Central Virginia
  • Albemarle County
  • Architectural Review Board Meeting 5/26/2026
  • Auto-scroll

Architectural Review Board Meeting   5/26/2026

Attachments
  • Agenda.pdf
  • Final Action Memo.pdf
  • Final ARB Action Memo Minutes.pdf
  • ARB-2026-00006 Car Lovers Major Amendment Staff Report.pdf
  • Attach 1 ARB-2026-00006 Car Lovers Major Amendment Site Plan.pdf
  • Attach 2 ARB-2026-00006 Car Lovers Major Amendment Architectural Package.pdf
  • ARB-2026-00008 Vet Emergency Group staff report.pdf
  • Attach 1 ARB-2026-00008 Vet Emergency Group Architectural Drawings.pdf
  • Attach 2 ARB-2026-00008 Vet Emergency Group Site Plan.pdf
  • Draft ARB Action Memo Minutes 05_11_2026.pdf
    • SPEAKER_04
    • 00:00:04
      Now live.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:06
      All right, thanks.
    • 00:00:07
      It's 106 by my watch.
    • 00:00:13
      So I'm calling the May 26, 2026 meeting of the Albemarle County Architectural Review Board to order.
    • 00:00:20
      If you could call the roll, please.
    • SPEAKER_04
    • 00:00:23
      Yes.
    • 00:00:23
      Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:24
      Here.
    • SPEAKER_04
    • 00:00:24
      Mr. Stoner.
    • Justin ShimpFounder and Principal Engineer
    • 00:00:25
      Here.
    • SPEAKER_04
    • 00:00:26
      Mr. Matsuno.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:28
      Here.
    • SPEAKER_04
    • 00:00:29
      Van Der Werf.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:30
      Here.
    • SPEAKER_04
    • 00:00:30
      Mr. Hancock is absent today.
    • 00:00:32
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:33
      Thanks a lot.
    • 00:00:35
      Do any ARB members have anything to disclose?
    • 00:00:39
      No.
    • 00:00:40
      No.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:00:40
      No.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:41
      Neither.
    • 00:00:44
      Today's meeting is a hybrid meeting.
    • 00:00:46
      The public may access and participate in the meeting electronically.
    • 00:00:49
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:00:55
      The public has real-time audiovisual access to this meeting over Zoom and real-time audio access over telephone.
    • 00:01:01
      Both is provided in the lawfully posted meeting notice.
    • 00:01:05
      This meeting is being recorded and will be made available on the county's website calendar.
    • 00:01:10
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:15
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:01:20
      Applicants who are making presentations, note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:29
      Staff will let you know when the 15 minutes are up.
    • 00:01:32
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:01:40
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:01:48
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • SPEAKER_04
    • 00:01:54
      I don't have anyone on line.
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:58
      All right.
    • 00:02:00
      In that case, we don't have any consent agenda items today.
    • 00:02:03
      So we'll move on to our first of two regular review items, which is ARB-2026-6, Car Lovers Rio.
    • Khris TaggartSenior Planner
    • 00:02:18
      Good afternoon.
    • 00:02:19
      The application I'm presenting on is a major amendment for Car Lovers Car Wash located at 1083 Rio Road East.
    • 00:02:28
      The site was developed before the establishment of this entrance quarter and does not feature design and landscape elements, typical developments approved by the ARB.
    • 00:02:38
      The plan proposes to remove the vacuum islands between the car wash facility and the Royal Road entrance corridor.
    • 00:02:43
      This would be replaced with seven parking spaces and seven vacuum stations along the southern side of the building.
    • 00:02:51
      The vacuum equipment will be visible from the entrance corridor due to the site being established and the proposed changes being limited to a small portion of the site.
    • 00:02:59
      This makes the design of the vacuum equipment and the use of landscaping important in mitigating the visual impact the equipment will have on the EC.
    • 00:03:09
      The applicants provided images of the proposed vacuum equipment.
    • 00:03:12
      The equipment is shown to be gray and blue with LED tube lighting.
    • 00:03:17
      The use of multiple colors and LED lighting will highlight site features that should not be seen from the entrance quarter.
    • 00:03:24
      Revising the vacuum equipment to use a single neutral color and removing the LED tube lighting would be appropriate.
    • 00:03:32
      The current landscaping does not align with the approved plan.
    • 00:03:35
      Along Grier Road, there are ornamental trees and a few scattered shrubs.
    • 00:03:38
      The plan proposes a mixture of evergreen and deciduous shrubs interspersed between the existing trees.
    • 00:03:45
      However, a single row of shrubs will not adequately screen the visibility of the equipment due to its height and proximity to the entrance quarter, and there is a gap in the southeast corner.
    • 00:03:56
      It would be appropriate to revise the plan to show a double staggered row of evergreen shrubs along Rile Road and Gasoline Alley.
    • 00:04:05
      The site plan shows vacuums under existing hip roof canopy and near carwash amenity equipment located along the south side of the building.
    • 00:04:13
      The proposed equipment based on its height and location appears to conflict with the canopy and existing equipment.
    • 00:04:19
      However, no change has been noted to the exterior of the building.
    • 00:04:24
      Revising this medal to show how the vacuum equipment relates to the canopy and the system equipment would be appropriate.
    • 00:04:31
      Staff was recommended approval of the major amendment with the revisions listed in the staff report.
    • 00:04:37
      I'd be happy to answer any questions you all may have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:04:40
      All right, thanks for the presentation, Chris.
    • 00:04:44
      I guess we'll start with Frank Stoner, if you have any questions.
    • Frank StonerMember, Architectural Review Board
    • 00:04:48
      I do not.
    • Chris HenningsenChair, Architectural Review Board
    • 00:04:49
      All right, Dade?
    • 00:04:51
      No questions, thanks.
    • 00:04:52
      Taro?
    • 00:04:53
      I don't have any questions.
    • 00:04:55
      Yeah, sorry, Chris.
    • 00:04:55
      I don't have any either.
    • 00:04:59
      If the applicant has a presentation, now would be the time for it.
    • SPEAKER_00
    • 00:05:26
      Hello, everyone.
    • 00:05:27
      My name is Julia Flynn-Moore.
    • 00:05:28
      I work for Shimp Engineering.
    • 00:05:30
      Chris, thank you for the introduction.
    • 00:05:32
      And I am also here with Justin Shimp, as well as Remus Witt, who manages the site, and Matt Bascom, who owns the site.
    • 00:05:41
      So they will be here for any additional questions.
    • 00:05:45
      And as was discussed, this is a proposed amendment or letter of revision to a 2001 site plan in order to remove some vacuums and add additional vacuums.
    • 00:05:57
      Some points of clarification that came up based on the staff report and comments and questions.
    • 00:06:03
      The existing canopy structure shown in red here is planned to be removed along with the equipment along the wall there.
    • 00:06:11
      So there will be space for all seven of the new vacuums to not have any conflict with that canopy.
    • 00:06:19
      And then another key point, which we can discuss more with the lighting, we have some questions on this, but
    • 00:06:25
      Each of the existing four vacuums there as you can see in this other red box has a pole light with it currently and those pole lights will be removed with these new vacuums that will be installed.
    • 00:06:41
      I just want to highlight that as this is an existing site that was approved prior to the entrance corridor, as of now you can see the vacuums and the lights.
    • 00:06:52
      So we think that going forward our improvements will be a net benefit.
    • 00:06:59
      Again, this is the plan.
    • 00:07:01
      These are kind of the areas that we want to focus our discussion on, make sure we're clear on the landscape and what's going on with the vacuums and the proposed lighting fixtures.
    • 00:07:13
      And so we are on board with the majority of the proposed revisions.
    • 00:07:18
      We just have a couple of questions and clarifications that we would like to go over.
    • 00:07:23
      We're happy to add additional landscape along the frontage.
    • 00:07:27
      We just wanted to make sure we were talking about the same spot with the southeast corner.
    • 00:07:31
      See from your side, we are talking about the same spot.
    • 00:07:33
      So that's great.
    • 00:07:34
      I'll show some slides where we're proposing additional shrubs and trees.
    • 00:07:40
      We would like to confirm that black is considered a neutral color.
    • 00:07:45
      We can get to that in a slide.
    • 00:07:46
      And then we are hoping that you all will be amenable to keeping the tube lighting on the canopy.
    • 00:07:55
      So I'll talk about that in a little bit.
    • 00:07:58
      We submitted in our application an example of the blue vacuums.
    • 00:08:03
      This is the applicant's first preference, ones that they have at other sites in the area.
