Architectural Review Board Meeting   10/5/2026

Attachments
  • Agenda.pdf
  • Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB-2026-16 Flow Pre-Owned Staff Report.pdf
  • Attach. 1 ARB-2026-16 Flow Pre-Owned Architectural Drawings.pdf
  • ARB-2026-00014 Airport Road Self Storage Work Session Memo.pdf
  • Attach 1 ARB-2026-00014 Airport Road Self Storage September 14, 2026, Action Letter.pdf
  • Attach 2 ARB-2026-00014 Airport Road Self Storage Revised Drawings to address September 14 issues.pdf
  • Attach 3 ARB-2026-00014 Airport Road Self Storage August 24, 2026, Staff Report.pdf
  • Attach 4 ARB-2026-00014 Airport Road Self Storage September 14, 2026, Staff Memo.pdf
  • Draft ARB Action Memo Minutes 09_14_2026.pdf
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:05
      OK, we are now live.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:06
      All right, great.
    • 00:00:07
      It's, I don't know, 107 by my watch.
    • 00:00:11
      So I'm calling the October 5, 2026 meeting of the Albemarle County Architectural Review Board to order.
    • 00:00:19
      Could you call the roll, please?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:21
      Yes, Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:23
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:24
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:25
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:25
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:27
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:27
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:29
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:29
      And Mr. Stoner is absent.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:32
      Thank you.
    • 00:00:34
      Do any ARB members have anything to disclose?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:00:38
      No.
    • 00:00:39
      Yes.
    • 00:00:39
      I will need to recuse myself from the work session item.
    • 00:00:45
      Airport storage site plan.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:49
      All right.
    • 00:00:50
      I don't have any disclosures.
    • 00:00:51
      So today's meeting is a hybrid meeting.
    • 00:00:55
      The public may access and participate in the meeting electronically.
    • 00:00:59
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:01:04
      The public has real-time audio-visual access to this meeting over Zoom and real-time audio access over telephone, both as provided in the Lawfully Posted Meeting Notice.
    • 00:01:14
      This meeting is being recorded and will be made available on the county's website calendar.
    • 00:01:19
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:24
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:01:30
      Applicants who are making presentations note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:37
      Staff will let you know when the 15 minutes are up.
    • 00:01:40
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:01:48
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:01:56
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:01
      No one online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:05
      All right.
    • 00:02:07
      Would anyone like to pull the minutes off the consent agenda?
    • 00:02:12
      No.
    • 00:02:14
      In that case, I move to approve the minutes of the September 14th, 2026 ARB meeting.
    • 00:02:20
      Second.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:23
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:24
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:25
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:26
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:27
      Mr. Hancock?
    • 00:02:28
      Aye.
    • 00:02:29
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:30
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:30
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:31
      Thank you.
    • 00:02:31
      We have one regular review item today, which is ARB 2026-15 flow Toyota pre-owned sales conceptual advisory review.
    • Khris TaggartSenior Planner
    • 00:02:49
      Good afternoon.
    • 00:02:50
      The application I'm presenting today is a preliminary review of the renovation design submitted for the Zisting Flow Mercedes Building.
    • 00:02:59
      The site is located on Route 250 between Flow Toyota and the former Honeycar dealership.
    • 00:03:07
      The ARB has approved several applications for the site, including ARB applications for the original design in the building, building renovations, and signage.
    • 00:03:15
      ARB has also denied an application in 2012 due to the incompatibility of the proposed design.
    • 00:03:24
      The existing Mercedes building is a one-story structure with a showroom in the front and a service area in the rear.
    • 00:03:32
      The proposed changes focus solely on the showroom.
    • 00:03:37
      The proposed renovation removed the existing gable and accent window from the facade and replaced a large entrance element consisting of opaque white spandrel gas and red, silver and red ACM panels and painted the existing brick, ephus and accent gray.
    • 00:03:58
      The proposed entrance element design mirror is the one approved for the adjacent Toyota Sew Room in 2012, while this element aligns well with Toyota's building's horizontal rhythm and flat roof.
    • 00:04:12
      The element applied to the Mercedes building clashes with existing roof forms and façade detailing, disrupting the existing architectural harmony.
