Central Virginia
  • Albemarle County
  • Architectural Review Board Meeting 4/20/2026
  • Auto-scroll

Architectural Review Board Meeting   4/20/2026

Attachments
  • Agenda.pdf
  • Final Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB202600001 and SDP202600029 Airport Self Storage Staff Report.pdf
  • Attach. 1 ARB202600001 and SDP202600029 Airport Self Storage Architectural Drawings.pdf
  • Attach. 2 ARB202600001 and SDP202600029 Airport Self Storage Initial Site Plan.pdf
  • Rooftop Solar Criteria Staff Report.pdf
  • Attach. 1 Draft Action Memo Minutes excerpt from 01_20_2026 ARB meeting.pdf
  • Attach. 2 Rooftop Solar Criteria Revised draft design criteria redline.pdf
  • Attach. 3 Rooftop Solar Criteria Revised draft design criteria clean.pdf
  • Attach. 4 Rooftop Solar Criteria selected images of rooftop solar installations.pdf
  • Draft ARB Action Memo Minutes 01_20_2026.pdf
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:04
      It's 1.04 and I'm calling the April 20th, 2026 meeting of the Albemarle County Architectural Review Board to order.
    • 00:00:17
      If you could call the roll, please.
    • SPEAKER_01
    • 00:00:20
      Yes.
    • 00:00:21
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:22
      Here.
    • SPEAKER_01
    • 00:00:23
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:24
      Here.
    • SPEAKER_01
    • 00:00:25
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:26
      Here.
    • SPEAKER_01
    • 00:00:26
      Mr. Hancock and Mr. Matsuno are absent today.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:29
      Thank you.
    • 00:00:31
      Today's meeting is a hybrid meeting.
    • 00:00:33
      The public may access and participate in the meeting electronically.
    • 00:00:38
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:00:43
      The public has real-time audio-visual access to this meeting over Zoom and real-time audio access over telephone.
    • 00:00:50
      Both is provided in a lawfully posted meeting notice.
    • 00:00:53
      This meeting is being recorded and will be made available on the county's website calendar.
    • 00:00:58
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:05
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:01:10
      Applicants who are making presentations, note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:18
      Staff will let you know when the 15 minutes are up.
    • 00:01:21
      If the applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:01:29
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:01:36
      Do any ARB members have anything to disclose?
    • 00:01:40
      I do not.
    • 00:01:41
      No.
    • 00:01:42
      Me either.
    • 00:01:43
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • SPEAKER_04
    • 00:01:57
      Good afternoon.
    • 00:01:58
      My name's Neil Williamson with the Free Enterprise Forum.
    • 00:02:01
      Today, you do have on your agenda a work session, but there's not an opportunity for public comment at that work session, so we're taking advantage of this opportunity to speak to the goals of the solar discussion.
    • 00:02:12
      I'm hopeful that the goal will be finding a way to allow more solar in the entrance corridors.
    • 00:02:21
      The perfect world would say the ARB won't weigh in on solar panels.
    • 00:02:25
      Of course, the perfect world would destroy the ARB entirely, but that's neither here nor there.
    • 00:02:29
      If you choose to have controls on solar, I strongly encourage you to have uniform standards that do not require an ARB meeting, that do not require subjective review.
    • 00:02:46
      It is only adding additional cost to a potential energy source
    • 00:02:52
      and considering where we are today, I think we need all that we can get.
    • 00:02:55
      Thank you for the opportunity to speak.
    • 00:02:58
      All right, thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:03:03
      Any other members of the public?
    • 00:03:07
      Okay, so we do not have any consent agenda items today.
    • 00:03:11
      We have one regular review item today, which is SDP202600029 and ARB2026.
    • 00:03:23
      Four zeros and a one Airport Road self storage.
    • 00:03:27
      Margaret.
    • Margaret MaliszewskiPlanning Manager
    • 00:03:28
      Thanks.
    • 00:03:29
      This is a proposal to construct a self storage facility with associated site improvements at the northeast corner of Airport Road and Timberwood Boulevard.
    • 00:03:38
      And today you're reviewing the initial site plan and a conceptual architectural design.
    • 00:03:43
      The location of the storage building is the southern end of the larger site that was under review in January for a flex office development.
    • 00:03:50
      You recommended approval of that development with conditions to be approved by staff and revisions addressing those conditions are currently under review.
    • 00:03:59
      In the staff report for the current application, we identified several areas in which the proposal is not aligned with the entrance corridor design guidelines.
    • 00:04:07
      This is the proposed site layout.
    • 00:04:09
      In this image, Airport Road is to the left of the slide.
    • 00:04:13
      The layout appears generally organized with the building more or less centered in the site and then travel way around the building and parking towards the back as it's viewed from the entrance corridor.
    • 00:04:22
      however that layout places the main entrance into the interior of the building and all of the architectural features associated with that entrance on the elevation that isn't visible from the entrance corridor and it places rows of overhead doors on the other three elevations that are visible from the entrance corridor and this tends to emphasize the utilitarian character of the elevations and emphasizes that the front doesn't face the corridor
    • 00:04:48
      The proposal does include a berm along Airport Road with trees and shrubs on the berm, and that will help limit visibility of the lower part of the elevation and the lower parts of those overhead doors on the Airport Road side, but the screening effect is expected to be limited, particularly until the trees and the shrubs have matured.
    • 00:05:07
      The perspectives included in this middle help describe the size, mass, and character of the building, but they show mature landscaping.
    • 00:05:14
      We've recommended that the perspectives be provided both with and without the landscape for a clearer understanding of the proposal.
    • 00:05:24
      As viewed from the entrance corridor, the mass of the building is broken down into three main parts, defined primarily by changes in the roofline, panel type, and siding colors.
    • 00:05:33
      That does help reduce blankness, but it doesn't really establish human scale, and the locations of panel and color changes at the lower level are not consistent with the location of changes above, which contributes to a busy and disjointed appearance.
    • 00:05:48
      Those characteristics are also present in the feature at the southeast corner of the building.
    • 00:05:53
      The upper part of that looks like a tower, but the proportions, distribution of materials and colors and the window treatments do not contribute to an overall cohesive design.