    • 00:08:09
      But if we went with black, it would look something like this, obviously within the site that we'll be working on, but just want to show that as an option.
    • 00:08:20
      Black would be our second preference and hoping that that counts as a neutral option.
    • 00:08:27
      and went ahead and drafted in some additional shrubs and trees just to show how these could fit within the proposal.
    • 00:08:35
      We're happy to add these double staggered row of evergreens in the front as the side, as well as the trees on the side.
    • 00:08:42
      And so the lights, we understand that in the entrance corridor, it's not ideal to have
    • 00:08:53
      Mechanical equipment visible.
    • 00:08:55
      However, these are existing vacuums.
    • 00:08:58
      We will be adding landscape.
    • 00:09:00
      The amount of light added by these potential canopy structures is less than 3000 lumens.
    • 00:09:07
      We calculated that it's about four of the older traditional 60 watt light bulbs that would be with each vacuum.
    • 00:09:15
      And to note the current vacuums have existing pole structures.
    • 00:09:19
      So there is already undue attention being called to the vacuums.
    • 00:09:23
      We think that incorporating lighting into
    • 00:09:27
      The canopy is just going to create more cohesive situation.
    • 00:09:31
      It's important that there be shade and it's important that there be lighting for safety.
    • 00:09:36
      This is 24 hours operation.
    • 00:09:39
      So that's kind of really our main priorities here is shade and safety.
    • 00:09:45
      And just incorporating the lights into the canopy makes the most sense.
    • 00:09:51
      Any other option would be kind of awkward and would add more unnecessary structures to the site.
    • 00:09:59
      And as I highlighted here, we would use the less than 3000K warm light, not the cool light for the two lights.
    • 00:10:14
      So that's all I have.
    • 00:10:16
      If anyone, you guys want to add anything at this point?
    • 00:10:19
      Okay.
    • 00:10:20
      We'll be available for questions, comments.
    • 00:10:24
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:10:25
      All right.
    • 00:10:25
      Thanks a lot.
    • 00:10:26
      I guess we'll start with Dade, if you have any questions.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:10:30
      Sure, yeah.
    • 00:10:31
      Thank you for your presentation highlighting the existing use and the landscaping improvements.
    • 00:10:37
      I guess one question I have is, you know, with the existing canopy on the building and the existing incorporation of equipment in it, did you give any consideration to using an architectural canopy as a way to incorporate and integrate the vacuums in the site?
    • SPEAKER_00
    • 00:10:54
      Do you guys want to add anything to that?
    • SPEAKER_11
    • 00:11:01
      We haven't really considered, these are- Please come up to the mic.
    • SPEAKER_00
    • 00:11:04
      Yeah, come up, yeah.
    • SPEAKER_11
    • 00:11:07
      Just say your name and then- Thanks for your question.
    • 00:11:09
      So the, I'm sorry, my name's William Bascom and the vacuum equipment that we proposed with the canopies that are built in are, it's equipment we've used at a number of other locations we've been happy with.
    • 00:11:25
      Using a different style canopy,
    • 00:11:30
      isn't something we really seriously considered.
    • 00:11:33
      So we'd be happy with what we're proposing.
    • 00:11:36
      And I would imagine if we went with a different style canopy that I'm envisioning, it'd probably increase the project cost quite a bit.
    • 00:11:45
      But we haven't really seriously looked at other alternatives.
    • Chris HenningsenChair, Architectural Review Board
    • 00:11:50
      Thank you.
    • SPEAKER_11
    • 00:11:50
      Sure.
    • Chris HenningsenChair, Architectural Review Board
    • 00:11:53
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:11:55
      Yes, do you have any specs for the shrubbery that you want to include on Rio Road and how tall that might get?
    • SPEAKER_00
    • 00:12:04
      Oh, yes.
    • 00:12:06
      We had specified a mix of evergreen and deciduous in our original, but I think with these, it would just be evergreen.
    • 00:12:14
      So, for example, like Winterberry Holly, one of those evergreens, Bayberry, and we'll make sure it's two foot height at Plecting, that was one of the
    • 00:12:22
      comments.
    • 00:12:24
      We had not specified that correctly, but we will say two foot height and make sure they're appropriate evergreens from the planting list.
    • 00:12:31
      Okay, thank you.
    • Taro MatsunoMember, Architectural Review Board
    • 00:12:34
      Tara?
    • 00:12:37
      Yeah, so the lights, they're always on, like at nighttime essentially, or they switch in some way.
    • SPEAKER_00
    • 00:12:44
      Yes.
    • 00:12:45
      Do they have a switch that goes off at any point on your other sites?
    • 00:12:51
      Yeah, so like it senses whether they need to be on or off, yeah.
    • Taro MatsunoMember, Architectural Review Board
    • 00:12:57
      Great, thank you.
    • 00:12:58
      Yeah.
    • Chris HenningsenChair, Architectural Review Board
    • 00:12:59
      I guess where the canopy and equipment is being taken off the side of the building, is that just going to be replaced with horizontal siding like is essentially what's there now?
    • SPEAKER_00
    • 00:13:11
      Yes, to match the existing siding, that's correct.
    • Chris HenningsenChair, Architectural Review Board
    • 00:13:16
      All right.
    • 00:13:16
      Thanks, I think that's all the questions.
    • 00:13:20
      Are there any members of the public that want to make a comment?
    • SPEAKER_04
    • 00:13:24
      I don't have anyone online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:13:27
      All right.
    • 00:13:28
      In that case, the ARB will now go into discussion.
    • 00:13:31
      I guess we'll start with Taro, if you have any comments.
    • Taro MatsunoMember, Architectural Review Board
    • 00:13:35
      Thanks.
    • 00:13:36
      I appreciate the applicant submitting this application.
    • 00:13:40
      I do agree that what's proposed does improve on the
    • 00:13:51
      in the current situation and provides a more consistent scheme for lighting and vacuum equipment.
    • 00:13:59
      So in that respect, I think it certainly makes sense from the owner's perspective.
    • 00:14:07
      I think the landscape improvements certainly help align more closely with the entrance corridor design guidelines and
    • 00:14:19
      I don't have any other particular issues with this one, so thank you.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:14:26
      Oh yeah, thank you, Chris.
    • 00:14:28
      I agree that the additional landscaping will be an improvement.
    • 00:14:32
      And I think in the context of this having been approved, the site in general, having been approved prior to the BC guidelines and existing with equipment, I think I personally can see a narrow path to approval.
    • 00:14:47
      I think there is perhaps a missed opportunity.
    • 00:14:53
      Approaching this with an architectural solution that the equipment can be incorporated into.
    • 00:14:59
      I think there are examples.
    • 00:15:01
      I think the aqua spa has canopies.
    • 00:15:03
      The vacuum equipment is integrated with to some degree and to some degree those canopies
    • 00:15:09
      establish a different hierarchy where the equipment becomes more secondary visually and I think in general for the incorporation's equipment which is proliferating would prefer to see it incorporated in architectural solutions and I think there's potentially one here.
    • 00:15:27
      I don't disagree that it would be a greater
    • 00:15:28
      construction expense, but I think it could have been an improved opportunity.
    • 00:15:35
      Some of the other new sites I'm pleased to have been able to incorporate the equipment behind the buildings relegated and that's been positive.
    • 00:15:42
      So all to say, I think, appreciate the applicant's presentation and willing to support this with my colleagues as an existing site.
    • 00:15:53
      All right, thank you.
    • 00:15:54
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:15:56
      Yeah, I would agree with
    • 00:15:58
      Both comments from Tara and Dade.
    • 00:16:03
      I think color-wise, probably have a slight preference for black.
    • 00:16:09
      I think they're looking for some acknowledgement that black is neutral, although I could probably support the blue as well.
    • 00:16:19
      I understand the applicant's concern over cost for an architectural solution, and while
    • 00:16:27
      I think it probably would look better.
    • 00:16:32
      I appreciate the cost constraints.
    • 00:16:35
      And given the fact that this is sort of an existing site pre-ARB, I'd be inclined to support it as submitted.
    • 00:16:45
      All right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:45
      Thank you.
    • 00:16:46
      I'm in agreement also.
    • 00:16:50
      I also would kind of lean towards the black over blue.
    • 00:16:55
      But as far as the integral lights, my feeling is that as long as lights are needed anyway, I think it would be a little bit more cohesive to have the lights that are provided with the equipment and then try and have some kind of external light source like what's there now.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:17:19
      I guess one question regarding the lighting, I realize maybe I didn't ask, is in terms of how it's incorporated in the canopies, will it create any glare or issues relative to the EC or will it otherwise be compliant?
