Central Virginia
  • Albemarle County
  • Architectural Review Board Meeting 9/14/2026
  • Auto-scroll

Architectural Review Board Meeting   9/14/2026

Attachments
  • Agenda.pdf
  • Final Action Memo.pdf
  • Final ARB Action Memo Minutes.pdf
  • ARB-2026-00015 Parham Circle Self Storage staff report.pdf
  • ARB-2026-00015 Parham Circle Self Storage plans.pdf
  • ARB-2026-00014 Airport Road Self Storage Work Session Memo.pdf
  • Attach 1 ARB-2026-00014 Airport Road Self Storage August 24 2026 Action Letter.pdf
  • Attach 2 ARB-2026-00014 Airport Road Self Storage Sep 4 2026 Revised Drawings.pdf
  • Attach 3 ARB-2026-00014 Airport Road Self Storage August 24 2026 Staff Report.html
  • Draft Action Memo Minutes 09_08_2026.pdf
    • SPEAKER_01
    • 00:00:03
      You're not alive.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:04
      All right.
    • 00:00:07
      It's about 101 by Marwatch.
    • 00:00:12
      So I'm calling the September 14th, 2026 meeting of the Albemarle County Architectural Review Board to order.
    • 00:00:19
      If you could call the roll, please.
    • SPEAKER_01
    • 00:00:22
      Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:24
      Here.
    • SPEAKER_01
    • 00:00:24
      Mr. Hancock.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:25
      Here.
    • SPEAKER_01
    • 00:00:26
      Mr. Matsuno.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:28
      Here.
    • SPEAKER_01
    • 00:00:29
      And Mr. Van Der Werf.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:30
      Here.
    • SPEAKER_01
    • 00:00:31
      Mr. Stoner's not here.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:33
      All right, thanks a lot.
    • 00:00:35
      Do any ARB members have anything to disclose?
    • 00:00:38
      No.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:00:39
      No.
    • 00:00:40
      Yes, I will need to recuse myself from the work session item, Airport Road Self Storage.
    • 00:00:49
      The Foundation is an adjacent landowner, so got it.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:52
      Okay, thanks.
    • 00:00:53
      I don't have any disclosures.
    • 00:00:56
      So today's meeting is a hybrid meeting.
    • 00:00:59
      The public may access and participate in the meeting electronically.
    • 00:01:03
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:01:07
      The public has real-time audio visual access to this meeting over Zoom and real-time audio access over telephone, both as provided in the lawfully posted meeting notice.
    • 00:01:18
      This meeting is being recorded and will be made available on the county's website calendar.
    • 00:01:22
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:28
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:01:33
      Applicants who are making presentations note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:41
      Staff will let you know when the 15 minutes are up.
    • 00:01:44
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:01:51
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:02:00
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • SPEAKER_04
    • 00:02:07
      Yes, sir.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:09
      All right.
    • 00:02:11
      Would anyone like to pull the minutes off the consent agenda?
    • 00:02:15
      No, no, no.
    • 00:02:17
      In that case, I will move to approve the minutes from the September 8th, 2026 ARB meeting.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:02:24
      I'll second.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:27
      I'll put that to a vote.
    • SPEAKER_01
    • 00:02:29
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:30
      Aye.
    • SPEAKER_01
    • 00:02:31
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:32
      Aye.
    • SPEAKER_01
    • 00:02:32
      Mr. Hancock?
    • 00:02:34
      Aye.
    • 00:02:34
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:35
      Aye.
    • SPEAKER_01
    • 00:02:36
      Thank you.
    • 00:02:36
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:37
      All right, so we have one regular review item today, which is ARB 2026-15, Parham Circle self-storage.
    • Margaret MaliszewskiPlanning Manager
    • 00:02:52
      This is a proposal to construct a self-storage facility in the Mill Creek commercial area.
    • 00:02:58
      The site is located off of Parham Circle.
    • 00:03:00
      It's just southeast of the Avon Mill Creek intersection, and it's behind the Exxon gas station car wash and the Carter Bank.
    • 00:03:07
      Rezoning was approved in June of this year to amend the proffers to allow this facility in this location and special exceptions were approved to eliminate the step back requirement and to allow a setback reduction.
    • 00:03:20
      And staff has met with the applicant to discuss the proposed design also in June this year.
    • 00:03:27
      The parcel is mostly cleared and graded.
    • 00:03:29
      There are some remaining trees on the southeast and southwest sides.
    • 00:03:33
      The proposed building will be visible from the Avon Mill Creek intersection.
    • 00:03:37
      It will be seen above, beyond, and between the existing buildings.
    • 00:03:43
      Existing street trees along Avon Street significantly reduce views into the commercial area, particularly in the months when leaves are on the trees, but the view does open up in the winter months.
    • 00:03:56
      Adjacent parcels along the south side of the property are wooded and they provide additional screening from the south, but those parcels are not under the control of the applicant.
    • 00:04:06
      The proposed building is significantly larger in footprint, height, and general massing than the nearby buildings.
    • 00:04:13
      on the primary elevation, which is labeled as the east elevation in this slide.
    • 00:04:19
      It's the one facing Mill Creek Drive.
    • 00:04:21
      In that elevation, the mass of the building is broken up by dividing the length into five bays with alternating materials and details.
    • 00:04:28
      The windows, applied shutters, and alternating roof treatments create rhythm across the bays.
    • 00:04:35
      Proposed materials that would be visible from the entrance quarter include a Nichiha panel that is meant to resemble brick, as well as stucco and metal panels.
    • 00:04:44
      There is some discrepancy among the drawings and the materials legends regarding the colors of the metal and stucco.
    • 00:04:50
      Some suggest that the color palette trends more towards gray, others more towards white.
    • 00:04:55
      And the legend includes some materials that are not called out on the drawings.
    • 00:04:58
      So some clarification or correction is needed there.
    • 00:05:01
      And physical samples of the materials and colors are needed for review.
    • 00:05:05
      Although white is a color used in the surrounding buildings, it's not recommended for the storage building.
    • 00:05:11
      More muted tones would help mitigate the mass and scale.
    • 00:05:15
      Physical samples will be particularly important for the Nichihaw panel.
    • 00:05:19
      It's not clear how closely it resembles true brick, and that material will have some visibility from the corridor.
    • 00:05:27
      The shutters in the two largest building bays are applied ornament and windows for the building are proposed with a combination of vision glass and spandrel glass.
    • 00:05:36
      Distance from the entrance corridor street and the intervening development may help reduce the impact of the spandrel glass, but extensive use of spandrel glass has typically not been considered appropriate in the entrance corridors.
    • 00:05:49
      In this image, the circled windows are the ones proposed with the spandrel.
    • 00:05:53
      We've recommended that additional information be provided to show how that glass will have an appropriate appearance for the corridor.
    • 00:06:01
      The proposed building design does include long expanses of blank wall.
    • 00:06:07
      and there are walls that would be less visible or not visible from the corridor, but that lack of visibility relies on existing trees to remain both on and off site.
    • 00:06:17
      The applicant doesn't have control over the offsite trees and the plans don't show the content of the onsite wooded area.
    • 00:06:22
      So it isn't clear that the trees to remain are adequate to mitigate the blankness.
    • 00:06:28
      Drawings were submitted to show the line of sight to the building from various distances.
    • 00:06:33
      The concern is the visibility of rooftop equipment.
    • 00:06:36
      That equipment was not included in these drawings, so we need that to be added to show that it won't be visible.
    • 00:06:42
      And this is a review of a preliminary site and architectural design.
    • 00:06:47
      Looking ahead to future submittals, if the initial site plan is consistent with the plan included in this submittal, we recommend approval of that initial plan without any additional ARB review.
    • 00:06:57
      Regarding the architectural design, we recommend the changes listed in the staff report to be included in the next submittal for ARB review.
    • 00:07:03
      Be happy to try to answer any questions you have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:07:06
      All right.
    • 00:07:06
      Thanks a lot for that presentation, Margaret.
    • 00:07:08
      I guess we'll start with Dade if you have any questions.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:07:12
      Thank you, Margaret.
    • 00:07:13
      No questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:07:15
      Frank?
    • 00:07:17
      I don't have any questions.
    • 00:07:19
      Thanks, Margaret.
    • 00:07:20
      Tara?
    • 00:07:21
      No, no questions.
    • 00:07:22
      Thank you very much.
    • 00:07:23
      Yeah, I'm sorry.
    • 00:07:24
      I don't have any questions either.
    • 00:07:26
      If the applicant has a presentation.
    • Kevin SchaferStudio Director
    • 00:07:42
      Good afternoon, my name is Kevin Shaffer.
    • 00:07:47
      I am the Charlottesville Studio Director for Design Develop.
    • 00:07:51
      We are representing Live Oak Capital Partners and here is Steve Teter to represent the application as well.
    • 00:08:00
      In addition to the entrance corridor guidelines, which provide the design guidelines that we're ensuring that were appropriate, we have a couple of key points that I think help emphasize and ensure appropriateness in this location as well.
    • 00:08:13
      We have significant distance from the entrance corridor, and we also have the luxury of having a mature landscaping, particularly along the Avon Street, along the market, as well as existing buildings that are providing significant screening
    • 00:08:29
      The second point that we have is a ZMA process for a lot of those special exceptions that afforded significant work with the neighborhood, the Mill Creek residents.
    • 00:08:42
      Stephen mentioned up to six meetings with the Mill Creek residents through this process to ensure that they felt comfortable with the design and that that was cohesive with adjacent structures and appropriately contextual.
