Architectural Review Board Meeting 9/8/2026
Auto-scroll
Architectural Review Board Meeting
9/8/2026
Attachments
Agenda.pdf
Final Action Memo.pdf
Final Action Memo Minutes.pdf
ARB-2025-00032 Southside Tier II Staff Report.pdf
Attach. 1 ARB-2025-00032 Southside Tier II Site Plan.pdf
Attach. 2 ARB-2025-00032 Southside Tier II Verizon Wireless Antenna and Equipment Plan.pdf
Draft Action Memo Minutes 08_31_2026.pdf
Frank Hancock
Vice Chair, Architectural Review Board
00:00:05
is 102.
00:00:08
I'm calling the September 8, 2026 meeting of the Albemarle County Architectural Review Board to order.
00:00:16
Can we call roll, please?
SPEAKER_01
00:00:19
Yes.
00:00:20
Mr. Van Der Werf?
Frank Hancock
Vice Chair, Architectural Review Board
00:00:21
Here.
SPEAKER_01
00:00:22
Mr. Matsuno?
Frank Hancock
Vice Chair, Architectural Review Board
00:00:23
Here.
SPEAKER_01
00:00:24
Mr. Hancock?
Frank Hancock
Vice Chair, Architectural Review Board
00:00:25
Here.
SPEAKER_01
00:00:26
Mr. Stoner and Mr. Henningsen are not here today.
Frank Hancock
Vice Chair, Architectural Review Board
00:00:30
Thank you, Carolyn.
00:00:32
Disclosures.
00:00:32
Do any ARB members have anything to disclose?
00:00:37
No.
00:00:38
And I don't either.
00:00:41
Let's go to announcements.
00:00:45
Today's meeting is a hybrid meeting.
00:00:47
The public may access and participate in the meeting electronically.
00:00:50
Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
00:00:57
The public has real-time audio-visual access to this meeting over Zoom and real-time audio access over telephone, both as provided in a lawfully posted meeting notice.
00:01:09
This meeting is being recorded and will be made available on the county's website calendar.
00:01:14
This meeting is a public record and subject to the disclosure under the Freedom of Information Act.
00:01:21
All speakers, when it is your turn to speak, please first state your name for the record.
00:01:27
Applicants who are making presentations note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
00:01:37
Staff will let you know when the 15 minutes are up.
00:01:40
If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
00:01:49
Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
00:01:57
Public comment.
00:01:59
Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
SPEAKER_01
00:02:09
I don't have anyone.
Frank Hancock
Vice Chair, Architectural Review Board
00:02:11
Okay.
00:02:12
Consent agenda.
00:02:15
Let's see.
00:02:15
Would anyone like to pull the minutes off the consent agenda?
Dade Van Der Werf
Member, Architectural Review Board
00:02:19
No.
Frank Hancock
Vice Chair, Architectural Review Board
00:02:20
No.
00:02:20
Okay.
00:02:21
Do we have a motion to approve the minutes?
Dade Van Der Werf
Member, Architectural Review Board
00:02:25
We'll move to approve the consent agenda.
Frank Hancock
Vice Chair, Architectural Review Board
00:02:27
Second.
00:02:29
Great.
00:02:30
Can we call the vote?
SPEAKER_01
00:02:32
Sure.
00:02:32
Mr. Hancock?
Frank Hancock
Vice Chair, Architectural Review Board
00:02:33
Aye.
SPEAKER_01
00:02:34
Mr. Matsuno?
Frank Hancock
Vice Chair, Architectural Review Board
00:02:35
Aye.
SPEAKER_01
00:02:36
Mr. Van Der Werf?
Frank Hancock
Vice Chair, Architectural Review Board
00:02:37
Aye.
SPEAKER_01
00:02:37
Thank you.
Frank Hancock
Vice Chair, Architectural Review Board
00:02:38
Thank you.
00:02:40
Moving to regular review items.
00:02:42
There is one regular review item today.
00:02:45
It is ARB-2025-00032 Southside Tier 2 PWSF.
00:02:56
Good afternoon.
Khris Taggart
Senior Planner
00:02:57
ARB reviewed a proposal for a personal wires facility on October 4, 2021.
00:03:07
ARB requested revisions to reduce the standoff to a flush-mounted and clarified visibility, but no revised application was submitted or further action was taken.
00:03:18
This proposal we're reviewing today is to establish a similar personal wires service facility at 2415 Southside Drive, which is located on the northeast corner of Route 29 in Redhill Road.