    • Khris TaggartSenior Planner
    • 00:17:34
      I guess I wanted to add that with the lighting, that particular lighting that hasn't been approved for other vacuum equipment in the entrance quarter, in particular other developments where the lighting, the equipment has been behind the building, it still hasn't been approved for similar vacuum equipment.
    • 00:17:52
      So this would be going again counter to what has been previously approved.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:17:57
      Right, so I should just amend my remarks.
    • 00:17:59
      I think the lighting perhaps accepted for me to the extent, I mean, if there is a way to demonstrate that it doesn't create glare and it respects the cutoff and other things that we expect in the EC, then that would be one thing, but presuming it doesn't, I think would want to see another lighting solution.
    • Margaret MaliszewskiPlanning Manager
    • 00:18:24
      We want to pull up the detail that shows the lighting.
    • 00:19:07
      This is something that might need clarification is whether or not that lighting, if it's just like it's showing in this image, the question is does that lighting move?
    • 00:19:34
      Maybe the applicants can help.
    • 00:19:38
      Is it part of the vacuum that moves?
    • SPEAKER_11
    • 00:19:42
      Yeah, the lights don't move.
    • Margaret MaliszewskiPlanning Manager
    • 00:19:48
      So that's a plus.
    • 00:19:49
      But as it's illustrated here, it wouldn't be a full cutoff fixture.
    • 00:19:56
      The guidelines do recommend all full cutoff fixtures.
    • SPEAKER_11
    • 00:20:00
      Just to clarify, that's a picture that's similar to the lighting that we were proposing.
    • 00:20:05
      It's not the same structure.
    • 00:20:07
      One thing that's different with ours is it's going underneath the canopy where that one's not, but it's a similar style tube and it's all stationary.
    • 00:20:17
      It doesn't move at all.
    • Justin ShimpFounder and Principal Engineer
    • 00:20:22
      Sorry, Dustin Champ, I just wanted to add one bit of commentary.
    • 00:20:26
      One that we brought up earlier, the lumens.
    • 00:20:29
      There are only 1,800 lumens.
    • 00:20:31
      I think our observation is in the scale of what's going on in that corridor, these lights are going to be pretty minimally visible.
    • 00:20:38
      They're under the code requirements, 3,000 is the cutoff to be fully screened.
    • 00:20:44
      So these are much more equivalent to somebody has their lamp on the front of their house than a commercial lighting fixture.
    • 00:20:49
      Just wanted to make sure that was
    • 00:20:51
      brought up in this context.
    • Frank StonerMember, Architectural Review Board
    • 00:20:54
      Is there a diagram showing how many lumens are actually on the site and how much spillover there is?
    • Justin ShimpFounder and Principal Engineer
    • 00:21:04
      We have a lighting plan, yes.
    • 00:21:06
      That's in the application.
    • 00:21:07
      We can pull it up if folks want to see it.
    • 00:21:09
      But they're not especially bright.
    • 00:21:12
      I think they're mounted 8 feet off, 11 feet off the ground.
    • 00:21:18
      There's the lighting plan.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:21:21
      and are there 14 of them?
    • 00:21:23
      There are two at each station?
    • Justin ShimpFounder and Principal Engineer
    • 00:21:24
      Two at each station, right.
    • Frank StonerMember, Architectural Review Board
    • 00:21:31
      So we're well under one.
    • Justin ShimpFounder and Principal Engineer
    • 00:21:34
      Yeah, so we have, you know, we're at 6.6.
    • 00:21:36
      There's a, you know, 11 is it, but that's very concentrated.
    • 00:21:39
      You'll see in the middle of the parking lot, we're at two foot candles, so it's a
    • 00:21:42
      You know, it establishes a safe zone to see at night around your car, but these are real, you know, it's really like putting a couple residential light bulbs out, which I don't, this has come up very infrequently where we have a lighting plan where we show even a fixture under 3000 lumens.
    • 00:22:01
      Sometimes those are sort of just exist without being shown a lighting plan because of the scale.
    • 00:22:06
      And this is unusual circumstance, but I do think it's worth noting that, you know,
    • 00:22:11
      Half the cutoff threshold, the 3,000th threshold, we're at 1,800 or something like that.
    • 00:22:16
      So there are relatively low impact.
    • 00:22:18
      So our concerns about glare and things like that, I think that should help mitigate that concern.
    • Margaret MaliszewskiPlanning Manager
    • 00:22:24
      Just to clarify, typically for the lighting plans in the entrance corridors, we do have all ground-mounted and building-mounted lights shown on those plans, and so some of those, particularly the building-mounted fixtures, are less than 3,000 lumens, but we're looking for all that information and to understand what the total impact of the illumination is.
    • Justin ShimpFounder and Principal Engineer
    • 00:22:50
      The ordinance requirement, but the entrance quarter guidelines recommend that all fixtures be full cut off.
    • Khris TaggartSenior Planner
    • 00:23:11
      I guess to add, the other car wash dwellings within the entrance corridor have been directed to remove this tube lighting and put up pole-mounted lighting and or building-mounted lighting, that's appropriate.
    • 00:23:29
      Most, I think if not all, those newer car wash dwellings, the vacuum equipment is behind the building.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:23:38
      Thank you, Chris.
    • 00:23:39
      And thank you to the applicant's representatives for the further clarification.
    • 00:23:42
      I guess I remain concerned despite the lower lumen level that the number of fixtures and their potential lack of full cutoff could contribute to unwanted lighting impacts on the core.
    • Khris TaggartSenior Planner
    • 00:24:05
      I will also add that there is an issue with the landscaping that is remaining on site along the intersection.
    • 00:24:20
      I'll just drag it over.
    • 00:24:23
      intersection of Rile Road and Gasoline Alley.
    • 00:24:26
      It's showing a row of shrubs that doesn't appear to be existing anymore on the site.
    • 00:24:32
      And even the updated landscape plan is still showing that.
    • 00:24:36
      So there need to be either confirmation or a planting of new shrubs to fill in that gap, because either way, there would still be a gap based on the current site conditions.
    • Frank StonerMember, Architectural Review Board
    • 00:24:57
      I have a question that's somewhat unrelated.
    • 00:24:59
      What's maximum lumen output allowable for a backlit sign in the entrance quarter is what?
    • Margaret MaliszewskiPlanning Manager
    • 00:25:10
      Are you asking what the maximum lumen output for a backlit sign?
    • 00:25:14
      There is no maximum that I'm aware of.
    • Frank StonerMember, Architectural Review Board
    • 00:25:19
      Okay.
    • Chris HenningsenChair, Architectural Review Board
    • 00:25:32
      I guess just to clarify, so the lights, the materials we have don't actually have a photo of the canopies that are going in with the lights on.
    • 00:25:46
      The photo has the canopy and then the photo with the lights, that's a different type of vacuum equipment.
    • 00:25:57
      Yeah, that's accurate.
    • SPEAKER_11
    • 00:25:59
      The lights are on the, it's just not lit.
    • Chris HenningsenChair, Architectural Review Board
    • 00:26:03
      So where are they on this?
    • 00:26:07
      Right there.
    • 00:26:09
      Okay.
    • 00:26:11
      They're really, they're pointing down and not out.
    • Khris TaggartSenior Planner
    • 00:26:16
      I think that's the part they still wouldn't use.
    • Taro MatsunoMember, Architectural Review Board
    • 00:26:19
      For the most part.
    • 00:26:24
      Yeah, but they're not, so they're not technically full cutoff fixtures, right?
    • 00:26:31
      Because the, the, the curve canopy is, I don't know, like it lets some light cruise, so it's, it would let light, the arch,
    • Khris TaggartSenior Planner
    • 00:26:51
      Oh, and the other thought about the landscaping that the 24 inches or two feet is the minimum.
    • 00:26:59
      And we note in the staff report that shrubs greater than the minimum may be needed or likely will be needed due to the proximity of the equipment to the entrance quarter.
    • 00:27:11
      And with this being new equipment replacing old equipment, that is the reason why here it needs ARB review.
    • 00:27:20
      So
    • 00:27:20
      landscaping greater than the minimums will likely be appropriate in mitigating the visual impact that this new equipment will have on the entrance quarter that is notably taller than the existing equipment.
    • Taro MatsunoMember, Architectural Review Board
    • 00:27:44
      And Chris, you said that the precedent in other car washes along the entrance corridor, has this been just like in conversations with the owners about the lighting on those?
