 01:56:26
      Everybody assumed that the project list, even the original PTF list, not the general fund list because they weren't in there by year, through I guess 06 at the time.
    • 01:56:36
      But the Priority Transportation Fund, there's nothing in the VTA that says that money has to be allocated to that project from FRANs or Priority Transportation Fund in the next six years.
    • 01:56:46
      That is, when you start using those FRANs, where we expect to see the first $800 million or so on a rolling basis is on this project, meaning that at some time in the future, whenever you get to a point,
    • 01:57:01
      where you sort of lived up to that commitment of, you know, $20 million on Harrisonburg Southeast Bypass, then the General Assembly is either going to have to make the decision, do we just get rid of the project list within the VTA, do we get rid of the VTA altogether, or do we add new projects to that list, because it is a rolling piece of legislation for the most part.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 01:57:27
      I don't know if Clark can answer this question,
    • 01:57:30
      6-year plan that we had adopted before the VTA 2000, or let me ask it another way.
    • 01:57:43
      The projects were included in VTA 2000, are they still included in the current 6-year plan?
    • Barbara W. ReeseChief Financial Officer
    • 01:57:51
      Not in all cases.
    • 01:57:53
      There are some, I believe, that have been taken out simply because funding is not available.
    • 01:57:57
      And again, that's fine.
    • 01:57:58
      In accordance with the law, there's nothing wrong with that.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:58:02
      But you're going to have to return to the issue.
    • Barbara W. ReeseChief Financial Officer
    • 01:58:08
      Yes, and that's what I was trying to say.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 01:58:09
      At the expiration of the two-year budget.
    • 01:58:14
      Unless you amend the statute.
    • 01:58:16
      Right.
    • Barbara W. ReeseChief Financial Officer
    • 01:58:18
      And to be honest, from a General Assembly perspective, the reason why it's always been frowned upon to reopen the VTA legislation is then you just open it up to another wish list categorization of projects.
    • 01:58:34
      Going back to page 11, which is just to talk briefly about federal law, this is the last part of the policy direction that the Commonwealth Transportation Board has to follow in terms of allocating resources.
    • 01:58:48
      As I mentioned earlier, it is a reauthorization every six years.
    • 01:58:52
      T-21 is set to expire at the end of federal fiscal year 2003, which is next October or next September.
    • 01:58:59
      Federal law does stipulate in many ways how federal funding is to be distributed among types of roadways, for what purposes, and in many cases how it has to be distributed across the state.
    • 01:59:10
      And if you look at page 12, we've walked through those at a fairly high level, and we'll talk a little bit in more detail about some of them later.
    • 01:59:18
      There's basically about, there's six, I guess what I would consider to be the top
    • 01:59:23
      S. White, Ulysses X.
    • 01:59:45
      50% by certain population brackets that are federally defined, not the same population brackets that are used at the state level, another nuance that has implications.
    • 01:59:59
      If you look at the population bracket, about $91 million goes there.
    • 02:00:04
      Of that amount, most of it, to be perfectly honest, goes to the areas over 200,000 in population, which are Northern Virginia,
    • 02:00:12
      Richmond, and Hampton Roads area.
    • 02:00:18
      If you look at both minimum guarantee and STP, the part that's not the 30% that's not listed there under STP, in total that's about $89 million that does go through the state funding formula.
    • 02:00:31
      And how it goes through the state funding formula is through that language.
    • 02:00:35
      It's in the front of the appropriation act under Secretary Clement's area of the budget.
    • 02:00:41
      Bridge funds right now, which are about $59 million for 03, go through the state funding formula.
    • 02:00:48
      Again, because of language, it's in the Appropriation Act.
    • 02:00:53
      CMAQ, as you know, is a set-aside program that the MPOs allocate those resources.
    • 02:00:59
      And then minimum guarantee, that's the flexible pot of money that you receive
    • 02:01:03
      to keep Virginia at the 90.5% minimum guaranteed level of return on the motor fuels taxes paid by Virginians into the Federal Highway Trust Fund.
    • 02:01:16
      That's 82.7 million dollars.
    • 02:01:19
      There is language again in the appropriation act that says first call and minimum guarantee though is to keep
    • 02:01:25
      The secondary and urban and primary systems hold to the extent possible of using minimum guarantee funds.
    • 02:01:35
      Back when T21 was done, and this gets somewhat complicated, but when T21 was enacted,
    • 02:01:41
      The year prior to that the policy decision was made by the Commonwealth Transportation Board at the time that at the time Senator John Warner's proposal for federal reauthorization which was one program flexible was all get out would be used to develop the program.
    • 02:02:00
      So that was done.
    • 02:02:01
      Well then T-21 was enacted and golly gee here's all these six major programs still there.
    • 02:02:06
      So then all this reconciliation work had to happen.
    • 02:02:09
      And at the time the question was, all right, if we go in and correct what we did last year using this broad one program idea versus all these individuals, it would have devastated the program.
    • 02:02:24
      The decision was made at that time to do things through this language in the appropriation act to try to mitigate those negatives as much as possible and minimum guarantee therefore
    • 02:02:43
      While you would have total discretion for allocating it, there is a pot of it that goes through the funding formula.
    • 02:02:49
      And there's very little, it's only like $16 million now a year out of a total of $82 million that actually is the board's discretion for projects.
    • 02:03:02
      So I'm going to sit down for a while unless you have questions on those parts.
    • 02:03:08
      and John Lawson, Financial Plan Director is going to start the second part which is the question about how do we determine how much in transportation resources we have to spend.
    • 02:03:27
      Yes, and of that additional 30%, again going back, 24% of it goes through the highway construction formula in the appropriation act.
    • 02:03:39
      6% is for mass transit and that's in the appropriation act and that's a recent change, fairly recent change.
    • 02:03:47
      And there is a little slice of minimum guarantee, I think it may be 10% of minimum guarantee that goes to mass transit for the appropriation act.
    • SPEAKER_09
    • 02:04:05
      Good morning.
    • John W. LawsonFinancial Planning Division Director
    • 02:04:07
      I want to take you a little deeper into the details, start to look at some of how we actually determine what resources we have available and how we go about determining, using all this resource guidance that Barbara has talked about and start distributing it to different programs and so forth.
    • 02:04:33
      There we go.
    • 02:04:34
      This slide, this is just a little information for you to kind of give you a reminder of the sources, the major sources of our state revenues.
    • 02:04:45
      You can see here listed all the different state taxes and approximately the amount we have estimated in the budget that you're here this afternoon.
    • 02:04:56
      You'll see that the motor fuel taxes as well as the sales and use taxes that are applied and we receive for distribution.
    • 02:05:07
      The piece at the bottom you'll notice the state general sales and use tax of four and a half percent.
    • 02:05:12
      Of that, that half cent is the piece that was designated for transportation and that is the component of the $403 million that gets distributed to the modes.
    • 02:05:22
      And we'll talk more about those pieces a little later.
    • 02:05:25
      Also, just as a point of reference, if you notice at the top, the motor fuel tax is 17.5 cents per gallon.
    • 02:05:33
      That equates to about $45 million per penny, per cent of tax.
    • 02:05:39
      That correlates to 18.5 cents of federal taxes that are also on each gallon of gas sold in Virginia.
    • 02:05:46
      So it gives you a basis for how much gas taxes are really out there.
    • 02:05:58
      Forecasting the revenues is a very important effort and it requires lots of analysis to determine what do we think we will have available to use.
    • 02:06:14
      This is not a task that's done by VDOT.
    • 02:06:18
      Department of Taxation is responsible for determining the revenue estimates for all these sources that we just saw in this previous slide.
    • 02:06:27
      The process that taxation uses for estimating transportation revenues for the most part is a mirror image of what they use to estimate the general fund revenues.
    • 02:06:40
      They use economic models.
    • 02:06:43
      Those models include predictions of how much gallons of fuel will be sold.
    • 02:06:48
      The number of licenses that will be sold, the number of cars that are sold, etc., that help them base what they anticipate collecting during the next, not only the next year, but for the next six years.
    • 02:07:01
      They do produce for REP transportation a full six-year estimate of revenues.
    • 02:07:06
      In making this consideration, they also are looking at national and state economic scenarios.
    • 02:07:13
      Is Virginia trending equivalently to the rest of the nation?
    • 02:07:18
      Are we above or are we below?
    • 02:07:19
      And typically we tend to trail a little bit behind the rest of the nation.
    • 02:07:24
      The federal estimate, however, VDOT does prepare.
    • 02:07:29
      We use computation tables provided by the Federal Highway Administration to determine the federal revenue numbers that we include in our budget.
    • 02:07:39
      Those numbers, as you know, this year, starting with 03, we have
    • 02:07:43
      chosen to use the obligation authority versus a full apportionment to get it more realistically in line with what we anticipate being able to utilize during that current year or each of the years that we are estimating.
    • SPEAKER_13
    • 02:07:58
      On this particular point, if I could, I'd like to make a point.
    • 02:08:03
      If I go back six or seven years, I think Randy chaired a committee, what was it called, federal legislation, something,
    • 02:08:13
      And I know the finance committee sees this in bits and pieces as we go through the year, but as you guys are working this, that point in time that we get close to the budget process that
    • 02:08:34
      That we detail it a little more in the finance committee that they see it.
    • 02:08:39
      Because again, if I go back six or seven years, I think Randy and her committee saw, you saw it more of that.
    • 02:08:47
      And then it would, we would have it come, you know, it would kind of trickle down.
    • 02:08:50
      But I guess what I'm looking for is more of an emphasis on that source of funds to very quickly come into one of the subcommittees that the board members see it.
    • John W. LawsonFinancial Planning Division Director
    • 02:09:01
      Okay, we can certainly do that.
    • 02:09:11
      As you notice, I've been talking about taxation providing these estimates.
    • 02:09:17
      That's a change.
    • 02:09:18
      If you remember prior discussion, we've always talked about the estimates being provided by DMV.
    • 02:09:23
      This past session, the function of estimating and forecasting transportation revenues was transferred from the Department of Motor Vehicles to the Department of Taxation.
    • 02:09:35
      That effort has been consolidated to ensure consistency in
    • 02:09:41
      The method of determining the revenues between both of the general fund and the non-general fund transportation revenues
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:09:51
      Question on that.
    • 02:09:54
      Every month we get the blue sheets from DMV which reports all the different, that's an actual what was projected versus actual reporting.
    • 02:10:02
      Are we still going to receive that from DMV or is that now going to come from taxation?
    • John W. LawsonFinancial Planning Division Director
    • 02:10:07
      I understand actually the last one you received actually came out of taxation.
    • 02:10:11
      It did because it looked exactly the same exact same form and it's actually the staff that did it at DMV moved to taxation.
    • 02:10:18
      I got you.
    • 02:10:18
      But they now are under the control and guidance of taxation.
    • 02:10:28
      A key point to the revenue estimates is that the official revenue estimate, once it's been determined to be the official estimate, that becomes the basis for the annual program.
    • 02:10:42
      So that is the basis for revenues used in the annual budget as well as the estimate of revenues that are utilized for determining the program amounts that are available for the six-year program update each year.
    • 02:10:55
      So that becomes a very key point.
    • 02:10:57
      And again, just to reiterate, the forecasting of revenue with the addition of some of the fees and the federal revenue that we don't estimate the federal revenue because we're using the federal comp tables, we do not, you know, it's not VDOT's job to forecast our revenues.