00:03:31
The star in the side encase the site's general location.
00:03:35
We've noticed some minor inconsistencies in the site plan, which we addressed in the staff report.
00:03:43
I'll summarize those shortly, but first I'll give a brief overview of the ARB's review role
00:03:49
ARB addresses two main items in the review of personal wire service facilities.
00:03:55
The first one is related to the certificate of appropriateness for base equipment, ensuring that items such as ground-mounted equipment and chain-link fences are not visible from the entrance corridor.
00:04:06
The second one concerns siting of the facility to minimize visibility, with ARB providing a recommendation to the agent for the site review committee.
00:04:16
The ARB also provides recommendations on special exceptions when requested.
00:04:23
The proposal in front of you now is for a hundred foot tall pole, some ground equipment, and a eight foot tall cedar fence and antennas on mounting frames.
00:04:40
The pole is to be located within a 50 foot square compound
00:04:46
which sits centered along the southern boundary of 100 foot square lease area.
00:04:54
The poles location is approximately 161 feet from the Route 29 right away.
00:04:59
The site plan shows that the existing mixed tree line between the proposed site and Route 29 will not be impacted.
00:05:10
But because many of these trees sit off-site within the right-of-way, site visibility may increase during the fall and winter when the leaves are off the trees or in the event of right-of-way maintenance.
00:05:23
However, the proposed wooden fence is expected to eliminate visibility of the ground-mounted equipment from the entrance corridor, while remaining visually compatible with the surrounding context.
00:05:36
The tree inventory plan shows 14 trees to be removed within the proposed access and utility easements, lease area, and compound.
00:05:46
However, several trees have conflicting notes and symbology regarding tree removal and preservation.
00:05:52
Revising the table to resolve these conflicts would be appropriate.
00:05:57
A balloon test was held on August 18, 2026.
00:06:01
Due to the density of the wooded area and the size of the balloon, the balloon was not flown from the proposed monopole location, which is the orange circle on this slide.
00:06:11
Instead, the balloon was flown in clearing west of the site represented generally by the red triangle on the plan.
00:06:18
Location is approximately 95 feet west of the proposed monopole location and approximately 147 feet north of the right-of-way, Route 29 right-of-way.
00:06:29
The orange line shows the segment of the entrance quarter along which the balloon was visible.
00:06:36
This is generally between 2936 Monacan Trail Road and just west of Taylor's Gap Road, a distance of approximately a fourth of a mile.
00:06:46
The balloon was most visible along the segment between the red lines shown on the slide.
00:06:53
This balloon location, so this photo shows the balloon from a location a short distance east of the subject parcel.
00:07:04
These photos show the balloon as viewed from the eastbound lanes where the greatest visibility is suspected.
00:07:10
As mentioned earlier, the balloon wasn't flown from the exact proposed monopole location, but we anticipate the monopole would be slightly to the right of the balloon with similar visibility.
00:07:21
Given the overall limited visibility in the proposed wooden fence screen the ground equipment, the structure is not expected to have a significant negative visual impact as viewed from the entrance quarter.
00:07:32
Staff recommendation is that this location sufficiently minimizes the facility's visibility.
00:07:40
To summarize, staff recommends approval of the certificate of appropriateness for the ground equipment in the base station, and we find that the proposed location sufficiently minimizes visibility of the monopole.
00:07:55
Happy to answer any questions.
Frank Hancock
Vice Chair, Architectural Review Board
00:07:57
Thanks, Chris.
00:07:59
Let's see, Dade, do you have any questions for Chris?
Dade Van Der Werf
Member, Architectural Review Board
00:08:02
Sure.
00:08:02
Well, I guess this is probably outside of our purview today, but I was just trying to remind myself of the update to the county regulations.
00:08:11
As I recall previously, I think the height of monopoles was limited to 10 feet above the reference tree, but that was recently.
Khris Taggart
Senior Planner
00:08:18
The county ordinance still connects the tin to the reference tree.
00:08:28
It removed some items from the definitions which changed the understanding of
00:08:35
The reference tree cannot be considered a concealment element.
00:08:42
So with the 10 feet above that the county allows and the federal regulation allows or that defines a substantial change is 20 feet above that allows now 30 feet above the reference tree.
Dade Van Der Werf
Member, Architectural Review Board
00:08:55
I see.
00:08:56
So for context, this monopole at 100 feet is 23 feet above the reference tree or so.