    • Khris TaggartSenior Planner
    • 00:27:58
      I think in some stage or version, maybe even like the initial, or maybe even pre-app, that
    • 00:28:07
      Vacuum equipment and lighting has been either submitted or reviewed prior to being submitted, but ultimately been removed prior to final site plan approval.
    • Taro MatsunoMember, Architectural Review Board
    • 00:28:35
      I mean, personally, I do think that the lighting doesn't meet the requirements of the corridor design guidelines.
    • 00:28:46
      Like, I'm not opposed to meeting that solution with other lighting and building-mounted pole fixture, whatever, seeing as that also pre-existed and is being removed.
    • 00:29:03
      But I just think
    • 00:29:05
      Based on what I'm hearing, it doesn't meet the requirements and it is not in line with exceptions granted on other projects.
    • 00:29:13
      So, you know, I don't know about planting to screen the equipment.
    • 00:29:21
      I think so long as the corridor planting meets the design guidelines.
    • 00:29:27
      I don't know that anything specific for the equipment is, if I'm understanding correctly, like screening in front of the equipment.
    • Khris TaggartSenior Planner
    • 00:29:34
      It's the thought that equipment should be sited in locations that's not visible.
    • 00:29:41
      We acknowledge that's not possible with established sites, so landscaping makes it important.
    • 00:29:48
      Equipment must not be visible from the entrance corner, so without siding, landscaping becomes the primary way that that's accomplished.
    • Taro MatsunoMember, Architectural Review Board
    • 00:30:07
      Anyway, so I'm inclined to say that the lighting doesn't meet the requirements, but I don't have any other issues with the submission.
    • Chris HenningsenChair, Architectural Review Board
    • 00:30:16
      Yeah, if we want to take a look at the recommended motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:30:45
      So these are the recommendations that were listed in the staff report.
    • 00:30:50
      I've highlighted the ones that were in question as I understand it from the conversation.
    • 00:30:56
      Five is regarding the neutral color.
    • 00:31:00
      Seven is the one with vacuums without canopies.
    • 00:31:05
      And nine is dealing with the tube lighting.
    • Khris TaggartSenior Planner
    • 00:31:11
      Oh, and regarding five, the other car wash developments have used a single color.
    • 00:31:20
      So it's gray with gray tube, might be different shades of gray, but it's ultimately a single gray.
    • 00:31:28
      So that's where that kind of recommendation was aimed or getting at.
    • Frank StonerMember, Architectural Review Board
    • 00:31:37
      Are we considering black to be neutral?
    • Khris TaggartSenior Planner
    • 00:31:43
      I would consider it neutral, but it wouldn't ultimately result in a single color, because it would be gray with black.
    • 00:31:51
      I think they're like they showed in the photo, gray with black vacuum tubes and canopy and I forget what other items were blue, but all the blue items would be black in that instance, which still would be using two colors.
    • Frank StonerMember, Architectural Review Board
    • 00:32:09
      Look at that picture again one more time.
    • 00:32:35
      Do we have the black, or is that only at the applicant?
    • 00:32:39
      That's on your hat.
    • Khris TaggartSenior Planner
    • 00:32:41
      Right, the black was in URL's presentation.
    • 00:32:44
      That's what you want to see?
    • 00:32:46
      It was just noted in the one submitted.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:49
      It was this here.
    • 00:32:54
      I guess, do you know, is gray one of the manufacturer's standard colors?
    • SPEAKER_11
    • 00:33:03
      I think it's possible.
    • 00:33:06
      That would be further down our list of preference, but that is possible.
    • 00:33:11
      OK.
    • Frank StonerMember, Architectural Review Board
    • 00:33:24
      I may be the outlier here, but I think I'd be OK with the black if that's.
    • 00:33:30
      Yeah, I'm OK with the black, even black and gray.
    • 00:33:33
      When the picture that you showed of kind of a view from the corridor, I think gives you a more accurate perspective on the impact of the canopies.
    • 00:33:45
      They're much more impactful when looking at them from this angle than they are when looking at them from the street.
    • Taro MatsunoMember, Architectural Review Board
    • 00:33:57
      Yeah.
    • 00:33:58
      Yeah, right.
    • 00:33:59
      and the other ones are trying to sell you the canopy.
    • Frank StonerMember, Architectural Review Board
    • 00:34:08
      I tend to think that while the lighting is not what we would consider to be full cutoff, given the dimmer intensity of the light, the color of the light,
    • 00:34:25
      and the sort of non-impact on the corridor.
    • 00:34:29
      If you look at the lumens really at the edge of the parking or down below one, I think this is a more elegant solution than providing the separate pole lights which will be more intense in terms of the volume of light on the road surface.
    • 00:34:54
      I don't know, it would be helpful to see a picture of this at night, but I just don't see the impact.
    • 00:35:07
      So again, I may be the outlier here, but I think overall I would favor this solution over a solution with separate pole lights in the parking area or on the sidewalk there.
    • Chris HenningsenChair, Architectural Review Board
    • 00:35:27
      I think that's kind of my feeling also that it's a little bit more elegant to have it just as part of the vacuum itself than not having lights and adding a separate light in addition to that.
    • 00:35:53
      But that's
    • 00:35:55
      Realizing that they technically do not meet the requirements.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:36:02
      Yeah, I think because the guidelines so clearly encourage or does it encourage or require the full cutoff?
    • Margaret MaliszewskiPlanning Manager
    • 00:36:11
      I'm going to look for the exact wording.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:36:15
      OK.
    • 00:36:15
      I think regardless.
    • 00:36:19
      I'm hesitant to relax that in this instance because I do think that overall the control of light in the EC is pretty important to the effectiveness of the guidelines.
    • 00:36:35
      I think it would be worth from my perspective including the comment either to remove the tube lights or provide a compliant cutoff immersion.
    • 00:36:45
      There may be another lighting solution that the manufacturer could incorporate or there may be
    • 00:36:49
      a fairly minimal way to provide additional site lighting and avoid opening a fairly large exposure to exposed light sources in the EC.
    • Frank StonerMember, Architectural Review Board
    • 00:37:09
      It would be helpful to see a picture, a nighttime picture.
    • 00:37:13
      I don't know if you guys have one, but that would be...
    • Justin ShimpFounder and Principal Engineer
    • 00:37:19
      I was talking to Julia before, I was like, that's the first time this has come up where I had a situation where you had a, you know, if you were building this site from scratch, you wouldn't put the vacuums in front, right?
    • 00:37:29
      We know what the rules are.
    • 00:37:29
      We wouldn't do it.
    • 00:37:30
      This is a different circumstance, obviously.
    • 00:37:33
      They have a site in Roanoke that has the same setup.
    • 00:37:37
      And I guess it sounds like the light itself is blacked out on the top.
    • 00:37:42
      So the tube light is sort of cut off, doesn't illuminate up, but we don't have all that in front of us.
    • 00:37:48
      So it's probably something that if it was agreeable to folks, you kind of leave it as it is for now.
    • 00:37:54
      And then if we can come back with more information, maybe have a very quick meeting in a month or something like that with the actual picture of it, and then details, it may be actually really close to full cutoff.
    • 00:38:04
      I'm just not sure that any of us right now can tell you with the definitive that it is, but we could probably bring the thing to you all, the tube light.
    • 00:38:12
      and we could determine that more precisely if that's the easier way to settle this for the moment and then have more information to visit.
    • 00:38:21
      It's an interesting question.
    • 00:38:22
      It looks to me the way it's mounted underneath that canopy, it would be pretty limited to where it could project light outwards and upwards, but I haven't seen it up close.
    • 00:38:30
      I don't wanna tell you that's the truth without having more information.
    • Taro MatsunoMember, Architectural Review Board
    • 00:38:37
      Yeah, I mean, I think that
    • 00:38:40
      I do take Frank's point that you could have less discrete lighting solutions that would be in compliance with the guidelines and more expensive and
    • 00:38:55
      I don't know that we would necessarily like that outcome either so I'm willing to see what the light looks like and if there's a case to be made that it's sufficiently shielded from illuminating upwards.
    • 00:39:08
      I think that that could work.
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:11
      I guess Margaret, is there a
    • 00:39:14
      mechanism for that where we could maybe kind of reserve judgment on the lighting for now and in light of further information.
    • Margaret MaliszewskiPlanning Manager
    • 00:39:24
      I think we could just the applicant could request deferral until we bring the additional information back.
    • 00:39:34
      I guess I'd prefer
    • Justin ShimpFounder and Principal Engineer
    • 00:39:35
      that we just go ahead and go through it and just leave the lighting condition as proposed by staff.
    • 00:39:39
      We've replaced the light with a, you know, traditional full cutoff fixture, okay, install a wall mounted or a pole.