    • 00:06:03
      We've recommended changes to the form and material and color changes throughout the building, including that corner feature, to establish that more cohesive design.
    • 00:06:12
      We've also noted that more vertical elements on the entrance corridor facing elevation might help further reduce the mass and increase coordination.
    • 00:06:21
      In this design, a blue color is proposed for EFIS panels and it's illustrated as very bright and bold.
    • 00:06:28
      It's used in large panels and across long lengths of the elevation, most at the upper levels.
    • 00:06:33
      The blue stands out from the other white, off-white and gray colors that are proposed and appears potentially out of place on the corridor.
    • 00:06:41
      The applicant has explained that those proposed colors and materials are meant to coordinate with those approved for the micro-air building across Airport Road to the south, but in the micro-air building, the blue panels are smaller, they're set back further from the street, and so they were expected to have much less visual impact.
    • 00:06:59
      We've recommended replacing the blue with a color that contributes to a more coordinated appearance.
    • 00:07:05
      One other item I'd like to address is the future RV parking lot that's shown on the plan.
    • 00:07:11
      The RV parking is considered storage and that storage currently requires a special use permit.
    • 00:07:18
      Because it's not a permitted use, it can't be included on an approved plan.
    • 00:07:22
      A note on the plan does acknowledge that the permit is required and states that the spaces will not be used for storage until the required approvals are in place.
    • 00:07:29
      But again, it's not a permitted use without an approved permit and can't be on the plan.
    • 00:07:35
      So we're recommending that the parking lot be removed as a condition of approval for that initial site plan.
    • 00:07:40
      In addition to that, I'd like to make clear that because the SP was not applied for, we did not do a complete review of that storage like we would typically do if that application had been submitted.
    • 00:07:55
      Except we have said that we anticipate that there will be some visibility of the RVs, probably even with the fencing and the landscaping that's proposed.
    • 00:08:06
      I do want to point out that that strip where that fence and that landscaping is proposed is very narrow and so if at the time the review of the storage is undertaken if this board finds that additional screening is needed or if a different configuration of screening is needed or some other treatment is needed the site layout
    • 00:08:29
      may not be able to accommodate that.
    • 00:08:31
      So it's important for everybody to understand, even with the RV parking removed from the plan for now, that moving forward with this layout doesn't guarantee that that storage could be accommodated there in the future.
    • 00:08:42
      And I've added a note to the recommended action to note that.
    • 00:08:49
      That is a summary of our analysis and recommendations.
    • 00:08:52
      I'm happy to try to answer any questions that you might have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:08:55
      All right, thanks a lot, Margaret.
    • 00:08:57
      I guess we'll start with Frank if you have any questions.
    • Frank StonerMember, Architectural Review Board
    • 00:09:01
      Margaret, do we have any pictures just of contextual pictures of the corridor or what's on either side?
    • 00:09:08
      I think UVA Research Park entrance, I think, is on one side, but I don't know.
    • Margaret MaliszewskiPlanning Manager
    • 00:09:17
      Let me.
    • 00:09:33
      This is from the applicant submittal.
    • 00:09:35
      It includes some head-on shots and some corner shots.
    • Frank StonerMember, Architectural Review Board
    • 00:10:12
      Do we have shots of any of the buildings further east on Airport Road?
    • Margaret MaliszewskiPlanning Manager
    • 00:10:31
      But east.
    • Frank StonerMember, Architectural Review Board
    • 00:11:05
      I assume all these predate the ARVs.
    • Margaret MaliszewskiPlanning Manager
    • 00:11:08
      All those do, yes.
    • Frank StonerMember, Architectural Review Board
    • 00:11:15
      That's great.
    • 00:11:15
      Thanks.
    • 00:11:16
      I don't have any other questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:11:18
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:11:19
      Thank you, Chris.
    • 00:11:20
      Thank you, Margaret.
    • 00:11:20
      No further questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:11:22
      Yeah, I don't have any questions either.
    • 00:11:25
      So if the applicant has a presentation, Duke, give me one sec.
    • Chuck RappLandscape Architect
    • 00:11:48
      All right, good afternoon.
    • 00:11:49
      I'm Chuck Grapp with Collins Engineering.
    • 00:11:50
      I also have representatives from the architecture team here to speak to some of that.
    • 00:11:57
      I'll try to answer some of y'all's questions as well as we go and I will say I'll walk through some of the site planning approach.
    • 00:12:03
      Chris, the architect will work through some of the architectural design and then we've also got some follow-up additional work we've been doing over the past few days since some comments came out to kind of show how we plan to address some of that, some additional direction we can take to hopefully address some of the ARB's concerns and then obviously whatever comes out of today.
    • 00:12:24
      As Margaret pointed out, it's really just a flat pad site right now in front of the flex industrial spaces that we discussed a few months or two ago.
    • 00:12:38
      We did look for some contacts in the area.
    • 00:12:40
      As Margaret pointed out, there's not a lot.
    • 00:12:42
      You've got the sheets, which is new, but once you get past that, it's kind of a mixture of corrugated metal buildings.
    • 00:12:49
      You do have a church that has its own unique style, and then across the way, you have the micro-air, and then you have what used to be the 24-hour emergency vet building.
    • 00:13:00
      So it's kind of a, it's not really a defined style, unfortunately, on that corridor that we could really draw from, so.
    • 00:13:05
      I'll present kind of what we submitted and then we'll dive into some minor adjustments that we can make here.
    • 00:13:13
      So this is generally from the site layout.
    • 00:13:16
      The reason why it was laid out this way is we have this access road on the right side that serves the flex office on one as well as the other.
    • 00:13:24
      We wanted to kind of situate that parking and everything right at the entrance there.
    • 00:13:29
      Just some challenges kind of
    • 00:13:30
      Pulling everything to the front, you don't have an entrance off of Airport Road.
    • 00:13:33
      We won't have an entrance off of Timberwood Boulevard just to the proximity of that intersection.
    • 00:13:38
      And so trying to get everything around made it a bit challenging.
