Central Virginia
  • Albemarle County
  • Architectural Review Board Meeting 1/20/2026
  • Auto-scroll

Architectural Review Board Meeting   1/20/2026

Attachments
  • Agenda.pdf
  • Final Action Memo.pdf
  • Final ARB Action Memo Minutes.pdf
  • SDP-2025-00138 CDJR Honda ARB Staff Report.pdf
  • Attach. 1 SDP-2025-00138 Flow Honda CDJR Site Plan.pdf
  • SDP-2025-00127 Rivanna Futures Initial Site Plan Staff Report.pdf
  • Attach. 1 SDP-2025-00127 Rivanna Futures Initial Site Plan.pdf
  • Solar Guidelines Draft Criteria Staff Report.pdf
  • Attach. 1 Solar Guidelines Resolution of Intent.pdf
  • Attach. 2 Solar Guidelines summary of VA localities with solar guidelines.pdf
  • Attach. 3 Solar Guidelines draft design criteria for rooftop solar installations.pdf
  • Draft ARB Action Memo Minutes 01_05_2026.pdf
    • Frank HancockVice Chair, Architectural Review Board
    • 00:00:01
      Let's see.
    • 00:00:03
      It is one o'clock.
    • 00:00:05
      I'm calling the January 20th, 2026 meeting of the Albemarle County Architectural Review Board to order.
    • 00:00:14
      Can we please call the roll?
    • SPEAKER_03
    • 00:00:16
      Yes.
    • 00:00:17
      Mr. Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:00:18
      Here.
    • SPEAKER_03
    • 00:00:19
      Mr. Stoner?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:00:20
      Here.
    • SPEAKER_03
    • 00:00:20
      Mr. Matsuno?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:00:22
      Here.
    • SPEAKER_03
    • 00:00:22
      Mr. Van Der Werf?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:00:23
      Here.
    • SPEAKER_03
    • 00:00:24
      Mr. Henningsen is absent.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:00:26
      Thank you.
    • 00:00:27
      Today's meeting is a hybrid meeting.
    • 00:00:29
      The public may access and participate in the meeting electronically.
    • 00:00:33
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:00:41
      The public has real-time audio visual access to this meeting over Zoom and real-time audio access over telephone, both as provided in a lawfully posted meeting notice.
    • 00:00:53
      This meeting is being recorded and will be made available on the county's website calendar.
    • 00:00:58
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:04
      All speakers, when it is your turn to speak, please state your name for the record.
    • 00:01:09
      Applicants who are making presentations, note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:19
      Staff will let you know when the 15 minutes are up.
    • 00:01:22
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:01:29
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:01:36
      Do any ARB members have anything to disclose?
    • Frank StonerMember, Architectural Review Board
    • 00:01:41
      I do.
    • 00:01:42
      I need to recuse myself from the first item as we are, my firm is doing work for Flow.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:01:48
      Okay.
    • 00:01:49
      Thank you.
    • 00:01:49
      I do not have anything to disclose.
    • 00:01:52
      We'll move to public comment.
    • 00:01:55
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • SPEAKER_03
    • 00:02:01
      I do not have anyone on line.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:02:05
      Thank you.
    • 00:02:07
      Consent agenda.
    • 00:02:08
      There are no consent agenda items today.
    • 00:02:11
      We'll move to regular review items.
    • 00:02:15
      There are two regular review items today.
    • 00:02:17
      The first is SDP-2025-00138 flow Honda CDJR major amendment.
    • 00:02:29
      Chris, are you ready to give your presentation?
    • Khris TaggartSenior Planner
    • 00:02:32
      Yes.
    • 00:02:33
      Good afternoon.
    • 00:02:35
      The application being reviewed today is a major amendment to span the existing outdoor display and sales area associated with an auto dealership.
    • 00:02:44
      The site is located at 960 Hilton Heights Road and contains the Flo Subaru Honda and Chrysler Dodge Jeep Ram dealerships.
    • 00:02:53
      The display area is subject to the proposed amendment.
    • 00:02:55
      It's located in front of the Honda and Chrysler Dodge Jeep Ram showroom building.
    • 00:03:01
      A.R.B.
    • 00:03:02
      reviewed the SP requests in September of last year and forwarded a recommendation of approval to the Planning Commission and Board of Supervisors.
    • 00:03:09
      The Board of Supervisors approved this SP request on January 14th.
    • 00:03:16
      To accommodate this expansion, the property owner is acquired a little over a third of an acre right away from VDOT.
    • 00:03:22
      The site plan shows that a portion of the existing landscape area along the frontage will be converted into paved parking, which will include triple stacked parking arrangements on both the northern and southern sides of the right entrance.
    • 00:03:36
      The landscape plan shows large trees along with ornamental trees and shrubs throughout the frontage planting area, and a large shade tree and two ornamental trees within the display area.
    • 00:03:46
      This arrangement lines with the approved concept plan is expected to minimize the visual impact of the expanded paved areas viewed from the entrance quarter.
    • 00:03:56
      As mentioned on the previous slide, the landscape plan shows the two interior trees, or two interior parking lot, or islands within the paved area.
    • 00:04:07
      One has a large shade tree, another two ornamental trees in shrubs.
    • 00:04:13
      While this arrangement does not meet the requirements of the five large trees for the 51 new parking spaces,
    • 00:04:21
      It adds interior trees in with the existing trees north and south of the entrance and along the perimeter to help compensate for the shortfall.
    • 00:04:33
      Staff recommends approval in the major amendment with the revisions listed in the staff report, and I'd be happy to answer any questions you all may have.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:04:41
      Thanks, Chris.
    • 00:04:43
      Let's see.
    • 00:04:45
      We'll go to questions for staff.
    • 00:04:48
      Dade?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:04:49
      Thank you, Chris.
    • 00:04:50
      I was just trying to recall if there's been an established practice on the part of the board relative to parking lot trees for display lots.
    • 00:04:59
      I seem to recall a recent application where we requested additional islands to meet that requirement.
    • Khris TaggartSenior Planner
    • 00:05:06
      You may be recalling the SP review for this application because the original concept plan only showed one interior parking island.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:05:21
      But just to clarify, the proposal still does, or it now does, or it doesn't meet the interior?
    • Khris TaggartSenior Planner
    • 00:05:29
      The concept plan, the original concept plan only showed one interior parking island.
    • 00:05:35
      The approved concept plan showed two interior parking lot islands, and the site plan shows that as well.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:05:42
      Thank you.
    • 00:05:43
      And does that meet the parking lot tree requirement?
    • Khris TaggartSenior Planner
    • 00:05:47
      The one large tree and two ornamental trees would not meet the interior parking lot requirements.
    • 00:05:54
      The guidelines call for five large trees for the number of parking spaces that they are proposing.
    • 00:06:02
      Thank you.
    • Taro MatsunoMember, Architectural Review Board
    • 00:06:06
      Tara?
    • 00:06:07
      I don't have any questions.
    • 00:06:08
      Thank you, Chris, for your presentation.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:06:11
      I don't have any questions either, thanks Chris.
    • 00:06:15
      We'll move to the applicant's presentation.
    • SPEAKER_05
    • 00:06:40
      Good afternoon, I'm Chris Marshall, Shimp Engineering, representing Flow Automotive.
    • 00:06:45
      Keep this one pretty short.
    • 00:06:47
      So as Chris gave us a pretty good summary.
    • 00:06:50
      So here's our site on 29.
    • 00:06:52
      This is Honda Chrysler Dodge Jeep Ram.
    • 00:06:57
      This is what we had previously submitted, which is the same layout that Chris just showed you.
    • 00:07:04
      We are adding, I think we have 56 spaces now, proposing one landscape island on this side and one on the other side.
    • 00:07:12
      We have a few easements that run through the property, so that's kind of
    • 00:07:19
      restricted us a little bit with where we can place trees.
    • 00:07:21
      But we have a lot of shrubs we're providing in excess of the screening requirements to compensate for that.
    • 00:07:31
      This is also our previously submitted lighting plan.
    • 00:07:36
      Staff's comments from last year's meeting were to provide tree protection fencing for any trees that are going to remain, which you can see here in red.
    • 00:07:50
      And then staff had a few comments on the lighting plan, making sure we're at 3000K for the color temperature.
    • 00:07:59
      That's been adjusted here.
    • 00:08:00
      Adding a note about the light pole base, that it does include the base in the light height.
    • 00:08:09
      Specifying the finish, which is bronze, which matches what's existing.
    • 00:08:15
      I think that covers all of staff's concerns from last meeting, so I will open it up to any questions.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:08:22
      Thank you.
    • 00:08:24
      Let's see.
    • 00:08:24
      Dade, do you have any questions for the applicant?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:08:30
      I guess I'm still under my question for staff.
    • 00:08:32
      Did you give any consideration to providing the five parking lot trees that normally would be required by standards?
    • SPEAKER_05
    • 00:08:39
      We did and had an issue with all the easements that are running through that area, so we tried to
    • 00:08:45
      compensate with additional trees between the parking lot and the sidewalk in 29.
    • 00:08:50
      So we have a couple of ornamental trees that we're able to fit and then a large shade tree on the left side over here.
    • 00:09:00
      I think what we're providing for screening is exceeding all of the screening requirements just to sort of offset that, that we don't really have much space to include more parking lot trees.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:09:12
      Thank you.
    • 00:09:15
      Taro?
    • Taro MatsunoMember, Architectural Review Board
    • 00:09:18
      No, I don't have any questions.
    • 00:09:19
      Thank you.
    • 00:09:21
      I don't have any questions.
    • 00:09:22
      Thank you for your presentation.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:09:24
      Thank you.
    • 00:09:26
      All right.
    • 00:09:28
      Do we have any members from the public that would like to comment?
    • SPEAKER_03
    • 00:09:34
      I do not.
    • 00:09:34
      Anybody online?
    • 00:09:36
      Nobody in the audience?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:09:39
      All right.
    • 00:09:39
      The ARB will now go into discussion.
    • 00:09:41
      We'll start with Taro.
    • Taro MatsunoMember, Architectural Review Board
    • 00:09:44
      Thanks.
    • 00:09:45
      I appreciate the applicant coming back with some revisions as well as staff taking the time to review this project.
    • 00:09:52
      I think, you know, given that there are some constraints to planting in this area and, you know,
    • 00:10:02
      Considering the easements and the utilities, I think that this does a good job of providing sort of the best landscaping that's kind of in line with the intent of the entrance corridor design guidelines.
    • 00:10:21
      So, you know, I appreciate the applicant coming forward.
    • 00:10:24
      I think what they've proposed is appropriate.
    • 00:10:27
      I don't have any other concerns.
    • 00:10:29
      Thank you.