    • 00:04:21
      The use of monochromatic grey paint serves to emphasize corporate identity, reducing the entrance element's height to align with the cornice line, coordinating framing with the façade divisions, and retaining the red brick can better integrate the element into the building.
    • 00:04:39
      while reflecting local historic architecture.
    • 00:04:44
      Staff recommends the changes listed in the staff report to be reviewed by the ARB at a future meeting.
    • 00:04:50
      I'd be happy to try to answer any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:04:54
      All right.
    • 00:04:55
      Thanks a lot, Chris.
    • 00:04:57
      We'll start with Dade if you have any questions.
    • 00:05:00
      Thanks for your report, Chris.
    • 00:05:01
      No questions.
    • 00:05:02
      Frank?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:05:04
      I don't have any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:05:05
      Thanks, Chris.
    • 00:05:06
      Taro?
    • 00:05:07
      No, no questions.
    • 00:05:08
      Thank you.
    • 00:05:09
      Yeah, sorry, Chris.
    • 00:05:09
      I don't have any questions either.
    • 00:05:12
      So if the applicant has a presentation.
    • SPEAKER_03
    • 00:05:15
      No presentation today.
    • 00:05:17
      My name is Evan Phillips with Design Develop, standing in for Kevin Shaffer.
    • 00:05:20
      As always, we appreciate staff comments and understand the comments in relation to the design guidelines.
    • 00:05:28
      We're just eager to hear the board's discussion more than anything and have comments moving forward so that we can address them adequately.
    • Chris HenningsenChair, Architectural Review Board
    • 00:05:37
      All right.
    • 00:05:38
      Thanks a lot.
    • 00:05:38
      Well, I guess we'll start with questions and then we'll go into discussion.
    • 00:05:46
      I guess we'll start with Frank, do you have any questions?
    • 00:05:49
      I don't, thank you.
    • 00:05:51
      Tara?
    • Taro MatsunoMember, Architectural Review Board
    • 00:05:54
      Can I ask, so it looks like the front facade is basically in plane with the existing building and then it doesn't, at the parapet, it doesn't like, it doesn't turn back and meet the roof.
    • 00:06:09
      Is that correct?
    • SPEAKER_03
    • 00:06:10
      That's correct as designed the parapet would extend up above as a parapet and be more like a shield in the front.
    • Taro MatsunoMember, Architectural Review Board
    • 00:06:19
      Okay and then I know that this is like an early conceptual design for comment but did you think about how like the roof would drain and if downspouts and that sort of thing would be a part of the proposal as viewed from the street as well like are there certain existing gutter for instance on the
    • 00:06:41
      hiproof that would take it to some other point?
    • SPEAKER_03
    • 00:06:45
      It's a great question.
    • 00:06:46
      I believe adjacent to the shield, existing gutters would be preserved as much as possible behind the shield.
    • 00:06:54
      I imagine a cricket would be added and we would drain on either side.
    • 00:07:00
      But it is a preliminary design, so we hadn't gotten that far.
    • Taro MatsunoMember, Architectural Review Board
    • 00:07:03
      Yeah, cool.
    • 00:07:04
      Thank you very much.
    • Chris HenningsenChair, Architectural Review Board
    • 00:07:08
      Dade, any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:07:11
      Sure.
    • 00:07:11
      I guess prompted in part by Taro's question and response, is there room on site to move the shield element forward so it is not directly engaged with the building?
    • SPEAKER_03
    • 00:07:26
      I'm unsure.
    • 00:07:26
      I'd have to get back to you on that one.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:07:28
      Thank you.
    • SPEAKER_03
    • 00:07:29
      No other questions.
    • 00:07:30
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:07:31
      All right.
    • 00:07:32
      I don't have any questions.
    • 00:07:34
      So are there any members of the public that want to make a comment?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:07:39
      No, sir.
    • Chris HenningsenChair, Architectural Review Board
    • 00:07:40
      All right.
    • 00:07:42
      So in that case, ARB will now go into discussion.
    • 00:07:45
      I guess we'll start with Taro if you have any comments.
    • Taro MatsunoMember, Architectural Review Board
    • 00:07:49
      Yeah, thanks.
    • 00:07:51
      I'm curious to hear what my other board members think.
