Architectural Review Board Meeting 7/6/2026
Auto-scroll
Architectural Review Board Meeting
7/6/2026
Attachments
Agenda.pdf
Final Action Memo.pdf
Final Action Memo Minutes.pdf
Draft ARB Action Memo Minutes 061526.pdf
ARB-2026-00008 Vet Emergency Group Staff Report.pdf
Attach 1 ARB202600008 Vet Emergency Group original design presented May 26 2026.pdf
Attach 2 ARB-2026-00008 Vet Emergency work session drawings presented June 15 2026.pdf
Attach 3 ARB-2026-00008 Vet Emergency annotated revised drawings for July 6 2026.pdf
Attach 4 ARB-2026-00008 Vet Emergency combined revised site and architectural drawings for July 6 2026.pdf
ARB-2026-00010 Med Square Staff Report.pdf
Attach 1 ARB-2026-00010 Med Square December 8 2025 Staff Report.pdf
Attach 2 ARB-2026-00010 Med Square Final Site Plan.pdf
Attach 3 ARB-2026-00010 Med Square Architectural Drawings.pdf
Chris Henningsen
Chair, Architectural Review Board
00:00:08
OK, thank you.
00:00:09
So it's just about 1 o'clock.
00:00:13
I'm calling the July 6, 2026 meeting at the Albemarle County Architectural Review Board to order.
00:00:20
If you could call the roll, please.
SPEAKER_05
00:00:21
Yes.
00:00:22
Mr. Henningsen?
Chris Henningsen
Chair, Architectural Review Board
00:00:23
Here.
SPEAKER_05
00:00:24
Mr. Matsuno?
Chris Henningsen
Chair, Architectural Review Board
00:00:25
Here.
SPEAKER_05
00:00:26
Mr. Van Der Werf?
Chris Henningsen
Chair, Architectural Review Board
00:00:27
Here.
SPEAKER_05
00:00:27
We have Mr. Stoner and Mr. Hancock are both out absent.
00:00:30
Thank you.
Chris Henningsen
Chair, Architectural Review Board
00:00:31
All right.
00:00:31
Thank you.
00:00:33
Do any ARB members have anything to disclose?
00:00:37
No.
Dade Van Der Werf
Member, Architectural Review Board
00:00:37
No.
Chris Henningsen
Chair, Architectural Review Board
00:00:38
Neither.
00:00:41
So today's meeting is a hybrid meeting.
00:00:43
The public may access and participate in the meeting electronically.
00:00:48
Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
00:00:53
The public has real time audio visual access to this meeting over Zoom and real time audio access over telephone.
00:01:00
Both is provided in the lawfully posted meeting notice.
00:01:04
This meeting is being recorded and will be made available on the county's website calendar.
00:01:09
This meeting is a public record and subject to disclosure under the Freedom of Information Act.
00:01:15
All speakers, when it is your turn to speak, please first state your name for the record.
00:01:20
Applicants who are making presentations, note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
00:01:28
Staff will let you know when the 15 minutes are up.
00:01:31
If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
00:01:39
Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
00:01:48
Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
00:01:57
No.
00:02:00
Got it.
00:02:00
Would anyone like to pull the minutes off the consent agenda?
00:02:05
No.
00:02:06
All right.
00:02:07
In that case, I move to approve the consent agenda.
00:02:11
Second.
SPEAKER_05
00:02:13
All right.
00:02:14
Mr. Henningsen?
Chris Henningsen
Chair, Architectural Review Board
00:02:16
Aye.
SPEAKER_05
00:02:16
Mr. Matsuno?
Chris Henningsen
Chair, Architectural Review Board
00:02:18
Aye.
SPEAKER_05
00:02:19
Mr. Van Der Werf?
Chris Henningsen
Chair, Architectural Review Board
00:02:21
Aye.
SPEAKER_05
00:02:21
Thank you.
Chris Henningsen
Chair, Architectural Review Board
00:02:22
All right.
00:02:22
Thank you.
00:02:24
We have two review, regular review items today.
00:02:27
The first is ARB 2026-8, Vet Emergency Group Shell Building.
Margaret Maliszewski
Planning Manager
00:02:48
Okay.
00:02:50
This is a proposal for a veterinary clinic at the intersection of Hydraulic Road and Swanson Drive in the Stonefield Town Center.
00:02:58
This is a view of the site next to the Regal Cinema.
00:03:01
It's from the entrance corridor.
00:03:03
You first reviewed this proposal on May 26th and then again in a work session on June 15th.
00:03:09
Our staff report for today outlined how the comments from the May review had been addressed.
00:03:13
And as a reminder, the result of the work session was that the design was moving in the right direction.
00:03:19
This is the design of the entrance corridor facing elevation that was reviewed in May, and the primary issue then was the back of building appearance of the elevation.
00:03:29
This is the revised entrance corridor elevation.
00:03:32
Here's the comparison.
00:03:33
The materials have been redistributed for a more symmetrical appearance in this revised elevation.
00:03:39
There's also a greater proportion of hardy siding, and the siding and the ephus colors are consistent with those used throughout the shopping center.