    • 02:11:18
      We are using these revenue forecasts from other sources.
    • SPEAKER_10
    • 02:11:22
      Would you explain what happens to the revenue if it comes in higher than forecasted, the official forecast?
    • 02:11:29
      What happens to that excess revenue?
    • John W. LawsonFinancial Planning Division Director
    • 02:11:31
      As defined in the VTA, revenue collected in excess of the official forecast is to be deposited into the priority transportation fund.
    • SPEAKER_10
    • 02:11:47
      Correct.
    • 02:11:50
      What happens to the mass transit fund?
    • Barbara W. ReeseChief Financial Officer
    • 02:11:56
      It's part of his fund, it's just part of the mass transit fund.
    • SPEAKER_10
    • 02:11:58
      It comes back to transit?
    • 02:12:00
      I was not aware of that.
    • Barbara W. ReeseChief Financial Officer
    • 02:12:03
      When it comes in, it comes in as the transportation for us fund.
    • 02:12:07
      So you're in, you said a lot of the backwoods.
    • 02:12:10
      All it is, is that make to be out shares.
    • 02:12:13
      You get your share, of course it's their share, everyone gets their share.
    • 02:12:18
      The part that's having construction in excess of the estimate, you have to go to the primary.
    • SPEAKER_10
    • 02:12:24
      I'm confused and I thought that the excess revenue that came in for mass transit also went into the priority transportation fund.
    • John W. LawsonFinancial Planning Division Director
    • 02:12:38
      We will verify that.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:12:39
      Okay.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 02:12:42
      Hobie.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:12:43
      There's a question of that and then a counter to what you talked about, what you're talking about.
    • 02:12:48
      The priority transportation fund then, if the decisions about how those funds are used are then made by this board, the VTL,
    • 02:12:59
      The counter is, to his question, what happens if we have less funds coming in?
    • 02:13:07
      Because I read those blue sheets and I notice that the car sales revenue is up, but the gas tax revenues have been down here, not by much.
    • John W. LawsonFinancial Planning Division Director
    • 02:13:19
      But they are down. Overall, I think we may be down, if I remember. So the counter to that is what happens when the revenue is less than what we forecasted. What do we do then with projects? What we would do in the case of having lower than anticipated revenues is that when the budget is updated the following year, you reduce, you take into account a reduction for a year.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:13:42
      So for instance, if O3 revenues are down, then the adjustment is made on O4 to either increase the revenue sources to counter that reduction or you have to reduce some projects if that's necessary.
    • Barbara W. ReeseChief Financial Officer
    • 02:14:06
      Two points.
    • 02:14:08
      Leo is right.
    • 02:14:09
      Mass transit excess revenue does go to the priority transportation fund.
    • 02:14:12
      I apologize.
    • 02:14:13
      Second thing is though, in terms of that excess revenue that goes to the priority transportation fund, that's an after the fact event.
    • 02:14:20
      In other words, the six-year financial plan you have before you in the program does not assume any excess revenues for 03 or beyond.
    • 02:14:27
      It's simply based on...
    • 02:14:29
      It's every year.
    • 02:14:30
      Basically the only excess revenue you would show is maybe what there was in 02 and I don't
    • 02:14:34
      Next I want to talk just a little bit about cash forecasting.
    • John W. LawsonFinancial Planning Division Director
    • 02:14:50
      We talk about what revenues we have and how we're going to distribute those revenues.
    • 02:14:58
      We can't just
    • 02:15:01
      Distribute those revenues through the budget or through the six-year program and go about a merry way.
    • 02:15:08
      We have to plan how they're going to be spent and time how they are spent so that your revenues and your expenditure outlays pretty much mirror or match themselves.
    • 02:15:21
      Otherwise you find yourself with a huge cash balance or potentially a huge cash deficit.
    • 02:15:28
      The forecast is based on the official revenue estimates that we mentioned earlier that we include in the budget.
    • 02:15:36
      We do forecast revenue collections for federal based on actual project construction spending.
    • 02:15:45
      In other words, since federal revenue is based on, you collect federal money, you have to incur an expenditure and in turn bill Federal Highway Administration.
    • 02:15:54
      So based on a plan of work,
    • 02:15:56
      We determine our flow of federal revenue as well as based on this work plan for construction projects we can project out using spending curves how we expect to pay out that project.
    • 02:16:10
      For the other programs we use the program budgeted levels and historical spending patterns.
    • 02:16:15
      We know historically each month of the year we spend X percentage of our budget and they are used to predict our cash for not only the current year but for the full six years.
    • 02:16:36
      In doing this
    • 02:16:38
      We look at the program.
    • 02:16:43
      Can we in fact afford the program as we've laid it out?
    • 02:16:48
      And we have done that this year.
    • 02:16:49
      We have taken the tentative program and the program that is to be the final that you have presented to you later this afternoon and we have looked at that and analyzed it through the forecast and
    • 02:17:05
      It's clear that the program that you're being brought to you is not only supported by allocations, but it's also supported by cash.
    • 02:17:13
      We have some work to do still in the secondary program as we are working through the new schedules that they're just coming up with, but it seems that we have a very solid plan that you'll be seeing this afternoon.
    • 02:17:27
      The first two years, 03 and 04, are fairly close in looking at the cash.
    • 02:17:37
      We're seeing in both cases that in 03 and 04, and we're ending the year with an average balance in the construction fund of about $50 million, which is certainly positive.
    • 02:17:49
      And we're looking at maintenance fund, HMO balances at the end of each of those two years of about $100 million.
    • 02:17:55
      We do still have our issues with the timing of the HMO revenues beginning of the year, and we'll be looking at that closely.
    • 02:18:03
      We'll be expecting to have to do some interim fund loans as we did last summer to carry us through the summer months until the revenues stabilize again at the beginning of the year startup.
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 02:18:15
      Does the, you say he has a little bit more work to do on the funding for secondary roads?
    • 02:18:21
      The cash analysis.
    • John W. LawsonFinancial Planning Division Director
    • 02:18:22
      The cash analysis.
    • 02:18:23
      We don't have, we don't have new and updated programs for all the secondary counties yet.
    • 02:18:28
      That is presently being, the board of supervisors are working with the residencies now to come up with their new county plans based on the new program allocations.
    • 02:18:39
      We won't have those finalized until this fall.
    • 02:18:41
      Okay.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:18:46
      The overall state revenue source has been down for six months overall.
    • 02:18:56
      I know that just reading some things here and other things, income tax refunds seem to be up a little bit.
    • 02:19:03
      Income revenue coming in has been down a little bit.
    • 02:19:09
      Maybe I'm two slides ahead.
    • 02:19:11
      Maybe this is a two-slide question.
    • Barbara W. ReeseChief Financial Officer
    • 02:19:13
      Ten slides ahead actually.
    • 02:19:15
      We're going to talk about revenues and that's a challenge that we do have on both the federal level and the state level.
    • 02:19:20
      We're going to walk through that
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:19:25
      I was trying to think about even though overall state revenues could be down I guess specifically as it relates to transportation things why we have a principal funding from the DMV fees gas revenue fees and those kind of things why they're off a little bit overall they're pretty close to projections I think at the reading some of those element month-to-month I read those things religiously they're really
    • Barbara W. ReeseChief Financial Officer
    • 02:19:51
      And we can talk about the general fund when we get to that part.
    • 02:19:57
      I don't want to interrupt what John is doing because you need to be sensitive to what is going on in the general fund.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:20:03
      Well that is what I am being because inevitably when those have problems it affects what we do.
    • 02:20:08
      Exactly.
    • 02:20:08
      We are going to talk about that.
    • 02:20:09
      Okay.
    • 02:20:10
      Thank you.
    • John W. LawsonFinancial Planning Division Director
    • 02:20:17
      Oh, just one other comment you're about to find out, Bob, I want to make about the cash forecasting.
    • 02:20:22
      As each month, the ad schedule is revisited and potentially revised, and we will be reforecasting every month based on a revised ad schedule, as well as taking into account the differences between what we had forecasted and what has actually taken place
    • 02:20:43
      III, John H. B.
    • 02:20:44
      Page, Michael A. Shucet, Roy P. Byrd, L. C.
    • 02:21:05
      The forecast or whether we're having issues with actually the execution of what we intended on doing.
    • 02:21:11
      So either case can impact the results of the forecast and the actuals as compared to the forecast.
    • SPEAKER_13
    • 02:21:18
      The only chart here, the FRAN is 163.1 million.
    • 02:21:25
      What time period is that?
    • 02:21:29
      Is this from past monies that have come in from FRANs?
    • John W. LawsonFinancial Planning Division Director
    • 02:21:35
      What you see here, this slide, are actually yesterday's physical cash balances.
    • 02:21:41
      So that $163 million is the amount of FRAN proceeds that remain out of the $375 million sale that was done in the fall of 2000.
    • 02:21:52
      That what now?
    • 02:21:53
      The initial sale, the only sale of Frans we have done at this point in time was the $375 million.
    • 02:21:58
      And this is what's left of that?
    • 02:22:00
      That's what has not been spent of the $375 million.
    • SPEAKER_13
    • 02:22:02
      And what are we anticipating in the six-year plan that we have not gone for yet?
    • 02:22:09
      $525 million?
    • John W. LawsonFinancial Planning Division Director
    • 02:22:12
      Yeah, I think it's close to $700 million in additional sales.
    • SPEAKER_13
    • 02:22:17
      So we'll be going after?
    • SPEAKER_15
    • 02:22:19
      Yes.
    • John W. LawsonFinancial Planning Division Director
    • 02:22:20
      And you'll hear more about that later.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 02:22:22
      The toll facilities are revolving account.
    • 02:22:28
      What's that?
    • John W. LawsonFinancial Planning Division Director
    • 02:22:30
      The Toll Facility Revolving Account was created just as it's called a revolving fund to support the toll operations.
    • 02:22:38
      It receives the interest that it's earned on the transportation cash balances.
    • 02:22:46
      So that's its source of revenue.
    • 02:22:48
      The interest earned is deposited into the Toll Facility Revolving Account.
    • 02:22:52
      It supports
    • 02:22:54
      Some of the facilities that are unable to satisfy their own debt service requirements and operations expenses.
    • 02:23:02
      It's also providing some funding to some other projects as a revolving loan program.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 02:23:08
      It has nothing to do with Dulles because Dulles is a stand-alone.
    • 02:23:15
      Correct.
    • SPEAKER_06
    • 02:23:20
      Question.
    • SPEAKER_12
    • 02:23:21
      mentioned I think you anticipate a balance of a hundred million in HMO, right?
    • 02:23:31
      Correct.
    • 02:23:31
      Is that, I'm trying to remember, is that the payments to towns and cities come due 1st of July, right?
    • 02:23:39
      Yes.
    • 02:23:40
      Is that balance, that's the amount we need to then have that available when we need it in July or are we going to have to do some borrowing?
    • John W. LawsonFinancial Planning Division Director
    • 02:23:46
      No, your city street payments are about $50 million or so each quarter.
    • SPEAKER_12
    • 02:23:51
      So in reality the balance in that fund also is closer to the $50 million as the other fund is?
    • John W. LawsonFinancial Planning Division Director
    • 02:23:58
      Once you take that word to deduct.
