Central Virginia
  • Albemarle County
  • Architectural Review Board Meeting 5/11/2026
  • Auto-scroll

Architectural Review Board Meeting   5/11/2026

Attachments
  • Agenda.pdf
  • Final Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB-2026-00004 Dutch Pantry Addition Staff Report.pdf
  • Attach. 1 ARB-2026-00004 Dutch Pantry Addition Architectural Plans.pdf
  • Attach. 2 ARB-2026-00004 Dutch Pantry Addition Site Plan.pdf
  • Rooftop Solar Criteria Staff Report.pdf
  • Attach. 1 Draft Action Memo Minutes excerpt from 01_20_2026 ARB meeting.pdf
  • Attach. 2 Rooftop Solar Criteria Revised draft design criteria redline.pdf
  • Attach. 3 Rooftop Solar Criteria Revised draft design criteria clean.pdf
  • Attach. 4 Rooftop Solar Criteria selected images of rooftop solar installations.pdf
  • Draft ARB Action Memo Minutes 05_04_2026.pdf
    • SPEAKER_02
    • 00:00:05
      We are now live.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:08
      All right.
    • 00:00:09
      It's 101 by my watch.
    • 00:00:13
      So I'm calling the May 11th, 2026 meeting of the Albemarle County Architectural Review Board to order.
    • 00:00:20
      If you could call the roll, please.
    • SPEAKER_02
    • 00:00:23
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:24
      Here.
    • SPEAKER_02
    • 00:00:25
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:26
      Here.
    • SPEAKER_02
    • 00:00:26
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:28
      Here.
    • SPEAKER_02
    • 00:00:28
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:29
      Here.
    • SPEAKER_02
    • 00:00:30
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:31
      Here.
    • SPEAKER_02
    • 00:00:31
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:32
      All right, thanks.
    • 00:00:33
      Do any ARB members have anything to disclose?
    • 00:00:37
      No, no, no.
    • 00:00:39
      All right, great.
    • 00:00:41
      Today's meeting is a hybrid meeting.
    • 00:00:43
      The public may access and participate in the meeting electronically.
    • 00:00:46
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:00:52
      The public has real-time audio-visual access to this meeting over Zoom and real-time audio access over telephone, both as provided in the lawfully posted meeting notice.
    • 00:01:03
      This meeting is being recorded and will be made available on the county's website calendar.
    • 00:01:08
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:14
      All speakers, when it is your turn to speak, please state your name for the record.
    • 00:01:19
      Applicants who are making presentations, note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:27
      Staff will let you know when the 15 minutes are up.
    • 00:01:30
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:01:39
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:01:48
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • SPEAKER_02
    • 00:01:54
      No one online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:58
      Shucks.
    • 00:02:01
      There are no consent agenda items today.
    • 00:02:03
      We have one regular review item today, which is ARB 2026-00004 Dutch Pantry edition.
    • Margaret MaliszewskiPlanning Manager
    • 00:02:20
      Okay, this is a review of a proposal to construct an addition to the existing store building that's located at 5548 Seminole Trail.
    • 00:02:29
      And that location is on the west side of the Route 29 entrance corridor and it's just a short distance south of the Albemarle-Greene County line.
    • 00:02:37
      The addition is proposed on the south side of the building.
    • 00:02:40
      It's set back from the front elevation of the existing store and it uses the same basic building and roof forms and materials as the existing.
    • 00:02:48
      The work also includes the construction of a pergola and a patio area in front of the addition.
    • 00:02:55
      The entrance corridor facing elevation of the addition would be faced with brick painted to match the existing store.
    • 00:03:01
      That elevation has a pedestrian door, an overhead rolling door, and two windows.
    • 00:03:06
      In the staff report, we noted that the windows aren't coordinated with the other openings in the existing and proposed buildings, but given the size and setback from the street, we don't expect them to have a significant impact, particularly if the glass meets the standard criteria.
    • 00:03:22
      The side and rear elevations of the addition would be constructed of concrete block.
    • 00:03:27
      That material is not typically appropriate for the entrance corridor, but only a portion of the south elevation is expected to be visible from the street.
    • 00:03:34
      We don't think that will have a significant impact.
    • 00:03:37
      The proposed materials have been indicated in a virtual materials board, but they're not called out on the elevations or renderings, and the architectural drawings have no scale or dimensions.
    • 00:03:48
      So we've recommended that those items be added to the drawings.
    • 00:03:52
      The site plan shows a mechanical unit in the corner where the new addition meets the existing building.
    • 00:03:58
      It doesn't seem to be shown consistently on all the drawings.
    • 00:04:01
      So we've recommended that it be located where it won't be visible from the street.
    • 00:04:06
      We've recommended coordination among the drawings and additional screening if the unit will still be visible.
