Architectural Review Board Meeting   1/21/2025

Attachments
  • Agenda Annual Meeting.pdf
  • Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB2024-70 Flow Mercedes staff report.pdf
  • Attach. 1 ARB2024-70 Flow Mercedes Site Plan.pdf
  • Attach. 2 ARB2024-70 Flow Mercedes Architectural Submittal.pdf
  • Attach. 3 ARB2024-70 Flow Mercedes Dimensioned Elevations.pdf
  • ARB2024-71 400 Rio Rd West Staff Report.pdf
  • Attach. 1 ARB2024-71 400 Rio Rd West Narrative.pdf
  • Attach. 2 ARB2024-71 400 Rio Rd West Concept Plan.pdf
  • Attach. 3 Safety and Screening Fencing Design Criteria.pdf
  • ARB2024-74 High School Center 2 memo.pdf
  • ARB2024-49 High School Center 2 action letter.pdf
  • ARB2024-74 High School Center 2 Combined metal information.pdf
  • Draft ARB Action Memo Minutes 12_16_2024.pdf
    • Margaret MaliszewskiPlanning Manager
    • 00:00:02
      1 o'clock.
    • 00:00:03
      I'm calling the January 21st, 2025 meeting of the Albemarle County Architectural Review Board to order.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:10
      Carolyn, can you call the roll please?
    • 00:00:12
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:14
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:14
      Mr. Hancock?
    • 00:00:15
      Here.
    • 00:00:16
      Mr. Stoner?
    • Frank StonerMember, Architectural Review Board
    • 00:00:17
      Here.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:18
      Mr. Van Der Werf?
    • 00:00:19
      Here.
    • 00:00:20
      And Ms. Matsuno is absent.
    • Margaret MaliszewskiPlanning Manager
    • 00:00:23
      Thank you.
    • 00:00:24
      This is the first meeting of the ARB for this year.
    • 00:00:27
      So this is our annual meeting.
    • 00:00:29
      And the first item of business is electing the chair.
    • 00:00:32
      I'd like to ask for nominations, please.
    • Frank StonerMember, Architectural Review Board
    • 00:00:37
      I'd like to nominate Chris Henningsen.
    • 00:00:40
      I'll second.
    • Margaret MaliszewskiPlanning Manager
    • 00:00:42
      Are there other nominations?
    • 00:00:45
      Carolyn?
    • 00:00:46
      No.
    • 00:00:46
      You called it that?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:49
      Van Der Werf?
    • Margaret MaliszewskiPlanning Manager
    • 00:00:51
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:52
      Mr. Stoner.
    • 00:00:54
      Aye.
    • 00:00:55
      Mr. Hancock.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:56
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:00:56
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:00
      All right.
    • 00:01:00
      Well, thank you.
    • 00:01:03
      So at this point, we will call for nominations for Vice Chair.
    • 00:01:09
      Does anybody want to nominate Frank Hancock?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:01:15
      I'd be pleased to nominate Frank Hancock.
    • 00:01:18
      Second.
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:20
      All right.
    • 00:01:20
      If we could call a vote.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:01:23
      All right, Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:26
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:01:26
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:28
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:01:28
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:29
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:01:29
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:30
      All right, thanks a lot.
    • 00:01:34
      Adoption of the 2025 ARB submittal and meeting schedule, I guess unless anyone has any proposed changes, would anybody like to make a motion on that?
    • 00:01:52
      So moved.
    • 00:01:55
      Mr. Henningsen?
    • 00:02:02
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:02
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:04
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:04
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:05
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:06
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:07
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:07
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:08
      All right, thanks.
    • 00:02:09
      And then the ARB rules of procedure.
    • 00:02:15
      Does anybody want to make any kind of amendment or tweak?
    • 00:02:21
      No.
    • 00:02:23
      All right.
    • 00:02:24
      In that case, would anybody like to make a motion to adopt the rules?
    • 00:02:31
      So moved.
    • 00:02:32
      Second?
    • 00:02:36
      Second.
    • 00:02:38
      All right, we could put that to a vote.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:43
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:44
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:44
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:46
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:46
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:48
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:48
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:50
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:02:50
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:51
      All right, thanks a lot.
    • 00:02:53
      Today's meeting is a hybrid meeting.
    • 00:02:56
      The public may access and participate in the meeting electronically.
    • 00:03:00
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:03:06
      The public has real-time audiovisual access to this meeting over Zoom, and real-time audio access over telephone both is provided in the lawfully posted meeting notice.
    • 00:03:17
      This meeting is being recorded and will be made available on the county's website.
    • 00:03:22
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:03:28
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:03:32
      Applicants who are making presentations, note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:03:40
      Staff will let us know when the 15 minutes are up.
    • 00:03:44
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:03:52
      Everyone who is participating virtually, please mute and microphone until it is your turn to speak.
    • 00:04:00
      Do any ARB members have anything to disclose?
    • Frank StonerMember, Architectural Review Board
    • 00:04:03
      No.
    • 00:04:06
      I will need to recuse myself from the Flo Mercedes-Benz review.
    • 00:04:10
      All right, thanks.
    • 00:04:11
      I do not have any disclosures.
    • Chris HenningsenChair, Architectural Review Board
    • 00:04:13
      I guess my disclosure is that if we have not concluded by 3 p.m., I will have to leave at that point and hand over the reins to Frank Hancock.
    • 00:04:28
      I accept.
    • 00:04:30
      All right, so thank you.
    • 00:04:33
      We don't have any consent agenda items today.
    • 00:04:37
      Oh, one thing I forgot.
    • 00:04:41
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:04:51
      No one online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:04:52
      All right, great.
    • 00:04:54
      So no consent agenda items.
    • 00:04:57
      We have two regular review items today.
    • 00:05:00
      The first is ARB 2024-70 Flow CVL Mercedes-Benz.
    • Margaret MaliszewskiPlanning Manager
    • 00:05:20
      This is a proposal to replace the existing automobile showroom that's located at 1313 Richmond Road with a new showroom for Flo Mercedes-Benz.
    • 00:05:31
      The new building would be positioned in about the same location as the existing building and the proposal would maintain the building's orientation to the street as well as the general layout of the site.
    • 00:05:42
      The proposed building design is a version of the company's trademark design.
    • 00:05:47
      There are other buildings here in this image based on that design as well.
    • 00:05:52
      The roof form, the ACM panels, particularly those that are angled and curved, and the expansive glass are all part of the trademark design.
    • 00:06:01
      The roof with its thin form, rounded corners, and deep overhang is an unusual feature in the corridor, but the metal panels, geometric shapes, and the large areas of storefront glass are compatible with other contemporary auto dealerships along the corridor.
    • 00:06:17
      The exterior design is meant to showcase the vehicles on display inside the building with an expansive glass at the northwest corner.
    • 00:06:25
      The glass corner combined with the topography of the site result in the showroom floor standing well above the parking area that's located west of the building.
    • 00:06:32
      The vehicles on display inside the building will appear elevated to viewers outside the building and interior illumination will highlight the building at night.
    • 00:06:42
      Two features of the building are identified in the staff report as needing additional clarification.
    • 00:06:47
      One is where the building steps back from the main facade to the vehicle delivery area, then to the service drive reception.
    • 00:06:54
      Although the stepped form should help break up the mass and establish some human scale, the renderings show the eastern end of the building is a very dark mass.
    • 00:07:02
      The dark color and shadows there may reduce the positive benefit of the stepping patterning and divisions.
    • 00:07:08
      On the other end of the building, the west end, there are metal panels above a black painted base.
    • 00:07:15
      The illustrations suggest a continuous appearance from panel to base, but the reflectance of the metal panels is expected to differ from the painted finish.
    • 00:07:23
      The surfaces are expected to wear differently and the paint could be a maintenance issue.
    • 00:07:28
      So we've recommended additional details to clarify both conditions.
    • 00:07:34
      Service building at the rear of the site would be painted as part of this proposal, and the blank metal siding on the side elevations would be painted white gloss.
    • 00:07:42
      Although the service building is set back from the street, the west elevation is visible from the corridor, and we've recommended a more muted tone to help minimize the impacts of that blank wall.
    • 00:07:53
      The proposal includes some minor changes to the site compared to the previously approved plan.
    • 00:07:58
      The layout and distribution of parking and display spaces was approved with a special use permit for outdoor display in 2008.
    • 00:08:05
      So a plan or diagram will need to be included in the site plan to confirm consistency with that approval.
    • 00:08:12
      Our recommendation is for revisions to the proposal to be reviewed by the ARB in a future meeting.
    • 00:08:17
      I'd be happy to answer any questions you have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:08:20
      All right, thanks a lot for that presentation.
    • 00:08:23
      I guess we'll start with Dade if you have any questions.
    • 00:08:27
      Thank you, Margaret, no questions.
    • 00:08:29
      All right, Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 00:08:31
      I'm recused.
    • Chris HenningsenChair, Architectural Review Board
    • 00:08:33
      Oh, that's right.
    • 00:08:36
      Frank Hancock.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:08:38
      Thank you, Margaret.
    • 00:08:39
      I'm not sure if I read it correctly.
    • 00:08:43
      Was the service
    • 00:08:46
      Part of the building in the front before and now it's been shifted to the east side or did I read that plan wrong?
    • 00:08:53
      Has it always been on that side?
    • 00:08:59
      Or was that just orientation of the plan?
    • Margaret MaliszewskiPlanning Manager
    • 00:09:06
      I'm not sure if there is a service entrance visible from the street currently.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:09:13
      I believe currently the service is at the facility on the rear.
    • 00:09:17
      So this will be a new service bay on the one closer.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:09:21
      Should we look at the site plan?
    • 00:09:23
      The black, just the lines drawn.
    • Chris HenningsenChair, Architectural Review Board
    • 00:09:32
      Yeah, 250 is on the left.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:09:34
      Oh, no, that's what it is.
    • Chris HenningsenChair, Architectural Review Board
    • 00:09:35
      I was oriented wrong, sorry.
    • 00:09:39
      No other questions.
    • 00:09:41
      Thanks.