    • 00:08:56
      And so through that process, we were able to get a lot of
    • 00:08:59
      public feedback that might not be afforded from many other projects.
    • 00:09:04
      And then the third point here is just an emphasis on the entrance corridor facing facades to utilize high quality materials that do blend very well with the adjacent context and the adjacent structures.
    • 00:09:20
      Quickly, here's an aerial view from Google Earth that starts to talk about just the extent of the screening that we have here.
    • 00:09:28
      These are the mature landscape trees that county staff talked about along the entrance corridor.
    • 00:09:34
      Probably the area of most visibility would be in this intersection here where Mill Creek and Avon Street meet.
    • 00:09:41
      The proposed building is screened by Carter Bank, by the gas canopy covering, as well as the market itself and a car wash.
    • 00:09:51
      Significant distance is correct.
    • 00:09:54
      We're over 250 feet away from the entrance corridor in the closest location.
    • 00:10:01
      From the spot of the highest visibility, which would be the Avon Street and Mill Creek Drive intersection, we're 420 feet away.
    • 00:10:08
      And even if we were to consider coming down Mill Creek Drive, which is not an entrance corridor, it'd be 280 feet away and slightly uphill on that grade.
    • 00:10:19
      So as you're coming into town and if we consider entrance corridors, the goal of the entrance corridor is to mitigate the impact on visitors and residents traveling through Albemarle County.
    • 00:10:30
      I think a northbound view into town is very well screened.
    • 00:10:35
      We do have the luxury of the car wash here beside us as well as the market itself and then the gas station canopy.
    • 00:10:42
      I'm not sure when these trees were planted, but they're quite mature and they're quite dense.
    • 00:10:48
      And I think that's a success to the entrance corridor guidelines.
    • 00:10:53
      From this location, which is, I think, the
    • 00:10:55
      The most visible we are using this existing tree line that you can see over the gas canopy is sort of a reference point to start to try and figure out just how much of the building mass would be visible.
    • 00:11:07
      We do have the Carter Bank that's going to screen us and a lot of things in our foreground as we layer these views through.
    • 00:11:13
      And so as we were massing out our buildings and trying to determine how visible this project would be, we generated this rendering, which may be the first rendering to come to you that's actually underplanted instead of overplanted as I know you typically see.
    • 00:11:29
      So we thought we'd just do a quick material composite and show what we believe that to be.
    • 00:11:37
      Staff is correct in that the white coloring that was shown on our renderings was probably
    • 00:11:43
      a little bit too much sun exposure and would not necessarily be the intent.
    • 00:11:48
      We would look for a tan material that matches the adjacent Carter Bank.
    • 00:11:53
      And that's going to really help mute this building and not become this highlighter that sticks out above the Exxon gas canopy.
    • 00:12:02
      So we agree with that sentiment as well.
    • 00:12:06
      The parcel does have a significant amount of existing tree cover to remain as well as adjacent landowners.
    • 00:12:14
      Albemarle County,
    • 00:12:15
      and this land, which would be to the east and downhill.
    • 00:12:21
      And that is part of a firehouse buffer is how it's labeled in GIS.
    • 00:12:27
      This parcel that's directly behind the parcel would be owned by a company called American Wireless Towers, American Towers perhaps, and it's utility oriented owner.
    • 00:12:42
      That being said, there are some steep slopes around this area that are going to make development, future development challenging.
    • 00:12:49
      And we do have quite a significant tree buffer already on the parcel itself.
    • 00:12:56
      So as part of the ZMA application, this drawing was submitted by Timmons Group, which shows the existing tree buffer
    • 00:13:04
      coming along the south facade here, the south boundary of this parcel, as well as the east boundary of the parcel.
    • 00:13:11
      You can see on this map here that we have about 20 to 25 feet of grade change that's happening along this hillside right here, making development significantly challenging and also very effectively screening the rear facade.
    • 00:13:29
      And then on this side, it's a similar situation where we're actually dropping 25 feet, which would make development on either side of this tree line here very, very challenging and encourages us to preserve and protect those existing trees simply because it's not particularly usable land.
    • 00:13:51
      So when we overlay our building footprint, I don't believe an existing tree is to be removed.
    • 00:13:57
      We'll certainly clarify that in our final submission, but it does work.
    • 00:14:02
      The building form itself is situated such that it does not impact that existing tree line significantly and stays out of those very intensive grading areas.
    • 00:14:17
      So we're confident that the rear of the building will be very, very well screened.
    • 00:14:21
      We're confident that the front of the building is visible, but only limited visibility because it's getting screened through so many existing landscaping and structures.
    • 00:14:36
      Making sure that we're contextual, that we're being sympathetic to our adjacent structures and relating to those is something that became very important for the residents and became very important for the ownership group.
    • 00:14:48
      Obviously we have a pretty unified material palette in this area, in this neighborhood.
    • 00:14:53
      A lot of red brick.
    • 00:14:55
      There's some tan stucco or tan eifs.
    • 00:14:58
      There's some dark metal panels that you can see either as wall panels or in roof panels here and here or from Monticello High School.
    • 00:15:08
      So there's a pretty cohesive material palette that's being employed in this region and now it's
    • 00:15:15
      The first step to ensuring that this was contextual and appropriate.
    • 00:15:20
      And so I think if we start to apply those materials and consider the existing screening, this becomes a very appropriate building for this location and a very appropriate use for this location sort of tucked behind a more prominent use of a bank and then the service station.
    • 00:15:40
      I did want to note the white panels are not part of this project.
    • 00:15:46
      They were a previous study that then was left on this rendering.
    • 00:15:52
      So staff is correct in calling that out.
    • 00:15:54
      And we'll go ahead and clean up those elevations for our future submission.
    • 00:15:59
      It's a much more tan and earth tone, stucco field color that would
    • 00:16:07
      that would be related to the Carter Bank tan, as I mentioned.
    • 00:16:12
      The strategy of the building, as Steph mentioned, is this five bay sort of rhythm that is generated.
    • 00:16:18
      The brick material extends up on each wing and in the middle to mark the entrance.
    • 00:16:25
      And then that allows for the middle base to sort of recess into the background a little bit.
    • 00:16:31
      I know there are questions about the Nichiha panel and we are certainly happy to provide samples of those at the final submission.
    • 00:16:41
      I did want to provide some examples of what that Nichiha looks like.
    • 00:16:45
      This is portfolio images from their website.
    • 00:16:49
      I am not sure if there's buildings that have used it in this area, but we will certainly reach out to our vendor and try and track those down so that county staff and board members can go and take a look for themselves.
    • 00:17:01
      We like Nichiha as a product.
    • 00:17:03
      It is a 5 eighths inch dimensionally stable composite material.
    • 00:17:09
      It has enough depth in it to actually get some real reveal in a grout line.
    • 00:17:14
      But it's also very dimensionally stable.
    • 00:17:16
      It's low maintenance.
    • 00:17:18
      It holds up very well.
    • 00:17:19
      And you see it on a lot of commercial products for those reasons.
    • 00:17:26
      The line of sight, we are happy to add the mechanical units to this diagram, but I did want to sort of reiterate that we certainly believe those are not going to be visible.
    • 00:17:41
      for a few reasons.
    • 00:17:42
      One is they're very small mechanical units.
    • 00:17:45
      So instead of a single, you know, eight foot tall by 12 or 16 foot long RTU unit, there's a collection of these sort of very small four ton condenser units on the roof.
    • 00:17:59
      And the other reason is they're quite set back from the roof edge itself.
    • 00:18:04
      We do have the luxury of parapets in some locations,
    • 00:18:08
      You can see it in this image, which is an image from the project team in a different location, but we have the corner parapets that stick up, a front parapet that sticks up here, and another corner parapet here that shrouds from the entrance corridor and also Mill Creek Drive.
    • 00:18:24
      We'll make sure to provide enough clarity on the next submission that it's clear that those mechanical units will not be visible.
    • 00:18:33
      I did mention the grading opportunity or the sort of the, maybe not opportunity, but this helps us screen our mechanical rooftop units from the Mill Creek Drive side.
    • 00:18:48
      We would be looking downhill.
    • 00:18:50
      And so the idea that the mechanical units would ever be visible from this side is hard to believe that it would be.
    • 00:18:59
      This is more of in keeping with the tan color that we were trying to represent previously, but got a little bright with our sun exposure.
    • 00:19:08
      So I think here you see keeping the material palette much more in keeping with adjacent structures.
    • 00:19:15
      We'd be trying to relate to this tan that's on the right side of the screen as much as possible.
    • 00:19:21
      Overall, the building is broken down nicely.
    • 00:19:24
      We're employing canopy elements to sort of emphasize our human scale.
    • 00:19:28
      We've got these corner towers that start to emphasize hierarchy and establish hierarchy with the front entrance here.
    • 00:19:36
      The corner that faces the entrance corridor is our most glazed corner and also has true glazing.
    • 00:19:45
      It's not a spandrel glass on that corner.
    • 00:19:48
      It's always a balancing act with the self-storage use.
    • 00:19:52
      The strategy is to employ a hallway that's adjacent to those windows while sacrificing leaseable.
    • 00:20:01
      storage space in those areas.
    • 00:20:04
      That being said, we did feel it was important enough facing the entrance corridor and probably this corner that was most visible from that Mill Creek Drive and Avon Street location, that corner, that intersection, to emphasize the glazing from there.