    • 00:04:14
      The drawings are also not coordinated regarding the patio and the pergola and neither are shown on the site plan and only the patio is shown on the architectural plan.
    • 00:04:23
      No details are provided for the pergola and we've recommended that those details be provided and all the drawings be coordinated.
    • 00:04:31
      Some light fixtures are shown on the renderings.
    • 00:04:33
      We've recommended some notes to be added to the drawings to make sure the lighting is consistent with the guidelines.
    • 00:04:40
      And the development of the site predates the establishment of the entrance quarter, so that frontage is not consistent with the guidelines.
    • 00:04:47
      What looks like a good-sized planting island is mostly off-site in the right-of-way, and overhead lines run along the frontage, so there's no space for the standard street trees.
    • 00:04:58
      We've recommended, as a recommendation and not as a requirement, that shrubs be added to help mitigate that paved area.
    • 00:05:06
      And our recommendation is for approval with the conditions listed in the staff report.
    • 00:05:11
      I'd be happy to try to answer any questions that you have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:05:14
      All right.
    • 00:05:14
      Thanks a lot, Margaret.
    • 00:05:15
      I guess we'll start with Frank Stoner.
    • 00:05:18
      Do you have any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:05:19
      I do not.
    • 00:05:20
      Thank you, Margaret.
    • Chris HenningsenChair, Architectural Review Board
    • 00:05:21
      All right.
    • 00:05:22
      Dade?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:05:22
      Thank you, Margaret.
    • 00:05:23
      Chris, no questions.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:05:24
      All right.
    • 00:05:25
      Frank?
    • 00:05:26
      I don't have any questions.
    • 00:05:27
      Thanks, Margaret.
    • Chris HenningsenChair, Architectural Review Board
    • 00:05:28
      Taro?
    • 00:05:29
      No.
    • 00:05:30
      No questions.
    • 00:05:30
      Thank you.
    • 00:05:32
      Yeah, it's not because I don't care, but I don't have any questions either.
    • 00:05:37
      If the applicant has a presentation, now would be the time.
    • SPEAKER_00
    • 00:05:47
      Thank you.
    • 00:05:47
      I don't have any additional presentation.
    • 00:05:49
      I just wanted to thank you for your time and make you aware that I'm here to answer any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:05:54
      Thank you.
    • 00:05:55
      I guess we'll move to questions for the applicant.
    • 00:05:59
      Dave, do you have any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:06:01
      I guess if you've had a chance to review the staff report and recommendations, are there any questions or difficulties addressing those?
    • SPEAKER_00
    • 00:06:10
      No, we have reviewed that.
    • 00:06:12
      So part of the patio is taking an existing concrete pad that was there for a dumpster that's no longer used that way.
    • 00:06:18
      So that's what led to the patio decision and the HVAC equipment will be behind the building.
    • Chris HenningsenChair, Architectural Review Board
    • 00:06:24
      Thank you.
    • 00:06:26
      All right.
    • 00:06:26
      Thanks, Frank Stoner.
    • Taro MatsunoMember, Architectural Review Board
    • 00:06:29
      I don't have any questions, thanks.
    • 00:06:31
      Tara?
    • 00:06:33
      Is there any renovation work associated that would take place on the exterior of the building?
    • SPEAKER_00
    • 00:06:39
      On the exterior of the existing building, no.
    • 00:06:41
      Just the addition, there is going to be an addition of an office space on the interior.
    • 00:06:46
      They've well exceeded the capabilities of the current building, so they need more storage and an office space.
    • Chris HenningsenChair, Architectural Review Board
    • 00:06:53
      Great.
    • 00:06:54
      Thank you.
    • 00:06:54
      All right.
    • 00:06:55
      Thanks, Frank.
    • 00:06:57
      I don't have any questions.
    • 00:06:58
      Thanks.
    • 00:06:59
      Yeah.
    • 00:07:00
      And I don't have any questions either.
    • 00:07:02
      Are there any members of the public that want to make a comment?
    • SPEAKER_02
    • 00:07:09
      Nobody online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:07:10
      All right.
    • 00:07:10
      In that case, the ARB will now go into discussion.
    • 00:07:14
      I guess we will start with Tara, if you have any comments.
    • Taro MatsunoMember, Architectural Review Board
    • 00:07:17
      Thanks to the applicant for making the application.
    • 00:07:20
      I think that the proposed addition is nicely in keeping with the existing building.
    • 00:07:29
      I appreciate that they've sort of had it defer a little bit to the existing.
    • 00:07:33
      I don't have particular issues with the way that they've decided to
    • 00:07:37
      designed the window openings.
    • 00:07:40
      I think they're well different from the existing structure.
    • 00:07:43
      They're in my sense compatible with that general scale.