    • 00:09:42
      I don't have any questions.
    • 00:09:44
      So if the applicant has a presentation.
    • Kevin SchaferStudio Director
    • 00:10:03
      Good afternoon.
    • 00:10:04
      My name is Kevin Schaefer.
    • 00:10:05
      I'm the Charlottesville Studio Director at Design Develop.
    • 00:10:09
      Thank you, Margaret, for the staff report and the introduction there that covered many of my topics as well.
    • 00:10:16
      I'm happy to talk through the service drive kind of procedure that's being refined here in this proposal.
    • 00:10:26
      But I did want to maybe just make clarity.
    • 00:10:29
      We, excuse me, we are in between a Toyota dealership and a BMW dealership and directly across from the Floati Porsche dealership.
    • 00:10:40
      So this is not the Mercedes Benz where it currently is today, which is further up the street on the other side of the Toyota.
    • 00:10:48
      This would be replacing the
    • 00:10:50
      the current Hyundai dealership and as staff mentioned replacing the building in what is pretty much the same location.
    • 00:11:03
      We actually intend to utilize some of the existing foundation along that northwest facade in an effort to keep the footprint and the mass the same.
    • 00:11:14
      As you can see in the existing images the existing structures
    • 00:11:20
      A collection of boxes that kind of fall down the grade as you work your way east towards town, excuse me, west towards town on 250.
    • 00:11:30
      And kind of a disjointed appearance also has a significant amount of interior elevation changes from floor to floor, which as you can imagine is not necessarily ideal for cars on the interior trying to move interior stairs.
    • 00:11:49
      So the proposal, as staff has mentioned, aims to establish a plinth and create a more sort of cohesive building form that's under a singular kind of unifying roof element.
    • 00:12:03
      The roof element is
    • 00:12:07
      A little bit more unique in the automotive dealership and is one of sort of a trend breaker than just the regular ACM box that a lot of the contemporary auto dealerships employ.
    • 00:12:22
      And we thought it tied well as kind of a unifying element with this sweeping ACM panel that was on the front that kind of softened the hard geometric lines and sort of broke down
    • 00:12:33
      the big glass box in a way that felt pretty appropriate for this entrance corridor, especially given its context and its goal of achieving sort of orderly and complementary appearance along this entrance corridor.
    • 00:12:50
      The color itself as we're sort of going through this evaluation internally as well seems to be appropriate when you consider the Kia directly up the street as well as the material palette that's being employed at the Mazda and the Volkswagen.
    • 00:13:07
      And so when we laid out the ARB submission and we're going through the entrance corridor guidelines, this started to check a lot of the boxes.
    • 00:13:16
      We weren't
    • 00:13:17
      Disrupting the mass too much, we weren't expanding the building footprint.
    • 00:13:21
      The existing landscaping was to remain and you can see the landscaping along Route 250 would remain and anywhere that there's
    • 00:13:33
      A missing tree or a dead tree, part of this project would be remediating any missing landscaping as has been part of all of the flow projects along entrance corridors recently.
    • 00:13:48
      But the big move was to establish sort of this cohesive building form that was broken down in an appropriate manner
    • 00:13:56
      and giving hierarchy to the showroom.
    • 00:13:59
      Simplifying the use within by creating the level of slab, as I mentioned, and trying to ensure that the service functions remained to the rear.
    • 00:14:14
      Currently, correct, you drop off at a service drive-through lane at the rear of the site.
    • 00:14:21
      That's where the service building is.
    • 00:14:22
      That building would remain there and just get an exterior facelift.
    • 00:14:27
      The service drop off that is on the left of our proposed building would be the customer interaction at that point.
    • 00:14:34
      So they would pull into this, drop the keys, and then a technician would then take the car to the rear of the site.
    • 00:14:44
      The customer could then view their car getting its maintenance on a camera, a CCTV scenario, but the aim would be to keep the customers and all sort of customer-facing activities in this main showroom building and allowing the more utilitarian and service drive to happen in the rear, service functions to happen in the rear of the site.
    • 00:15:12
      I think staff brings up
    • 00:15:14
      Two good points, the first being this service drive and I think you know perhaps our renderings particularly in this corner or maybe the shadows a little bit dramatic and we could provide some clarity on the material there but we felt the step back was appropriate given the use
    • 00:15:32
      and that the consistency of the panel was important and that the unifying roof element that goes over the main showroom feature helps break this down a little bit or helps provide the clarity that we're looking for in a hierarchy of a building form.
    • 00:15:53
      The glass continues back towards that service bay where there's just a couple of garage doors for the service drop-off.
    • 00:16:03
      But we felt like the breaking down of the form was consistent with the goals of the entrance corridor, as well as giving the hierarchy to the showroom and the front element here.
    • 00:16:13
      So maybe this front elevation provides a little bit more clarity as to how that building form breaks down, despite maybe being in heavy shadow in that one rendering.
    • 00:16:26
      I think the other comment that staff brings up, which is also a good one, is the change in material from the masonry base to the ACM panel.
    • 00:16:37
      Something we had kicked around a lot and contemplated and in debate, does the ACM panel go all the way to grade and what are the implications of that or challenges of installing it?
    • 00:16:47
      It is anticipated at this point in this proposal to be either parched masonry or an eaves with the sort of the high impact reinforcement mesh.
    • 00:17:04
      but it felt important to kind of break that masonry plane or that base and then elevate the finishes above the slab and mark the change from the ACM panel from a logistical perspective or an installation perspective installing
    • 00:17:24
      ACM cleanly along that grade line, particularly where people are parking so close to the building was a concern.
    • 00:17:30
      Was the ACM going to get damaged quickly?
    • 00:17:34
      What would that repair look like?
    • 00:17:35
      Could we make that joint look clean as it met the bottom of the curb and the landscaping along there?
    • 00:17:42
      And so we did feel it was prudent and important to change that material
    • 00:17:49
      But in saying that, I do acknowledge that there would be a gloss difference.
    • 00:17:54
      And we're hoping that the board can provide guidance on the preferred direction that they'd like to see there.
    • 00:18:02
      This screen also shows the high gloss white, which is another valid comment.
    • 00:18:08
      And we would look to tone down that color.
    • 00:18:12
      We're certainly willing to do that.
    • 00:18:14
      The high gloss was a brand specification, but in hindsight was
    • 00:18:19
      It's important to definitely reduce the visibility of that and not draw attention to that service center in the rear.
    • 00:18:25
      So we could paint it either a black that matches the rest of the building, but maybe that's too eye-catching as well.
    • 00:18:31
      We could go to a gray.
    • 00:18:33
      We have a gray color along the roof trim of the front showroom, which might be appropriate, or it could just be a white that is not a high gloss.
    • 00:18:44
      That's a satin finish.
    • 00:18:45
      So we're open to those suggestions as well.
    • 00:18:49
      This image also finally shows our strategy for screening the mechanical units.
    • 00:18:57
      I know staff has a number of comments that we're happy to address regarding glass transparency, proper screening of mechanical units and just clarifying how that would be done.
    • 00:19:07
      Mediating landscape and providing more information on site lighting as well.
    • 00:19:13
      We're happy to do in our subsequent submissions.
    • 00:19:17
      But initially we were just interested in the feedback and engaging in the dialogue with the board.
    • 00:19:24
      Gaining clarity on some of the items that staff brought up and always happy to engage in this discussion.
    • 00:19:31
      Happy to answer any questions and thank you very much.
    • Chris HenningsenChair, Architectural Review Board
    • 00:19:34
      All right.
    • 00:19:35
      Thanks for that presentation.
    • 00:19:36
      I guess we'll start with Dade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:19:40
      Thank you for your presentation.
    • 00:19:42
      Can you clarify where you expect the transition between the base material and the ACM to occur?
    • 00:19:47
      Sure.
    • Kevin SchaferStudio Director
    • 00:19:50
      So let's see if, so there's basically where the curtain wall sits on the slab of the showroom.
    • 00:19:57
      So everything below the curtain wall would be the transition.
    • 00:20:01
      Above that line would be ACM and below would be the parging and painting.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:20:08
      Great, thank you.
    • 00:20:11
      So you mentioned, yeah, parging or ephus.
    • 00:20:13
      Have you considered brick or other masonry that would be coursed and textured there?
    • Kevin SchaferStudio Director
    • 00:20:20
      Yeah, I think that is something we have discussed and I think something we'd be open to.
    • 00:20:23
      And we see the success of it across the street as well, the Audi and the Porsche dealership.
    • 00:20:29
      And a dark colored masonry could be a very good fit here.
    • 00:20:33
      Obviously from a maintenance perspective, it's preferred.
    • 00:20:36
      It could give that heavy kind of masonry base that starts to establish hierarchy vertically through the building.
    • 00:20:44
      So that's definitely something we would consider too if the board looked favorably upon that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:20:50
      Thank you.
    • 00:20:51
      And then I appreciate you restoring the trees at the entrance corridor from the photos.
    • 00:20:55
      It looks like they're all sort of understory, ornamental trees.
    • 00:20:58
      Are there are there any large shade trees in the existing plan?
    • Kevin SchaferStudio Director
    • 00:21:03
      You know, I don't know.
    • 00:21:05
      I think they're all I think they're all dogwoods, but I'm not entirely sure.
    • 00:21:11
      We're working with SHMP Engineering on this site plan.
    • 00:21:15
      There's currently a minor site plan amendment going through the review process.
    • 00:21:20
      In this area specifically, we're not touching curb and gutter landscaping or anything like that.
    • 00:21:25
      So I'm not as familiar with those trees along there.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:21:29
      Thank you.
    • Kevin SchaferStudio Director
    • 00:21:30
      No other questions.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:21:32
      All right, thanks.
    • 00:21:34
      Yes, Frank?
    • 00:21:35
      Sure, thanks for your presentation.
    • 00:21:38
      Kind of following on Dade's question, is the swoop element, is that all the ACM all the way to ground?
    • 00:21:48
      And then on either side of it or on one side of it would be the all the other material?
    • Kevin SchaferStudio Director
    • 00:21:53
      That's correct.