    • 02:24:09
      Talk a little bit now about the actual distribution of the resources.
    • 02:24:14
      How we take those estimated revenues.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:24:23
      The cash forecasting, a part that plays an important role in this is construction seasons.
    • 02:24:31
      And sometimes you have a dry, or what you will term as a better construction season, which means work is getting done sooner rather than later.
    • 02:24:40
      And if this contractor is able to do that, to what extent is this playing a role in the cash forecasting?
    • 02:24:48
      For instance, we have a great summer season.
    • 02:24:50
      That's when all construction happens.
    • 02:24:52
      Projects are really moving much quicker than we thought, which affects cash.
    • 02:24:57
      How has that been a problem in the past, or under our circumstances, do you see it as a problem?
    • John W. LawsonFinancial Planning Division Director
    • 02:25:04
      Certainly it has made it difficult to forecast in the past.
    • 02:25:09
      The new model that we use for cash forecasting takes that into account.
    • 02:25:14
      Each month it looks at a project's payout and based on what it's forecasted and compares it to what it's actually paid out.
    • 02:25:23
      And if it's paid out more than it has forecasted, it readjusts the forecast so that the remainder of the payout is based on what's left to be paid versus what we think we're still doing.
    • 02:25:35
      So it's self-adjusting.
    • 02:25:37
      We're forecasting based on historical payout curves.
    • 02:25:41
      So if you get a deviation, in other words, you're paying out faster than expected, it's going to shorten the payout window for the project.
    • 02:25:49
      If you're paying slower than anticipated, it's going to lengthen the payout window in order to bring it in line.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:25:57
      So do you see a problem, let's say we have a very good, dry, good news, bad news, you do a sensitivity analysis, say we have a very dry July, August, September, a lot of this work gets done, so you're going to have, the model will adjust for that, do you see any cache problems, say by the fall, because we have an accelerated schedule because of construction, if that happens, do we see a problem coming up for that?
    • John W. LawsonFinancial Planning Division Director
    • 02:26:27
      Having just run the forecast, finished it yesterday afternoon late, having gone into it in that detail, certainly what we can do is we know our projected cash balance is at each month and based on that we can tell how much room we have to work and how much acceleration we could stand during the year in order to prevent from running into any kind of trouble.
    • 02:26:53
      Also, you know, if we keep, as a large portion of our work is federal, you know, if you do the work sooner, you collect the revenue sooner so that it's somewhat mitigating in that respect as well.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:27:07
      So it's a revenue source to mitigate some of that too?
    • 02:27:09
      Yes.
    • 02:27:11
      Okay.
    • SPEAKER_20
    • 02:27:12
      Thanks.
    • 02:27:12
      Is any percentage of these funds set aside for a reserve fund?
    • John W. LawsonFinancial Planning Division Director
    • 02:27:19
      Do we have any reserve funds?
    • 02:27:20
      We do not, and actually we are supposed to,
    • 02:27:24
      Allocate all available resources.
    • 02:27:27
      We do not hold a reserve fund.
    • 02:27:38
      Talk a little bit now about how we actually distribute that based on some of the things you've heard earlier.
    • 02:27:46
      and Barbara talked earlier, our first requirement is funding maintenance in the city street payments.
    • 02:27:52
      Following those two items is funding for administration.
    • 02:27:58
      The basis for our administrative budget is the Appropriation Act.
    • 02:28:03
      We talked to you earlier about the Appropriation Act.
    • 02:28:05
      Listed in the act is the program level that is set forth for
    • 02:28:10
      for every agency and transportation certainly having to follow that as well.
    • 02:28:16
      Administration is intended to provide oversight for non-construction operating and elder general expenses.
    • 02:28:25
      In doing this, this administrative program budget
    • 02:28:29
      is covering about 1,000 FTEs out of our 10,000.
    • 02:28:34
      And you can see here that's broken out between general management direction, computer services, and physical plant.
    • 02:28:42
      We also are a fund that provides funding for, if you see, 3,400 facilities that we have to maintain.
    • 02:28:47
      So it's not just people.
    • 02:28:50
      It's a lot of other efforts that have to be done that are not directly tied to maintenance or construction.
    • 02:28:58
      And this budget for fiscal 03 is right at $114 million.
    • 02:29:04
      Our other component of what can be considered administration is construction management.
    • 02:29:16
      And construction management again is to support the construction program but it's non-specific in that it doesn't relate to any individual specific project.
    • 02:29:27
      This again is
    • 02:29:30
      About 800 FTEs out of the 10 million.
    • 02:29:34
      So between the two, you see we've got about 10,000, about 2,000 out of the 10,000 of our employees are supported through these administrative programs.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 02:29:46
      Yeah.
    • 02:29:46
      Can you give me job titles, some illustrative job titles for this 800?
    • 02:29:52
      What do they do?
    • John W. LawsonFinancial Planning Division Director
    • 02:29:54
      Construction management here, a resident engineer, the chief engineer,
    • 02:30:00
      It would be a good example of... We don't have 800 of them.
    • Whittington W. ClementChair, Commonwealth Transportation Board
    • 02:30:06
      Oh, no.
    • John W. LawsonFinancial Planning Division Director
    • 02:30:09
      But you've got numbers of people and the programming staff, some location design staff, construction staff, there are a number.
    • 02:30:37
      What's left available for construction has to get distributed and as I mentioned earlier we have the special revenue taxes that do get distributed by
    • 02:30:48
      We're at the beginning to airports and ports, mass transit, and to highways.
    • 02:30:55
      The portion of the Transportation Trust Fund that goes to ports and airports is defined in the code.
    • 02:31:01
      2.4% goes to the Airport Fund, 4.2% to the Port Fund.
    • 02:31:07
      This is formula driven based on estimated revenues and actual transfer is based on actual collections and it is a distribution of funds that this board doesn't have had any flexibility or discretion over.
    • 02:31:21
      It is based on formula.
    • 02:31:24
      Those amounts are estimated for fiscal 03 to be $17 million for the airport and $29 million or $30 million for the ports.
    • 02:31:37
      Mass Transit picks up 14.7% of the trust funding.
    • 02:31:44
      That again is also specified in code and it is formula driven.
    • 02:31:51
      Again there's some sub-formulas that further define how those funds are used between capital operating and promoting mass transit.
    • 02:31:59
      Later today when you hear the budget presentation from DRPT you'll hear more details on how their budget is laid out.
    • 02:32:07
      But again, the distribution of funds from the Transportation Trust Fund to Mass Transit is co-driven, and this board has no discretion in deciding what that amount will be.
    • 02:32:19
      And this amount is estimated to be $100 million in 03.
    • 02:32:22
      Is that up from last year?
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 02:32:29
      It's down.
    • John W. LawsonFinancial Planning Division Director
    • 02:32:30
      That's down.
    • SPEAKER_12
    • 02:32:32
      Twelve percent, right?
    • John W. LawsonFinancial Planning Division Director
    • 02:32:34
      The Transportation Act and VTA also provide some guidance on how the fundings are distributed.
    • 02:32:44
      The administrative cost for the Department of Railroad and Public Transportation is provided for out of the HMO.
    • 02:32:50
      And we show that in the VDOT budget as support to other state agencies.
    • 02:32:57
      The total amount of funding shown in the VDOT budget to DRPT is $138.4 million.
    • 02:33:03
      And again, you'll get the full explanation of DRPT's budget this afternoon when they make their presentation.
    • 02:33:17
      The remainder of the funds flow through to construction and Charlie is going to talk to you about how that is distributed.
    • SPEAKER_17
    • 02:33:30
      The remaining 78.7% of the Transportation Trust Fund revenues, including state and federal revenues, are generally used for the highway construction activities.
    • 02:33:43
      In FY03, $1,493,500,000 is in the construction program.
    • 02:33:54
      The specific funding for identified projects or programs including debt programs, revenue sharing, access programs, federal demo programs come off the top of this program and that amounts to $538.3 million in the FY03 budget.
    • 02:34:15
      Then France, proceeds and other VTA funding amounts to $347 million.
    • 02:34:25
      Of the $608.2 million that's left available for interstate, primary, secondary, and urban construction funds,
    • 02:34:34
      That flows through to the systems, but first we match all the interstate projects off the top, and then what's remaining for distribution, 5.67% of that fund is allocated for, is taken off for unpaid secondary groups.
    • 02:34:58
      And then the formula distribution as my code,
    • 02:35:02
      40% for the primary system, 30% for the secondary system, and 30% for the urban system.
    • 02:35:09
      The funding for each of the systems is further allocated by the highway construction district and the localities.
    • 02:35:18
      What is the federal match?
    • 02:35:21
      The federal match
    • 02:35:25
      Most of our funds are at an 80-20% match, but a lot of our projects, when you get to the project level, it's not 80-20, it's more like 70-30 because so many of the things that we do are non-participating costs.
    • 02:35:50
      Interstate funds.
    • 02:35:52
      Again, they're allocated for the code and the Appropriations Act.
    • 02:36:07
      The Act provides that the National Highway System funds are for state form of matching purposes.
    • 02:36:15
      They're treated as interstate.
    • 02:36:16
      In other words, the matching funds for the National Highway System federal funds come off the top just as they do for the interstate funds.
    • 02:36:26
      The CTB has discretion in distributing the federal interstate funds and the required match based upon statewide project needs.
    • 02:36:37
      but there's no sub-allocation by district or form.
    • 02:36:41
      In other words, you have the discretion
    • 02:36:43
      to determine where you replace the interstate funds statewide.
    • 02:36:50
      One of the issues right now is that we, because of the situation we find ourselves in, there is not enough funds to go beyond the required funding for the huge project we have in Northern Virginia and what projects that are now on the primary system.
    • 02:37:15
      It requires that the code requires that the primary share be distributed as a 40% share of what's remaining.
    • 02:37:25
      And then it's distributed to the districts based on 70% by primary vehicle miles of travel, 25% by primary lane miles, and 5% needs factor.
    • 02:37:39
      The CTB has some discretion to allocate funding to specific urban projects within each district.
    • 02:37:44
      So you have some discretion there within the district.
    • 02:37:48
      The secondary system.
    • 02:37:50
      The code requires that the secondary share be 30% and that's distributed by formula to each county based upon the code again which says 80% by population, 20% by land area.
    • 02:38:03
      The project distribution is done in each respective county by the boards of supervisors in consultation with VDOT's resident engineers.
    • 02:38:14
      The code also establishes a percentage and the method of distribution for the unpaved secondary road fonts.
    • 02:38:24
      The CTB has no discretion in these applications.
    • SPEAKER_13
    • 02:38:29
      When we take, when we peel maintenance off the top and we say we've got so much money in maintenance to maintain our highway systems,
    • 02:38:39
      When we get down into the primary, I mean this is the construction side here, but when we allocate the maintenance to the, is it on a needed basis or do we have some type of informal formula that the secondary system obviously in all of these counties needs maintenance?
    • 02:39:00
      And you don't know today what it is today or what it's going to be tomorrow or next, but how is that
    • 02:39:08
      How has that trickled down?
    • 02:39:10
      I got a problem.
    • 02:39:12
      You got to fix it or is there some allocation, some informal allocation that it affects these systems?