00:03:48
These are the site elevations with the original design at the top and the revised design at the bottom.
00:03:53
These revised elevations are consistent with the entrance quarter elevation and the east elevation incorporates green screens like those used elsewhere in the shopping center.
00:04:03
Although the green screens are shown on the elevation drawing, the site plan does not show any planting area associated with them.
00:04:10
So one of our recommendations is to update the site and landscape plans with that information.
00:04:17
The site wall was also a topic of discussion in the previous reviews.
00:04:21
The current submittal provides details that show double-sided blocks for the site wall and the fence that's proposed for the top of the wall and that those appear to have an appropriate appearance.
00:04:30
The plan also shows a row of shrubs added along the entrance quarter side of that wall, and we expect that combination to have an appropriate appearance on the corridor.
00:04:40
Another issue discussed in the previous reviews was the proposed trimming of the arborvitae that are planted along the regal cinema.
00:04:47
The applicant has indicated that the trimming won't damage the root system, which is a good thing, but there's still a concern that the trimming will damage the appearance of the trees and possibly permanently.
00:04:58
The trees were planted very close to the screen wall that's next to the cinema building.
00:05:02
There aren't many branches on the screen side, so trimming on the new building side of the tree could result in a unnatural appearance.
00:05:09
So we've repeated the comment requesting additional information to show exactly how that's going to work.
00:05:17
We've also included a few comments on standard requirements for landscaping and lighting and our recommendation is for approval with the revisions listed in the staff report.
00:05:25
I'd be happy to try to answer any questions you have.
Chris Henningsen
Chair, Architectural Review Board
00:05:27
Thanks a lot, Margaret.
00:05:30
I guess we'll start with Dade if you have any questions.
00:05:33
No questions.
00:05:33
Thank you, Margaret.
00:05:35
Taro?
00:05:35
No, I don't have any questions.
00:05:36
Thank you very much.
00:05:37
Yeah, sorry, Margaret.
00:05:38
I don't have any questions either.
00:05:41
So if the applicant has a presentation.
Juanita Li
Project Architect, AIA, NCARB, LEED GA
00:05:56
This is Juanita Lee from Design Develop, the architect for the project.
00:06:01
I'm just going to go through one by one with the staff recommendations to outline how we have either started to address or will address all of the comments.
00:06:11
So for the green screen plantings, I have here markup and how
00:06:18
The civil engineer will be updating the site plan to include the English ivy which is the plantings used for the other green screens around Stonefield and to mark the locations on the site plan there.
00:06:34
In terms of making sure the lighting meets all the requirements for the entrance corridor, we've noted that these are full cutoff fixtures.
00:06:46
The temperature of the lighting has been updated to 3000K for warm light glow, and the dark bronze color will be used for all the fixtures.
00:06:56
We've already updated the site lighting photometric plan.
00:07:01
We have added the parcel line.
00:07:04
Since the parcel is basically for the entire shopping center, there's really no specific building lots.
00:07:13
So what we've done is we've marked that parcel line.
00:07:15
on the south there.
00:07:18
And then we have annotated that the shopping center at that whole parcel extends over 300 feet in both directions from the sides of the building to show that the foot candle requirement is going to be met.
00:07:36
We've also updated the fixture schedule to match the 3000K temperature and then added the note for in the general notes about the outdoor luminaire.
00:07:55
In terms of the recommendation to be more specific in how the trimming will be done, the contractor has informed us that they just need four feet of clearance beyond the line of the site wall.
00:08:12
and they would trim vertically up about 10 feet and so what we plan to do is on the existing conditions have lines demarcating that line of trimming and then also a line demarcating where the site wall will be and then hatch in the area of the trees that will need to be trimmed
00:08:33
for the construction and also adding a note for the one large existing tree you can see there in the northwest corner that the lower branches would only need to be trimmed to about eight feet and so we're hoping that with this information it would be more clear the extent of what the tree trimming will be.
00:08:59
Just for illustrative purposes for this presentation here we have basically a rear elevation where you can see the point cloud data from the trees and I've marked out
00:09:14
In the dotted yellow box that's where you would see the four feet past the site wall up to 10 feet above the grade there and so where the trimming will happen will be in the lower part of the tree and the upper parts that are screening the regal cinema would still remain in place and then for the site plan
00:09:37
for what the conditions will be after construction we will have the same annotations but then also note that the trees would be the property owner says the trees will be allowed to grow back to that site wall so all the things that were trimmed from the bottom would be able to grow back
00:09:57
and so we're hoping that with that information that will help clarify the extent of the trimming and what the plan is for those trees.
00:10:10
In the landscape schedule we would update the schedule to include a column to note that the minimum planting sizes for the cherry, laurel, and the surface berry would be 24 feet.
00:10:23
I think for the service berry probably be closer to six feet.
00:10:28
But since those plants don't have calibers, we'll just have to add an extra column to make those sizes more clear.
00:10:38
And then there was a note about the wall signs.
00:10:42
Currently what we have is a note on our elevations that the exterior signage is provided by the owner.
00:10:49
It's in their scope to work with the tenant to apply for the approval for the signage.
