Central Virginia
  • Albemarle County
  • Architectural Review Board Meeting 11/4/2024
  • Auto-scroll

Architectural Review Board Meeting   11/4/2024

Attachments
  • Agenda.pdf
  • Final Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB2024-58 2415 Ivy Road (Bellair Place) Comprehensive Sign Plan.pdf
  • Attach. 1 - ARB2024-58 2415 Ivy Road (Bellair Place) Amended Comprehensive Sign Plan.pdf
  • ARB 2024-59 Community Christian Academy staff report.pdf
  • Attach 1 ARB2024-59 Community Christian Academy Site Plan.pdf
  • Attach 2 ARB2024-59 Community Christian Academy Architectural Drawings.pdf
  • ARB2024-61 Holly Hills Final Staff Report.pdf
  • Attach. 1 ARB-2024-61 Holly Hills Development Phase I – Final Site Plan.pdf
  • Attach. 2 ARB-2024-61 Holly Hills Development Phase I – Architectural Drawings.pdf
  • Attach. 3 ARB-2024-61 Holly Hills Development Phase I – Perspectives.pdf
  • Draft ARB Action Memo Minutes 10_21_2024.pdf
  • SP2024-20 Carter Machinery Memo.pdf
  • Attach. I SP2024-20 Carter Machinery – Original Concept Plan (October 21, 2024).pdf
  • Attach. II SP2024-20 Carter Machinery – Revised Concept Plan (November 4, 2024).pdf
  • Attach. III SP2024-20 Carter Machinery – Action Letter (October 21, 2024).html
    • SPEAKER_05
    • 00:05:21
      Hello?
    • 00:05:24
      I'm not getting any sound on your end.
    • 00:05:57
      I still can't hear anything.
    • 00:07:27
      I'm not getting any sound through the computer or the phone.
    • Khris TaggartSenior Planner
    • 00:08:37
      My technical difficulty.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:08:49
      OK, you can let Chris do his again.
    • Khris TaggartSenior Planner
    • 00:08:53
      All right.
    • 00:08:54
      The application you're doing today is amendment to the existing TSP for 2415 Abbey Road.
    • 00:09:01
      In 2021, a certificate of appropriateness was issued for development in the CSP.
    • 00:09:07
      Since then, construction has been completed and several signs have been approved.
    • 00:09:12
      In June of this year, two sign applications for great coffee and selvedge brewing were submitted that weren't consistent with the CSP.
    • 00:09:22
      The amendment removes one improved sign location, adds two new sign locations and types, and adds white as a letter face color to accommodate these signs and tenant spaces on the east side of the building.
    • 00:09:35
      Through building renovation created traditional storefronts with side and bands on the south elevation that faces Ivy Road and maintain much of the industrial character on the east elevation.
    • 00:09:47
      The existing CSP provides a unified design by limiting the allowed sign types and locations.
    • 00:09:56
      The proposed signs, a hanging sign, and a projecting aluminum cabinet add a creative component to the plan while maintaining unity and simplicity.
    • 00:10:08
      The signs match the industrial character on the east elevation, and the variation between the south and east elevations allow for new sign types without creating an uncoordinated appearance.
    • 00:10:19
      Regarding the selvedge sign, it was noted in the staff report the sign height exceeded the roofline, which is now allowed in the zoning district.
    • 00:10:28
      However, since the staff report, the applicant revised the height to meet the sign height required by ordinance.
    • 00:10:34
      Staff recommends approval of the proposed sign and the CSP amendment with changes listed in the staff report.
    • 00:10:42
      I'd be happy to answer any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:10:44
      All right, thanks a lot, Chris.
    • 00:10:45
      That was even better than the first one.
    • 00:10:49
      Just in case any questions have percolated since the last time I asked.
    • 00:10:53
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:10:54
      Still no questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:10:56
      Frank Stoner?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:10:57
      No, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:10:58
      Frank Hancock?
    • 00:10:59
      No, thank you.
    • 00:11:00
      I still don't have any questions either.
    • 00:11:03
      Now is the time for the applicant's presentation.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:11:08
      All right, Keith, go ahead and state your name and who you're representing.
    • 00:11:12
      And you'll have 15 minutes starting when you start talking.
    • SPEAKER_05
    • 00:11:16
      Hi, my name is Keith Wagner.
    • 00:11:17
      I'm representing Talley Sign Company in Richmond, Virginia.
    • 00:11:21
      I want to share this thing.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:11:42
      Have you tried share screen?
    • 00:11:49
      Yeah, you have permission, so you should be, there you go.
    • SPEAKER_05
    • 00:11:52
      Okay.
    • 00:11:58
      So, Chris pretty much tackled everything.
    • 00:12:01
      This is the front of the building.
    • 00:12:07
      Looks really nice.
    • 00:12:09
      All the letters are the same.
    • 00:12:12
      Koller, except for that banner which I think is gone now.
    • 00:12:15
      All the lighting is exterior gooseneck lights.
    • 00:12:22
      This is the side of elevation that we're going to be working with.
    • 00:12:26
      It's still kept very much industrial from when I believe it was a John Beer dealership.
    • 00:12:35
      We're proposing two signs.
    • 00:12:38
      That's a great coffee.
    • 00:12:39
      It's an aluminum
    • 00:12:40
      aluminum cabinet on the bottom PVC letters on top and it's going to be hanging from the existing canopy.