    • Barbara W. ReeseChief Financial Officer
    • 02:39:21
      If you use the term informal to mean that's a VDOT internal decision the state maintenance engineer has a working group of all the maintenance engineers around the state and they sit down as a group and take the total pot and they do this early I mean it's not like tomorrow they're going to sit down and start allocating they know they've been working for a year now on this is how much you can expect to have and how where do we need to put those dollars I mean there are some things that are set aside for example snow removal
    • 02:39:48
      Emergency, that kind of thing.
    • 02:39:50
      But they work as a group to make those decisions and then it's up to the commissioner to agree or disagree with that decision.
    • SPEAKER_13
    • 02:39:58
      You made a, to me you made a very critical statement about that you have a group in VDOT.
    • 02:40:05
      I think you call it your maintenance committee or something.
    • 02:40:09
      Program leadership group.
    • 02:40:09
      Maintenance leadership group.
    • 02:40:10
      Maintenance leadership.
    • 02:40:12
      We've discussed this in the past.
    • 02:40:14
      It is my suggestion
    • 02:40:16
      that somehow or another you appoint or have one member of the transportation board to set in on that committee to see that.
    • 02:40:27
      I think it would be a great help.
    • 02:40:31
      And where I'm coming from, if I go back five or six years, I know Ms. Lionberger and I were in discussion with staff about this.
    • 02:40:41
      I think it would be very helpful
    • 02:40:44
      to the board to have, I don't know how you meet once a month or something like that, but it's to have a board member represented there to just have a feel for that.
    • 02:40:57
      I think that within the board we would like to know a little more about that.
    • Barbara W. ReeseChief Financial Officer
    • 02:41:04
      Well certainly I think the commission would be willing to have the MPLG representative, they usually have a chairman each year come and give a presentation to the full board about that process so you would have an understanding of how they go about their work.
    • SPEAKER_13
    • 02:41:16
      Because it is, I mean it's critical to all of us, we're all very concerned about it and would somehow like to see, again I throw the term in informal and I don't know what it is but I've always been very much interested in the maintenance, how the maintenance money is spent in the state and what goes on with it.
    • Ambrose W. BaileyMember, Commonwealth Transportation Board
    • 02:41:34
      That piggybacks earlier when I brought up a comment about secondary system because even though I've only been on the show a while and trying to get around to all my jurisdictions I'm getting hammered with a question that I can't answer that I'm seeing now and that is the secondary people that have a great amount of secondary they feel that it's this body
    • 02:42:00
      CTB that short changes them on being able to get better maintenance or quicker maintenance on their roads.
    • 02:42:09
      The secondary people just feel that the funding for them is that they're so cheated and that they don't ever get
    • 02:42:20
      enough for their projects or situations heard, understood, or taken care of, or resolved.
    • 02:42:25
      Maybe that type of thing would help us to understand it.
    • 02:42:30
      I'm hearing it from six of the jurisdictions I've visited, and I didn't know what to say to them.
    • 02:42:36
      Not really.
    • 02:42:38
      Ambrose, you and Ms. Burr are both talking about maintenance.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 02:42:43
      W. Smith, John W. Smith Jr., John W. Smith Jr., John W. Smith Jr.,
    • SPEAKER_13
    • 02:43:01
      I think the key is how it's done, is how that break down.
    • 02:43:08
      I found it very beneficial at times for that last comment, the CTB has no discretion in the secondary.
    • 02:43:17
      We give them the money and they set the priority.
    • 02:43:20
      It saved me a lot, I can tell you that.
    • 02:43:25
      Ambrose discovered our secrets.
    • SPEAKER_17
    • 02:43:27
      Any other questions on that?
    • 02:43:28
      Any other comments on the secondary system allocations?
    • 02:43:33
      I'll move on to the urban system.
    • 02:43:35
      Again, the code requires that the urban share be 30% of the remaining amount distributed by formula to each city and town based strictly on population.
    • 02:43:45
      The project distribution is done to each individual city and town based upon what the town feels is their next most important priorities and it's done in consultation with VDOT and that's the urban office.
    • 02:44:03
      The CTB has no discretion of lease funds and the
    • 02:44:11
      Can we expand a little bit here?
    • SPEAKER_13
    • 02:44:15
      It says in consultation with you folks, and I know that I have, it's kind of like a secondary fund, on the urban system, I have felt, okay, it's hands off, they get their money, they can do what they want to with it.
    • 02:44:30
      But there have been occasions that as I have followed what a city was doing, that I have questioned,
    • 02:44:40
      Question.
    • 02:44:40
      Why are you doing this?
    • 02:44:41
      You know what I'm saying.
    • 02:44:44
      How much consultation do you say we don't have any discretion now, but I know that you guys in reviewing this obviously can say you agree or you don't agree with what they're doing, and how do you keep a handle on that?
    • 02:44:58
      Let's say you totally disagree with what they want to do.
    • SPEAKER_17
    • 02:45:01
      That's happened?
    • 02:45:04
      That's happened?
    • 02:45:05
      Let me give you a little bit of background on how they come up with those priorities first.
    • 02:45:10
      Across the state, we have transportation plans in all of the jurisdictions that we deal with.
    • 02:45:17
      All of the towns and cities that we deal with have a transportation plan.
    • 02:45:24
      And that lays out for the town or for the city what their next most important
    • 02:45:28
      In the larger areas, Richmond, Hampton Roads, and Northern Virginia, we have not only the individual transportation plan, the portion that the individual jurisdiction has, we also have a comprehensive plan for the entire region.
    • 02:45:48
      So now we've got, in the towns, we try to help the towns make the decision on what's their next most important project based upon safety, congestion, or if it's a continuation of a project that we've started or we've started improving a facility, whether or not it's a continuation of that.
    • 02:46:10
      So those are the three things we look at first.
    • 02:46:12
      If we're dealing with the small towns, when we're dealing with a city, then we look at their overall transportation plan.
    • 02:46:19
      Again, we look at safety, we look at congestion, and we look at whether or not it's a continuation of the facility that might, if you continued constructing that facility, would it help relieve traffic congestion, or would it improve safety in other parts of the town or city?
    • 02:46:35
      Now, when you get to the MPO areas, it gets a little bit more complicated.
    • 02:46:39
      In fact, it gets a whole lot more complicated because then you've got more than one jurisdiction involved.
    • 02:46:45
      You have conflicts between jurisdictions, and then you have the MPO that decides what the program should be for the next year and what their transportation plan should be.
    • 02:46:55
      And so when you're dealing with the larger areas, we look to the jurisdiction
    • 02:47:00
      We looked at the MPO plan, and then we have to look at some other things such as air quality attainment.
    • 02:47:07
      So there's a lot of things that take place.
    • 02:47:09
      We're still looking at safety, we're looking at congestion, we're looking at air quality attainment, or in the case of Hampton Roads, the maintenance of air quality standards that we've met.
    • 02:47:23
      And so those things take a big role in determining what our next priorities are.
    • 02:47:30
      We look to the city to have satisfied the federal requirements for having a project that is part of an overall transportation plan that's been approved by the MPO and whether or not that's the next highest priority that we should be looking at.
    • 02:47:49
      They don't always get it the way we would like to see it, but in most cases we try to persuade them to follow that plan.
    • SPEAKER_13
    • 02:47:57
      Let's say a city
    • 02:48:00
      55, whatever.
    • 02:48:03
      They get an allocation for urban system construction money.
    • 02:48:09
      And let's say that the city fathers, in setting the priority, say, we want this street or we want this bridge.
    • 02:48:18
      And it's a massive project.
    • 02:48:21
      And this is our priority.
    • 02:48:23
      And they move in that direction and we start allocating money towards it and whatnot.
    • 02:48:29
      And yet, as a transportation board member, or in your position, you look at it and say, you look at that project and the draw on the allocation for six years, 12, 15 years, and you say, well, something else is going to suffer here because of what's happening.
    • 02:48:51
      How do we, I mean, again, I see this, sometimes I see this and say, what are you doing?
    • 02:48:59
      because you're not going to be able, it's going to take you 15, 20 years to do this and yet to me your other systems are going to suffer because of what you're doing.
    • 02:49:10
      How do I, I mean when I see I don't have any discretion but when I look at it from the citizen standpoint and a lot of times I don't pay no attention to these politicians, you know, I got here because I was one at one time but it's much nicer to lose and get out of that, you know.
    • 02:49:28
      How do you say you're going the wrong direction here?
    • SPEAKER_17
    • 02:49:34
      Well, Mr. Byrd, I've always had a theory about where we are.
    • 02:49:37
      We're technical people in the political world, and we do the best we can to try to persuade the political leaders that this is the next best project or this is the next highest priority project, but sometimes we don't prevail.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 02:49:51
      Is that my decision to make?
    • SPEAKER_17
    • 02:49:52
      It's between us and the city, between VDOT and the city, but on the other hand, we don't have the authority under the code to require them to do a different project if they so choose to do a massive project like you're talking about.
    • SPEAKER_12
    • 02:50:11
      This has come up before in other times and other discussions, but there is a concern that I have and continue to have where we have a portion of the program that is produced in one manner with a certain degree of cooperation within the district.
    • 02:50:31
      And you've got two other portions of the program that are produced for all intents and purposes basically outside of that system.
    • 02:50:42
      And even though there is, certainly there is communication, hopefully, in most times.
    • 02:50:48
      in most instances.
    • 02:50:50
      There certainly have also been instances that I'm aware of in the Salem District where we have found out about an urban project when it has gone into the first time, when it has gone into the Six-Year Plan.
    • 02:51:04
      We had a discussion about some of the rail projects that are handled directly between Richmond and the locality where the district is out of the loop.
    • 02:51:16
      and if in those instances the resident engineer attends the Board of Supervisors meeting or the City Council meeting at which those funds are discussed
    • 02:51:32
      then they find out about it if that person attends and tells somebody we find out about it but if they're not in attendance or if they if they don't communicate what they've heard at that meeting at the time that this discussion occurred the last time there was no
    • 02:51:51
      I can address that just for a moment.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 02:51:57
      I can't speak for the past, but I can speak for the future.
    • 02:52:05
      There's not going to be any district administrators out of the loop in terms of putting our program together.
    • 02:52:11
      I believe the staff here as well as the district administrators have heard me loudly and clearly on that point.
    • 02:52:21
      While we may or may not have discretion to do certain things, we certainly have everything to do with how we operate as an organization.
    • 02:52:30
      and the district administrators are not going to be those people out there and us people in here.
    • 02:52:37
      So I feel pretty darn confident in telling you that that aspect of it organizationally is going to change.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 02:52:48
      Just one observation.
    • 02:52:51
      There's one locale up my way that loves to play the game on what I call secondary road blame.
    • 02:53:01
      And they love to blame VDOT for a secondary road project, which was number three on their project list one year and then dropped to number 37.
    • 02:53:11
      And I have, on occasion, called them on, and I think you have to do that.
    • 02:53:21
      I get it, too.
    • SPEAKER_13
    • 02:53:25
      The news, they'll say VDOT did this, and I say, wait a minute.
    • 02:53:30
      We didn't do that.
    • 02:53:32
      That was at the discretion of a city or that was at the discretion of a county to make that decision.
    • 02:53:38
      and sometimes then the public picks up and we're the bad guy.
    • SPEAKER_17
    • 02:53:43
      If I may just for a second I'd like to address that question that Ms. Lionberger mentioned.