    • 00:13:43
      And then as was discussed initially there, this idea of the ground floor garages, we wanted to provide access for that.
    • 00:13:49
      as a way to try and screen that.
    • 00:13:51
      As Margaret also pointed out, we wanted to create some berming along Airport Road to help elevate that landscape and recognize that it needs some time to grow in.
    • 00:14:00
      And so we have kind of the mixture of shrubs, flowering trees, shade trees, and kind of a meandering organic shape to work along there.
    • 00:14:07
      Along the backside, we do have that fence and evergreen plantings to hopefully hide the potential storage out there as well.
    • 00:14:17
      Then we also kind of did a similar approach to Long Timber Wood Boulevard to help with some of that lower level as well.
    • 00:14:24
      We prepared a couple of different sections to show what that would look like with, you know, it's about a three to five foot berm along the front based on what we could work with with the topography out there.
    • 00:14:36
      This is kind of a section along Timberwood Boulevard showing the street trees and then the sidewalk and then some additional plantings to help screen some of the internal driveway that goes around the building.
    • 00:14:45
      On the backside again, kind of basically within a 10-foot space trying to fit in evergreen trees, some shrubs, and a six-foot privacy fence as well.
    • 00:14:56
      One thing I did want to point out
    • 00:14:59
      Some of our discussions I guess before this started with county staff was that you know the storage could be it basically had to do with whether or not it was visible from the entrance corridor and the roadway that would require the special use permit so that's why we did kind of really try to beef up this side out here and as we worked through this process kind of the first step would be to model this area and really show what those views are see if it is visible at all
    • 00:15:25
      Then we're also aware the county staff, I believe, is working on amendments to the process.
    • 00:15:31
      They would remove the requirement for special use permit if certain criteria is met, I believe, that's also underway.
    • 00:15:37
      And then there's also the special use permit process.
    • 00:15:39
      So multiple ways to try and flush that out that we plan to continue to work on to see if we can accommodate that.
    • 00:15:46
      Certainly open to not having the storage out there in the interim as this process moves forward.
    • 00:15:54
      They've just got a technical landscape plan, again it's been tweaked a little bit since this
    • 00:16:01
      Sight lighting, I tried to match what we did on the flex industrial spaces behind, so a mixture of pole lights and same aura fixture on the building.
    • 00:16:11
      Basically kind of this modern version of the kind of razor type fixture that we see a lot.
    • 00:16:17
      And then on the building, dark sky compliant, downward projecting lights, wall metal lights as well, just because we're really always trying to light immediately adjacent to the building.
    • 00:16:27
      So with that, I'm gonna pass it on to Chris, let him talk a little bit about the architecture.
    • Chris ElamArchitect
    • 00:16:34
      Good afternoon.
    • 00:16:34
      My name is Chris Elam.
    • 00:16:36
      I'm with RBA Architects.
    • 00:16:38
      Happy to be here today to talk about this.
    • 00:16:41
      So as Chuck mentioned, we do have some architectural renderings as well as the site plan that's been tweaked that we're gonna get to just in one moment, but just wanted to touch on some of the drivers of this initial submitted architectural configuration.
    • 00:17:02
      So as Margaret mentioned, I think she summarized well that
    • 00:17:06
      That access to the loading area at the, you know, functionally the front of the building really appears as the rear of the building.
    • 00:17:16
      And so that's a big driver as far as the, you know, the articulation of the architecture.
    • 00:17:22
      That loading zone has a future office associated with it as well and some storefronts and what have you.
    • 00:17:33
      And so the rear of the facility was really shaped by the continuous overhead doors along the ground floor.
    • 00:17:45
      We feel like those are gonna be
    • 00:17:47
      you know sufficiently screened that they're not going to have a substantial impact but even just the materials that are available when you've got continuous overhead doors around that bottom floor you know it was a driver of this side of the of the building the architectural design so
    • 00:18:05
      So what we're showing here was a combination of different metal panels, insulated metal panels, which is a concealed fastener, three foot wide panel with some options for different textures.
    • 00:18:20
      We're also showing a KW120 panel, another concealed fastener panel, smooth finish, one foot wide panels.
    • 00:18:30
      And then we're showing the EIFS in the blue as well.
    • 00:18:33
      The intention with the blue, it's eye catching for sure, and the church adjacent just across Timberwood
    • 00:18:45
      is all white with a gray roof and so we were picking up that color palette to begin with and then just looking to you know add some pop and add some interest to the building and so the you know blue was a effort in that direction and the mass of the building was a big driver trying to break that down like she said with roof lines transition of materials without getting too repetitive but
    • 00:19:09
      After receiving the comments and after some review with the design team, the development team, it was determined that we could actually, it made sense to eliminate the overhead doors on the outside of the building.
    • 00:19:23
      Those were to provide access to exterior access storage units, right?
    • 00:19:28
      So we're going to, we think it makes sense at this location to
    • 00:19:32
      go towards a entirely interior accessed storage units and to eliminate those interior or those exterior access doors, which is a big, I mean, a change is one of the primary drivers of the architecture.
    • 00:19:49
      So we came back and revisited just in the last few days, the basic premise.
    • 00:19:58
      And if you don't mind, I'm gonna jump ahead to the,
    • 00:20:00
      And so you can see here the top and left and right sides were entirely surrounded by those large overhead accessed storage units over exterior access storage units.
    • 00:20:12
      And so that's the concept that we're willing and able to revise at this point and move towards.
    • 00:20:22
      I'll let Chuck jump back to you, but I just wanted to
    • 00:20:26
      show what the sort of result of if we eliminate all of those doors what we're able to do is to transition to materials at the base.
    • 00:20:35
      One of the big leeway's that it helps out with is that around those overhead doors it's really difficult to accommodate any masonry of any kind.
    • 00:20:43
      They basically have a foot between each door and you know eight to nine feet of
    • 00:20:49
      header spans and just a real trouble.
    • 00:20:52
      But so getting rid of those meant that we could treat the base of the building in some areas with a masonry in this view.
    • 00:21:01
      And again, we're still anticipating that the plantings and the berm are largely screening the building from the road view, but just per Margaret's request and for the sake of clarity showing here with the trees turned off.