00:09:02
So it fits within the county's current.
00:09:07
Correct.
00:09:07
Yes.
00:09:08
And similarly, the previously, I think antennas needed to be kept like 30 inches off of the monopole or something like that.
00:09:15
And now there's a greater standoff permitted by the ordinance.
00:09:18
Correct.
00:09:19
Yes.
00:09:22
Thank you.
00:09:22
I think just wanted to catch up again.
Taro Matsuno
Member, Architectural Review Board
00:09:25
Thanks, Taro.
00:09:27
Thank you, and thanks for the reminder on the ARB's purview in this review.
00:09:34
No questions.
00:09:35
Thanks.
Frank Hancock
Vice Chair, Architectural Review Board
00:09:35
Thanks, Taro.
00:09:37
I don't have any questions either.
00:09:39
Thanks, Chris.
Khris Taggart
Senior Planner
00:09:39
Thank you.
Frank Hancock
Vice Chair, Architectural Review Board
00:09:42
Do we have an applicant either in person or on Zoom?
SPEAKER_01
00:09:48
He's online.
00:09:50
Lee, can you please unmute yourself?
SPEAKER_06
00:09:54
Yes, I'm here.
00:09:55
Okay, great.
00:10:03
So, Chris summarized everything on it that we're trying to apply for the new cell tower.
00:10:14
and it's gone through the process originally and we were trying to address the staff reports and the balloon test was done a couple weeks back as well.
Frank Hancock
Vice Chair, Architectural Review Board
00:10:34
Okay, thank you.
00:10:37
Let's see if ARB members have any questions for the applicant.
00:10:42
Dade, we'll start with you.
Dade Van Der Werf
Member, Architectural Review Board
00:10:43
No questions, thank you.
Frank Hancock
Vice Chair, Architectural Review Board
00:10:45
Thank you.
00:10:46
Tara?
Taro Matsuno
Member, Architectural Review Board
00:10:47
Tara?
00:10:49
Yes, I was just wondering if you could speak to the siting of the tower within the leased area, just what your considerations were in terms of siting it towards the southern half and if there were any anticipated impacts to visibility by siting it elsewhere in that leased area.
SPEAKER_06
00:11:12
I think the main consideration had to do with the train setting it further back from the house there on Southside Drive.
00:11:24
So just set it further back and the train, you know, the trees were a consideration.
00:11:31
And it's still well enough back from US 29 as well.
Taro Matsuno
Member, Architectural Review Board
00:11:43
And I guess, do you think that putting it in that more steeper area would have meaningfully impacted its visibility from the corridor?
SPEAKER_06
00:11:53
Yes, it could have.
00:11:56
So, I mean, where it's put is the best in terms of the terrain, combination of the terrain, the trees, and, you know, yes, it's less visible from
00:12:12
from the highway.
00:12:13
I mean, it's going to be a little bit visible, but people are just driving by on the highway.
00:12:22
And so it's in a good spot relative to other areas we could have chosen.
Taro Matsuno
Member, Architectural Review Board
00:12:33
And are there reasons that
00:12:41
by relocating it further from the Route 29 that would change the height of the tower or the construction methods or anything?
SPEAKER_06
00:12:53
I don't.
00:12:59
Yeah, I honestly, I don't think so.
00:13:02
I don't know for sure exactly how it was determined, the exact location.
00:13:11
Why there and why not even a little bit further back?
00:13:16
Because I mean, it meets the setbacks on both ends, but it's just, yeah, it's just in that kind of backside central location between US 29 and the property line to the north.
00:13:32
So it's almost halfway between the two.
Frank Hancock
Vice Chair, Architectural Review Board
00:13:37
Great, thank you very much.
00:13:39
Thank you.
00:13:41
And I don't have any questions for the applicant.
00:13:46
Let's see, we'll move to public comment.
00:13:49
Are there any members of the public that would like to make a comment?
SPEAKER_01
00:13:52
Carolyn?
00:13:53
He's here.
SPEAKER_04
00:14:01
Thank you, Mr. Chairman, members of the board.
00:14:02
My name is Ed Donahue.
00:14:04
I represent SBA Towers.
Dade Van Der Werf
Member, Architectural Review Board
00:14:06
Chris, could we go to your, I think it's your second slide.
SPEAKER_04
00:14:08
It's the aerial shot.
00:14:11
So SBA owns a tower approximately 772 feet southwest of the proposed tower, on the other side of 29, right about there, right?