00:10:55
So we'll add the comment that wall signs cannot be approved until Stonefield comprehensive sign plan is revised to include the new building in that elevation note, just so that it's more clear.
00:11:07
And I believe that handles all of those comments.
00:11:11
If there's any questions about how we plan to address all of those suggestions, let me know.
Chris Henningsen
Chair, Architectural Review Board
00:11:19
Thanks a lot.
00:11:21
Tara, do you have any questions?
00:11:22
I don't.
00:11:22
Thank you.
00:11:24
Dave?
Dade Van Der Werf
Member, Architectural Review Board
00:11:24
Not about the response to the comments, thank you.
00:11:26
That's an extraordinarily thorough presentation of those responses, thank you.
00:11:31
One question I had for the future signage plan, which may be on your radar too, it looks like the location of the sign that's proposed is
00:11:42
prominent also in the view of the pylon side of the monument sign for the overall complex.
00:11:49
So there's a little bit of tension between sort of the building and that.
00:11:52
And then there's thankfully a lot of nice landscape also going in front of that sign, which may obscure it.
00:11:57
So I don't look forward to seeing what you'll propose for the signage after reviewing it with Stonefield.
Juanita Li
Project Architect, AIA, NCARB, LEED GA
00:12:04
Yes.
00:12:04
And Margaret has made us aware that we need to be careful about the height of the lettering to make sure there's enough clearance around that with that band where the signage will go.
00:12:16
And so that will be something that is worked out with the tenant.
Chris Henningsen
Chair, Architectural Review Board
00:12:21
Thank you.
00:12:23
All right.
00:12:23
I don't have any questions.
00:12:25
Thank you.
00:12:26
Are there any members of the public that want to make a comment?
00:12:30
No.
00:12:31
All right.
00:12:31
Great.
00:12:34
So in that case, the ARB will now go into discussion.
00:12:37
I guess starting with Dave, if you have any comments.
Dade Van Der Werf
Member, Architectural Review Board
00:12:40
Sure.
00:12:40
So I appreciate the applicants working with the board over the last couple of weeks and their response to staff comments.
00:12:46
I think the additional detail on the tree trimming is helpful.
00:12:50
And I think between the extent that's proposed and its location effectively behind much of the building, I think that addresses any concerns I may have had about it.
00:13:01
and then just appreciate generally the further development and the design so prepared to have an approval today.
00:13:12
All right, thank you.
00:13:13
Tara.
Taro Matsuno
Member, Architectural Review Board
00:13:14
Yeah, I agree wholeheartedly with what Dave mentioned, including the, you know, I think all of our questions have been answered by the presentation.
00:13:22
I don't have anything to add.
00:13:23
I appreciate the applicant working with us.
Chris Henningsen
Chair, Architectural Review Board
00:13:26
All right.
00:13:27
Yeah, the rest sound like a broken record.
00:13:30
I would say the same thing, but I'll save time by not saying that.
00:13:37
If we could take a look at the recommended motion.
Margaret Maliszewski
Planning Manager
00:13:57
So recommendations for approval with the conditions listed in the report.
Dade Van Der Werf
Member, Architectural Review Board
00:14:08
I don't have any comments on that.
Chris Henningsen
Chair, Architectural Review Board
00:14:10
I don't either.
00:14:13
In that case, I move for approval of the certificate of appropriateness for ARB 2026-8, FET emergency group shell building with the conditions listed in the staff report.
Dade Van Der Werf
Member, Architectural Review Board
00:14:28
I'll second.
Chris Henningsen
Chair, Architectural Review Board
00:14:31
Right.
00:14:31
If we could put that to a vote.
SPEAKER_05
00:14:34
Mr. Van Der Werf?
Chris Henningsen
Chair, Architectural Review Board
00:14:35
Aye.
SPEAKER_05
00:14:35
Mr. Matsuno?
Chris Henningsen
Chair, Architectural Review Board
00:14:37
Aye.
SPEAKER_05
00:14:37
Mr. Henningsen?
00:14:38
Aye.
00:14:38
Thank you.
Chris Henningsen
Chair, Architectural Review Board
00:14:39
All right.
00:14:39
Thanks a lot.
00:14:40
All right.
00:14:44
Our second regular review item is ARB 2026-10 Med Square Ambulatory Surgery Center.
Margaret Maliszewski
Planning Manager
00:14:56
This is a review of a final site development plan and a revised architectural design for a new medical office building in the Peter Jefferson Place development.
00:15:10
The site is located approximately 380 feet south of the Route 250 East entrance corridor.
00:15:16
The parcel does not have frontage on the corridor.
00:15:19
The ARB completed a preliminary review of this project in December of last year.
00:15:24
These are some of the images from that review.
00:15:25
The staff report for today's meeting outlined how the revised proposal addressed the comments from that meeting.
00:15:32
One change that has been made since the December review is a change to the layout of the ambulance drop-off area.
00:15:39
This slide shows a comparison of the previous layout on the left to the current layout in the middle.
00:15:44
And the image at the right is the updated drop-off.
00:15:47
It has a reduced canopy length as viewed from the entrance corridor.