    • 00:10:30
      Thanks, Tara.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:10:32
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:10:32
      Yeah, thank you, Frank.
    • 00:10:35
      I think Tara said it well.
    • 00:10:36
      I appreciate the applicant highlighting the additional frontage plantings and shrubs that they're providing and satisfied that it provides an orderly appearance for the corridor.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:10:49
      Thank you.
    • 00:10:49
      I agree with my colleagues.
    • 00:10:52
      I do think, too, pointing out the existing trees and staff noting the tree protection I think will be added to the landscaping.
    • 00:11:02
      I think looking at the whole picture will be sufficient.
    • 00:11:05
      So I don't have any concerns.
    • 00:11:07
      I think this is an appropriate application.
    • 00:11:12
      Can we review the recommended motion?
    • Margaret MaliszewskiPlanning Manager
    • 00:11:16
      Sure.
    • 00:11:17
      Let's pull it up.
    • 00:11:31
      The recommendation is for approval with the five conditions that were listed in the staff report.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:11:45
      Thank you.
    • 00:11:46
      Any comments or questions for staff on this?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:11:48
      No comments from me.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:11:50
      Do we have a motion?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:11:54
      I'll move for approval of the certificate of appropriateness for STP 2025-00138 with the conditions listed in the staff report.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:12:03
      Do we have a second?
    • 00:12:04
      Second.
    • 00:12:06
      Could we call the vote?
    • SPEAKER_03
    • 00:12:08
      Mr. Van Der Werf?
    • 00:12:10
      Aye.
    • 00:12:10
      Mr. Matsuno?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:12:11
      Aye.
    • SPEAKER_03
    • 00:12:11
      Mr. Stoner?
    • 00:12:14
      Mr. Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:12:17
      Aye.
    • SPEAKER_03
    • 00:12:17
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:12:19
      Thank you.
    • 00:12:21
      All right, moving to the second item, second regular review item.
    • 00:12:26
      It is SDP-2025-00127, Rivanna Futures, Lambay 82, Initial Site Plan.
    • Margaret MaliszewskiPlanning Manager
    • 00:12:39
      Just as a reminder, in October of last year, I had contacted each of you about an initial site plan that was submitted for the Rivanna Futures development.
    • 00:12:53
      At that time, I didn't think that that proposed work was going to be visible from the entrance corridor, but I wanted to see if anybody had any issues with that.
    • 00:13:03
      You were all in agreement at that time.
    • 00:13:05
      Since then, the project has changed a bit.
    • 00:13:08
      The area of work has gotten much closer to the entrance corridor, and so I thought that this would be a good time to bring the plan to you for a formal review, but to start with an overview of the larger project.
    • 00:13:21
      And to do that, I'd like to start with Emily Kilroy, who is our director of the Economic Development Department, and she's going to do that overview for us.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:13:30
      Great.
    • Margaret MaliszewskiPlanning Manager
    • 00:13:31
      Thanks, Margaret.
    • Emily KilroyDirector of Economic Development
    • 00:13:34
      Good afternoon.
    • 00:13:35
      I'm trying to find the mouse.
    • Blake AbplanalpChief of Project Management
    • 00:13:38
      There we go.
    • Emily KilroyDirector of Economic Development
    • 00:13:43
      OK, sorry about that.
    • 00:13:46
      And good afternoon, members of the Architectural Review Board.
    • 00:13:49
      I'm Emily Kilroy.
    • 00:13:50
      I'm the director of economic development for Albemarle County.
    • 00:13:52
      I'm joined today by Blake Alplanap, who is the program director, program manager for Rivanna Futures.
    • 00:14:01
      It's a new role, new position, sort of in recognition of the new phase of work that we're in with this project, which I'll get into in a couple minutes here.
    • 00:14:08
      and then we also have Kendra Moon who's an engineer with line and grade who the county has been working with on all the civil engineering aspects of the Rivanna Futures project to date.
    • 00:14:19
      So they, Blake will come up to do some slides but we're all available for questions as part of this presentation and then also with the discussion to follow with Ms. Maliszewski.
    • 00:14:28
      So I'll get into it then.
    • 00:14:31
      Just wanted to take a couple minutes of your time today to talk about the larger project besides zooming out a little bit from the site plan that Ms. Maliszewski will talk about a little bit later here.
    • 00:14:45
      So we wanted to talk about sort of the cascade of Rivanna Futures, which is what the county calls all of the property.
    • 00:14:51
      that the county purchased adjacent to Rivanna Station in 2023.
    • 00:14:57
      Talk a little bit about AstraZeneca, which was the announcement of the first sort of tenant of Rivanna Futures in October.
    • 00:15:05
      And then Blake will come up and talk about what the next 12 months of work will look like out on the site.
    • 00:15:11
      And that crosses Rivanna Futures and AstraZeneca lines, and he'll go into that.
    • 00:15:16
      So starting with Rivanna Futures, this is an aerial of the site.
    • 00:15:23
      This is, I think you guys cannot see my.
    • 00:15:30
      Okay, so this is Route 29.
    • 00:15:33
      North is to the left.
    • 00:15:36
      And this is Rivanna, the development that you can see here is Rivanna Station, as well as an office building that sits directly adjacent to Rivanna Station that is outside the fence line.
    • 00:15:47
      This is a current surface parking lot that is leased by the federal government for employees who work at Rivanna Station.
    • 00:15:55
      That parking lot does sit on the property that the county purchased.
    • 00:15:59
      And so we are the owner of that parking lot and they are a lease holder to be able to use it for parking.
    • 00:16:05
      And that's a condition that we sort of got with the land acquisition.
    • 00:16:10
      Rivanna Futures is roughly this whole area along Route 29.
    • 00:16:14
      There's a little bit of a notch out of our ownership right about there.
    • 00:16:19
      And then coming up 29
    • 00:16:21
      all the way probably a little bit off this page and then heading back roughly along Watts Passage through this electrical corridor back behind Rivanna Station and their fence line.
    • 00:16:34
      inclusive of the pond that you can see up here and then kind of back around to the front.
    • 00:16:40
      So everything behind next to and in front of Rivanna Station is now owned by Albemarle County.
    • 00:16:47
      It's 463 acres in all.
    • 00:16:51
      I guess I'll add just for a little history note, you can see this little house here.
    • 00:16:57
      In the graphic, that's an old, if you've lived here a while, it used to be a palm reader's house.
    • 00:17:04
      The county acquired that acre site in, I think 2017.
    • 00:17:09
      And the reason for that at the time was
    • 00:17:15
      That the county's master plan has long envisioned, actually since the original adoption of the first 29 master plan, there was this vision that eventually Boulders Road, which currently terminates right about at the edge of the parking lot for the private office building.
    • 00:17:32
      would continue on to make a full loop back to Route 29 and that that landing point, because of VDOT considerations, would be at the existing T intersection of Austin Drive, which is a signalized intersection that gives access to the Emerson property across the street.
    • 00:17:50
      You all probably are very familiar that VDOT is reluctant to add additional intersections, especially signalized intersections onto Route 29 as a corridor of statewide significance.
    • 00:18:00
      But adding a leg to an existing signalized intersection is a lot easier.
    • 00:18:05
      And so it's long been envisioned that that Boulder Road extension, wherever to happen, would happen at that location.
    • 00:18:11
      So that house sits right where that intersection would connect in on the other side.
    • 00:18:16
      And so in all the county now owns 463 acres.
    • 00:18:20
      The why for that goes back many years.
    • 00:18:26
      Some folks will start the clock on the discussions for this as early as 2004, but there's been a lot of understanding and focus really driven out of the state government on the fact that Rivanna Station
    • 00:18:39
      is the only military installation in the Commonwealth of Virginia that has available land around it.
    • 00:18:47
      So all the other military installations in the Commonwealth are either surrounded by existing development or water.
    • 00:18:53
      And this was really the only one that had available undeveloped land adjacent to it, which is an opportunity and a threat.
    • 00:19:00
      There's lots of cases across the world of
    • 00:19:05
      foreign adversaries purchasing property directly adjacent to military installations which compromises the United States' ability to use those spaces any longer and an opportunity in that you could dream of a future for Rivanna Station that's different than what is out there today.
    • 00:19:23
      And so this is just a couple of old clips from some old documents that sort of hint at the state's interest in looking at what might be possible there.
    • 00:19:33
      And the graphic is a 2016 concept plan that was initiated by the state, but in partnership with the federal government to look at what a potential expansion of Rivanna Station could look like.
    • 00:19:45
      And that's what's depicted on this diagram here.
    • 00:19:48
      and that was sort of a guiding document for the county as we begin our property negotiations in 2022.
    • 00:19:54
      And we really saw an opportunity, you know, why were we interested in property adjacent to Rivanna Station?
    • 00:20:02
      Rivanna Station is really the anchor of the intelligence national security sector in Albemarle County and our broader region.
    • 00:20:11
      There was a study that was done through the Chamber of Commerce in 2023 that found that it's a $1.2 billion economic impact each year.
    • 00:20:21
      That puts it neck and neck at number two.
    • 00:20:25
      University of Virginia is number one.
    • 00:20:27
      and that number is more like 25, $26 billion a year coming out of the university.
    • 00:20:34
      So number two is a distant number two, but a really important number two.
    • 00:20:38
      And it's not just the military installation itself, although that does have 3,000 employees and itself a $600 million annual impact, but there's a presence of companies that are located in our greater region
    • 00:20:55
      because Rivanna Station is located in Albemarle County.
    • 00:21:00
      So these are companies that are doing contract work, providing services, providing goods, workforce connections.
    • 00:21:07
      Maybe they used to work at Rivanna Station and then wanted to start their own company.
    • 00:21:11
      So this is just a collection of some logos of some of the companies that are really comprising the other half of that Intel national security sector in our broader community.
    • 00:21:21
      and Albemarle was really interested in looking at what would it look like to really build more of a cluster, have these companies talk to each other, engage with each other, engage with the federal government to understand what some common shared opportunities, challenges might be, and then how they might work together to leverage those or overcome those.
    • 00:21:44
      And that's sort of the work of economic development.
    • 00:21:48
      There's also been some investments made that really help us see a future that could be larger than the current sector today, as it sits today.
    • 00:21:58
      One is just the county's acquisition of the Rivanna Futures property.
    • 00:22:03
      Another thing that's happened over the past couple of years is the University of Virginia created the National Security Data and Policy Institute,
    • 00:22:11
      That's significant.
    • 00:22:12
      It leverages a lot of the knowledge and expertise and research happening at the School of Data Science, but also the Batten School of Public Policy.
    • 00:22:23
      and is really a research contract between the Institute and the Office of the Director of National Intelligence to have the Institute, ODNI, share to the National Security Data and Policy Institute.