    • 02:53:47
      Yes, it has occurred in the past when there was not the knowledge of a project that passed on to the district administrator but we also have had cases where we dealt with the resident engineer where it was not passed on to the district administrator.
    • 02:54:01
      I'm trying to cure some of those and I'm pleasuring to you that we're going to take care of that in the future.
    • 02:54:07
      Let me move on with this.
    • 02:54:13
      That concludes the part that we had about question number three, which is how do we make decisions, how do you make decisions, what your discretionary role is, and how do we plan to spend transportation resources.
    • Barbara W. ReeseChief Financial Officer
    • 02:54:27
      I do want to point out the comment that was at the bottom of page 31.
    • 02:54:31
      Last month I know at the tentative budget at the workshop there was a lot, you know there's only $596 million going to interstate, primary, secondary, and urban out of a total construction program of about $1.5 billion.
    • 02:54:44
      To get the best sense of what your total construction program is in an individual district is to go, when you get your new plan in a little while, look at the front page summary for each district and that gives you the total pot because there are things up in Access Roads and other, the federal demo projects.
    • 02:55:01
      The projects that are allocated France that are shown separately within the budget and the way the numbers all have to come together and you know saying how much is left for formula and how much is earmarked some way else.
    • 02:55:15
      So I just want to point that out because I know it was distressing last month and that is one third of the total pot of money that is actually allocated to districts.
    • 02:55:25
      Okay, this is sort of getting into Mr. Mitchell's earlier question.
    • 02:55:29
      We're going to start with the last part of this presentation, which is what are our most immediate financial management challenges?
    • SPEAKER_12
    • 02:55:36
      And trust me, there are plenty.
    • Barbara W. ReeseChief Financial Officer
    • 02:55:39
      And I'm just going to hit the highlights.
    • 02:55:41
      First one is RABA, which is the Federal Revenue Aligned Budget Authority Adjustments.
    • 02:55:47
      This program includes $116 million less in federal funding in FYI, Federal Fiscal Year 03, because of RABA adjustments.
    • 02:55:58
      RABA is where when actual federal revenue collections, just like at the state level, are lower than estimated, RABA requires a reduction in state apportionments.
    • 02:56:07
      That is a one-year action that is included in the budget and in the six-year program.
    • 02:56:16
      If the budget, if the President signs a bill restoring R.A.B.A., the plan will be modified to reflect the additional federal funding.
    • 02:56:24
      I want to point out though that the federal, because I know there have been many people who have been criticized for that, the fact that we did embed R.A.B.A.
    • 02:56:31
      when there's all this congressional action saying we're going to restore R.A.B.A.,
    • 02:56:35
      and the President will sign it.
    • 02:56:38
      But our official communications from the federal government, which we use, which are the apportionment tables, reflect the $116 million reduction.
    • 02:56:47
      And as you know, a policy goal embedded that was an edict from the Governor and the Secretary was use realistic and reasonable and accurate forecasts.
    • 02:56:57
      And just like we've done with the state revenue estimates, the federal official tables are what is embedded in your final program.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 02:57:05
      On this last point, if the President signs RABA, will that restore the $116 million or some portion of that?
    • Barbara W. ReeseChief Financial Officer
    • 02:57:15
      Well, that's what we don't know.
    • 02:57:17
      Right.
    • 02:57:17
      And the reality is, too, you've got to remember that, you know, those six major programs we talked about earlier, interstate maintenance, NHS, STP, minimum guarantee, it'll all get, that $116 million will get distributed through those federal formulas on how they just put money in each of those pots.
    • 02:57:32
      So in the end, it may not be, it'll be $116 million, but it's going to be cut up so much.
    • 02:57:38
      It won't be a lot in any one place.
    • 02:57:42
      State revenue outlook.
    • 02:57:44
      And this is back behind Tab 3, and I would like for you to turn to Tab 3.
    • 02:57:48
      Each month, the Secretary of Finance reports to the Governor through the Chief of Staff
    • 02:57:53
      on revenues for the prior month and where that means we are year to date.
    • 02:57:58
      I put this purposely here for tab 3 because the website where you can find this document is listed at the bottom.
    • 02:58:05
      It comes out typically around the 13th or 14th of each month.
    • 02:58:09
      The letter that's at the beginning, the memorandum, basically outlines where we are in the general fund.
    • 02:58:15
      But I want to point out, and we're going to walk through the general fund a little bit, but I also want to point out this letter each month includes the official look from the state's accounting system and the state revenue collection systems of the HMO and TTF, and those tables are embedded in here as well.
    • 02:58:33
      As Mr. Mitchell pointed out earlier, the General Fund, which if you look at behind tab 3, it's the first table in that packet after the memorandum.
    • 02:58:43
      This is the report of the General Fund through the end of May.
    • 02:58:47
      It's not a positive
    • 02:58:48
      They are saying, and Commissioner Shucet and I were with the House Appropriations Committee on Monday and the Secretary of Finance reported to them that even though the revenue estimate for the general fund has been revised downward twice since December, it will be short at least, and he emphasized the words, at least $150 million by June 30th.
    • 02:59:12
      meaning that they have to balance the books.
    • 02:59:17
      We, by state law, by constitution, have to have a balanced budget.
    • 02:59:22
      So if you look at that first table, I just want to point out what the issues are.
    • 02:59:26
      If you look, under column 8,
    • 02:59:30
      About three-fourths of the way down you see a line called Total General Fund Revenues.
    • 02:59:35
      Right now, year to date, the general fund is negative 5.8 percent in terms of revenue growth.
    • 02:59:42
      It was forecasted to be at negative 1.7.
    • 02:59:45
      The two key drivers of that
    • 02:59:48
      significant decline are estimated payments from small businesses, wealthy individuals, or those who pay a quarterly estimated income tax payment versus have money withheld at their place of employment, and also refunds are greatly accelerated.
    • 03:00:06
      And you see that breakdown above, and I'm not going to spend a lot of time on it, but you can see tax due estimated payments year-to-date is down 20.3%.
    • 03:00:16
      compared to negative 14% that was assumed.
    • 03:00:20
      Secretary Bennet indicated that that number could reach as high as 37% by the end of June.
    • 03:00:26
      Refunds, on the other hand, while they were forecasted to be 27% higher than they were last year, they're actually running 38% higher.
    • 03:00:37
      And if you think about the economy, that makes sense intuitively that people are getting more money back from their taxes because their incomes haven't grown as fast or their
    • 03:00:45
      Unemployed, or whatever.
    • 03:00:47
      If you look at the last table behind tab three, this is the one I look at.
    • 03:00:53
      Yes, the blue sheet comes out every month.
    • 03:00:55
      I'm not sure long-term of tax will continue to provide that, but you can get this letter and we can make sure that that happens.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:01:00
      Yeah, I'd like to make sure I read them religiously.
    • 03:01:02
      I think it's good information.
    • Barbara W. ReeseChief Financial Officer
    • 03:01:04
      I'm not sure.
    • 03:01:05
      I haven't talked to the tax department about whether or not they're going to continue that.
    • 03:01:08
      My guess is they'll continue something, but I don't know what form.
    • 03:01:11
      But if you look at the HMO and the Transportation Trust Fund, we're actually in pretty good shape.
    • 03:01:16
      Right now, if you look over at the year-to-date column percent change in the HMO, we're 2.1 percent ahead in terms of we've grown from last year by 2.1 percent and we were expected to grow negative 0.4.
    • 03:01:30
      The reason for that
    • 03:01:31
      is that the official forecast for the HMO assume car sales when the economy started to slide would go completely, would evaporate.
    • 03:01:41
      Well of course then what happened?
    • 03:01:43
      The manufacturers put out zero percent financing so all these people bought cars.
    • 03:01:48
      Now what I don't know is long-term implications of that.
    • 03:01:52
      If I bought a new car, which I did this fall, does that mean
    • 03:01:55
      I had planned to buy one and what intuitively would have been a purchase next year won't happen.
    • 03:02:00
      So there is a two-edged sword to that.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:02:02
      Is that good for air quality emissions?
    • 03:02:04
      I mean, do we help the... No.
    • Barbara W. ReeseChief Financial Officer
    • 03:02:08
      And same thing, you see some motor vehicle fuel sales and use tax is up, but motor vehicle fuel tax collections are down.
    • 03:02:16
      They're somewhat negating each other.
    • 03:02:18
      And then the other key one is the federal grants and contracts, which you see down at the bottom under other revenue.
    • 03:02:23
      This year, through the end of May, we've collected almost $900 million in federal revenue through some very aggressive action that the Department took to try to get as much federal money that was owed to us back, the reimbursement process, because originally that was only forecasted to be about $503 million.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:02:42
      Mr. Byrd?
    • Barbara W. ReeseChief Financial Officer
    • 03:02:44
      I'm sorry, Mr. Byrd.
    • SPEAKER_13
    • 03:02:47
      Bob, I guess it's page one on the general fund numbers.
    • 03:02:52
      I have three-fourths way down in the tobacco master settlement.
    • Barbara W. ReeseChief Financial Officer
    • 03:03:00
      Yes, the MSA payment.
    • SPEAKER_13
    • 03:03:04
      I would like to deliver a message from the farmers in Pennsylvania County, Halifax County, Charlotte County, Patrick County.
    • 03:03:14
      That's a nice increase.
    • 03:03:16
      It looks like it's holding up the numbers for the state.
    • 03:03:23
      But see, when you get over into the
    • 03:03:25
      VDOT side, and you get down to the secondary roads, that old tobacco farmer still living on that dirt road, he doesn't like this at all, I can tell you that.
    • Barbara W. ReeseChief Financial Officer
    • 03:03:34
      What, that the general fund receives it?
    • SPEAKER_13
    • 03:03:36
      Yeah.
    • 03:03:37
      It's a real sore point in the agricultural community, the tobacco fund settlements.
    • 03:03:43
      That there's a percentage share that goes.
    • 03:03:44
      and how it relates to transportation issues.
    • 03:03:49
      But I just thought I'd bring it in.
    • Barbara W. ReeseChief Financial Officer
    • 03:03:51
      Well, that might be a future strategy.
    • 03:03:53
      I don't know.
    • 03:03:55
      But just turning back to the presentation on page 34, the key point with this in relation to the general fund, how the governor is going to address the continuing general fund revenue decline is unknown at this time.
    • 03:04:07
      Obviously, because transportation revenues
    • 03:04:09
      are $3.1 to $4 billion next year.
    • 03:04:14
      It could be that in order to keep the general fund whole and to address the other issues in operating state government and 50% of the general fund budget goes back to localities, how that will have to be addressed, we don't know.
    • 03:04:27
      We do know that the governor has said that he is going to officially re-forecast revenues over the summer months with the goal of presenting a new forecast, I think it's August 19th, to the money committees at the annual meeting about how did FY02 end up and what he plans to do and what the forecast now shows for General Fund HMO and TTF in late August.
    • 03:04:53
      So we may have to make adjustments based on that as well.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:04:58
      Question.
    • 03:05:00
      You know, when you, we're sort of stable in some of our funding sources.
    • 03:05:05
      It's almost like putting a target on it because there's a potential source of capital to balance the budgets.
    • 03:05:13
      Other revenue sources are down.
    • 03:05:15
      You really don't have a choice.
    • 03:05:16
      You need to, by state statute, balance the budget.
