Central Virginia
  • Albemarle County
  • Architectural Review Board Meeting 5/4/2026
  • Auto-scroll

Architectural Review Board Meeting   5/4/2026

Attachments
  • Agenda.pdf
  • Final Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB-2026-00002 City Church Addition Final Site Plan Staff Report.pdf
  • Attach 1 ARB-2026-00002 City Church Addition Final Site Plan.pdf
  • Attach 2 ARB-2026-00002 City Church Addition Combined Architectural Drawings.pdf
  • ARB2026-03 Sheetz Initial Site Plan Staff Report.pdf
  • Attach. 1 ARB2026-00003 and SDP-2026-00033 Sheetz Initial Site Plan.pdf
  • Attach. 2 ARB2026-00003 and SDP-2026-00033 Sheetz Architectural Drawings.pdf
  • Draft ARB Action Memo Minutes 04_20_2026.pdf
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:07
      Alright, let's see, it's 1.05.
    • 00:00:13
      I'm calling the May 4th, 2026 meeting of the Albemarle County Architectural Review Board to order.
    • 00:00:19
      If you could call the roll, please.
    • SPEAKER_02
    • 00:00:22
      Yes, Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:25
      Here.
    • SPEAKER_02
    • 00:00:25
      Mr. Hancock.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:27
      Here.
    • SPEAKER_02
    • 00:00:27
      Mr. Stoner.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:28
      Here.
    • SPEAKER_02
    • 00:00:29
      Mr. Matsuno.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:30
      Here.
    • SPEAKER_02
    • 00:00:31
      And Mr. Van Der Werf is absent.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:33
      All right.
    • 00:00:33
      Thanks a lot.
    • 00:00:34
      Do any ARB members have anything to disclose?
    • 00:00:38
      No, no, no.
    • Frank StonerMember, Architectural Review Board
    • 00:00:40
      All right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:41
      Me either.
    • 00:00:41
      Great.
    • 00:00:43
      Today's meeting is a hybrid meeting.
    • 00:00:45
      The public may access and participate in the meeting electronically.
    • 00:00:49
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:00:55
      The public has real-time audiovisual access to this meeting over Zoom and real-time audio access over telephone, both as provided in the lawfully posted meeting notice.
    • 00:01:05
      This meeting is being recorded and will be made available on the county's website calendar.
    • 00:01:10
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:16
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:01:21
      Applicants who are making presentations, note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:29
      Staff will let you know when the 15 minutes are up.
    • 00:01:33
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:01:41
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:01:50
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • SPEAKER_02
    • 00:01:55
      I have no one online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:59
      All right.
    • 00:02:00
      I don't see any takers in person.
    • 00:02:02
      We don't have any consent agenda items today.
    • 00:02:06
      We have two regular review items.
    • 00:02:09
      The first is ARB 2026-00002 City Church Final.
    • 00:02:18
      Margaret?
    • Margaret MaliszewskiPlanning Manager
    • 00:02:26
      Thank you.
    • 00:02:26
      This is a proposal to construct a multi-use facility adjacent to the existing church that's located at 1010 Rio Road East across from Belvedere Boulevard.
    • 00:02:37
      You reviewed and recommended approval of the initial site plan for this development in October of last year, and you reviewed a conceptual architectural design in December of last year.
    • 00:02:47
      And many of the issues identified in those previous reviews have been addressed with this submittal.
    • 00:02:53
      This image is from the December review and one of the primary issues identified at that time was the coordination between the existing church and the proposed addition.
    • 00:03:04
      The applicant was asked to revise materials, colors, and or details to increase compatibility between the buildings and to consider modifying the heights of the canopies and the openings.
    • 00:03:15
      The applicant has clarified that this image was already outdated at the time it was shown in December and the canopy was shown higher than was intended.
    • 00:03:24
      The canopy at the church is proposed at 11 feet tall and the one at the addition is proposed at 12 and a half feet tall.
    • 00:03:31
      The canopy at the addition aligns with the band that separates the two stories of the building.
    • 00:03:38
      The coordination issue has also been addressed by changing the color of the ground story elevation of the addition from white to a shade of brown and by making the band between the stories black to coordinate with the canopies.
    • 00:03:53
      There are canopy details in the drawing set, but they aren't completely legible.
    • 00:03:57
      So we've recommended that revised legible details be submitted.
    • 00:04:02
      Also, the canopy at the church is shown at a different length on the site plan than it is on the architectural drawing.
    • 00:04:08
      So we've asked for coordination there.
    • 00:04:12
      The architectural elevations do call out materials, but not the proposed colors.
    • 00:04:16
      So we've recommended that the drawings be updated with the call outs for all the materials and colors.
    • 00:04:23
      There were some landscape comments made in the previous meetings that haven't been addressed in the current plan.
    • 00:04:30
      One comment was to add a tree and an island in the parking row in front of the addition.
    • 00:04:36
      We've repeated that recommendation in this round of review.
    • 00:04:39
      Also, there was a recommendation to shift trees away from utilities.
    • 00:04:43
      There are still some trees that are very close to utilities, and that includes the two trees in front of the addition where there's a storm pipe and a water line.
    • 00:04:51
      and the trees between the site entrances that are very close to an existing underground telephone line.
    • 00:04:59
      Also, plants are shown in the perspective views along the addition but they're not shown on the landscape plans so we recommend coordination there.
    • 00:05:08
      Our recommendation is for approval with the conditions listed in the staff report.
    • 00:05:13
      Most of those are some simple changes and adding just notes to the drawings and then coordination of those landscape issues.
    • 00:05:21
      I'd like to point out that we've had some communication glitch with the applicant.
    • 00:05:26
      The applicant did not get the staff report ahead of time, so they're not as familiar with these recommendations as needed.
    • 00:05:32
      So if you need additional clarification, I'm happy to jump in.
    • 00:05:36
      Our recommendation is, again, for approval with the conditions listed in the report.
    • Chris HenningsenChair, Architectural Review Board
    • 00:05:42
      All right.
    • 00:05:42
      Thanks a lot, Margaret.
    • 00:05:43
      I guess we will see if any members have questions.
    • 00:05:48
      Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 00:05:50
      Mark, can you go back to the landscape, the elevations that show the landscaping, that when there were two, I don't know whether one was the previous, and this is
    • Margaret MaliszewskiPlanning Manager
    • 00:06:03
      So there are two perspective images that show the building, and they show different landscaping along the foundation of the addition.
    • 00:06:12
      So this is one of them.
    • 00:06:12
      All right.