00:14:22
And it's our view that consistent with the county's policies that colocation ought to be encouraged, as we're encouraged to make maximum use of an existing structure, that the carriers proposed for the north side of 29 ought to be encouraged to use the existing structure
00:14:38
Southside of 29, again only on 772 feet.
00:14:41
The tower proposed on the north side of 29 will be visible.
00:14:47
I note that the trees there look to be largely deciduous.
00:14:51
The applicant suggests that well for the motorists on 29 it won't be much visibility.
00:14:56
When those leaves come down there will be a good deal of visibility.
00:14:59
Now we have an existing structure.
00:15:01
That structure could be extended to accommodate the additional height
00:15:05
that appears to be proposed for Verizon Wireless.
00:15:08
So we can get the height of 107 feet on the existing tower on what's known as 6409.
00:15:13
And that's a by-ride extension.
00:15:16
And it's a zoning application, but it's fast track because it's a guaranteed height extension.
00:15:22
We'd have to do some groundwork.
00:15:23
We'd have to do some other things to accommodate the needs.
00:15:26
But again, consistent with colocation, you would have all facilities on one tower.
00:15:32
We note that the application, different applicant, but the application for the site has been around since 2021.
00:15:37
And it may be that what I'm suggesting may take a better time to try to accommodate.
00:15:44
However, this is also subject to zoning.
00:15:47
The site plan and process staff shows it to be approximately halfway through.
00:15:51
We've been tracking this throughout, but I want to make the board aware of this because I wanted you to know that while we're opposed, we'd like to continue to cooperate, collaborate with staff and see if we can't come up with something that would meet the needs of the carriers involved here, but also meet the county's policies on colocation.
00:16:10
Those are my comments, Mr. Chairman.
Frank Hancock
Vice Chair, Architectural Review Board
00:16:11
Thank you.
00:16:17
All right.
00:16:19
Where are we?
00:16:24
The ARB will now go into discussion.
00:16:27
We'll start with Taro.
Taro Matsuno
Member, Architectural Review Board
00:16:30
I'd like to thank the applicant for making the presentation.
00:16:33
You know, I think
00:16:36
Going to our two points of review, that speaking from the perspective of whether or not the ground equipment will be screened, it seems that the proposal does do that.
00:16:54
I think in terms of the facility's siting, it sounds like from the applicant's comments that there are other options in order to minimize its visibility.
00:17:08
So I would
00:17:10
So just that they do so, but that in general, you know, I think that it's in keeping with the criteria for our review.
00:17:21
So unless there is some practical reason why the facility can't be moved to a different location within the leased area, I think it may make sense for the applicant to do so.
00:17:34
and I do, I think speaking to the county's
00:17:43
Policy of Encouraging Collocation, I would look to staff to guide whether or not that becomes a factor in our decision.
00:17:53
But in general, I would continue to affirm that the county's position of collocation is in keeping with what we've discussed previously on the board, and I'm not sure how that comes into our decision-making process.
00:18:10
But I appreciate the applicant's proposal.
00:18:13
I don't have any significant issues with it.
00:18:16
So apart from the ones that I've raised, so thank you.
Frank Hancock
Vice Chair, Architectural Review Board
00:18:22
Thanks, Taro.
00:18:23
Dave?
Dade Van Der Werf
Member, Architectural Review Board
00:18:24
Yeah, thank you, Frank.
00:18:25
Thank you, Taro.
00:18:27
Yeah, I agree with Taro's comments.
00:18:28
I do wonder, Frank, if we might ask staff to advise.
00:18:33
I appreciate the member of the public providing those comments about the site for colocation, how that figures into our assessment of whether the facility is sited to minimize visibility.
00:18:45
Because obviously, if there's another site, this is an additional site.
00:18:50
It might be an additional visibility that I think, per the comments from the public, might not be necessary.
00:18:58
I'd be interested in staff's assessment of how that might weigh in our consideration today.
Frank Hancock
Vice Chair, Architectural Review Board
00:19:03
Thank you.
00:19:04
Margaret, Chris, would you all be willing to shed some light on this?
Khris Taggart
Senior Planner
00:19:09
Sure.
00:19:09
Co-location options cannot be a justification for denial.
00:19:16
They're used when other reasons for denial are on the table in looking at co-location as a kind of exploring ways to
00:19:30
Be able to prove that the application but they can't be the sole reason for denial.