    • 00:21:54
      So the slab level comes across here.
    • 00:21:56
      The swoop starts and ends at that slab level or sort of terminates into the the parging.
    • 00:22:05
      And then there's this vertical element as well here.
    • 00:22:08
      Let me jump ahead to that front elevation, which might provide a little bit more clarity.
    • 00:22:12
      So the established plinth comes along right through here and ends up tying into our ADA entrance right at this location.
    • 00:22:21
      So there's the majority of this swoop and then this vertical signage element.
    • 00:22:28
      All that is ACM.
    • Chris HenningsenChair, Architectural Review Board
    • 00:22:32
      Thank you.
    • 00:22:35
      All right, thanks.
    • 00:22:36
      I don't have any questions for the applicant.
    • 00:22:39
      So are there any members of the public that want to make a comment?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:22:46
      I don't have anyone online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:22:48
      All right, great.
    • 00:22:49
      In that case, the ARB will now go into discussion.
    • 00:22:52
      I guess we'll start with Frank Hancock if you have any comments.
    • 00:22:58
      Sure.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:23:00
      Interesting forms.
    • 00:23:04
      I do.
    • 00:23:05
      First of all, I think staff's comments are right on.
    • 00:23:09
      And I think the focus could kind of get into that transition with the base material and the ACM.
    • 00:23:16
      I think
    • 00:23:19
      There's some work maybe that could be done there and the applicant I think put forth some good ideas in the presentation.
    • 00:23:27
      I think it would just be a matter of seeing them and I do think maybe even an alternate material or color for that base might actually help the building relate to some of the other buildings in this corridor.
    • 00:23:44
      and that applicant kind of alluded to that, that this is a little bit of an outlier and maybe, you know, the next evolution in auto showroom design.
    • 00:23:54
      But, so be interested to see that.
    • 00:23:58
      I don't think we have overhead power on this side of the street to anything.
    • 00:24:04
      So we should be able to get the full landscape requirements or if they're already there, just document that.
    • 00:24:14
      And yeah, other than that, I don't really have anything additional.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:21
      All right, thanks, Dade.
    • 00:24:22
      Yeah, I appreciate the staff comments and the applicant's presentation.
    • 00:24:26
      I think, like Frank, focusing on the base and I think I appreciate the applicant's openness to consider masonry.
    • 00:24:33
      I think
    • 00:24:34
      Of course, visible masonry would be a good connection to the traditional ways of building and many of the precedents even in the dealerships in this area and maybe give the project a little bit more texture, which I think to the question about gloss, certainly for my part, I don't feel like the gloss needs to match across every part of it and in fact, some material diversity and subtlety would be appreciated.
    • 00:24:59
      I think it's having been in the existing facility and the applicant notes the changes of floor level I think it's great it'll be one level and actually it's a nice way with a plinth or an architectural you know device to create a good display for the vehicles that I think are effective.
    • 00:25:18
      I think in terms of the, appreciate the applicants opened a different color for the white on the service facility.
    • 00:25:26
      I do think in the context of everything being so dark in the new showroom that anything that's lighter back there starts to pop a bit in the background.
    • 00:25:35
      And so a deeply recessive color I think would be appropriate.
    • 00:25:43
      And I think interested, I don't know, maybe it's a question for Margaret, which I missed relative to the full landscape requirements.
    • 00:25:51
      If absent curb and gutter work, if there are not existing large shade trees, and if there are ways to incorporate them, is that an option through this?
    • Margaret MaliszewskiPlanning Manager
    • 00:26:05
      I think typically we wouldn't go back and apply additional requirements in the area that's not being affected by the proposal unless you thought that the architectural design required some mitigation through additional landscaping.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:26:23
      Okay, thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:26:28
      Thanks.
    • 00:26:30
      Yeah, I don't have much to add.
    • 00:26:32
      I'm in agreement with
    • 00:26:34
      with what's been said already.
    • 00:26:36
      I agree that that rear building, I think the gloss white seems like an unintended consequence of drawing attention to something that you may not want attention.
    • 00:26:50
      So I'm thinking like a gray or something might be a better choice.
    • 00:26:55
      And then as everybody said that,
    • 00:26:59
      transition from the base to the ACM panel.
    • 00:27:04
      I think like you get the impression that that's something that like conceptually you want that difference to kind of go away but I think it does need to be treated because I think it's gonna as the staff reported pointed out I think it whether or not initially eventually it will start to
    • 00:27:29
      make itself different over time, so I think a different, I guess a more thoughtful treatment of that would serve your client.
    • 00:27:45
      That's about it as far as my comments.
    • 00:27:48
      I guess if we could take a look at the recommended motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:28:13
      The recommended motion is to provide the applicant with the comments listed in the staff report to return for another review.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:23
      All right.
    • 00:28:24
      I did not have any adjustments or anything.
    • 00:28:26
      I guess, Dave, do you have any tweaks?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:28:30
      None to propose at this time.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:32
      Frank?
    • 00:28:33
      No, I don't.
    • 00:28:34
      All right.
    • 00:28:35
      Great.
    • 00:28:35
      In that case, would anybody like to make a motion?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:28:41
      Sure, I'll move to provide the applicant with the comments listed in the staff report to be addressed with the next submittal.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:50
      Second.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:28:51
      Alright, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:52
      We could put that to a vet.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:28:54
      Alright, Mr. Van Der Werf.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:56
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:28:56
      Mr. Hancock.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:57
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:28:58
      Mr. Henningsen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:59
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:29:00
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:29:01
      Alright, thanks a lot.
    • 00:29:05
      Our next item is ARB 2024-71, 400 Rye Road West.
    • Khris TaggartSenior Planner
    • 00:29:19
      Good afternoon.
    • 00:29:29
      Application being reviewed today is a conceptual plan for a special use permit.
    • 00:29:33
      The proposal is to establish outdoor storage display and sales associated with the development of a wholesale plumbing business.
    • 00:29:41
      The site is located at 400 Ryle Road West and contains two structures, a brick face building at the front of the property and a large metal shed towards the rear of the paved area.
    • 00:29:52
      Thank you.
    • 00:29:54
      The entrance quarter guidelines stipulate that the storage area should be situated to eliminate visibility and if after appropriate siting the area still has a negative visual impact on the entrance quarter, screening should be provided.
    • 00:30:07
      The site's layout is already established and the size and orientation of the existing building along the frontage are insufficient to screen the stored items.
    • 00:30:15
      Between the storage area and the frontage, the plan shows an 8-foot tall black aluminum picket fence replacing the existing chain link fence, along with a 3-foot tall burned landscape with deciduous and evergreen planings.
    • 00:30:28
      The fencing shown is not screening fencing.
    • 00:30:31
      A solid screen fence could reduce the visual impact of the stored items to those taller than the fence, but a screening fence of approximately 368 feet would have visual impacts of its own and could result in reduced frontage landscaping.
    • 00:30:45
      The plan can show and exceed the minimum requirements, but they would not provide complete screening, and the western site entrance creates a permanent gap in screening.
    • 00:30:57
      Although the proposed fencing landscaping will not completely screen the storage area from the entrance corridor, the addition of a landscaper and the removal of chain link fencing are expected to create a more organized and visually appealing development as viewed from the entrance corridor.
    • 00:31:13
      Regarding the organization of the storage area, one of the site sections notes the maximum storage height is 12 feet and shows a pipe storage rack at the same height as the fence along the fence line.
    • 00:31:23
      The applicant's narrative provides exhibits that outline the materials that would be stored at this location.
    • 00:31:28
      The exhibits show a variety of materials distributed with no clear method or organization.
    • 00:31:34
      The visual impact of the storage area could be reduced by positioning the items with lower overall stack height closer to the entrance quarter and taller items further away and parking vehicles depending on type and size towards the front of the storage area.
    • 00:31:51
      Dafrath's recommended a few revisions to the concept plan to be reviewed by the ARB prior to planning commission review.
    • 00:31:58
      And we have listed a few draft conditions for the SP and a few sub recommendations for the site plan.
    • 00:32:06
      I'd be happy to answer any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:08
      All right.
    • 00:32:08
      Thanks a lot, Chris.
    • 00:32:10
      I guess we'll start with Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 00:32:15
      Thanks.
    • 00:32:15
      Thanks, Chris.
    • 00:32:17
      I don't have any questions.
    • 00:32:19
      All right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:19
      Thanks.
    • 00:32:20
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:32:21
      Chris, thank you.
    • 00:32:22
      Is there any detail provided on the gate entry at the secondary entrance to the storage area?
    • 00:32:30
      Did you say that again?
    • 00:32:30
      Is there any elevation or other detail provided in the application on the appearance of the proposed black aluminum gate?
    • Khris TaggartSenior Planner
    • 00:32:42
      No.
    • 00:32:43
      It just has that example of the fencing.
    • 00:32:47
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:50
      Thanks.
    • 00:32:50
      Frank?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:32:53
      Looking at that area, is that an existing drive in?
    • 00:32:58
      It is.
    • 00:32:58
      It is.
    • Chris HenningsenChair, Architectural Review Board
    • 00:33:01
      Thanks.
    • 00:33:02
      I don't have any other questions.
    • Kevin SchaferStudio Director
    • 00:33:03
      All right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:33:04
      I don't have any questions.
    • 00:33:06
      So I guess if the applicant has a presentation.
    • Valerie LongAttorney
    • 00:33:43
      Thank you, Mr. Chairman and members of the board.
    • 00:33:45
      I'm Valerie Long with the law firm of Williams Mullen, here representing the applicant BND Holdings.
    • 00:33:51
      My colleague Megan Nadostup is here with me, also landscape architects from Timmons Group.
    • 00:33:57
      We also have several representatives participating virtually from BND Holdings as well as the proposed tenant business.
    • 00:34:08
      I imagine that most of you are relatively familiar with this site.
    • 00:34:12
      It's been owned by the phone company for a very long time.
    • 00:34:15
      It's been zoned industrial since the early 70s, not technically in the development area.
    • 00:34:22
      The Rio Road is the dividing line there, but because it was zoned industrial before the development area boundaries were determined, that zoning was left in place.