    • 03:05:18
      So we could be a target
    • 03:05:21
      For more cuts or something, there's got to be a way to, you've got to balance it some way.
    • 03:05:30
      And usually where you've got some money is where you look at it first and then you look at other things.
    • Barbara W. ReeseChief Financial Officer
    • 03:05:34
      And that's what the third bullet on that page is supposed to be.
    • 03:05:37
      The governor makes those calls.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:05:38
      But from a transportation perspective, if we try to protect sources of revenue, our goal is to build roads and maintain roads first and then build new things.
    • 03:05:49
      Doesn't it really beg to the idea of creating certain districts where they have certain revenue source?
    • 03:05:56
      For instance, you've got a 28 tax district that has specific revenue sources that are there to do this.
    • 03:06:01
      The referendums that both in
    • 03:06:03
      The Tidewater and the Northern Virginia area that come up this fall, those things can't be touched once they're established.
    • 03:06:12
      If there's a revenue source, they go and stay there no matter what happens with general fund changes or economics of general fund appropriations.
    • 03:06:23
      So those are fixed resources to do those improvements in the future.
    • 03:06:28
      They cannot be touched.
    • 03:06:29
      by the General Assembly or by state government.
    • Barbara W. ReeseChief Financial Officer
    • 03:06:34
      The referendum packages, no, because that is not state revenue that's included in those referendum packages.
    • 03:06:41
      Route 28, hypothetically in the appropriation act, back in the last part of that act, there is language that gives the governor the authority in times like this where revenues and the general fund are not fulfilling what was needed to balance the budget.
    • 03:06:57
      He can reach out and touch non-general funds.
    • 03:06:59
      P. Smith, Michael A. Smith, John C. White,
    • 03:07:20
      I think anybody would be reluctant to do anything to a bond fund or a fund that supports debt service payments or capital construction costs for projects within a bond program that would be negatively viewed by the rating agencies in New York.
    • SPEAKER_20
    • 03:07:40
      Governor, does that what they called, I think General Assembly called it the rainy day finals?
    • Barbara W. ReeseChief Financial Officer
    • 03:07:44
      Yes, sir.
    • 03:07:45
      That was tapped for 03.
    • 03:07:47
      There was a withdrawal of half of the amount that was in there somewhere in the 400, or for 02.
    • 03:07:55
      It's somewhere in the $400 million range, but I don't remember what.
    • 03:07:58
      Now, there is language, and I'd have to go back and read it in the Constitution about he could tap that again, but I forget the things that have to happen.
    • 03:08:05
      There are restrictions to that.
    • 03:08:07
      but he took half so there's only half left so you're looking at most 200 million or so.
    • 03:08:15
      Turning to the next issue which is FRAN allocations within the six-year program that you're going to hear about this afternoon.
    • 03:08:21
      That starts on page 35.
    • 03:08:23
      As we talked about earlier, the 2002 session did amend how FRANs can be used.
    • 03:08:31
      I want to point out
    • 03:08:32
      The Virginia Transportation Act itself was not amended.
    • 03:08:35
      There's language in the appropriation act.
    • 03:08:37
      It's page 386 behind tab 1 that amended what the authority was.
    • 03:08:43
      As I think Mr. Kline pointed out earlier, that's a two-year act.
    • 03:08:46
      It was actually a three-year action because it was also included in the bill that adjusted 02.
    • 03:08:51
      But what happens in 04 and 05 and 06 is unknown at this time.
    • 03:08:55
      But it did say you can use those FRANs for anything because the general funds went away, opened up FRANs use for any project listed in the VTA, and it also increased the debt authorization to 1.2 billion.
    • 03:09:09
      And again, 1.2 billion outstanding in debt at any one time.
    • 03:09:13
      That is a rolling number.
    • 03:09:15
      In other words, as you pay off an earlier issue of FRANs, you can issue more because you freed up excess as long as you never exceed the 1.2 billion.
    • 03:09:24
      There is language that was included in the appropriation act that we all know that transfers $317 million in state sales and use tax from the highway construction share, the 78.7% share that goes from the TTF to the general fund and is replaced one-to-one with $317 million in France.
    • 03:09:45
      Friends, they are not included in the state debt service.
    • SPEAKER_13
    • 03:10:06
      W. Smith, John W. Smith Jr., John W. Smith Jr., John W. Smith Jr.,
    • 03:10:24
      to construct and spend and do all those things necessary.
    • 03:10:29
      How do we reconcile?
    • 03:10:30
      I mean, I know this is a theory type, but when I look at that and say it's not interstate debt load, but yet it's impacting everything that we do, how do we reconcile ourselves?
    • Barbara W. ReeseChief Financial Officer
    • 03:10:40
      Well, the state debt load basically is in some ways an artificial debt capacity.
    • 03:10:46
      It's how much is general fund tax revenue supported versus everything else.
    • 03:10:54
      It's an artificial mechanism.
    • 03:10:55
      Certainly when we go to New York to issue more friends,
    • 03:11:00
      They're going to talk about that and that is a concern that we're going to have to address because we also have Route 28 bonds, we have Northern Virginia Transportation District bonds we need to sell this year.
    • 03:11:10
      There's a lot of work and debt issues that's going to be happening.
    • 03:11:13
      That's why the last slide you'll see in this presentation is that debt management is a very critical challenge that we're facing.
    • SPEAKER_13
    • 03:11:21
      I mean it's impacting our ability to provide infrastructure to the state.
    • 03:11:26
      But yet, if you say when you're talking with bond counseling and whatnot, the way we do it, it's not right.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:11:37
      Mr. Klein.
    • 03:11:38
      The $317 that's been replaced by France, that will net out at some $48 million less because of the debt service we have to pay.
    • Barbara W. ReeseChief Financial Officer
    • 03:11:48
      That's what the additional general funds beyond the one-third insurance premiums were done for, was to cover that debt service in the biennial appropriation.
    • 03:11:56
      Now, in the out years, it is not assumed that those general funds continue to pay that debt service.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:12:02
      What about 04?
    • Barbara W. ReeseChief Financial Officer
    • 03:12:03
      04, there isn't a general fund appropriation to cover the debt service.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:12:10
      Are you going to use FRANZ again for 04 to replace the 317?
    • Barbara W. ReeseChief Financial Officer
    • 03:12:14
      No, that's a one-year action at this time.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:12:16
      So the 317 goes away in 04, is that correct?
    • Barbara W. ReeseChief Financial Officer
    • 03:12:20
      Correct.
    • 03:12:20
      They restored the General Assembly.
    • 03:12:22
      Governor Gilmore proposed taking it in both years, 03 and 04.
    • 03:12:25
      The General Assembly restored the $336 million take, so to speak, in the Governor's budget and restored that funding back to transportation.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:12:34
      But it's not restored in 04?
    • Barbara W. ReeseChief Financial Officer
    • 03:12:36
      It's restored in 04.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:12:38
      Oh, it is?
    • Barbara W. ReeseChief Financial Officer
    • 03:12:39
      03, it's not restored.
    • 03:12:40
      The transfer of 317 out of transportation to the General Fund.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:12:44
      So in 04, we'll have the 317.
    • Barbara W. ReeseChief Financial Officer
    • 03:12:47
      Yes, it'll be regular TTF money.
    • 03:12:50
      That number in 04 is 336.
    • 03:12:52
      It's the same.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:12:54
      That's how much it was originally.
    • Barbara W. ReeseChief Financial Officer
    • 03:13:02
      Page 36 there's a key issue embedded in the final plan that there's been lots of discussion around but it was bottom line was it just was no easy way to address this issue between the tentative plan and the final plan.
    • 03:13:18
      I want to point out first off for fiscal year 2003
    • 03:13:21
      All the debt service required for all the FRANs is being paid for out of the Priority Transportation Fund cash so that no system allocation had to be impacted in 03 by debt service.
    • 03:13:34
      Enactment 6 of the VTA, which is in tab 2, is the last page of that legislation.
    • 03:13:40
      There's a number 6, and you can read it for yourself.
    • 03:13:43
      It requires that FRAN debt service be proportional to the amount of FRAN proceeds allocated to each district.
    • 03:13:51
      The way the tentative program and now the final plan were put that you interpreted that statement was to allocate debt service using the percentage share FRANs provided to each construction district in the VTA for highway projects only.
    • 03:14:07
      And if you recalled earlier this morning, we talked about how when the General Assembly did it, they didn't think of highways, mass transit, rail, and ports as being separate entities.
    • 03:14:17
      They thought of it as one.
    • 03:14:19
      But the decision was made internally that that's how it was done.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:14:23
      I remember a couple, was it last meeting?
    • 03:14:28
      That discussion came up, so I guess the decision was, I mean, Lynchburg,
    • 03:14:33
      had a percentage of FRANs.
    • 03:14:37
      So if Lynchburg is not using FRANs for debt service, then they don't have any debt service payments sent.
    • Barbara W. ReeseChief Financial Officer
    • 03:14:45
      The way it's done in the plan is don't even worry about how FRANs are allocated in the plan to your district.
    • 03:14:52
      The debt service that is assigned to each district and each system and it's just the interstate and primary that are paying debt service or have debt service is based on
    • 03:15:00
      Total amount of friends that are included in the program and then if you go back to the VTA and you take all those projects and you run an Excel spreadsheet by district and say how much of this is Bristol Interstate, how much of this is Bristol Primary,
    • 03:15:17
      You assign a percentage of the total, and that's how it's been allocated.
    • 03:15:21
      So there is not a one-to-one correlation.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:15:23
      So the Lynchburg District, if they have no friends, they don't pay any debt service?
    • Barbara W. ReeseChief Financial Officer
    • 03:15:29
      No, they are paying debt service.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:15:31
      Believe me, we're paying debt.
    • 03:15:34
      Each district is paying debt service.
    • 03:15:37
      based on the proportionment of projects in the VTA Act, not the projects in the current six-year program.
    • SPEAKER_19
    • 03:15:50
      And I'll tell you why I decided not to change that.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:15:55
      Two reasons.
    • 03:15:56
      One of them is probably a poor reason, but yet a fact is that in the coming fiscal year, debt service is handled by the PTA.
    • 03:16:07
      Secondly, in the last 30 days we have not been able to become terribly smarter in terms of debt management.
    • 03:16:17
      We recognize it is a major issue to address and one that will address and come forth with a recommendation
    • 03:16:30
      with more consultation and discussion for the next go-around of the six-year program.
    • 03:16:36
      I mean, is it fair?
    • 03:16:40
      I don't know.
    • 03:16:41
      Is it the most prudent decision to make?
    • 03:16:44
      I believe it is.
    • 03:16:46
      I just simply believe it is.
    • 03:16:48
      Ms. Lionberger.
    • SPEAKER_12
    • 03:16:48
      I do think that it's extremely important that every board member looks at the, and this was General Assembly, this was not action by this board or by this governor or anybody else, but looks at those statements regarding the debt service not being assigned to the urban system or to the mass transit.
    • Barbara W. ReeseChief Financial Officer
    • 03:17:13
      No, that decision in terms of the urban system was an internal decision.
    • 03:17:18
      Oh, that was not General Assembly.
    • 03:17:20
      That's not General Assembly.
    • 03:17:22
      No?
    • 03:17:23
      No.
    • 03:17:24
      I mean, there are urban projects that receive friends that
    • 03:17:28
      You should have, I mean you could have said you should have allocated debt service to a specific city.