    • 00:39:47
      That way, if we decide, you know, that's what we're gonna do, we can do that.
    • 00:39:51
      But then we can have a separate, we can submit an amendment, right, to the, whatever, we can submit some sort of ARB amendment, if you will.
    • 00:39:58
      I mean, we have just a meeting where it's very narrowly focused on that one issue.
    • 00:40:02
      to help advance everything else along, rather than deferring it now and coming back.
    • 00:40:07
      It's just in case we maybe look at it ourselves and say, ah, well, this light, it's too much uplit.
    • 00:40:12
      ARB is not going to like this.
    • 00:40:13
      And then at that point, we wouldn't be coming back anyway.
    • 00:40:19
      Maybe our perspective to, if everything else can be agreed upon aside from that, then just move it along with that one condition we've just requested an amendment later.
    • Chris HenningsenChair, Architectural Review Board
    • 00:40:37
      Okay, so that being the case, I guess we're back to item five.
    • 00:40:41
      I guess I'll just put it out there personally.
    • 00:40:45
      I think black would be fine.
    • 00:40:50
      That seems neutral enough to me, but that's just my opinion on it.
    • Taro MatsunoMember, Architectural Review Board
    • 00:40:58
      I would agree.
    • 00:41:00
      Yeah, I think it's technically a neutral color.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:41:04
      Yeah, I tend to agree.
    • 00:41:06
      The vacuum canisters look like they had a somewhat specular metal finish, like a bright metal finish.
    • 00:41:13
      The only observation I maybe would add is that there may be a greater visual contrast between the black and the reflective metal finish than there might be between gray and it.
    • 00:41:23
      So I'm not willing to accept black with you all.
    • Taro MatsunoMember, Architectural Review Board
    • 00:41:35
      I think we agreed that, like, I never got the sense that we were looking at, looking to the applicant to not include the canopies.
    • 00:41:45
      Is that right?
    • 00:41:45
      We should strike item seven?
    • 00:41:49
      Yeah, I'd be comfortable with that.
    • Chris HenningsenChair, Architectural Review Board
    • 00:41:50
      Yeah.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:41:51
      Yeah.
    • 00:41:54
      Is an elevation of the existing building with the canopy removed needed for documentation for any reason or is that already a comment?
    • 00:42:11
      I guess that would be providing a south elevation showing the equipment.
    • Frank StonerMember, Architectural Review Board
    • 00:42:24
      I think five requires further because the vacuums I think themselves appear to be stainless steel.
    • 00:42:36
      Is that correct?
    • 00:42:39
      Yeah, so we need to take out
    • 00:42:41
      single neutral color and less clear that color requirement doesn't apply to the vacuums themselves.
    • Margaret MaliszewskiPlanning Manager
    • 00:42:58
      And I'm sorry, so for number two, is that text acceptable or is there a change needed?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:43:12
      I don't think it needs to be changed, but I guess I assume that means providing an elevation.
    • Frank StonerMember, Architectural Review Board
    • 00:43:17
      That canopy is going away, isn't it?
    • Taro MatsunoMember, Architectural Review Board
    • 00:43:25
      Oh, yeah, that's to the existing canopy.
    • Frank StonerMember, Architectural Review Board
    • 00:43:27
      That's the existing canopy, yeah.
    • 00:43:29
      That can be removed.
    • Taro MatsunoMember, Architectural Review Board
    • 00:43:34
      You could change it to relates to the south elevation or something.
    • Margaret MaliszewskiPlanning Manager
    • 00:43:44
      I think, yeah, to be clear, an elevation would be helpful because then it will show what's coming off and what change is going to be made to make that elevation still look acceptable.
    • Taro MatsunoMember, Architectural Review Board
    • 00:44:01
      And then for number nine, is it revise the lighting plan to remove the tube lighting from the vacuum equipment or demonstrate that it
    • 00:44:09
      is full cutoff, is that what we're asking?
    • 00:44:14
      That they can move forward and they can pick which path.
    • Chris HenningsenChair, Architectural Review Board
    • 00:44:33
      Just to clarify, there were no issues with any of the other comments that are listed from the applicants.
    • Margaret MaliszewskiPlanning Manager
    • 00:44:52
      So with these revisions and sort of setting aside that one lighting issue, it looks like everything else can be reviewed and approved by staff.
    • 00:45:04
      Is that what you're...
    • Bob PineoPrincipal
    • 00:45:06
      I think so.
    • Chris HenningsenChair, Architectural Review Board
    • 00:45:11
      That being the case, I guess I move to approve with the
    • 00:45:22
      Move to provide the applicants with the comments listed in the staff report amended as follows.
    • 00:45:31
      Add provide an elevation to item two.
    • 00:45:35
      Strike single from item five and black is considered a neutral color.
    • 00:45:40
      Strike item seven and add or demonstrate that it is a full cutoff to item nine.
    • 00:45:49
      I'll second.
    • 00:45:51
      All right, if we could put that to a vote.
    • SPEAKER_04
    • 00:45:55
      Mr. Van Der Werf.
    • Chris HenningsenChair, Architectural Review Board
    • 00:45:57
      Aye.
    • SPEAKER_04
    • 00:45:58
      Mr. Matsuno.
    • Chris HenningsenChair, Architectural Review Board
    • 00:45:59
      Aye.
    • SPEAKER_04
    • 00:46:00
      Mr. Stoner.
    • Chris HenningsenChair, Architectural Review Board
    • 00:46:01
      Aye.
    • SPEAKER_04
    • 00:46:01
      Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:46:03
      Aye.
    • SPEAKER_04
    • 00:46:03
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:46:04
      All right, thank you.
    • Khris TaggartSenior Planner
    • 00:46:09
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:46:10
      All right, so we will move to our second and final item, which is ARB 2026-8 Veterinary Emergency Group Site Plan.
    • Margaret MaliszewskiPlanning Manager
    • 00:46:26
      This is a proposal to construct a veterinary clinic in the Stonefield Town Center.
    • 00:46:31
      The site is located at the intersection of Hydraulic Road and Swanson Drive, and that's just east of the Regal Cinema building.
    • 00:46:39
      Most of the town center buildings were reviewed and approved by the ARB in 2011 and 2012, but this site was left as a future phase of development.
    • 00:46:48
      It's currently a grassy lot with landscaping along both streets and a small parking lot at the north.
    • 00:46:55
      Our review of this proposal resulted in several recommendations.
    • 00:46:58
      The primary issue is that the back of the building faces the entrance quarter and that elevation looks like the back of the building.
    • 00:47:05
      The form and materials of the proposed building are compatible with others in the shopping center and the mass of the building is oriented parallel to the street, but the entrance quarter elevation hasn't been designed to eliminate that back of building appearance.
    • 00:47:18
      The elevation is mostly blank.
    • 00:47:21
      The bay divisions appear random and the positions of the doors and single windows seem to fight with the material changes.
    • 00:47:28
      Also, there aren't sufficient design features to mark it as something other than a service elevation.
    • 00:47:33
      So we've recommended that the entrance quarter elevation be redesigned to present an appropriate appearance to the street and to eliminate the back of building character.
    • 00:47:43
      We've also recommended that changes be made to the side elevations as necessary to maintain a cohesive design.
    • 00:47:51
      Another issue is the retaining wall that's proposed around all but the front of the building.
    • 00:47:56
      There's space between the building and the retaining wall on the entrance corridor side to form a pet relief yard.
    • 00:48:02
      The wall would extend above ground level on the entrance corridor side so some of it would be visible from the street.
    • 00:48:09
      The retaining wall is proposed in a gray block.
    • 00:48:12
      Nearby masonry is in shades of tan and brown.
    • 00:48:15
      So we've recommended that the retaining wall material be revised to be more consistent with that masonry.
    • 00:48:22
      The proposal also includes rooftop mechanical equipment, and a screen wall is proposed to eliminate visibility of the equipment.
    • 00:48:28
      That wall is integrated into the architecture on the north side of the building, but not on the entrance corridor side.
    • 00:48:35
      So we've recommended integrating that feature into the redesign of the entrance corridor elevation.
    • 00:48:41
      The proposal calls for trimming the row of evergreens that stand along the cinema.
    • 00:48:46
      Those trees were required with the original town center design to help mitigate the impacts of the cinema building.
    • 00:48:52
      It isn't clear that the trimming will leave the trees with an appropriate appearance or a healthy condition, so we've asked for additional information on that.
    • 00:49:01
      There are additional recommendations on lighting, safety railing, and standard notes on the plan.