    • 00:07:49
      So along with just complying with the elements that were listed in the staff report, I think that the applicant has done a nice job and I'm looking forward to seeing that project.
    • 00:08:00
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:08:01
      Thanks.
    • Taro MatsunoMember, Architectural Review Board
    • 00:08:02
      Frank Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:08:04
      Sure.
    • 00:08:06
      Yeah, I don't have any additional comments to what Taro said or what was included in the staff report.
    • 00:08:12
      I think it's entirely appropriate.
    • 00:08:16
      Yeah, thank you.
    • 00:08:19
      Thanks.
    • 00:08:20
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:08:21
      Yeah, Taro, Margaret, and Frank summed it up well.
    • 00:08:24
      So I don't have anything to add.
    • 00:08:25
      It seems like a good appropriate addition to the quarter.
    • 00:08:29
      Thanks.
    • 00:08:29
      Frank?
    • SPEAKER_06
    • 00:08:30
      Great.
    • 00:08:31
      I concur with the rest of the group.
    • 00:08:35
      I think it's very reasonable, appropriate, compatible.
    • Chris HenningsenChair, Architectural Review Board
    • 00:08:42
      All right.
    • 00:08:42
      Thanks.
    • 00:08:43
      And yeah, I think I am also in agreement and I think as long as the applicant agrees with all the comments from staff, then I think we're good to go on that.
    • 00:08:59
      So if we could take a look at the recommended motion.
    • 00:09:07
      Assuming there are no suggested changes, anybody want to make a motion?
    • Taro MatsunoMember, Architectural Review Board
    • 00:09:18
      I'd like to make a motion to approve ARB 2026-0004 Dutch Pantry edition with the conditions listed in the staff report.
    • 00:09:27
      I'll second that if we want to put it to a vote.
    • SPEAKER_02
    • 00:09:32
      Alright, Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:09:34
      Aye.
    • SPEAKER_02
    • 00:09:35
      Mr. Matsuno.
    • Chris HenningsenChair, Architectural Review Board
    • 00:09:37
      Aye.
    • SPEAKER_02
    • 00:09:37
      Mr. Stoner.
    • Chris HenningsenChair, Architectural Review Board
    • 00:09:38
      Aye.
    • SPEAKER_02
    • 00:09:39
      Mr. Hancock.
    • 00:09:40
      Aye.
    • 00:09:40
      And Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:09:42
      Aye.
    • SPEAKER_02
    • 00:09:42
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:09:43
      All right.
    • 00:09:43
      Thanks a lot.
    • 00:09:45
      We have one work session item today, which is on the solar guidelines.
    • 00:09:50
      And Margaret has a presentation for that.
    • Margaret MaliszewskiPlanning Manager
    • 00:10:05
      This work session is a follow-up to the one held on January 20th in which you commented on the first draft of the criteria for rooftop solar installations.
    • 00:10:17
      We originally had this planned for a meeting in April and we've moved it today so that everyone could be present to comment.
    • 00:10:25
      We shared with you the red line version of the criteria in which we made edits based on your comments from that earlier meeting.
    • 00:10:32
      The goal for today is to finalize or get as close to final as possible on those text edits and also to discuss a few issues that came up in the previous meeting.
    • 00:10:41
      My plan for this presentation is to stop periodically through it and get your comments on each item.
    • 00:10:49
      So there were several edits to the criteria for panels on pitched roofs.
    • 00:10:54
      Edits were made to criteria number one and seven, as you requested, but I'd like to go into a little detail on some of the other changes.
    • 00:11:02
      Let's start with number three.
    • 00:11:04
      In the January meeting, there was some confusion about the meaning of number three.
    • 00:11:09
      The criteria is meant to say that the panels must be mounted parallel to and at the same angle as the roof.
    • 00:11:17
      So the panels in the left image in this slide would not meet that criteria, but the ones on the right would.
    • 00:11:25
      I revised the text to reference the roof plane instead of the surface of the roof.
    • 00:11:30
      So that criteria now reads that panels mounted parallel to the roof plane.
    • 00:11:36
      Does that work?
    • SPEAKER_06
    • 00:11:38
      Yes.
    • Margaret MaliszewskiPlanning Manager
    • 00:11:41
      Okay, let's move on to number six.
    • 00:11:44
      Criteria six limits the amount of space between the roof and the panel.
    • 00:11:49
      And there was discussion about whether six inches was the right distance.
    • 00:11:54
      So I went back to the research that I had prepared for the January meeting.
    • 00:11:58
      Not all the localities provide a specific measurement and those that do use different language to talk about it.
    • 00:12:08
      For example, Chesapeake says that the system must not be more than 8 inches from the surface of roof to the face of the panel.
    • 00:12:17
      Richmond says panels may not extend more than 6 inches above the roof surface.