    • 00:06:29
      And then on the right side is another version with landscaping along the wall of the addition.
    • Frank StonerMember, Architectural Review Board
    • 00:06:38
      Now which one they're proposing?
    • Margaret MaliszewskiPlanning Manager
    • 00:06:41
      I do not.
    • Frank StonerMember, Architectural Review Board
    • 00:06:44
      I don't have any other questions.
    • 00:06:45
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:06:47
      Frank Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:06:49
      Sure.
    • 00:06:50
      One, can we go to the other exhibit that I think showed an elevation with the landscape plan, a color elevation?
    • 00:06:58
      Yes, this one.
    • 00:07:00
      Is just the top two, is one of these old and one of these new?
    • Margaret MaliszewskiPlanning Manager
    • 00:07:06
      No, these are, my understanding is these are both current.
    • 00:07:12
      They're just, I've taken snips of them so they maybe look more similar than they are.
    • Chris HenningsenChair, Architectural Review Board
    • 00:07:18
      Thank you.
    • 00:07:22
      Thanks.
    • 00:07:23
      Tara?
    • 00:07:25
      No, I don't have any questions.
    • 00:07:26
      Thank you, Margaret.
    • 00:07:27
      I don't have any questions either.
    • 00:07:30
      So if the applicant has a presentation, now would be the time for it.
    • 00:07:42
      All right.
    • 00:07:43
      Well, I guess we'll just do a Q&A in that case.
    • Margaret MaliszewskiPlanning Manager
    • 00:07:48
      I'm not sure the applicant heard you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:07:50
      Oh.
    • 00:07:52
      If you have a presentation, now's the time.
    • SPEAKER_06
    • 00:08:06
      Thanks for being patient with us guys.
    • SPEAKER_02
    • 00:08:10
      Please state your name for the record.
    • SPEAKER_06
    • 00:08:12
      My name is John Daly with Mather Daly Architects and Chris Becker with City Church.
    • 00:08:19
      and you were asking about which image is correct.
    • 00:08:24
      It would have been the one to our left, the one that, because that matches the landscape plan more directly.
    • 00:08:32
      And we don't have a presentation to speak of other than to, I mean, we could go through the list of questions.
    • 00:08:42
      We did not receive the staff report.
    • 00:08:46
      So,
    • 00:08:47
      I mean, if you like, we can kind of go through that one by one right now.
    • 00:08:53
      Sure.
    • 00:08:53
      Yeah, I think it works.
    • 00:09:00
      OK, so the first two main items, architectural design and landscaping, potential utility conflicts.
    • 00:09:09
      So that'll certainly be relayed to Timmons, the civil engineer on this project.
    • 00:09:17
      Have you had any discussions with them on that?
    • 00:09:19
      Not specifically with where it goes, but we can.
    • 00:09:22
      Yeah, I've spoken to them a little bit about that.
    • 00:09:25
      Yeah, we'll definitely make sure that that resonates with them.
    • 00:09:29
      Mass scale, color, material, basically just listing all that stuff on the elevations themselves, specific colors, I imagine, like Sherwin-Williams numbers and stuff like that.
    • 00:09:42
      We can do that.
    • 00:09:50
      Sorry, I'm reading this in real time right now.
    • 00:09:56
      Some of these things like revise the luminaire schedule to indicate proposed light fixture and pole colors.
    • 00:10:02
      I believe we okay pole color I don't think we had on there.
    • 00:10:09
      Margaret, do you?
    • Margaret MaliszewskiPlanning Manager
    • 00:10:11
      No, I think there are cut sheets on the lighting plan set, but the colors have not been specified.
    • SPEAKER_06
    • 00:10:21
      Okay, a number of these things look like civil-related items.
    • Margaret MaliszewskiPlanning Manager
    • 00:10:27
      Yeah, it's like six through 11 are related to the site plan, and those are really just coordination issues and notes.
    • SPEAKER_06
    • 00:10:39
      Sure.
    • 00:10:40
      Well, we're happy to get together and coordinate those, absolutely.
    • 00:10:49
      We're happy to answer any other questions that you have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:10:52
      All right.
    • 00:10:54
      Cool.
    • 00:10:54
      We'll start with Frank Stoner.
    • 00:10:57
      Do you have any questions?
    • Frank StonerMember, Architectural Review Board
    • 00:10:59
      Two questions.
    • 00:11:01
      The brown and white, are both stucco, or is the white a different material?
    • SPEAKER_06
    • 00:11:06
      There's a brick base that matches the existing church, approximately 24 to 30 inches tall or so.
    • 00:11:14
      And then, yeah, everything from there up is stucco.
    • 00:11:20
      The darker color is meant to pick up the hue, one of the hues of the brick to go with it.
    • Frank StonerMember, Architectural Review Board
    • 00:11:31
      And then on the, you said the landscape rendering to the left is the correct one that matches the site plan, although I don't, the shrubs that are planted in front.
    • 00:11:44
      And I don't know if we're looking at the wrong.
    • Margaret MaliszewskiPlanning Manager
    • 00:11:50
      That's one of the coordination issues that's outstanding.
    • SPEAKER_06
    • 00:11:56
      And my understanding is that
    • 00:11:59
      So the idea on Timmons' part was to put the, I guess, the required landscaping for the area.
    • 00:12:12
      Am I to understand that any landscaping is going to need to be on that plan that's to be ongoing, evaluate in the future, make sure it stays there, all that stuff?
    • 00:12:27
      OK.
    • 00:12:30
      So basically anything we show on the ARB plan for Architectural would have to be on that site plan.
    • 00:12:36
      Yeah, I think so.
    • Frank StonerMember, Architectural Review Board
    • 00:12:38
      Is there actually room for the shrubs that are shown on the existing site plan?
    • 00:12:42
      Because it looks like sidewalks pretty tight to the building there.
    • SPEAKER_06
    • 00:12:48
      There's room.
    • 00:12:48
      There's about a four foot section of planting area there.
    • Frank StonerMember, Architectural Review Board
    • 00:12:57
      That's all.
    • 00:12:58
      I don't have any other questions.
    • 00:12:59
      Thanks.
    • 00:13:00
      Tara?
    • Taro MatsunoMember, Architectural Review Board
    • 00:13:04
      So am I correct in saying, so the idea is that we should be taking the, from the images that are on the screen right now, the landscape of the left and the building design of the right and mentally combine them into one composite?
    • SPEAKER_06
    • 00:13:18
      Well, the elevations in the architectural drawings would be the one that's represented probably better by the one on the right there and the landscaping elements.