    • 00:34:33
      and it is two tax map parcels, both the smaller rectangular one there at 400 and then the larger one behind it.
    • 00:34:43
      It's just a close up the aerials.
    • 00:34:47
      Pretty much the site was interesting.
    • 00:34:49
      It looks very, very similar now to how it has looked since the early 1970s.
    • 00:34:55
      Obviously, these photos are a little blurry, but you can see how even back then the phone company and its predecessors were storing equipment, vehicles, fleet vehicles, and other equipment there.
    • 00:35:07
      And there's been storage in the back.
    • 00:35:09
      area back here for quite a long time and as the staff report indicates this area has been determined to have existing permitted outdoor storage non-conforming but legal and thus permitted in the back so really we're talking more about the storage in this area.
    • 00:35:29
      The existing conditions, as the staff report noted, almost no landscaping and unobstructed views of the storage area, as well as unobstructed and unscreened views of the mechanical equipment right there in the front.
    • 00:35:46
      Again, these are just street view images.
    • 00:35:48
      If you haven't been by recently, again, an existing chain link fence, again, unobstructed views of the area.
    • 00:35:55
      We obviously want to improve that.
    • 00:35:59
      but you can see there are some trees there but just not very many.
    • 00:36:05
      This was in our pocket, so I imagine you've seen it.
    • 00:36:08
      Again, the existing mechanical here.
    • 00:36:11
      That's not obviously part of the storage for outdoor storage and display, but because we knew it was appropriate to provide a pretty robust landscape plan along the frontage to screen the outdoor storage, we felt it was appropriate to also go ahead and screen the mechanical equipment and provide
    • 00:36:29
      some plantings along the frontage of the building to help improve the overall frontage conditions, not just that needed for screening the proposed equipment.
    • 00:36:42
      Again, this just shows the new landscape plan and I have a color version I'll get to in a moment, but proposed berm and a fairly robust landscape plan to help screen the storage materials.
    • 00:36:59
      There's a close up.
    • 00:37:03
      Mr. Van Der Werf, we do not yet have, I don't have an answer to your question about the gate, but we can certainly find out.
    • 00:37:08
      I presume it would be similar to the fence, but we'd need to find that out.
    • 00:37:13
      It's a good question.
    • 00:37:15
      You saw this as well with the way the berm would function and help provide some additional screening of the stored equipment from the entrance corridor.
    • 00:37:25
      We are fine with the proposal to have a,
    • 00:37:29
      condition or modify the concept plan to show that shorter materials would be stored up closer to the road and taller materials would be stored further to the back.
    • 00:37:40
      It's just obviously a color rendering to provide a bit of a better visual image of what the proposed landscaping would look like along the entrance corridor compared to what is there now.
    • 00:37:52
      and we didn't have it on the plan, but we're agreeable to the staff report suggested a note on the plan confirming that these existing plantings along the boundaries would remain in place.
    • 00:38:04
      There's no desire or plan to remove that.
    • 00:38:08
      This is a zoomed in version of the street view showing the existing conditions of the parking area.
    • 00:38:15
      That whole area is visible from the entrance corridor, not screened.
    • 00:38:20
      You can see obviously the stored equipment in the back there.
    • 00:38:25
      And again, another reminder of the absence of plantings along the frontage of the building.
    • 00:38:32
      The applicant's not proposing any material modifications to the building other than the plantings.
    • 00:38:39
      Oh, and again, this is the mechanical equipment, which I know you would never allow today without screening if there at all.
    • 00:38:46
      But the new plan does propose to screen that equipment with new plantings.
    • 00:38:56
      And again, the renderings showing that area and the vast improvement over existing conditions
    • 00:39:06
      Again, showing the mechanical equipment being screened, close up of the fence.
    • 00:39:14
      There was a recommendation in the staff report to require any stored materials to be set back 45 feet from the property line.
    • 00:39:24
      What that would effectively result in is a 100 foot setback of stored materials from the entrance corridor.
    • 00:39:32
      We are not comfortable with that proposal given the depth of the existing planning area shown 55 feet in that area.
    • 00:39:40
      We think there's plenty of room for robust plantings there.
    • 00:39:44
      such that again as long as the taller equipment is not stored in this area that this setback is not necessary.
    • 00:39:52
      The proposed tenant really needs all the space for all its stored materials and needs to have the flexibility to
    • 00:40:00
      respond to customer demands.
    • 00:40:03
      Sometimes they need lots of 36 inch pipes, other days they need smaller pipes.
    • 00:40:08
      You'll see some photos with fire hydrant stored, things like that.
    • 00:40:11
      They need to be able to move things around and have materials available for whatever customers need in the coming days.
    • 00:40:20
      and again, just I wanna show you a series of the existing conditions and then the proposed renderings right after it to really try to drive home the point what a substantial increase the planting plan is over the existing conditions.
    • 00:40:41
      So pretty dramatic improvement we think, particularly given that this property has looked this way for five decades.
    • 00:40:51
      I don't know if the building's been there for five decades, but it has looked pretty rough for that long, and this will be a substantial improvement.
    • 00:41:00
      We wanted to also provide some photos of what type of equipment might be stored there.
    • 00:41:04
      Again, the proposed tenant is a National Plumbing Water Works distributor of materials, so these are the types of equipment.
    • 00:41:14
      These are from other locations, just to demonstrate the types of materials that are stored.
    • 00:41:21
      Those are fire hydrants.
    • 00:41:28
      Again, just a close up of the planting plan and the rendering there.
    • 00:41:34
      We would like to have some conversations with you all about three of the staff recommended conditions of approvals.
    • 00:41:42
      I think two were to the concept plan and one was to the conditions.
    • 00:41:45
      There was a suggestion that the concept plan be revised
    • 00:41:49
      and provide a layout plan for what materials would be stored in which locations and again because of the nature of the business they can't predict from really one week to the next how much of certain materials they will have so the idea of saying all the 36 inch pipes will be here and the fire hydrants will be here and the smaller pipes here
    • 00:42:10
      is overly restrictive for their business needs.
    • 00:42:13
      They need to have the flexibility to move things around.
    • 00:42:16
      The other suggestion was a note or some sort of designation on the plan again that taller stored materials would be closer to the back and shorter in the front.
    • 00:42:27
      We are agreeable to the second one.
    • 00:42:29
      And we think that with that condition, plus the plantings along the frontage that there's not really a need to have a layout plan for the stored material that
    • 00:42:39
      The new plantings will screen the materials enough that it won't matter in that regard.
    • 00:42:46
      And likewise, the staff recommendation for a 45-foot setback from the fence area, which again is equivalent to a 100-foot setback from the entrance corridor.
    • 00:42:57
      We think that's far too large, and we would ask for flexibility to be able to use the storage area up to the fence.
    • 00:43:06
      We'd be happy to answer any questions or comments you may have.
    • 00:43:10
      This is an exploratory review.
    • 00:43:12
      We did go ahead and submit the special use permit application at the end of the year so that we could be as efficient as possible with the application review process.
    • 00:43:23
      So we'll be incorporating any feedback into those plans.
    • Chris HenningsenChair, Architectural Review Board
    • 00:43:27
      All right.
    • 00:43:27
      Well, thanks for your presentation.
    • 00:43:29
      I guess we'll
    • 00:43:32
      See if anyone has questions starting with Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 00:43:38
      Yeah, first let me say this is a dramatic improvement.
    • 00:43:43
      Thank you for your effort.
    • 00:43:45
      I had one question, which is, did you guys explore an opaque fence?
    • 00:43:50
      And if so, why did you decide on the choice you've made?
    • Valerie LongAttorney
    • 00:43:55
      Sure.
    • 00:43:56
      We did think about that was my initial thought was, oh, well, we'll just have an opaque fence and you won't see anything.
    • 00:44:03
      Staff then made us aware of your safety and screening and security fencing guidelines that talk about, and I think those were an attachment to the staff report, I was not previously familiar with those, but essentially the thought was that an opaque fence of 300 and I think 68 feet, thereabouts,
    • 00:44:23
      you that that would not be considered consistent with the fence guidelines to have just a long opaque fence it would have to have a lot of undulations and it wouldn't be just a straight fence would need to have a fairly nice level of design and decor to the extent that trying to have an opaque fence designed that could be approvable by you all would be
    • 00:44:53
      even more challenging and perhaps not have as nice of an overall effect even within additional plantings.
    • 00:45:00
      So I will say I did follow closely your actions and review of the Carter Machinery Project just down the street at Rio over by the library and so I learned a lot from your review of that and then tried to kind of think along the same lines of like them they had a
    • 00:45:19
      aluminum picket fence, but lots of screening in front.
    • 00:45:23
      So we thought, and that's obviously much closer to the entrance quarter than this one will be.
    • 00:45:28
      So that was our thought process.
    • 00:45:29
      Again, this is a conceptual review.
    • 00:45:31
      We appreciate your feedback on that.
    • 00:45:35
      So if that's something that you all think would be better, we're open to those ideas, but we know this aluminum fence will work with the client's budget.
    • Frank StonerMember, Architectural Review Board
    • 00:45:44
      Awesome.
    • 00:45:44
      Thank you.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:45:44
      No other questions.
    • Frank StonerMember, Architectural Review Board
    • 00:45:47
      Thanks.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:45:48
      Thank you for the presentation and do appreciate the landscape improvement to the corridor.
    • 00:45:54
      Let's see, I appreciate your description of the applicant's willingness to look at storing taller material toward the rear of the site.
    • 00:46:00
      I was interested to ask, do you think there might be an acceptable regulating line similar to the way that we look at mechanical screening that looks at sight lines from the EC and establishes the height of storage in that way?
    • Valerie LongAttorney
    • 00:46:13
      If I understand correctly that the idea we've sort of kicked around for lack of a better phrase is literally drawing a line on the concept plan?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:46:23
      It would be in section potentially that would sort of establish a regulated height that increased.