    • 00:20:22
      I wanted to quickly address comment 12, which regards our street trees and ensuring that we will get our street trees at 40 feet on center per entrance corridor guideline requirements.
    • 00:20:34
      We've got a few opportunities, a few levers to pull there, but you can see additional trees coming around this corner here, again, being another layer of landscape screening at our front corner.
    • 00:20:48
      And it may be possible that we get one in here by spreading these
    • 00:20:52
      Parallel parking spots apart a little bit, getting a landscape island in the middle here, or even potentially eliminating a parallel spot.
    • 00:21:01
      We're working with our landscape architects and our civil engineers to work through that process, but we'll have that resolved for the final submission.
    • 00:21:09
      Overall, a building that is appropriately, appropriate rhythm that's established sort of the traditional
    • 00:21:19
      Brick Building with a masonry punched opening at a very rational and rhythmic grid.
    • 00:21:26
      And so I just wanted to spend the last minute that I have here going through the staff recommendations.
    • 00:21:35
      I believe we're amenable to all of these or most of these.
    • 00:21:38
      And I do have some specific questions for board input on, but
    • 00:21:44
      Going through these, we're happy to provide all materials for our final ARB submission as requested.
    • 00:21:51
      As mentioned, I'll reach out to our vendor and see if we can get some building samples or examples within this area.
    • 00:22:00
      We'll clean up and correct our elevations and white panels will not be part of this project.
    • 00:22:08
      The existing conditions map that was provided as part of our ZMA,
    • 00:22:12
      I would just ask the board if that is sufficient.
    • 00:22:15
      I realize there's some steep slopes in that area, tree location, a tree survey may be pretty challenging to do, but would love the board's input on that as well as the spandrel question.
    • 00:22:31
      We're happy to provide VLT and VLR values.
    • 00:22:34
      We will certainly add all of the standard notes that required, complete the lighting plan,
    • 00:22:43
      I guess the final question as I run out of time here would be provide additional information to show the spandrel glass will have an appropriate appearance from the entrance corridor.
    • 00:22:52
      What's the best way to do that?
    • 00:22:54
      Is that samples of that product?
    • 00:22:56
      Is it additional renderings?
    • 00:22:58
      We'd love the board's input on that.
    • 00:23:00
      So with that, any questions I can answer, I'm happy to do so.
    • 00:23:03
      Thank you so much.
    • 00:23:05
      All right, thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:23:06
      I guess we'll start with David if you have any questions.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:23:10
      Sure, yeah, thank you for your presentation.
    • 00:23:11
      I'm glad to hear about the process and community involvement that led to the design you have today.
    • 00:23:16
      I appreciate the efforts you've made to break down the scale of the projects and to incorporate the material palette of the adjacent buildings.
    • 00:23:27
      I think probably looking forward to the further architectural submissions, just a couple questions come to mind.
    • 00:23:37
      And that is, I guess, any thoughts you have about how much depth you expect there to be between the various materials that transition, say, between Michihaw and window openings or the Michihaw and the stucco?
    • 00:23:52
      Just what sort of relief might there be in the facade?
    • Kevin SchaferStudio Director
    • 00:23:55
      Yeah, great question.
    • 00:23:56
      Right now, the bearing line is
    • 00:23:58
      a flat bearing line and we're using the depth of the material so it's not a particularly deep change of plane there and using really the color and the contrast to make that distinction.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:12
      See, so right now they would largely be in the same plane as one another.
    • 00:24:15
      And then in terms of the planar relationship between the corner brick pieces or the, well, the brick appearing pieces and the stucco, notice that the roof line of the stucco portion projects in front of the brick.
    • 00:24:34
      Any thoughts you have about how that relates compositionally to the overall building?
    • Kevin SchaferStudio Director
    • 00:24:40
      It's a good question.
    • 00:24:41
      The pitch metal roof actually came from some of the discussions with the residents and was hoping to see sort of a move away from just a flat commercial roof and incorporate some sort of pitch and high quality metal roofing material to some degree.
    • 00:25:01
      And so this was a solution that allowed the brick to establish the hierarchy by raising that parapet higher than that
    • 00:25:09
      the adjacent roofline while also then sort of coinciding that roofline with that material.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:25:19
      Thank you.
    • 00:25:19
      A couple more questions.
    • 00:25:21
      In terms of the change from the brick appearance material to the lighter material at the parapets at those elements, what's the thinking behind that transition?
    • Kevin SchaferStudio Director
    • 00:25:31
      Establishing a cohesive roofline, which I think is certainly something that we could still work through and would value the board's input.
    • 00:25:41
      As you can see on some of these renderings right now, it's up on one side of the building and lower on the other side of the building.
    • 00:25:50
      If it felt like more of a hierarchy and more of an established presence to raise that and to help break up that roofline, I think we would certainly be open to doing that.
    • 00:26:02
      The initial thought was, let's create this sort of cohesive line that helps unify that building.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:26:07
      Thank you.
    • 00:26:08
      And my last question is, in terms of the, is it, are the truck bays that seem to set the datum of the transition from brick to stucco, are those at sort of their required height?
    • 00:26:19
      Is there any, and indeed, are those what is establishing that datum for the facade?
    • Kevin SchaferStudio Director
    • 00:26:24
      I believe so.
    • 00:26:25
      Let me jump to here.
    • 00:26:27
      So this line here?
    • 00:26:29
      Yes.
    • 00:26:29
      Yeah.
    • 00:26:29
      Yeah.
    • 00:26:30
      That's correct.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:26:31
      Right.
    • 00:26:32
      What height is that for the loading bays?
    • Kevin SchaferStudio Director
    • 00:26:33
      14 feet.
    • 00:26:35
      14 feet.
    • 00:26:37
      OK.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:26:37
      Thank you.
    • Taro MatsunoMember, Architectural Review Board
    • 00:26:40
      Thanks, Tara.
    • 00:26:43
      Yes, one of my questions was if there's any chance the next time you come before the board, could we get a view of the
    • 00:26:55
      Gosh, I guess it's basically further away showing the view without the trees.
    • 00:27:03
      That was very helpful for the view from the intersection because I think it's hard to assess the visibility of the building through that portion of pretty and existing trees.
    • 00:27:17
      but I'm just hoping to confirm that the rear face is not especially or whether it's especially visible from the corridor.
    • 00:27:27
      So would it be possible to provide that, you know, showing the 20-foot grade change
    • 00:27:37
      yeah sort of so maybe from from this side yeah a little bit further to this even yeah i think that's the that's the perspective i just still have questions about and and it could very well be that the tree canopy screens it but being able to see it without the canopy would be helpful
    • Kevin SchaferStudio Director
    • 00:27:56
      Yeah, and I do want to call attention to that we will have some pretty significant additional screening along that facade as well, as you can see here with this plan, but absolutely happy to provide that.
    • Taro MatsunoMember, Architectural Review Board
    • 00:28:13
      And then my only other question was on the brick, I think it's on the plan north face or not the brick per se, but the windows that are proposed to be spandrel,
    • 00:28:26
      Could you talk a little bit about what is happening?
    • 00:28:28
      I think you kind of alluded to it a little bit, but what's happening inside the building for those last two bays of windows on the east elevation?
    • 00:28:37
      Here.
    • 00:28:38
      Yeah.
    • 00:28:38
      So is it like transitioning to storage units or?
    • 00:28:42
      Correct.
    • 00:28:42
      That's correct.
    • 00:28:43
      And is there any reason that the brick has to extend those two bays or could it just be pulled back to the four and then it's four and four?
    • Kevin SchaferStudio Director
    • 00:28:51
      Do you?
    • 00:28:52
      We could certainly pull it back and make it a four and four.
    • 00:28:55
      situation it was it was kind of a proportionality study is it like a two-thirds relationship kind of thing happening here and and how much can we you know sort of emphasize this corner that's going to be the one that's visible from the entrance corridor but i think a four by four corner there would be appropriate cool thanks just curious appreciate your presentation all right thanks uh frank
    • Frank HancockVice Chair, Architectural Review Board
    • 00:29:24
      Well, thanks for your presentation.
    • 00:29:27
      Very thorough.
    • 00:29:28
      And I really don't have any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:29:32
      So thanks.
    • 00:29:34
      All right.
    • 00:29:35
      Thanks.
    • 00:29:36
      I just have a couple of questions about the Nisha Ha brick, just that wouldn't be apparent from looking at a small sample.
    • 00:29:45
      Do you have any idea how big you can get those panels?
    • Kevin SchaferStudio Director
    • 00:29:49
      I think they're as wide as eight feet.
    • 00:29:54
      So if we were to look at maybe I'll try and zoom in here.
    • 00:29:58
      So you can see some and this is a pretty large field, it's unbroken right here, but you can see how they try and start to break down those panels and emphasize that looks like it may be bigger than eight feet.
    • 00:30:17
      So I think it's 4 by 12, actually, maybe.
    • 00:30:22
      It comes in two-foot increments in this 4 by 8, 4 by 10, 4 by 12, I'm sure.
    • 00:30:28
      I'm pretty sure.
    • Chris HenningsenChair, Architectural Review Board
    • 00:30:29
      Right.
    • 00:30:30
      OK. That's mostly what I'm getting at.
    • 00:30:33
      And this might be a finer grain detail than you would ever see from the entrance corridor anyway.
    • 00:30:41
      Just wondering what those joints look like and how apparent are they from a distance?
    • Kevin SchaferStudio Director
    • 00:30:48
      So I think, yeah, that's a great question and always the concern.