    • 00:13:30
      I mean, the main thing about the one on the left is that it actually shifts a little bit further back to where it shows some of the parking vegetation within the parking lot and also shows a second tree next to the building, which is per the civil drawing.
    • 00:13:51
      if that answers your question.
    • Taro MatsunoMember, Architectural Review Board
    • 00:13:54
      And is there any reason why the comments around tree locations, to your knowledge, couldn't be adjusted to coordinate more closely with utilities and to adjust the count to meet the requirements?
    • SPEAKER_06
    • 00:14:11
      As far as utilities, we brought that up with the civil engineer.
    • 00:14:16
      is under the impression that they were working with you guys on that.
    • 00:14:23
      I can't really speak to it.
    • 00:14:25
      As far as having another tree near the building, I wasn't sure that it was picked up.
    • 00:14:34
      I think the last elevation maybe only showed one tree, but the landscape drawings show two.
    • 00:14:45
      So I was assuming that that was now addressed.
    • 00:14:48
      Are you guys wanting a third tree?
    • 00:14:51
      I guess that's my question.
    • Taro MatsunoMember, Architectural Review Board
    • 00:14:55
      I guess I'm just trying to see that you would be
    • 00:15:03
      You and Civil would be open to working with the board and staff on resolving those coordination issues for the final record submission.
    • 00:15:13
      Oh, absolutely.
    • 00:15:14
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:15:17
      All right, thanks.
    • 00:15:18
      Frank?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:15:20
      Just the question about the building color in these two elevations.
    • 00:15:24
      On the lower level, there just seems to be a difference between the one seems a little kind of
    • 00:15:33
      Yeah, darker and one little more like tan color, which are you going with?
    • SPEAKER_06
    • 00:15:40
      Well, I believe there was a specific set of colors that was sent.
    • 00:15:44
      Was there not, Margaret, in the last application, like Sherwin-Williams numbers?
    • Margaret MaliszewskiPlanning Manager
    • 00:15:51
      No, I don't believe so.
    • SPEAKER_06
    • 00:15:52
      Okay.
    • 00:15:54
      Well, on the elevations that are forthcoming, the updates on them, we can add those specifics.
    • 00:16:03
      Okay.
    • Frank StonerMember, Architectural Review Board
    • 00:16:04
      You know which of these two is closer to reality?
    • SPEAKER_06
    • 00:16:08
      I would say the one on the right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:13
      Thank you.
    • 00:16:14
      All right, thanks.
    • 00:16:15
      I don't have any questions for the applicant.
    • 00:16:19
      Are there any members of the public that want to make a comment?
    • SPEAKER_03
    • 00:16:24
      No, sir.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:25
      All right, great.
    • 00:16:26
      So the ARB will now go into discussion.
    • 00:16:29
      I guess we'll start with Tara if you have any comments.
    • Taro MatsunoMember, Architectural Review Board
    • 00:16:32
      Yeah, thanks to the applicants and I appreciate their willingness to speak to some of these issues given the issues around receipt of the staff report.
    • 00:16:44
      I think that the images that we've seen generally reflect a design that's compatible with the entrance corridor guidelines.
    • 00:16:56
      I think there's been significant changes since the last iteration and I think based off of
    • 00:17:02
      The applicant's response is in our question period that it seems like there is a path to resolving a lot of the issues noted in the staff report and so I feel reassured that there's a willingness and a possibility of meeting those and that I feel fairly comfortable moving forward with the project from my perspective.
    • 00:17:26
      All right, thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:17:28
      Frank Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:17:28
      Sure.
    • 00:17:29
      I think, yeah, I appreciate the applicant's updates.
    • 00:17:34
      I think I probably said this the first time we looked at it.
    • 00:17:37
      I think given the distance from the corridor, the fact that it, I think it sits about 15 feet below the elevation of Rio Road,
    • 00:17:48
      It's a pretty massive building, but given those two site conditions, I feel like the impact on the corridors is minimized.
    • 00:17:59
      I agree with all the comments staff has made.
    • 00:18:01
      I don't have any to add.
    • 00:18:04
      The only thing to say, I think the image on the color of the lower half of the building
    • 00:18:10
      on the image on the left, I think is more like contextually, like makes more sense that will help the building to recede versus the right.
    • 00:18:21
      I think the kind of that tan buff image seems to me that it would stand out, but that's always tough to judge on a rendering.
    • 00:18:29
      I could be wrong, but those are just my two cents on that.
    • 00:18:34
      But yeah, thanks.
    • 00:18:36
      All right, thank you, Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:18:39
      Yeah, I would echo Frank and Taro.
    • 00:18:42
      Nothing really to add.
    • 00:18:43
      I think the applications in its current form is approvable.
    • Chris HenningsenChair, Architectural Review Board
    • 00:18:50
      All right, thanks.
    • 00:18:51
      I kind of feel the same way.
    • 00:18:54
      I agree with what's been said.
    • 00:18:56
      I appreciate the applicant's willingness to work with staff and the board through this process.
    • 00:19:02
      And I think the remaining issues are pretty minor.
    • 00:19:09
      So we could take a look at the proposed motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:19:25
      So again, the recommendation is for approval with the conditions listed in the staff report.
    • 00:19:31
      And those are now on the screen.
    • Frank StonerMember, Architectural Review Board
    • 00:19:37
      I'll move to approve ARB 2026-00002 City Church Final Site Plan as with the 11 items as listed.
    • Chris HenningsenChair, Architectural Review Board
    • 00:19:51
      I'll second.
    • 00:19:52
      Right.
    • 00:19:52
      Great.
    • 00:19:53
      If we could put that to a vote.
    • SPEAKER_02
    • 00:19:56
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:19:57
      Aye.
    • SPEAKER_02
    • 00:19:58
      Mr. Stoner?
    • 00:19:59
      Aye.
    • 00:19:59
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:00
      Aye.
    • SPEAKER_02
    • 00:20:01
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:02
      Aye.
    • SPEAKER_02
    • 00:20:02
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:03
      Thank you.
    • 00:20:03
      All right, so we will move to our second regular review item, which is ARB 2026-00003, Sheets, Rio East.
    • Khris TaggartSenior Planner
    • 00:20:34
      Good afternoon.
    • 00:20:35
      Application being reviewed today is an initial site plan and preliminary review of architecture.
    • 00:20:41
      The subject property is located at 1648 Royal Road East and is currently occupied by a vacant Red Lobster.
    • 00:20:50
      The proposal is to demolish the Red Lobster and construct a sheets fuel station consisting of a store building and a fuel pump canopy along with associated site improvements.
