Architectural Review Board Meeting   7/7/2025

Attachments
  • Agenda.pdf
  • Final Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB2025-13 Hyatt Studios Final Site Plan Staff Report.pdf
  • Attach. 1 ARB2025-13 Hyatt Studios Final Site Plan.pdf
  • Attach. 2 ARB2025-13 Hyatt Studios ARB Submission Package.pdf
  • Wooded Buffers Work Session Memo.pdf
  • Draft ARB Action Memo Minutes 05_19_2025.pdf
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:00
      All right.
    • 00:00:06
      It's 102 by my watch.
    • 00:00:10
      I'm calling the April 7th, 2025 meeting of the, wait, it's not April 7th.
    • 00:00:16
      It's July 7th, actually.
    • 00:00:21
      Meeting of the Albemarle County Architecture Review Board to order.
    • 00:00:25
      If you could call the roll, please.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:31
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:34
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:35
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:36
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:37
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:38
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:38
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:39
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:40
      Mr. Stoner is absent.
    • 00:00:41
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:42
      Alright, thanks.
    • 00:00:44
      Today's meeting is a hybrid meeting.
    • 00:00:46
      The public may access and participate in the meeting electronically.
    • 00:00:50
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:00:56
      The public has real-time audiovisual access to this meeting over Zoom and real-time audio access over telephone, both as provided in the lawfully posted meeting notice.
    • 00:01:06
      This meeting is being recorded and will be made available on the county's website.
    • 00:01:10
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:17
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:01:22
      Applicants who are making presentations note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:30
      Staff will let us know when the 15 minutes are up.
    • 00:01:33
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:01:42
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:01:48
      Do any A or B members have anything to disclose?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:01:52
      No.
    • 00:01:53
      No.
    • 00:01:54
      No.
    • 00:01:54
      All right.
    • 00:01:55
      Great.
    • 00:01:55
      Me either.
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:57
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • Neil WilliamsonPresident and Executive Director
    • 00:02:07
      Good afternoon.
    • 00:02:08
      Neil Williamson with the Free Enterprise Forum, a privately funded public policy organization focused on central Virginia's local governments.
    • 00:02:16
      Today, you're going to be discussing what it buffers.
    • 00:02:20
      There are two points in the wooded buffers discussion that we find interesting and would appreciate your conversation on.
    • 00:02:28
      The first is the understanding that the development area is less than 5% of the landmass of Albemarle County.
    • 00:02:37
      And any wooded buffer that's required, any wooden buffer that's required takes up space that is not available for housing or commercial uses.
    • 00:02:47
      That being said, it's a balancing act.
    • 00:02:50
      As you all well know the challenges of placing stormwater retention areas and the inability to plant wooded buffers within those stormwater detention areas per county code, it is a balancing act that I hope you will consider.
    • 00:03:06
      The second point is one that doesn't come up that often, but it does come up, is the VDOT trees.
    • 00:03:16
      You're often asked by some to ignore the fact that trees exist in the VDOT right-of-way because, well, the applicant doesn't control the right-of-way.
    • 00:03:27
      There is logic to that.
    • 00:03:29
      There's also logic to say, hey, there's a tree.
    • 00:03:34
      And it is serving a buffer function.
    • 00:03:37
      So considering the first, it might be advantageous to at least provide some level of discount for those VDOT-owned trees in the buffer.
    • 00:03:48
      They could go away, I understand.
    • 00:03:51
      One thing I've learned during this 23 years, VDOT and mostly the county doesn't do anything quickly.
    • 00:03:56
      So I think your tenure is probably fairly secure that 64 won't be widened in the next 20 years.
    • 00:04:05
      But that being said, I look forward to your conversation.
    • 00:04:09
      Thank you for the opportunity to speak.
    • Chris HenningsenChair, Architectural Review Board
    • 00:04:10
      All right.
    • 00:04:11
      Thank you.
    • 00:04:14
      Are there any other members of the public that want to make a comment about a project not on the agenda?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:04:19
      No, sir.
    • Chris HenningsenChair, Architectural Review Board
    • 00:04:20
      All right.
    • 00:04:21
      Great.
    • 00:04:22
      We do not have any consent agenda items today.
    • 00:04:25
      We have one regular review item today, which is ARB 2025-13 Hyatt Studios final site plan.
    • Khris TaggartSenior Planner
    • 00:04:38
      Chris?
    • 00:04:39
      Yes.
    • 00:04:39
      Good afternoon.
    • 00:04:40
      The application review today is a final site plan and architectural design for a four-story hotel.
    • 00:04:55
      Start from the top.
    • 00:04:56
      Application under review today is for a final site plan architectural design of a four-story hotel, which includes surface parking and related site improvements.
    • 00:05:06
      Subject properties are located on the south side of Route 250, west of the Hanson Road Route 250 intersection.
    • 00:05:13
      Site plan has undergone several reviews by the ARB, which most recently provided comments on an initial site plan and preliminary architecture in September of last year.
    • 00:05:25
      Architectural design remains mostly unchanged, except for the elevation facing the entrance corridor, which now features a brick stair tower instead of hearty siding.
    • 00:05:34
      Additionally, a second bay of windows and a ground-level canopy have been added, along with double storefront doors replacing the utilitarian door.
    • 00:05:43
      These changes help mitigate the elevation's back-of-building appearance and reduce its mass.
    • 00:05:51
      Regarding site landscaping, the interior parking lot trees remain too close together for optimal tree health.
    • 00:05:57
      Trees are shown over a sidewalk, an existing stormwater pipe, and no landscaping is provided at the base of the lower retaining wall along the western perimeter of the site.
    • 00:06:08
      Staff recommends revising the landscape plan to provide sufficient spacing for the interior parking trees, eliminate tree and utility conflicts, and provide plantings at the base of the north and south ends of the retaining wall along the resting property line.
    • 00:06:24
      Staff recommends approval of the final site plan with the revisions listed in the staff report.
    • 00:06:29
      I'd be happy to try to answer any questions.
    • 00:06:32
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:06:33
      All right.
    • 00:06:34
      Thanks for the presentation, Chris.
    • 00:06:36
      I guess we'll start with Dade if you have any questions.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:06:40
      Thank you for your report, Chris.
    • 00:06:41
      No questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:06:43
      Taro?
    • 00:06:44
      No.
    • 00:06:45
      Thank you, Chris.
    • 00:06:46
      Frank?
    • 00:06:47
      I don't have any questions.
    • 00:06:48
      Thanks.
    • 00:06:49
      Yeah, I'm sorry.
    • 00:06:50
      I don't have any questions either.
    • 00:06:53
      So if the applicant has a presentation, now would be the time.
    • Kevin SchaferStudio Director
    • 00:07:04
      Good afternoon.
    • 00:07:05
      My name is Kevin Shaffer.
    • 00:07:06
      I am with the architecture firm Design Develop here in Charlottesville to discuss the Hyatt Studios at Richmond Road.
    • 00:07:13
      Thank you, Chris, for the staff report and for the introduction.
    • 00:07:19
      It's been several times that you've seen this project in front of you, so I just wanted to sort of summarize the process, if I can figure out how to move the PDF.
    • 00:07:32
      Maybe a keyboard.
    • 00:07:33
      We seem stuck.
    • 00:07:42
      Give it a minute.
    • 00:07:43
      OK, great.
    • 00:07:54
      Okay, so the top image was from our August 5th submission of last year, where we were able to have a preliminary discussion at a September 16th hearing.
    • 00:08:09
      Some of the
    • 00:08:10
      Images may look familiar because we were able to take staff's comments from that initial submission and that initial review and start to try and apply those at this September 16th meeting.
    • 00:08:25
      As Chris mentioned, those revisions included the addition of this new canopy on the entrance corridor facing side, as well as the revision to an all brick tower here, the addition of the new
    • 00:08:39
      Storefront windows in an effort to make this appear more entrance corridor facing.
    • 00:08:45
      There's also some additional rules added in terms of the use of brick along the base and we have interjected a wood-like material anywhere there was covered by a canopy.
    • 00:09:01
      The rear patio also was in need of a lot more articulation and sort of fleshing out and so that work has been done in this latest submission and one of the big moves is the area of the rear patio is clad in the same brick that is found on the first level masonry and also on that
    • 00:09:21
      Northside Stair Tower.
    • 00:09:23
      The retaining walls that flank either side of that rear patio are in the retaining wall material and that sort of helps distinguish this rear patio as part of the building as it comes out.
    • 00:09:36
      There's also been a lot more thought and consideration given to the railing and the furniture on the rear patio and this canopy element as well.
    • 00:09:47
      The previous scheme had sort of undefined landscaping on the rear as we were really looking for sort of architectural feedback.
    • 00:09:55
      That landscaping has been refined thanks to staff's comments and supplemented pretty significantly.
    • 00:10:02
      I think as we go through these images, you'll see it's a pretty heavily landscaped site.
    • 00:10:10
      Part of that is the nature of the retaining walls as we come down Pantops it is a sloping site which require retaining walls and so retaining walls require vegetation at the bottom of them but also is just the matter of entrance corridor screening and an effort to sort of visually layer this building away from the road which I think the
    • 00:10:35
      Entrance corridor plantings as well as the interior parking lot plantings do a good job of.
    • 00:10:40
      So this is the trees located and probably after several years of growth in here, but we did want to show that with and without the plantings.
    • 00:10:49
      It is a well landscaped site.
    • 00:10:54
      This would be eastbound on 250 headed up the hill.
    • 00:11:00
      This is the Honey Car dealership right here and some pretty significant screening here as well.