00:15:51
This is a more distant view of that side of the building.
00:15:54
Overall, the form and the character of the building remain the same as does the landscaping in the vicinity.
00:16:02
This slide highlights where other recent changes have been made to the elevations and they're mostly changes to windows and canopies.
00:16:11
Material samples were requested and they have been provided.
00:16:14
They are up behind you at the stage if you'd like to look at those up close.
00:16:20
We do expect that these materials will be compatible with the others in the development and with the buildings along the corridor.
00:16:28
One comment made in the previous review was about the rooftop elements and whether they contributed to a coordinated appearance.
00:16:35
This image highlights some of the changes that were made to rooftop elements.
00:16:39
Again, primarily the adjustments were to the sizes of the canopies and to the mansard roof on the main entrance side of the building.
00:16:46
The multiple roof elements remain, but the applicant has explained that the multiple forms are meant to help reduce scale, establish hierarchy, and express the organization of the program.
00:16:58
The roof forms are visible in these new perspective views and the building is expected to be visible from the street, but it will be visible at a distance and beyond and through the existing street trees.
00:17:10
Another comment from the previous review asked for a lighting plan to be submitted.
00:17:14
That has been submitted.
00:17:16
We reviewed that plan and we've had a few recommendations for changes to make that plan consistent with the guidelines.
00:17:22
So our recommendation is for approval of the plan with the revisions listed in the staff report.
Chris Henningsen
Chair, Architectural Review Board
00:17:27
All right, thanks a lot for the presentation.
00:17:30
I guess, Dave, do you have any questions?
00:17:35
No, I don't believe so.
Dade Van Der Werf
Member, Architectural Review Board
00:17:35
Thank you, Margaret.
Chris Henningsen
Chair, Architectural Review Board
00:17:37
Tara?
00:17:38
I don't have any questions either.
00:17:39
Thank you, Margaret.
00:17:41
Yeah, I don't have any questions either.
00:17:43
So if the applicant has a presentation.
SPEAKER_05
00:17:49
I need some help.
00:17:50
Do you need some help?
00:17:52
The mouse is not moving.
SPEAKER_00
00:17:57
Oh,
SPEAKER_02
00:18:37
Good afternoon, everyone.
00:18:38
I apologize for this technical difficulties I was having today.
00:18:43
Thank you so much, Margaret, for the summary and the recommendations.
00:18:47
And I am an architectural designer at B.A.
00:18:51
Wolpert.
00:18:53
Today, the applicant, Shannon Drake, couldn't join us in person and he apologizes, but he is available online and joining us on the Zoom call to answer any questions you might have.
00:19:04
Today, we have prepared the presentation for you to talk about the points of discussion that were mentioned in the report.
00:19:15
The site is located on Peter Jefferson Place on Parcel D, which means that we have to abide by more regulations architecturally than that is required by the ARB.
00:19:29
And all of the buildings that are surrounding our building are also
00:19:33
Following these same restrictions, the entrance corridor is about 180 feet from the building.
00:19:39
And you can see that for parcel D, we do have some more constraint that we took into consideration when we were developing the design.
00:19:49
The site plan should feel like a campus with connecting walkways around it.
00:19:55
The architecture needs to reflect classical Virginia architecture with a predominant building of color white.
00:20:04
And the roof needs to be defined by dormers and gables.
00:20:09
Having one solid surface for the roof is not something that was recommended and we needed to break up the roof into smaller pieces.
00:20:21
The landscape and all the fencing around the walls need to be in harmony with the landscape around it and all the plants that were selected were native to the location.
00:20:37
So if we look at this site, it's located within the boundaries of the yellow line and all the buildings around our site look and feel
00:20:50
respect all of these rules.
00:20:53
And then we can see that the building D, C and E are predominantly white.
00:20:59
And we looked at these as precedents for our building and how the shape and the massing of these buildings informed our design decisions.
00:21:10
This is our new building here.
00:21:12
It's a medical office building that will be located between these buildings.
00:21:18
And you can see where it says one here, it's connecting with the center, Martha Jefferson Hospital campus, which we wanted to keep because this is also a medical office building.
00:21:30
Number two, it shows how it's connecting to existing detention ponds.
00:21:34
And then number three, the view from the entrance corridor that we have
00:21:43
We added a section here for the building to see how it will look from the entrance corridor route 250.
00:21:50
You can see here that we have a landscape buffer between the roadway and the building.
00:21:57
And we have a setback with the retention pond being in between.
00:22:02
So this will be heavily vegetated and not really interfering much with the visibility of the building from the main entrance corridor.
00:22:14
And this is what it would look like.
00:22:16
And you can see all the landscape that we assume in summer would be like that.
00:22:22
I will show a little bit more pictures about what it could look like in winter when the trees are not so bushy.
00:22:29
But you can see how the building and its roof composition reads as a cohesive whole and it fits within the urban planning setting that we have here and the other buildings around it.
00:22:44
For our roof hierarchy, we wanted to create a cohesive image and express the program within the constraints of the building.
00:22:53
This is a clinical building, but we wanted to also emphasize the entrances.