    • 00:21:16
      but showing the, that would be the east, southeast corner of the building that is sort of more formalized, two towers framing it in and less of a sort of transitional facade and more of a fixed and symmetrical facade for the one half of the building.
    • 00:21:39
      and with Mason at the bottom showing here proposed split faced concrete block dark gray.
    • 00:21:49
      And we've also, as I mentioned, so as Margaret suggested that incorporation of an additional tower element along the front facade would be helpful.
    • 00:22:02
      And you can see we've picked one up at the middle helps to define that section of the building.
    • 00:22:07
      and then also increase the amount of storefront windows along the airport road facade.
    • 00:22:14
      And this proposed approach with the, and I'm probably jumping out that we've eliminated, or not entirely eliminated, but reduced the amount of blue.
    • 00:22:24
      And I'm thinking that we would still like to use that element, the blue ethos at the,
    • 00:22:33
      Primary public access, the overhead or the canopy area at the rear of the building, but limiting it facing Airport Road as we're shown here.
    • 00:22:45
      Now, we haven't fully reconciled this new design approach all the way around the building.
    • 00:22:50
      There'll still be some work to be done to sort of follow it through.
    • 00:22:56
      and to make sure that it's acceptable all the way in all directions.
    • 00:23:01
      But this also gives us the opportunity since we're in a sort of a working state here, we're happy to get your thoughts or inputs and see which direction you'd like us to proceed as we refine the elevations.
    • 00:23:16
      And then I don't know if you wanted to touch on the site plan changes.
    • Chuck RappLandscape Architect
    • 00:23:19
      Yeah, I'll scroll back to this kind of a revised layout plan that we just put together.
    • 00:23:25
      This eliminates that parking, as Chris mentioned.
    • 00:23:28
      And so it does a couple of things for us.
    • 00:23:30
      First, I'll say along Airport Road, there's just quite a mess of existing utilities that run along the back of the sidewalk, which is why everything got pushed back towards the building.
    • 00:23:39
      But also by eliminating those garage doors, it allows us to have a little more room to
    • 00:23:45
      improve the way I haven't revised the grading for those berms yet, obviously you can kind of see, but a little more of a typical approach, more consistent spacing along there.
    • 00:23:54
      There are some utilities that we're going to be getting rid of as we can to help improve that.
    • 00:23:59
      but what it does also allow us to do is put some foundation plantings along the building and incorporate some trees where we have a little more room so we can fit in a narrow column or tree or something like that to help also kind of add some interest and break up that facade and get you know a little more typical as we would see kind of going around the building and again kind of really trying to beef this up I was looking at different species and things to try and
    • 00:24:19
      fit into that tighter space as Margaret mentioned for the back delt screen that some more narrow evergreen trees and kind of really kind of emphasizing a decent sized berm on that side as well.
    • 00:24:31
      So while we haven't moved the entrance to Airport Road, we do certainly hear the idea of wanting to engage Airport Road.
    • 00:24:39
      a bit more.
    • 00:24:40
      So that was kind of the idea here is how can we improve that facade of the building, give it a bit more of an engaging treatment with landscape so that it certainly doesn't look like the back of a building and is more of has a face along Airport Road there.
    • 00:24:56
      So I think that's about it.
    • 00:24:58
      I think, right?
    • 00:24:59
      Yeah.
    • Chris HenningsenChair, Architectural Review Board
    • 00:25:00
      Just a couple of views.
    • 00:25:01
      Yeah, we're seeing more.
    • 00:25:03
      All right, thanks for the presentation.
    • 00:25:06
      I guess we'll see if anybody has any questions.
    • 00:25:10
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:25:11
      Sure, yeah.
    • 00:25:11
      Well, thank you for your presentation and for responding quickly to staff's comments.
    • 00:25:15
      I appreciate the change in the access for the lower units.
    • 00:25:19
      I had that question about whether it was possible, and glad to know it is.
    • 00:25:22
      It does seem to solve a lot of that.
    • 00:25:25
      I was interested to ask, in terms of you've located the towers and the darker, maybe more
    • 00:25:31
      Present part of the building to the east, more towards the interior corner of the site.
    • 00:25:38
      The other corner at Timberwood may be more visible than is opposite another lane.
    • 00:25:43
      Did you give any consideration to locating the tower features or the more prominent part of the building more towards the corner with Timberwood?
    • Chris ElamArchitect
    • 00:25:51
      Yeah, we could do, and there was some thought given, I think the logic with the location of the towers stemmed from, you know, again, this being a sort of natural place for architectural elements, and then just sort of wanting to, in the initial draft with only two towers, I was really looking to just sort of spread them out and, you know, separate them in a way that would give, you know, I guess the most bang for the buck.
    • 00:26:19
      But it should be said that I indicated that we're still working through the revisions and we're thinking that it would be desirable to pull that tower that's over the loading area, that canopy, pull that to the corner that's shown in this image.
    • 00:26:44
      So that's the corner along Timberwood Boulevard and Songbird.
    • 00:26:48
      that that would just be a more prominent location for that tower and a more appealing location.
    • 00:26:57
      So that doesn't put it quite at the southwest corner that I think you were mentioning, but it does bring it towards the facade that's gonna be towards that elevation that's gonna be visible from Songbird and also from Timberwood and obviously Songbird.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:27:12
      Yeah, thank you for that.
    • 00:27:13
      I guess, as a follow up, my question was, you know, could you effectively flip it so that the portion that's currently towards the eastern end of the building, that facade, we're more towards the western on Airport Road.
    • Chris ElamArchitect
    • 00:27:27
      Yeah, I think we could.
    • 00:27:29
      This was, the configuration was derived largely from the roof slopes.
    • 00:27:34
      As Margaret touched on, we used the, maybe the aerial view show at best, used the different roof slopes to help to break down the massing a little bit.
    • 00:27:45
      So everything on the right hand side of this image is sloping entirely back towards Songbird Drive and then the,
    • 00:27:53
      areas on the roof area on the left hand side is sloping towards Songbury, no towards Timberwood.