    • 00:11:08
      Additional screening was added sort of
    • 00:11:10
      I won't say at the last minute, but after review of staff's comments and staff's concerns regarding retaining wall visibility, we have a little patch of land right here where we've added additional shrubs that weren't necessarily required from guideline perspective, but just being mindful of the visibility.
    • 00:11:30
      As you come down the hill, the planting along the entrance here and specifically what staff is calling for now will go a long way in continuing to screen that.
    • 00:11:42
      And we think that that comment is appropriate and we're able to address it.
    • 00:11:46
      I will sort of go through each of the landscape comments just to make sure that we're all on the same page here momentarily.
    • 00:11:53
      But the one
    • 00:11:54
      The one architectural comment that we had was the height of the parapet walls and can certainly understand the confusion because I think we had slide 20 in your booklet that was submitted did not show a parapet wall.
    • 00:12:08
      The roof plan actually does have a parapet wall and we'll be submitting drawings to county staff that show we've got
    • 00:12:15
      essentially three different heights of parapet wall and a roof that slopes from front to back.
    • 00:12:22
      And so we have essentially what's a four foot parapet wall in the front element and then that steps down to a three foot retaining wall and then that steps to a two foot retaining wall.
    • 00:12:36
      Here's some elevations with those different heights on there.
    • 00:12:40
      But essentially, this was what was provided in the booklet, which would be concerning.
    • 00:12:45
      And this is actually the consideration after further refinements.
    • 00:12:49
      The elevator overrun, the rooftop units, which are minimal, there's only a handful of mini split units that are handled sort of right in here at the elevator overrun, are all screened by that parapet wall.
    • 00:13:05
      Everything else is just a rooftop vent, like a plumbing stack vent.
    • 00:13:11
      and the rooms are handled through a PTAC unit cooling system.
    • 00:13:16
      So they don't have a rooftop unit.
    • 00:13:18
      So there's not large equipment sitting on this roof.
    • 00:13:21
      There's the roof access hatch up here as well.
    • 00:13:24
      So we're confident that everything will be screened by that parapet wall that was not shown correctly as well as just being generally low equipment.
    • 00:13:35
      Here's where I'll go through what we believe are correct interpretation of staff's comments regarding the landscape.
    • 00:13:44
      I think Chris has already noted this conflict here with the stormwater pipe, which we're happy to shift out.
    • 00:13:51
      There's plenty of room on either side of that pipe to shift those.
    • 00:13:56
      We're happy to add some of the required street trees along this sidewalk as well.
    • 00:14:04
      This tree we know needs to shift to eliminate a sidewalk.
    • 00:14:09
      I think one of the questions we had was we were trying to decipher where the trees didn't have enough room to grow because I think these are pretty large interior islands with some good room to grow.
    • 00:14:23
      So we were thinking that this may have been the area here because I think there's plenty of room along here and even along here, these are some pretty significant landscape islands that we feel comfortable with the trees that we're planting in there but would love staff's comment on that.
    • 00:14:39
      These were the additional shrubs that we added.
    • 00:14:42
      Again, I won't say last minute, but just more in sort of consideration of staff's previous comments.
    • 00:14:51
      And I think we're certainly happy to add landscape here as well.
    • 00:14:55
      There's a sewer lateral that comes out of the building, which is why we were pushing our landscape efforts towards the entrance corridor because we felt like it would be
    • 00:15:04
      More successful screening but we can also add shrubs in this location that's shown.
    • 00:15:11
      I think staff comments for both northern end and southern end of the retaining wall but the southern end is several hundred feet away from the entrance corridor at that point and also starting to get into the location of our riprap discharge from our stormwater system so we just
    • 00:15:30
      would request if maybe it can just be along the northern end of the retaining wall just for practicality's sake and for effectiveness of screening.
    • 00:15:41
      I think here is a good area too where you see just the extensive landscaping on this parcel.
    • 00:15:49
      It is pretty heavily planted, which I think goes a long way towards the success of this project and the visual screening of this four-story building.
    • 00:16:00
      The last comment that we had had to do with tree protection along these areas here where we're doing some regrading and there are some existing trees that may stay and I think will provide clarity on that per staff's comments.
    • 00:16:17
      So those are the landscape comments that we wanted to talk through, but we're happy to answer any questions you may have.
    • 00:16:24
      I do have Chris Marshall with Shimp Engineering here in case we have more detailed discussion on landscape required, but happy to answer any questions you may have.
    • 00:16:33
      And we would greatly appreciate sort of staff's guidance on the parking island specific question.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:41
      All right.
    • 00:16:42
      Thanks a lot.
    • 00:16:43
      I guess we will start with David if you have any questions.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:16:47
      Sure.
    • 00:16:47
      Thank you for the presentation.
    • 00:16:48
      No questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:51
      Frank?
    • 00:16:52
      I don't have any questions.
    • 00:16:53
      Thanks.
    • 00:16:54
      Taro?
    • 00:16:55
      Nope.
    • 00:16:55
      Very clear.
    • 00:16:55
      Thank you very much.
    • 00:16:58
      Sorry.
    • 00:16:59
      I've gotten up.
    • 00:17:00
      No questions.
    • 00:17:02
      Are there any members of the public that want to comment?
    • 00:17:09
      All right.
    • 00:17:09
      Sounds good.
    • 00:17:12
      The ARB will now go into discussion.
    • 00:17:14
      I guess we'll start with Tara if you have any comments.
    • Taro MatsunoMember, Architectural Review Board
    • 00:17:18
      Thank you.
    • 00:17:19
      I appreciate the applicant's presentation.
    • 00:17:22
      I think the developments since the last time we saw this project have all been really positive, and I appreciate the direction that the shape the project is taking.
    • 00:17:32
      And I think that pending some clarity on the
    • 00:17:37
      Tree spacing in the islands that all of the proposed responses seem adequate to me.
    • 00:17:44
      So I appreciate it.
    • 00:17:46
      And yeah, thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:17:48
      Thanks, Frank.
    • 00:17:50
      I agree with Taro.
    • 00:17:51
      I think it's a nice project.
    • 00:17:54
      I don't have any questions or comments.
    • 00:17:56
      It all is pretty clear.
    • 00:17:58
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:18:00
      All right, Dade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:18:01
      I agree with my colleagues.
    • 00:18:02
      I appreciate the developments in the project and the applicant's willingness to incorporate the staff comments on the landscape.
    • 00:18:09
      So appreciate the way it's developing.
    • 00:18:12
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:18:12
      Thanks.
    • 00:18:13
      Yeah.
    • 00:18:15
      Don't want to sound like a copycat, but I agree too.
    • 00:18:19
      So I think all the tweaks were in a positive direction.
    • 00:18:24
      So I think it'll be a pretty nice project.
    • 00:18:30
      So if we could take a look at the recommended motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:18:35
      Did you want to look at the specific planting islands that staff thought were an issue?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:18:43
      Sure.
    • 00:18:44
      I'll just do it all with my browser and into my Bluebeam.
    • Khris TaggartSenior Planner
    • 00:19:19
      So based off the tree species, the large trees, the little oaks,
    • 00:19:29
      Yeah, they're all Lawyer's Deciduous series that staff was pointing out more so these islands and lesser than this one and this one here of there might be enough space at the time of initial planting but all those trees or those species grow to, once mature, will irrespective grow to going off the top of the head by I think 20 to 50 feet in spread.
    • 00:20:00
      It seemed like a tight planning area for the number of large trees proposed within those islands.
    • 00:20:12
      It's also acknowledging that it intends to meet the interior parking requirements, which is one tree for every 10 parking spaces and
    • 00:20:26
      I can't remember the exact number.
    • 00:20:29
      I think the one above their required parking, I believe is 123 versus 122 or 124 versus 123.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:20:46
      I don't know if we might defer to Frank for his knowledge.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:20:51
      I mean, I think, you know, those spreads and mature heights and a lot of times are under ideal conditions.
    • 00:20:59
      So we're in a parking lot.
    • 00:21:02
      They're going to be stressed.
    • 00:21:03
      They might not reach that in our lifetime.
    • 00:21:07
      But they may.
    • 00:21:10
      The other option is to look at something else on the county's approved list that is maybe a little, has a different form, more upright.
    • 00:21:18
      At first glance, especially if they meet the numbers, I don't know that we can do much, but it sounds like the applicant's willing to consider alternatives.
    • 00:21:35
      At this point, I don't wanna dictate what species
    • Kevin SchaferStudio Director
    • 00:21:40
      Yeah, I think the question would be, do we do less trees, which doesn't seem desirable, or do we switch to a more upright, narrower tree, which I think is an option.
    • 00:22:02
      We can go through with that.
    • 00:22:04
      So just to provide clarity, the concern would be, I can't control the mouse, the concern are those two, mostly just those areas right there, those three.
    • 00:22:14
      Oh, and those three.
    • 00:22:16
      So part of that is clearly we're getting pinched with the stormwater structure that's happening in that island right there.
    • 00:22:27
      It seems like maybe just a species substitution in those areas that is less spread.
    • 00:22:36
      That's fine.
    • 00:22:37
      We don't particularly feel compelled to reduce the number of trees.
    • 00:22:43
      Yeah.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:22:44
      OK. All right, that provides clarity.
    • 00:22:46
      Yeah, I think more trees is better for screening and I guess just
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:22:52
      Left field question, the very narrow triangular portion of the island leading up to those three trees in question, is there any portion of that that would be of sufficient width to receive one of them and maybe alleviate the concern?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:23:09
      You're saying move one of those since there's three in the island portion or in the end of the parking.