00:22:57
We wanted to reduce the massing of the building instead of having a whole
00:23:03
Block, breaking it up to have different roof hierarchies showing intentionally the human experience of where the entrance is so we can like a way of wayfinding and they can see where the entrance is.
00:23:20
We wanted to clarify that by having these walls that show the entrance with the signage on top.
00:23:28
And then where we have larger windows is where we have the staff lounge so they can have a better view of the pond that is going to be in their site.
00:23:40
They will overlook it.
00:23:42
And all of the windows here are where we have more clinical spaces.
00:23:54
From the main corridor, this would be the view and Margaret showed us the same view.
00:23:58
So we just wanted to show that we updated this ambulance drop-off canopy, which was much larger before, but after we talked with the tenants, we agreed on reducing it and making it more human scale and more informative of where the entrance is.
00:24:17
This would be another view from the south looking at the building.
00:24:21
You can see that it doesn't really show much, but you can still see that it has a good presence.
00:24:26
It shows what it is, the intent of it.
00:24:29
And it is visible, but also blending with the overall landscape over there.
00:24:39
These are some pictures we were trying to show kind of the experience of how you would see this building if you are on the corridor and driving by.
00:24:48
And this is like in the winter.
00:24:51
This was summer.
00:24:52
This is winter when we have less leaves.
00:24:56
And then these would be other images that we can see.
00:25:00
Winter.
00:25:04
We updated the site plan, as I mentioned, the drop-off canopy.
00:25:09
We highlighted here all the revisions that we think are moving in the right direction and making the building look better.
00:25:16
The floor plan has been updated a little bit when we talked to the tenants and agreed on the ambulance drop-off with the staff entrance.
00:25:29
So all the roofs are located where these entrances are important.
00:25:34
From the south is the main entrance to the building.
00:25:36
The north side that is visible from the highway and the entrance corridor is for the service.
00:25:44
And then on the right and left, we have staff coming in.
00:25:49
And then on the left side is more staff, but also the ambulance drop off.
00:25:52
and the roof land shows where these entrances are.
00:25:57
That's why we have these mansard roofs located where they are and the canopies above the ambulance drop-off has been updated as well.
00:26:10
The elevations here, we highlighted all of the revisions we made to the drawings.
00:26:16
We made the larger window from the entrance corridor.
00:26:19
The first elevation would be the one that is visible.
00:26:24
So we made larger windows at the center and then the ambulance drop-off canopy updated.
00:26:30
We removed some windows because they were
00:26:34
in the way of the pre-post bays where we don't really need the windows, but we still wanted to keep the brick pattern over there for hierarchy and rhythm in the building overall.
00:26:49
In the bottom, you can see how that elevation where the ambience drop-off is is also updated.
00:26:56
And we added more window on the one on the right.
00:27:04
We did submit some samples of the materials that we picked.
00:27:08
We have the red brick and we have a white tonal range for the white parts.
00:27:17
and then we have some ACM metal panels.
00:27:20
We did provide a sample for the roof which is packed clad in a gray color and we have fiber cement screening on the roof that matches the metal panels that we picked in color.
00:27:37
They are light gray and
00:27:43
We did provide a glass sample as well that we will talk about later with the specs.
00:27:48
There was a recommendation in the report to talk about it.
00:27:51
And these are overall the materials for the site wall.
00:27:58
We did provide a sample of that as well.
00:28:04
This would be the updated view of the entrance.
00:28:09
You can see we removed the windows and the ambulance drop-off canopy now looks a little bit more better and suitable for the overall composition of the building.
00:28:21
This would be the other side of the building.
00:28:25
And then the glass sample that we picked, we were basing it off of the ARB guideline, which says that the reflectance of the outside pane of the glass should be kept below 7%.
00:28:36
And that's why we picked the one that we did.
00:28:40
The recommendation was to have a different sample possibly that
00:28:48
is more aligning with the requirement of having a visible light transmittance VLT of not below 40%, which is right now we are showing it as below, and then VLR not to exceed the 30%.
00:29:04
So the sample that we provided is the number two here, GL1A.
00:29:10
We are proposing to move to GL1 that could fit these requirements better, but for us, the light to solar gain was an important factor and that's why we picked the second one.
00:29:27
But we can definitely move to the first one here on the list that could be more in line with what the ARB wanted us to do.
00:29:37
And we have a sample in the office that we can mail in.
00:29:45
And we are looking forward to getting an approval from the board.
00:29:49
Thank you so much for your time.
00:29:51
And if you have any questions, I'm happy to answer them.
Chris Henningsen
Chair, Architectural Review Board
00:29:55
All right, thanks a lot for the presentation.
00:29:59
We'll start with Dade, if you have any questions.
Dade Van Der Werf
Member, Architectural Review Board
00:30:02
Sure, yeah.
00:30:02
Thank you for the presentation, and thank you for the additional visualization today.
00:30:06
It's very helpful to understand more fully the building and what's proposed.
00:30:11
I don't know if it's possible for you to hold up.
00:30:13
I think it's called The View from the Southeast.
00:30:15
It's earlier in the presentation.
SPEAKER_02
00:30:17
I think there's a... Is it this one?