    • 00:21:02
      There are a couple of layout issues with the site plan submitted.
    • 00:21:05
      The proposed orientation of the building's facade away from the Rile Road entrance quarter and siting of utility connections in the dumpster enclosure results in the development having a back of building appearance as viewed from the entrance quarter.
    • 00:21:18
      While revising the site orientation to place the fuel pump can be closer to the Rile Road would increase the visual impact that the canopy has on the entrance quarter.
    • 00:21:27
      It would also provide greater visibility of the side, which could provide a more appropriate front to the entrance quarter.
    • 00:21:35
      The building incorporates architectural forms and materials found in historic styles, but the overall designs more closely is aligned with modern branding than when counting historic architecture.
    • 00:21:46
      On the north elevation of the building, two groups of faux windows with canopies above are proposed in addition to the utility connections that are along this elevation.
    • 00:21:58
      The minimum detailing creates elevation that, while not entirely blank, has a utilitarian service-oriented appearance.
    • 00:22:07
      Revising the design of the elevations visible from Ryle Road to reduce this utilitarian look would be appropriate.
    • 00:22:15
      Architectural drawings show roof-mounted mechanical equipment was proposed to be screened by dark bronze metal screens.
    • 00:22:24
      While these screens only eliminate the visibility of the equipment, they do not coordinate with the proportions found in the building design.
    • 00:22:31
      A parapet wall similar to the one used at the other seat's location along the entrance quarter would better integrate with the overall design.
    • 00:22:39
      Revisions to the height of the tower forms will also be needed to coordinate with the raised wall heights.
    • 00:22:48
      Regarding the fuel pump canopy, the height of the canopies with similar designs has been consistently limited to a maximum of 14 feet, six inches from grade to the lowest point of the trust.
    • 00:23:00
      Revising this height to match what has been previously approved would be appropriate.
    • 00:23:06
      A total of 40 parking spaces are proposed, which requires the installation of four interior parking lot trees.
    • 00:23:14
      Primer trees are shown along the parking areas south of the fuel pump canopy and east of the building, but no trees have been provided for the spaces on the west and south sides of the building.
    • 00:23:25
      Adding tree islands near the southeast and southwest corners of the buildings could help provide a more equal distribution and meet interior tree requirements.
    • 00:23:36
      Because of the site-related issues that have been detailed in the staff report, we are not recommending the approval and initial site plan at this time.
    • 00:23:44
      We have provided recommendations and staff report for the final site plan.
    • 00:23:48
      I'd be happy to answer any questions you all may have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:23:51
      All right.
    • 00:23:52
      Thanks a lot for the presentation, Chris.
    • 00:23:54
      I guess we'll start with Frank Stoner if you have any questions.
    • Frank StonerMember, Architectural Review Board
    • 00:23:58
      I don't have any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:24:01
      Frank Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:24:03
      I don't have any questions.
    • 00:24:04
      Thanks, Chris.
    • Chris HenningsenChair, Architectural Review Board
    • 00:24:06
      Taro?
    • 00:24:08
      No, thank you.
    • 00:24:11
      I don't have any questions either.
    • 00:24:13
      Sorry.
    • 00:24:15
      So if the applicant has a presentation.
    • Valerie LongAttorney
    • 00:24:45
      Good afternoon, Mr. Chairman, members of the board.
    • 00:24:48
      I'm Valerie Long with Williams-Mullen here representing the applicant sheets.
    • 00:24:53
      We do have several members of our team here today.
    • 00:24:55
      We have Tony Caruso, who is the in-house civil engineer and project manager.
    • 00:25:02
      We also have representatives from Kimley-Horn, the project civil engineers, and we also have a few individuals listening in and available to answer questions as necessary.
    • 00:25:12
      A lot of our slides were already covered by staff slides, so I'm going to zip through them pretty quickly.
    • 00:25:18
      Feel free to hit me with any questions afterwards.
    • 00:25:21
      I did very much appreciate the benefit of the updated GIS system with the new pictography.
    • 00:25:29
      It's really amazing to be able to get these aerial views and they're current with the new Home Depot there.
    • 00:25:35
      So it really helps provide the perspective of how these two sites can relate to each other.
    • 00:25:44
      This is just a street view image of the existing conditions with regard to the sidewalk, the existing plantains and so forth.
    • 00:25:52
      And that was obviously from the Rio EC.
    • 00:25:54
      This is from the
    • 00:25:57
      Route 29 entrance corridor looking in the opposite direction.
    • 00:26:00
      And here is the view there, which interestingly, some of you all may remember we talked about that berm and that retaining wall when you were reviewing the Home Depot and how that really changed the landscape there.
    • 00:26:16
      and there with those changes the different elevation plus the existing vegetation some of that existing red lobsters is visible presumably some of the new sheets would be as well but there is you know the combination of the distance and the plantings in the foreground do make a difference.
    • 00:26:37
      and this is just that same sort of from, again, the aerial image and so those, get this cursor to work, there, those are the trees we're seeing there from Route 29 North.
    • 00:26:51
      We first started working with sheets back in the fall and they came to us with this original, very conceptual layout.
    • 00:26:59
      We just wanted to show this is that the sheets and its design team have,
    • 00:27:04
      gone through an evaluation in terms of working to try to find the site alignment or layout that could really work the best and balance all of the competing factors.
    • 00:27:17
      Obviously lots of operational and safety requirements with regard to truck circulation, customer circulation, parking.
    • 00:27:24
      just general operations things like the dumpster and sufficient spacing.
    • 00:27:29
      This was their original concept.
    • 00:27:32
      We talked about how your design guidelines and the board generally has a preference for not having the fuel canopies along the entrance corridor but that to our knowledge
    • 00:27:43
      Few, if any, convenience stores had been able to achieve that given their operational needs.
    • 00:27:51
      We thought this might have worked, but we did ultimately, they volunteered that they could put the fuel pumps on the far side of the building.
    • 00:27:59
      So we really wrestled with all the things we'll probably talk about today, which is how do you balance those competing goals when you want, you know,
    • 00:28:08
      You can have them both on the inside.
    • 00:28:11
      So here's the revised conceptual layout.
    • 00:28:13
      This is the one that we discussed with staff at a December.
    • 00:28:19
      Oh, I've got my date wrong there.
    • 00:28:21
      December pre-application meeting.
    • 00:28:23
      And then this is what sort of translated into the Ultimo site plan that was submitted and is under review.
    • 00:28:30
      But this shows sort of what we are working with with the original concept.