    • 00:30:51
      Here's where I think they didn't do a great job with their joints and they used what appears to be either the light mortar that's the same color here and that corner starts to stick out and become almost like this
    • 00:31:07
      design element, but it really just sort of reveals that it's not a true brick.
    • 00:31:11
      I think on this one over here, they're doing a much better job concealing their joints by using a grout and more closely matches the brick or ties in a little bit to sort of this dark colored brick here.
    • 00:31:25
      I struggle to find the panel lines in this one.
    • 00:31:29
      And so I think this one is just being installed with a little bit more care and a little bit, I think it's right here.
    • 00:31:37
      So that would be the importance of correct detailing and selecting the right material is the difference between this looking appropriate and not.
    • 00:31:52
      And we'd be happy to specify the correct grout and show sort of how we plan that detailing to happen to ensure that it would be correct.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:03
      Yeah, I mean, that would be helpful if the sample had the proposed grout color that you could at least put next to the sample just to see what it would look like.
    • 00:32:18
      That concludes our questions.
    • 00:32:20
      So are there any members of the public that want to make a comment?
    • 00:32:29
      All right, that sounds like a no.
    • 00:32:32
      So the ARB will now go into discussion.
    • 00:32:35
      We'll start with Taro if you have any comments.
    • Taro MatsunoMember, Architectural Review Board
    • 00:32:38
      Thanks.
    • 00:32:38
      I appreciate the presentation.
    • 00:32:40
      I think the applicant has made a thoughtful and well organized presentation and design proposal.
    • 00:32:52
      For me, I think that the general scheme
    • 00:32:57
      meets the intent of the design guidelines.
    • 00:33:02
      I think the only points that I would have some questions or thoughts about future development would be around
    • 00:33:13
      I guess I don't have any significant concerns about the shutters.
    • 00:33:18
      I think the color change is an improvement that is more in keeping with the design guidelines.
    • 00:33:25
      My only questions would be around the brick material.
    • 00:33:28
      I think it's great to see some further exploration and new products.
    • 00:33:35
      I think in terms of meeting the applicant's goal of sort of
    • 00:33:40
      hierarchy of the entrance and in the corners that potentially some change in the building plane to bring those brick bays out a little bit closer to where those
    • 00:33:54
      roof edges meet could potentially help to give them more visual prominence along the lines of what the applicant was trying to do and maybe give the brick a sense of depth that some of the better examples where I turned the corner kind of did.
    • 00:34:18
      But otherwise, I think it's a
    • 00:34:21
      Thoughtful proposal, and I appreciate them bringing it forth to the board.
    • Chris HenningsenChair, Architectural Review Board
    • 00:34:26
      All right, thanks.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:34:28
      Frank?
    • 00:34:29
      Sure.
    • 00:34:30
      Yeah, I agree.
    • 00:34:31
      I think, you know, there's a couple things that we typically don't like to see, like the spandrel glass, the honesty of materials, thinking about the Nichihaw panels.
    • 00:34:45
      but I think given the distance from the corridor and if we get maybe further explanation on some of the detailing to understand specifically the brick or the panels, we could maybe overcome that.
    • 00:35:01
      I think the industrial character fits this building type.
    • 00:35:07
      I realized the,
    • 00:35:09
      Breaking it up probably was a comment or maybe it was a comment from the community, but maybe in direct response to our guidelines.
    • 00:35:18
      But in this case, I mean, I don't know that we need that clear, distinct, different like character of the building.
    • 00:35:27
      But anyway, that's I think as it is, I think it works.
    • 00:35:33
      I do think
    • 00:35:34
      The site, the foreground of the two parcels, the bank and the gas station, are really gonna obscure the building.
    • 00:35:44
      Even though some of the renderings show trees that are deciduous, I still think the distance and kind of the elements in the foreground are gonna, you're not gonna really read this building from the entrance corridor, so.
    • 00:36:00
      Those are my comments, but all in all I think it's a really nice application.
    • 00:36:04
      I think the applicant really knew what we were looking for or the questions we would have and I think did a good job answering them, so thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:16
      Thanks.
    • 00:36:17
      Yeah, I agree with what's been said and I also thought it was for the thoughtful submission and just
    • 00:36:30
      Concerns about the amount of spandrel glass and then just the detailing on the Nichiha panels.
    • 00:36:36
      But, you know, I think use of spandrel glass to
    • 00:36:45
      Spandrelglass is frowned upon, but blankness is also frowned upon.
    • 00:36:53
      So it's kind of a balance.
    • 00:36:54
      And I think, as Frank pointed out, the building itself and the site are fairly distant from the entrance corridor.
    • 00:37:03
      So I think it's down to a couple of details.
    • 00:37:12
      Well, thanks for letting me have the last word for it.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:37:17
      I'll reiterate my colleagues' comments.
    • 00:37:19
      I appreciate the application and the thoroughness of the presentation and the thinking behind it.
    • 00:37:23
      I think, like folks who've observed, I think the grade and the siting does a good deal to mitigate the impact and to make it reasonably compatible with the district.
    • 00:37:33
      I think I do appreciate the applicant's willingness to provide the site section that Tara requested.
    • 00:37:39
      I'm hopeful that'll show that.
    • 00:37:41
      It's reasonably well screened by grade and trees.
    • 00:37:45
      And then I think as my questions may be indicated, I think I'm primarily interested in the architectural submission of seeing some development of depth in the facade, willing to accept the Nichiha panel if it's detailed.
    • 00:37:58
      I think as Chris said carefully, so that there's still some of the depth of openings and appreciate the applicants.
    • 00:38:05
      Consideration of the roofline and the parapet and whether ultimately, you know, breaking the roofline and maybe maintaining the brick at the corners helps further break down the scale and set up a hierarchy or not.
    • 00:38:20
      And then I think if, would similarly be interested in seeing what depth of detail is proposed with the shutters, you know, ideally beyond the material differences, there will be some light and shadow in the facade to give it scale and character.
    • 00:38:35
      and lastly, I think the vehicular entrance for the moving vehicles at 14 feet ends up setting that datum sort of between story heights and in the middle of a window and if there's a way to explore any options to further resolve that with the other datum so clearly established by the building, I think it might make it an even stronger proposal.
    • 00:38:57
      But all in all, and I guess, yeah, but I think I'll leave it at that and thank you for the proposal.
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:04
      All right, thanks a lot.
    • 00:39:05
      So I guess we'll just move on to the recommended motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:39:23
      So the recommendation starts with the recommendation for approval of the initial site plan if it's consistent with the conceptual plan, and then the standard comments listed in the staff report to be addressed with the next submittal.
    • 00:39:40
      I've attempted to make some revisions to address your comments.
    • 00:39:44
      In the first one, provide material and color samples of all proposed materials for review, identify the proposed Nichihaw grout color.
    • 00:39:53
      In number five, regarding the existing condition sheet asking for the composition of the tree canopy, a suggestion that could be revised to provide just a detailed description of the tree save area that would address the quantity, species, and sizes included in the area.
    • 00:40:16
      I've added a few items at the end.
    • 00:40:19
      15, provide an additional view of the building from the entrance corridor showing the rear elevation and confirming that it won't be visible.
    • 00:40:25
      16, consider extending the brick to eliminate the spandrel glass on the entrance corridor side.
    • 00:40:33
      And 17,
    • 00:40:33
      It's not fully developed here.
    • 00:40:36
      There were comments about the hierarchy of the brick at the corners and pursuing additional development of depth in the facade.
    • 00:40:43
      We'll need your help if you want to include those to get that wording right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:40:48
      All right.
    • 00:40:49
      Thank you.
    • 00:40:50
      I guess if anyone has any tweaks or proposed deletions, additions, just speak up.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:41:02
      And I think Margaret did a nice job of capturing the conversation and appreciate the general language around the issues noted.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:41:13
      I don't have any edits.
    • Kevin SchaferStudio Director
    • 00:41:14
      Yeah.
    • 00:41:17
      Sure.
    • 00:41:18
      Regarding number 16, is that extending BRIC or reducing BRIC?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:41:25
      I think it's reducing.
    • 00:41:28
      Your comment, Taro, is to consider reducing the amount of brick and glass enough.
    • Kevin SchaferStudio Director
    • 00:41:34
      I guess it's partly our responsibility to sort of evaluate if a 4x4 looks better than a 4x6 kind of scenario.
    • Taro MatsunoMember, Architectural Review Board
    • 00:41:46
      I think that's part of the consider.
    • Kevin SchaferStudio Director
    • 00:41:48
      OK. Yeah, right.
    • 00:41:50
      Wonderful.
    • 00:41:50
      And just to maybe clarify number 17,
    • 00:41:56
      The masonry depth is a lot of times what sort of gives it that richness, right?
    • 00:42:03
      The depth around the windows.
    • 00:42:05
      Maybe it's either the
    • 00:42:10
      The wall itself there gets thicker in an effort to emulate that depth and that richness and give some differing materials a chance to die into, or it's this transition to like a true masonry, I guess would be another way of offering that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:42:28
      Yeah, I think so.
    • 00:42:29
      And I haven't detailed Nichiho myself, but to the extent it's a rain screen system, if they make corner returns, there may be a chance just to deepen the rain screen and create that depth.
    • Kevin SchaferStudio Director
    • 00:42:39
      Very good.
    • 00:42:39
      OK, great.
    • 00:42:40
      Thank you.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:42:41
      And then I think I realized I forgot to mention in my comments.
    • 00:42:44
      I know the applicant had asked about for clarity about what was wanted from the board on samples for the spandrel.