    • Neil WilliamsonPresident and Executive Director
    • 00:23:16
      Right.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:23:16
      Yeah.
    • 00:23:17
      Move one of those to that sliver.
    • 00:23:20
      That makes sense to me.
    • Chris HenningsenChair, Architectural Review Board
    • 00:23:21
      There's room.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:23:22
      I mean, it is a linear, you know, it gives more room for the roots to grow if it has that linear.
    • 00:23:29
      and I don't know the width.
    • 00:23:31
      It's like three or four feet.
    • 00:23:33
      It should be fine.
    • Kevin SchaferStudio Director
    • 00:23:34
      Okay.
    • 00:23:34
      If you move one of those.
    • 00:23:36
      Yeah, we can look into if there is around that storm structure, if there's room to shift one of those down.
    • 00:23:42
      Okay.
    • 00:23:45
      Thank you very much for the clarity.
    • Margaret MaliszewskiPlanning Manager
    • 00:23:47
      All right.
    • 00:24:15
      So the staff's recommendation is for approval with the conditions listed here as in the staff report.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:36
      I think relative to item six, the applicant had asked for some relief on the southern end of the retaining wall.
    • 00:24:44
      in terms of the shrubs near the riprap.
    • Khris TaggartSenior Planner
    • 00:24:52
      To clarify.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:53
      So item six, it says incorporate trees and shrubs at the northern and southern ends of the lower retaining wall.
    • 00:25:00
      I think the applicant had requested some relief at the southern end of that wall relative to the riprap.
    • 00:25:07
      It is very distant from the EC, as the applicant pointed out.
    • 00:25:11
      I don't know whether others,
    • Chris HenningsenChair, Architectural Review Board
    • 00:25:14
      I agree.
    • 00:25:15
      I feel like the projection of that patio would block the view of additional plantings there anyway.
    • Khris TaggartSenior Planner
    • 00:25:25
      Right.
    • 00:25:28
      To clarify staff's perspective on that, their perspective wasn't provided in the package there, but we're interpreting the viewpoint from the entrance of Honey Car into the parking, through the parking lot.
    • 00:25:45
      And there's, but most times cars are parked there, but while knowing what landscaping on Honey Car site versus what landscaping's on the site to be, oh, it's kind of,
    • 00:25:57
      it's hard to interpret how visible that southern portion of that wall would be right that's why the continent was made technical difficulties lost our motion there it is working now just come up and down the stairs please
    • Chris HenningsenChair, Architectural Review Board
    • 00:26:36
      Any additional tweaks?
    • 00:26:39
      No.
    • 00:26:41
      If anybody feels like making a motion, now would be a good time.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:26:48
      I'd be pleased to move for approval of the certificate of appropriateness for ARB 2025-13 with the conditions listed in the staff report as follows as originally presented with one revision to item six, strike after the word northern and southern and change the plural ends to end.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:27:13
      I'll second.
    • Chris HenningsenChair, Architectural Review Board
    • 00:27:15
      All right, great.
    • 00:27:16
      If we could put that to a vote.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:27:19
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:27:22
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:27:23
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:27:24
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:27:25
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:27:26
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:27:26
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:27:27
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:27:27
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:27:28
      All right.
    • 00:27:29
      Thank you.
    • 00:27:31
      We have one work session today, which is a discussion on wooded buffers for the entrance corridor design guidelines addenda.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:28:15
      Good afternoon, everyone.
    • Mariah GleasonUrban Designer
    • 00:28:24
      We're excited to be back and continuing work on the entrance corridor design guideline addenda.
    • 00:28:30
      This is our first work session following the development of informational sheets on each of the entrance corridors.
    • 00:28:35
      And our topic today is wooded buffers.
    • 00:28:38
      The goal of this effort, which was initiated by ARB and staff, is to address gaps in the current guidelines by recognizing the unique characteristics of individual corridors and providing better guidance on how the guidelines are applied along the various corridors.
    • 00:28:53
      Our current work on the addenda includes general editing by staff,
    • 00:28:57
      And in that staff have identified guidance, additional guidance from the ARB or that additional guidance from the ARB is needed on a few key topics.
    • 00:29:08
      Wooded buffers, landscaping, corner properties, and on-ramps.
    • 00:29:13
      These are things that were identified during the sheets and sometimes in our discussions, so we're just bringing those back to actually have those conversations.
    • 00:29:22
      We also recognize that there might be some overlap between some of these topics, so we might try to group them in the future.
    • 00:29:29
      So getting into today's topic of wooded buffers, there are two key issues that we see.
    • 00:29:35
      The first one is that wooded buffers are frequently referenced throughout the addenda, but wooded buffers are not all the same.
    • 00:29:43
      There's a general lack of distinction between the buffers that define the character of a corridor and those that are simply a byproduct of un or underdeveloped properties.
    • 00:29:52
      The second one is that wooded buffers expected to screen or limit visibility of some new developments are proving ineffective.
    • 00:29:58
      This could be due to factors including topography, composition of the buffers, or location of the buffers within the right of way.
    • 00:30:09
      So as described in the memo for this work session, the addenda could provide better or greater guidance on where wooded buffers should be maintained or continued and how consistency should be evaluated.
    • 00:30:21
      To help with this discussion, we have offered the following questions.
    • 00:30:25
      We'll go through each of these questions individually on upcoming slides.
    • 00:30:29
      So I won't read them here, but I will read them on those slides.
    • 00:30:34
      So the first question is, are there corridors or portions thereof where deep or dense wooded buffers should be maintained?
    • 00:30:42
      Staff's recommendation is yes, there is.
    • 00:30:46
      And I'd like to stop at this point to see if the ARB agrees.
    • 00:30:51
      And also recognizing the points made by Mr. Williamson,
    • 00:30:55
      As you can see from staff's recommendation for Route 250, there may not be a propensity of entrance corridors or segments thereof where wooded buffers are important or appropriate to maintain given additional considerations of zoning or expected land use.
    • 00:31:15
      So rolling back a bit, if this was a yes or no question,
    • 00:31:24
      Are there corridors or portions thereof where deep, dense wooded buffers should be maintained?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:31:47
      I think this is challenging.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:49
      Sorry.
    • 00:31:51
      This is open.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:31:52
      Open discussion.
    • 00:31:53
      This is the work session.
    • 00:31:54
      We're working now.
    • 00:31:58
      It seems that, you know, and there are times where we want distant views to be visible or buildings to be visible.
    • 00:32:09
      And I guess maybe I don't understand like the mechanics of if we went through and said yes to some of these
    • 00:32:17
      how that got incorporated into the addenda and then how that was part of the guidelines.
    • 00:32:26
      Is it like, for instance, the guidelines call for larger caliper trees along the entrance corridor, which becomes a requirement.
    • 00:32:37
      If we go through this and we say certain wooded buffers are required and we come up with a distance or a depth of buffer
    • 00:32:47
      Does it then go into the guidelines as similar to the larger caliper tree example?
    • 00:32:52
      Is that the vision for it?
    • Mariah GleasonUrban Designer
    • 00:32:55
      So it's complex, right?
    • 00:32:59
      So I think part of it is acknowledging that when we did the evaluations of each of the corridors, a lot of times wooded buffers was written down or noted as like, this is a quality, this is what I'm seeing along this corridor, there's a lot of it.
    • 00:33:17
      We're asking for greater detail and okay, there's a lot of it, but is it important to preserve?
    • 00:33:22
      Is this a defining feature?
    • 00:33:24
      I think like John Warner Parkway is an example of, well, maybe yes, that is important to maintain.
    • 00:33:33
      Or even Route 53 by Monticello and Carter Mountain, you know, there are different places where it might be appropriate and it might be a defining feature.
    • 00:33:50
      So one is acknowledging what's there and we're asking for greater specificity on is, okay, it's there, is it important?
    • 00:34:00
      A second aspect is
    • 00:34:05
      We get rezonings all of the time and ARB is a reviewer of that.
    • 00:34:11
      This would give greater allowance for greater guidance to say this, a wooded buffer is needed on this rezoning and just give more weight to that because it's not just a comment.
    • 00:34:27
      It is in a document that has been approved.
    • 00:34:31
      I think the third aspect is getting to your point about what is really the guidance going to be and I think in terms of will we prescribe a three and a half inch caliper at planting large tree.
    • 00:34:49
      along the length of this.
    • 00:34:50
      I think that's actually getting to a update to the entrance corridor guidelines themselves.
    • 00:34:57
      This document is more so supposed to comment on what is consistent and important to maintain.
    • 00:35:06
      So it's less of a requirement.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:35:11
      So it's like, OK, we've identified this is a key feature of this specific corridor.
    • 00:35:16
      You know, if you're looking to do development in this corridor, we recommend you focus on preserving or maintaining.
    • 00:35:26
      But there's no requirement that the developer comes in and keeps a 100 foot buffer.
    • Mariah GleasonUrban Designer
    • 00:35:31
      No, that wouldn't be so much a requirement.
    • 00:35:34
      I think the guidelines state that it should be consistent with the local context and there should be consistency along the corridor.
    • 00:35:42
      That's often language that we're using in our staff reports.
    • 00:35:47
      So I think it would more so fit into that bucket of is it generally consistent, but there could be differences.
    • 00:35:54
      But Margaret, do you have anything to add?
    • Margaret MaliszewskiPlanning Manager
    • 00:35:59
      So I think you're right in this, the work we're doing now with the Addenda is to identify those key features.
    • 00:36:04
      This work is intended to inform a future guidelines update.
    • 00:36:07
      And that's when we would get into the details of how, what needs to be, you know, what level of detail needs to go into that and what exactly it means.