    • 00:28:35
      And then we worked with Sheets and Kimley-Horn to
    • 00:28:38
      Look at a lot of different things including, let me just go to the next slide which zooms in a little bit more.
    • 00:28:43
      This is obviously the site plan and a little bit closer up.
    • 00:28:47
      We worked with them a lot to add additional landscaping throughout the site that we knew would be important to your review as well as additional pedestrian connections.
    • 00:28:58
      Knowing that was an important element of the Home Depot was providing
    • 00:29:01
      Direct Pedestrian Connections from the existing sidewalk network along Rio, not only for the customers that would want to come to Sheetz, as well as those who will want to come to what hopefully will be a more developed former Fashion Square Mall in the not too immediate future.
    • 00:29:21
      and not distant future.
    • 00:29:23
      So this shows the layout again as staff indicated with the building along the entrance corridor and the gas canopy, fuel pump canopy behind.
    • 00:29:33
      As you probably know, this site is at a lower elevation than the entrance corridor.
    • 00:29:39
      and this just shows the landscaping and we work to demonstrate and really add as much landscaping as possible knowing that would be very important as well as along this entrance, the dumpster enclosure in that location knowing that would be an issue as well and this vegetation does exist but we know that whether that can be preserved or not is not always a guarantee.
    • 00:30:08
      So we are happy to chat with you about the dumpster location and the treatment of the entrance corridor side of the building.
    • 00:30:17
      Had the same elevations that staff just had, so we can flip through these and certainly come back to them.
    • 00:30:24
      Based on the feedback in the staff report, the sheets team did come up with some very rough concepts of what might be done to improve it.
    • 00:30:35
      In the meantime we've just included for reference these are images from Sheetz's existing store from airport on airport road from the EC there just for frame of reference in terms of what that same back of building looks like on that side this store obviously has a drive-through which the proposed store at Rio would not so that does add more
    • 00:30:57
      Activity and interest on this side of the building.
    • 00:31:00
      But likewise, I remember struggling years ago with how the car wash would be handled because of its utilitarian nature.
    • 00:31:08
      is just slightly further away to show the context of the site as a whole.
    • 00:31:12
      This is obviously the condition of the existing dumpster enclosure.
    • 00:31:18
      You can see it does have brick and there's plantings around it.
    • 00:31:22
      If we were to relocate the dumpsters to the location, we have another location they could probably move it to, it would likely result in a similar, there's a topography issue there.
    • 00:31:35
      So we can talk about the pros and cons.
    • 00:31:37
      It wouldn't be along the entrance corridor like this one is.
    • 00:31:40
      So perhaps that would be favorable from a design perspective, but create some corresponding operational challenges with regard to circulation.
    • 00:31:50
      It's just a street view image of looking, obviously the Red Lobster current building is kind of right behind here, but this is how that existing vegetation relates to where that dumpster area might be located.
    • 00:32:03
      And then to just even more close up design elements showing that how they provided a design that was unique to Sheets as well and to Albemarle County when it was reviewed several years ago.
    • 00:32:18
      These are just some higher quality images that were shared from opening day at the sheets that year, which I thought provided better images about some of the architectural elements that were added there, as well as their proposed canopy design that's very similar to what is proposed for Rio Road.
    • 00:32:40
      And then just a little bit, again, no drive through, but just to provide some context of how those elements relate together.
    • 00:32:46
      This is rough concept of how they might
    • 00:32:52
      update the design from the entrance corridor elevation to address some of the concerns that were mentioned.
    • 00:33:00
      As you can see, it's about adding additional stonework and variations and parapet walls on all sides to more appropriately screen the rooftop equipment.
    • 00:33:13
      We talked a lot about the window treatment and what options might exist.
    • 00:33:19
      I understand your guidelines and preference is not for reflective windows, so we're open to discussion about if there are any other options that might be more preferable, but we show those just as an option of how it might look.
    • 00:33:35
      We can obviously come back to this at any point.
    • 00:33:39
      These are just images from the staff report or the submitted plans just so we had them on the screen if anyone wanted to talk about them.
    • 00:33:47
      These are obviously from another store in Virginia just as precedent images.
    • 00:33:52
      This is from another store that
    • 00:33:55
      Sheets provided again as an alternative if that were something of interest but again we understand that most likely reflective is not your preference but we are open to discussions and then one slightly goes up and that's everything we have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:34:13
      All right, thanks a lot for the presentation.
    • 00:34:15
      I guess we will start with Frank Stoner if you have any questions.
    • Frank StonerMember, Architectural Review Board
    • 00:34:23
      Tell me why you guys migrated from the site plan you showed us at first to the current one and whether that was driven by concern over what we might approve or not approve or whether it was really because you didn't like it?
    • Valerie LongAttorney
    • 00:34:41
      Well, there were a couple things.
    • 00:34:42
      Let me go back to it so I have it in front of me.
    • 00:34:47
      There were two things.
    • 00:34:49
      One was technical and one was attempting to provide a better design.
    • 00:34:53
      So the technical issue is that there is a maximum front setback along Rio Road of 30 feet.
    • 00:35:06
      which does not exist at the Rio 29 store because route 29 was exempted as was the interstate and maybe 250 but not Rio Road from that maximum setback.
    • 00:35:24
      And so we were looking at the measurement of the closest point of this building to the property line and it was greater than 30 feet.
    • 00:35:32
      and trying to rearrange it given the shape of the parcel.
    • 00:35:37
      We were working with Sheets and their team to try and figure out could you rotate it just enough so you could get the building in there and fit, but of course, they really need to be parallel.
    • 00:35:48
      So then we talked about how, again, we explain how typically the preferences for the canopy not to be along the entrance corridor.
    • 00:35:58
      So that's when it kind of evolved into, well, we really could flip the building.
    • 00:36:02
      Maybe that works better there.
    • 00:36:04
      During the pre-op, we had not only, you know, ARB staff there, but also Mariah Gleason, who I know you all know, who's been working in sort of the lead designer for the
    • 00:36:14
      Redevelopment of the Rio 29 area and so there were a lot of just competing priorities.
    • 00:36:20
      She really likes and is focused on the activation of the back of the store relative to the future Rio 29 redevelopment obviously will be very helpful and is going to be important for sheets.
    • 00:36:32
      Hopefully that is going to be a lot of customers living in the Rio 29 area for them who can walk close by.
    • 00:36:38
      But obviously equal concern and balancing about against the elevations and I guess the treatment of how the building is designed
    • 00:36:48
      and relates to the Rio Entrance Corridor and of course the Route 29 Entrance Corridor as well.