    • 00:42:51
      Right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:42:52
      Yeah.
    • 00:42:53
      I mean, beyond a sample of each, I'm not sure what else you could do.
    • Taro MatsunoMember, Architectural Review Board
    • 00:42:58
      I think a sample is probably more helpful than an additional vendor.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:43:05
      So a sample of the spandrel panel itself.
    • Taro MatsunoMember, Architectural Review Board
    • 00:43:09
      Margaret, could I ask a question on number five?
    • 00:43:14
      This is just trying to say that the trees that are remaining in that heavily sloped area to the, I guess, planned northwest of the site, that that has a density or a character that would make it not especially visible.
    • 00:43:36
      Is that the intention?
    • 00:43:40
      Do they need to do a tree search?
    • 00:43:42
      I guess I'm just trying to figure out how granular that information should be.
    • Margaret MaliszewskiPlanning Manager
    • 00:43:48
      Well, certainly a detailed tree survey would be best if you think that's not necessary.
    • 00:43:53
      So I'm suggesting maybe just a written description of what's in there.
    • 00:43:58
      If it turns out that it's not as dense or if the trees are lost, then we have something to go back to to replace, know what to replace it with.
    • Taro MatsunoMember, Architectural Review Board
    • 00:44:15
      And that's the second part, the provided prescription.
    • 00:44:17
      Okay, great.
    • 00:44:18
      I just want to make sure I understood.
    • 00:44:19
      Thanks.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:44:20
      Yeah, I appreciate the amendment here because I do think requiring a detailed tree survey is probably unnecessary.
    • 00:44:28
      Okay.
    • Taro MatsunoMember, Architectural Review Board
    • 00:44:41
      That sounds good.
    • 00:44:48
      Should we make 17 statement or should it be consider or what do you guys think about that one?
    • 00:44:56
      To me, I just think given the variability and what's available from the manufacturer and the detailing and such, I would be willing to make that a consider, but I'm not open to other feedback.
    • Chris HenningsenChair, Architectural Review Board
    • 00:45:13
      Yeah, because I would
    • 00:45:16
      I'd feel better about a Consider too on that one just because it's like kind of you know exploring depth is kind of a to a certain extent you're like limited by the capabilities of that material and in terms of like whether what you do is going to look good or look convincing
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:45:41
      I guess I would offer just as a contrasting viewpoint, I do think that depth is one of the key character defining elements of the traditional architecture of the area and some light and shadow and facades and depth is sort of a vital component of
    • 00:45:57
      relating to those traditions.
    • 00:45:59
      I think some of these materials, if provided without depth, can really have the appearance of applique and wallpaper and really lose architectural substance.
    • 00:46:10
      And I do think it's feasible to create depth in these systems based on the variability of how they can
    • 00:46:18
      is also I value and respect the suggestion to make it a considered I guess just offering that for me personally I think it's pretty vital to it being an effective connection to the tradition of the architecture.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:46:41
      Is there something on here that asks for kind of the detailing of the
    • 00:46:48
      product that maybe could, it's 17 and 1 I feel like.
    • 00:46:58
      I think that we've, with our comments, conveyed that we want to see some depth, see what this product can do, you know, and maybe that detailing can answer that question.
    • 00:47:18
      But I understand your comment, I think.
    • Chris HenningsenChair, Architectural Review Board
    • 00:47:23
      And they do have to come back.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:47:24
      That's true.
    • 00:47:25
      Indeed.
    • 00:47:25
      Yeah, yeah.
    • 00:47:27
      So there's some time for considerations.
    • Taro MatsunoMember, Architectural Review Board
    • 00:47:33
      I think that addition makes sense, Frank.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:47:37
      Yeah.
    • 00:47:37
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:47:43
      All right.
    • 00:47:45
      If there are no more suggestions or questions, does anybody care to make a motion?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:47:54
      I'll move to approve the initial site plan consistent with the conceptual plan and provide the applicant with the comments listed in the staff report amended as follows.
    • 00:48:10
      Item 1, Add, Identify the Proposed Ninjihawk Ground Color.
    • 00:48:14
      Item 5, Strike the Text After Provide, an Insert on the Plan, a Description of the Tree Save Area, Addressing Quantity, Species, Sizes, etc.
    • 00:48:26
      Item 8, Insert After Information, a Sample,
    • 00:48:32
      At item 15, provide an additional view of the building from the EC showing the rear elevation and confirming that it won't be visible.
    • 00:48:40
      At item 16, consider reducing brick to eliminate the spandrel glass on the EC side.
    • 00:48:45
      At item 17, consider the hierarchy of the brick at corners and pursuing additional development of depth in the facade.
    • 00:48:53
      At item 18, provide additional information on the materials detailing the depth of the product.
    • Chris HenningsenChair, Architectural Review Board
    • 00:48:59
      All right, I'll second that, if we could put that to a vote.
    • SPEAKER_01
    • 00:49:05
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:06
      Aye.
    • SPEAKER_01
    • 00:49:06
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:08
      Aye.
    • SPEAKER_01
    • 00:49:08
      Mr. Hancock?
    • 00:49:09
      Aye.
    • 00:49:10
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:11
      Aye.
    • SPEAKER_01
    • 00:49:11
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:12
      All right, thanks a lot.
    • 00:49:14
      We have one work session item today, which is ARB 2026-14, Airport Road self-storage final.
    • SPEAKER_04
    • 00:49:25
      I'm going to recuse myself.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:49:29
      See you in September?
    • SPEAKER_04
    • 00:49:34
      Or later in September.
    • Margaret MaliszewskiPlanning Manager
    • 00:49:45
      Okay, this is a proposal to construct another self-storage facility with associated site improvements.
    • 00:49:51
      This is located at the northeast corner of Airport Road and Timberwood Boulevard.
    • 00:49:57
      You last reviewed this proposal in August.
    • 00:50:00
      At that time, you directed the applicant to return for a work session to resolve four issues with the design.
    • 00:50:05
      Those issues were related to the block veneer detail at the windows,
    • 00:50:09
      the spandrel glass, the roof on the eastern block of the building, and the horizontal lines in the design.
    • 00:50:17
      The applicant has made revisions to address each of those items in this slide and in the next slide.
    • 00:50:25
      The top image is the design you reviewed in August and the current revised design is on the bottom.
    • 00:50:32
      In this revised design, the block detail around the windows has been changed.
    • 00:50:36
      The line of the block is now maintained at the bottom of the windows.
    • 00:50:40
      The roof lines have been revised to eliminate the slope on the block fronting Airport Road.
    • 00:50:46
      And the horizontal lines have been simplified.
    • 00:50:49
      The method of addressing the spandrel glass was to eliminate windows with that glass and to replace them with ephus ornament.
    • 00:50:57
      That is the detailing in the towers that is colored blue in these two images.
    • 00:51:02
      Our recommendation is that the blue be revised to a color that's more consistent with the primary color palette of the building.
    • 00:51:09
      One of the comments from the previous reviews was the submittal of physical material and color samples for review.
    • 00:51:14
      We do have those for you today.
    • 00:51:17
      The applicant will share them with you, explain those to you.
    • 00:51:21
      Assuming you're okay with them, our recommendation is for approval of the revised design with a change to the color of the blue ephis and then the remaining minor revisions on the site plan left from the previous reviews.
    • 00:51:34
      I'm happy to try to answer any questions that you might have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:51:37
      All right, thanks a lot, Margaret.
    • 00:51:39
      Dave, do you have any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:51:42
      No questions, Margaret.
    • 00:51:43
      Thank you.
    • Taro MatsunoMember, Architectural Review Board
    • 00:51:44
      Tara?
    • 00:51:45
      I'm sorry, so the blue windows are not spandrel.
    • 00:51:49
      They're actually blue ephus.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:51:51
      Yes.
    • Taro MatsunoMember, Architectural Review Board
    • 00:51:52
      OK, I see.
    • Chris HenningsenChair, Architectural Review Board
    • 00:51:55
      No, I don't have any other questions.
    • 00:51:57
      Thanks.
    • 00:51:58
      I don't have any questions.
    • 00:51:59
      So if the applicant has a presentation, now would be the time.
    • Chris ElamArchitect
    • 00:52:16
      All right.
    • 00:52:18
      Hello, all.
    • 00:52:19
      My name's Chris Elam of RBA Architects.
    • 00:52:23
      Happy to be back, talk about the updates that we've made for you.
    • 00:52:26
      I appreciate the summary, Margaret.
    • 00:52:28
      I think that touched on the majority of them, so I won't go point for point.
    • 00:52:33
      I did want to
    • 00:52:37
      I want to clarify one aspect.
    • 00:52:40
      So the previously submitted design had 100% of the windows were shown as spandrel glass.
    • 00:52:50
      And so this revised design has
    • 00:52:53
      changed the vast majority of them from spandrel glass to transparent glass, which will be visible, which will allow visibility through into a hallway.
    • 00:53:03
      You know, so we've made that concession and sacrificed some, you know, reasonable square footage and then we'll have, you know, interior visibility.
    • 00:53:15
      So that's for
    • 00:53:16
      for all of the windows, except for the ones at the corners, the ones that are currently shown as the blue ethos.
    • 00:53:24
      And the reason we identified those to, you know, not follow the same profile is that if you, you know, looking at the actual structural lines, so this is approximately a third floor finished floor.