    • 00:12:22
      Smithfield says, panels should be mounted less than or equal to six inches above the surface of the roof.
    • 00:12:29
      And Williamsbury says, panels should not project greater than 12 inches above the roof surface.
    • 00:12:34
      So there's just not consistency in the number or the way it's talking about the distances from the roof to the panels.
    • 00:12:43
      Just as a reminder, the Virginia Asphalt Services Project that you all reviewed and approved, that distance was four inches from the surface of the roof to the underside of the panel.
    • 00:12:56
      So I'd left the number, I left the distance at six inches here, but also clarified by saying that the measurement would be to the underside of the panel, just so it's not confusing which part of the panel we're talking about.
    • 00:13:10
      Does that?
    • 00:13:12
      being reasonable or do you have further concerns?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:13:15
      I appreciate the research on other precedents.
    • 00:13:18
      I do feel like probably regulating the top surface of the panel is ultimately a way to give us more certainty about where it ends up.
    • 00:13:27
      So I don't know if others agree and whether that means we should specify a high number.
    • 00:13:32
      I think you mentioned eight inches in one locality to the top surface of panel.
    • 00:13:37
      I think in general, the panels are getting
    • 00:13:39
      Slimmer, and there's no incentive for folks to make the mounting more extensive than it needs to be.
    • 00:13:44
      But the closer it is to the roof surface, the better.
    • 00:13:49
      So I don't know if others have any thoughts.
    • 00:13:55
      So I guess I might offer maybe the language of eight inches to the top or even six inches to the top if that were feasible, but I don't know off the top of my head.
    • 00:14:04
      Might be preferable from my perspective, but I defer to others.
    • SPEAKER_06
    • 00:14:12
      You know with the thickest panel?
    • Margaret MaliszewskiPlanning Manager
    • 00:14:18
      I do not, but I could make a couple calls and see what we can find out.
    • SPEAKER_06
    • 00:14:26
      Typically, they're pretty thin.
    • 00:14:28
      Yeah, right.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:14:29
      I mean, I think it's a good idea to make it to the top of the panel.
    • Chris HenningsenChair, Architectural Review Board
    • 00:14:35
      Because that's the surface that you see, so yeah, I think
    • 00:14:40
      giving two inches of wiggle room seems pretty reasonable to me too.
    • Margaret MaliszewskiPlanning Manager
    • 00:14:47
      Okay.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:14:47
      Yeah.
    • 00:14:48
      So you'd go with the eight inches to the top, is that?
    • 00:14:51
      Yeah.
    • Margaret MaliszewskiPlanning Manager
    • 00:14:52
      Okay.
    • 00:14:53
      Great.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:14:55
      Can you remind us, Margaret, which locality was it?
    • 00:14:59
      Which locality had that eight inch to the top standard?
    • Margaret MaliszewskiPlanning Manager
    • 00:15:01
      I've got eight inches for Chesapeake and 12 inches for Williamsburg.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:15:14
      Panels were thicker in colonial times.
    • Margaret MaliszewskiPlanning Manager
    • 00:15:16
      I'm sorry?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:15:16
      The panels were thicker in the colonial era.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:15:25
      OK. Yeah, I feel like it's adequate.
    • 00:15:28
      Yeah.
    • 00:15:29
      Yeah, but I think it's smart to do it to the top side, because that's the ultimate distance.
    • 00:15:34
      Right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:15:35
      I think like if we're being too strict with that, I think we'll start getting applicants asking for, you know, we can't do that because, you know, you need five inches to, you know, turn a wrench under the panel or whatever.
    • Margaret MaliszewskiPlanning Manager
    • 00:15:54
      I can go back and look at the applications that you had reviewed and see what those thicknesses are.
    • 00:16:01
      And if it seems to be a problem with those, then we can revisit again.
    • 00:16:05
      Okay, great.
    • 00:16:09
      Okay, next item.
    • 00:16:10
      At the January meeting, you noted that the racking system extending beyond the roof in this image was problematic.
    • 00:16:19
      So I added criterion number nine to say that mounting systems should not extend beyond the panels or the roof.
    • 00:16:27
      That seemed reasonable.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:16:29
      This is a great reference image.
    • 00:16:34
      What were you thinking?
    • 00:16:41
      This is like any ordinance you have, you can point to that.
    • Margaret MaliszewskiPlanning Manager
    • 00:16:46
      Okay, that was everything for the pitched roofs.
    • 00:16:49
      There were also edits to the criteria for flat roofs.
    • 00:16:52
      Simple edits were made to numbers two and four as you requested in January and to criterion three just for better flow of the text there.
    • 00:17:03
      Criterion one originally read, panels may be installed in any configuration set on an angle if the facility is entirely below the top of the roof, excuse me, below the top of the parapet.