    • 03:17:34
      The problem, and Charlie can certainly speak to that better than I can, is that when you start allocating debt service to a particular city, number one, not every city in Virginia got France in the VTA.
    • 03:17:46
      Number two, it eats up every dime they have.
    • 03:17:50
      And so the call was, it was a judgment call made here was not to allocate debt service to the urban system.
    • 03:17:57
      and to have the primary and interstate carry that full burden in this final program beyond 03.
    • SPEAKER_12
    • 03:18:05
      I understand the concept of none of us would choose to have France spent in our district if we had those options.
    • 03:18:12
      So I certainly understand the concept of what we're talking about.
    • 03:18:15
      I just will repeat what I said.
    • 03:18:20
      I think the board members need to understand and need to be able to
    • 03:18:26
      and then educate the people in their districts as to why our highway funding money is being so heavily impacted as compared to some of the other systems.
    • SPEAKER_13
    • 03:18:40
      That's the reason I made the comment but how do we reconcile this talking point?
    • 03:18:45
      I appreciate you and Philip coming to Dambel a couple of weeks ago.
    • 03:18:51
      I assume that they recognize this and are concerned with it.
    • Barbara W. ReeseChief Financial Officer
    • 03:18:58
      Commissioner Shucet has reached out also to the House Appropriations Committee and said we have a serious problem here but we don't know the answer right now.
    • 03:19:07
      Please work with us over the next six months as we try to figure out what is the best approach.
    • 03:19:13
      We don't know what it is right now and that's what we need to look at.
    • 03:19:16
      Since Monday, I mean, you can't just redo all these things and have it right.
    • 03:19:22
      So rather than do something quick and dirty that may not have been right.
    • 03:19:25
      And the other issue is if FRAN allocations change, like for example, the 29 projects in your district, if they needed more money because suddenly there's a change order, heaven forbid, and there's more costs that have to go out on a construction project,
    • 03:19:41
      and for programming purposes Bob decides I need to assign more Frans to Lynchburg District to help pay for that deficit.
    • 03:19:50
      Well that would mean that if you assigned it based on where Frans are allocated in the program next year suddenly your program would be ripped apart again
    • 03:19:58
      Again, I go back to our meeting there and our individual discussions on these large projects.
    • SPEAKER_13
    • 03:20:21
      When we look at 29 from Mr. Whitenim's area all the way down, and we know what we have to do with U.S. 29 in giving this issue, I mean, we've got to upgrade 29.
    • 03:20:34
      Now, how are we going to do it?
    • 03:20:36
      I don't know, but it's an issue from you guys' area right on down to me.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:20:45
      We've got to upgrade it in our area, too.
    • SPEAKER_10
    • 03:20:51
      There's really two separate issues here.
    • 03:20:56
      How the FRAM money is allocated, which is a cash flow issue.
    • 03:21:00
      And the other one is how the FRAMs are paid back, which is more of a policy issue.
    • 03:21:05
      And that's based on the fact that you're anticipating federal revenues and you're having to pay the debt on that anticipated revenues.
    • 03:21:13
      So they're really two separate issues.
    • 03:21:15
      And if you try to confuse the two, that's when things get a little messed up in terms of how it's paid.
    • Barbara W. ReeseChief Financial Officer
    • 03:21:22
      Well, and that's the issue with the law, though, and how it's written.
    • 03:21:26
      And, you know, we could spend hours talking about it, but we couldn't come.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:21:30
      There's no disagreement that it's a huge issue.
    • 03:21:33
      But in light of many other realities over the last 60 days, it was clear to me that we weren't going to solve this one.
    • 03:21:45
      And at the end of the day, you have to make a decision how you're going to do it.
    • 03:21:50
      This is a decision that I hope you'll agree to, I started to say be content with, but I don't expect anybody to be content, but at least agree to going forward realizing that at least in the coming year it's not an impact.
    • 03:22:10
      And we're not going to wait until 60 days before the next program
    • 03:22:14
      to try to figure it out and I'll guarantee you that we're going to make good use of the next 365 days and for the next 180 days of the next 180 days in getting ready for next year.
    • SPEAKER_20
    • 03:22:29
      Well, maybe we need to go back to the General Assembly later on and let them work out.
    • 03:22:32
      Maybe they need to get a user's tax or something.
    • Barbara W. ReeseChief Financial Officer
    • 03:22:36
      I think when Commissioner Shucet met with Senate Finance a few weeks ago, he does have him worried about it.
    • 03:22:40
      So, and I know the House is as well, so they're sensitive to this issue.
    • SPEAKER_20
    • 03:22:46
      I do want to point out...
    • 03:22:48
      I don't think we're going to find a resolution today to deal with it.
    • Barbara W. ReeseChief Financial Officer
    • 03:22:53
      And just at the bottom of page 36 very quickly, the six-year program that will be before you this afternoon and tomorrow assumes 650, about 659 million in new friends are going to be sold in 2003 through 2008.
    • 03:23:06
      This is on top of the 375 million that was sold previously and there is another about 127 million or so that is assumed for late late 08 that really becomes 09.
    • 03:23:19
      So just
    • 03:23:20
      for your information purposes.
    • 03:23:24
      And just to point out again on top of page 37, the debt service payments for FRANs are paid from the Priority Transportation Fund for 2003.
    • 03:23:32
      For 2004 through 08, which are the last five years, $376 million in assumed FRAN debt service payments is allocated to the nine districts primary allocations and the total interstate system allocation.
    • 03:23:49
      And that's listed separately for a reason.
    • 03:23:51
      I'll go back to what we talked about earlier.
    • 03:23:52
      The interstate system funding that you allocate is one big pot of money.
    • 03:23:57
      There is no subformula that says this, you know, Northern Virginia District gets X number of interstate certain percentage or Bristol gets this or Lynchburg gets that.
    • 03:24:06
      It's one pot of money.
    • 03:24:08
      Allocation of debt service to an interstate system within a district is simply like you were saying.
    • 03:24:13
      It's a project.
    • 03:24:15
      I have to allocate X number of dollars to this interstate project in a particular district.
    • 03:24:21
      It's debt service, but in essence it's a project, just as you do any other project.
    • 03:24:25
      For the primary system, though, and this is where the real crux of the matter is, it has to come out of each individual district's primary allocations that come down through that 40% of the formula, and that is a disconnect
    • 03:24:40
      That is one of the big policy issues that have to be worked through over the next six months.
    • 03:24:47
      And obviously debt service requirements are growing each year as more FRANs are sold.
    • 03:24:52
      And because there is no assumption that the insurance premium deposit from the general fund will occur or any of those other things, there's less priority transportation fund revenue assumed in the out year.
    • 03:25:02
      So between those two factors, you see more and more debt service as you go along in the program.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:25:07
      Just a general comment about the FRANs.
    • 03:25:11
      We're using FRANs to cover projects.
    • 03:25:17
      It covers shortfalls so we can continue with viewing projects.
    • 03:25:20
      Future money that we're borrowing and paying debt service money.
    • 03:25:23
      If it wasn't for the FRANs, we wouldn't be doing some of the projects we're doing today.
    • 03:25:30
      And to some extent it's a little dangerous on taking future monies and paying for things now, though we need to do them.
    • 03:25:38
      But it costs us money to pay the debt service payments.
    • 03:25:42
      So, you know, we need to be very careful about using FRANs in the future.
    • 03:25:48
      In my mind, this is kind of a one-time fix-it.
    • 03:25:52
      We try to get into a balanced program.
    • 03:25:54
      But these FRANs make me very nervous.
    • 03:25:58
      And how we take these things, we're fixing things now, we're making debt service payments.
    • 03:26:02
      It's annual appropriations and we take money from different spots to really pay the debt service.
    • 03:26:09
      I just think in the future we've got to be very careful.
    • 03:26:11
      We're coming it through.
    • 03:26:12
      Looks like we got some payments through 08.
    • 03:26:15
      But I'd try to discontinue as much of that as possible in the future and look at some other alternatives which I know are hard to find.
    • 03:26:24
      And I actually got a comment about that when you're through with your slides.
    • Barbara W. ReeseChief Financial Officer
    • 03:26:28
      I don't disagree with you, so it's a major issue that we're going to have to work on.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:26:39
      This is a short-term fix and it keeps the program going, but if we didn't have France, we'd really be much worse than where we're at today.
    • 03:26:50
      France is a tool.
    • 03:26:51
      A degree of brutality.
    • 03:26:54
      It could have been worse.
    • 03:26:56
      Absolutely.
    • Barbara W. ReeseChief Financial Officer
    • 03:26:58
      And then just turning to page 38, this is the next issue.
    • SPEAKER_12
    • 03:27:02
      So we've done revenue, we've done friend allocation, now we're talking about completing financing on projects.
    • Barbara W. ReeseChief Financial Officer
    • 03:27:09
      As you know, there are funding requirements embedded within the program that you saw as tentative and that you'll see as final, where there are project financing costs that are being paid off.
    • 03:27:21
      $301 million in the program is going to complete projects that have already been constructed.
    • 03:27:27
      This is just about getting our books back in balance basically of allocations to where actual spending has occurred.
    • 03:27:34
      Turning to page 39, for the interstate system that impact is mitigated as we just talked about because it is a statewide program.
    • 03:27:42
      The CTB directs money to specific projects, not a district.
    • 03:27:46
      So in other words if you have a
    • 03:27:47
      financing deficit on a project in Northern Virginia because it's a statewide program you can put resources there.
    • 03:27:53
      On the primary, secondary, and urban system there's nowhere to go except for the money that flows through the formula for the district and or locality.
    • 03:28:04
      So that's another why there's such a difference in impacts.
    • 03:28:08
      I want to point out on bullet three because this is a critical bullet
    • 03:28:11
      The same standards have been applied to all.
    • 03:28:14
      That means all projects, all funding sources, and who it occurs.
    • 03:28:20
      Completing financing on projects was a priority for funding.
    • 03:28:25
      The goal was to bring the allocations back in line with the statutory and policy guidelines.
    • 03:28:30
      If any of you follow the General Assembly
    • 03:28:34
      Early on there was questions about where is actual spending on construction occurring and if you started looking at that based on because of project deficits and financing it's really out of whack with what the state funding formula would suggest to you or even the VTA and by paying these things off hopefully
    • 03:28:52
      Soon in the future, things will start coming back in line with what all of us, I think, would say, this is the law, this is how it's supposed to look, and you'll get to that point.
    • 03:29:02
      But for CMAQ and STP regional funds that the metropolitan planning organizations control, they've been required to pay back deficits just on projects that they selected and are completed or underway.
    • 03:29:15
      Secondary system, every locality has been told you have to pay your deficits first.
    • 03:29:22
      Urban, the same thing.
    • 03:29:23
      There's been the same standard that the Commonwealth Transportation Board has been held to on the interstate and primary systems.
    • 03:29:30
      Those urban, secondary, and other sources have also been held to that same standard.
    • 03:29:35
      And I can assure you there's been, even in my short tenure here, been a lot of angst about that issue.
    • 03:29:43
      Turning to page 40, just very quickly, monitoring expenditures tools.
    • 03:29:49
      As you know, you've been given some tools recently in the past few months trying to give a better sense of what is going on in terms of spending, cash flow, revenue collections, that kind of thing.