    • 00:49:07
      We've recommended all those items be addressed in a revised submittal to be reviewed by the ARB in a future meeting.
    • 00:49:12
      I'd be happy to try to answer any questions you have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:15
      All right.
    • 00:49:16
      Thanks a lot for the presentation, Margaret.
    • 00:49:18
      I guess we'll start with Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:49:21
      Can you go back to that photograph with the existing and proposed landscaping?
    • Margaret MaliszewskiPlanning Manager
    • 00:49:26
      That one?
    • Frank StonerMember, Architectural Review Board
    • 00:49:27
      Just for a second.
    • 00:49:27
      No, on hydraulic.
    • Margaret MaliszewskiPlanning Manager
    • 00:49:31
      This one?
    • Frank StonerMember, Architectural Review Board
    • 00:49:31
      Thanks, Margaret.
    • 00:49:47
      I don't have any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:48
      All right.
    • 00:49:49
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:49:52
      Thank you, Margaret.
    • 00:49:53
      In terms of, I had assumed, looking at some of the elevations, that the retaining wall material was fieldstone like some of the other site walls on site, but is that not the case where it's not?
    • 00:50:02
      That's maybe a question for the applicant.
    • Margaret MaliszewskiPlanning Manager
    • 00:50:04
      The proposed retaining wall material?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:50:06
      Yes, yeah.
    • 00:50:07
      In terms of the face to the EC.
    • Margaret MaliszewskiPlanning Manager
    • 00:50:27
      It's labeled as ridge rock plus retaining wall with standard cap in the eastern gray.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:50:41
      Thank you.
    • 00:50:42
      Thanks.
    • 00:50:46
      And you mentioned safety railing.
    • 00:50:47
      Maybe another question probably for the applicant.
    • 00:50:50
      Will the retaining wall require a safety rail?
    • Margaret MaliszewskiPlanning Manager
    • 00:50:53
      Yes.
    • 00:50:53
      I believe so, yes.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:51:00
      No other questions, sorry about that.
    • Chris HenningsenChair, Architectural Review Board
    • 00:51:02
      Tara?
    • 00:51:03
      No questions, thank you.
    • 00:51:04
      And I don't have any questions either.
    • 00:51:07
      So if the applicant has a presentation, now's the time.
    • Bob PineoPrincipal
    • 00:51:15
      Thank you, everybody.
    • 00:51:16
      My name is Bob Pinnio with Design and Develop.
    • 00:51:19
      And we have Juanita here from the Baltimore office.
    • 00:51:24
      I feel like this is more of a working session as we're going to work out and block out the building.
    • 00:51:29
      The tough part about the site obviously is the grading and we're trying to our public facing side, at least as far as the front entrance.
    • 00:51:39
      integrates better with the shopping center itself, and the elevation that Margaret is talking about right now is more of an issue with the entrance corridor, which I know is important to you all.
    • 00:51:53
      So one of the things, we just did get the comments this morning, which talked to Margaret, which is fine, and we wanted to respond a little bit.
    • 00:52:03
      So here's a revised elevation.
    • 00:52:05
      I have to check with our client first to make sure that this is okay.
    • 00:52:08
      Part of the backdrop with any project like this is site development costs are expensive, the retaining wall, two building fronts, things like that.
    • 00:52:19
      OCT, O'Connor Capital Group, has that weighing on them.
    • 00:52:25
      With Margaret's comments in hand, we did this this morning to try to mitigate some of the issues that may be
    • 00:52:34
      So again, maybe to address some of Margaret's issues and just design guideline protocol.
    • 00:52:41
      And the idea here is to basically mimic the front and be able to kind of cohesively understand the building as a whole, use some of the articulation that we have in the front facade and also as that wraps around each of the smaller sides, let's call that the north and south sides.
    • 00:53:04
      So not sure if we should jump into that.
    • 00:53:08
      Maybe Margaret's concerns aren't the same as yours, but we did want to be able to present something and talk through it with you.
    • 00:53:17
      Time is of the essence for the client as we negotiate the lease with the tenant.
    • 00:53:22
      We have been working comprehensively with the tenant as well as they give us their requirements.
    • 00:53:28
      They don't want any windows and doors as little as possible on the facade facing.
    • 00:53:34
      So I think we're treating this as a kind of a massing and kind of facade work that also tries to integrate the front with this rear elevation.
    • 00:53:49
      With that, the other thing is the retaining wall that we're suggesting is part of, it's being used at the Elysian, so it's already part of the material palette of the site.
    • 00:54:01
      This would be a very, very expensive retaining wall to build out of block and backup stone.
    • 00:54:08
      This is about 100 feet or so of retaining wall.
    • 00:54:12
      So the objective here is to, if anything, to mitigate that part that sticks out, but we do want
    • 00:54:18
      a horizontal datum at that point just to clarify it and hopefully that runs parallel you know it's going to run parallel with the eaves to solidify and you know make the composition readable.
    • 00:54:32
      I think one other thing that we were trying to do is to mitigate maybe through more plantings or things like that to mitigate the view on the corridor.
    • 00:54:45
      We do have material samples here that we could show you, the eephus and the hardy.
    • 00:54:52
      A lot of this is what's used in the center itself.
    • 00:54:58
      And we also have the fieldstone.
    • 00:55:06
      So with that, I think just trying to understand next steps and what we can do to help mitigate this side and take general comments as well as the rest of the building.
    • Chris HenningsenChair, Architectural Review Board
    • 00:55:21
      All right.
    • 00:55:21
      Well, I guess we'll see if anybody has any questions.
    • 00:55:27
      Dave, do you have any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:55:30
      Sure.
    • 00:55:30
      And I just appreciate the quick response thinking about the back and responding to comments.
    • 00:55:35
      If this is in the spirit of a work session, I think.
    • 00:55:40
      Yeah, appreciate the challenges with the retaining wall and the site.
    • 00:55:44
      I wonder if there are any lessons to be taken from the cinema itself which obviously is really quite opaque and that makes more of a site wall and then through layering of landscape is sort of integrated in the in the EC so I don't know the
    • 00:56:00
      you know looking even just at this image I think I don't know if those are cherry laurel or other evergreens but I wonder if thinking about you know because this is effectively a back to the building and there's there's not a need for windows or other things to really hide that and the grade differential makes it hard to put them in a location that makes sense as an EC front whether it would be worth considering something that
    • 00:56:26
      perhaps was more muted, more uniform but more layered in terms of landscape and maybe depth and I think there are applied features on the cinema that take something that's opaque but I integrate it quite well.
    • 00:56:40
      I do wonder
    • 00:56:42
      as well in terms of integrating this in the complex if there might even be a moment at the corner with the sign where some of the fieldstone could appear and save the money on the other retaining wall materials if indeed ultimately you know there's more maybe landscape and safety fence navigating that that I don't know if you know for example if it's required that the retaining wall
    • 00:57:04
      go up as far as it is right now.
    • 00:57:08
      Just speculating and thinking out loud, appreciate the challenges and offering that alternative.
    • 00:57:13
      I think while I appreciate the effort to respond quickly, I agree this makes an intelligible
    • 00:57:20
      facade that relates to the other side of the building and its overall organization.
    • 00:57:24
      I don't know how successful it is as a back or as compared to perhaps taking some of the lessons from some of the other backs in the complex and how they can be incorporated into the EC.
    • Chris HenningsenChair, Architectural Review Board
    • 00:57:42
      Thanks, Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:57:46
      Just to be clear, the photo on the bottom which shows windows in your updated elevation is not the preferred solution.
    • 00:57:57
      Is that correct?
    • Bob PineoPrincipal
    • 00:57:59
      Yeah, so it's kind of just because of the time, what you'll see is kind of a mashup.
    • 00:58:06
      So if you took the middle one, you see that dotted line that's representative of right above that, the red block, that's kind of the sight line of the retaining wall.
    • 00:58:17
      So it's, as I was talking about, this is more of a kind of a perceptual thing, but you're absolutely right, that elevation shows windows.
    • 00:58:26
      just because we were trying to mash it up before we got to you.
    • 00:58:31
      Yep.
    • Juanita LiProject Architect, AIA, NCARB, LEED GA
    • 00:58:33
      Hi, I'm Juanita Lee.
    • 00:58:35
      Also at the time we submitted the package for ARB review, there were windows in the back and the tenant has since requested almost no windows in the building.
    • 00:58:46
      So there have, yeah, on the facade.
    • 00:58:49
      So there have been some changes.
    • 00:58:51
      So we recognize the comments on all of the elevations and we'll work towards making sure that the design is more cohesive while also ensuring that the tenant is able to store all the things that they need to for their animals.