    • 00:36:54
      So lots of competing challenges.
    • 00:36:56
      We also have to work with the access issues.
    • 00:36:59
      So there's an inter-parcel connection here we're working with as well as working with VDOT and staff on the location of this entrance.
    • 00:37:07
      So just so you all know, all the puzzle pieces have to fit together.
    • 00:37:12
      We did share this with staff after the pre-app
    • 00:37:17
      When we brought this version forward and got a lot of the same feedback that was in the report, we went back and said, hey, would you prefer this one better?
    • 00:37:27
      Which is better?
    • 00:37:27
      And staff indicated both had challenges.
    • 00:37:33
      So we decided to stick with the one that we had already been moving forward with.
    • 00:37:41
      Thank you.
    • 00:37:41
      You're welcome.
    • Taro MatsunoMember, Architectural Review Board
    • 00:37:42
      I don't have any other questions.
    • 00:37:43
      Thanks.
    • 00:37:44
      Tara?
    • 00:37:45
      Yes, do you happen to know what the grade change is from a general point on Rio Road to the finished floor of the building, say?
    • Valerie LongAttorney
    • 00:37:56
      Yeah, I have a copy of the survey.
    • 00:37:59
      I think it was in the existing conditions, but we'll look.
    • 00:38:01
      I don't know it off the top of my head unless the civil folks do.
    • Taro MatsunoMember, Architectural Review Board
    • 00:38:05
      I'm just like my perception of it in my memory might not be what it actually is, but I feel like there's some change.
    • 00:38:12
      I just don't know how much.
    • Valerie LongAttorney
    • 00:38:13
      Yeah, there definitely is.
    • 00:38:14
      It's lower.
    • 00:38:15
      I mean, if you look on existing conditions.
    • 00:38:27
      I'll probably need to come back so I don't hold everybody up.
    • Margaret MaliszewskiPlanning Manager
    • 00:38:41
      The finished floor elevation is showing as 508 and then along the entrance quarter maybe 510.
    • Taro MatsunoMember, Architectural Review Board
    • 00:38:51
      So not that much.
    • SPEAKER_03
    • 00:38:52
      They were saying 14, but they may have been measuring from a different...
    • Valerie LongAttorney
    • 00:39:12
      Let me zoom in.
    • 00:39:13
      I'll show you exactly what he was just showing me.
    • 00:39:15
      That was 510 here at this location and about, make sure I point to the right spot.
    • 00:39:26
      Oh, this is, I don't have the grading plan loaded on my slides, but it was 495 back in here.
    • Margaret MaliszewskiPlanning Manager
    • 00:39:34
      We can pull the grading plan up.
    • Valerie LongAttorney
    • 00:39:35
      Yeah.
    • 00:39:40
      In relation to this pedestrian connection, it was right around this area.
    • Margaret MaliszewskiPlanning Manager
    • 00:39:51
      Sorry, I thought you were asking about the difference between the elevation of the street and the finished floor elevation of the building.
    • Taro MatsunoMember, Architectural Review Board
    • 00:40:00
      Yeah, that is what I was asking.
    • 00:40:02
      So just a couple feet.
    • 00:40:03
      Okay, thank you.
    • Valerie LongAttorney
    • 00:40:04
      You're welcome.
    • 00:40:05
      Sorry, I misunderstood.
    • 00:40:05
      Now you have more information.
    • Taro MatsunoMember, Architectural Review Board
    • 00:40:07
      I appreciate the willingness to get all plants.
    • 00:40:11
      Okay.
    • 00:40:12
      And then my only other question, it looks online like this proposed building is a good, I don't know, 10 feet, maybe more closer to the entrance corridor than the previous Red Lobster building.
    • 00:40:30
      Is that about right?
    • Valerie LongAttorney
    • 00:40:33
      Yes, and we actually looked into that.
    • 00:40:35
      We thought, well, maybe Red Lobster obtained a waiver from that modification and we pulled the records and the Red Lobster was approved before that maximum setback went into effect.
    • Taro MatsunoMember, Architectural Review Board
    • 00:40:46
      Right, okay, great.
    • Valerie LongAttorney
    • 00:40:48
      Great beforehand.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:40:49
      Those are all my questions.
    • 00:40:55
      Thank you.
    • 00:40:56
      Brian?
    • 00:40:58
      Thank you for your presentation.
    • 00:40:59
      I don't have any questions.
    • Frank StonerMember, Architectural Review Board
    • 00:41:01
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:41:03
      Yes, thanks for your presentation.
    • 00:41:05
      I also don't have any questions.
    • 00:41:10
      Are there any members of the public that want to make a comment?
    • SPEAKER_02
    • 00:41:15
      No.
    • Chris HenningsenChair, Architectural Review Board
    • 00:41:16
      All right.
    • 00:41:17
      In that case, the ARB will now go into discussion.
    • 00:41:21
      I guess we'll start with Tara, if you have any comments.
    • Taro MatsunoMember, Architectural Review Board
    • 00:41:25
      Yes, thank you for the presentation.
    • 00:41:28
      I appreciate all the context and the many overlaid elements that the applicant has raised.
    • 00:41:37
      I had a similar thought to what I
    • 00:41:41
      I think that Frank might have been gesturing to.
    • 00:41:44
      I think, you know, looking at the consequences for the way that the building is oriented towards the entrance corridor, particularly the one that I think is, well, we would think of as most primary, the one off Rile Road rather than the one off of 29, that, you know, bringing the building a lot closer, which I understand partly meets some of the requirements that are existing under the zoning,
    • 00:42:11
      and making that sort of the rear facade that has a lot of the stuff that the building needs to function but is not the most attractive from the entrance corridor is a little unfortunate.
    • 00:42:25
      And that from that perspective, I think the design as originally presented to my eye meets the competing interests a little bit better in that
    • 00:42:39
      The facade that's presented towards the entrance corridor is more active.
    • 00:42:44
      The facade that's presented towards the future development is more active.
    • 00:42:48
      Yes, the canopy is within tight line of the entrance corridor, but it's oriented in a way where it's not the predominant feature.
    • 00:42:58
      I don't know what
    • 00:43:04
      That's my opinion.
    • 00:43:06
      I understand that there are other considerations.
    • 00:43:08
      But my thought is when ranking the various interests that the design guidelines present in terms of presenting active facades to the street, relegating parking, the visual impact of canopies, that sort of in the mix of those, I would
    • 00:43:31
      tend to prioritize the appearance of activity on the building.
    • 00:43:35
      And so that previous option is presented, I think, more closely aligns with what I would envision for the site.