    • Valerie LongAttorney
    • 00:46:29
      sort of, you know, we thought somewhere maybe in this range, nothing taller than the fence height beyond this point or say in this range, I would say something to that effect is that was how we thought might be the easiest way to identify it and then comply with it too.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:46:48
      Is there a maximum height of storage that the applicant anticipates?
    • Valerie LongAttorney
    • 00:46:53
      I think they're 12 feet is what they said, the tallest they ever store anything.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:46:57
      Okay.
    • 00:46:58
      Thank you.
    • Valerie LongAttorney
    • 00:46:59
      Sure.
    • Chris HenningsenChair, Architectural Review Board
    • 00:47:01
      All right.
    • 00:47:01
      Thanks, Frank.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:47:03
      Thank you for your presentation.
    • 00:47:05
      Great exhibits to I feel like easy to understand what the questions are.
    • 00:47:12
      Just that idea that the applicant would store materials taller than the fence.
    • 00:47:18
      Is that just written into the special use permit?
    • 00:47:21
      Like how does that become part of the
    • 00:47:25
      when you say the idea that they could do you mean the ability of the applicant or that commitment that the applicant would make is it how's that documented is it part of the special use permit is it
    • Valerie LongAttorney
    • 00:47:36
      What my thinking was, and again, because this is just conceptual, first of all, was that we would update this conceptual plan and draw a line through that orange storage area and essentially say, you know, say it's right here or somewhere thereabouts.
    • 00:47:51
      Nothing taller, no materials taller than the fence height are stored between this line and the fence.
    • 00:48:00
      is what I've envisioned.
    • 00:48:01
      And so that would then be eventually on the special use permit application plan.
    • 00:48:06
      And so that if the board of supervisors approves the SUP plan, that would become an essential element of that plan that the applicants would have to comply with.
    • 00:48:16
      Could also be a condition of approval as probably would be in both.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:48:23
      That's helpful, thank you.
    • 00:48:24
      And then just curious, this exhibit that shows the nonconforming, like the different colors, just curious why it doesn't align with the property line, why it kind of comes in board to that other parcel?
    • Valerie LongAttorney
    • 00:48:36
      We don't know.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:48:39
      That was just a separate boundary.
    • Valerie LongAttorney
    • 00:48:41
      That's just how it's been based on aerials and analysis, mostly using the county GIS imagery, that that's where the existing storage has been.
    • 00:48:53
      So they don't actually intend to do much more with that.
    • 00:48:58
      The primary area is up in the orange area where there's asphalt and it's flatter and more appropriate for storage of materials and obviously closer to their building.
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:10
      Thank you.
    • Valerie LongAttorney
    • 00:49:11
      Sure.
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:14
      All right.
    • 00:49:14
      I'm going to ask this just because I'll regret it if I don't ask it, but is there
    • 00:49:21
      Any possibility of eliminating the entrance off of Ryer Road and having access behind the building so that the landscaping could be continuous?
    • Valerie LongAttorney
    • 00:49:33
      I'm not sure I understand.
    • 00:49:34
      Do you mean using access here?
    • 00:49:37
      Yeah.
    • 00:49:38
      And then not
    • 00:49:40
      not having an entrance here at all.
    • 00:49:43
      We haven't discussed that, so I'd have to talk to our clients about that.
    • 00:49:50
      I assume that they would have
    • 00:49:56
      shown something like that, or we would have talked about it if that was an option.
    • 00:50:00
      I'm going to assume they need it for circulation purposes.
    • 00:50:04
      They, as you can imagine, use very large flatbed trucks coming and going all day long with deliveries, drop off customer deliveries.
    • 00:50:15
      And so I would, I'm speculating that they probably need the circulation.
    • 00:50:20
      They need that separate entrance
    • 00:50:23
      for circulation purposes, but we can certainly take that back to them.
    • Chris HenningsenChair, Architectural Review Board
    • 00:50:26
      All right.
    • 00:50:27
      Yeah.
    • 00:50:27
      Well, thanks.
    • 00:50:28
      Yeah.
    • 00:50:29
      Like I said, I figured it's sure if it's there, it's probably needed.
    • 00:50:37
      Are there any members of the public that want to make a comment?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:50:42
      I don't have anyone online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:50:45
      All right, thanks.
    • 00:50:47
      In that case, the ARB will now go into discussion.
    • 00:50:51
      We'll see what the comments are, starting with Frank Hancock.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:50:58
      Sure, I think this will be a drastic improvement for the corridor.
    • 00:51:05
      I think adding the berm is
    • 00:51:09
      going above and beyond.
    • 00:51:10
      I think actually it will be more effective than it was shown in the visualizations.
    • 00:51:19
      Yeah, I don't really have any issues.
    • 00:51:23
      I think to me it feels appropriate.
    • 00:51:25
      One little thing, I think there's maybe some siting of the evergreen trees you could do to reduce the visibility a little bit more.
    • 00:51:39
      They're located between the berm and the road or some of them are on the high side or on the top of the berm, but I do appreciate the kind of naturalistic layout and design.
    • 00:51:52
      So I wouldn't want a straight line of one species.
    • 00:51:56
      I don't think that would be effective, but yeah, I mean, the application isn't to really do anything to the building.
    • 00:52:05
      It's not adding a new building.
    • 00:52:06
      So I think the impact on the corridor
    • 00:52:09
      If you think about it in those terms, it's an upgrade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:52:18
      uh sure yeah to use Frank's words appreciate the landscape upgrade and uh really supportive of it i appreciate the applicant will uh provide some more information on the gate at the fence um and appreciate while the they're sensitive to the extent of opacity for the full fence being an issue maybe it would be useful if that gate were opaque um but yeah i appreciate the improvement proposed to the property
    • Chris HenningsenChair, Architectural Review Board
    • 00:52:47
      Thanks, Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:52:50
      Yeah, I agree on both counts.
    • 00:52:55
      I also tend to agree that an opaque fence might be less effective here than what they proposed, especially given the amount of landscaping that they're proposing in front of it.
    • 00:53:10
      It's a vast improvement by any measure.
    • 00:53:14
      So I applaud the effort.
    • 00:53:18
      I don't really see any issues from my perspective.
    • Chris HenningsenChair, Architectural Review Board
    • 00:53:27
      Thanks.
    • 00:53:28
      And yeah, I totally agree with what's been said.
    • 00:53:31
      I feel like the proposal kind of goes beyond the minimum that you would expect to plop down a few trees.
    • 00:53:40
      And so I do appreciate the extent of the landscaping that's proposed.
    • 00:53:49
      I also agree with the height stipulation.
    • 00:53:55
      Generally, like if it's
    • 00:53:57
      under the top of the fence for a certain amount.
    • 00:54:01
      That seems like an easy
    • 00:54:04
      easy way to kind of handle it just even in the future you know you can kind of take a visual marker at the top of the fence and and then taller material in the back so I think if if you're willing to do that like I don't think the other stipulations are really necessary so if we could take a look at the recommended motion
    • Margaret MaliszewskiPlanning Manager
    • 00:54:46
      We've got two motions for you today.
    • 00:54:50
      The first one regarding the concept plan for the special use.
    • 00:54:57
      I've added to that list that are eliminating the Rye Road entrance to the storage area.
    • 00:55:03
      And I've just noted gate details.
    • 00:55:05
      I'm not sure if you want those at this point or not.
    • Chris HenningsenChair, Architectural Review Board
    • 00:55:13
      Yes, and so I'm the one who brought it up.
    • 00:55:16
      I think the Rye Road entrance, since it says consider, you know, I'm comfortable with it staying, even though there's no penalty for not doing that.
    • 00:55:28
      And to me, at least the gate details seems reasonable also.
    • Frank StonerMember, Architectural Review Board
    • 00:55:49
      Can I ask one question to the applicants?
    • 00:55:53
      If we were to establish a sort of fixed line at whatever, maybe the 45 feet that was suggested and at that line, everything in front of that line would be no higher than the fence.
    • 00:56:06
      Is there a dimension that would be preferred there?
    • Valerie LongAttorney
    • 00:56:13
      We haven't quite figured that out yet.
    • 00:56:16
      We wanted to kind of get some feedback from you, but kind of in the general location.
    • 00:56:20
      I don't know if I can switch back to the screen or if Margaret or Chris could go to the conceptual plan.
    • 00:56:32
      And just before I forget, I have a question for you about the gate details in a moment.
    • 00:56:35
      So I don't forget.
    • 00:56:48
      Thank you, Margaret.
    • 00:56:49
      Where you have that little sort of the piece that juts out there on the southern end of the building closest to the outdoor storage.
    • 00:56:57
      Yeah, we thought maybe along the top of that little jut, which is going to be a little bit more than 100 feet back, but somewhere in that range.
    • 00:57:07
      is what we were thinking, so probably certainly no closer than 100 feet from the entrance corridor, 45 feet from the gate, so maybe 50 feet from the gate, 60 feet from the gate is probably the way to clarify that.
    • 00:57:22
      Is that what you have in mind?
    • 00:57:24
      Yes, yeah, that was the nature.
    • 00:57:29
      If I may, we would welcome your feedback and recommendations on the gait material.
    • 00:57:35
      If there's a preference for it to be opaque, I can appreciate how that would help.
    • 00:57:41
      And if so, any particular feedback or guidance on that versus picket fence or right now it's a chain link fence.
    • 00:57:49
      So thank you.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:57:55
      Well, I'm interested in my colleagues' thoughts as well.
    • 00:58:02
      Yeah, I think opaque, but I don't know whether that's aluminum slats, you know, whether it's horizontal or vertical or, I don't know, defer to others, you know, and I don't, it's traditional to have potentially piers at either side of an opening like that if there was something necessary for support and there was a moment where there was, you know, a brick pier or otherwise that would be,
    • 00:58:26
      a possibility, but it's not an expectation or a prescription.
    • 00:58:30
      I don't know.
    • 00:58:30
      What other ideas do you have for what would be appropriate?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:58:36
      Yeah, it could be a number of things.
    • 00:58:38
      I agree on that we need like any masonry piers or anything, but it'll probably need to be a beefier post and
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:58:52
      Yeah, I don't want to be prescriptive.