    • 00:28:01
      And so
    • 00:28:02
      That roof configuration sort of drove the architectural massings and those towers.
    • 00:28:09
      The pre-engineered metal building systems, I don't know if y'all are familiar with these self-storage buildings, but they're 100% built out of a pre-engineered metal building system with a long span standing seam roof.
    • 00:28:23
      They will not accommodate a valley or a parapet.
    • 00:28:27
      that the, at the low eve.
    • 00:28:30
      So it's not, you know, I don't want to bore with details, but there was a fair amount of consideration given to that roof slope and that sort of drove the tower locations because they're at a high eve on this roof that's sloping away from them.
    • 00:28:43
      All that being said, I think that we could look into the location of a tower at that southwest corner and, you know, reconfigure the roofs, you know, if needed.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:28:54
      Well, thank you.
    • 00:28:54
      And regarding the roof slope, the building seems largely well ordered with a lot of horizontal expression so that the sloped roof, when it appears, seems like a different element than the rest of it.
    • 00:29:07
      And would there be a way to reconcile that sloped roof so that the parapets were more consistently level around the building?
    • Chris ElamArchitect
    • 00:29:17
      It's easy enough to cover up the rake side of the roof and challenging both in terms of getting a watertight detail to cover up the low eaves.
    • 00:29:32
      For instance, this side, it'd be very easy to cover the
    • 00:29:38
      Airport roadside, that slope side, and then that would leave a sort of exposed parapet edge at that corner, if that makes sense, which I'm not terribly fond of.
    • 00:29:52
      I like to close off a parapet that's extending above the wall.
    • 00:29:57
      I mean I think again they can be hidden and but it requires a little bit of attention to the entire roof design in order to be able to hide an eave for this building type which is not you know we're not ruling out the possibility of a roof redesign it just requires it just requires a fair amount of consideration the hope was in showing that slope
    • 00:30:22
      that it helped to differentiate the two sections as opposed to clashing or contrasting that it gave, you know, we're trying to retain one character, you know, where we've got the flat top of parapet and create a different character that complemented
    • 00:30:39
      at the areas where you can see that slope and then the corresponding downspouts on the low eve at that spot and we already had this we had the conversation earlier today that the you know the downspouts the gutter and downspouts
    • 00:30:57
      at this iteration really need to have some architectural ornaments to sort of activate them that if we're intending on using those as architectural elements rather than sort of an afterthought,
    • 00:31:14
      that it would help to create, align some columns, to beef up the columns, to create some elements that sort of corresponded with those and help to articulate them, which I think was our intention, you know, as a next step.
    • 00:31:28
      If there's some agreement that the concept is sound as far as leaving exposed, you know, gutter and rake conditions.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:31:44
      Thank you, and I don't think I have further questions at this time.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:50
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:31:54
      First question relates to the windows.
    • 00:31:57
      And what they, are they real windows?
    • 00:32:03
      Fake?
    • 00:32:03
      What's on the inside of the, what's behind them?
    • Chris ElamArchitect
    • 00:32:06
      Yeah, the drive is to have no real windows, or at least that's the economic drive, right?
    • 00:32:15
      And so what we typically do, here's a third floor plan, you can see the hallways at the top of the plan.
    • 00:32:22
      Pulling the hallway to the exterior of the building allows us to make those real windows.
    • 00:32:28
      but that is actually a sacrifice of the efficiency of the layout and so the drive is to make them all fake to be as cost effective as possible so we try to pick certain spots that are going to be the most prominent, the most visible and spend the sort of efficiency capital at those locations
    • 00:32:50
      So the short answer is a mix of real and fake windows.
    • 00:32:56
      Now, the fake windows are still just full storefront windows.
    • 00:33:00
      We just put the transom glass and then cover them over from the back side.
    • 00:33:08
      So they're not fake windows, but they don't see through the inside.
    • 00:33:13
      So we haven't made the determination at this point of exactly all of the
    • 00:33:18
      So windows that will or will not be visible through, but our hope would be that we can, like I say, pick some of them to be true windows, especially having made the revision to show a pretty substantial increase in the number of windows in this latest version.
    • 00:33:40
      We would hope that not all of them would be truly visible.
    • Frank StonerMember, Architectural Review Board
    • 00:33:47
      Second question, I guess, relates to the towers and how much, if at all, you've got in the way of a bump where those towers are, particularly on the... Yeah, I mean, just a six inch to a one foot bump is what we're currently proposing, just enough to create a shadow line, really, except for
    • Chris ElamArchitect
    • 00:34:11
      The latest draft, I think Chuck mentioned, you can see that small, it's a five foot step there in the middle of the building.
    • 00:34:19
      And so we used that to locate the second tower, where we added a tower so that that gave us the chance to articulate that tower a little bit better using that five foot inset.
    • Frank StonerMember, Architectural Review Board
    • 00:34:37
      Thanks.
    • 00:34:38
      Those are all my questions.
    • 00:34:39
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:34:39
      I guess I just wanted to confirm that the tower elements and the renderings are shown as kind of a solid block
    • 00:34:49
      I was just wondering if that was the plan rather than just have them on the surface where you might be able to see around it.
    • Chris ElamArchitect
    • 00:35:00
      Good question.
    • 00:35:00
      Yeah, they are intended to be solid separate roofs.
    • 00:35:05
      And again, the roof in this configuration slopes fully away from
    • 00:35:11
      the airport road and so that gives us the leeway to you know treat those as fully articulated fully enclosed tower elements without you know having having drainage issues that are that are you know not easily accommodated so yes that's the intention.
    • 00:35:30
      Thanks.
    • 00:35:33
      I may ask one follow-up question just in terms of the facade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:35:36
      Right now, there are roughly four window bays in each mass.
    • 00:35:42
      Would it be feasible to differentiate them so that, for example, the span between the towers had five windows and the shed portion three?
    • Chris ElamArchitect
    • 00:35:50
      Oh, sure.
    • 00:35:53
      Yeah.
    • 00:35:54
      That's easily done.
    • 00:35:57
      You know, also the glass wrapping the corner has been discussed, you know, just perhaps not carrying those windows all the way down the Timberwood Boulevard facade, but at least rounding the corner I think might do some service, you know, to finish out the architectural character.