    • 00:36:17
      But right now it really is about identifying key features.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:36:20
      Okay.
    • 00:36:21
      Thank you.
    • 00:36:22
      That's helpful.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:36:23
      And thank you for that context and for this work session.
    • 00:36:26
      I'm looking forward to delving into this topic.
    • 00:36:29
      I think this is a great summary of the corridor and the different segments of it.
    • 00:36:35
      And I think while we're going to be focused on wooded buffers today, I think the question that it's raised for me is that actually there are probably a number of different landscape
    • 00:36:44
      types or characters in the county.
    • 00:36:47
      The wooded buffer is one.
    • 00:36:50
      And it may be helpful to further expand the vocabulary of landscapes and typologies and characters that folks should be striving to maintain and be contextual with.
    • 00:37:03
      Our specific authorization, I guess, is for architecture, but we've also acknowledged through our conversations that so much of what defines the county's character and the architecture is the landscape.
    • 00:37:14
      So without expanding the scope of today's conversation too broadly, I hope it's the beginning of maybe talking about the various landscape characters and how they can be maintained and development within them can be orderly and attractive.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:37:33
      Yeah, I think that's, I mean, identifying our assets and I guess,
    • Chris HenningsenChair, Architectural Review Board
    • 00:37:43
      This comment is not really based on factual information, but I just have the feeling that if I'm thinking of segments that have more heavily wooded areas on the side of the road,
    • 00:38:05
      I have the feeling that those are the areas where it's a higher proportion of residential properties in those areas that would not fall under our jurisdiction.
    • 00:38:16
      So I think it would be the areas where we would want to maintain, or at least if there's an existing character of kind of a wooded buffer on the side of the road,
    • 00:38:33
      It seems like it would be tricky because there's a lot, the further you get from the center of Charlottesville, it seems like the higher the proportion of residential properties along the entrance corridors and harder to kind of control what happens in terms of landscaping or buffers or any of that.
    • 00:39:00
      So I don't know.
    • 00:39:04
      That doesn't seem like a very helpful comment either.
    • Mariah GleasonUrban Designer
    • 00:39:09
      Well, I think you're right in that these places will probably be more so in the rural areas than the development areas because it would create a conflict with the land use and zoning.
    • 00:39:20
      But wasn't Glenmore in the rural area before it was rezoned?
    • 00:39:29
      The village?
    • 00:39:32
      Joss Keswick, so I don't think it's, because it's in the rural area, it's immune from rezoning.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:39:43
      Right.
    • 00:39:45
      So within that, perhaps, Mariah, there might be a pathway to require buffers, even if properties that were used aren't subject to ARB review.
    • 00:39:57
      if the buffers were more than a guideline but a zoning requirement.
    • Mariah GleasonUrban Designer
    • 00:40:07
      Can you repeat your question?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:40:08
      In terms of mechanism, as Chris points out, we don't have purview over residential development along entrance corridors.
    • 00:40:21
      Is that correct?
    • 00:40:24
      So I guess,
    • 00:40:25
      In terms of any regulatory vehicle or pathway to influence the character and development along entrance corridors in uses not subject to ARB review, what would a pathway be?
    • Margaret MaliszewskiPlanning Manager
    • 00:40:47
      There could potentially be pathways to that.
    • 00:40:51
      It's hard to speculate on what or when, but I think it is beneficial to identify those features along the full length of the corridor just because we don't know exactly what's going to happen in the future and it could inform other decisions that are being made along the way.
    • Mariah GleasonUrban Designer
    • 00:41:11
      I might be wrong on the history of Glenmore.
    • 00:41:14
      I wasn't here for it, but I think it's an example of where we have more dense development surrounded by rural area.
    • Taro MatsunoMember, Architectural Review Board
    • 00:41:22
      Yeah, I think in principle, I think there's this kind of, I think, yeah, there are certainly areas where wooded buffer
    • 00:41:42
      sort of being integral to the character of that corridor is appropriate but I think as sort of the example here shows it applies to like a pretty limited set of corridor portions throughout the county and you know I'm pretty comfortable with the idea that there are parts of our county that
    • 00:42:07
      Like the sort of wooded nature of them is something that's sort of integral to their character.
    • 00:42:14
      But I also think given that it's mostly outside of the development areas, I don't know if it's going to be a significant, I think it'll have limited impacts on the actual majority of the things that we see through the board.
    • 00:42:30
      And I think like, you know, that's kind of a mixed,
    • 00:42:37
      I think it's important to note that that's part of the character of the corridor.
    • 00:42:43
      But as we get to the later questions, I don't know if the wooded buffers is necessarily going to be more super pertinent to cases where we've seen existing plantings or existing trees not sufficiently screen other projects.
    • 00:43:03
      Yeah, I feel like it makes sense to include them and that the application that you're suggesting in this case is pretty appropriate.
    • 00:43:14
      I think we'll have to see how it interacts with the other questions that you have coming up.
    • Mariah GleasonUrban Designer
    • 00:43:20
      Sure.
    • 00:43:21
      And since we're kind of getting to it, I had prepared a slide that just had example images of each of these
    • 00:43:29
      Afton was the only segment that we were recommending.
    • 00:43:33
      Wooded buffers have that identification as wooded buffers are important to maintain.
    • 00:43:43
      In the others, you can see that it's not so much wooded buffers that wooded buffers aren't predominant or an integral feature.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:43:58
      Yeah, and I think if it says, you know, the language is important, whether it's, it's a recommendation to retain or it's a acknowledgement of a defining feature.
    • 00:44:09
      I think where you get into trouble is if you say like, you know, minimum 100 foot buffer, you know, retain 100 foot buffer on all these corridors or something like that.
    • 00:44:22
      Like, I don't, I don't think, first of all, this is not the document to do that in.
    • 00:44:28
      Second of all, like you've done in this analysis, it's different.
    • 00:44:34
      It's going to change along a corridor.
    • 00:44:37
      And a lot of times the open character is very nice and something to be preserved as well, where you don't have a wooded buffer.
    • 00:44:52
      Yeah, I think it's going to help the applicant.
    • 00:44:56
      It's going to help us review it when you say this is a defining feature.
    • 00:45:00
      For instance, if a development comes in and, you know, clears the buffer.
    • 00:45:06
      And that's something we're going to consider when we review the application or when staff reviews the application.
    • Mariah GleasonUrban Designer
    • 00:45:14
      And it could also be dismissed at this stage.
    • 00:45:18
      I think we're getting to the point where we're talking about where is that very fine line between the addenda and an update.
    • 00:45:26
      So it is tricky because we're on the line.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:45:31
      And if your metal building that typically wouldn't meet the spirit of the guidelines is behind a certain amount of wooded buffer,
    • 00:45:41
      you know that'll take that into consideration so there's examples where it's an advantage to the applicant.
    • Chris HenningsenChair, Architectural Review Board
    • 00:45:49
      Yeah I think because if the applicant is using a wooded buffer as part of their I guess scheme for addressing the ARB requirements it's
    • 00:46:05
      I think easier to establish some specific criteria for what would constitute a wooded buffer.
    • 00:46:14
      That seems to be something that we get a lot of.
    • 00:46:18
      If you have an applicant is saying, we're gonna clear cut this whole site and we're gonna provide this wonderful landscaping program against the entrance corridor and
    • 00:46:34
      You know, all the buildings in the development are going to meet the ARB guidelines.
    • 00:46:41
      That's one thing.
    • 00:46:42
      There's nothing to stop them from doing that.
    • 00:46:45
      But we seem to get a lot of applications where, you know, well, the back of the building and the parking faces the entrance corridor.
    • 00:46:54
      But, you know, we have this wooded buffer that, you know, makes that OK.
    • 00:47:01
      But I think it would be
    • 00:47:05
      You know, appropriate if the applicant is going to state that they have a wooded buffer.
    • 00:47:12
      A little more guidance on what constitutes a wooded buffer would be helpful, I think.
    • Mariah GleasonUrban Designer
    • 00:47:26
      So is the general consensus that agreement with staff were
    • 00:47:32
      Something else.
    • 00:47:33
      It seems like it's a general agreement with staff, but some approach it carefully.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:47:40
      Agreed.
    • 00:47:42
      Yeah, I think acknowledging it as a defining feature in certain segments of a corridor is the exact spirit of what we set out to do for this document of contextually put a development
    • 00:47:58
      In this context, and let's review it in that context, versus the guidelines that represent all the corridors in the county.
    • 00:48:09
      So I think it, for sure, it's just as important as a neighboring significant work of architecture, I think.
    • Mariah GleasonUrban Designer
    • 00:48:20
      It does contribute to that sense of getting out in nature.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:48:24
      What's that?
    • Mariah GleasonUrban Designer
    • 00:48:24
      I think when we were first starting on the AC44 work and there was this kind of visioning question about how would, in what ways is Albemarle County unique?
    • 00:48:36
      I think one of the answers from the board was you can get out into nature so easily.
    • 00:48:42
      There are very dense areas and then there are very more natural areas and you can get out into nature quickly.
    • 00:48:52
      I think that contributes to that.
    • 00:48:54
      Okay, so understanding that yes, and we kind of want to flesh out more of what buffers might be one and there might be other terminologies that we can use and apply.
    • 00:49:05
      Is this, if we went through one corridor, just to test it and bring you an example of
    • 00:49:17
      the way we're thinking of evaluating these corridors and if what it prefers should be maintained.
    • 00:49:24
      We can continue to do this format if it's helpful or something like it, or if it's not helpful, we can also do something else.