Dade Van Der Werf
Member, Architectural Review Board
00:19:38
Our review of that criteria is advisory?
Khris Taggart
Senior Planner
00:19:40
Right, and co-location wouldn't be under the purview of the ARB.
Dade Van Der Werf
Member, Architectural Review Board
00:19:47
So the board could potentially provide an advisory opinion that it's not cited to minimize visibility since there's a co-location opportunity, but that would ultimately just be something that would be considered by, because this goes to other boards fundamentally for approval, ours is an advisory one?
Khris Taggart
Senior Planner
00:20:04
I believe that it is my understanding
Margaret Maliszewski
Planning Manager
00:20:07
I think what you want to do is provide advice on the siting that's being proposed and if you want to make a recommendation about co-location that would be in addition to your advice on what's proposed.
Dade Van Der Werf
Member, Architectural Review Board
00:20:29
Thank you.
00:20:30
If I may ask one other question of staff and us, Frank.
00:20:33
Sure.
00:20:37
You know, I don't recall other applications where applicants have provided explorations of alternative locations to demonstrate that the chosen location has the least visibility.
00:20:51
Is there precedent for that or no?
SPEAKER_01
00:20:55
The applicant might want to respond to some of your questions.
00:20:58
I think he's trying to talk, but I've got to change.
00:21:02
Are you trying to talk?
SPEAKER_06
00:21:05
Yeah, there's not necessarily a precedence for that.
Margaret Maliszewski
Planning Manager
00:21:12
I would agree with that.
00:21:20
That's not done typically.
Frank Hancock
Vice Chair, Architectural Review Board
00:21:22
Yeah, I don't have anything really to add.
00:21:28
I'm in agreement with staff comments.
00:21:33
Yeah, it seems outside our purview, it seems like a business decision, not necessarily architectural control if this application meets the requirements.
00:21:44
I mean, that was in the staff report, noted the existing facilities, you know, there's pictures of them, you know.
00:21:56
I think that was all taken into consideration with staff review and the overall review.
00:22:02
So, yeah, I don't have anything else to add.
00:22:07
Do we want to look at the recommended motion?
Margaret Maliszewski
Planning Manager
00:22:27
So as we've been discussing, there are two items.
00:22:30
The recommendation would be for a motion for number one for approval of the certificate of appropriateness for the ground equipment and base station as it's proposed.
00:22:41
And the second item of the motion would be to forward the recommendation in the staff report regarding visibility of the facility to the agent with those conditions or with the changes that are recommended to the site plan regarding the trees.
Frank Hancock
Vice Chair, Architectural Review Board
00:23:00
Does anybody have any revisions or questions or edits to the motion?
Taro Matsuno
Member, Architectural Review Board
00:23:07
I don't believe I do.
Dade Van Der Werf
Member, Architectural Review Board
00:23:09
Thank you.
Taro Matsuno
Member, Architectural Review Board
00:23:11
I think my only question is the phrasing of minimize.
00:23:15
I'm not sure that adjusting the location would, well, the applicant said that the change in location would further minimize the visibility of the monopole, although
00:23:32
So I don't know how to assess whether the proposed is going to have as much of an impact.
00:23:44
So I don't know if there needs to be a note that they should consider alternate locations within the leased area or something.
00:23:51
But in general, I'm not opposed to it falling within any part of the leased area.
Margaret Maliszewski
Planning Manager
00:24:02
Would you like to add here at that bullet the ARB recommends considering alternate locations to further reduce visibility but finds that the proposed location will generally sufficiently minimize the visibility of the monopole from the entrance corridor?
Taro Matsuno
Member, Architectural Review Board
00:24:20
Yeah, I think what you said is just encouraging the applicant to explore
00:24:28
areas within the least area to minimize visibility.
00:24:31
I think that sounds good to me.
Dade Van Der Werf
Member, Architectural Review Board
00:25:14
Thanks, Margaret and Taro.
Frank Hancock
Vice Chair, Architectural Review Board
00:25:16
Do you mean, sorry, that find alternate locations within this specific leased area?
00:25:24
Or lease area?
Taro Matsuno
Member, Architectural Review Board
00:25:25
Yeah, I just I just understood what the applicant said that they had selected a site within that larger box of the area the lease applied to.
00:25:36
And I thought that they just told us that where they had cited it didn't minimize visibility.
Frank Hancock
Vice Chair, Architectural Review Board
00:25:46
Then the question though is, you know, does it come back to us?