    • 00:07:55
      I think in ways, like if you were proposing to build that facade at the scale of the entire building, I don't think that there's any really issue with it.
    • 00:08:09
      I think the question is just the integration of it with the existing building.
    • 00:08:16
      and I think that that's the part that's a little trickier for me.
    • 00:08:20
      You know, just because the original is pretty well resolved, if quite traditional, and I think like bridging that gap seems to be tough.
    • 00:08:34
      I think as a front elevation, I don't have
    • 00:08:41
      I think it's really more of it as a 3D object, because as I think Dade was gesturing towards, it is really like a facade applied to the face of the building.
    • 00:08:53
      And I am just curious to see how that would play out in three dimensions.
    • 00:09:00
      As far as like the color goes, I think that in this part of the corridor, there's precedent for non-white bricks.
    • 00:09:09
      I know that it would be a paint.
    • 00:09:12
      But I'm not opposed to the idea of changing the brick color to coordinate with branding.
    • 00:09:18
      And that the colors that are selected seem more or less in line with the range that's here on the corridor.
    • 00:09:26
      So I don't have particularly strong feelings at that.
    • 00:09:30
      It's really more about how this new element interfaces with the rest of it.
    • 00:09:37
      That's the question for me.
    • 00:09:39
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:09:40
      All right.
    • 00:09:40
      Thanks, Frank.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:09:42
      Yeah, I agree with Taro and what is in the staff report.
    • 00:09:50
      I think they're just kind of two unrelated entities.
    • 00:09:55
      It's like it was just kind of pasted on the front facade.
    • 00:10:02
      You know, this new element is contextual and would make sense, but not kind of applied to this
    • 00:10:11
      Building.
    • 00:10:13
      So yeah, I think as it is, it's not kind of an appropriate condition in the entrance corridor.
    • 00:10:21
      And I think you've gotten kind of the feedback from staff and I think it's more, you have to investigate one or the other kind of this traditional building that exists.
    • 00:10:36
      or how does it become this contemporary facade that's related to the other flow building that is more of the kind of corporate architecture but has already been approved and lives in the corridor.
    • 00:10:57
      So look forward to seeing the next iteration.
    • 00:11:03
      I know it's,
    • 00:11:05
      It might be a challenge, but I think hopefully you've gotten the feedback or you'll get some additional feedback, but make it appropriate.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:11:16
      Okay.
    • 00:11:16
      Thank you, Brian.
    • Chris HenningsenChair, Architectural Review Board
    • 00:11:18
      Thanks, Dade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:11:18
      Oh, yeah.
    • 00:11:20
      Thanks, Chris.
    • 00:11:21
      I appreciate.
    • 00:11:22
      The comments in the staff report appreciate my colleagues' comments.
    • 00:11:25
      I think it is an interesting situation.
    • 00:11:28
      I agree generally, you know, it's not, it doesn't create a cohesive overall whole with the existing architecture that's there.
    • 00:11:35
      Certainly, like if it were proposed as a new building with this element, it would not make any sense to me as a condition.
    • 00:11:42
      It is somewhat interesting and mitigated for me by the context of the adjacent dealership
    • 00:11:52
      and effectively the language that establishes.
    • 00:11:56
      I think Taro's technical question raised for me the question of separating it.
    • 00:12:03
      And I don't know whether they're in the same way that folks approach historic buildings by trying to make clear any additions as additions or changes as being reversible.
    • 00:12:13
      I don't know whether there might be a narrow path if it became a more distinct element that was not
    • 00:12:21
      Directly attached to the building that might somehow allow the disharmony of the elements to be at least perhaps more intentional and clear.
    • 00:12:37
      I think similarly, to the extent the Gable expression remains in the other portions of the building, it makes this less harmonious with those.
    • 00:12:48
      So could there be a path where
    • 00:12:54
      This element is not as foreign because those other elements are no longer there.
    • 00:12:57
      I don't know, but just speculating.
    • 00:13:00
      But I agree that as presented, I don't know that it really aligns enough with our guidelines.
    • Chris HenningsenChair, Architectural Review Board
    • 00:13:08
      All right, thanks.
    • 00:13:09
      Yeah, I agree with what's been said.
    • 00:13:11
      I thought separating the new element was a great suggestion, too.