    • 00:49:33
      So was this helpful?
    • 00:49:37
      Would you like to see a different format?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:49:41
      This seems helpful to me.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:49:44
      Yeah.
    • 00:49:45
      Yeah, and I mean, I don't know that it's to its recommendation for retaining, I think it's just an acknowledgement of its presence as a defining feature, right?
    • 00:49:55
      Because when you say that, you know, there might be an instance where an application removes a portion of it, but we're okay with it, you know, and it's done in a certain way, or they supplement it, or it's, you know, they're doing it to add an entrance
    • 00:50:11
      to their property.
    • 00:50:12
      There's lots of ways that that could happen.
    • 00:50:18
      And I think it would be confusing in this.
    • 00:50:22
      Applicants would wonder if that's a requirement.
    • 00:50:25
      You know, it's not in the guidelines and so.
    • Mariah GleasonUrban Designer
    • 00:50:30
      OK, so going to move on to question number two, but thank you for your comments.
    • 00:50:37
      So the second question,
    • 00:50:40
      is how should the visibility of a proposed development be assessed when a large part of the existing wooded buffer that is identified as to remain stands in the right of way and is not under control of the property owner?
    • 00:50:54
      So in other words, can wooded buffers within rights of way be relied upon for screening?
    • 00:51:01
      And this question acknowledges the growing concern that some of the newer developments are more visible than expected.
    • 00:51:06
      When evaluating new development proposals, there's a propensity to allow wooded buffers in the rights of way to contribute to the screening.
    • 00:51:14
      Often the depth of the wooded buffer is the primary or only criteria used to establish whether the development would be visible.
    • 00:51:21
      There are a couple of issues with this.
    • 00:51:23
      The location and qualities of the wooded buffers within the rights of way are not guaranteed.
    • 00:51:28
      As acknowledged in earlier comments, they could be altered or removed at any time regardless of the development.
    • 00:51:34
      But also, the depth of the wooded buffer does not provide an accurate picture of whether the wooded buffer can or will provide adequate screening.
    • 00:51:42
      Topography and buffer composition are also a factor.
    • 00:51:45
      So we have a couple of examples related to this question that I can just go through.
    • 00:51:51
      So this first one is 5th Street Apartments.
    • 00:51:54
      In it, the buildings from this location are 660 feet from the entrance corridor.
    • 00:52:00
      The retaining wall is 530 feet.
    • 00:52:04
      The next example is 5th Street Station, so the back of Wegmans and what used to be public lands.
    • 00:52:11
      These buildings are 220 feet from the entrance corridor.
    • 00:52:17
      Alta View Apartments, which is 750 feet from the entrance corridor.
    • 00:52:22
      Retaining walls are about 500 feet.
    • 00:52:27
      This is Old Ivy Residences, which is currently under development.
    • 00:52:32
      The proposed buildings are 75 feet from the entrance corridor.
    • 00:52:41
      These apartment buildings are Rio Point and they are 25 feet from the entrance corridor but they did dedicate a good amount of their frontage to right-of-way.
    • 00:52:55
      And then Brookhill might be our last example.
    • 00:53:00
      The apartment buildings are 66 feet from the entrance corridor.
    • 00:53:03
      The wooded buffers were maintained, and they were 70 feet in depth.
    • 00:53:09
      And in the top right image, there are moments where the wooded buffers are very much limiting visibility.
    • 00:53:18
      And then there are other times where the development is visible.
    • 00:53:27
      Those are our examples.
    • 00:53:29
      So this is along Route 29, John Warner Parkway.
    • 00:53:33
      This is the 250 bypass.
    • 00:53:39
      And then these first examples are along 64.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:53:48
      So thank you, it's very good examples and a good question.
    • 00:53:52
      I think for me personally, based on the experience over the last few years,
    • 00:53:58
      I don't feel like we should rely on buffers in rights of way for screening to the extent we're considering them as a way to mitigate the impacts of the architecture or to maybe not scrutinize it or the landscape associated with the development as closely.
    • 00:54:16
      Cause I don't believe they've been particularly effective and frequently in some cases the rights of way have changed or proposals to the changes have occurred within
    • 00:54:28
      Weeks, even, of when we reviewed an application, the old Ivy apartments.
    • 00:54:31
      I know just shortly after that, VDOT came out with a recommendation to change the on-ramp and the exiting lanes between there and Darden, Leonard Sanders.
    • 00:54:43
      So I think the other thing about wooded buffers is that I think, for me personally, in order for them to be effective and for us to really be able to rely on them as a mitigation measure,
    • 00:54:57
      I think we should consider requiring documentation of the planting within the buffer because I don't know that without that there's really a mechanism to assure in the same way that we do with the site plan that the development continues to be in compliance.
    • 00:55:19
      All of this I think is tempered by the discussion we just had about how this really is a supplement and something to be considered narrowly in terms of where wooded buffers are really truly part of the character to be maintained or to be attempted to maintained.
    • 00:55:37
      But I guess that's what I would offer from what I think I've observed in the last few years.
    • 00:55:42
      But what do others think about this question?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:55:47
      This is a tough one.
    • 00:55:49
      A few thoughts.
    • 00:55:51
      I think the other thing to consider is topography.
    • 00:55:55
      A few of these examples, like when you look at it in plan, all you see is like 500 feet of existing trees to remain.
    • 00:56:05
      And you think there's no way someone's gonna see this.
    • 00:56:10
      And we use the argument on 64, you're going a certain speed, you're down here, this is up here.
    • 00:56:18
      But yeah, I think the one near Martha Jefferson,
    • 00:56:23
      always think of Dade when I think of this when I drive by on 64.
    • 00:56:30
      You know the architecture is perfectly acceptable it's that it's on these retaining walls and so then it was the idea was you know mitigating the retaining walls so I would just I think we need to think about like that but the other piece is that
    • 00:56:51
      You know, in some ways, the expertise of staff and the board, you know, it's up to us to kind of read the plans, read the perspectives, the visualizations that the applicants put forth and ask the tough questions of like, what does it look like from this vantage point?
    • 00:57:11
      I know you're not thinking about it from 64 West, you know, a mile away.
    • 00:57:18
      but at some point, and so that raises the question of like how this could be a case by case thing and we might not be able to prescribe a one size fits all.
    • 00:57:31
      But yeah, and I agree.
    • 00:57:32
      I think the other point of like, what's the makeup of the species if they're largely deciduous trees and not, you know,
    • 00:57:44
      not full of underbrush or any evergreens at all.
    • 00:57:47
      You could have 100, 150 foot buffer.
    • 00:57:50
      You could see right through it.
    • 00:57:52
      The other piece to that is at what point is it okay to see a building?
    • 00:57:57
      You know, there's a lot of buildings we want to see and that are architecturally very nice and that contributed like signs of life.
    • 00:58:03
      You know, if we would go around with the blinders on and always see your vegetation, you know, that's tough for wayfinding.
    • 00:58:09
      That's tough for a sense of what is this place.
    • 00:58:13
      So this is a difficult one, but I agree that we've had some recent applications that brought all this to light and
    • 00:58:23
      I don't think I helped anything but I just added some more commentary.
    • Taro MatsunoMember, Architectural Review Board
    • 00:58:31
      Yeah I think actually going through that it's interesting to see the varying degrees of success of some of these like some of them I think this is part of what's tricky about the wooded buffer is like the worst outcome in some ways is like
    • 00:58:46
      Nothing gets built in this buffer and the buffer doesn't hide anything, you know?
    • 00:58:51
      Whereas like, I think some of the later examples, they did still, the wooded buffer is integrated with some other plantings.
    • 00:59:01
      I think like Rio Point is a better example, right?
    • 00:59:04
      Where I remember reviewing planting strategy alongside that kind of,
    • Frank HancockVice Chair, Architectural Review Board
    • 00:59:11
      The multi-use path, right?
    • 00:59:13
      Was that the comment of like they gave right away for the multi-use path?
    • Taro MatsunoMember, Architectural Review Board
    • 00:59:16
      Yeah, like I think this one's a lot more, this in combination with the topography is a lot more successful and I feel almost like the existence of the wooden buffer
    • 00:59:27
      Looking at these examples, I'm more inclined to discount the wooded buffer, but I think in the cases where we have a development that's in an area where development should be happening, I think it's appropriate for development to be happening.
    • 00:59:42
      near a highway exit or on 29.
    • 00:59:45
      Those are very, the outcomes could be, can be or are improved a lot by the landscaping that's closer to the buildings and closer to the elements, even though their distance from the corridor might not always make us think that they're going to have such an impact.
    • 01:00:06
      Looking at the ones off of 64, I think
    • 01:00:11
      Seems like it might not even necessarily be, that one's a tough one, but like Fifth Street Station and the Fifth Street apartment complex, like I think I'm not entirely sure what's going on, but it feels to me like greater attention to landscaping near the building and the parking areas could have a
    • 01:00:34
      much more impactful way of helping this to fit into the corridor than like the degree to which this buffer was maintained or not maintained.
    • 01:00:44
      That's a good point.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:01:01
      Did y'all have specific thoughts about whether the
    • 01:01:04
      buffer within the right of way can be considered or not.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:01:10
      I feel like every application that has that condition, staff has brought that up in the staff report and pointed that out to, you know, just brought it to light.
    • 01:01:23
      And then it's up to us and the applicant to address it.
    • 01:01:30
      I mean, I feel like most every staff review acknowledges, hey,
    • 01:01:34
      There is this buffer, but it's not controlled by the applicant.
    • 01:01:44
      I do think it's a factor though.
    • 01:01:45
      I think we consider it.