Dade Van Der Werf
Member, Architectural Review Board
00:30:26
And maybe a little earlier still, I think there was a page maybe with two views or this one.
00:30:31
Yeah, I think the... Keep going back.
00:30:41
There was one before that.
00:30:48
Sorry, no, I guess if you go forward again, sorry.
00:30:51
And then...
00:30:57
I think this one.
00:30:58
And thank you also for highlighting the standards of the development.
00:31:03
I'm just interested to ask, is there a review process for the development that has this design?
SPEAKER_02
00:31:07
Yes, we did do that review process and we got a proof on it.
Dade Van Der Werf
Member, Architectural Review Board
00:31:12
Thank you.
00:31:12
I was interested especially just that those standards call for gables or dormers because the roof forms in this building are fundamentally sort of sheds or lean-tos, you know, not gables and not complete so was interested to ask I guess just generally to staff's comment about increasing the coherence of the roof forms if you have any thoughts about how that might be done.
SPEAKER_02
00:31:40
Well, we didn't want to do dormers.
00:31:41
We wanted to make this building more timeless.
00:31:44
And that's why we picked the Mansard roof instead.
00:31:48
If we want to make them more cohesive, what would be your what is your thinking?
Dade Van Der Werf
Member, Architectural Review Board
00:31:56
I don't know that I have a prescriptive solution.
00:31:58
I was just interested, you know, given staff's comment, whether you had thoughts about alternatives to make the roof form more coherent and in light of the
00:32:08
the standards that you referenced about the use of gables was interested to highlight that.
00:32:16
I think I agree as you've described the entrances, they all are rational in terms of how they relate to approaches from parking and other areas.
00:32:24
I think the view from the Southeast that you're sharing here before, it's not as clear how the roof forms contribute to the overall hierarchy or organization of the mass as it's perceived from
00:32:37
the corridor, I think.
00:32:40
So, but that was my main question.
00:32:45
So with that, happy for my colleagues to offer theirs.
00:32:48
Thank you.
00:32:49
Thank you.
00:32:50
Tara?
Taro Matsuno
Member, Architectural Review Board
00:32:52
Yes.
00:32:53
I had a question.
00:32:54
Would you be able to talk a little bit about the mechanical units on the roof and whether the screening is sufficient for shielding them
SPEAKER_02
00:33:07
Yeah, so we did work with our mechanical engineers on the roofing and the reason why we have these screens the way they are is because all of the RTU units are gonna be placed in the center of the building and hidden by the fiber cement panels on the right and left here.
Taro Matsuno
Member, Architectural Review Board
00:33:23
And so the height of those walls in the center, I think I saw like six or seven feet.
SPEAKER_02
00:33:31
Correct.
Taro Matsuno
Member, Architectural Review Board
00:33:31
And so that should cover the mechanical units.
SPEAKER_02
00:33:33
Yeah, it should cover them, yes.
Taro Matsuno
Member, Architectural Review Board
00:33:35
Okay, cool, thank you very much.
Chris Henningsen
Chair, Architectural Review Board
00:33:37
All right, I don't have any questions.
00:33:40
So are there any members of the public that want to make a comment?
SPEAKER_05
00:33:43
Shannon Drake, is she with you?
00:33:45
Yes, he's with me.
00:33:47
Shannon, go ahead and unmute yourself and you can speak.
SPEAKER_06
00:33:52
Quick, thank you.
00:33:53
This is Shannon Drake.
00:33:55
Can you hear me?
00:33:56
I can hear you.
00:33:57
Can you hear me?
SPEAKER_05
00:33:59
Okay.
SPEAKER_06
00:34:00
Great.
00:34:01
Again, my name is Shannon Drake.
00:34:03
I am with VA Wilbert.
00:34:04
Thank you for the opportunity to
00:34:07
Add commentary to what my colleague Rola presented.
00:34:10
I wanted to go back and talk a little bit about the review process on the roof configuration and why we ultimately ended up with shed roofs instead of a gabled roof or a pitched roof.
00:34:23
The review process we had with the planned development people that are in charge of that parcel of land was we initially actually had a very different
00:34:37
roof configuration and that it was a flat roof and they were actually not interested in creating a sort of historical language that really didn't go along with an ambulatory surgery center and so we worked I believe over the course of six or seven months to come back to something that had some of the geometries that you see
00:35:03
in traditional architectural language, but that had a more modern bent to it.
00:35:12
So we did this four times with them.
00:35:15
And ultimately the approval was successful.
00:35:19
I think one of the things that they mentioned was materiality was important to them and the tonal ranges.
00:35:26
So gray roofs will be that slate, be that metal,
00:35:30
but something that had that flavor to it and really the desire or the language that talks about dormers and things of that nature is language that came forth in the 90s when this was set forth so they completely understood that you know again a surgery center isn't going to have that type of element to it so there were some
00:35:54
opportunities to negotiate that.
00:35:57
Having said that, I think one strategy that we could deploy to further enhance the hierarchy here is really I think the imagery isn't
00:36:09
developed to the point where the contrast of the roof elements with the horizontal line is coming through in the images.