    • 00:58:54
      I think to the extent it had some texture that would likely be helpful.
    • Frank StonerMember, Architectural Review Board
    • 00:59:03
      What if you kept the same rhythm of the vertical pickets, so you just put a metal backing?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:59:14
      Yeah, I mean, it's hard to say without pictures.
    • 00:59:22
      I would maybe leave it to the applicant if folks agree that an opaque material and a dark material be appropriate with some texture and they might leave it at that.
    • 00:59:37
      I don't know.
    • 00:59:39
      Just in your thoughts.
    • Chris HenningsenChair, Architectural Review Board
    • 00:59:41
      Yeah, I guess I'm a little torn on that just because
    • 00:59:45
      They were kind enough to provide a sketch of the development of the landscaping over time and so I think you will see more of everything initially and my thought was at least I think what would look better initially was if the gate just matched the fence
    • 01:00:11
      and obviously I think, you know, Pate Gate with a, you know,
    • 01:00:18
      on opaque fence, once all the landscaping is there, will look more reasonable.
    • 01:00:26
      But I'm just wondering if it would look kind of strange right off the bat, like to have an opaque gate with basically like a...
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:00:36
      If there are ever temporal clauses like when's the last... That's a good point.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:00:42
      Especially to you, it's viewed...
    • 01:00:47
      Dude from a vehicle, you know, you're never, you're not really gonna be looking straight on at it.
    • 01:00:51
      Yeah.
    • 01:00:52
      Right.
    • Frank StonerMember, Architectural Review Board
    • 01:00:53
      Yeah.
    • 01:00:54
      I think it's going to look awkward.
    • 01:00:56
      Certainly initially.
    • 01:00:57
      Yeah.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:00:58
      Right.
    • 01:00:58
      Yeah.
    • 01:00:59
      Although I think in the long run that once the landscape is so beautifully screening everything and the building is screening everything.
    • 01:01:06
      See the glimpse.
    • Frank StonerMember, Architectural Review Board
    • 01:01:07
      When the entrance becomes less visible, unless you're right next to it.
    • 01:01:11
      Yeah.
    • 01:01:11
      Right.
    • 01:01:11
      I see it.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:01:17
      So consider and opaque or consider options.
    • Margaret MaliszewskiPlanning Manager
    • 01:01:23
      I would just mention that you may not really need to figure that level of detail out right now if the special use permit gets approved that it would come back to you for additional review later and maybe that level of detail is for later.
    • Chris HenningsenChair, Architectural Review Board
    • 01:01:38
      That sounds good.
    • 01:01:40
      Sounds fine.
    • Frank StonerMember, Architectural Review Board
    • 01:01:46
      Margaret, do we want to reflect the 50 feet or 100 feet off the corridor of eight feet?
    • Margaret MaliszewskiPlanning Manager
    • 01:02:01
      We were thinking that the applicant would take these comments back and come back with a plan that shows
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:02:08
      And I appreciate the understanding that the present maximum storage height is 12 feet.
    • 01:02:13
      I don't know whether that will be reflected in the special use permit.
    • 01:02:16
      I mean, certainly there are.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:02:17
      It would be, for sure.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:02:18
      OK, great.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:02:25
      Should we strike number one?
    • Margaret MaliszewskiPlanning Manager
    • 01:02:31
      Whatever is your preference?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:02:32
      I think that's consistent with the discussion.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:02:47
      And number two, is it just that that boundary versus rear of the site?
    • Margaret MaliszewskiPlanning Manager
    • 01:03:32
      So I've just added, taller than the fence height will be limited to a specific area at the rear of the site, meaning we'll want to see that plan revised to show that line beyond which the taller equipment would be stored.
    • 01:03:49
      Does that work?
    • 01:03:57
      I'm happy to add whatever wording you think is.
    • Frank StonerMember, Architectural Review Board
    • 01:04:01
      What if we just said revise the concept plan to show the area suitable for storage above 8 feet.
    • 01:04:47
      I was going to make a motion.
    • Chris HenningsenChair, Architectural Review Board
    • 01:04:50
      Oh, okay.
    • 01:04:51
      Great.
    • 01:04:51
      Yeah.
    • 01:04:51
      So we'll do this one and then move on to the next one.
    • Frank StonerMember, Architectural Review Board
    • 01:04:56
      I'll move to recommend revisions to the concept plan as listed in the staff report to be reviewed by the ARB prior to the Planning Commission review as follows.
    • 01:05:05
      Strike item one, revised item two,
    • 01:05:12
      He revised the concept plan to show the area suitable for storage of materials and equipment taller than eight feet.
    • 01:05:21
      And add item four, consider eliminating the Raya Road entrance to the storage area on strike number five.
    • Chris HenningsenChair, Architectural Review Board
    • 01:05:32
      Thanks.
    • 01:05:33
      I'll second that.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:05:40
      All right, Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 01:05:42
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:05:43
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 01:05:45
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:05:45
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 01:05:47
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:05:47
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 01:05:49
      Aye.
    • 01:05:51
      All right, thanks a lot.
    • 01:05:52
      So I guess we'll move on to the next one.
    • Margaret MaliszewskiPlanning Manager
    • 01:05:55
      The second motion that we're recommending is just to support staff's recommended draft conditions, the special use permit, which we would likely update with a revised plan coming in and also to support the recommendations for the site plan, which would follow the special use permit approval.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:06:20
      Would item two be struck to align with them?
    • 01:06:29
      revised to match.
    • Margaret MaliszewskiPlanning Manager
    • 01:06:30
      I'm sorry, I didn't hear that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:06:33
      I'll strike a revised item to align with the prior motion.
    • Margaret MaliszewskiPlanning Manager
    • 01:07:00
      These are only draft conditions, so we will do the wordsmithing.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:07:06
      Can you scroll down just to see that?
    • 01:07:33
      Are we ready for a motion, Chris?
    • 01:07:35
      Yeah, I think so.
    • 01:07:39
      I'll move to support staff's recommended draft conditions on the special use permit and revisions for the final site plan as follows.
    • 01:07:46
      Revision to strike item two of the draft conditions on the special use permit.
    • 01:07:52
      Great, thanks.
    • Margaret MaliszewskiPlanning Manager
    • 01:07:53
      Just note that the number one there would be adjusted.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:07:56
      And revised number one to align with the prior motion.
    • 01:07:59
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:02
      Anybody like to second that?
    • 01:08:04
      I'll second.
    • 01:08:08
      Could I put that to a vote?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:12
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:13
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:14
      Mr. Stoner?
    • 01:08:15
      Aye.
    • 01:08:16
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:17
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:18
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:19
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:20
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:21
      All right.
    • 01:08:21
      Thanks a lot.
    • 01:08:26
      Okay, we have one work session item today, which is ARB 2024-49, High School Center 2.
    • Margaret MaliszewskiPlanning Manager
    • 01:09:15
      In November of last year, the ARB reviewed ARB 2024-49 High School Center 2 and approved that request pending staff administrative approval of several conditions and ARB review of alternate colors for the metal.
    • 01:09:36
      This work session is to resolve that metal color issue.
    • 01:09:41
      I've got illustrations of each color that's been discussed so far to show you.
    • 01:09:45
      This is the original dark bronze shown in the applicant's illustrations.
    • 01:09:52
      This is the medium bronze that was submitted by the applicant in response to your request for alternate colors.
    • 01:09:58
      This is a gray color that was under consideration by the applicant early in the design process.
    • 01:10:05
      This image is a comparison showing the existing condition street view at the top.
    • 01:10:12
      The dark bronze color is in the middle.
    • 01:10:15
      The medium bronze is on the bottom and the gray color is on the right.
    • 01:10:23
      I've got some possible motions for you when you're ready to get to that point.
    • 01:10:29
      And the applicants are here and I'm happy to try to answer any questions that you might have.
    • Chris HenningsenChair, Architectural Review Board
    • 01:10:36
      All right, thanks.
    • 01:10:38
      I guess we'll just start with Frank Hancock.
    • 01:10:43
      Do you have any questions?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:10:46
      I'm trying to remember if I was at this meeting when we talked about this.
    • 01:10:53
      Did we not like the dark bronze?
    • 01:10:56
      We just wanted to see options.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:10:58
      Some of us.
    • 01:10:59
      Some of us didn't care for the dark bronze.
    • 01:11:01
      Thought that a lighter color would both relate better to the existing.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:11:05
      Just want to make sure I don't contradict myself.
    • 01:11:07
      I'll have to go back to the tape to find out.
    • Margaret MaliszewskiPlanning Manager
    • 01:11:10
      I've been trying to find the minutes and see if you were there.
    • Chris HenningsenChair, Architectural Review Board
    • 01:11:12
      I think you may not have been there.
    • Margaret MaliszewskiPlanning Manager
    • 01:11:14
      Yeah.
    • Chris HenningsenChair, Architectural Review Board
    • 01:11:15
      I think I saw that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:11:18
      No more questions.
    • Margaret MaliszewskiPlanning Manager
    • 01:11:24
      I think that the issue was we pointed out in the staff report that the color was a contrast to the existing buildings and a contrast with the sky and the mountain background.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:11:38
      Mr. Hancock was absent?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:11:40
      Oh, I was absent, yeah.
    • 01:11:44
      Thank you.
    • 01:11:45
      I can say whatever.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:11:46
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:11:57
      Frank, do you have any questions?
    • Frank StonerMember, Architectural Review Board
    • 01:11:59
      Is there a rendered version of the gray similar to the other two or no?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:12:11
      Yeah, I agree.
    • 01:12:11
      A rendering would be helpful.
    • 01:12:12
      I think on the way back machine when you weren't Frank, I think I was at least of the opinion that
    • 01:12:22
      As an addition to the campus, I thought that something with a lighter gray that related to the existing building would be more successful and more appropriate in terms of continuing the existing fabric that's there and that a lighter and cooler color would
    • 01:12:39
      likely transitioned better to the sky without as great or as stark a contrast.
    • 01:12:46
      I think it's fair to say that while we had differing opinions, everybody agreed that the mountain backdrop and the sky are the central features of the site.