    • 00:22:39
      Here are some of the major challenges that we see on the horizon from a national security standpoint.
    • 00:22:44
      and how can the university be a research partner in helping to overcome, develop what the resolution to some of those challenges could be.
    • 00:22:52
      And that contract is an initial two-year period with options to extend that out much further.
    • 00:22:59
      It's just a really exciting opportunity to think about if all this research is happening here, what are some of the commercialization spin-offs that could happen because of that in the future?
    • 00:23:09
      And how can we position ourselves as a community to support that?
    • 00:23:13
      And so that really was sort of the business case for Rivanna Futures itself.
    • 00:23:19
      We could grow this innovation acceleration campus right next to Rivanna Station.
    • 00:23:24
      The future tenants could be expansion of the current federal agency footprint, but also private sector.
    • 00:23:31
      partners in cybersecurity, IT, engineering.
    • 00:23:35
      There's an overlap with the biotech sector.
    • 00:23:37
      And we felt like, you know, if you had an owner that was eager to see that property develop in that way, that we could really grow the sector.
    • 00:23:48
      And that really set up the county's acquisition of that property and the work that we've done since then to ready the property for development and do a lot of partner engagement to try to increase attention and interest on the future of the property.
    • 00:24:04
      So again, just a little bit more background on the property.
    • 00:24:07
      I'll just kind of flip through these quickly.
    • 00:24:08
      We have 172 acres in the red dotted line as a subset of the county's land holding that was rezoned to Light Industrial Office in 2024.
    • 00:24:23
      And you can see there's a sort of an intentional natural area buffer around the dotted line property.
    • 00:24:30
      The property is unique in that there's 231 acres of rural area and 230 acres of development area that the county owns.
    • 00:24:44
      This is a diagram that we'll come back to.
    • 00:24:46
      This, from that aerial, has sort of flipped the orientation a little bit, so I apologize for the whiplash on how you're thinking of the site.
    • 00:24:55
      But this is sort of the start of the conceptual engineering work that the county engaged in with the support from Lining Grade.
    • 00:25:03
      to think about what to do, how to program the development area portions of the property.
    • 00:25:09
      And you can see we've got, again, this red dashed line is what was rezoned to Light Industrial Office.
    • 00:25:17
      And then the yellow is also in the development area, was not part of that original rezoning.
    • 00:25:22
      And the rationale for that was really that Rivanna Station along this back property line has a secured fence perimeter.
    • 00:25:31
      And so access to that yellow portion is a real challenge from the public right-of-way, which is this existing Boulder's Road alignment.
    • 00:25:40
      Here's just a summary of some of the work that we've been doing over the past several years since coming into ownership of the property.
    • 00:25:48
      Grant seeking has been a big part of that.
    • 00:25:50
      The county invested $58 million to acquire the property.
    • 00:25:54
      We are now up to over $30 million in grants from the state.
    • 00:26:01
      All of this is from state government, different agencies.
    • 00:26:04
      to ready the site for future development and also complete the Boulder Road extension over the next several years, which is really exciting.
    • 00:26:16
      So the Commonwealth of Virginia does economic development as well through the Virginia Economic Development Partnership, or VEDP, and VEDP really often collects a lot of the larger economic development prospects that are thinking about Virginia.
    • 00:26:34
      and then works with localities and regions to identify sites that are going to be a good fit.
    • 00:26:40
      Over the summer, VEDP called and inquired if Rivanna Futures could be a potential future home for AstraZeneca and that set off a flurry of work in the month of July and August to explore that further, to pull that thread a little bit harder and see if it was going to work for them and if it was going to work for us.
    • 00:26:58
      and we were just so excited to celebrate the ceremonial groundbreaking in October of 2025 and we're continuing to work really diligently under the leadership of Blake to make sure that we have a really successful development process for them.
    • 00:27:18
      This is just a conceptual drawing of what they intend to locate here.
    • 00:27:22
      There's two manufacturing facilities that are part of their plan.
    • 00:27:27
      This is sort of the front office functions for the larger manufacturing facility and this will have employee training space, it'll have
    • 00:27:43
      The QAQC process will happen in this building as well as sort of the administrative functions of any large employer.
    • 00:27:51
      You can sort of see hints of the way that they're approaching the design to really
    • 00:27:58
      Take advantage of any opportunities to have environmental design.
    • 00:28:01
      They try to achieve LEED Gold as a minimum in their office buildings and incorporate a lot of environmental practices into their manufacturing facilities.
    • 00:28:10
      You can see the timber, the laminated timber in this drawing, as well as the emphasis on daylighting.
    • 00:28:22
      And we look forward to learning more of the details of what they're actually going to do as they get further into their design process.
    • 00:28:28
      Just a quick by the numbers, again it's one manufacturing campus with two different specialized production facilities.
    • 00:28:36
      They will come to acquire 82 acres of that 172 light industrial office acreage at Rivanna Futures.
    • 00:28:46
      They'll employ 600 people directly at the two facilities.
    • 00:28:49
      and then they have some expected sort of indirect and induced job numbers as a result of the construction activity and then sort of long-term jobs that will be created because they're here and that's supply chain type jobs that's also dry cleaning and lunch printing that kind of thing.
    • 00:29:09
      and that's based on what they've experienced in other facilities across the country.
    • 00:29:15
      The minimum salary is $125,000 a year and just to emphasize these are manufacturing jobs.
    • 00:29:21
      These are very high-paying manufacturing jobs that are going to be sort of that next-gen, AI-driven,
    • 00:29:28
      virtual reality manufacturing environment that we're really excited about from an economic development standpoint because those are not jobs that you necessarily need a four-year degree to be a successful candidate for and so we're really excited about the prospects of bringing such high-paying jobs to the community and in all it'll be a 4.5 billion dollar capital investment.
    • 00:29:53
      talked a little bit about their focus on green building.
    • 00:29:56
      AstraZeneca has a corporate commitment to being carbon neutral.
    • 00:30:00
      I forget the date, but it's in the 2030s.
    • 00:30:04
      And so they'll have onsite solar panels, both roof mounted and on ground arrays, and then also be purchasing offsite renewable energy as part of their energy
    • 00:30:15
      to be able to meet the fullness of their energy needs.
    • 00:30:18
      I talked about green design principles and they have an emphasis on closed loop systems to recapture and reuse as much as they can through their production process.
    • 00:30:27
      This project was aligned to the County's Economic Development Strategic Plan.
    • 00:30:31
      That document was recently refreshed and adopted by the Board of Supervisors in August of this past year.
    • 00:30:38
      And that is really how staff approaches any prospect opportunity that comes to us.
    • 00:30:45
      Is this going to be a good fit?
    • 00:30:46
      based on what we've articulated we want to see more of in the community.
    • 00:30:51
      And in this case, it was a real great opportunity for us to focus on our goal too, which is about the biotech and life sciences sector.
    • 00:30:59
      And one of the sort of stretch goals there was to get an anchor employer, anchor company in that space to help grow sort of the broader ecosystem here.
    • 00:31:09
      And we're just so thrilled to have AstraZeneca joining the community.
    • 00:31:13
      There's research partnership opportunities with the University of Virginia, a lot of workforce training and upskilling opportunities with Piedmont Virginia Community College, commercial partnerships with some of the startups that we have in town.
    • 00:31:26
      There's going to be infrastructure built out to serve the capacity needs of AstraZeneca that are going to have ancillary positive benefits for other properties in the northern part of the county.
    • 00:31:35
      and then we believe that there'll be some attraction opportunities for similar types of facilities by other companies as well as supply chain partners for AstraZeneca.
    • 00:31:47
      I am almost done, I promise.
    • 00:31:49
      This is, if you've seen some of the county's materials on the Rivanna Futures Project over the past two years, you may have come across this graphic which sort of shows the sort of the conceptual opportunity for development within the red area.
    • 00:32:07
      And so we kind of had carved the property into three large sort of land bays
    • 00:32:12
      The numbers here are acreage, so that's how large each of these is, and with AstraZeneca, that had us sort of rethink and rejigger a couple things to be able to accommodate their project, and so this is sort of the latest version of that concept drawing that we've used.
    • 00:32:32
      and you can see AstraZeneca will be on what is now 82 acres on what had previously been Lambay 50 and a little bit into what had previously been Lambay 30 and significantly the road alignment
    • 00:32:48
      shifted so I'm going to go back and then forward again so you can see that again.
    • 00:32:52
      So it had followed the ridgeline previously but to allow for a contiguous campus we brought that much closer in and this was awarded 20 million dollars by the Commonwealth of Virginia two weeks ago and so Blake will share more about the development timeline for that but we're really excited to have this road as part of what will happen over the next several years
    • 00:33:18
      in support of the AstraZeneca project because it has a lot of benefits to Rivanna Station as well.
    • 00:33:26
      And so that's a road that had not been in the county's funded five-year plan for road construction, but it's something that we're able to do because of the AstraZeneca project.
    • 00:33:38
      So with that, I'm gonna invite Blake to take over and talk about what the construction looks like coming up.
    • Blake AbplanalpChief of Project Management
    • 00:33:48
      Good afternoon, and again, I am Blake Applinaup.
    • 00:33:51
      I am in the third week a program manager for Rivanna Futures, though I've been with the county for 14 years, previously as division chief of facilities planning and construction, and then most recently, the last year as deputy director of facilities and environmental services.
    • 00:34:08
      I've been working on this project since March of 2023, and back in our due diligence,
    • 00:34:17
      part of the project and climbing through wooded areas and down into swamps and everything just to be part of the evaluation process prior to our purchase with this.
    • 00:34:30
      So what's gonna be happening, let's see here.
    • 00:34:37
      Let me get the lay of the land here over the next 12 months.
    • 00:34:47
      All right, you saw the picture before, and now what we're depicting here is kind of our layout and where the work that we'll be managing is going to happen.
    • 00:35:00
      Emily alluded to our $9.7 million Virginia Business Ready Sites program grant, and that has a combination of work associated with the areas you see primarily in the blue and green.
    • 00:35:15
      and that is work that is comprised of design activities, line and grade from here in Charlottesville is our engineering design firm for that work.
    • 00:35:28
      There is tree clearing, there is grading, there are utility extensions of water, sewer and gas and
    • 00:35:37
      and as we move forward with this project, obviously services to plants of this significance or this size and the capacity that they need is a high priority item.