00:36:17
That roof should read as a major part of the massing and so anything that really reinforces the fact that we're trying to break this horizontal bar that's really long is something that's going to help increase the
00:36:34
The read of this being a very purposeful approach to the building.
00:36:39
So that's something that we can certainly look at is really tweaking the tonality of the roof and how that accentuates the actual pieces that it's framing.
00:36:49
So it's really framing the public entrance on the opposite side of the view corridor, the staff entrance on the west side of the building, and then what faces us in these images.
00:37:03
is the conference room and break area for the clinic and the inventory surgery center.
00:37:09
So we really want to keep reinforcing that.
00:37:13
I think it's a matter of tweaking, perhaps, the tonality of the roof.
00:37:19
And we can certainly look at adjusting the pitch so there's more presence to it.
00:37:23
That would, I think, really reinforce the purposefulness of this.
00:37:31
That's all I wanted to add.
00:37:32
Thank you.
Dade Van Der Werf
Member, Architectural Review Board
00:37:35
Thank you for the additional comments Thank you
Chris Henningsen
Chair, Architectural Review Board
00:37:38
All right, if there are no more comments from the public, the ARB will go into discussion.
00:37:45
Starting with Taro, if you have any comments.
00:37:48
Thanks.
Taro Matsuno
Member, Architectural Review Board
00:37:49
I think, generally speaking, I think that the presentation, as shown, meets a lot of the criteria in the entrance corridor design guidelines.
00:38:00
I appreciate the level of representation that we've received to kind of evaluate the proposal.
00:38:08
You know, I think to Dade's comment around the reforms, I think when we go to those perspectives that are closer to the building, like the one around the, like showing sort of the parking lot view, you know, I think we, I see where your,
00:38:35
Where the intention was really clear, it does play as like an element on the facade.
00:38:44
does signal entry and I can understand why not including those in those locations would sort of diminish the success of the proposal.
00:39:02
I think it's when you zoom out a little bit to like the views from the corridor where we have, where it becomes a little bit less purposeful maybe where
00:39:15
Like I can see that there's just a lot, because between the shed on the front, the shed on the, or what I read as the front and the back, just the long faces of the building.
00:39:26
And then the shed on the, I guess the staff entrance as well.
00:39:31
It just feels like there's a lot of planes going on where their relationship is less clear to the overall building form.
00:39:42
And
00:39:46
You know, I don't know that it's like a I think in my view, the ones on the long face of the building are the most successful at doing what the applicant described of breaking that horizontal line and establishing primary facades for the building.
00:40:08
But that it might be more legible with just one fewer shed on the
00:40:15
Service side.
00:40:16
It's a rather shortened facade anyway, and it has a canopy and it has other features that kind of distinguish it.
00:40:24
Overall, I think it's a nice addition to the campus.
00:40:28
I appreciate also that there are other constraints with the internal review process, but I think that data is probably onto something around the reforms and some study would be appreciated.
Chris Henningsen
Chair, Architectural Review Board
00:40:44
All right, thank you.
Dade Van Der Werf
Member, Architectural Review Board
00:40:46
Well, yeah, no, thank you.
00:40:47
And thank you, Taro, for your remarks.
00:40:49
I think I appreciate those perceptions.
00:40:51
And thank you again to the applicant for the additional visualization and for the additional background on the reviews, which are very helpful to understand.
00:40:58
I think, Taro, I appreciate your noting the application of the language of the sheds to the various facades and considering whether
00:41:08
A few ones would be more coherent or alternatively, I think it's that the corner with the ambulance entrance, at least through the visualizations today, seems to be one of the more prominent portions of the building to the entrance corridor.
00:41:22
So alternatively, I don't know if extending that shed language as an element that more consistently breaks up facades, highlights, entry, and programmatic function around the building.
00:41:36
Might alternatively make it more coherent, but I appreciate the applicant's willingness to explore and consider ways to
00:41:45
It further enhanced the language that they're working with to make the building forms more coherent overall for the project.
00:41:53
All right.
Chris Henningsen
Chair, Architectural Review Board
00:41:54
Thank you.
00:41:55
I don't really have anything significant to add.
00:41:58
I think some additional refinement on the roof forms would certainly be good.
00:42:04
But I feel that overall, I support the proposal as submitted.
00:42:14
but I appreciate the applicant's willingness to take a further look at the roof forms.
00:42:21
If we could take a look at the recommended motion.
Margaret Maliszewski
Planning Manager
00:42:41
The recommendation was for approval with the conditions listed in the staff report.
00:42:45
The first one in the list just says, consider revising the design of rooftop elements to increase coordination.
00:42:53
I don't know if you want to, you want a revision to that.
Dade Van Der Werf
Member, Architectural Review Board
00:43:01
I think personally understand the applicants willing to explore it a little further but I think at least along with Taro we have some concerns about seeing something more.
00:43:11
I would support maybe making it a requirement to further develop the roof elements for coordination.
00:43:22
I know some in some cases applicants have returned for a focused work session to advance that.