    • 00:36:20
      But yeah, varying the numbers is definitely doable.
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:29
      All right, thank you.
    • 00:36:31
      Are there any members of the public that want to make a comment?
    • SPEAKER_01
    • 00:36:36
      I don't have anyone online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:38
      All right, great.
    • 00:36:40
      In that case, the ARB will now go into discussion.
    • 00:36:43
      I guess we'll start with David.
    • 00:36:45
      Do you have any comments?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:36:47
      Sure.
    • 00:36:47
      Well, as I observed earlier, I appreciate the applicant responding to the staff's comments quickly and removing the doors that presented a real challenge.
    • 00:36:54
      It sounds like on a number of fronts.
    • 00:36:56
      And I appreciate the applicant's openness to considering flexibility and applying the design language they've worked out.
    • 00:37:05
      I do think that if the
    • 00:37:09
      The taller portion of the building between the two towers were more towards the corner with Timberwood and Airport.
    • 00:37:15
      That might be a sounder sort of urban place for that to be, to respond to the intersection within the shed roof portion on the eastern side, so effectively a flip.
    • 00:37:27
      And to the extent that shed portion were visible for
    • 00:37:31
      call it three window bays instead of four.
    • 00:37:33
      I think it might mitigate a little bit the appearance of that shed roof.
    • 00:37:40
      I appreciate Frank's questions about depth and would emphasize that I think to the extent the projections of the towers can be more like a foot or more to get that shadow line, but also to get some depth in the facade that would be appropriate for the corridor.
    • 00:38:01
      Yeah, so I look forward to seeing the updates from the applicant.
    • 00:38:05
      Thanks.
    • 00:38:06
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:38:07
      Yeah, I'd echo a lot of what Dave said.
    • 00:38:09
      I do think if there's a way to reorient the tower portion of the building toward the Timberwood Airport Road intersection, that it would feel better.
    • 00:38:27
      You know, the bar is not that high in this corridor.
    • 00:38:31
      So I don't want to end up imposing Capricious's subjective requirements on them.
    • 00:38:42
      And I'll largely defer to the architects here.
    • 00:38:46
      But I wonder whether, given the sloper roof and the inconsistency between the two sides of the building, whether it might help to even
    • 00:39:00
      put more contrast between the two sections instead of trying to unify them, almost make them feel like two buildings instead of one.
    • 00:39:11
      But again, I defer to you guys.
    • 00:39:15
      Otherwise, I mean, I think it's a reasonable solution for the site and its storage, which obviously do have some limitations on
    • 00:39:28
      What you can do architecturally, although when I see what they did with the one out in Crozet.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:39:35
      That's a good example.
    • Frank StonerMember, Architectural Review Board
    • 00:39:36
      Yeah.
    • 00:39:37
      Yeah.
    • 00:39:37
      They did a really nice job with it.
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:42
      Thanks.
    • 00:39:43
      I guess I agree with what's been said, but on that note,
    • 00:39:49
      I think this building is already going to be significantly taller and more massive than anything that's on the corridor now and conceivably on it for a while.
    • 00:40:04
      If there was any way
    • 00:40:08
      either bring down the actual height, and I'm not suggesting that the floor to floor be reduced or anything, but I noticed from the low eave to the top of the roof, there's probably about 12 plus feet in play.
    • 00:40:27
      if there was any way to kind of bring that down and also just visually kind of make the building appear less tall.
    • 00:40:37
      I think Frank referenced a storage facility in Crozet where they
    • 00:40:46
      the top floor they made it look like a mansard roof with the roofline kind of springing from over the second floor and I think that was an effective way to kind of bring maybe not the actual height of the building but the kind of appearance of the building a little bit
    • 00:41:08
      lower and less imposing and I'm not suggesting that that exact strategy be done here but if you could take a look at that I think that would help this structure just be less overpowering and kind of more
    • 00:41:30
      Well, I mean, there's not much on the corridor as pointed out.
    • 00:41:34
      So, but I think make it less of a kind of an imposing landmark on the corridor.
    • 00:41:43
      So, that's all for me.
    • 00:41:48
      If we could take a look at the recommended motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:42:15
      Again, this is an initial site plan and the conceptual architectural design.
    • 00:42:21
      The recommendation on the initial site plan is for approval with the condition that the RV parking area be eliminated from the plan.
    • 00:42:30
      Just added the note that the current site layout may not be able to accommodate significant, excuse me, sufficient mitigation measures for the parking lot as shown.
    • 00:42:41
      There are a number of comments for the final plan.
    • 00:42:48
      I think it sounds like everyone is happy with a lot of the changes that are made.
    • 00:42:57
      For tracking purposes, it would be easier to leave whatever comments that you
    • 00:43:07
      I believe are okay to leave them in and they'll get processed with the resubmittal when it comes back.
    • 00:43:15
      I've added a few at the end here based on your conversation.
    • 00:43:21
      I don't know if you want to start there or start at one.
    • Chris HenningsenChair, Architectural Review Board
    • 00:43:41
      I guess the three additional comments seem consistent with what we were talking about in my opinion.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:44:07
      Frank, was your comment about considering additional contrast between the two portions?
    • Frank StonerMember, Architectural Review Board
    • 00:44:12
      Yeah, I don't know what you guys think about that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:44:16
      I think that was a good observation.
    • 00:44:18
      Worth consideration for sure.
    • 00:44:22
      So maybe Margaret in those last three.
    • 00:44:34
      Either add it to number 20 or something and consider additional contrast between the two portions.
    • Frank StonerMember, Architectural Review Board
    • 00:45:05
      Margaret, with the RV parking note, are you suggesting that they need to get the special use permit before they can show it on the plan or?
    • Margaret MaliszewskiPlanning Manager
    • 00:45:15
      Yeah, it needs to be taken off the, but we can't approve the initial site plan with the parking shown there because it would approve the, it would suggest that we're approving the use and we're approving that particular layout.
    • Frank StonerMember, Architectural Review Board
    • 00:45:28
      So they need to get the SUP first?