    • 00:35:51
      On January 29th, actually, we're having a design charrette that's gonna involve Rivanna Water and Sewer, Albemarle County Service Authority, Rappahannock Electrical Cooperative, Charlottesville Gas,
    • 00:36:03
      AstraZeneca's engineering firm or architectural and engineering firm Arcadis is who they're using and we're going to spend a good portion of a day going over requirements, capacities, what AstraZeneca ultimately is going to need and
    • 00:36:21
      you know Rivanna Water and Albemarle County Service Authority will then you know adjust their schedules to try to to meet the demand up there and it's really probably the highest priority item that we have going on right now but again this diagram kind of shows the overlap that Land Bay 27 is what we call Gemini and
    • 00:36:46
      that is where they're gonna, that's become their top priority, AstraZeneca.
    • 00:36:50
      And they'll be producing a cancer fighting drug there.
    • 00:36:53
      And in clinical trials, apparently it's been very effective.
    • 00:36:57
      And that has moved to a higher priority than the Land Bay 54 plant or facility, which is gonna be making an obesity fighting drug.
    • 00:37:09
      And so that'll kind of be second in the order of what we'll be doing there.
    • 00:37:17
      Again, we're talking about the grant requirements at $9.7 million, clearing, grading, the underground utility extensions.
    • 00:37:28
      Our clock has just started ticking on this, and we have 12 months to complete that work.
    • 00:37:33
      So if you break that into one month pieces, we have to execute $808,000 worth of work a month.
    • 00:37:42
      And if we were putting buildings coming up vertical out of the ground, that wouldn't be a challenge.
    • 00:37:47
      But this certainly is a challenge to get site work clearing, site work, all of our permits in place.
    • 00:37:53
      And we have to get it done within that time period.
    • 00:37:57
      facilities and environmental services department is handling that we've already had a committee that has gone through an RFP process with site contractors we've gone through phase one which is an RFQ you know for qualifications to make sure that any firm that we put out there has the qualifications experience to meet our requirements
    • 00:38:18
      We're about to go into phase two, which is more price-based and have these, we selected six out of 10 proposers, and those six will now be involved in pricing exercises for us so we can select contractors to perform the work out there.
    • 00:38:36
      Our tree clearing is going to, you know, tentatively begin next month.
    • 00:38:42
      And we're trying to get that work done prior to the bat moratorium ending, which is the end of March and the northern long eared bat.
    • 00:38:50
      impacts us just about every project where any site work is going on but we'll be beginning that.
    • 00:38:58
      We are figuring about six weeks worth of work to do the trigger clearing that we need to do so we have our work cut out for us and we certainly hope there's no weather issues.
    • 00:39:10
      And again, the grading underground utility extensions will begin about halfway through the calendar year and we need to wrap that up and have that complete
    • 00:39:20
      by the end of this calendar year, the beginning of January, really.
    • 00:39:25
      And that's our challenge ahead of us.
    • 00:39:27
      And our partner, Line & Grade, is doing the engineering design on that.
    • 00:39:33
      And they're also doing 30% of the road design, but at that point, once they complete that, they'll be handing it over to Kimley-Horn for the rest of the design for the road project.
    • 00:39:50
      Alright, schedule that is still being determined and this has to do with the AstraZeneca work.
    • 00:39:59
      Probably shouldn't say this, but I think the dates here could be slightly optimistic, but currently, right now, this is the plan and site work and construction to begin late in this calendar year.
    • 00:40:11
      This is on the AstraZeneca site, and we are not performing that work, though we are doing some of the prep work for them.
    • 00:40:17
      The clearing and some of the site grading is associated with their properties, but this is referring to the work that's actually gonna go on by AstraZeneca and their contractors.
    • 00:40:29
      And you can see their goal right now.
    • 00:40:33
      We had a meeting recently and they suggested it would be early 2029 for that first building, the Gemini, where they're producing the cancer-fighting drug.
    • 00:40:42
      So we're in a bit of a challenging race as well to get the road done in time and for them to be able to access things.
    • 00:40:54
      And I'll show you in a different graphic how we intend to go about doing that.
    • 00:41:01
      All right, and that would be this graphic right here.
    • 00:41:03
      And again, you remember that original big loop in the road.
    • 00:41:07
      And that was prior to us even knowing about AstraZeneca having an interest of being here.
    • 00:41:12
      And that was designed to be able to distribute access to the rest of the property, thinking that we would kind of be working from what's shown here heading north.
    • 00:41:24
      and but this has been the latest design that's coming up.
    • 00:41:28
      It's a four-lane road, two lanes obviously on each side, bike lane sidewalks and there's a stream crossing it at Herring Branch and we've done some preliminary calculations and it looks like a multiple bay culvert style bridge.
    • 00:41:47
      should be able to be put in place there which saves us tremendous amount of money, the project a lot of money versus a standard kind of structural type bridge and certainly we have to confirm the calculations through the CLOMAR process with FEMA.
    • 00:42:03
      and but right now that you know that work has already started we've had recent meetings with our officials here at the county and the floodplain administrator and design teams that are involved in this and current hydraulics work is going on you know investigative work to make sure that we're not impacting the floodplain in a manner that would be more than what FEMA would typically allow.
    • 00:42:32
      We've also started there at the intersection an ICAP process which we have to do with VDOT and it's basically our design professionals will prepare sometimes three, sometimes five different options for the intersection and make a recommendation and then VDOT
    • 00:42:55
      We'll either go along with that recommendation or make suggestions on going a different direction with that.
    • 00:43:03
      We are going to be performing this project as a design build project.
    • 00:43:08
      Our board of supervisors last week approved the use of design build because our purchasing manual requires that we have to approve that on an individual project basis.
    • 00:43:19
      So they approve that.
    • 00:43:20
      We feel like the fact that you can do early work in a design-build package, you don't have to have everything done from a permitting standpoint.
    • 00:43:29
      You can go in pieces and get work started a little bit earlier.
    • 00:43:32
      So we intend to, if you look up where this roundabout is, we'll be starting right here.
    • 00:43:39
      This is where the road ends.
    • 00:43:41
      we'll be starting here the roundabout will go into place and then we'll be heading in a westerly kind of southwest direction the construction now this is the approximate location of the truck access for AstraZeneca so you know our intention is to get this whole thing done
    • 00:44:03
      uh worst case scenario something affects us if we get it done to here we've we've accomplished the goal of providing access for AstraZeneca they have two entrances into their facilities one will be off of this roundabout somewhere and uh and that will be for employee traffic visitors you know vendors coming in and then this would be more for trucks and deliveries and they're going to have uh
    • 00:44:29
      two different manufacturing plants they're actually separated by fencing but they'll be utilizing that building that Emily showed you will be shared by both facilities from an administrative standpoint and then they have warehousing as well there so
    • 00:44:44
      you know our goal though is to work toward that toward 29 from there and and we will you know obviously to create that road there's that's all trees there right now so you know there'll be some clearing there of the you know almost create like a tunnel
    • 00:45:03
      as we go down there.
    • 00:45:04
      So again, we were just successful in obtaining, the state just approved, the Commonwealth Transportation Board just approved the TPOF grant.
    • 00:45:15
      And the way this project is 42 million is what the estimate is for this road and intersection work and improvements along 29.
    • 00:45:23
      And the state's putting in 20 million, county's putting in 10 million, and AstraZeneca's contributing 12 million to the construction of this road.
    • 00:45:40
      Okay, Boulder Road extension that I was just alluding to.
    • 00:45:44
      We're expecting about 12 months for design and permitting that we have to do again.
    • 00:45:51
      We're already working on engineering associated with the Clomar.
    • 00:45:57
      We're already working on engineering associated with the intersection itself and have developed a kind of a strategy for permitting for the road.
    • 00:46:08
      The design-build process, we will turn over
    • 00:46:13
      We'll have a package developed for everyone that'll have technical and administrative specs.
    • 00:46:18
      We'll show the alignment that we will allow for, you know, slight deviations.
    • 00:46:22
      But what we do, what we've done on a project that's similar to this is we've created a box.
    • 00:46:28
      And within the parameters of that, you have the ability if you feel like a string crossing should be 20 feet.
    • 00:46:35
      you know to the north of what we're showing we allow for that providing they can provide all the backup and justification for making that change and it's still you know meeting all the requirements that are to come our way so we we don't think construction will really start for about 14 months or so when you throw in the design and then you know you've got all the approvals so
    • 00:47:01
      It's kind of where we stand at this moment.
    • 00:47:04
      It's literally a race to get this thing done in time for them.
    • 00:47:10
      But we're confident VDOT is partnering with us on this.
    • 00:47:14
      And their design build people are actually advising us, providing information for us.
    • 00:47:21
      They've already been contacting contractors
    • 00:47:25
      to kind of market the project so we feel confident that we'll be in a good position and we're doing taking all the right steps here to be able to get this done.
    • 00:47:38
      And with that I am done and we are open to any questions that you all may have.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:47:44
      Thank you for your presentation and congratulations on a nice economic development win and
    • 00:47:52
      Well, it seems to be a great project for the county.
    • 00:47:56
      Very informative.
    • 00:47:58
      So thank you.
    • 00:47:59
      We'll open it up to questions starting with Dade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:48:03
      Yeah, thank you very much.
    • 00:48:04
      It's an exciting development.
    • 00:48:05
      I was interested just to ask in terms of the land bank, is the county going to retain ownership and these are long term leases for the properties and development or the land is transferring?
    • Emily KilroyDirector of Economic Development
    • 00:48:16
      With respect to AstraZeneca specifically, they'll assume full ownership of the properties.
    • 00:48:24
      The timing of that is a little bit related to the grant that we have for land clearing and grading.
    • 00:48:32
      I'm going to bring a map back up real quick.
    • 00:48:43
      So the Virginia Business Ready Sites program grant, which is $9.7 million for clearing, grading, and utility extension work, was applied for and awarded prior to AstraZeneca making a site selection.
    • 00:49:01
      and so that's why there's some clearing and grading work that will happen on what's labeled here as Land Bay 27 and maybe even a little bit of Land Bay 54 as part of the next 12 months of work that the county is going to be executing because that grant was awarded and right now all of the underground utilities serving the broader site terminate somewhere within this Land Bay 55 area
    • 00:49:28
      And so in order for that to be developed long term, those terminus points need to come up to a better location and to provide service to the totality of the Rivanna Futures property.
    • 00:49:40
      They need to be extended a bit.
    • 00:49:42
      So that's part of what the grant funded.
    • 00:49:43
      And so we'll be taking the sewer, the water line and the gas line
    • 00:49:49
      sort of out of Land Bay 55 and following the current and future road alignment to be able to provide service access for the future and also to just sort of deconflict future development in that Land Bay 55.
    • 00:50:03
      So eventually, AstraZeneca will own the property that they are occupying.
    • 00:50:08
      In terms of the other, Land Bay 25, Land Bay 55, what could happen in the future, I think the county is sort of committed to flexibility in what makes sense.