    • 00:43:48
      And I'm open to discussion with my other board members on what their opinion might be.
    • Chris HenningsenChair, Architectural Review Board
    • 00:43:54
      All right, thanks.
    • 00:43:55
      Frank Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:43:57
      Sure.
    • 00:43:58
      Yeah, I appreciate the applicant kind of speaking candidly of the challenges and giving us a window into the site planning process.
    • 00:44:10
      I tend to think that this is the better option, mainly because I think this building has the biggest impact
    • 00:44:22
      As you're heading, I guess, west on Rio Road going towards 29, I think that when you're coming the other direction on Rio, you're not really going to experience this building.
    • 00:44:36
      So in my mind, kind of the entrance and the tower element are in the right place.
    • 00:44:43
      I'm wondering if they can turn the corner and somehow impact that I guess the north elevation that we're dealing with issues of blankness and maybe there's a pedestrian connection at that point I know that the grades are maybe a little different because I think the fuel canopy is in the right spot I think it needs to be pulled in
    • 00:45:10
      I think this configuration gives you the opportunity to provide a lot of landscaping along Rile Road East.
    • 00:45:18
      I think the building will still read that it's pretty close to the corridor.
    • 00:45:24
      Yeah, those are my initial thoughts.
    • 00:45:30
      The faux windows.
    • 00:45:33
      I don't like in concept but I feel like are more successful than the reflective windows as far as adding vitality and interest.
    • 00:45:42
      The key there is just to make it so they're not like a billboard or you know I think less is more when you're looking at those.
    • 00:45:50
      You already have a pretty
    • 00:45:54
      Loud color palette with just the sheets colors and I think that's by design but you know I don't know that those have to be as loud.
    • 00:46:06
      Those are my thoughts.
    • Chris HenningsenChair, Architectural Review Board
    • 00:46:08
      All right, thanks Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:46:11
      Yeah, it's a bit of a conundrum.
    • 00:46:14
      I understand why you guys did what you did.
    • 00:46:19
      My personal perspective is the 30-foot setback was designed in order to activate the street.
    • 00:46:27
      This elevation is not going to activate the street and putting windows on the back of the building doesn't really help.
    • 00:46:32
      There's not an entrance.
    • 00:46:33
      It's clear that it's not the front of the building.
    • 00:46:40
      And in that sense, I think landscaping it to cover up the fact that it's now closer to the corridor to meet the setback requirement doesn't really do much other than push it closer so you're just going to see the back of the building closer to the corridor.
    • 00:46:58
      And I guess for that reason, I tend to agree with Taro.
    • 00:47:01
      I think the original site plan works better.
    • 00:47:07
      I think we've kind of come to accept the fact that canopies are going to be on the corridor.
    • 00:47:14
      That's how gas stations work.
    • 00:47:16
      And we've approved a number of them with the canopy on the corridor.
    • 00:47:21
      That doesn't really give me anxiety.
    • 00:47:22
      And I look at how the sheets up at Airport Road came out.
    • 00:47:26
      That's a beautiful facility.
    • 00:47:30
      By any measure, I am thrilled with the way that came out.
    • 00:47:37
      So I understand the complexities of trying to get a waiver for the setback.
    • 00:47:43
      But I would encourage you to consider it.
    • Chris HenningsenChair, Architectural Review Board
    • 00:47:49
      All right.
    • 00:47:50
      Thanks.
    • 00:47:53
      I agree, it's a tough site, at least ARB speaking, just because there's no rear of this site, and obviously you have a rear of the building that you have to orient.
    • 00:48:13
      I think Frank Hancock made a good point that this
    • 00:48:19
      this orientation that's presented does kind of give you opportunity for landscape screening.
    • 00:48:29
      And I also agree, I don't think at least coming from kind of the Route 29 side, you're not really gonna see much of it.
    • 00:48:44
      But I also agree with Frank Stoner that the reason for that
    • 00:48:50
      30 foot maximum setback is just to expect the I guess having the back of the building face that entrance corridor kind of defeats the purpose in my opinion I have no idea how difficult it is to get a waiver or if it's even possible but I think
    • 00:49:17
      I agree that might be something to look at and if that's just not possible in my opinion the only solution would be to do more to make that backside of the building not as much backside maybe I don't know how flexible the interior
    • 00:49:42
      That layout of the building can be, but maybe to have an entrance that faces Rye Road.
    • 00:49:49
      I think.
    • 00:49:54
      I guess, yeah, I'll reiterate, it's kind of a difficult problem.
    • 00:50:05
      I guess we could take a look at the recommended motion.
    • 00:50:19
      Thank you.
    • Margaret MaliszewskiPlanning Manager
    • 00:50:29
      So this is an initial site plan and staff's recommendation is that the, to not recommend approval of this plan at this time.
    • 00:50:40
      There are two items there we've recommended to be resolved prior to approving that an initial plan, one being revised the overall site layout to ensure that the development presents an appropriate front to the Rio Road entrance quarter.
    • 00:50:56
      That leaves it sort of,
    • 00:50:58
      open as to how that might be achieved and the second one is about relocating the dumpster to make it less visible.
    • 00:51:10
      So that is the recommendation regarding the initial plan and then as usual there's a list of items to be addressed for the final site plan.
    • Taro MatsunoMember, Architectural Review Board
    • 00:51:24
      Margaret, given that there are
    • 00:51:28
      like the changes that would be required for the applicant to basically reconfigure the entire site plan and consider pursuing a waiver.
    • 00:51:40
      I guess like, is there any mechanism for, and given the fact that we have many different parties in play from our board to the sort of Mariah and the design guidelines for the district, like is there any way
    • 00:51:59
      that we could help provide the applicant some guidance in between this point and a future conversation with those other folks present.
    • 00:52:16
      I feel like if we were just to stop the conversation now and then it doesn't seem to help them move forward in a constructive way with the engineering time and the design hours that they have planned for.
    • 00:52:31
      Sure.
    • Margaret MaliszewskiPlanning Manager
    • 00:52:32
      To meet some deadlines, we do need to get an action on the initial plan today, but we'd be happy to set up a work session inviting whoever needed or wanted
    • 00:52:48
      to try and work through those layout issues.
    • Khris TaggartSenior Planner
    • 00:52:53
      I will say in internal discussion, there have been some other layout issues mentioned by other reviewers.
    • 00:53:00
      So they seem to be these kind of layout issues that need to be coordinated, not just ARV related.
    • Taro MatsunoMember, Architectural Review Board
    • 00:53:08
      That might have a domino effect on the site.