    • 00:17:16
      and then there was a request to add to that if not visible from the entrance corridor.
    • 00:17:22
      But if the facility won't be visible, then it doesn't require ARB review and approval.
    • 00:17:29
      So I eliminated what was originally number one under flat roofs, and I added a note at the end regarding visibility and ARB review.
    • 00:17:38
      And that reads, if parapets or other parts of the building eliminate visibility of the solar installation as viewed from the entrance quarter street, ARB approval of the design is not required.
    • 00:17:48
      Documentation confirming lack of visibility will be required for staff review.
    • 00:17:53
      That information would come along with the building permit, which we would be checking anyway, just as part of the process.
    • 00:17:59
      Anything in building permit in the entrance corridor would come to us for review for that type of item.
    • 00:18:04
      I also added a similar note for the pitched roof section.
    • 00:18:12
      Are there any questions or comments on that?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:18:16
      No.
    • 00:18:17
      That seemed like good steps.
    • Margaret MaliszewskiPlanning Manager
    • 00:18:19
      Okay.
    • 00:18:22
      And I also made edits to the captions of the example images just to coordinate with the edits that we've just discussed.
    • 00:18:37
      So with the change for the distance from the panel or from the roof to the panel to the eight inches, is there a general agreement that those edits are good?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:18:51
      Yes.
    • 00:18:53
      Yes.
    • 00:18:54
      Thank you, Margaret.
    • 00:18:55
      Awesome.
    • Margaret MaliszewskiPlanning Manager
    • 00:18:55
      OK.
    • 00:18:58
      So there were a few other topics that came up in January that weren't addressed in the draft criteria.
    • 00:19:03
      I've done a little bit of research and try to address those now.
    • 00:19:07
      One of those questions was about how panels over parking spaces fit into the criteria.
    • 00:19:13
      So if the proposal is to add solar panels to a structure that's already existing, we think that that could be handled the same way as panels on buildings with pitched or flat roofs.
    • 00:19:24
      But if the proposal is for a new solar parking canopy, which is a structure specifically engineered to both shelter the vehicles and generate solar energy,
    • 00:19:33
      Then we think that the panels would be fully integrated into the form and structure of the canopy, so some of those criteria that we've just looked at we wouldn't need to review for them.
    • 00:19:45
      However, as you can see from these images,
    • 00:19:49
      Solar parking canopies can be designed with some more dramatic profiles and with integrated lighting and they can also be used in multiples to cover large parking areas.
    • 00:20:03
      And those factors could result in significant visual impacts as viewed from the entrance corridor street.
    • 00:20:10
      Solar parking canopies may be structures that you'd like to reserve for full A or B review, or countywide certificates could be limited to canopies with minimal visual impact.
    • 00:20:22
      For example, those that are maybe single structures that are proposed and or with a single slope roof.
    • 00:20:30
      So if either of those options sound good, we can develop language accordingly.
    • 00:20:36
      Or if there's another option that you'd like to pursue, we can discuss that.
    • 00:20:40
      So the questions here, should the countywide criteria apply to solar panels proposed to be added to parking canopies?
    • 00:20:49
      Should countywide criteria be drafted for simple solar parking canopies and more complicated designs reserved for ARB review?
    • 00:21:05
      Are there any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:21:06
      So I guess, Margaret, in the first question, that scenario is that somebody would get approval for a parking canopy, which would require ARB approval.
    • 00:21:15
      And then if that were approved, they would be able to add.
    • Margaret MaliszewskiPlanning Manager
    • 00:21:19
      So the first question would be, that's when there's an existing structure that's over.
    • 00:21:24
      So do we want the countywide criteria to apply to panels that are proposed to be added to existing
    • Taro MatsunoMember, Architectural Review Board
    • 00:21:42
      I kind of feel like if it's an existing parking canopy, it's kind of like a roof just like any other building on a structure.
    • 00:21:52
      So I don't see why you shouldn't be able to meet some simple criteria and not have to go before us.
    • Margaret MaliszewskiPlanning Manager
    • 00:22:02
      So you're talking about the existing canopy, just adding panels to it, right?
    • 00:22:08
      Yeah, I think that we could just add a note to the criteria saying it's not just buildings, it includes structures, existing structures over parking.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:22:21
      Yeah, in which case, like if the panels would be visible to the EC on top of the canopy,
    • 00:22:32
      Well, the canopy is not a flat roof.
    • 00:22:35
      It's not a pitched roof.
    • 00:22:36
      So it would be outside of those two categories.
    • 00:22:40
      And it would be one that you could add panels to whether or not they were visible.
    • Margaret MaliszewskiPlanning Manager
    • 00:22:49
      At the end of what you said, it's actually hard to hear you all.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:22:54
      Oh, I'm sorry.