    • 01:12:59
      And I think that's the context for the discussion.
    • 01:13:01
      Thank you.
    • 01:13:02
      That's helpful.
    • Chris HenningsenChair, Architectural Review Board
    • 01:13:08
      I guess I don't have any questions.
    • 01:13:11
      So if the applicant has a presentation or wants to come up and answer questions, now is the time.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:13:25
      You remind me where to put this.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:13:26
      It's on the monitor.
    • 01:13:29
      Other side, I think, yeah.
    • Kylan ShirleyProject Manager
    • 01:14:02
      All right, good afternoon.
    • 01:14:03
      Thank you for having us once again.
    • 01:14:04
      We do have some renderings of... Can you please state your name?
    • 01:14:09
      Oh, thank you.
    • 01:14:10
      My name is Kylan Shirley.
    • 01:14:11
      I'm with Quinn Edmonds Architects representing Albemarle County Public Schools.
    • 01:14:15
      Thank you.
    • 01:14:19
      So the first few slides we have here are the original images that you've seen and that were presented just a moment ago.
    • 01:14:24
      This is the dark bronze color that was initially proposed.
    • 01:14:29
      These images here are just some of the design inspiration that was shared with our client, Albemarle Public County Schools, as we developed the design.
    • 01:14:37
      The masonry portions of the building are essentially intended to reflect and be representative of granite, limestone, clay brick, terracotta, kind of the natural earthen materials of the region.
    • 01:14:50
      So that's how we arrived at the orange clay bricks and the blended kind of light gray color bricks that are present in the design.
    • 01:14:59
      This is the image that was shown a moment ago.
    • 01:15:01
      This is an image from our early design studies showing those colors in combination with a lighter gray.
    • 01:15:07
      At this point, we thought there's just not a lot of contrast between the various grays that we were looking at, the brick and the metal panel together, and felt a little dull.
    • 01:15:18
      Hence, our direction to move towards that darker panel to bring in a third element, if you will.
    • 01:15:24
      And then the idea was that the mullions and framing of storefront curtain wall systems were this darker metal element along with the metal panel so that dark color was a third element that was contrasted
    • 01:15:38
      both in tone and color and materiality with the masonry.
    • 01:15:41
      So that's how we arrived at the design that was presented previously.
    • 01:15:45
      Here's that same image with a darker color.
    • 01:15:52
      We felt that it had a lot more pop, a lot more presence and proceeded that way.
    • 01:15:57
      This shows those brick colors and then our three metal panel colors that we have renderings of here in a moment.
    • 01:16:03
      All the way on the left is the lightest gray that we've looked at.
    • 01:16:08
      That's pretty close to the gray that was in the image I just had a moment ago.
    • 01:16:12
      In the middle there's a medium bronze and all the way on the right is a dark bronze.
    • 01:16:16
      And as I'm sure you're all aware, most metal panel companies provide a medium bronze and a dark bronze.
    • 01:16:21
      It's essentially consistent across most manufacturers.
    • 01:16:24
      When you get into lighter gray colors, it varies a lot manufacturer to manufacturer.
    • 01:16:28
      So we actually had a point now where contractors on board, they were able to tell us, you know, here's the company that we're going to provide.
    • 01:16:35
      Because as you know, publicly bid project, we don't know exactly what manufacturer we're going to get.
    • 01:16:38
      So what you see here is something I put into this presentation.
    • 01:16:42
      It's zinc gray from Morin Corporation.
    • 01:16:45
      That's not actually the color.
    • 01:16:47
      So what you see on the screen now is just slightly different than what's in the renderings.
    • 01:16:50
      The renderings we were able to do after we got the actual metal panel color from the manufacturer.
    • 01:16:57
      So it's very, very close, though.
    • 01:16:59
      I left it in here because it's essentially the same, but just the zinc gray name.
    • 01:17:02
      It's called slate gray or something, right?
    • 01:17:05
      It's same color, different name.
    • 01:17:08
      OK, so dark bronze, this is our original.
    • 01:17:13
      We have a couple of different angles.
    • 01:17:16
      And then this is the view from the road here.
    • 01:17:23
      Now here's the medium bronze, got those same angles.
    • 01:17:32
      And from the road.
    • 01:17:32
      And then the light gray, where
    • 01:17:38
      The gray and the tone of the brick are really very similar.
    • 01:17:56
      So we agree that the lighter colors have less of a presence against the mountain backdrop in this view.
    • 01:18:03
      We've done our best to replicate what that mountain view is actually like, but this is artistic rendering.
    • 01:18:08
      It's not identical to the view that's there.
    • 01:18:11
      At this point though, I think as the design team and the owner's preference is to proceed with a medium bronze metal panel color, we think it's a balance between mitigating the image of the building against the backdrop while still providing a third element to contrast with other building materials.
    • 01:18:31
      We think that's the right compromise that kind of respects both sides of that coin.
    • 01:18:37
      So I'm happy to click back and forth to any image if you'd like to see it further.
    • Chris HenningsenChair, Architectural Review Board
    • 01:18:43
      All right.
    • 01:18:43
      Well, thanks a lot for that.
    • 01:18:45
      We'll see if people have questions.
    • 01:18:48
      Starting with Dave, do you have any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:18:51
      No questions, but thank you very much for preparing the additional visualization.
    • 01:18:56
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 01:19:00
      Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 01:19:02
      No questions either.
    • 01:19:03
      Yeah, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 01:19:04
      Right.
    • 01:19:05
      I don't have any questions.
    • 01:19:07
      Thank you.
    • 01:19:08
      And I don't have any questions either.
    • 01:19:11
      Thank you.
    • 01:19:13
      I guess we'll see if are there any members of the public who want to make a comment?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:19:19
      No.
    • Chris HenningsenChair, Architectural Review Board
    • 01:19:21
      All right, great.
    • 01:19:22
      In that case, the ARB will now go into discussion.
    • 01:19:25
      I guess we'll start with Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 01:19:32
      I may defer to the architects on this decision.
    • 01:19:36
      My personal opinion is I think the lighter gray is better suited.
    • 01:19:46
      Having said that, I think the building is far enough off the entrance corridor that I'm not inclined to make a huge move over it.
    • 01:19:55
      but I do think the lighter gray integrates better with the existing high school and it certainly integrates better with the mountains behind or as a more subtle impact on that view.
    • 01:20:09
      So my two cents.
    • Chris HenningsenChair, Architectural Review Board
    • 01:20:12
      Thanks, Frank Hancock.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:20:15
      Sure, thank you.
    • 01:20:16
      I agree with comments, Frank.
    • 01:20:24
      However, I was just kind of surprised at how much of an impact changing that color had on the architecture and the view.
    • 01:20:37
      And I think more importantly, the architecture.
    • 01:20:42
      I like both.
    • 01:20:43
      I like the light gray and I like both bronzes.
    • 01:20:47
      But yeah, at this point, I think I would
    • 01:20:52
      defer to the design team.
    • 01:20:54
      I think it's an excellent set of exhibits to study it and understand it.
    • 01:21:01
      And this is as far as the entrance corridor, this view is pretty spectacular and the site is pretty spectacular, I think, because of that.
    • 01:21:13
      So not an easy decision.
    • 01:21:18
      but I do think the medium bronze is compelling and I think it's within the architecture.
    • 01:21:28
      I think kind of that architectural statement too of the gradation going from the bottom to the top of the building.
    • 01:21:37
      I think it makes sense in that context.
    • 01:21:42
      Having said that, I like the other one too.
    • 01:21:44
      I think the gray is a really nice subtle, calm,
    • 01:21:48
      rendering, but yeah, that's just some commentary on where I'm headed.
    • Chris HenningsenChair, Architectural Review Board
    • 01:21:57
      Thank you.
    • 01:21:58
      Thanks.
    • 01:21:58
      Great.
    • 01:21:59
      Dade?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:22:00
      Sure, well thanks again to the applicant for the additional materials.
    • 01:22:03
      I think for me they affirm my initial expectation that the lighter color is more cohesive with the existing campus and maybe more consistent and compatible with the view while
    • 01:22:20
      I appreciate the applicant's consideration that perhaps the darker color is a greater accent to the building.
    • 01:22:29
      I think in terms of thinking about the whole corridor and the whole complex, the whole campus, that the lighter gray is a more effective selection and certainly would be in support of that.
    • 01:22:42
      But I appreciate everybody on the board's consideration.
    • Chris HenningsenChair, Architectural Review Board
    • 01:22:47
      All right, thanks.
    • 01:22:48
      I guess, yeah, I was kind of in the minority last time.
    • 01:22:52
      I really liked the dark bronze and the medium bronze is slightly less good looking than the dark bronze.
    • 01:23:05
      I thought that was a good medium.
    • 01:23:07
      I thought the light gray gets a little bit washed out and in consideration of like the view behind the building, I know that that
    • 01:23:18
      like the less distinctive choice, but I guess my preference would be for the medium bronze.
    • 01:23:26
      But I guess that kind of gets down to the kind of essential, I guess, personal preference nature of like color selection.
    • 01:23:38
      I think I would
    • 01:23:42
      Ultimately like defer to what the design team and the client, you know, what their preference is.
    • 01:23:49
      But I do appreciate the additional visuals.
    • 01:23:55
      I do think the medium bronze and certainly the light gray like really do kind of address the concerns that were brought up at the last meeting.
    • 01:24:05
      So take a look at the motion.
    • Frank StonerMember, Architectural Review Board
    • 01:24:15
      I do think Dade makes an interesting and valid point about what our role is specific to the building or the context.
    • 01:24:29
      If the context is the primary consideration, how does that affect the way you view
    • 01:24:38
      Because I agree, the building, it gives it a nice pop.
    • 01:24:40
      If you're just looking at the building, the dark bronze gives it a nice pop at the top.
    • 01:24:48
      But when I look at the renderings from far back, it was fairly obvious and compelling to me that, yeah, it just didn't fit with the overall landscape.
    • Chris HenningsenChair, Architectural Review Board
    • 01:25:00
      Well, yeah, that's a good point.