    • 03:29:59
      Working to help effectively manage that and feel like we have better control of those things.
    • 03:30:05
      There is a new tool that's being developed called Dashboard for construction projects.
    • 03:30:10
      We'll show a one-shot view of project budget spending and estimates.
    • 03:30:15
      Mr. Shucet can pull up a project and see a number.
    • 03:30:18
      The same construction inspector or resident engineer out in the district would be able to see the same exact numbers and we've never had that tool before.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:30:28
      This is a new program that's been developing.
    • 03:30:32
      I guess this is being implemented right now, being used right now.
    • Barbara W. ReeseChief Financial Officer
    • 03:30:35
      It's being tested, I believe.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:30:37
      Yeah, it's still being tested.
    • 03:30:39
      I mean, we literally pulled it, initially pulled it together over the period of a week.
    • 03:30:48
      Some software that can reach out into all of our other systems and pull information together at one spot that talks about schedule, budget, number of work orders, and add date.
    • 03:31:01
      Pretty simple.
    • 03:31:03
      I wanted it in a fashion that, just as Ms. Reese said, what I'm looking at is the same thing that the resident engineer or construction inspector is looking at.
    • 03:31:15
      So there's none of this, you know, I don't understand what it says or I've got to have a book this big to look at.
    • 03:31:22
      It's still being tested because I want to make sure the data is good, but when I say the flawless execution of the program, this is going to be a pretty third grade level tool that we're going to be using to know whether or not we're coming through.
    • 03:31:41
      Now, a lot of the projects in there
    • 03:31:46
      you know I guess we could we could kind of cheat and say well we're all new so let's start everything off green you know no matter where it is kind of I think going to fall down on the side of not doing that there are certain projects in there that will be completed over the next 12 months that are already over the budget are already behind and in spite of
    • 03:32:09
      III, John H. W. B.
    • 03:32:26
      I had hoped we would be able to wipe off the under-construction July 1, but I believe it's premature.
    • 03:32:33
      It will be by August 1.
    • 03:32:35
      I mean, all the final decisions about parameters we're going to use to measure ourself will be done.
    • 03:32:41
      The data's largely been tested already.
    • 03:32:44
      The district folks
    • 03:32:46
      have done just a yeoman's effort in terms of getting in and updating information.
    • 03:32:52
      You know, if leaders don't send a message that information is important, it's not too hard to figure what comes after that.
    • 03:33:00
      Information is generally not any good.
    • 03:33:02
      Then every time you ask a question, you've got to talk to 15 people to try to update information.
    • 03:33:08
      Folks have gone through and just done a wonderful effort, made a wonderful effort of updating information.
    • 03:33:14
      It's new.
    • 03:33:14
      It's something that I think we thought about showing at this board meeting, but I think we'll show it in July.
    • SPEAKER_12
    • 03:33:22
      Can we copyright it?
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:33:25
      I think this tool sounds like it's a great tool for everybody to use.
    • 03:33:32
      I guess who's the one that's responsible to actually input the changes?
    • 03:33:38
      Everybody's got the same information, but you don't want everybody changing it.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:33:41
      No, we're working our way through that and getting that to the closest source, where the information originates and then who's accountable for updating it.
    • 03:33:53
      I actually believe we have a sheet in the dashboard, and you can stop by my office and we can look at this just real closely, give you an idea of what it looks like, some of the information in there.
    • 03:34:04
      I think we've got a few things to finish in that regard.
    • 03:34:07
      I've actually asked folks this morning for a report by Friday of all outstanding issues, all outstanding decisions that need to be made.
    • 03:34:16
      and I'll have that on Friday and by the end of the day, Monday or Tuesday, I'll assure you that any outstanding decisions that need to be made will be made.
    • 03:34:26
      That'll give us one month of kind of making sure we're doing the right thing and then it'll be
    • 03:34:33
      It'll be out there for people to see and use.
    • 03:34:39
      I was pretty damn impressed, to tell you the truth, with where we were and where we've come in 60 days.
    • 03:34:48
      It's pretty amazing.
    • Barbara W. ReeseChief Financial Officer
    • 03:34:53
      I'll go quickly through the last two slides because I know it's been a long morning.
    • 03:34:58
      The next big issue is cost estimating.
    • 03:35:00
      The two most critical issues are cost estimating and debt management.
    • 03:35:06
      For cost estimating, Commissioner Shucet has put in place a mechanism, if you recall, during the 2002 General Assembly.
    • 03:35:15
      There was a report that indicated the costs were above from contract award to actual award were 117% higher than anticipated at preliminary engineering and then when that review was expanded to include three years of data versus six months of data that 117% did drop to 86% higher.
    • 03:35:39
      Commissioner Shucet has made it very clear that that's still not an acceptable number by any stretch.
    • 03:35:43
      and he has convened a work group to review and analyze project debt summating process and that final report is expected this fall.
    • 03:35:52
      And lastly on debt management, the FRAN debt service issue we just walked through is one of many issues in this area.
    • 03:35:59
      There's work that needs to be done on many levels, technical, including staffing, funding utilization, meaning for example the Route 58 fund was
    • 03:36:08
      allowed to bill to $150 million when there were projects that were ready to have work done on them that that money could have been used on that's been remedied to some degree but there's situations like that you hear about more later and then also the appropriate use of debt and that's not just friends it's all the types of debt and then what should be long-term policy in this area.
    • 03:36:28
      The plan right now in three days is that from what we can tell is to address all those levels simultaneously because one feeds off the other with policy recommendations by December of 2002.
    • 03:36:39
      Thank you for your patience and we'll be around for the next few hours before two o'clock to answer any questions.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:36:47
      You know, one of the, having gone through this whole presentation, there's obviously a lot of interaction between different government bodies.
    • 03:36:58
      The one thing that seems to be prevalent is that you never know from year to year where you may stand.
    • 03:37:04
      We can do our best estimates, but times change and of course policies will change, revenues picture change.
    • 03:37:12
      You could get rated, you may not get rated, but there's a lot of unknowns.
    • 03:37:16
      and you're trying to develop a plan of six years it's really in some cases hit or miss sometimes about how you project revenues that's why you do it once a year but there's always an expectation from people both in the political world and the real world citizens about what this plan could be and I really think it's up to us to try to I don't know what the answer is
    • 03:37:39
      to figure out a way to have more reliable sources of capital both from a maintenance side but also from a capital side.
    • 03:37:49
      I still believe, and I know there's a lot of issues with it, is the PPTA process.
    • 03:37:55
      There's some lessons learned from that.
    • 03:37:57
      This is the 28 experience, for instance.
    • 03:37:59
      If it had not been for a lot of the 911 incidents and the Enron issues, maybe that district would have been able to float bonds at an investment-grade rating, in which case we wouldn't have to worry about localities or state government doing some kind of enhancements, which may count against debt service of the states.
    • 03:38:22
      They have a revenue source independent of the states.
    • 03:38:25
      Unfortunately, we had to do moral obligations to sort of enhance those revenues.
    • 03:38:30
      But I think there's billions of dollars worth of proposals and finding a way to give them a revenue source that they can do their own debt capacity and own revenue to build their own facilities.
    • 03:38:43
      And that's one concept that works anywhere in the state.
    • 03:38:48
      And I don't know where we're at in some of those ideas.
    • 03:38:50
      Just a general statement I had.
    • SPEAKER_20
    • 03:38:52
      I would like to thank you and the staff for this presentation.
    • 03:38:57
      It's been very beneficial to me.
    • 03:39:00
      While I understand there's still much work to be done, I think it was a wonderful presentation.
    • 03:39:06
      Thank you.
    • 03:39:06
      They worked very hard.
    • 03:39:07
      All of you for the work put into this.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:39:11
      Thank you.
    • 03:39:14
      I think dashboard is the most critical thing this agency can do.
    • 03:39:22
      The problems we have here are not revenue problems.
    • 03:39:28
      You know within very clear parameters what your revenues are going to be in any given year if you look at them honestly.
    • 03:39:40
      What's been killing us is the cost of the projects and the estimating of them.
    • 03:39:46
      The commission I chaired went into that in great detail.
    • 03:39:51
      If we can get our arms around that, and I don't know what an acceptable rate is, I don't know if it's 10, 20, 30, 86, or whatever, but if we can do that, we will go a long way towards solving the fundamental structural problem that we currently have.
    • 03:40:14
      The other thing I'd like to say is all of this has been recorded today.
    • 03:40:20
      It might be good when a new member comes on the board if they're given this book and a tape of this.
    • 03:40:29
      I wish I had had it when I came on the board in July of 98.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:40:35
      One of the things we've talked about, and actually it just occurs to me that Barbara hadn't been in on this discussion, was to take a presentation similar to this and even make it available over the Internet, not for just new members, but for some of us who might like to refer to it from time to time.
    • 03:40:58
      We have discussed that, and I agree with you.
    • J. Kenneth KlingeMember, Commonwealth Transportation Board
    • 03:41:01
      Maybe we could send it to the members of the General Assembly also.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:41:05
      They may get widely available.
    • SPEAKER_12
    • 03:41:10
      In the same vein, I see we have our PR people here with us today and this is something that again has been talked about over a period of years is to try to come up with pieces, something that the general public
    • 03:41:28
      can pick up and read in a fairly brief amount of time and get some degree of understanding and I again think this is a wonderful book and I would hope that at some time in the future the PR division can work with the financial division to put together something that can be accessible to the general public
    • 03:41:52
      to help them get on board decisions were made and where the control is and where it isn't.
    • Leonard S. "Hobie" MitchelMember, Commonwealth Transportation Board
    • 03:41:59
      On Kenny's comment, I agree.
    • 03:42:03
      The short-term problem is how we organize things, the estimating and project costs, those kind of things.
    • 03:42:11
      I think those are short-term.
    • 03:42:12
      But I do believe we still have a long-term, the longer-term problem is consistent revenue sources.
    • 03:42:17
      We're using FRANS today to cover some of those capital improvement problems.
    • 03:42:23
      If it wasn't for the FRANS, this plan would be substantially reduced.
    • 03:42:28
      And I do believe that we have to look at some other, and I don't know what the answer is, there's many ideas out there, and frankly I think consumer habits will change.
    • 03:42:40
      A lot of our revenue is based on the gas tax revenue.
    • 03:42:43
      I'm not sure that's in the long term, is that going to be the best reliable revenue?
    • 03:42:47
      Over time, if you look at it, I went back for several years, over time the gas tax revenue as a percentage has gone down.
    • 03:42:57
      I don't know what the answer is, but I do believe long-term we have to look at sources of revenue to keep up with the demand for transportation needs.
    • Philip A. ShucetVice Chair, Commonwealth Transportation Board
    • 03:43:16
      There's no question that the needs, we know what direction the needs are headed in.
    • 03:43:21
      And you made a comment earlier about PPPAs.
    • 03:43:24
      I completely support the idea of working with the private sector in finding true innovation.
    • 03:43:34
      I'm not particularly a fan of somebody telling me how they can spend my money faster, and I shouldn't say our money faster, but I still have to pay back.
    • 03:43:46
      I haven't found the innovation that I'm looking for yet, and we're going to be working hard.
    • 03:43:55
      We do have lunch in the third floor conference room and then we can readjourn, regroup here at two o'clock.
    • 03:44:08
      Let's roll.