    • Chris HenningsenChair, Architectural Review Board
    • 01:01:49
      I think it's worth considering, but I don't know that an applicant should be guaranteed buffer benefit
    • 01:02:06
      Now, this is a little bit more burden of proof.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:02:09
      Yeah, I'm remembering the was there a wastewater treatment plant at Keswick?
    • 01:02:15
      That was pretty close to 64.
    • 01:02:16
      Yeah.
    • 01:02:18
      And the building was like right on the property line or close to the property line.
    • 01:02:24
      And the applicant was trying to rely on the right of way.
    • 01:02:27
      And I think the review, the staff and board review ended up
    • 01:02:32
      requiring like evergreen screening.
    • 01:02:35
      And we didn't end up relying specifically on that.
    • 01:02:39
      Is that right?
    • Margaret MaliszewskiPlanning Manager
    • 01:02:41
      I think that's right.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:02:41
      I think it's known.
    • 01:02:47
      I think, you know, in this document, certainly a note to this effect for the 64 entrance corridor or for others.
    • 01:03:01
      I should know whether it's in there or not, but having that as a bullet point or an asterisk of like, hey, this right-of-way cannot be guaranteed or the language you have here relied upon for screening.
    • Mariah GleasonUrban Designer
    • 01:03:23
      Thank you.
    • 01:03:26
      I think the biggest thing there is that we've maybe relied too heavily on
    • 01:03:32
      the 2D plan.
    • 01:03:35
      and there's just so much topography in this area that really more information is needed because as these examples point out, you could very well see something from the vantage point of this is a thousand feet from the property line before the retaining walls start, but then the successful ones were 25 and 66 feet away.
    • 01:03:57
      So distance is just really not the criteria to use
    • Frank HancockVice Chair, Architectural Review Board
    • 01:04:05
      Yeah and I think the dates project, the wall is it's what you would see like for a Lowe's or like a giant pad site and it doesn't feel like contextual in any way or like light on the land and I think that's the struggle so.
    • Neil WilliamsonPresident and Executive Director
    • 01:04:29
      I think it's worth noting that for the proposal 29 North... Neil.
    • 01:04:34
      I'm sorry.
    • 01:04:35
      Neil Williamson with the Free Enterprise Forum, the Brookhill development, the majority of what you see is in the VDOT right away.
    • 01:04:42
      They have retaining funds.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:04:53
      Yeah, I mean, I remember looking at the one on Martha Jefferson and thinking, there's no way that we're going to see this.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:04:59
      Yeah.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:05:01
      I think distantly, but I was not picturing that.
    • Mariah GleasonUrban Designer
    • 01:05:08
      Yeah, Margaret, I'll point this out, but that I apparently scaled the image wrong.
    • 01:05:16
      The first, so in the site, I had taken pictures of the site plan or I had gotten pulled the site plans for all of these and measured them.
    • 01:05:24
      The scale must have been wrong on this photograph or on this site plan.
    • 01:05:31
      I guess, Sheet.
    • 01:05:32
      So this distance is at least, to the closest building, it's at least 100 feet.
    • 01:05:41
      And then some of it is in the right of way, but all of this gray area lands on its own property, which is at least 100 feet on its own.
    • 01:05:51
      And then there's some within the right of way.
    • 01:05:52
      So that's my mistake.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:05:58
      And I guess in the case of that development,
    • 01:06:01
      The wooded buffer was proposed by the developer.
    • 01:06:04
      I was just trying to remember the origin of it, because that area is in the development zone, correct?
    • Margaret MaliszewskiPlanning Manager
    • 01:06:10
      The master plan calls for a landscape buffer there.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:06:14
      Okay, which had been more about creating a buffer for the residential use that was envisioned there next to the corridor or something.
    • 01:06:20
      But because I think to Mr. Williams's earlier question about the limited development area in the county,
    • 01:06:31
      You know it does seem like maybe I can imagine a pathway to say well when something is designated in the development area necessarily that implies maybe some different landscape criteria and so I don't know that in the abstract you know wooded buffers would be a reasonable requirement within the development zone.
    • 01:06:58
      Although I think, you know, Frank, you made a good point about sort of varieties of planting and evergreen versus deciduous.
    • 01:07:06
      And I don't know whether other members or staff think it would be helpful to maybe develop any some general recommendations, not binding for sort of the mix and arrangement of species and a definition of what the purpose of a wooded buffer is, whether it's, you know,
    • 01:07:24
      simply to screen or to block or to and there might be a couple of different types but on the density of evergreen versus deciduous but you know recognizing the development pressure that much of our many of our designated entrance corridors are also in development zones it seems like it might be helpful to develop
    • 01:07:49
      similar to the street tree planting guidelines and others like a wooden buffer guideline that ideally could be effective and implementable in a way for those areas where things.
    • Taro MatsunoMember, Architectural Review Board
    • 01:08:07
      I think just from a perspective of evaluating applications, the things that I've seen that are most helpful in kind of understanding and
    • 01:08:16
      like giving me a sense that, oh, the final product was close to what I expected based on our review.
    • 01:08:25
      It seems like it's best if the things that we're reviewing are really like a perspective of the development of just the buildings and then a perspective of the buildings and the proposed landscape
    • 01:08:43
      And I've found in my own work too that representing existing landscape is very, very difficult to do in a way that's faithful to the landscape and that actually lets you see what's happening.
    • 01:08:55
      The photo collage doesn't tend to work super well all the time.
    • 01:08:59
      Modeling the elements that are existing is also not very accurate typically.
    • 01:09:07
      but for me sitting on the board looking at the proposals like just a sense of what they're the buildings that they're proposing and then the plantings that they're proposing on separate layers like is I feel like the best best thing to go on that I felt more solid on once things actually go into construction in our
    • 01:09:30
      But in because otherwise, it's just it's actually like from the perspective of someone trying to trying to produce drawings like that, it's really hard to represent accurately.
    • 01:09:40
      And so I feel like that's the best path for us to go on.
    • Mariah GleasonUrban Designer
    • 01:09:46
      This is really getting into our third question, which is what details or information should be included in the addenda to help identify when a wooded buffer would be consistent with the local character or context?
    • 01:09:56
      And I offered this list below, not as a recommendation, but just as kind of fodder and possibilities.
    • 01:10:05
      And the image to the right is an example pulled from the internet, and that's actually their code.
    • 01:10:12
      So it could go into something.
    • 01:10:15
      This is from a form-based code in Aurora, Colorado, where they do actually prescribe plantings and depth and composition.
    • 01:10:31
      That is a zoning code, not an entrance cord worth guidelines.
    • 01:10:48
      So what criteria would be helpful in evaluating would-it buffers if you were tasked with being the client developer?
    • 01:10:59
      What aspects would be helpful to see in the agenda to let you know about what to shoot for to be consistent?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:11:15
      Those seem like good ones that you've started with the list.
    • 01:11:18
      And there might be a variety of depths that have a buffer type 1, 2, 3, depending on the level of opacity and separation.
    • 01:11:31
      But it'd be like the idea of a matrix of the number of trees per lineal foot density and distributed.
    • 01:11:39
      It seems like a nice way to still
    • 01:11:44
      require a certain density and type, but leave it open to development.
    • Mariah GleasonUrban Designer
    • 01:11:50
      I was kind of thinking it would be, since some of these would be on segments, I was kind of thinking that a range would be good, but, or would a single number be better?
    • 01:11:59
      Should it be an average?
    • 01:12:04
      How would you report that number?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:12:05
      The depth or yeah.
    • 01:12:11
      I think it's project specific.
    • 01:12:13
      I don't know that we would dictate it.
    • 01:12:17
      I think the key in this diagram is the 50% evergreen if you're using it to screen anything.
    • 01:12:28
      And this could be a case too of like, they'd mentioned you do an inventory of an existing buffer or an adjacent buffer or something on the corridor.
    • 01:12:40
      and base it on that predominantly oak with some understory of X.
    • 01:12:53
      That's kind of like you would look to the designers or the applicants to bring that forth.
    • 01:13:01
      You know, that's similar to them saying, well, we noticed these architectural forms along this corridor.
    • 01:13:07
      So those are things we incorporated into the building or this is what we were acknowledging.
    • 01:13:11
      You know, you could do that similarly with a buffer.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:13:15
      Yeah, that's a good point, Frank.
    • Chris HenningsenChair, Architectural Review Board
    • 01:13:18
      Kind of think of like cell towers where they have to do a balloon test where you actually, I'm not suggesting that like we tell people they have to do this, but it seems like there's so many variables that it's like,
    • 01:13:33
      Almost have to do something like that to prove that a buffer really is going to screen something if it's undesirable to look at, I guess.
    • Mariah GleasonUrban Designer
    • 01:13:48
      I think there are two, like to Dade's point about the buffer type A, B, and C, or one, two, and three.
    • 01:13:54
      Is this a wooded buffer that is consistent, or is it a wooded buffer to limit visibility, or is it both?
    • 01:14:07
      because when driving around some of the Route 250-29 bypass, when you start to get into that O'Hill region, when you're going towards Route 29 up by barracks, you start to be able to see through the woods pretty easily but that's almost a defining feature itself and it's okay that there is visibility through it
    • Taro MatsunoMember, Architectural Review Board
    • 01:14:42
      Yeah, I guess there's, so are you, are we looking for like, cause there's one set of wooded buffers that are intended to provide screening.
    • 01:14:53
      But is this question like, does, like how much of the wooden buffer do you need to preserve to maintain the wooded character of the rest of that corridor?