    • 00:53:39
      And so these are,
    • 00:53:41
      in an area where they can functionally view into the interior space and then these windows which were previously at about that same height and I think it's important that they be towards the upper portion of those tower elements just as far as the composition of those elements
    • 00:53:58
      Those are actually in non-occupied space.
    • 00:54:02
      I mean, they'll be structurally sort of filled behind and not, you know, there's no fourth floor with occupied space there.
    • 00:54:11
      So the option for visibility through into those interior spaces was not an option for us.
    • 00:54:19
      Happy to consider an alternative color, but just to clarify, those were the reasoning behind identifying those for deviating from the general concession.
    • 00:54:33
      So yeah, we do have the sample materials here, and I think that obviously there's a very consistent color palette of the warm grays, and you can see
    • 00:54:47
      materials, in particular the block I wanted to point out so that's a we're showing a rustic face block which is to me a relatively new product so this is not it has some of the color variation of a ground face block and so it's not a it's not a and we're proposing a mix of different colors together so that you get some variation in the patterning of that block
    • 00:55:17
      comparable to a flashed brick or something that would be more variegated than just a traditional smooth-faced concrete block.
    • 00:55:30
      And I believe that otherwise the comments, as Margaret said, have been addressed in terms of the
    • 00:55:41
      Simplification of the right-hand side of the south elevation as far as the materials palette, alignment of horizontal elements from
    • 00:55:52
      one side, one end of the building to the next, and happy to hear y'all's thoughts.
    • 00:55:59
      Otherwise, we did include some indications of the lighting elements, which I think will also contribute to the character of the facades, but otherwise, happy to hear you all's thoughts, answer any questions you have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:56:19
      All right, thanks a lot.
    • 00:56:22
      The...
    • 00:56:25
      Dave, do you have any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:56:26
      Well, first of all, I want to thank you very much for coming back for the work session and the work to prepare for it.
    • 00:56:32
      I was trying to recall the site plan in terms of this view from the north, the facade with the four windows.
    • 00:56:40
      Is that one fairly visible from the entrance corridor?
    • 00:56:43
      I just, I wasn't recalling exactly if two sides.
    • Chris ElamArchitect
    • 00:56:46
      So this is viewed from a cut in on Timberwood Boulevard.
    • 00:56:51
      So the,
    • 00:56:52
      Airport Road would be several, what is it, a couple hundred feet, you know, sort of down Timberwood away from this current location.
    • 00:57:04
      And so the backside of this is really not visible at all from Airport Road, but this facade, which is facing,
    • 00:57:19
      which is facing west will be visible.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:57:30
      Thank you.
    • 00:57:30
      And then I think I recall in our last meeting, one of the comments was about looking again at sort of the horizontal datums and sort of simplifying it a little bit around the building.
    • 00:57:40
      Can you describe the steps you've taken?
    • Chris ElamArchitect
    • 00:57:42
      Yeah.
    • 00:57:44
      So that concern was largely, as I understood, referring to the area at the east end of the airport road facing facade.
    • 00:57:57
      And you can see that the horizontal elements along there differed slightly, in particular, this transition line that
    • 00:58:07
      was intended to sort of track generally with you know some of the horizontal elements through here but you know didn't align specifically with the consistent you know consistent elements along there and so the simplification the reduction so for one there's and you know rather than three distinct materials where we're showing two materials and with you know a little bit of ornamental banding in that area
    • 00:58:31
      But then the ornamental banding and the transition of the materials are very clearly aligned with elements that are established in the more regular facade around the rest of the building.
    • 00:58:43
      And then probably most importantly was the reconfiguration of the roof.
    • 00:58:48
      So we, you know, showing a low-slope standing seam metal roof for the entirety of the building, had originally elected to express the slope of that roof along the airport road facade.
    • 00:59:04
      And so we reconfigured the roof in this new configuration so that the
    • 00:59:15
      Low Eve is oriented towards Airport Road, and so that gives us the opportunity to align that with the Low Eve at the remainder of that facade.
    • 00:59:25
      and then the slope, the rake of that roof is back behind, considerably behind the front facade of the building.
    • 00:59:36
      You can see it a little bit here, but we anticipate that that will not be particularly visible or noticeable from the roadway and
    • 00:59:49
      We've sort of diminished that aspect in order to create very consistent horizontal lines all the way around Airport Road, down Airport Road and then rounding the corner to Timberwood Boulevard.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:00:06
      Thank you.
    • 01:00:07
      And then I noticed that the base detailing and colors differ somewhat from the left portion to the right portion.
    • 01:00:16
      Any particular thinking behind that?
    • Chris ElamArchitect
    • 01:00:20
      You're referring to the difference between this and this?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:00:23
      Yes.
    • Chris ElamArchitect
    • 01:00:25
      So the idea originally was to create distinct volumes that had an architectural language at one
    • 01:00:36
      for different portions of the building and just as a means of breaking down the massing of this building.
    • 01:00:45
      And so that was the intention here.
    • 01:00:47
      And so we're showing the darkest of the metal panels at the base on the west side of the airport road facade and then the concrete block, the rustic faced block
    • 01:01:05
      Eastern side of that facade.
    • 01:01:08
      And so that's been continued here.
    • 01:01:10
      So because we're differentiating those building blocks, but still obviously trying to establish enough of a correlation between the two with the horizontal elements, material transitions, and even reuse of some of the materials, there's a consistency.
    • 01:01:31
      and the previously discussed Eve Hite correlating to one another and window types as well and lighting.
    • 01:01:42
      So we've a number of elements that tie them together, but the intention was to create distinct architectural languages as a way to break down the building.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:01:51
      Thank you.
    • 01:01:51
      And my last question in terms of you talked a bit about the adjustment at the blue EIFS areas.
    • 01:02:00
      Can you maybe describe further the changes in the tower elements and how they're described, broken down in terms of color, opening sizes, things between the two proposals?
    • Chris ElamArchitect
    • 01:02:11
      Yes, so the towers remain largely the same, so we've increased the height of the concrete block and that just
    • 01:02:22
      So when we eliminated the glass from those, as previously mentioned, that was because it was really not a viable approach to show a true transparent interior views there.
    • 01:02:37
      There seemed to be a sort of abundance of an oversized upper portion of that element.
    • 01:02:46
      and so you can see we've raised the height of the concrete block at those locations up to the basically to the third floor level rather than the middle of the second floor and that was to reduce the the total quantity of the the ethos that's so all of the all of those towers elements you know the there's on the new one here you can see two different grays and then the accent blue
    • 01:03:12
      as well as the CAP, all of which are EFIS.
    • 01:03:17
      And so with the elimination of the windows, it seemed that we had a large area of unbroken material.
    • 01:03:27
      And so just working to break that down somewhat and to provide some ornament and articulation of that element.
    • 01:03:35
      Without overcomplicating, like I said, one of the suggestions last time around was to generally simplify the number of materials and the sort of composition.
    • 01:03:50
      So without overcomplicating, it wanted to pick up some ornament and the
    • 01:03:55
      Blue Accent, which we, you know, feature that color around the side where, you know, it'll be the primary customer entrance under, you know, just to the underneath the canopy there and back around, you know, out of view of the of Airport Road of the entrance corridor.
    • 01:04:17
      But it's still, you know, it was used as an accent color at that location.
    • 01:04:22
      And so in searching for an accent color for these towers, that seemed like the natural choice just to relate back to the already established accent color.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:04:38
      Yeah, thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:04:40
      All right.
    • 01:04:40
      Thanks, Tara.
    • Taro MatsunoMember, Architectural Review Board
    • 01:04:43
      um yeah is this uh since it's work session are we doing we're doing questions right now or should we just it is a work session so you you're welcome to use whatever format works okay
    • 01:05:00
      You know, I appreciate you taking the time.
    • 01:05:04
      I think the facade that we saw earlier has calmed down a fair amount.
    • 01:05:11
      I think it's just a little cleaner.
    • 01:05:13
      I would encourage the applicant to think about that again, because if you can go back to that rendering we just saw, I think I count eight different building materials from this view.
    • 01:05:30
      There's the dark, the mid-gray stucco, the rusticated block, the base metal panel, the lighter stucco, the sort of, I don't know if this middle one where the cursor is, is the same
    • 01:05:47
      Color is the one in the top right.
    • Chris ElamArchitect
    • 01:05:50
      Are those matching?
    • 01:05:53
      These are, no this is Ethos, this is metal panels.
    • Taro MatsunoMember, Architectural Review Board
    • 01:05:56
      Okay, so that's five materials and then there's the blue stucco and then there's the corrugated metal in the middle at seven and then there's eight.
    • 01:06:05
      There's a darker gray metal panel in the top left.
    • 01:06:10
      Right.
    • Chris ElamArchitect
    • 01:06:12
      Yes.
    • 01:06:12
      So that's a unique use back there.
    • 01:06:17
      That's correct.
    • 01:06:17
      But this is the three metal panels.
    • Taro MatsunoMember, Architectural Review Board
    • 01:06:24
      I guess I just feel like it could be a lot simpler.
    • 01:06:27
      The base doesn't have to be the secondary metal panel.
    • 01:06:31
      It could just be the block all the way through.
    • 01:06:36
      The stucco could, like, I just feel like there's a little bit of consolidation that still could happen to make it less complex to construct and more aesthetically harmonious to just, because like the rusticated block base and the metal panel base are doing the same thing, right?
    • 01:06:55
      They're trying to do a darker base.
    • 01:06:58
      So I feel like it'd be easy to just pick one.
    • 01:07:05
      Similarly, I think some of that thinking still needs to happen to just reduce the number of elements and the complexity of the building.