    • Margaret MaliszewskiPlanning Manager
    • 00:45:31
      Before they can show the parking on the plan, yes.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:45:47
      I guess in terms of 18, is it still applicable?
    • 00:45:58
      It's a consider.
    • 00:46:00
      Correct, yeah.
    • 00:46:08
      We didn't discuss that at length, but it seemed like the applicant explained why it was there.
    • 00:46:12
      Right, yeah.
    • Chris HenningsenChair, Architectural Review Board
    • 00:46:18
      I mean, I think it makes a lot more sense for the entrance to be on that side of the road.
    • 00:46:25
      So I think if something were to happen on the other side of the building, it would just be kind of the appearance of an entrance, I guess.
    • 00:46:32
      But I mean, I'd be comfortable striking that suggestion.
    • 00:46:41
      We're leaving it.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:46:42
      I mean, it's a consideration that it's fine to leave it, but I guess I'm just asking.
    • 00:46:47
      It seems like tacitly the board was OK with the current location.
    • Chris HenningsenChair, Architectural Review Board
    • 00:46:59
      I think we could leave it just because it's considered.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:47:02
      Yeah.
    • 00:47:05
      OK. Do you want to look at the prior page?
    • Chris HenningsenChair, Architectural Review Board
    • 00:47:16
      All right, well, any other tweaks?
    • 00:47:23
      Yes, would anybody like to make a motion?
    • Frank StonerMember, Architectural Review Board
    • 00:47:40
      Yeah, I'll move to forward the recommendations outlined in the staff report for SDP-2026-00029 and ARB-2026-00001.
    • 00:47:55
      Airport industrial complex self-storage facility to the agent for the site review committee amended as follows.
    • 00:48:09
      Additions are items 20, 21, and 22.
    • Chris HenningsenChair, Architectural Review Board
    • 00:48:16
      I'll second.
    • 00:48:18
      All right.
    • 00:48:18
      Great.
    • 00:48:19
      If we could put that to a vote.
    • SPEAKER_01
    • 00:48:21
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:48:23
      Aye.
    • SPEAKER_01
    • 00:48:24
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:48:25
      Aye.
    • SPEAKER_01
    • 00:48:25
      Mr. Henningsen?
    • 00:48:27
      Aye.
    • 00:48:27
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:48:27
      All right.
    • 00:48:28
      Thanks a lot.
    • 00:48:31
      We have one work session item today, which is the solar guidelines.
    • 00:48:37
      I personally thought it might be better to have this discussion when all five of us are present, just because it's kind of a policy-type discussion.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:48:51
      I agree, Chris.
    • 00:48:54
      I think it would be helpful to have everybody's perspective.
    • Chris HenningsenChair, Architectural Review Board
    • 00:48:57
      If you're OK with that, Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:48:59
      Can we get a preview?
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:01
      Yeah.
    • Frank StonerMember, Architectural Review Board
    • 00:49:03
      So we can think about what the issues are.
    • Margaret MaliszewskiPlanning Manager
    • 00:49:05
      I'm sorry, I didn't hear your question.
    • Frank StonerMember, Architectural Review Board
    • 00:49:07
      Can we get a preview just so we understand kind of what the decisions are?
    • Margaret MaliszewskiPlanning Manager
    • 00:49:11
      I can just go do a real quick run through?
    • 00:49:16
      Yeah, that'd be great.
    • 00:49:17
      Sure.
    • 00:49:22
      OK, so this was just a follow up to our January discussion.
    • 00:49:27
      We shared with you the red line edits on the criteria that were discussed at that meeting.
    • 00:49:35
      This version includes just several very simple edits based on exactly what your suggestions were.
    • 00:49:45
      Then there were a few things I wanted to go into a little more detail on.
    • 00:49:49
      There had been some discussion about guideline number three, which said panels mounted parallel to the surface of the roof.
    • 00:49:55
      Just change the wording there to identify the roof plane instead.
    • 00:50:02
      Hopefully that will be a little bit clearer, but that's something you can think about.
    • 00:50:07
      There was also a question about the distance allowed between the bottom of the panel and the surface of the roof.
    • 00:50:19
      I went back and looked at the research that I had done for the January meeting.
    • 00:50:27
      Most of the guidelines that I saw did not identify a specific measurement.
    • 00:50:34
      Some of them did.
    • 00:50:35
      They ranged from like six inches to eight inches to 12 inches, but the language around the measurement is not consistent.
    • 00:50:43
      And so some of those, it sounds like it's from the surface of the roof to the top of the panel.
    • 00:50:49
      So like 12 inches to surface of the top of the panel or
    • 00:50:52
      Maybe it's six inches from the surface of the roof to the underside of the panel or eight inches with language that's not entirely clear.
    • 00:51:00
      So I left it at six inches.
    • 00:51:03
      The one project that you all had reviewed on a pitched roof was the project out on Avon Street and that was four inches from the roof to the underside of the panel.
    • 00:51:26
      I added a criteria based on your comments on this image that was shown last time just to indicate that the mounting systems shouldn't extend beyond the roof or beyond the panels.
    • 00:51:39
      There were also some, so that was all pitched roof criteria.
    • 00:51:44
      There were also edits made to the criteria for flat roofs, some of them very straightforward.
    • 00:51:53
      The original number one said that panels could be installed on any configuration at any angle if the facility is entirely below the top of the parapet.
    • 00:52:05
      And the request was to add the words if not visible from the entrance corridor to that.
    • 00:52:11
      But if the panels are not visible from the entrance corridor, then review and approval is not required.
    • 00:52:17
      So I've added some information, some wording there to make that clear.
    • 00:52:22
      and to make it clear also on the pitched proofs as well.
    • 00:52:27
      Made edits to the captions of the illustrations just to be consistent with the changes to the text.
    • 00:52:35
      And so when we do come back to this, the question will be, are those red line edits acceptable?
    • 00:52:44
      And then getting beyond those simpler
    • 00:52:50
      Text edits, there were some questions that came up that I wanted to address.
    • 00:52:55
      One of those is the issue of these parking canopies.
    • 00:53:06
      and how those should be treated or if those should be available for county-wide certificates.