00:43:27
I don't know what means would be most efficient but certainly happy to
Taro Matsuno
Member, Architectural Review Board
00:43:33
Yeah I think the only thing is like I don't know if that I want them given the level of development of everything else and are pretty much consensus on it like I wouldn't want them to have to I would want to be able to provide them either with
00:43:58
either with the consider language so that they have the flexibility to propose something to staff and ultimately should they decide based on and give good reasons for why they would either remain with the current proposal or change it that they would be able to move forward in the process.
00:44:14
But if we're requiring a revision, I just don't know if it's like enough for staff to go on without checking back in with us.
00:44:22
That's my only concern.
Margaret Maliszewski
Planning Manager
00:44:24
If you want to require it, we can get back to you as quickly as possible in a work session, just as the schedule permits.
00:44:44
If you want to leave it at consider revising, then
00:44:52
There's a lot more wiggle room there.
Dade Van Der Werf
Member, Architectural Review Board
00:44:55
Yeah, I think fundamentally if we say consider, then we should all be comfortable with the current proposal because that could be what's executed.
00:45:03
I think for me personally, I don't feel like that corner in that one view is most prominent to the EC is satisfactory from my perspective yet, but I defer to others.
Margaret Maliszewski
Planning Manager
00:45:16
I will point out that some of those views are bird's eye views that I think don't take into consideration some of the impact that the trees right along the entrance corridor will have for screening and blocking some of the view.
Dade Van Der Werf
Member, Architectural Review Board
00:45:34
I agree the landscape will be a significant mitigating factor for that facility.
Taro Matsuno
Member, Architectural Review Board
00:45:45
Case for the Consider is I think that we're, I think we have different issues with the roots.
00:45:50
And I don't know that resolving one would necessarily satisfy this person.
00:45:54
So I don't, that's why I would put it, I think, you know, given their work on the project thus far, I feel like, I don't know that I feel as strongly about the emergency canopy side.
00:46:13
And I can,
00:46:16
So I would be content to just leave it as a consider in order to let them exercise their judgment based on what they've heard and are willing to put forth based on what they have going on.
00:46:29
That's my personal take.
Dade Van Der Werf
Member, Architectural Review Board
00:46:32
Sounds like that's probably the majority consensus.
00:46:36
Happy to.
Chris Henningsen
Chair, Architectural Review Board
00:46:40
All right.
00:46:41
Well, if there are no other points of discussion, then I'll move for approval of the certificate of appropriateness for ARV 2026-10, Med Square Ambulatory Surgery Center Final with the conditions listed in the staff report.
SPEAKER_00
00:47:10
Second.
Taro Matsuno
Member, Architectural Review Board
00:47:11
Oh, second.
SPEAKER_05
00:47:15
Mr. Henningsen?
Chris Henningsen
Chair, Architectural Review Board
00:47:16
Aye.
SPEAKER_05
00:47:17
Mr. Matsuno?
Chris Henningsen
Chair, Architectural Review Board
00:47:18
Aye.
SPEAKER_05
00:47:19
Mr. Van Der Werf?
Chris Henningsen
Chair, Architectural Review Board
00:47:20
Aye.
SPEAKER_05
00:47:20
Thank you.
00:47:21
All right.
Chris Henningsen
Chair, Architectural Review Board
00:47:22
Thanks a lot.
00:47:24
We do not have any work sessions today.
00:47:28
So we'll move on to other business.
00:47:33
But first of all, do any board members or staff have any other issues they'd like to discuss?
Margaret Maliszewski
Planning Manager
00:47:40
Attendance at upcoming meetings is the only other item for me.
Chris Henningsen
Chair, Architectural Review Board
00:47:47
Okay.
00:47:49
Well, starting with the next meeting, which is scheduled for Monday, July 13th, which is next Monday, I am planning on attending.
00:48:01
So I don't know about the other board members planning as well to attend.
00:48:07
I won't be able to attend.
00:48:09
All right, so I guess we'll do an email poll to hopefully get a quorum for that.
Margaret Maliszewski
Planning Manager
00:48:15
Yes.
00:48:16
And I think after today's meeting, Carolyn's going to send an email out to everyone to see about attendance through the summer, just so we have a better idea of, and understand that things may still change, but just have an idea of what sort of
00:48:37
Attendance we have as we keep having to bump things from one agenda to the next and we'll just help to know what it if you already know what dates you won't be available.
Taro Matsuno
Member, Architectural Review Board
00:48:50
I know looking at my calendar that I won't be available on the 27th.
00:48:53
I can repeat that in an email thread but just because we're here.
Margaret Maliszewski
Planning Manager
00:48:57
Great, thank you.
Dade Van Der Werf
Member, Architectural Review Board
00:49:00
Has anybody heard of any initiatives in Richmond to relax the...
Margaret Maliszewski
Planning Manager
00:49:11
Unfortunately, no.
Chris Henningsen
Chair, Architectural Review Board
00:49:16
Alright.
00:49:18
In that case, this meeting is adjourned.
00:49:22
Hopefully until Monday, July 13, or some other date to be determined later.
00:49:32
It's 149 by my watch.
00:49:36
Thanks a lot.
Margaret Maliszewski
Planning Manager
00:49:37
Thank you all.