    • 01:07:16
      So I think that was helpful in the other facade, but there's still
    • 01:07:25
      Like a significant number of elements that are as a part of it.
    • 01:07:30
      You know, I understand the desire to add an architectural detail to the upper part of the tower.
    • 01:07:37
      I think you could probably take another pass at that one, as I'm just not sure that something that sort of resembles a window but isn't quite a window in Ephis is
    • 01:07:48
      I mean, I even wonder if just not having something would be, I think that bringing the bass up was helpful.
    • 01:07:57
      I don't know that an ornament needs to be there.
    • 01:07:58
      I think that it could be different in character.
    • Chris ElamArchitect
    • 01:08:03
      I mean, I think that's a sound comment.
    • 01:08:07
      I think that
    • 01:08:10
      Yeah, certainly.
    • 01:08:10
      And, you know, maybe rather than, you know, perhaps I was responding to already having had windows there as an element, you know, and trying to retain a sort of punch of character at that location.
    • 01:08:21
      And there's perhaps enough going on at those tower elements already that even just a simple, you know, ethos reveals, you know, reveal work in that location could probably
    • Taro MatsunoMember, Architectural Review Board
    • 01:08:34
      you know add a little bit of ornament without actually changing color again in you know in that interior panel yeah or even if the middle panel is just a different color like that could be fine you know if you have if you try to keep it to two ephus colors and then one's lighter and then one's darker and the darker one goes in that in those portions like i think that would be pretty simple and easy yeah and in regard to um you know the simplification
    • Chris ElamArchitect
    • 01:09:01
      I think I heard you say that in this view in particular, it still seemed to be a little bit busy and, you know, we can revisit this corner or that, you know, we retained sort of a unique architectural character there and basically, you know, simplify that to, you know, pick up the, just to continue this language around that corner
    • 01:09:29
      Part of the logic of that was one that we needed to, I was hoping to pop the roof up at that location because we've got an elevator behind that will be changing the roof line one way or the other, but then also to identify the main entry point to distinguish it from the rest of the building.
    • Taro MatsunoMember, Architectural Review Board
    • 01:09:52
      Yeah, I wouldn't pick on that corner.
    • 01:09:54
      I think that that corner has stuff going on
    • 01:09:57
      I think it's more like the parts of the building that are intended to be simple still have a lot of different materials on them.
    • 01:10:04
      Like if there's going to be one part that's complex, like it's okay for it to be that, but on the portions where it's just supposed to be three levels showing you this is what's happening on the building, like maybe it can just be two to three materials.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:10:16
      I appreciate where you're coming from, Taro.
    • 01:10:19
      I think it's a good suggestion.
    • 01:10:21
      I do appreciate the work you've done to simplify it and respond to the comments last time, and especially the work to get the roof form and the eave facing the EC under control.
    • 01:10:32
      I don't know if you want to go back to the other slide that shows the comparison of views.
    • 01:10:38
      Yeah, so picking up on Taro's comment, I do think that
    • 01:10:44
      I think the scale of the implied openings, whether they're real or just architectural depth elements in the prior proposal at the towers maybe was a little more successful in breaking down the scale.
    • 01:10:57
      And so it may be worth looking at that.
    • 01:11:00
      Again, I think in terms of the spirit of simplification that Taro highlighted, I don't know whether the
    • 01:11:09
      Crenelation, if you will, on the bass is helping or not, but it might be something worth considering.
    • Chris ElamArchitect
    • 01:11:18
      Oh, please go ahead.
    • 01:11:21
      Yeah, that was a topic on some of the internal conversations.
    • 01:11:23
      Honestly, I think that that could that could very, very easily be that was something that previously was in place to try to relate to the elements that were the detailing around the windows before there was sort of a similar crenelation there and, you know, was hoping to
    • 01:11:44
      create a continuity in that or a sort of related detailing, but if there's a sort of agreement that simplification is still desirable, that seems to me, to my eye, the easiest to accomplish.
    • 01:12:04
      without, you know, not a material and substantial change to the composition of the building, but I do think we'll do a lot of work to simplify.
    • 01:12:15
      So we'd be really happy to offer that as an update.
    • Taro MatsunoMember, Architectural Review Board
    • 01:12:24
      Would you mind telling me what's going on with the tower?
    • 01:12:28
      Is the tower, because these are real veneer blocks, right?
    • 01:12:32
      Yes.
    • 01:12:33
      So it's going to turn the corner back.
    • 01:12:35
      It's like a course.
    • 01:12:36
      Yeah, exactly.
    • Chris ElamArchitect
    • 01:12:38
      Something like that.
    • 01:12:40
      Yes.
    • Taro MatsunoMember, Architectural Review Board
    • 01:12:40
      Great.
    • 01:12:41
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:12:49
      Yeah, I think since the last thing that we've seen, the lines of
    • 01:12:54
      and improved in my opinion and I think kind of further refinement I think Tara brought up a great point about the number of materials I think if you think of it less as like making it more simple but just more elegant it I think it
    • 01:13:20
      It's improved since the last time that we've seen it, and I think the suggestions that Dade and Tara put forth, I think, would be further improved.
    • Margaret MaliszewskiPlanning Manager
    • 01:13:38
      Do you all want to look at the material samples up close?
    • SPEAKER_04
    • 01:13:42
      Yeah, that'd be great.
    • 01:13:52
      Those are the rust kit blocks and the intention is that there's a combination of the two as a field.
    • 01:14:10
      You can see some of the horizontal bands in the block which would be in the dark.
    • 01:14:19
      These would be the storefront, just the
    • 01:14:24
      Trim bands that are flashing, which I'll show in some black.
    • 01:14:28
      And so we've got two primary ephes and three primary metal colors.
    • Chris ElamArchitect
    • 01:14:36
      And then the only addition to that is the black at the top of the tower elements, which is still an ephes, but doesn't come in a pre-manufactured color.
    • SPEAKER_04
    • 01:15:02
      and then the, so that's kind of explained on that, but these are the profiles of the different metal panels.
    • Taro MatsunoMember, Architectural Review Board
    • 01:15:19
      So the roof, the roof sort of things around the tower, those are going to be e-fists.
    • Chris ElamArchitect
    • 01:15:27
      Yes so at the top of the tower exactly that's actually a couple of feet you know it's high enough in the air that I mean that's actually a pretty sizable element so yes that's we're showing that currently and yeah like I say so we would have a
    • 01:15:45
      likely have a flashing at the top edge.
    • 01:15:48
      That would also be something along the lines of this black trim base itself, as well as the sort of fascia at the top of the wall that you can kind of see there's a top element and a helmet at the top of the wall.
    • 01:16:08
      And then, you know, the soffit
    • SPEAKER_04
    • 01:16:14
      are all shown in a similar dark black, not all the way black, honestly, it's not, but dark, dark, a very dark gray.
    • 01:16:30
      In some cases, this is the...
    • Chris ElamArchitect
    • 01:16:35
      So the majority of the eaves and downspouts would be matching
    • SPEAKER_04
    • 01:16:45
      Wall panel that they're sitting on.
    • Chris ElamArchitect
    • 01:16:49
      And then so we've got at the east end of that airport road, we're showing Ephos for that.
    • 01:16:59
      It's sort of gray Ephos is the same as the ocean tower.
    • SPEAKER_04
    • 01:17:04
      And for that area, we would use the darker metal
    • Chris ElamArchitect
    • 01:17:26
      Yeah, the darker area on the right-hand side of the view from the east is the, is in this, is in this latest version is Ephis.
    • 01:17:35
      So that's the same, that's the Ephis that's at the upper portion of the tower, continues around the eastern end of that facade.
    • SPEAKER_04
    • 01:17:43
      Just not in the level trim at the top of that seems darker.
    • 01:17:47
      Yeah.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:17:48
      It seems nice.
    • Chris ElamArchitect
    • 01:17:49
      Yeah agreed and that was um so I got I'm misspeaking a bit so that should be a darker uh a darker piece but and the intention was for it to be darker it's in our sort of medium gray panel so um so yeah it's intended that's darker and again that was the attempt to
    • 01:18:10
      be consistently working in a different architectural language for that piece.
    • 01:18:17
      We've got a rake trim as well, which is, I don't know if you've seen a lot of these buildings, but the rake trim, meaning the element on this side is basically, these are pretty sizable gutters by default.
    • 01:18:35
      They're six inch by six inch, but the rake side,
    • 01:18:39
      has the same profile.
    • 01:18:41
      It projects off the wall and has some depth and height to it.
    • Chris HenningsenChair, Architectural Review Board
    • 01:19:24
      All right, so at this point, do we want to look at the recommended motion or?
    • Margaret MaliszewskiPlanning Manager
    • 01:19:33
      So I did put together a motion for approval.
    • 01:19:38
      The list of comments here is the list from the original review.
    • 01:19:45
      I've struck through the items that were addressed in this revised submittal.
    • 01:19:51
      I've highlighted a couple of things and added a couple of things based on your conversation.
    • 01:19:58
      So the one item was the material samples.
    • 01:20:01
      Are there any items that you want me to add to the list based on your viewing of those samples right now?
    • Taro MatsunoMember, Architectural Review Board
    • 01:20:12
      I think they're all reasonable materials.
    • 01:20:16
      I don't have any comments really.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:20:19
      I don't know if it makes sense to provide them in alignment with the simplification to the extent perhaps you may be looking at which colors go where and some of them may be different than the ones we looked at.