    • 00:13:16
      But I think what's presented here is either
    • 00:13:21
      Too much of an intervention or not enough of an intervention depending on how much you want to respect the existing fabric of that building.
    • 00:13:34
      which is totally unlike everything else that Flow owns on that card or so I can see how you'd want to depart from what's there now.
    • 00:13:45
      But this is kind of like, they're not enough for too much in my opinion.
    • 00:13:50
      So I guess we don't, do we have a recommended motion in this case?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:14:08
      Thank you all for the comments.
    • 00:14:23
      Thank you.
    • 00:15:05
      Just want to make sure.
    • 00:15:40
      Has it worked earlier?
    • 00:15:40
      Fine.
    • 00:15:54
      You can go ahead and have a seat.
    • 00:15:56
      You're done.
    • 00:15:57
      Thank you all again.
    • Taro MatsunoMember, Architectural Review Board
    • 00:15:58
      Thank you.
    • 00:15:59
      Thank you.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:15:59
      I don't know.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:26
      Make sure you're paying attention.
    • Margaret MaliszewskiPlanning Manager
    • 00:16:47
      Okay, so sorry about that.
    • 00:16:49
      More technical difficulty.
    • 00:16:52
      The suggested motion is to move to provide the applicant with the comments that are listed in the staff report for review at the future ARB meeting.
    • Taro MatsunoMember, Architectural Review Board
    • 00:17:14
      I guess my only comment is I don't totally just I don't really disagree with the staff comments but I just wonder to Chris's point like either more or less I feel like if they choose the more option do these the comments don't really seem to capture that like if they were to for instance demolish a substantial portion and do it in that style
    • 00:17:40
      then it wouldn't really make sense to align that entrance element to the cornice line or coordinate with the existing divisions per se.
    • 00:17:48
      So I'm just trying to think of how we can communicate that.
    • Chris HenningsenChair, Architectural Review Board
    • 00:17:53
      I think, personally, I think if we had considered to the prescriptive kind of comments, some of them we could just leave as is, but the other ones that are kind of specific,
    • 00:18:05
      If we added a consider, I mean, we're definitely going to be seeing it again.
    • 00:18:09
      So I think we have an opportunity to weigh in a second time, at least.
    • Margaret MaliszewskiPlanning Manager
    • 00:18:16
      It looks like maybe adding consider to the beginning of numbers one, two, and three.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:18:20
      Yeah.
    • 00:18:23
      Yeah.
    • Taro MatsunoMember, Architectural Review Board
    • 00:18:30
      And then hopefully our conversation adds to this.
    • 00:18:32
      It's just as far as what officially goes out.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:18:47
      But I agree with the way you expressed it, Chris, that either more of an intervention that is consistent or less of one that's consistent with the current fabric.
    • Taro MatsunoMember, Architectural Review Board
    • 00:19:24
      Do we need anything else, or do we want to consider revising the building according to the comments in our meeting, something like that?
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:10
      Okay, any other tweaks or anything?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:20:13
      No.
    • Taro MatsunoMember, Architectural Review Board
    • 00:20:16
      I'll make a motion to provide the applicant with the comments listed in the staff report amended as follows.
    • 00:20:23
      To add consider revising to items one, two, and three, and to add item 10 to consider revising the building design based on the comments in our conversation.
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:32
      I'll second that.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:20:38
      All right, Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:40
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:20:40
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:42
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:20:42
      Mr. Matsuno?
    • 00:20:43
      Aye.
    • 00:20:44
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:45
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:20:45
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:45
      All right, thank you.
    • 00:20:48
      All right, we have one work session item today, which is ARB 2026-14, airport road self storage.
    • Margaret MaliszewskiPlanning Manager
    • 00:21:19
      Now it's working.
    • 00:21:23
      Okay.
    • 00:21:24
      You've seen this proposal a couple of times.
    • 00:21:26
      It is a proposal to construct a self-storage facility and associated site improvements.
    • 00:21:31
      It's located at the northeast corner of Airport Road and Timberwood Boulevard.
    • 00:21:36
      You first reviewed the proposal in August of this year.
    • 00:21:39
      At that time, you directed the applicant to return for a work session to resolve four issues with the design, and those issues were related to the block detail at the windows, the spandrel glass, the roof line, and the horizontal lines throughout the design.