00:25:52
Because we're reviewing it in a specific place.
00:25:56
And if it moves within that box,
00:26:00
Does that require another balloon test?
Taro Matsuno
Member, Architectural Review Board
00:26:03
I don't really want it to.
00:26:04
I feel like if they demonstrate that where it is visible is less visible, or if they can make a case as to why whatever location they eventually select is less visible than what we've seen now, then I don't see that it requires our review.
Frank Hancock
Vice Chair, Architectural Review Board
00:26:18
It would be like a staff level review?
00:26:25
We're basically saying we're okay with it in its current location?
Taro Matsuno
Member, Architectural Review Board
00:26:30
Yeah, I am okay with it in its current location.
00:26:32
I was just going off the wording of our criteria that it says it has to minimize.
00:26:36
And so if the applicant tells us that it could be further minimized, I don't know how we can, I think we have to at least suggest they look into it.
00:26:45
That's kind of how I feel about it.
Margaret Maliszewski
Planning Manager
00:26:49
I think if the ARB is generally okay with what's being proposed and we are certainly can work with the applicant to see if there's anything that makes it less visible within that lease area we can have that conversation.
Khris Taggart
Senior Planner
00:27:04
Yeah, and I guess I would stress the word that within the lease area that further reduces visibility if you're saying
00:27:14
And his current location is sufficient, but if there's like opportunities for further reduction of visibility.
Taro Matsuno
Member, Architectural Review Board
00:27:21
Yeah, and maybe I'm just getting hung up on the word minimize.
00:27:24
It's just like, I think that the impact is relatively small.
00:27:29
It's just there was a suggestion that it could be further minimized.
00:27:31
And so I would encourage the applicant to explore that.
Dade Van Der Werf
Member, Architectural Review Board
00:27:34
Any other comments?
00:27:41
No, thank you.
00:27:42
Thank you, Toru.
Frank Hancock
Vice Chair, Architectural Review Board
00:27:43
Do we have a motion?
Taro Matsuno
Member, Architectural Review Board
00:27:48
Make a motion to provide a certificate of appropriateness.
Margaret Maliszewski
Planning Manager
00:27:57
Yeah, I would just say it's a motion to, number one, approve the certificate of appropriateness for the ground equipment and base station as it's proposed, and number two, to forward that revised recommendation regarding visibility to the agent.
Taro Matsuno
Member, Architectural Review Board
00:28:09
Got it, thank you.
00:28:10
Yes, so I'll move to approve the certificate of appropriateness for the Southside Tier 2 PWSF ground equipment and base station as proposed and to forward the recommendations as amended to the agent as listed in the staff report and amended on the screen.
Frank Hancock
Vice Chair, Architectural Review Board
00:28:28
Thank you.
00:28:29
Do we have a second?
00:28:30
I'll second.
00:28:31
Can we call the vote?
SPEAKER_01
00:28:33
Mr. Van Der Werf?
Frank Hancock
Vice Chair, Architectural Review Board
00:28:34
Aye.
SPEAKER_01
00:28:35
Mr. Matsuno?
00:28:36
Aye.
00:28:36
Mr. Hancock?
00:28:37
Aye.
00:28:38
Thank you.
Frank Hancock
Vice Chair, Architectural Review Board
00:28:40
Thank you.
00:28:42
Let's see, moving to work session items.
00:28:44
There are no work session items today.
00:28:46
Other items, anything from other board members or staff?
00:28:54
No?
Khris Taggart
Senior Planner
00:28:55
No.
Frank Hancock
Vice Chair, Architectural Review Board
00:28:59
Let's see, next meeting, the next ARB meeting is scheduled for Monday, September 14th, 2026.
00:29:07
Do you know if you'll be able to attend?
00:29:10
Yes, I plan to attend.
Dade Van Der Werf
Member, Architectural Review Board
00:29:13
I plan to attend as well.
Frank Hancock
Vice Chair, Architectural Review Board
00:29:15
I'm planning to attend.
Dade Van Der Werf
Member, Architectural Review Board
00:29:17
Do you know how many items we have for the agenda?
Margaret Maliszewski
Planning Manager
00:29:19
We have two items right now.
Frank Hancock
Vice Chair, Architectural Review Board
00:29:24
Okay, anybody, there's nothing else.
00:29:30
This meeting is adjourned to the next meeting on Monday, September 14th, 2026.
00:29:36
The time is 1.32.
00:29:40
Thank you all.