    • Margaret MaliszewskiPlanning Manager
    • 00:22:55
      It's really well in the recording, but it's really hard to hear.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:22:58
      Okay.
    • 00:22:59
      Doesn't amplify it to the room.
    • 00:23:01
      Yeah.
    • 00:23:01
      Okay.
    • 00:23:02
      Sorry.
    • SPEAKER_06
    • 00:23:03
      It's hard to hear you as well.
    • Margaret MaliszewskiPlanning Manager
    • 00:23:05
      Good to know.
    • 00:23:06
      Yeah.
    • 00:23:07
      So I was thinking that, back to the images,
    • 00:23:17
      that for single maybe for single canopies or single or canopies with a single pitch that they would it would be it would make sense to just apply the criteria we've already talked about the either the the pitched roof okay or the the flat roof and i think that i think that would work okay
    • Frank HancockVice Chair, Architectural Review Board
    • 00:23:52
      Yeah, that makes sense to me.
    • 00:23:53
      Are there a lot of these in the county?
    • 00:23:58
      Not yet.
    • 00:23:59
      I think they're pretty expensive.
    • 00:24:00
      They are.
    • 00:24:00
      And so you don't see them a lot.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:02
      The foundation works surprisingly involved.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:24:05
      Yeah.
    • 00:24:05
      Yeah.
    • 00:24:10
      But I agree.
    • 00:24:11
      I think to the extent that there are these, they could follow that county-wide criteria of adding.
    • 00:24:20
      But then the second question,
    • 00:24:24
      I don't know how useful that would be.
    • 00:24:33
      Are we getting a lot of applications for these?
    • 00:24:38
      I think we would want to see it.
    • 00:24:40
      I don't know that it would make sense for it to be a countywide element.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:46
      I tend to agree.
    • SPEAKER_06
    • 00:24:48
      If it's a new candidate.
    • 00:24:51
      How do we even evaluate those?
    • 00:24:53
      Forget about the solar piece.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:24:55
      Well I think there's a precedent.
    • 00:24:57
      It's way back, but Colonial Nissan came to us to put a canopy, I think it had solar on it, on top of their parking deck.
    • 00:25:09
      It's been a few years.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:25:11
      It was a while ago.
    • 00:25:12
      That's the main building.
    • 00:25:13
      Yeah.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:25:14
      That's the only thing I can think of.
    • 00:25:16
      But maybe you're right.
    • 00:25:17
      Maybe that's just a modification to the building and not necessarily.
    • SPEAKER_06
    • 00:25:21
      Chris Henry did one on 20 North, that condo project they built.
    • 00:25:26
      Oh, he did?
    • 00:25:26
      Yeah.
    • 00:25:28
      That may be the only one I'm aware of.
    • Margaret MaliszewskiPlanning Manager
    • 00:25:30
      That is the only one that I can think of.
    • 00:25:33
      And it's not visible from the entrance border.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:25:43
      Yeah, I think we would want to see it.
    • 00:25:46
      I think we would spend a lot of time trying to draft the countywide when we might get one of these every five years or even if we got one a year, I don't know.
    • Margaret MaliszewskiPlanning Manager
    • 00:25:59
      Okay.
    • Taro MatsunoMember, Architectural Review Board
    • 00:26:00
      I mean, I guess my thought is just, yeah, if it's a structure that gets
    • 00:26:06
      Type Plan, or any other thing that pulls it into our process, we can evaluate it along, for the most part, the same criteria, right?
    • 00:26:16
      Like it's orderly and it looks nice, right?
    • 00:26:22
      Et cetera.
    • Margaret MaliszewskiPlanning Manager
    • 00:26:24
      I think this is anticipating an existing development
    • 00:26:31
      site plan's already approved, everything's already built, this is coming in after the fact, so.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:26:34
      Like a big shopping center with a big parking lot.
    • 00:26:37
      Right.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:26:38
      Yeah.
    • Margaret MaliszewskiPlanning Manager
    • 00:26:43
      Okay, so it sounds like there's general agreement that the solar parking canopies should, we don't need to add criteria for them, those are things that would come to the ARB for full review.
    • Chris HenningsenChair, Architectural Review Board
    • 00:26:57
      And we can certainly re-evaluate that if we start getting tons of applications for that too.
    • Margaret MaliszewskiPlanning Manager
    • 00:27:08
      Okay, another topic that came up in January was solar shingles.
    • 00:27:14
      You asked how solar shingles might fit into the criteria.
    • 00:27:17
      I did a little bit of research there.
    • 00:27:19
      We think the process could differ depending on the type of solar shingle that's proposed.
    • 00:27:24
      If an entire roof is covered with them, it seems like criteria regarding location, orientation, and mounting would not be issues.
    • 00:27:31
      It wouldn't be things we'd have to review for.