    • 00:50:18
      But for AstraZeneca's investment, ownership of the property was the best fit for them.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:50:23
      Thank you.
    • Taro MatsunoMember, Architectural Review Board
    • 00:50:26
      Thank you.
    • 00:50:27
      Tara?
    • 00:50:28
      Thanks.
    • 00:50:28
      I don't have any questions, but I appreciate the presentation and the chance to learn more about the project.
    • 00:50:34
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:50:35
      Thanks.
    • 00:50:36
      Yeah, I also appreciate the presentation.
    • 00:50:38
      It's great to finally see all the pieces coming together.
    • 00:50:43
      In terms of our review, this is really more for you, Margaret.
    • 00:50:47
      How does this impact the corridor and is that something we look at today?
    • Margaret MaliszewskiPlanning Manager
    • 00:50:53
      Yes, we'll be looking at the initial site plan for what's actually called Land Bay 82.
    • 00:51:00
      And as new site plans come in, we'll continue to bring them to you for review.
    • Frank StonerMember, Architectural Review Board
    • 00:51:09
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:51:11
      Thanks.
    • 00:51:12
      I don't have any additional questions.
    • 00:51:14
      Thank you for coming today and giving us this overview and good luck with everything.
    • 00:51:20
      We don't get any bad weather in the next 12 months.
    • Emily KilroyDirector of Economic Development
    • 00:51:25
      Thank you all.
    • 00:51:29
      Thanks very much.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:51:32
      All right, moving to the site plan portion.
    • 00:51:36
      Margaret, do you have your presentation?
    • Margaret MaliszewskiPlanning Manager
    • 00:51:38
      Yes, let me bring it up.
    • 00:51:50
      Okay, this is a review of an initial site plan for what's called Land Bay 82 in the Rivanna Futures Project.
    • 00:51:58
      The location is the three parcels that you see circled in red in this image.
    • 00:52:04
      As you've seen in the previous presentation, it's a land on the east side of Route 29 north.
    • 00:52:09
      It's basically across from Austin Drive and it's north of the current Boulders Road intersection with Route 29 and the Rivanna Station development.
    • 00:52:19
      The current condition is a mix of forested and cleared land.
    • 00:52:23
      That forested land does extend to Route 29, so that presents a wooded buffer along the entrance corridor.
    • 00:52:32
      This plan shows the tree clearing that's necessary to make land available for future development.
    • 00:52:37
      The image shows the extent of Land Bay 82, that's the hatched area, and that's laying over the three parcels that were shown in the earlier slide.
    • 00:52:48
      This image shows the area of proposed tree clearing.
    • 00:52:51
      It's again what looks like gray shaded areas.
    • 00:52:55
      In this image, Route 29 is at the left side of the image.
    • 00:52:59
      The orange line is the project area boundary and the dark line inside that is the limits of disturbance.
    • 00:53:07
      The plan does show that Boulders Road will be extended back out to Route 29 at the Austin Drive intersection.
    • 00:53:15
      And that connection isn't being proposed with this plan, just the extension to the point that you see in the plan here.
    • 00:53:22
      Tree clearing is proposed to stop approximately 300 feet from the entrance corridor street.
    • 00:53:29
      However, when that connection is made, a view will be available into the site along that extension.
    • 00:53:34
      Again, a future plan will show those details and will come to you for review.
    • 00:53:41
      Some of the sheets of this site plan do show grading.
    • 00:53:43
      Just want to point out that that grading is shown only for reference on this plan.
    • 00:53:47
      It was approved with the previous plan.
    • 00:53:49
      It's not expected to be visible from Route 29 at this point in time.
    • 00:53:53
      So to summarize, because the tree clearing is held back approximately 300 feet from the street, the clearing proposed with this plan is expected to have limited visibility, if any, from the entrance corridor.
    • 00:54:04
      It is possible that reduced depth of the wooded area or the wooded buffer might be noticeable from Route 29, but the plan does show that that wooded buffer will remain along the corridor.
    • 00:54:15
      So we expect the character to appear the same as viewed from the street.
    • 00:54:19
      It is anticipated that future work, including the extension of Boulder's Road to Route 29, will have greater visibility and will open views into the property, but future site plans showing that work will be subject to ARB review.
    • 00:54:31
      At this point in time, our recommendation is for approval of this plan as it's presented.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:54:37
      Thanks, Margaret.
    • 00:54:39
      We'll now ask questions.
    • 00:54:42
      Any questions for staff, starting with Taro?
    • 00:54:44
      No, no questions.
    • 00:54:45
      Thank you.
    • 00:54:47
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:54:48
      No, I don't have any questions either.
    • 00:54:50
      Thanks, Margaret.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:54:52
      Not for me either.
    • 00:54:53
      Dade?
    • SPEAKER_03
    • 00:54:54
      No.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:54:54
      No?
    • 00:54:56
      I don't think I have any questions either, Margaret.
    • 00:55:02
      Thank you.
    • 00:55:04
      Let's see, moving to the applicant.
    • 00:55:07
      Is there an applicant's presentation or have we already kind of received the applicant's presentation?
    • Margaret MaliszewskiPlanning Manager
    • 00:55:12
      I wasn't sure if Kendra wanted to say anything.
    • 00:55:15
      No, we're good.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:55:17
      Okay.
    • Emily KilroyDirector of Economic Development
    • 00:55:19
      I'm never going to not say yes.
    • 00:55:22
      And just to sort of re-emphasize, as we get further into the design process, all of the clearing that is shown on the site plan is not all of the clearing that will happen.
    • 00:55:33
      It will be less than that.
    • 00:55:34
      So this is sort of the, as we're sort of landing where
    • 00:55:38
      Clearing is necessary for the project to move forward.
    • 00:55:42
      We'll be eliminating sites of clearing that are not necessary for the project to move forward.
    • 00:55:47
      So what is before you today is sort of the maximum furthest extent, but that will get significantly reduced over the next several weeks.
    • 00:55:57
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:55:59
      Great.
    • 00:55:59
      Thank you.
    • 00:56:02
      Let's see.
    • 00:56:04
      I haven't kind of done the questions for the applicant, I think.
    • Frank StonerMember, Architectural Review Board
    • 00:56:07
      Is the road design finished?
    • 00:56:13
      It's not.
    • 00:56:14
      Okay.
    • Blake AbplanalpChief of Project Management
    • 00:56:20
      Currently the status that I had mentioned, line and grade is completing the road up to 30% complete.
    • 00:56:28
      And then it's being turned over to Kimley-Horn.
    • 00:56:31
      The reason that that was done was they started on road design prior to AstraZeneca being part of our life.
    • 00:56:39
      And so then it made sense when we went to the design build procurement method, you know, after meeting with VDOT,
    • 00:56:48
      We went ahead and lining grades did a great job but we felt like with the timeline that we had we wanted somebody that has a tremendous amount of experience with design build and that's why we ended up with Kimley-Horn and design or lining grade and Kimley-Horn we're having coordination meetings and so forth.
    • 00:57:06
      Another thing I will point out too to follow up on what Emily said about there'll be a reduction in tree clearing
    • 00:57:12
      That one point that I showed you, which was the truck access into AstraZeneca, that is about 700 feet from Route 29.
    • 00:57:22
      And so they want to get that in there.
    • 00:57:26
      And there's not going to be a whole lot more to the west of that.
    • 00:57:30
      So we don't think we'll be going too much further past that.
    • 00:57:35
      But we do not have their final layout and how much they need tree clearing done.
    • 00:57:41
      I do know from talking to some of the people of Arcadis is they actually they being AstraZeneca made them change the footprint of a building because of some big oak tree like a specimen oak that they wanted to save so they're very conscious of that type of work and also for reference the
    • 00:58:01
      the closest any part of that Gemini facility to Route 29 is 1100 feet so it's quite a distance that's you know almost four football fields so is the is the closest to 29 and everything else is is much further beyond does that answer your question yes okay thank you
    • 00:58:24
      And we expect the 30% design complete the end of this month, and then it'll be turned over to Kimley Horn, who will take it, will refine it a little bit, provide more detail, but then we're going the design-build route.
    • 00:58:37
      So, you know, we'll be providing the technical parameters, but whoever the design-build contractor, successful one is, will then take the design over the 12 months following that and getting to the point where then they start constructing it.
    • 00:58:53
      So will we see the road design ever or not?
    • Margaret MaliszewskiPlanning Manager
    • 00:58:58
      We don't typically bring road plans to you for review, but there should be, I would expect a site plan with more detail related to the road on it to come to you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:59:12
      Thank you.
    • 00:59:12
      Dade, do you have any questions, additional questions for the applicant?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:59:17
      And not really, I guess just out of curiosity, assuming that we would review the building, even though it is quite distant, is there an anticipated timeframe for when that would happen, or will we not?
    • Margaret MaliszewskiPlanning Manager
    • 00:59:28
      A timeframe for reviewing the building?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:59:30
      Yes, yeah.
    • Margaret MaliszewskiPlanning Manager
    • 00:59:31
      Actually, that image is, today is the first time I've seen that, so I don't know when, I have no idea, maybe Blake knows when architecture would be coming from review?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:59:44
      Haven't they just yet?
    • Blake AbplanalpChief of Project Management
    • 00:59:46
      I think a lot will happen that design charrette that I was talking about that is next week, I think will shed a lot of light.
    • 00:59:55
      They're bringing, they're just completing a front end study and they're bringing a lot of information specifically for utilities, but they'll also, we're going to have a kind of a schedule sync at that time as well as part of that meeting.
    • 01:00:10
      So, you know, within,
    • 01:00:12
      Nine days, we should have a lot better understanding of the schedule associated with our construction.
    • 01:00:20
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:00:21
      Thank you.
    • 01:00:23
      Tara, any additional questions?
    • 01:00:24
      No, thank you.
    • 01:00:26
      Thank you.
    • 01:00:26
      I don't have any additional questions.
    • 01:00:28
      Thanks.
    • 01:00:30
      Are there any members of the public that would like to comment?
    • Frank StonerMember, Architectural Review Board
    • 01:00:36
      Yes, sir.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:00:36
      No?
    • 01:00:38
      All right, ARB will now go into discussion, starting with Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 01:00:46
      Yeah, I don't have much to say.
    • 01:00:47
      I mean, it's a very exciting project for the county and for all of us.
    • 01:00:54
      So I mean, I guess we don't know where the building's going to end up.
    • 01:00:58
      We don't know whether it's going to be visible or further review.
    • 01:01:03
      But I don't have any problem with what's proposed.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:01:07
      Thank you.
    • 01:01:08
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:01:10
      Similar comments, just exciting to see this development for the county in its development zone supporting its financial growth and consistent with its character.