    • Mariah GleasonUrban Designer
    • 01:15:03
      Is that kind of what this is looking at?
    • 01:15:04
      Yeah, the questions are a little confused.
    • 01:15:07
      I think this one, this topic was just a,
    • 01:15:10
      It was hard to piece out the different questions.
    • 01:15:17
      So the first question was, would it buffer as a defining feature?
    • 01:15:21
      Second question is, should they contribute?
    • 01:15:25
      And really, what aspects should really be considered to allow them to contribute to making the development more visible or less visible?
    • 01:15:41
      This question is more so related to the first question where it's, okay, if a wooded buffer is significant to this corridor, how do you then gauge what aspects make it significant and then consistent with what's there?
    • 01:16:05
      This isn't really visibility or not.
    • 01:16:07
      This is consistency.
    • Taro MatsunoMember, Architectural Review Board
    • 01:16:12
      I wonder if part of it is like, if there are trees above a certain caliper or something within that, because I can imagine a situation where like, you could have a relatively shallow buffer, but if trees within that area were, that certain more significant trees were preserved, it could be okay to build closer into that buffered area provided that those trees are preserved, something like that.
    • 01:16:42
      Like I think one of the things that I'm starting to feel is that the depth is less important than I think what Frank was saying like the composition of what's actually there and then some acknowledgement of the history of the land and the landscape up to that point.
    • 01:16:58
      It's like part of it is like are there significant features in that landscape that can be preserved
    • 01:17:04
      Apart from whether like all of the little scrubby trees within 50 foot radius of that thing is preserved, like that might not be less, that might be less important and that might be okay to be incorporated into the development.
    • 01:17:16
      But if it's, you know, like it would be a real shame if like shrinking down that buffer at a 20 or 30 feet resulted in the elimination of grand oak trees.
    • 01:17:28
      That's like a different saying I feel like.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:17:35
      In terms of the case of the Fifth Street extended and the Fifth Street station that's visible from 64, was that development was not subject to any ARB review or was that elevation and the portion that faces 64 subject to ARB review?
    • Margaret MaliszewskiPlanning Manager
    • 01:17:51
      Fifth Street station, the view from 64 was subject to ARB review.
    • 01:17:55
      Was subject, okay.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:17:59
      I think they've like cleared the underbrush to make it more visible.
    • Margaret MaliszewskiPlanning Manager
    • 01:18:04
      It does feel like that.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:18:07
      But I don't know that, you know, there's also like some thought and care given to the architecture of the back of that, you know, that isn't typical of a shopping, retail type back of a building.
    • 01:18:25
      So.
    • Mariah GleasonUrban Designer
    • 01:18:38
      We have a couple of things.
    • 01:18:40
      Are there any others that would be helpful for a future applicant or ARB member to evaluate or have available?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:18:54
      To Frank's earlier point about topography, I mean, maybe it's so obvious it doesn't need a representation, but a representation of like appropriate sectional location of the buffer.
    • 01:19:07
      relative might be useful just to, like if it's above the roadway and I level that it counts.
    • Mariah GleasonUrban Designer
    • 01:19:22
      I think we'll be doing a lot more drive-bys of these entrance corridors just to, you all took away the easiest to evaluate the buffer depth.
    • 01:19:35
      Okay, great.
    • 01:19:38
      So thank you for your discussion.
    • 01:19:39
      Were there any other questions or comments?
    • 01:19:42
      I think some came up during the discussion, but are there other, like, I think the question of, you know, why does this matter?
    • 01:19:52
      You know, to what extent are we really suggesting what it buffers in rural areas?
    • 01:20:00
      But are there other questions that have come up?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:20:04
      No, I mean I think we touched on it briefly, the question of like residential development in the rural area and I think
    • 01:20:15
      Do other, is there anything in that?
    • 01:20:19
      Do other members feel like there's a gap and having a desire to find a way to fill it in terms of having a way to have entrance corridor oversight over that or any guidelines that would help assure continuity?
    • 01:20:33
      Because I guess right now that can largely just happen outside of it.
    • 01:20:36
      And there's some instances where it, you know, it's a discontinuity in terms of the character.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:20:46
      I don't know.
    • 01:20:46
      Meaning like if it's a by right development in the rural area or you know.
    • 01:20:52
      Yeah.
    • 01:20:53
      Yeah.
    • 01:20:54
      Yeah.
    • 01:20:54
      I don't think we and it's going to be a residential use.
    • 01:20:58
      Right.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:20:59
      Well, right.
    • 01:21:00
      And I don't know whether there's anything this board would like to recommend or could recommend or where things would need to change.
    • 01:21:06
      But obviously, there is pressure for development in the county.
    • 01:21:12
      There is a need for more housing and more affordability.
    • 01:21:16
      But thinking about our charge to protect the character and the order and the continuity of the entrance corridors, it just seems like there's a gap
    • 01:21:28
      right now where residential development along the corridors could gradually erode and significantly change their character without the chance for the board to continue the influence that we're charged with exerting over them more generally.
    • Chris HenningsenChair, Architectural Review Board
    • 01:21:55
      Yeah, I mean, right now residential, unless I'm wrong about that, I think like residential is pretty much just exempt from our purview.
    • 01:22:06
      So I don't know, that's kind of a difficult situation.
    • 01:22:12
      As an architect, I would like there to be some oversight, but I guess as a citizen or property owner, I might not.
    • 01:22:23
      there to be oversight.
    • 01:22:25
      So it's kind of a, I think politically it would be a difficult, kind of an uphill climb to try and get that included.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:22:37
      I agree.
    • 01:22:43
      I see the same.
    • 01:22:46
      Inflicting perspectives and the same political stakes.
    • 01:22:51
      I don't know if it would be worth in some form identifying it as a gap and something to be addressed.
    • 01:22:59
      It would be, so for example, we've been talking about wooded buffers.
    • 01:23:02
      If there were an area where a wooded buffer was a character defining feature,
    • 01:23:09
      You know, would the board recommend that somehow zoning or another ordinance be amended so that even by right development needed to respect it so that that continuity was maintained?
    • 01:23:22
      I don't know what staff would, what is the pathway?
    • 01:23:25
      That would fall not into a guideline amendment, but it would need to be what, a recommendation or a consideration from the board to planning commission or
    • Frank HancockVice Chair, Architectural Review Board
    • 01:23:35
      You'd have to amend the overlay, like an entrance corridor ordinance.
    • 01:23:41
      I mean, that would be right.
    • Margaret MaliszewskiPlanning Manager
    • 01:23:44
      It would be an ordinance change.
    • 01:23:46
      Some of those issues were identified in the draft chapter, in the comp plan chapter, so those concepts are there.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:23:56
      I guess it would be maybe up to each of us if we so felt inclined to speak to our supervisors or others to try to raise the concern.
    • 01:24:06
      Okay, thank you.
    • Mariah GleasonUrban Designer
    • 01:24:09
      Well, next we have a treat for you.
    • 01:24:11
      We are working on as we're working on putting all these into a document that also has an introduction.
    • 01:24:18
      We have a table of contents.
    • 01:24:23
      So this is the reference map table and table of contents that goes with it.
    • 01:24:28
      We thought that
    • 01:24:30
      being geographically minded it might be helpful to have identified a map where things are organized by location so that if something is if a property exists at a corner it's a corner property they would be able to very easily the user would be very easy
    • 01:24:49
      able to scoot just a couple of pages to see all of the information that they need.
    • 01:24:55
      We also have this, the table of contents organized by route number and by street name.
    • 01:25:03
      But the primary organization is going to be by location.
    • 01:25:06
      So if they only print out one page, it would be this and they would have all that they need.
    • 01:25:13
      But if people like to reference different ways, we've built that into the into the agenda as well.
    • 01:25:21
      That's all we have for you today, but thank you very much for your comments and grappling with these complex questions as we did.
    • 01:25:37
      We really appreciate the feedback.
    • Chris HenningsenChair, Architectural Review Board
    • 01:25:40
      All right, well thanks a lot.
    • 01:25:46
      Yes, we'll move on to other business.
    • 01:25:48
      First item would be approval of the May 19th, 2025 minutes.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:25:54
      Since I believe I was not here, I'm very inclined to move for their approval.
    • Chris HenningsenChair, Architectural Review Board
    • 01:25:59
      I'll second.
    • 01:26:00
      All right, if we could put that to a vote.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:26:04
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 01:26:07
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:26:07
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 01:26:08
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:26:09
      Mr. Matsuno?
    • 01:26:10
      Aye.
    • 01:26:11
      Mr. Van Der Werf?
    • 01:26:12
      Aye.
    • 01:26:12
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:26:14
      All right.
    • 01:26:15
      Do any board members or staff have any additional items?
    • Margaret MaliszewskiPlanning Manager
    • 01:26:20
      We wanted to bring to your attention that there were some recent state code changes that went into effect on July 1st that have impacted our review times.
    • 01:26:33
      They have reduced the review period for plans and plats from 60 days to 40 days.
    • 01:26:42
      We think that this is going to
    • 01:26:44
      primarily affect ARB reviews as they relate to initial site plans and what that really means in terms of
    • 01:26:59
      actual work days that we can spend on getting an application to you for review in some cases it can reduce that review time to 10 working days or 15 working days most of the review periods would be more than that but it does significantly reduce our time
    • 01:27:20
      Our question for you is, would you be willing to add meeting dates, add additional ARB meetings on Mondays?
    • 01:27:30
      If we could do that, it could help our, it could expand our review times, make those a little more generous.
    • 01:27:41
      We wouldn't necessarily need, well, the easiest thing to do would be to
    • 01:27:48
      have a potential for ARB meeting on any Monday afternoon and just cancel when we don't need them.