    • 00:21:53
      You reviewed revisions to address those four items on September 14th.
    • 00:21:59
      At that time you asked for three changes to the revised design and the applicant has made changes to address them.
    • 00:22:06
      In this slide and the next, the top image is the design you reviewed in September and the current revision is on the bottom.
    • 00:22:14
      In September, you wanted the blue ephis detail on the towers to be revised to a color that is more consistent with the primary color palette of the building.
    • 00:22:22
      In this revised design, the blue ephis detail on the towers has been deleted.
    • 00:22:27
      In September, you also asked for the crenelation detail at the base of the building to be reconsidered for greater simplicity.
    • 00:22:34
      That detail has also been eliminated.
    • 00:22:36
      The horizontal line in that area is now consistent across the building.
    • 00:22:41
      The third item from September was to consolidate materials to further simplify and harmonize the design and that's been done in this revision by replacing the masonry at the base of the eastern end of the entrance quarter elevation with metal to match the western end and by revising the gray ephus at the eastern end to light stone metal panel to match the center of the western end.
    • 00:23:06
      At the September meeting, there was discussion about the proposed colors and you looked at the physical samples of the proposed materials and those samples are behind you on the stage if you want to see those again.
    • 00:23:15
      There was a request to provide the missing metal sample for the even downspout.
    • 00:23:20
      The colors are now identified as light stone and ash gray.
    • 00:23:25
      for which we have samples.
    • 00:23:27
      The applicant has clarified that the standard gutter and downspout for the building will be in light stone color.
    • 00:23:33
      The gutter and downspout on the part of the building that has the ash gray, eave, and rake trim will have ash gray downspouts.
    • 00:23:41
      There are two new colors in the proposed palette.
    • 00:23:43
      They're Iron Mountain and Silver Fox.
    • 00:23:46
      Iron Mountain is the Ephis color at the top of the towers, and Silver Fox is the accent color in the towers.
    • 00:23:53
      I've included snips of those colors on this side, and again, there are samples there on the stage behind you.
    • 00:24:01
      At the end of the September meeting, I noted that images of wall-mounted light fixtures had been included in the revised drawings, and I noted that they were not full-cutoff fixtures.
    • 00:24:09
      Full cutoff is the preference for all fixtures in the entrance corridors, even those emitting less than 3,000 lumens, so we recommended that alternate fixtures be chosen.
    • 00:24:18
      So with those most recent revisions, our recommendation is for approval of revised design with the remaining minor revisions to the site plan left from the previous review, including an updated one related to the wall fixtures.
    • 00:24:33
      Happy to try to answer any questions you have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:24:35
      All right.
    • 00:24:35
      Thanks a lot, Margaret.
    • 00:24:37
      We'll start with Dave if you have any questions.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:42
      Thank you for your report, Margaret.
    • 00:24:43
      No questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:24:45
      Tara?
    • 00:24:46
      I don't have any questions.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:25:12
      Chris, if you would like to speak, please unmute yourself.
    • 00:25:15
      And if you have anything to add or let us know.
    • 00:25:23
      Can you hear me?
    • 00:25:29
      I can't hear you.
    • SPEAKER_05
    • 00:25:31
      Hi, are you able to hear me now?
    • 00:25:41
      I appreciate the presentation, Margaret.
    • 00:25:55
      I think that covered all of the major changes that we made in keeping with corrections from the September meeting.
    • 00:26:06
      I would, I guess just a couple of minor changes that we made in addition to those that were already articulated.
    • 00:26:15
      One is that if you're looking, if you all look back at the second slide that shows the before and afters, at the western end of the entrance corridor facing the facade where we eliminated the crenellations from the bottom portion of that, of the western end of the facade,
    • 00:26:36
      We also reorganized the number and distribution of downspouts.
    • 00:26:44
      So there's fewer of them being shown and more consistently reflect the pattern that is on the eastern end of the facade.
    • 00:26:53
      So there's just, you know, from one end to the other, just a more consistent sort of rhythm of those downspouts.
    • 00:27:02
      And then
    • 00:27:04
      Second minor change that we incorporated in addition to the more major changes was that we were previously calling out for a Caribbean blue in the early iterations.