    • Frank StonerMember, Architectural Review Board
    • 00:59:08
      Yeah, I think doing away with the windows on the back actually helps.
    • 00:59:12
      I think so too.
    • 00:59:13
      I think so too.
    • 00:59:15
      It's a bit confusing.
    • 00:59:16
      Any consideration to signage on the hydraulics, on the hydraulic side?
    • 00:59:22
      On the building?
    • Bob PineoPrincipal
    • 00:59:24
      Yeah, I think that would really help.
    • 00:59:26
      Margaret, we have a comprehensive sign design that kind of tells us where signage can go and I don't think that's a place that allowed for it.
    • 00:59:37
      but if it could, and a lot of times, although we showed signage on the front of the building, that's up to the client.
    • 00:59:45
      I think it would help the building.
    • 00:59:47
      It would help.
    • 00:59:48
      To help break down the scale.
    • Margaret MaliszewskiPlanning Manager
    • 00:59:50
      I will have to look at that because when the Comprehensive Sign Plan was approved, I believe it addressed each building and gave the locations on the walls where signs could go.
    • 01:00:02
      Since this building didn't exist, I think we just need to amend the Comprehensive Sign Plan.
    • 01:00:07
      We can work to figure that out.
    • Bob PineoPrincipal
    • 01:00:09
      Okay.
    • 01:00:09
      That would help.
    • 01:00:10
      And I know the client would like that as well.
    • Frank StonerMember, Architectural Review Board
    • 01:00:13
      And I tend to agree with Dade.
    • 01:00:15
      I think Evergreen, Shrubbery, whether it's
    • 01:00:19
      laurels or whatever that's, you know, if you get four or five feet up, I think it eliminates a lot of what beer feels arbitrary or, you know, just ineffective as a sort of genuine architectural expression on the back of the building.
    • 01:00:51
      Otherwise, you know, that's.
    • 01:00:55
      I have to add.
    • Bob PineoPrincipal
    • 01:00:57
      Frank, do you think that the massing as shown outside of the windows helps to break down that scale and at least tie the front of the building with the back?
    • Frank StonerMember, Architectural Review Board
    • 01:01:05
      Yeah.
    • 01:01:06
      Yeah, definitely.
    • 01:01:07
      OK. You know, the other thing they did effectively over there is they've got these vines that grow up on sort of lattice work on some of those buildings.
    • 01:01:17
      It's remarkably effective.
    • Taro MatsunoMember, Architectural Review Board
    • 01:01:19
      Yeah.
    • 01:01:19
      Yeah, it's true.
    • 01:01:21
      Yeah, I'm looking at the Trader Joe's right now on my phone.
    • 01:01:24
      That seems like it's just down the road from you and is a pretty effective integration of landscape.
    • 01:01:31
      I think that's a good reference.
    • 01:01:34
      Can you remind me, is the center volume, is that in plane with the front?
    • 01:01:42
      Yes.
    • 01:01:42
      Or is it projected out?
    • 01:01:43
      Okay.
    • Bob PineoPrincipal
    • 01:01:44
      In this current design it is.
    • 01:01:45
      It's basically, the previous design has stopped that massing short of this elevation.
    • Taro MatsunoMember, Architectural Review Board
    • 01:01:50
      This would bring it all the way to the... Yeah, but I thought in the renderings, if I was right, did the middle volume project in the front by like a little bit?
    • 01:02:01
      Yes.
    • 01:02:04
      Yeah, because I think that's one thing that helps the Trader Joe's too is it, I mean, it's not like a really significant plane change, but like if you're going to do it on the front, it feels like it makes sense to do it on the back as well.
    • Bob PineoPrincipal
    • 01:02:16
      We'll just have to check.
    • 01:02:17
      We have, everything's getting tight with the site and the client, the tenant wants as much space as possible.
    • 01:02:24
      We've got the toe of the, but we'll do what we can, we'll do what we can and come back to you.
    • Taro MatsunoMember, Architectural Review Board
    • 01:02:34
      What's the envisioned, so there's like storage back here, what's going on in plan exactly?
    • Bob PineoPrincipal
    • 01:02:39
      Yeah, VEG has a very kind of, in some ways they're open-ended about what they want, but you know, the front of the house is very open and there's a lot of, you know, yeah, why don't you speak to it?
    • Juanita LiProject Architect, AIA, NCARB, LEED GA
    • 01:02:52
      So in terms of the plan the front would have a staff break room and exam rooms for the animals and then in the towards the rear you have the procedure open procedure areas with basically an enclosed storage area where you have the
    • 01:03:10
      Fire Pump and electrical and a lot of storage.
    • 01:03:14
      And so they plan to, excuse me, they plan to line the whole back with shelving.
    • 01:03:20
      And so they said that the windows were not necessary in the back.
    • Chris HenningsenChair, Architectural Review Board
    • 01:03:35
      All right, yeah, I agree with what's been said before.
    • 01:03:39
      I think the change massing is kind of a step in the right direction.
    • 01:03:45
      It seems like that central, and this might just be the turnaround time that you have, but the front has some articulation in terms of what appear to be like reveals in the
    • 01:04:02
      in the ephus or whatever that isn't carried through to the back.
    • 01:04:06
      I mean, I think a little bit more articulation of that type would help.
    • 01:04:11
      And I agree with Dade, I think kind of a layered approach to the landscaping would also probably be really helpful as well.
    • 01:04:23
      In terms of the retaining wall, I think if it is gonna have to have
    • 01:04:32
      you know, guardrail around the whole thing.
    • 01:04:35
      It'd be good to just kind of get that on the rendering tone, just kind of see how that, what that does.
    • 01:04:44
      Cause I think it's can, could possibly be a kind of a prominent element, but.
    • 01:04:52
      Could either hurt or help.
    • 01:04:55
      Yeah.
    • Bob PineoPrincipal
    • 01:04:58
      yeah and and just uh has there ever been an example because the building code doesn't necessarily require a railing in this situation as long as there's a vegetated you know um uh is is it one or the other and is that coming from the county or is that coming from us i should know that that's true yeah because it has to be a walking surface it has to be a walking surface for the for the building yeah
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:05:25
      And it may be a question for Stonefield and what they want as the landlord for the site.
    • 01:05:29
      Some folks have worked with one client before who, even though it wasn't required by code, wanted a rail.
    • 01:05:38
      But I agree.
    • 01:05:39
      If there's not a walking surface right next to that change in elevation, it's not required by the building code.
    • Bob PineoPrincipal
    • 01:05:44
      I think it would help our cause to do more landscaping there and to have it more dense to help reduce the scale of the building, I think.
    • 01:05:54
      We like to render it to make sure.
    • 01:05:56
      But with that retaining wall, it's hard, as everybody knows, to mount anything to a segmented wall.
    • 01:06:03
      So you have to go in front of it.
    • 01:06:05
      And if there's any grade changes, then we'd like to keep it horizontal.
    • 01:06:09
      We wouldn't want the fence to kind of drop with grade.
    • 01:06:12
      So it's a whole other level of fussiness that isn't probably going to help that much the building.
    • Margaret MaliszewskiPlanning Manager
    • 01:06:22
      And my comment on the railing was just reacting to something that was in the submittal.
    • 01:06:27
      Yeah.
    • 01:06:27
      It says railing, so just wanted to see a detail.
    • 01:06:30
      It's not requiring the railing.
    • 01:06:32
      Yeah, understood.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:06:35
      and if you'll forgive one other observation from the field just looking at like Trader Joe's and the cinema and others I think to some extent there's a pattern where corner materials wrap at corners and they're sort of volumes expressed uniformly and to the extent the plan is layered from sort of open and transparent public in the front to opaque in the back there might be a chance which I think is somewhat evident in the side elevations
    • 01:07:01
      for the building's materiality and approach to evolve from front to back in terms of the column expression of the corner.
    • 01:07:11
      There is a lot of columnation in the complex, but I think it begins in the complex and not so much on the EC.
    • Bob PineoPrincipal
    • 01:07:19
      Understood.
    • 01:07:19
      So just so I understand, are you OK with that transition from more in the upper elevation, more hardy, more articulation as you move to the south?
    • 01:07:38
      So basically, we're trying to keep some of the major elements together, the entablature and things like that.
    • 01:07:45
      And a lot of those lines above the
    • 01:07:49
      The Hardy there, that's the same line as now go to the front.
    • 01:07:54
      Yeah, maybe an animation would help to walk that through.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:07:59
      I was certainly totally fine with the more opacity at the back.