    • Frank StonerMember, Architectural Review Board
    • 01:25:16
      Any opinions from staff?
    • Margaret MaliszewskiPlanning Manager
    • 01:25:22
      This all started with a staff comment.
    • 01:25:29
      I think that the entrance quarter design guidelines are not just about the building, it's about the building in the context.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:25:51
      Yes, I hope it would be out of order.
    • 01:25:53
      I could make a motion.
    • 01:25:54
      It could fail under its own weight.
    • 01:25:59
      I'll move to approve the light gray color offered by the applicant for the High School Center 2 building.
    • Chris HenningsenChair, Architectural Review Board
    • 01:26:07
      Does anybody want to second that?
    • Frank StonerMember, Architectural Review Board
    • 01:26:10
      I'll second it.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:26:13
      Mr. Van Der Werf, Mr. Stoner, Mr. Hancock, Mr. Henningsen
    • Frank HancockVice Chair, Architectural Review Board
    • 01:26:29
      So just for the record that motion failed so we could go for a second motion if anyone has one.
    • 01:26:55
      We can discuss a little bit more if that's okay.
    • 01:27:00
      I think there's a lot going on on the site with the high school, existing high school and middle school and elementary school.
    • 01:27:14
      And I don't think you can see the Boys and Girls Club from the corridor, but I mean, there are lots of buildings and
    • 01:27:24
      Just thinking about the high school you know that facade is an addition or is a you know it's not like the high school that was built there and that's what we're dealing with so you know I guess you could argue the other side of that and say well why add another distinct element to that soup but I just
    • 01:27:50
      I think it's nice for buildings to relate to each other.
    • 01:27:54
      But I do think it's nice for this building to have its own character.
    • 01:27:58
      And I appreciate the architect's concept of it and the vision of it and that it is distinct within the materials that automatically kind of connects to the existing buildings.
    • 01:28:12
      And there's a relationship there.
    • 01:28:19
      I, in some way, yeah, I'll stop there.
    • 01:28:23
      I don't know if I'll convince you, but then.
    • Frank StonerMember, Architectural Review Board
    • 01:28:32
      Can we go back to the rendered image that just shows the building, the more close up?
    • Margaret MaliszewskiPlanning Manager
    • 01:28:41
      Which one?
    • Frank StonerMember, Architectural Review Board
    • 01:28:42
      Well, there were three on a page, but the third one, the light gray, just was a close up of that.
    • Margaret MaliszewskiPlanning Manager
    • 01:28:52
      Is this what you wanted?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:28:56
      It'll be back.
    • Frank StonerMember, Architectural Review Board
    • 01:29:37
      Yeah, I guess the case I would make is twofold.
    • 01:29:40
      One, there's a lot going on here just with the brick pattern.
    • 01:29:49
      Feels like when you throw the dark bronze top on, well, it's a nice accent.
    • 01:29:56
      It just makes it even busier.
    • 01:30:02
      And I think there is, well, every building can have its own identity.
    • 01:30:06
      I think there should be some desire to unify.
    • 01:30:10
      It's part of the campus.
    • 01:30:12
      It's part of the school.
    • 01:30:13
      Boys and Girls Club is something different, a different use.
    • 01:30:17
      And it's a light building, which, again, tends to blend into the background a little better.
    • 01:30:29
      Yeah, it just, to me, it feels out of place.
    • 01:30:37
      Having said that, if I had to choose one or the other, I would probably choose the medium bronze.
    • 01:30:42
      Although the medium bronze, in fact, I think will seem darker than what's shown in this rendering.
    • Chris HenningsenChair, Architectural Review Board
    • 01:31:00
      Yes, I'm looking at that photo on the top there.
    • 01:31:03
      And it appears that some of the existing parameters visible, at least in that photo, is white.
    • 01:31:10
      And some of it appears to be gray.
    • Frank StonerMember, Architectural Review Board
    • 01:31:18
      Where is the white?
    • 01:31:20
      I see the white.
    • 01:31:22
      Looked at that on Google Earth before it came today.
    • 01:31:31
      I'm a little unclear as to where the Boys and Girls Club is relative to.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:31:34
      Right.
    • 01:31:35
      So I think that's the ticketing and some locker facility for the field.
    • 01:31:39
      And I think that the roof is actually shingled, but here is rendered white, maybe is what's showing up in terms of the rendering, if that's what you're referring to.
    • Frank StonerMember, Architectural Review Board
    • 01:31:55
      Like building, you don't really see.
    • 01:31:57
      Yeah.
    • 01:31:57
      Yeah, I think you're right.
    • 01:31:58
      That may be a shingle.
    • Margaret MaliszewskiPlanning Manager
    • 01:32:08
      Well, Chris has the street view pulled up if you want to, do you want to look at that?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:32:27
      So it's that shingled roof over the, so then immediately to the, I'm sorry, the light there, right?
    • 01:32:34
      That white, I think, since this time has been replaced with metal panel that matches the rest of the building.
    • 01:32:41
      And it's gray, I think.
    • 01:32:48
      It appears white, but it is the metal panel matching the metal panel on other parts of the school.
    • 01:32:52
      It's gray?
    • Frank StonerMember, Architectural Review Board
    • 01:32:53
      Yeah, it's gray.
    • 01:33:10
      Screening on the rooftop appears to be closer to maybe the...
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:33:16
      It does look darker in that view than I saw in the...
    • Frank StonerMember, Architectural Review Board
    • 01:33:22
      Better than I'm thinking it does.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:33:28
      Yeah, the roof over the auditorium is a darker color than in the renderings.
    • Chris HenningsenChair, Architectural Review Board
    • 01:34:09
      Does everyone still feel the same way?
    • 01:34:17
      Is there any movement in terms of like, I'll say, color preference or anything?
    • 01:34:25
      And get me wrong, I don't think the gray looks bad.
    • 01:34:29
      It's more like I
    • 01:34:34
      In this case, it kind of does align with my personal opinion, but I also am kind of trying to keep into consideration the stated preference of the architect and client, which is kind of where my medium bronze...
    • Frank StonerMember, Architectural Review Board
    • 01:34:58
      I don't have any idea what the color is next to the chimney there that's in that screen.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:35:04
      Yeah.
    • Frank StonerMember, Architectural Review Board
    • 01:35:07
      Anybody know what that is?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:35:18
      And on the brick boards that are behind you, Chris, are there any are those for this project and are there any metal samples?
    • Frank StonerMember, Architectural Review Board
    • 01:35:33
      That's medium.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:35:35
      That's medium?
    • Margaret MaliszewskiPlanning Manager
    • 01:35:36
      Wow, okay.
    • 01:35:42
      That sample says midnight, sorry, midnight bronze, do you know?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:35:46
      Midnight bronze.
    • Frank StonerMember, Architectural Review Board
    • 01:35:54
      Well, do they have the medium?
    • Chris HenningsenChair, Architectural Review Board
    • 01:35:56
      Sounds like they're, or it looks like.
    • Frank StonerMember, Architectural Review Board
    • 01:36:06
      May that he showed us actually looks pretty close to that.
    • Margaret MaliszewskiPlanning Manager
    • 01:37:45
      Would it be worth someone making a motion for the medium gray just to see where that goes?
    • 01:38:02
      I mean, excuse me.
    • Chris HenningsenChair, Architectural Review Board
    • 01:38:02
      Yeah, I'll move to approve the medium bronze.
    • 01:38:09
      I'll second.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:38:17
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 01:38:19
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:38:20
      Mr. Hancock?
    • 01:38:22
      Aye.
    • 01:38:22
      Mr. Stoner?
    • Frank StonerMember, Architectural Review Board
    • 01:38:32
      Given the distance off the corridor, I'm going to go ahead and vote aye, even though... Mr. Van Der Werf?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:38:46
      Just since I forced us to spend this much time on it, I'll be consistent and say no.
    • 01:38:54
      It's good.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:38:57
      This is healthy for us.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:38:59
      Yeah, actually, I think we've got a lot here today.
    • 01:39:04
      Thank you.
    • 01:39:06
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:39:09
      All right, well, I expect a lot less controversy when we vote on the December 16, 2024 minutes.
    • 01:39:21
      Does anybody want to make a motion?
    • 01:39:25
      So moved.
    • 01:39:27
      I'll second that.
    • 01:39:29
      We could put that to a vote.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:39:32
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 01:39:33
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:39:34
      Mr. Hancock?
    • 01:39:35
      Aye.
    • 01:39:36
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 01:39:37
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:39:37
      Mr. Van Der Werf?
    • 01:39:38
      Aye.
    • 01:39:39
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:39:41
      All right.
    • 01:39:41
      Do any board members or staff have any additional items?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:39:47
      No.
    • 01:39:48
      All right.
    • 01:39:48
      Question.
    • 01:39:49
      When will the county jail return a review?
    • 01:39:52
      Is it scheduled yet?
    • Margaret MaliszewskiPlanning Manager
    • 01:39:55
      Yes, it's coming up, one of the February meetings I think.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:40:02
      I think it's in February.
    • 01:40:14
      One second, let me look one other place.
    • 01:40:16
      I think it's the second meeting in February.
    • Chris HenningsenChair, Architectural Review Board
    • 01:40:18
      Okay, thank you.
    • 01:40:22
      All right.
    • 01:40:24
      Okay, so the next ARB meeting is scheduled for Monday, February 3rd.
    • 01:40:30
      It seemed like everybody can make up.
    • Frank StonerMember, Architectural Review Board
    • 01:40:34
      Yes, I will not be here.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:40:37
      Okay, all right.
    • 01:40:37
      I will, so that's three of us.
    • 01:40:39
      Yeah, I don't know whether Taro's coming.
    • Chris HenningsenChair, Architectural Review Board
    • 01:40:40
      Right.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:40:41
      Yeah, Taro unknown, but yep.
    • Chris HenningsenChair, Architectural Review Board
    • 01:40:45
      All right, in that case, this meeting is adjourned until our next meeting on Monday, February 3rd, 2025.
    • 01:40:51
      It's
    • 01:40:54
      241 by my watch.
    • 01:40:59
      Thanks a lot.