    • 00:27:19
      It was a pretty prominent color within the composition.
    • 00:27:25
      And in the last version, it was really just at the office area that was not visible from the entrance corridor.
    • 00:27:32
      but we revised that rather than showing the Caribbean blue to pretty intense blue, revised it to lunar eclipse which is illustrated in the various renderings and elevations.
    • 00:27:50
      It's just a little bit more muted, a little bit closer to a natural blue rather than the intense Caribbean blue.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:10
      All right, well, thank you.
    • 00:28:11
      I guess we'll see if any ARB members have questions for the applicant, starting with Dave, if you have any questions.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:28:20
      Thank you for continuing to work with the board and respond to comments.
    • 00:28:23
      No questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:25
      Tara?
    • Taro MatsunoMember, Architectural Review Board
    • 00:28:31
      Yes, I appreciate the applicant taking the time.
    • 00:28:36
      I think my only question is I'm looking at the submission now.
    • 00:28:39
      It looks like the corner tower, did the height of that brick masonry area change a little bit?
    • 00:28:49
      It looks like there's some slight, so that was moved down in order to match the height of that line in the metal panel, that horizontal trim piece that goes all the way around.
    • SPEAKER_05
    • 00:29:02
      Yes, that's correct.
    • 00:29:03
      So just further attempt to align, you know, a more consistent horizontal lines.
    • 00:29:10
      But also there was a comment at the last hearing that the design and articulation of that tower element wasn't quite, I guess, as successful, I think, was mentioned.
    • 00:29:25
      And so when we eliminated
    • 00:29:28
      The blue color at the center of those towers, just to balance things out a little bit more, I enlarged the white area and wanted to show the gray that is also located across the top of that white panel, just so that it pulled the whole detail down a little bit.
    • Chris HenningsenChair, Architectural Review Board
    • 00:29:58
      OK, thank you.
    • 00:30:00
      Thanks.
    • 00:30:01
      I don't have any questions for the applicant.
    • 00:30:03
      So the ARB will now go into discussion.
    • 00:30:08
      We'll start with Taro.
    • Taro MatsunoMember, Architectural Review Board
    • 00:30:10
      Thanks.
    • 00:30:11
      Yeah, I appreciate the applicants working with us on this.
    • 00:30:16
      I think it shows improvement since the original scheme.
    • 00:30:24
      And yeah, I just appreciate them coming back to us and working with us to find a way that this project can become more compatible with the entrance corridor.
    • Chris HenningsenChair, Architectural Review Board
    • 00:30:38
      All right, thank you.
    • 00:30:40
      Dade?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:30:41
      Yeah, thank you, Chris.
    • 00:30:42
      Thank you, Taro.
    • 00:30:43
      I agree with your observations.
    • 00:30:45
      And thanks to the applicant for working to advance the proposal.
    • Chris HenningsenChair, Architectural Review Board
    • 00:30:53
      And I totally agree.
    • 00:30:55
      I appreciate your willingness to work with us.
    • 00:30:59
      And I don't really have anything to add to that.
    • 00:31:03
      So if we could take another look at the recommended
    • Margaret MaliszewskiPlanning Manager
    • 00:31:09
      So rather than try to instigate another technical difficulty, I'm going to stay with this slide and just say that the recommendation is a motion to approve with the conditions now listed on the screen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:30
      I don't have any proposed changes to what's listed.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:31:33
      Nor do I.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:34
      On that case, I move to approve.
    • 00:31:39
      etc.
    • 00:31:44
      Second.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:31:46
      Mr. Van Der Werf.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:47
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:31:48
      Mr. Matsuno.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:49
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:31:50
      Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:51
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:31:51
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:52
      All right.
    • 00:31:52
      Thank you.
    • 00:31:56
      All right.
    • 00:31:58
      Do board members or staff have any other items?
    • Margaret MaliszewskiPlanning Manager
    • 00:32:03
      I do have one other business item for you.
    • 00:32:20
      There it is.
    • 00:32:28
      OK. We recently had a pre-application conference for a development on a portion of Block 6 in Old Trail.
    • 00:32:35
      Block 6 is marked with a red star in this image and Route 250 is at the bottom of the image.
    • 00:32:42
      Just zooming in a little more again, the red star is block six.