    • 01:08:02
      I was suggesting, you know.
    • Juanita LiProject Architect, AIA, NCARB, LEED GA
    • 01:08:04
      Yeah, I guess it's hard to tell in the renderings, but the articulation does carry around the corner.
    • 01:08:11
      Right, okay.
    • 01:08:16
      Probably could pick a different view that would make that more apparent.
    • Bob PineoPrincipal
    • 01:08:20
      I think an animation would be really clear so that we could walk that through and let everybody know what it actually looks like.
    • 01:08:28
      Because part of the problem is we're showing elevations that aren't really elevations that you'll see in the public realm because we're trying to show you maybe another exhibit which shows you where the retaining wall is, but then the other part is where the viewer is relative to that.
    • 01:08:45
      The closer you get to it, obviously, the more of that facade you see.
    • 01:08:49
      A straight elevation isn't ever going to be what you see.
    • Frank StonerMember, Architectural Review Board
    • 01:08:58
      Is the darker orange like material the same?
    • 01:09:02
      It's all hardy?
    • SPEAKER_04
    • 01:09:09
      You need to come up to the mic so we can hear you.
    • Juanita LiProject Architect, AIA, NCARB, LEED GA
    • 01:09:14
      The darker orange is a composite wood plank.
    • 01:09:17
      And so on the material palette at the end, it's by Fiberon.
    • 01:09:25
      The color that we've chosen is a little bit richer brown.
    • Frank StonerMember, Architectural Review Board
    • 01:09:37
      and there was that comment.
    • 01:09:39
      Given what was on the back of the building and then the notion that you're going to have landscaping that further shields that, I wonder if it's worth putting the fiber on on the back?
    • Bob PineoPrincipal
    • 01:09:57
      Yeah, it could be.
    • 01:09:59
      And the other thing I think that
    • 01:10:01
      We are still working with the site contractor, the civil on exact grades.
    • 01:10:07
      I'd like to kind of deep dive, do a deep dive three dimensionally into this and make sure that we understand that because yeah, that would just be an expense.
    • 01:10:15
      And if it's too low and if we're putting the shrubs up, then effectively, you know, this whole elevation, the perception of that elevation is going to jump and then you'll never see it.
    • 01:10:24
      So why spend that month?
    • Frank StonerMember, Architectural Review Board
    • 01:10:27
      Yeah, it almost draws attention to something that you don't necessarily want to draw attention to.
    • 01:10:32
      Yeah.
    • Bob PineoPrincipal
    • 01:10:33
      In some way, we thought it in the future was kind of off topic.
    • 01:10:36
      In the future, if somebody else wanted windows, like clear story windows, something like that, it would be a placeholder.
    • 01:10:42
      But there's a lot of ifs in that statement.
    • Chris HenningsenChair, Architectural Review Board
    • 01:10:53
      All right.
    • 01:10:53
      Well, that was kind of a combo.
    • 01:10:56
      Question and comment, period.
    • 01:11:01
      But I'll ask, are there any members of the public that want to make a comment?
    • SPEAKER_04
    • 01:11:06
      No, sir.
    • Chris HenningsenChair, Architectural Review Board
    • 01:11:08
      All right.
    • 01:11:08
      Yeah, I kind of suspected that.
    • 01:11:11
      You don't want to assume.
    • 01:11:14
      I guess at this point, do we have a recommended motion or
    • Margaret MaliszewskiPlanning Manager
    • 01:11:31
      So our recommendation was to provide the comments listed in the staff report to be addressed in another submittal to come to the ARB.
    • 01:11:40
      So I think that could still, I think that still works.
    • Chris HenningsenChair, Architectural Review Board
    • 01:11:51
      Yeah, it sounds like everybody's in agreement this will be coming back and nobody has a problem with that.
    • 01:12:03
      Anybody feel like making a motion?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:12:09
      Is there anything from the discussion today that the applicant feels should be reflected or anything?
    • Bob PineoPrincipal
    • 01:12:16
      Yes, from the client's perspective, we'd like to move this as much as possible.
    • 01:12:21
      So I understand that facade is important.
    • 01:12:26
      Anything else that we should
    • 01:12:28
      I think the retaining wall for the client's kind of a non-starter.
    • 01:12:32
      We looked into that, that a real CMU with a backup is a lot, especially if we're masking it with the landscape.
    • 01:12:42
      Is there anything else about the building that we should be considering?
    • Chris HenningsenChair, Architectural Review Board
    • 01:12:45
      The front isn't in your purview, I guess.
    • Bob PineoPrincipal
    • 01:12:47
      or it is, so it's really just those two elevations and trying to match it, obviously having the front as a cohesive piece of architecture, so you can say, where are some of these decisions coming from and how does the public realm, as a public experience, it makes sense, but it seems like it's mostly addressing those two facades.
    • Margaret MaliszewskiPlanning Manager
    • 01:13:11
      I don't wanna,
    • 01:13:14
      Don't forget that those existing evergreens that are along, because they're, if you look at those closely, sort of look at it from the screen side, the half that's on the cinema side is pretty much not there.
    • 01:13:26
      So if that gets really cut on your site side, I'm afraid it's not gonna, it's just not gonna work.
    • Bob PineoPrincipal
    • 01:13:34
      Let's talk about that.
    • 01:13:35
      So, you know, the site,
    • 01:13:40
      Is there anything to mitigate that in the case, so your concern is a valid one, how do we address it in a way that makes sense?
    • 01:13:53
      And let's talk about the plan B, let's say that we are too close or there's a net effect in those trees, something happens to them because of the thing that we're doing.
    • 01:14:03
      What is our, the building helps green it where it wasn't a building there before,
    • Margaret MaliszewskiPlanning Manager
    • 01:14:09
      Yeah, it might help to maybe show on the plan the actual size of the trees, how close that comes to the proposed building, how much might need to be trimmed and just give you a little more into that and figure out what that really does to what's there.
    • Taro MatsunoMember, Architectural Review Board
    • 01:14:40
      I'll make a motion to provide the applicant with the comments listed in the staff report with no amendments to be addressed with the next submittal.
    • Chris HenningsenChair, Architectural Review Board
    • 01:14:51
      I'll second that.
    • SPEAKER_04
    • 01:14:57
      Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 01:14:58
      Aye.
    • SPEAKER_04
    • 01:14:59
      Mr. Stoner.
    • 01:15:00
      Aye.
    • 01:15:00
      Mr. Matsuno.
    • 01:15:02
      Aye.
    • 01:15:02
      Mr. Van Der Werf.
    • Margaret MaliszewskiPlanning Manager
    • 01:15:03
      Aye.
    • SPEAKER_04
    • 01:15:04
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:15:05
      Thanks a lot.
    • 01:15:05
      Thank you.
    • 01:15:06
      Appreciate it.
    • 01:15:08
      All right, we do not have any work sessions today, so we move to other business.
    • 01:15:13
      And, you know, sadly, this is going to be possibly the last time we get to approve minutes as its own item, because I was just informed that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:15:27
      They're going to the consent agenda in the future?
    • Chris HenningsenChair, Architectural Review Board
    • 01:15:29
      Going to the consent agenda, yeah.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:15:35
      Who would like the honor of
    • Chris HenningsenChair, Architectural Review Board
    • 01:15:39
      You know, in the future it's sad that minutes will not be attention that they really deserve in this.
    • 01:15:47
      If anybody would like to- Mr. Chairman, would you- In that case, I'll move to approve the May 18th minutes.
    • 01:15:59
      If anybody would like to second that.
    • 01:16:01
      I'll second.
    • 01:16:02
      If we could put that to a vote.
    • SPEAKER_04
    • 01:16:04
      All right, Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 01:16:06
      Aye.
    • SPEAKER_04
    • 01:16:06
      Mr. Stoner.
    • 01:16:07
      Aye.
    • 01:16:08
      Mr. Matsuno.
    • Chris HenningsenChair, Architectural Review Board
    • 01:16:09
      Aye.
    • SPEAKER_04
    • 01:16:09
      Mr. Van Der Werf.
    • 01:16:10
      Aye.
    • 01:16:11
      Thank you.
    • 01:16:11
      All right, thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:16:13
      So do any board members or staff have any other items for discussion?
    • 01:16:21
      Great.
    • 01:16:21
      In that case, the next ARB meeting is scheduled for Monday, June 8th.
    • 01:16:27
      I'm pretty sure I'll be able to attend.
    • 01:16:34
      sounds like we will have four tentatively so in that case this meeting is adjourned until our next meeting on Monday June 8th 2026 and it is 2 23 by my wife thank you