    • 01:20:36
      today in terms of resolution.
    • 01:20:38
      It sounded like, for example, the trim might be darker than the samples that are here today.
    • Chris ElamArchitect
    • 01:20:43
      Yeah, I think I just sort of neglected to bring the metal panel sample that would represent the eaves and downspouts at that end.
    • SPEAKER_01
    • 01:20:53
      I mean, I would think that if anything... Come closer to the microphone because we won't be able to hear you in the recording.
    • Chris ElamArchitect
    • 01:20:59
      Yes, so I would think that I did neglect to bring the metal sample that represents the low eave and downspout at the eastern end of the
    • 01:21:07
      Airport Road facade, but I think that, you know, as far as the total materials, I'm happy with the palette here, and if, you know, as I work to, you know, make some refinements to these, then I'll definitely, I'll hope to just work within that palette, so to speak, rather than bringing new materials.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:21:28
      Thank you.
    • 01:21:28
      Yeah, that sounds like that's okay with others.
    • Margaret MaliszewskiPlanning Manager
    • 01:21:35
      Okay, I've highlighted the item that was about the lighting, the light fixtures and the lighting plan.
    • 01:21:46
      Just to clarify, it may look like there are more numbers now.
    • 01:21:50
      What's now number 10 had been part of number 9 by mistake, so I've just separated them out because they're two different items.
    • 01:21:58
      I did not look at the, I did not review in detail the light fixtures that were included in this submittal.
    • 01:22:06
      The wall fixture looks like it's not full cut off.
    • 01:22:09
      We do try to
    • 01:22:12
      Stick with full cut-off fixtures, but I think the lighting details we can work through with the final site plan if that's all right with everybody.
    • 01:22:23
      The items that I've added based on your conversation, 13, revised the blue EIFUS detail on the towers to a color that is more consistent with the primary color palette of the building.
    • 01:22:36
      Sorry, that was one that I already had.
    • 01:22:39
      If you want to replace that with number 15, reconsider the tower window detail and the crenelation at the base for greater simplicity.
    • 01:22:46
      14, consolidate materials to further simplify and harmonize the design, provide the missing metal sample for the even downspout and revise the samples as needed.
    • Taro MatsunoMember, Architectural Review Board
    • 01:22:56
      Yeah, I guess for number 15, can we take out everything from the tower detail and just have it be reconsider the crenelation
    • Margaret MaliszewskiPlanning Manager
    • 01:23:05
      reconsider the crenelation.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:23:07
      Yeah.
    • 01:23:08
      Since 13 covers that.
    • 01:23:10
      I think so.
    • Taro MatsunoMember, Architectural Review Board
    • 01:23:15
      Yeah, I appreciate the applicant.
    • 01:23:17
      I think it can be a complex task sometimes to address this type of building, but I think a lot of the moves that you've made are there.
    • 01:23:27
      You have this base, middle-top organization, you have the towers, the elements are there.
    • 01:23:32
      I just think it's just another passive development, a couple of revising according to the comments that we've made.
    • Chris ElamArchitect
    • 01:23:40
      I appreciate that and glad to hear we're moving in the right direction.
    • 01:23:43
      Yeah, certainly the over, you know, over complication of the facade so to speak, you know, is a
    • 01:23:50
      attempt to be respectful of a large building and treating it using the architectural elements to help to make it fit in and break it down and fit in in that regard.
    • 01:24:05
      So yeah, happy to continue to massage this a little bit.
    • 01:24:11
      It sounds like we're very close.
    • Margaret MaliszewskiPlanning Manager
    • 01:24:15
      Do you want to see the revisions back in another work session?
    • Taro MatsunoMember, Architectural Review Board
    • 01:24:22
      In another work session, you said?
    • 01:24:24
      Yeah, I guess process-wise, what's on the horizon for the project?
    • Margaret MaliszewskiPlanning Manager
    • 01:24:36
      What we've done in the past is we could go ahead with this motion for approval with items maybe 13 through 15 to be reviewed in a work session prior to final approval.
    • Chris ElamArchitect
    • 01:24:57
      Is there a mechanism, just out of curiosity, for allowing you all to review the revisions and or generate comments to them without a proper work session or is that really the only format for that?
    • Margaret MaliszewskiPlanning Manager
    • 01:25:15
      The board can't make decisions outside of a public meeting, so if you want to have that as part of your review, you need to do it in a public meeting.
    • Taro MatsunoMember, Architectural Review Board
    • 01:25:32
      Is the issue just making it out?
    • 01:25:35
      I don't know where you're based.
    • 01:25:36
      Is the issue getting out?
    • Chris ElamArchitect
    • 01:25:38
      I'm in Virginia Beach, so yeah, it's a bit of a ride.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:25:42
      From three to eight hours, right?
    • Chris ElamArchitect
    • 01:25:46
      Yeah, exactly.
    • 01:25:46
      I've been pretty lucky so far.
    • Taro MatsunoMember, Architectural Review Board
    • 01:25:49
      It's been between three and four every time.
    • 01:25:51
      Well, is there a way, if it's a work session, do we need the applicant present, for instance?
    • 01:25:57
      or could they be present virtually?
    • Margaret MaliszewskiPlanning Manager
    • 01:26:00
      Yeah, applicants are always welcome to attend virtually.
    • SPEAKER_01
    • 01:26:04
      You can't see a slide and listen to him talk at the same time.
    • Margaret MaliszewskiPlanning Manager
    • 01:26:08
      Right, right.
    • 01:26:08
      It's just a little clunky and so we encourage everyone to attend in person, but maybe at this point you're sort of narrowing down the items to be discussed and maybe that would be fine.
    • Taro MatsunoMember, Architectural Review Board
    • 01:26:19
      OK. Yeah, I guess because it seems really rough to get from here to there.
    • 01:26:26
      But if it would work for you, we could have the work session.
    • 01:26:30
      It's a little less formal.
    • 01:26:33
      And we could review the response.
    • 01:26:37
      You would need to be physically present.
    • 01:26:40
      Then we could.
    • 01:26:42
      provide information for the final.
    • Chris ElamArchitect
    • 01:26:44
      That sounds viable to me.
    • 01:26:48
      I'm hoping that when I send the updated renderings this next time around, you all are able to say, yeah, I think that's it and wouldn't necessarily require me to explain all of the actions, which it sounds like that would be the real challenge is that
    • 01:27:08
      If I needed to go slide by slide to explain the updates, then the format's gonna be a challenge at that point.
    • 01:27:15
      But I'm hopeful that the updates are clear and we're talking about some minor changes that have some pretty explicit direction at this point.
    • 01:27:27
      So that seems viable to me.
    • Margaret MaliszewskiPlanning Manager
    • 01:27:34
      So I think in that case the motion would be to move to forward the amended comments to the applicant and to have items 13, 14, and 15 addressed in a work session.
    • SPEAKER_04
    • 01:27:55
      Sounds good to me.
    • Margaret MaliszewskiPlanning Manager
    • 01:28:01
      You need someone to...
    • 01:28:03
      So moved, yeah.
    • Taro MatsunoMember, Architectural Review Board
    • 01:28:05
      Second.
    • SPEAKER_01
    • 01:28:08
      Who's first?
    • 01:28:08
      Who did the first?
    • Chris HenningsenChair, Architectural Review Board
    • 01:28:10
      Oh, Chris did.
    • 01:28:10
      Yeah, that was me.
    • SPEAKER_01
    • 01:28:11
      Okay.
    • 01:28:15
      Okay.
    • 01:28:18
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 01:28:19
      Aye.
    • SPEAKER_01
    • 01:28:19
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 01:28:20
      Aye.
    • SPEAKER_01
    • 01:28:21
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 01:28:22
      Aye.
    • SPEAKER_01
    • 01:28:22
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:28:23
      All right.
    • 01:28:23
      Thanks a lot.
    • 01:28:26
      Do any board members or staff have any other items for discussion?
    • 01:28:34
      All right.
    • 01:28:37
      Our next ARB meeting is scheduled for Monday, September 28th, 2026.
    • Taro MatsunoMember, Architectural Review Board
    • 01:28:42
      I'm sorry, 28th or 21st?
    • 01:28:45
      I have 21st on my paper here.
    • Chris HenningsenChair, Architectural Review Board
    • 01:28:47
      I have 28th on this one, but hold on.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:28:51
      I think it is the 28th.
    • 01:28:52
      My paper also says the 21st.
    • 01:28:55
      The 21st was canceled, right?
    • Margaret MaliszewskiPlanning Manager
    • 01:28:57
      The 21st is canceled.
    • 01:28:58
      We don't have any items for the 21st.
    • 01:29:00
      We do potentially have for the 28th.
    • 01:29:04
      So we would like to keep that on the calendar for right now.
    • Chris HenningsenChair, Architectural Review Board
    • 01:29:08
      OK.
    • 01:29:10
      If it's the 28th, I am planning on attending.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:29:14
      I plan to attend on the 28th.
    • Chris HenningsenChair, Architectural Review Board
    • 01:29:17
      I also plan to attend on the 28th.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:29:18
      Do we know how many items?
    • Margaret MaliszewskiPlanning Manager
    • 01:29:21
      One item.
    • 01:29:22
      OK.
    • 01:29:23
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:29:25
      In that case, our meeting is adjourned until our next meeting on Monday, September 28th.
    • 01:29:31
      And it is 2 29.
    • 01:29:33
      Thanks a lot.
    • SPEAKER_04
    • 01:29:34
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:29:36
      Thank you very much.