    • 00:32:45
      The entrance corridor is still at the bottom of the screen here.
    • 00:32:47
      Moving a little closer, you can see that the block is sort of in between the two traffic circles.
    • 00:32:56
      And this is a view from 250 looking into the old trail development.
    • 00:33:08
      Again, just moving a little closer, and those are the buildings that you were seeing from a greater distance at the entrance corridor.
    • 00:33:15
      And then looking off to the west, that is Block 6.
    • 00:33:22
      So in June of 2017, the ARB discussed that block layout of Old Trail to determine what level of review would be required for the various blocks based on the distance from the entrance quarter and the visibility.
    • 00:33:36
      This diagram shows what was decided.
    • 00:33:39
      The blocks colored purple here was decided would not need ARB review.
    • 00:33:45
      Orange blocks would require ARB review and yellow initial site plans would be reviewed by the ARB, but the final site plan would be a staff level review and block six fell into that last category.
    • 00:33:58
      But now that a large portion of the development has been constructed and it's easier to judge that resulting visual impact, we thought it best to revisit the decision on block six.
    • 00:34:10
      We think it won't be visible from the entrance corridor and we'd like to recommend that it be switched to the purple color, meaning that ARB review wouldn't be required.
    • 00:34:18
      We have a suggested motion if that's what you'd like to do.
    • 00:34:23
      You can go back through any of the images and try to answer any questions that you might have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:34:32
      Based on my personal experience with that intersection, I agree.
    • 00:34:36
      I don't think it would be visible at all, but so I'm willing to support that and make a motion unless anyone has any objections.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:34:44
      No objection on my part.
    • Taro MatsunoMember, Architectural Review Board
    • 00:34:46
      Yeah, I think the I mean, only if the proposal is really tall or something, but it seems really hard to imagine.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:34:52
      It will be constrained to the same height as the other parts of the development.
    • 00:34:57
      It's three store.
    • Margaret MaliszewskiPlanning Manager
    • 00:34:58
      A block that is closer to the entrance corridor, just south of it, is much taller than the townhouses that are proposed, so I think even if it wasn't the townhouses and something else came in there that was taller, I think it'd still be fine.
    • Chris HenningsenChair, Architectural Review Board
    • 00:35:22
      In that case, I move to revise the 2017 determination regarding visibility of the Old Trail Village development to no longer require ARB review of Block 6.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:35:35
      I'll second.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:35:38
      Mr. Van Der Werf?
    • 00:35:39
      Aye.
    • 00:35:39
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:35:40
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:35:41
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:35:42
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:35:43
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:35:44
      Thank you.
    • 00:35:47
      All right, if there's no other items, the next ARB is scheduled for Monday, October 12th, 2026, which is next Monday.
    • 00:36:00
      Both of my sons have off from school on that day, so I don't know that I definitely cannot attend, but I'm kind of iffy on that.
    • 00:36:10
      Which day was that again?
    • 00:36:11
      Sorry.
    • 00:36:12
      Next Monday.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:36:14
      I currently plan to attend.
    • Taro MatsunoMember, Architectural Review Board
    • 00:36:16
      um that is a good question let us look at the school schedule yeah yeah county schools uh have monday and tuesday off and miller school at least has monday off i would put myself in the iffy camp with chris i didn't i i i think i should be able to attend but i i
    • 00:36:47
      is this new knowledge I can't wholeheartedly confirm.
    • Margaret MaliszewskiPlanning Manager
    • 00:36:51
      We do have two items on that agenda right now.
    • 00:36:54
      We'll check with the other members and we'll let you know what we find and if you find that you.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:37:00
      And just speculating, I think Frank Hancock also has children in the county schools.
    • Margaret MaliszewskiPlanning Manager
    • 00:37:09
      Okay, we'll follow up.
    • Chris HenningsenChair, Architectural Review Board
    • 00:37:11
      Thanks.
    • 00:37:12
      All right.
    • 00:37:13
      In that case, this meeting is adjourned until our next meeting, which may be on Monday, October 12th, 2026.
    • 00:37:22
      And it's 144 by my watch.
    • 00:37:25
      Thanks a lot.
    • 00:37:26
      Thank you.
    • 00:37:27
      Thank you.