    • 00:53:13
      I guess I'm wondering, does it seem helpful to my fellow board members and to the applicant to try to get after these initial site plan comments have been sort of digested, to have a work session on this particular item with other staff?
    • Khris TaggartSenior Planner
    • 00:53:32
      Yeah, I would say with the previous sheets, that's essentially what happened that they came back with showing the kind of responding to applicant or responding to staff comments showing the layout, different options for layout configurations that kind of
    • 00:53:51
      highlighted that in that particular instance with two entrance quarters at the later, maybe not exactly the layout they were showing, but layout closer to what they were showing was kind of what was needed with what they were proposing.
    • 00:54:04
      So we did have a work session that kind of showed multiple layout options and talk through and discuss that.
    • 00:54:11
      So that was just kind of my thought that the direction we would be going.
    • Chris HenningsenChair, Architectural Review Board
    • 00:54:19
      I mean, in my opinion, that would be useful.
    • 00:54:22
      I think if my fellow board members agree with that.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:54:29
      Yeah, definitely.
    • 00:54:29
      If the applicant.
    • 00:54:30
      Yeah, right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:54:32
      Certainly.
    • 00:54:32
      It's amenable to that.
    • 00:54:34
      Yeah.
    • Taro MatsunoMember, Architectural Review Board
    • 00:54:36
      Because I just, while I have my personal opinion, I think it would be, or my opinion as a board member, given that I would hesitate to give definitive direction
    • 00:54:49
      given that there are other considerations at play and other process milestones that need to be met that I think that that would be productive if the applicant's open to that.
    • Chris HenningsenChair, Architectural Review Board
    • 00:55:00
      Right, I agree.
    • 00:55:01
      I think it would be bad for us to impose some requirement that's like directly contradictory to other requirements that they have to conform to from other, you know, other directions.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:55:13
      I mean, I don't think that would happen.
    • 00:55:16
      I think the process is pretty clear, like when they go through the initial site plan, right?
    • 00:55:21
      I mean, all the departments have reviewed this and then it comes to us, you know,
    • Margaret MaliszewskiPlanning Manager
    • 00:55:30
      All the members of the Site Review Committee are reviewing the plan now and we forward your recommendation on so it's one of many that's being considered.
    • 00:55:43
      Your action is a recommendation and it's considered that way and I think right now
    • 00:55:50
      The way we've worded that recommendation, it sounds like that you all have some level of issue with what's shown on the plan regarding layout.
    • 00:56:01
      So I think that that recommendation can work and we can follow it up with the work session with the other people that need to
    • 00:56:12
      that have comments that are related so that we can all work through it.
    • Frank StonerMember, Architectural Review Board
    • 00:56:26
      Would a setback waiver require the board or just the Planning Commission?
    • Margaret MaliszewskiPlanning Manager
    • 00:56:32
      I am not sure.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:56:40
      I'll just say for the record, you know, it might be confusing how you vote on this versus how your comments, more than me, how my comments.
    • 00:56:50
      So I think forwarding the recommendations is okay, but I'll just say, you know, and I said this in my comments, I think the site layout as shown is, you know, had an inappropriate for me as, you know,
    • 00:57:06
      the way I see things, and then similarly to the Dumpster location.
    • 00:57:11
      But I think there's also comments in here that would need to be addressed as the application continues.
    • 00:57:18
      It would be weird if I voted no, right?
    • 00:57:22
      It just seems weird, but I want to make sure that that's clear that my comments are out there.
    • Margaret MaliszewskiPlanning Manager
    • 00:57:31
      We do try to summarize the comments in the minutes, so that would go forward.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:57:37
      Great, thank you.
    • Frank StonerMember, Architectural Review Board
    • 00:57:46
      Any in motion?
    • Margaret MaliszewskiPlanning Manager
    • 00:57:48
      Yes.
    • Frank StonerMember, Architectural Review Board
    • 00:57:50
      I'll move to forward the recommendations outlined in the staff report for initial site plan to the agent for the site review committee as listed.
    • 00:57:59
      I don't think
    • 00:58:01
      Are we adding anything?
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:02
      I don't think so.
    • 00:58:05
      I'll second that.
    • 00:58:10
      We could put that to a vote.
    • SPEAKER_02
    • 00:58:13
      Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:14
      Aye.
    • SPEAKER_02
    • 00:58:15
      Mr. Hancock.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:58:17
      Aye.
    • SPEAKER_02
    • 00:58:17
      Mr. Stoner.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:58:18
      Aye.
    • SPEAKER_02
    • 00:58:19
      Mr. Matsuno.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:58:20
      Aye.
    • SPEAKER_02
    • 00:58:21
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:21
      All right.
    • 00:58:27
      Thank you.
    • 00:58:30
      We don't have any work session items, so we'll move to other business, which is approval of the April 20th, 2026 minutes.
    • 00:58:41
      If anybody would feel strongly about the minutes and like to make a motion.
    • 00:58:49
      I move to approve the April 20th, 2026 minutes.
    • 00:58:55
      Second.
    • 00:58:56
      If we could put that to a vote.
    • SPEAKER_02
    • 00:59:01
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:59:02
      Aye.
    • SPEAKER_02
    • 00:59:03
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:59:04
      Aye.
    • SPEAKER_02
    • 00:59:04
      Mr. Hancock?
    • 00:59:06
      Aye.
    • 00:59:06
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:59:07
      Aye.
    • 00:59:07
      Thank you.
    • 00:59:08
      Thank you.
    • 00:59:09
      Do any board members or staff have any other items they'd like to discuss?
    • 00:59:15
      No.
    • 00:59:17
      All right.
    • 00:59:17
      In that case, the next ARB meeting is scheduled for Monday, May 11, 2026.
    • 00:59:27
      Do you guys know your availability for that?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:59:32
      Next Monday.
    • 00:59:35
      I'm planning to attend.
    • 00:59:36
      Do we have some review items?
    • Margaret MaliszewskiPlanning Manager
    • 00:59:39
      Yes, we have two review items and if everyone is present, we'll go back to the rooftop solar.
    • 00:59:46
      Okay.
    • Chris HenningsenChair, Architectural Review Board
    • 00:59:47
      All right.
    • 00:59:50
      Yeah, I'm pretty sure
    • 00:59:53
      So in that case, the meeting is adjourned until our next meeting on Monday, May 11th.
    • 01:00:00
      And it is 2.05 by my watch.
    • 01:00:04
      Thanks a lot, everybody.
    • 01:00:05
      Thank you.