    • Taro MatsunoMember, Architectural Review Board
    • 01:01:21
      Thank you.
    • 01:01:21
      Tara?
    • 01:01:23
      Yes, same here.
    • 01:01:25
      I think it's encouraging to see the way that they are considering the impacts to the land.
    • 01:01:32
      I think the points around the trees to remain along the entrance corridor is still pretty substantial.
    • 01:01:44
      And my sense is that once architecture and other construction work proceeds, that
    • 01:01:52
      We'll have the opportunity to review it and that they'll be able to find a way to make the project work that's consistent with the guidelines and attractive and expresses that this is a cool project for the county.
    • 01:02:06
      So I have no problem, no questions.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:02:09
      Thank you.
    • 01:02:10
      I don't have any additional questions, just once again thank you.
    • 01:02:14
      It's good to know what's going on and that was a pretty comprehensive update, so thanks for coming to the meeting today.
    • 01:02:23
      Let's see, do we have a recommended motion to review?
    • Margaret MaliszewskiPlanning Manager
    • 01:02:27
      Yes, I will bring that up.
    • 01:02:42
      The recommendation is to recommend approval of the initial plan as it's presented and this is the standard recommendations for an initial site plan from the ARB.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:02:59
      Thank you.
    • 01:03:00
      Any edits or questions or anything for staff?
    • Taro MatsunoMember, Architectural Review Board
    • 01:03:06
      Do we have a motion?
    • 01:03:10
      Make a motion to forward the recommendations outlined in the staff report to the agent for the site review committee with no modifications.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:03:18
      12 seconds.
    • 01:03:21
      Thanks.
    • 01:03:21
      Can we call the vote?
    • SPEAKER_03
    • 01:03:23
      Yes.
    • 01:03:23
      Mr. Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:03:25
      Aye.
    • SPEAKER_03
    • 01:03:26
      Mr. Stoner?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:03:27
      Aye.
    • SPEAKER_03
    • 01:03:27
      Mr. Matsuno?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:03:29
      Aye.
    • SPEAKER_03
    • 01:03:29
      Mr. Van Der Werf?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:03:30
      Aye.
    • SPEAKER_03
    • 01:03:30
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:03:32
      Thank you.
    • 01:03:32
      Thanks.
    • 01:03:37
      All right.
    • 01:03:41
      Moving on to work session items.
    • 01:03:45
      There's one work session item today.
    • 01:03:47
      It is rooftop solar criteria for a new category of countywide certificate of appropriateness.
    • 01:03:54
      Margaret, do you have a presentation?
    • Margaret MaliszewskiPlanning Manager
    • 01:03:55
      Yes.
    • 01:03:57
      I guess this is a work session to consider draft guidelines for rooftop solar installations in the entrance corridors.
    • 01:04:03
      As you may remember, in September of last year, the ARB reviewed and approved three applications for rooftop solar installations.
    • 01:04:13
      At that meeting, the ARB expressed interest in developing design criteria by which future applications of this type could be reviewed and approved by staff.
    • 01:04:21
      The way to do that is through the countywide certificate of appropriateness process and adding a new category of countywide certificate.
    • 01:04:29
      A resolution of intent to amend the County Code to add that category was adopted by the Board of Supervisors in December of last year.
    • 01:04:39
      Also at the September ARB meeting, there was a question about which other Virginia localities had entrance quarters and solar guidelines.
    • 01:04:46
      So after that meeting, we did some additional research.
    • 01:04:48
      That research was presented in attachment two to the staff report.
    • 01:04:52
      And that research showed that there's a lot of repetitions in the standards from one community to the next.
    • 01:05:00
      And it showed that more communities had historic districts than corridor overlays.
    • 01:05:05
      and it showed a tendency toward stricter guidelines in the historic districts.
    • 01:05:13
      Using that research and the discussion from the September meeting, we've assembled some draft guidelines for your review.
    • 01:05:18
      We've divided the guidelines into three categories.
    • 01:05:21
      That'll be general goals, criteria for buildings with pitched roofs, and criteria for buildings with flat roofs.
    • 01:05:29
      My plan was to run through each of those categories, and then we can go back through them again and discuss each of the criteria in detail.
    • 01:05:37
      Does that sound workable for you?
    • 01:05:40
      Good?
    • 01:05:40
      Okay.
    • 01:05:41
      Great.
    • 01:05:43
      So we have two general goals drafted.
    • 01:05:45
      One is, to the greatest extent possible, choose locations, mounting options, and design features that will minimize visibility of the facility from the entrance corridor.
    • 01:05:54
      And two, panels and related items must not interfere with existing elements that contribute to the architectural composition style or character of the building.
    • 01:06:05
      We have eight draft criteria for installations on pitched roofs.
    • 01:06:11
      First guideline is that panels should be mounted in an organized pattern that avoids multiple roofs, disjointed arrangements, and stair stepping.
    • 01:06:20
      These three images were chosen to try to illustrate each of those conditions.
    • 01:06:24
      We'll point out that as written, this would mean that there are probably some roofs that would not be able to accommodate solar panels.
    • 01:06:32
      So if that's a concern, we might consider adding it to the greatest extent possible to that criteria, although that makes the review a little fuzzier.
    • 01:06:42
      Guidelines two through six for pitched roofs regulate the placement and general appearance of the solar panels.
    • 01:06:50
      Number two says panels should be located parallel to and set back a minimum of 12 inches from the ridge, eaves, and edges of the roof.
    • 01:06:58
      Three says that panels should be mounted parallel to the surface of the roof.
    • 01:07:03
      Four, panels should have a consistent size and color.
    • 01:07:06
      Five, panels should be mounted flush to the surface of the roof.
    • 01:07:11
      or mounted such that there's no more than six inches from the surface of the roof to the panel and six says that the panels should be fixed and non-movable.
    • 01:07:26
      Criteria seven and eight are about panel related equipment.
    • 01:07:30
      Seven says that conduit hardware and related equipment should be located interior to the building or on walls that are not visible from the entrance corridor whenever possible.
    • 01:07:41
      And if that's not possible, then matte finishes and colors consistent with the color of the surface to which the equipment is attached is what we'd be looking for.
    • 01:07:50
      Eight says panels, frames, and attached hardware should be in a consistent color and coordinated with the building whenever possible.
    • 01:08:01
      We have four draft criteria for flat roofs.
    • 01:08:05
      The first one says that any configuration at any angle is okay if the facility is entirely below the top of the parapet.
    • 01:08:14
      This could be further limited if there's concern about views from above looking down onto a roof, in which case the words as viewed from the entrance quarter street could be added.
    • 01:08:26
      Guideline two for flat roofs says that panels must be arranged in an organized pattern aligned with the edges of the roof if the facility is not entirely below the parapet.
    • 01:08:35
      With these images, you can see that it does allow for a lot of visibility of the panels.
    • 01:08:42
      Guideline three says that the mounting design must be unobtrusive or must be an element that complements the building.
    • 01:08:48
      That language is a bit general, but I think the images do help show the intent.
    • 01:08:55
      and Guideline 4 for flat roofs is similar to 7 for pitched roofs.
    • 01:09:00
      That panel related equipment should be located interior of the building or on walls not visible from the street whenever possible.
    • 01:09:06
      When that's not possible, the equipment should have a matte finish and colors consistent with the color of the surface to which the equipment is attached.
    • 01:09:17
      So now just gonna go back through and we'll stop for each one or each group for discussion.
    • 01:09:25
      So starting with pitched roofs and the first guideline is the one that says that the panel should be mounted in an organized pattern that avoids multiple roofs, disjointed arrangements and stair stepping.
    • Frank StonerMember, Architectural Review Board
    • 01:09:38
      Does this only apply if it's visible from the corridor?
    • Margaret MaliszewskiPlanning Manager
    • 01:09:44
      Yes.
    • Frank StonerMember, Architectural Review Board
    • 01:09:46
      So if this is the back of somebody's house, we're not...
    • Margaret MaliszewskiPlanning Manager
    • 01:09:51
      Right.
    • 01:09:51
      It's just like any other development in the entrance quarters.
    • 01:09:56
      We're only reviewing what we expect will be visible from the entrance quarter street.
    • 01:10:02
      The thing about it being on somebody's house, maybe attached townhouses, but you wouldn't be reviewing installations on single-family detached houses for the most part.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:10:19
      Thank you, Margaret.
    • 01:10:20
      I was trying to recall our broad guidelines, our purposes, what to create an orderly and coordinated appearance or something.
    • 01:10:28
      I wondered whether those words might be useful here in terms of like the proposed mounting and incorporation should be orderly and coordinated.
    • 01:10:42
      Just in case there are other ways that it might be disorganized that we aren't naming it.
    • Margaret MaliszewskiPlanning Manager
    • 01:10:46
      Right.
    • 01:10:47
      OK. That's great.
    • 01:10:48
      And what we can do, whatever suggestions you have or edits you want, I'm going to try to take really good notes.
    • 01:10:53
      And we can come back with revisions at the next meeting to review that, if that suits.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:11:02
      And first of all, thank you for the proposal.
    • 01:11:05
      That's great.
    • 01:11:05
      Sure.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:11:09
      Any other comments on this one?
    • 01:11:12
      add to the greatest extent possible?
    • 01:11:14
      I mean, part of me is, like, if this is countywide, you know, we wouldn't add that.
    • 01:11:23
      You could say just do A, B, and C, and we don't need to review it.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:11:30
      I think I agree with you, Frank, yeah.
    • 01:11:31
      If it wasn't to the greatest extent possible, or if there were a question on staff's part, it would need to come to us.
    • Frank StonerMember, Architectural Review Board
    • 01:11:39
      Okay, I guess the multiple roof question, if in this example, picture on the top was infected two separate rooms here, it looks like it's one extended, but if it were two, and if the panels were oriented in an organized fashion on each of the two roofs, would we have an issue with that?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:12:12
      Probably not.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:12:13
      Yeah, that's a good question.
    • 01:12:15
      I don't think so.
    • 01:12:16
      I don't know if the intent of multiple routes was maybe multiple planes or approaches, but yeah.
    • 01:12:22
      But if it were.
    • Frank StonerMember, Architectural Review Board
    • 01:12:28
      Maybe we don't include.
    • Taro MatsunoMember, Architectural Review Board
    • 01:12:31
      Multiple routes?
    • Frank StonerMember, Architectural Review Board
    • 01:12:32
      Yeah, the multiple routes.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:12:37
      OK. Yeah, I'm OK with that.
    • 01:12:41
      I mean, if you think of the school examples, that might have been more than one roof.
    • 01:12:46
      Like the new school building.