    • 00:27:34
      But color and pattern could be things we'd still want to look at.
    • 00:27:39
      If solar shingles are to be mounted to only part of a roof, then it seems like the design criteria could be like those that we've already discussed.
    • 00:27:48
      Coordinating shingle size, color orientation and mounting details with the existing roof form and materials could all be relevant considerations.
    • 00:27:58
      So the questions here, should countywide criteria be drafted for roofs covered entirely in solar shingles?
    • 00:28:05
      If so, should these include criteria beyond color and pattern?
    • 00:28:09
      Another question, should countywide criteria for coordinating size, color, orientation, and mounting details be drafted for solar shingles installed on parts of roofs?
    • 00:28:28
      Any questions there?
    • 00:28:33
      And just for reference, we haven't had any applications for these.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:41
      I mean, to me, it seems like solar shingles, like all these examples that we're looking at, just by their very nature, meet all the requirements for solar panels.
    • 00:28:53
      unless I'm not thinking of one.
    • 00:28:58
      They are in the same plane as the roof.
    • 00:29:00
      They would not extend beyond the roof.
    • 00:29:03
      They're within six inches of the roof plan.
    • 00:29:07
      I'd say if there are requirements, I would lean on the very permissive side or not have any additional requirements just because they're solar shingles.
    • 00:29:24
      seem to be just by their very nature like in compliance with the requirements that we were talking about for solar panels.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:29:36
      Yeah, that seems like a good observation, Chris.
    • 00:29:39
      And to the extent there's one regulation that addresses it, that seems positive.
    • 00:29:47
      In terms of the question about color and pattern,
    • 00:29:53
      I don't know whether that applies to the solar panels themselves.
    • 00:29:58
      Do the solar shingles come in different colors?
    • Margaret MaliszewskiPlanning Manager
    • 00:30:03
      I'm not sure.
    • 00:30:04
      I was just thinking about the lower middle image, how that one just looks very different than the others.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:30:19
      I'm all for making things like easier but we've never seen an application so we have no idea like we could create this county-wide and then be presented with even something in one of these images and it could have an impact on the corridor I feel like we should maybe see an application with the shingles before we go and
    • 00:30:45
      Right?
    • 00:30:45
      And we might not.
    • 00:30:48
      But I mean, I like the countywide, but I feel like doesn't that usually come out of, we've had multiple reviews.
    • 00:30:56
      We say the same thing.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:30:57
      Yeah.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:30:58
      You know, it's, it's not good observation, Frank.
    • 00:31:01
      Yeah.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:31:01
      I agree.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:31:02
      But I feel like if we have one or multiple, if we have multiple that might lead to a countywide, but right now, you know, it might be, have some unintended consequences.
    • Margaret MaliszewskiPlanning Manager
    • 00:31:13
      Okay.
    • 00:31:14
      Looks like there's general agreement there?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:31:17
      I think so.
    • Margaret MaliszewskiPlanning Manager
    • 00:31:18
      Okay.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:31:19
      Yep.
    • Margaret MaliszewskiPlanning Manager
    • 00:31:22
      Okay.
    • 00:31:23
      The images in this slide, in the lower left and lower right corners were shown in the January meeting, and that led some of you to note that a raise of that type might be more difficult to see as being available for countywide certificates.
    • 00:31:40
      It's really hard to find internet images of solar panels on flat roofs as viewed from the ground.
    • 00:31:49
      This is the best I could do.
    • 00:31:51
      These do show sort of a variety of installations on the flat roofs.
    • 00:31:56
      With those images, it seems like there are three categories of arrays on flat roofs or nearly flat roofs.
    • 00:32:03
      First is the arrays that are fully screened by parapets, and that would be the top left image.
    • 00:32:09
      Second is those arrays that are mostly screened by parapets and are oriented to the entrance quarter street in a way that significantly minimizes the view of the array.
    • 00:32:19
      An example of that would be the top right.
    • 00:32:22
      That's the High School Center 2 project that you reviewed and approved.
    • 00:32:26
      And then the third category is the arrays that are not only visible themselves, but they might change the building's proportions or impact the form and general character of the building as in the bottom two images.
    • 00:32:40
      If the array is fully screened, as we noted earlier, then ARB review isn't required.
    • 00:32:45
      I think the question is what level of review is appropriate for those mostly not visible arrays and the significantly visible arrays.
    • 00:32:56
      Installations of both types could be reserved for full ARB review, or we could try to outline some parameters for what that mostly not visible means.
    • 00:33:07
      So the questions here, should arrays on flat roofs that are not fully screened by parapets require ARB review and approval, or is there some level of not fully screened that should be available for staff level review?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:33:23
      I think it may be challenging to define a consistent threshold for fully screened versus un-fully screened, so it seems like either screened or not screened is an easier thing to establish factually.