    • 01:27:55
      I think most of them would be able to cancel, but it's harder to get you all in at the last minute rather than much easier to just say there's a potential meeting and cancel it.
    • 01:28:06
      So just looking to see how willing you all might be to add some meeting dates.
    • 01:28:16
      And if you want to think about it for a moment.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:28:20
      It's the thought.
    • 01:28:23
      It would be a standing every Monday.
    • Margaret MaliszewskiPlanning Manager
    • 01:28:25
      That would be the easiest to do.
    • 01:28:30
      Everybody would know, OK, it's a Monday, there might be an A or B meeting when we and we would know, you know, weeks ahead if we needed to have it or not.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:28:38
      I'll just speak personally on, you know, given most of the meetings are pretty short, I mean, I guess you're assuming it would be a one or two item meeting, usually like, it would allow staff to like meet those new deadlines and the applicant, everybody to keep things moving.
    • 01:28:59
      Yep, exactly.
    • 01:29:00
      I don't have any issues with that.
    • 01:29:04
      But that's just me.
    • Chris HenningsenChair, Architectural Review Board
    • 01:29:07
      Yeah, no, I think, yeah, I kind of agree.
    • 01:29:10
      It seems like just more a matter of keeping Monday afternoons, like, you know, open calendar-wise with the expectation that a lot of them are going to be canceled.
    • 01:29:29
      How much lead time do you think we would have to know whether or not
    • 01:29:36
      A meeting was going to be canceled or not?
    • Margaret MaliszewskiPlanning Manager
    • 01:29:39
      Well, we're looking at every Monday as a submittal deadline.
    • 01:29:45
      So every Tuesday, we could let you know whether that corresponding meeting date would be needed or not.
    • 01:29:53
      So it would be weeks.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:29:58
      Could you remind us of the virtual attendance option?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:30:06
      You can do it twice a year.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:30:07
      Each board member can utilize it twice a year.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:30:11
      You have to have a reason.
    • 01:30:12
      It can't be just because you don't want to come in.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:30:15
      I think we also have to have a in-person forum.
    • 01:30:19
      We have to have an in-person quorum.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:30:21
      Yeah, you do have to have an in-person quorum.
    • 01:30:24
      You always have to have at least three, but you can only get two a year.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:30:29
      And is that requirement for the in-person quorum from state code or county code or is that just the religious quorum?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:30:36
      Yeah, I think it's the state code for the Zoom meetings.
    • 01:30:41
      You have to have an in-person quorum.
    • 01:30:44
      It also makes it tougher if I have say like there's five of you and three of you want to be on Zoom.
    • 01:30:51
      It makes it tough when you want to talk about a specific slide because we can't do that.
    • 01:30:56
      Yeah, it can't go back and forth.
    • 01:30:57
      So that makes it tough.
    • 01:30:58
      And we have to have a quorum in person in order to have a meeting anyway, unless it's a full Zoom meeting and we're not allowed to do those anymore.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:31:09
      And then I'm just thinking about the logistics of having a quorum.
    • 01:31:17
      So is it five members max, minimum?
    • 01:31:24
      Like, is it always five members on the architectural review board?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:31:28
      Yes.
    • 01:31:30
      And then if you only have three here and somebody needs to be recused, maybe on both items, then you're not going to have a quorum.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:31:37
      As long as you start the meeting with a quorum.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:31:40
      If there's one item, if there are only three in attendance, and one of the three has to be recused, we can't do it because we don't have a quorum.
    • 01:31:50
      In the tech week we do, but we don't because we don't have that third person to vote in person.
    • Taro MatsunoMember, Architectural Review Board
    • 01:31:55
      Yeah, it seems like it'd be easy.
    • 01:31:56
      I'm personally OK having more meetings on my calendar.
    • 01:32:03
      That's OK.
    • 01:32:03
      It's just the other quorum issue I'm kind of wondering about.
    • 01:32:07
      Because sometimes we, even with our every other week schedule, we occasionally have moments where we're like, oh, crossing our fingers that our three members are going to show.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:32:18
      I can send you a yearly.
    • 01:32:22
      For the Planning Commission, I send them a yearly.
    • 01:32:25
      Calendar Invite, so it shows up on your calendar whenever the meeting is.
    • 01:32:30
      I'll be more than happy to do that if we go to every Monday, or even what's left for the year if we don't go every Monday right away.
    • 01:32:38
      I'll be glad to set up an email that lets you know, and then I can just cancel it there, and I'll also email you and let you know it's been canceled.
    • 01:32:47
      But if it's been canceled, I'll just delete it, and it'll come off your calendar.
    • Taro MatsunoMember, Architectural Review Board
    • 01:32:52
      Yeah, I guess I worry on the other side too, like, so that you're not, like, I would appreciate knowing, but also I would just worry that, you know, we don't get in touch with you fast enough for the date.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:33:09
      Right.
    • 01:33:10
      I just need to know by Friday morning if you're coming or not, because we wait till Monday and then we have to open the meeting and then cancel the meeting because it's,
    • 01:33:22
      You can do it, but they don't really like us to do that.
    • Taro MatsunoMember, Architectural Review Board
    • 01:33:29
      Well, I guess to that point, so we are a five-member board.
    • 01:33:36
      I'm just curious.
    • 01:33:38
      I don't think that this should hold up us.
    • 01:33:44
      putting in more meetings but like is there like an alternates policy or like increasing the board or something like that that would help meeting quorum?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:33:52
      If you increase the board you're going to have to have more people here in person.
    • 01:33:57
      If you say you're six you're going to have to have four always.
    • 01:34:01
      Seven you have to have you know.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:34:06
      Would it make a substantial difference if we went to, as opposed to a month, one every two weeks?
    • 01:34:14
      Or it's really the weekly cycle that will open up the
    • Margaret MaliszewskiPlanning Manager
    • 01:34:18
      Potentially, it shouldn't be as challenging as it is to figure this out, but when you get a fifth Monday, it just messes up the whole county.
    • 01:34:31
      So it's just hard to make it very simple.
    • 01:34:36
      And since we don't know when,
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:34:40
      applications are going to be made it's just it's it's hard to say you know which which review period do we really need to to get it in there so potentially that could help so the output so it's 40 calendar days for the review is that right or 40 yeah so the the application land the the application is the date that it's logged by the county or that the applicant postmarks it or
    • Margaret MaliszewskiPlanning Manager
    • 01:35:06
      The date that it's submitted is the application date.
    • 01:35:10
      So it is 40 days.
    • 01:35:12
      We're talking primarily about initial site plans.
    • 01:35:16
      So on initial site plans, the ARB is providing advice as a site review committee member to
    • 01:35:25
      Basically the lead planner, the planner who's leading the review of the site development plan.
    • 01:35:30
      So that planner has 40 days to get to take an action on that.
    • 01:35:35
      So we have, so they need a little bit of time to get everybody's comments in to figure out, you know, to get that coordinated.
    • 01:35:43
      So we have 35 days to get them the A or B comment.
    • 01:35:49
      And then when you back out, you know, it's sort of a day at the front end and two and a half days at the back end for getting it posted and take out the weekends.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:36:05
      I think like fellow members if it were a standing reservation on Mondays I think that that could work and especially I guess working with the assumption that as we've been able to cancel a number lately would still remain roughly you know two meetings or fewer a month.
    • Margaret MaliszewskiPlanning Manager
    • 01:36:21
      Yeah, I think it's potential that you might not see all that many added meetings.
    • 01:36:28
      Last year, there were 12 initial site plans.
    • 01:36:31
      I think that it's that category that's going to be the real issue of getting that done in the shorter timeframe.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:36:40
      Is that in the code that we review initial site plans?
    • 01:36:49
      Yes.
    • 01:36:49
      As a member of the site review committee, like the whole ARB.
    • Taro MatsunoMember, Architectural Review Board
    • 01:36:58
      Yes.
    • 01:36:59
      I guess if we have items before other boards, it's good that I'll benefit from the review time being shorter.
    • 01:37:08
      So I'm happy to give some of my Mondays to potential additional meetings.
    • 01:37:13
      So in that perspective, I think it makes a lot of sense.
    • Chris HenningsenChair, Architectural Review Board
    • 01:37:18
      I guess, I mean,
    • 01:37:20
      The way I look at it is like this is not increasing the number of applications that we're reviewing.
    • 01:37:26
      It's just making it such that maybe we meet two Mondays in a row and then don't meet for the next three.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:37:35
      Just a little bit more flexibility in terms of when... Makes it easier to say no to client meetings on Mondays.
    • Margaret MaliszewskiPlanning Manager
    • 01:37:49
      OK, I think that's the information I need for now.
    • 01:37:52
      I will contact Mr. Stoner and have this discussion with him and see if he's on board with that.
    • 01:37:59
      And then we'll get back to you with more details.
    • Chris HenningsenChair, Architectural Review Board
    • 01:38:01
      Thank you.
    • 01:38:02
      All right.
    • 01:38:02
      Thanks.
    • 01:38:03
      Thank you.
    • 01:38:05
      OK, so the next ARB meeting is scheduled for Monday, July 21, 2025.
    • 01:38:10
      Is there anyone who does not think they'll be out of attend?
    • 01:38:19
      I'll plan to be here.
    • 01:38:21
      All right.
    • 01:38:21
      So it seems like we will have a quorum.
    • 01:38:25
      So in that case, this meeting is adjourned until our next meeting on Monday, July 21st, 2025.
    • 01:38:30
      It's 2.40 by my watch.