    • Taro MatsunoMember, Architectural Review Board
    • 01:12:50
      Yeah, I guess it's not pitched, but I think that's the thing I'm trying to think of.
    • 01:12:56
      Big pitched roof examples.
    • 01:12:58
      Yeah.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:12:58
      I feel like, too, the retrofits are going to be harder.
    • 01:13:08
      The new construction is going to be a lot easier.
    • 01:13:15
      or A.R.B.
    • 01:13:16
      Friendly, probably.
    • Margaret MaliszewskiPlanning Manager
    • 01:13:23
      Any more comments on this one?
    • 01:13:25
      Can we move on?
    • Frank StonerMember, Architectural Review Board
    • 01:13:28
      Move on.
    • Margaret MaliszewskiPlanning Manager
    • 01:13:30
      OK.
    • 01:13:34
      So these are the guidelines that relate to placement and general appearance.
    • 01:13:40
      The one question that I asked here is are the 12 inch and 6 inch limits reasonable?
    • 01:13:54
      That those dimensions are what seem to be most typical in the examples that we researched.
    • Frank StonerMember, Architectural Review Board
    • 01:14:03
      Seems reasonable to me.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:14:06
      I think the 12 inch,
    • 01:14:09
      The extension question is, is there going to be a new technology or something that comes along that panel is more efficient?
    • 01:14:18
      I mean, if we say they're non-movable.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:14:24
      I know somebody for a new building purposely designed it so the roof matched the size of the array and the array was all that was really seen.
    • 01:14:40
      You know, I mean, personally, I have no objection to the array being the entire roof plane, right?
    • 01:14:45
      For example, that was visible.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:14:48
      You're saying like the panels are the roof essentially?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:14:52
      Yeah, yeah.
    • 01:14:54
      But I guess that could be something that could be an exception that staff could bring to us.
    • 01:15:00
      Generally, it seems like having some setback probably, especially if it's applied to an existing roof.
    • 01:15:11
      is worthwhile.
    • Taro MatsunoMember, Architectural Review Board
    • 01:15:15
      What does it mean, um, barrels mounted, panels mounted parallel to the surface of the roof?
    • Frank StonerMember, Architectural Review Board
    • 01:15:22
      Not like, not that.
    • Taro MatsunoMember, Architectural Review Board
    • 01:15:25
      Like the long direction of the panels is in the long direction of the roof?
    • Frank StonerMember, Architectural Review Board
    • 01:15:30
      No, it does mean you're not going to tilt the panels.
    • Taro MatsunoMember, Architectural Review Board
    • 01:15:33
      Okay, they'll be, they'll all be on, I see.
    • Frank StonerMember, Architectural Review Board
    • 01:15:36
      They'll all be flat on the roof.
    • Taro MatsunoMember, Architectural Review Board
    • 01:15:38
      Okay.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:15:49
      Are we good with the 12-inch and 6-inch limits?
    • 01:15:53
      Do we want to keep those?
    • Frank StonerMember, Architectural Review Board
    • 01:15:56
      Maybe you could go just six from the top and six from the... What's the thinking between 12 at the ridge?
    • Margaret MaliszewskiPlanning Manager
    • 01:16:09
      I think looking at some of the examples that, like the top image here where the
    • Frank HancockVice Chair, Architectural Review Board
    • 01:16:17
      where the panels extend to the edge, it just doesn't have as... Kind of makes the architecture ill eligible, ill legible.
    • Margaret MaliszewskiPlanning Manager
    • 01:16:29
      Yeah.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:16:30
      Ill eligible.
    • 01:16:31
      Ineligible.
    • 01:16:32
      Makes it ineligible.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:16:35
      You can't read the roof line.
    • 01:16:37
      You can't, you know, it's panels affixed to a roof.
    • 01:16:41
      The roof is still the architectural element.
    • Margaret MaliszewskiPlanning Manager
    • 01:16:46
      Yeah, and I think six inches might be too little to make it.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:16:53
      Yeah, I guess if it's set back 12 inches and projects six that it's, you know, one to two sort of setback, that seems reasonable.
    • Taro MatsunoMember, Architectural Review Board
    • 01:17:01
      I think 12 inches is good.
    • 01:17:07
      I'm just, I don't feel knowledgeable enough about the installation.
    • 01:17:15
      possibilities to feel that strongly about six inches.
    • 01:17:23
      I mean, if you get more performance.
    • 01:17:25
      It's like eight or something.
    • Frank StonerMember, Architectural Review Board
    • 01:17:26
      I just pew from putting a whole row because you're now approaching into that 12 inches.
    • 01:17:35
      Yeah, you'd have to weigh 6' 12'' thing against having to put more panels somewhere else or.
    • Margaret MaliszewskiPlanning Manager
    • 01:17:44
      Then just to be clear that the six inches is how much space there can be between the panel and the surface of the roof so that you don't have a roof and then the panel is a foot or two above it.
    • 01:17:59
      It's not floating.
    • Taro MatsunoMember, Architectural Review Board
    • 01:18:00
      I just don't feel comfortable enough about the mounting technologies and I don't know that it makes as much of a visual difference to me.
    • 01:18:06
      So I'm kind of inclined to not have a six inch limit.
    • Frank StonerMember, Architectural Review Board
    • 01:18:13
      That's six inches off the surface, you mean?
    • Taro MatsunoMember, Architectural Review Board
    • 01:18:14
      Yeah, like I just don't know what part of the panel are you measuring to and all those kinds of...
    • Frank HancockVice Chair, Architectural Review Board
    • 01:18:23
      I guess if it keeps, you know, if it's an angled panel, it's going to keep that angle pretty low to the roof.
    • 01:18:32
      but then I guess if you thought of it as the whole thing was like up off the roof keeps us from having something that's like way off the roof like all four points or whatever it's connected are the same yeah be awkward yeah
    • Taro MatsunoMember, Architectural Review Board
    • 01:18:48
      I mean, I could see something like eight, 16 inches or 18 inches.
    • 01:18:54
      Like I just I just thought that I could see that being like, oh, yeah, that seems pretty far.
    • 01:18:58
      But there's just something about like it's just not that much margin for somebody to be designing with.
    • Margaret MaliszewskiPlanning Manager
    • 01:19:05
      Yeah, I think that the the application that you approved for the installation on Avon Street would meet that criteria.
    • 01:19:15
      And we can double check that.
    • 01:19:16
      I could see what other information I can find on that.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:19:18
      And you said that from your research a lot of these guidelines or dimensions were coming from your research.
    • 01:19:28
      I guess if it's an issue or they need to be more than six inches it's not a countywide opportunity or application and it comes to us and we review it.
    • 01:19:38
      Some of this will be trial and error of like how effective is the countywide if everything has to come to us.
    • Margaret MaliszewskiPlanning Manager
    • 01:19:46
      Then we'd want to broaden the criteria probably.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:19:49
      So it's a choice between including item two or item three?
    • 01:19:57
      I'm just trying to understand the difference between item two and item three.
    • 01:20:04
      They both talk about parallel one as a setback.
    • Margaret MaliszewskiPlanning Manager
    • 01:20:08
      So if you look at the top image, so
    • 01:20:15
      This line is parallel to the ridge.
    • 01:20:20
      If you installed them so that it came down this way, it wouldn't be parallel, right?
    • 01:20:27
      Three is talking about the panel is at the same angle.
    • 01:20:33
      It's sloping at the same angle as the roof is.
    • 01:20:42
      So one is talking about setting it back from
    • 01:20:45
      Ridge, and sending it back from the sides and from here.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:20:48
      I totally get it.
    • 01:20:49
      I just, they both mentioned located parallel to the plan of the roof, it wasn't.
    • Margaret MaliszewskiPlanning Manager
    • 01:20:56
      So the two was talking about parallel to the ridge, and three is talking about parallel to the actual surface.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:21:03
      I lost surface, okay.
    • 01:21:04
      So, thank you.
    • 01:21:07
      Parallel to edges, okay.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:21:09
      Got it.
    • 01:21:13
      We're good.
    • 01:21:14
      Move on?
    • 01:21:14
      Yeah, I think we should, but yeah.
    • 01:21:16
      Thanks.
    • Margaret MaliszewskiPlanning Manager
    • 01:21:18
      Okay, then seven and eight, again, still for the pitched roofs.
    • 01:21:23
      This is about the panel-related equipment.
    • 01:21:25
      Seven is all that equipment should be located interior to the building or on walls not visible whenever possible.
    • 01:21:32
      And if that's not possible, then matte finishes and colors should be used, consistent with the colors of the building.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:21:41
      It seems like that offers enough options that whenever possible is not necessary.
    • Margaret MaliszewskiPlanning Manager
    • 01:21:59
      And eight is saying that the equipment should have a consistent color coordinated with the building.
    • 01:22:04
      Again, it says whenever possible.
    • 01:22:05
      I think there's a very limited
    • 01:22:11
      Limited color choices for panels and frames at this point in time.
    • Taro MatsunoMember, Architectural Review Board
    • 01:22:21
      That seems acceptable to me too.
    • Frank StonerMember, Architectural Review Board
    • 01:22:24
      I guess with the panel language in the prior slide applied to the frames, for example, shown in this site where the panels might be 12 inches from the edge of the roof, but the frame itself extends over the roof as you see in the next picture.
    • 01:22:43
      Yeah.
    • 01:22:49
      I don't know whether additional language is required addressing the frame.
    • Margaret MaliszewskiPlanning Manager
    • 01:23:00
      Okay.
    • Frank StonerMember, Architectural Review Board
    • 01:23:03
      About as bad as it gets.
    • Margaret MaliszewskiPlanning Manager
    • 01:23:10
      Anything else on 7 or 8?
    • 01:23:13
      Then we're on to flat roofs.
    • 01:23:18
      The first guideline here is that any configuration of panels is okay if the facility is entirely below the top of the parapet.
    • 01:23:32
      The question is
    • 01:23:35
      If you end up with a vantage point where you're looking down onto the roof, is it still okay for any configuration?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:23:44
      Yeah, I think it's a good point.
    • 01:23:48
      I wonder if maybe instead of below the top of the parapet, we would just say it isn't any configuration is acceptable if it's not visible from the EC?
    • 01:23:59
      Okay.
    • 01:24:00
      Yeah.
    • Margaret MaliszewskiPlanning Manager
    • 01:24:08
      Anything else on that one?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:24:11
      No.
    • Margaret MaliszewskiPlanning Manager
    • 01:24:13
      Okay.
    • 01:24:14
      Guideline 2 says that panels must be arranged in an organized pattern, again, aligned with the edges of the roof if the facility is not entirely below the parapet.