    • 00:33:36
      I do think to the extent applicants could provide, like in the case of the center two sight lines from the EC demonstrating that there aren't readily visible angles from which the panels are visible
    • 00:33:53
      Staff could then have that in the record and establish a finding of either screened or not visible by the roof extent itself.
    • 00:34:03
      Because I can just imagine if in some cases panels are not fully screened to some degree and then another applicant expects that same relief, how we have a line that is meaningfully held and that applicants feel is
    • 00:34:23
      equitably applying.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:34:28
      I agree.
    • Chris HenningsenChair, Architectural Review Board
    • 00:34:32
      Yeah.
    • 00:34:34
      Once again, especially because we're not inundated with, you know, application.
    • 00:34:41
      I think, you know, like the other examples, like if we was starting to clog up every meeting, then
    • 00:34:51
      It would be worth trying to split that.
    • Margaret MaliszewskiPlanning Manager
    • 00:34:55
      OK, general agreement there.
    • 00:34:57
      Other comments?
    • SPEAKER_06
    • 00:35:03
      Fully screened could just include elevation as well, right?
    • 00:35:06
      I mean, we're not we're looking down at buildings.
    • 00:35:09
      If it was a six story building and it's on top, even if there's no parapet.
    • Margaret MaliszewskiPlanning Manager
    • 00:35:17
      Right, you may not see it.
    • 00:35:25
      Other comments?
    • 00:35:31
      Okay.
    • 00:35:35
      That is all I had for you today.
    • 00:35:36
      So I think what we'll do is make the few changes that we talked about and bring it back to you next time for adoption.
    • 00:35:48
      And just as an aside, on May 26,
    • 00:35:54
      We'll be at the Planning Commission with the zoning ordinance text change that accompanies this.
    • 00:36:06
      So that's just the adding that category of countywide certificate to the list of categories.
    • 00:36:10
      Great.
    • 00:36:14
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:15
      Thanks a lot.
    • 00:36:18
      Alright, next order of business is a motion to adopt the May 4th, 2026 minutes.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:36:26
      Since I wasn't here, I'd like to move to approve them.
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:28
      Alright, I'll second that if we can put it to a vote.
    • SPEAKER_02
    • 00:36:33
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:34
      Aye.
    • SPEAKER_02
    • 00:36:35
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:36
      Aye.
    • SPEAKER_02
    • 00:36:37
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:38
      Aye.
    • SPEAKER_02
    • 00:36:38
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:40
      Aye.
    • SPEAKER_02
    • 00:36:40
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:42
      Aye.
    • SPEAKER_02
    • 00:36:42
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:42
      Alright, thank you.
    • 00:36:45
      All right, do any board members or staff have any other items for discussion?
    • 00:36:53
      I'd like to know on that.
    • 00:36:55
      So the next ARB meeting is scheduled for Monday, May 26th.
    • Margaret MaliszewskiPlanning Manager
    • 00:37:00
      Actually, it's a Tuesday.
    • Chris HenningsenChair, Architectural Review Board
    • 00:37:02
      Oh, okay.
    • Margaret MaliszewskiPlanning Manager
    • 00:37:03
      We have a typo.
    • Chris HenningsenChair, Architectural Review Board
    • 00:37:05
      Okay.
    • 00:37:05
      So Tuesday, May 26th, 2026.
    • 00:37:11
      It's possible that I may not be able to make that.
    • 00:37:15
      I don't know for sure, but I'll let you know.
    • 00:37:19
      I will not be able to make that meeting.
    • Margaret MaliszewskiPlanning Manager
    • 00:37:23
      Others?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:37:24
      I currently can.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:37:26
      Same here.
    • Margaret MaliszewskiPlanning Manager
    • 00:37:28
      If that changes, please let us know.
    • 00:37:29
      Yes.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:37:32
      Are there review items scheduled for it?
    • Margaret MaliszewskiPlanning Manager
    • 00:37:34
      There is.
    • 00:37:36
      There is one.
    • 00:37:37
      The 24th.
    • 00:37:44
      Just forgetting what it is at the moment.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:37:48
      We can look forward to it on the agenda a little bit.
    • SPEAKER_02
    • 00:37:53
      We have ARB 2026-06, Car Lovers Rio, and then ARB 2026-08, Vet Emergency Group, and then a work session for the outdoor display for ZTAs.
    • Margaret MaliszewskiPlanning Manager
    • 00:38:08
      Yeah, we've got a few things.
    • 00:38:10
      Okay.
    • Chris HenningsenChair, Architectural Review Board
    • 00:38:11
      well so it seems like tentatively we have a forum so so this meeting is adjourned until our next meeting on Monday May Tuesday May 26 2026 it's say 140 thank you thank you