    • 00:53:13
      I think the thing to think about here is some of them are very simple in form and general character.
    • 00:53:21
      Some of them have sort of more dramatic profiles and lighting and can be used in multiples across a parking lot.
    • 00:53:29
      So those are some issues to consider and maybe potentially the simpler ones could be available for a county-wide certificate and the more complicated ones maybe would be reserved for Airbnb review.
    • 00:53:49
      There was also a question about solar shingles.
    • 00:53:55
      I think it may be that we can develop some criteria for roofs that might be entirely solar shingles and make those available for countywide certificates.
    • 00:54:13
      In the cases where there are
    • 00:54:16
      Polar shingles that are only part of the roof.
    • 00:54:19
      There may be other criteria that might be needed.
    • 00:54:22
      So this is really a question for you.
    • 00:54:23
      Do those seem like areas that you want to pursue additional criteria for?
    • 00:54:33
      And then this is the final issue.
    • 00:54:36
      In the January meeting, we had looked at the images in the lower left and lower right corners of this slide.
    • 00:54:44
      And there were some comments about maybe, you know, some of these installations that are sort of more open, more visible.
    • 00:54:51
      Maybe they're harder to see as available for county-wide certificates.
    • 00:54:56
      It's hard to find images on the internet of installations on flat roofs as seen from the street.
    • 00:55:06
      Really hard to find.
    • 00:55:07
      I tried to add the ones I could.
    • 00:55:09
      It's hard to get this one illustrated.
    • 00:55:13
      With the ones we found, there seem to be three categories of arrays on flat roofs.
    • 00:55:17
      One would be those that are screened by parapets completely.
    • 00:55:22
      Second category would be those that are maybe mostly screened by parapets or they're oriented or located in a way that the visibility is minimized.
    • 00:55:37
      That would be illustrated in the upper right image, and that's the High School Center II project that you all reviewed last year.
    • 00:55:47
      I think the third category is those installations that are not only visible, but they potentially change the character of the building, maybe change the form of the building.
    • 00:55:57
      And those are the two slides on the bottom.
    • 00:56:02
      So again, if the array is going to be fully screened, then it doesn't require ARB review and approval.
    • 00:56:07
      I think the question then is you know what level of visibility if any do you want to reserve for full ARB review if there are if there's like a mostly not visible category maybe that's available for staff level review the significantly visible ones maybe for ARB review so the question is
    • 00:56:35
      Is that a distinction that sounds reasonable, and do you want us to sort of pursue some language around defining those categories better and finding some additional criteria associated with those?
    • SPEAKER_01
    • 00:56:52
      I think that, yeah.
    • Margaret MaliszewskiPlanning Manager
    • 00:56:57
      Very quick went through.
    • Frank StonerMember, Architectural Review Board
    • 00:56:58
      Thank you, Margaret.
    • 00:56:59
      That's great.
    • 00:57:00
      Thank you.
    • 00:57:00
      Thank you.
    • Margaret MaliszewskiPlanning Manager
    • 00:57:01
      Are there any questions or anything right off the top of your head that we can try and add in for when this comes back around?
    • Frank StonerMember, Architectural Review Board
    • 00:57:15
      What are we shooting to adopt this?
    • Margaret MaliszewskiPlanning Manager
    • 00:57:18
      This is on sort of two tracks.
    • 00:57:22
      The development of the guidelines is totally with the ARB, and I don't know of any
    • 00:57:33
      Projects that are getting ready to come in that we're trying to get this in place for, so there's no real deadline for that.
    • 00:57:40
      The other part of this is the actual amendment to the zoning ordinance, which is just adding a few words to the list of allowable county-wide certificates of appropriateness.
    • 00:57:54
      It's a very simple text amendment, and that is currently scheduled for the Planning Commission on May 26,
    • 00:58:00
      and then it would go onto the board after that.
    • 00:58:02
      That can travel on its own track.
    • 00:58:04
      This doesn't have to be completed before that.
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:06
      All right, well, thank you.
    • Margaret MaliszewskiPlanning Manager
    • 00:58:17
      Okay, we'll try and get this scheduled for the next time everyone's together.
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:21
      Yeah, I think just since it doesn't seem like a time-critical thing, then there's no resentment, no regrets, you know?
    • 00:58:36
      Right.
    • 00:58:37
      So I guess we'll move on to other business, which the only item would be a motion to adopt the January 20th minutes.
    • 00:58:46
      So moved.
    • 00:58:48
      Second.
    • 00:58:49
      All right, great.
    • 00:58:49
      If we could put that to a vote.
    • SPEAKER_01
    • 00:58:52
      Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:53
      Aye.
    • SPEAKER_01
    • 00:58:54
      Mr. Stoner.
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:55
      Aye.
    • SPEAKER_01
    • 00:58:55
      Mr. Van Der Werf.
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:56
      Aye.
    • SPEAKER_01
    • 00:58:57
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:58:58
      Thank you.
    • 00:59:00
      Do any board members or staff have any other items for discussion?
    • Frank StonerMember, Architectural Review Board
    • 00:59:06
      My favorite topic, the quarter specific guidelines.
    • Margaret MaliszewskiPlanning Manager
    • 00:59:13
      We are
    • 00:59:17
      Working on the text edits have been completed.
    • 00:59:22
      The photo edits are still in process.
    • 00:59:28
      Warm base code has taken priority, but MRI is making progress through those.
    • 00:59:33
      And so we are still hoping to get them done, getting those, the addenda done in the summer.
    • Chris HenningsenChair, Architectural Review Board
    • 00:59:45
      Right.
    • 00:59:47
      Next ARB meeting is scheduled for Monday, May 4th.
    • 00:59:56
      I will be away.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:59:59
      I'll be here.
    • Chris HenningsenChair, Architectural Review Board
    • 01:00:00
      I should be here.
    • 01:00:02
      So I guess we'll see what Frank and Taro can do.
    • 01:00:10
      So in that case, we
    • 01:00:13
      This meeting is adjourned until our next meeting, which may be on Monday, May 4th, 2026.
    • 01:00:20
      It's 2.04.