    • Taro MatsunoMember, Architectural Review Board
    • 01:24:27
      For me, I don't know if I have such a big issue, and maybe this is just me thinking of larger buildings, but
    • 01:24:34
      I'm not sure if I have a strong opinion about whether it should be like the grid should be aligned to the roof shape as long as it's organized.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:24:47
      I think I wonder whether
    • 01:24:50
      These step outside of the countywide, because I think a lot of them may just be quite subjective.
    • 01:24:56
      Like, I mean, the Colonial Auto Array ultimately is an architectural feature that is reasonably coordinated and compatible.
    • 01:25:04
      I can imagine that there might be versions of that that wouldn't be.
    • 01:25:08
      I don't know.
    • 01:25:09
      And it might be tough to ask staff to be the arbiter of that.
    • 01:25:17
      but I don't know, but alternatively with folks, I guess I could imagine saying it must have a coordinated and orderly appearance that is consistent with the architecture of the building, but I don't know that that's easy to do as a countywide, but I don't know, but just asking.
    • Frank StonerMember, Architectural Review Board
    • 01:25:48
      How do frame mounted solar panels over parking spaces fit into this?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:26:01
      That's a good question.
    • Margaret MaliszewskiPlanning Manager
    • 01:26:04
      It is a good question.
    • 01:26:06
      I hadn't thought about those.
    • 01:26:12
      The only one I can think of
    • 01:26:16
      There's one at the residential development that's right next to Dardentau Park.
    • Frank StonerMember, Architectural Review Board
    • 01:26:23
      Yeah, Stony Point, the condo project.
    • Margaret MaliszewskiPlanning Manager
    • 01:26:29
      I think those tend to be the whole roof structure is the panels.
    • 01:26:37
      It's not really like you've got panels on top of a roof, I think.
    • 01:26:40
      I haven't seen that many of them.
    • 01:26:43
      So it feels like it's a little bit different.
    • Taro MatsunoMember, Architectural Review Board
    • 01:26:58
      Can I ask a broader question about the solar?
    • 01:27:01
      I think this makes sense in terms of a renovation or a new array that's being installed on an existing building.
    • 01:27:10
      But in my experience with the solar arrays, if I were to go forward with a new building, you might know that solar would be
    • 01:27:23
      You know, part of the project at some point in the future would be designing with the intent that solar goes on the roof.
    • 01:27:29
      But often at that stage of the project, it's difficult to say what the array is actually going to look like, because mechanical, electrical, and plumbing have not been super clearly laid out on the roof.
    • 01:27:45
      And the solar is generally done by somebody who's not part of the design team at that stage anyway.
    • 01:27:52
      And so I think you can do general sense of how many panels can you fit on there, but in terms of actually committing to something that is actually going to be constructed, it doesn't really happen until a few months before construction, that the solar contractor actually gets on board and they actually have a layout that you can look at.
    • 01:28:18
      There's a process and a typical building practice scope gap in terms of who is going before the ARB and what assurances are they able to do.
    • 01:28:32
      that far away from construction.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:28:34
      In many cases, the array might end up going for the county-wide certificate after the structure is otherwise permitted.
    • Margaret MaliszewskiPlanning Manager
    • 01:28:41
      Yeah, I think essentially that means most everything will end up being a retrofit just based on either the building was already existing or the construction may not be done, but the approval precedes the new design.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:28:56
      Good point, Star.
    • 01:28:57
      The other thing that happens is the manufacturers discontinue something where a new panel comes out and everybody changes that.
    • Margaret MaliszewskiPlanning Manager
    • 01:29:07
      One thing we could keep in mind is buildings are coming through, particularly the ones with flat roofs is just
    • 01:29:16
      You can think about what it might be, you know, it might just a parapet height.
    • 01:29:23
      Thinking about that a little bit more in terms of the if there's a solar installation to come.
    • Frank StonerMember, Architectural Review Board
    • 01:29:28
      I assume this would not apply to solar shingles, for example, Tesla shingles.
    • Margaret MaliszewskiPlanning Manager
    • 01:29:40
      That was not part of my research.
    • 01:29:41
      I'm not really I haven't really looked into that.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:29:45
      I mean, wouldn't that just be a building material?
    • Taro MatsunoMember, Architectural Review Board
    • 01:29:58
      So the level of visit, the question, the level of visibility in rooftop solar installations, are you asking kind of what's on screen right here?
    • Margaret MaliszewskiPlanning Manager
    • 01:30:19
      I realize these are all looking down onto the building.
    • 01:30:23
      That's not always the case, but just... Yeah.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:30:31
      I mean, certainly support the goal of streamlining the application and deployment of this.
    • 01:30:37
      I think for the county-wide approval, it seems like
    • 01:30:44
      The arrays that are either not visible or can comply with sort of prescriptive guidelines of how they relate to a roof plane makes sense to me.
    • 01:30:53
      It seems difficult once it becomes more open to leave it as a county wide.
    • 01:30:58
      I don't know whether others agree.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:31:02
      Yeah, that makes sense to me.
    • Margaret MaliszewskiPlanning Manager
    • 01:31:06
      OK. Can work on some alternate language there.
    • 01:31:16
      Any other comments on this one?
    • 01:31:22
      Okay, guideline three for flat roofs says that mounting design must be unobtrusive or must be an element that complements the building.
    • 01:31:32
      I think that top image is sort of an example of also
    • 01:31:42
      more than six inches from the roof.
    • 01:31:46
      That's sort of a big example of that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:31:50
      I guess they were trying to let the light continue to fall onto their skylights and get the array high enough that the neighboring properties didn't shade it.
    • Khris TaggartSenior Planner
    • 01:32:10
      I don't know.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:32:24
      Yeah, maybe shading.
    • 01:32:25
      Yeah, I don't know.
    • 01:32:27
      OK.
    • 01:32:27
      I think that makes sense.
    • SPEAKER_03
    • 01:32:32
      OK.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:32:32
      I don't have any objections to that.
    • Taro MatsunoMember, Architectural Review Board
    • 01:32:35
      Yeah, it's hard for me to say what would be better, how you would write it better, it seems.
    • 01:32:41
      OK.
    • 01:32:42
      I get what you mean.
    • Margaret MaliszewskiPlanning Manager
    • 01:32:43
      Yeah.
    • 01:32:43
      OK. And the next one, this is the one that's also similar to the pitched roof one.
    • 01:32:54
      equipment should be located interior or in walls not visible whenever possible and if that's not possible the colors should be consistent with the surface to which the equipment is attached.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:33:12
      I was just going to see do we strike the second sentence like if there's
    • 01:33:25
      Conduit going somewhere that we would need to see it.
    • 01:33:30
      That's visible.
    • 01:33:35
      Or is this minor?
    • Margaret MaliszewskiPlanning Manager
    • 01:33:37
      I'm just thinking about the example on Avon Street from last year.
    • 01:33:43
      There was a conduit that was coming down the wall on the outside, and it was the wall facing the street.
    • 01:33:53
      And it didn't seem to make sense to, it didn't seem practical to put it anywhere else.
    • 01:34:03
      So having it painted to match the wall
    • Frank HancockVice Chair, Architectural Review Board
    • 01:34:07
      Okay.
    • Margaret MaliszewskiPlanning Manager
    • 01:34:08
      Reasonable.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:34:10
      Makes sense.
    • Margaret MaliszewskiPlanning Manager
    • 01:34:11
      Okay.
    • 01:34:15
      Right and then the two goals and these would just be just trying to get the concept down what we're aiming for to the greatest extent possible locations mounting options and design features should try to minimize visibility from the entrance corridor and panels and related items shouldn't interfere with any existing elements that really contribute to the architectural character of the building.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:34:44
      Sounds good to me.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:34:44
      Yep, and I wasn't sure if for item two, whether we need the word existing or... On level, on number two.
    • Taro MatsunoMember, Architectural Review Board
    • 01:34:55
      On number two.
    • Margaret MaliszewskiPlanning Manager
    • 01:34:59
      Okay.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:35:00
      Yeah, just get rid of existing.
    • 01:35:02
      Yeah.
    • Margaret MaliszewskiPlanning Manager
    • 01:35:04
      All right, very good.
    • 01:35:07
      We will then work on incorporating these changes into a round of revisions and we will bring them to you for review hopefully next time.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:35:18
      Thank you.
    • 01:35:19
      Thank you, Margaret.
    • 01:35:19
      Do we need to have our public comment or are there anybody online?
    • 01:35:29
      Great.
    • 01:35:30
      Any other questions for staff on this?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:35:33
      No.
    • 01:35:34
      Thank you for the research and effort.
    • 01:35:37
      Yeah.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:35:37
      Yeah.
    • 01:35:37
      Thank you, Margaret.
    • 01:35:39
      No motion or action.
    • 01:35:40
      We'll look for it coming back.
    • 01:35:43
      OK.
    • 01:35:44
      Well, that takes us to other business.
    • 01:35:48
      Approval of the January 5th meeting minutes.
    • 01:35:52
      Do we have a motion to adopt the January 5th, 2026 minutes?
    • Frank StonerMember, Architectural Review Board
    • 01:35:56
      So moved.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:35:58
      Second.
    • 01:35:59
      Whatever.
    • SPEAKER_03
    • 01:36:01
      Just pick one.
    • 01:36:02
      Yep, pick one.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:36:04
      All right.
    • 01:36:05
      Do we, or can we call the vote?
    • SPEAKER_03
    • 01:36:08
      Yes.
    • 01:36:08
      Mr.
    • 01:36:10
      Hancock, Mr. Stoner, Mr. Matsuno, Mr. Van Der Werf.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:36:19
      Thank you.
    • 01:36:21
      Other items, any board members or staff have any other items?
    • 01:36:26
      No.
    • 01:36:32
      The next meeting, so we don't have a meeting on January 26th, correct?
    • 01:36:39
      Then the next possible ARB meeting is Monday, February 2nd.
    • Margaret MaliszewskiPlanning Manager
    • 01:36:43
      Yeah, I'd like to leave that open.
    • 01:36:44
      Our applicant for the Crozet Fastmark project is trying to get some revisions back to you, and we're just not sure if we can meet that deadline.
    • 01:36:55
      So we'd like to leave that open for a bit, if possible.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:36:58
      OK. Do board members know if they will be able to attend if that happens?
    • Frank StonerMember, Architectural Review Board
    • 01:37:05
      Currently, we'll be here.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:37:06
      Perfect.
    • 01:37:07
      I'll plan to attend.
    • Frank StonerMember, Architectural Review Board
    • 01:37:08
      Thank you.
    • 01:37:08
      As well.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:37:10
      All right, the meeting is adjourned to the next meeting on Monday, February 2nd, 2026.
    • 01:37:16
      The time is 2 37.