    • 00:12:52
      The selvage brewing sign is going to be on the corner mounted with 90 degree brackets.
    • 00:13:02
      I did this before we revised it so it will not go over the roof line.
    • 00:13:08
      It's another aluminum cabinet.
    • 00:13:12
      Letters will be the only thing that light.
    • 00:13:14
      The background is opaque.
    • 00:13:17
      It's just a close review.
    • 00:13:22
      It's going to be hanging from the steel right there and one more.
    • 00:13:30
      Like I said, the background is opaque.
    • 00:13:31
      It's not going to emit very much light.
    • 00:13:34
      That's basically it.
    • Chris HenningsenChair, Architectural Review Board
    • 00:13:40
      All right, well, thanks for that presentation.
    • 00:13:42
      We'll just see if any board members have any questions, starting with Frank Stoner.
    • 00:13:49
      No, I don't, thanks.
    • 00:13:51
      A date?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:13:52
      No questions, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:13:54
      Frank Hancock?
    • 00:13:55
      No, I don't have any questions.
    • 00:13:56
      And I don't have any questions either.
    • 00:13:59
      Are there any members of the public who want to make a comment?
    • 00:14:05
      Doesn't look like anyone.
    • 00:14:08
      So the ARB will now go into discussion.
    • 00:14:13
      We'll start with Frank Hancock.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:14:16
      Thanks.
    • 00:14:17
      Thanks for the presentation.
    • 00:14:19
      And it seems pretty straightforward to me.
    • 00:14:23
      It's a different condition than the front elevation with kind of the recessed
    • 00:14:29
      facade due to loading dock.
    • 00:14:32
      And so I think these sign like hanging off the side and then mounted to the corner, I think make total sense.
    • 00:14:42
      And I think graphically or color wise, I think they fit in very nicely.
    • 00:14:50
      So now I don't I don't have any any comments other than that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:14:56
      All right.
    • 00:14:56
      Thanks, Dade.
    • 00:14:58
      Yeah, I think it's a nice proposal.
    • 00:15:00
      Like Frank, I appreciate him outlining sort of the logic building sort of has a front side and a back and the sign types evolving that way.
    • 00:15:08
      Seems appropriate.
    • 00:15:10
      All right.
    • 00:15:10
      Thanks, Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:15:11
      Great.
    • 00:15:12
      I don't really have anything to add.
    • 00:15:15
      I think they're appropriate solutions too.
    • Chris HenningsenChair, Architectural Review Board
    • 00:15:21
      Thanks.
    • 00:15:21
      And yeah, I agree with all that.
    • 00:15:23
      I think it's appropriate and tasteful.
    • 00:15:27
      And so I guess if we could take a look at the recommended motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:15:56
      The motion is, or the recommendation is to approve the revisions to the sign plan and approve the signs for grit coffee and salvage brewing with the conditions listed in the staff report.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:11
      All right, I'll just run through and see if anybody has any tweaks.
    • 00:16:16
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:16:17
      No, looks good to me.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:19
      Frank Donner?
    • 00:16:20
      Frank Hancock?
    • 00:16:21
      No.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:22
      either.
    • 00:16:23
      So would anybody care to make a motion?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:16:26
      Be happy to move for approval to approve the revisions to the 2415 Ivy Road comprehensive sign plan and the signs for great coffee and salvage brewing with the conditions listed in the staff report.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:36
      All right, thanks.
    • 00:16:38
      I'll second that.
    • 00:16:39
      So if we could put that to a vote.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:16:44
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:45
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:16:45
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:47
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:16:47
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:48
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:16:49
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:50
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:16:50
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:51
      All right, thanks a lot.
    • 00:16:53
      We will move on to our next review item, which is ARB 2024-59, Community Christian Academy.
    • Margaret MaliszewskiPlanning Manager
    • 00:17:03
      Okay, this is still a proposal to construct a modular classroom building and related site improvements at the property located at 114 Old Brook Road, which is the north corner of the intersection with the Ryer Road entrance corridor.
    • 00:17:18
      The site is occupied by a church, a parsonage, a playground, and a parking lot.
    • 00:17:22
      And the modular building would be located behind the parsonage as viewed from the entrance corridor.
    • 00:17:26
      And that's approximately 210 feet from the property line and another 50 feet from the sidewalk.
    • 00:17:31
      A special use permit was approved for this use in September.
    • 00:17:35
      The approved concept plan showed the modular building envelope in the general location of the existing parsonage.
    • 00:17:41
      The zoning has determined that the current proposal, which retains the parsonage now and places the modular building to the east of it or behind it, that it is still consistent with the approved concept plan.
    • 00:17:53
      The proposed building is a prefabricated modular structure.
    • 00:17:56
      Each building elevation has multiple windows and the site plan shows building entrances on the north and west sides.
    • 00:18:04
      The structure has minimal detailing and mechanical units are proposed on the long walls, including the one that faces the entrance corridor.
    • 00:18:11
      The modular building has little connection to the historic architecture of the county.
    • 00:18:15
      As with most structures of this type, its form, materials, and features are distinctly utilitarian.
    • 00:18:20
      The building is expected to have some visibility from the street, so the primary issue is mitigating visual impacts of the building form and the wall-mounted equipment.
    • 00:18:29
      Given that location of the building, it's anticipated that this mitigation can be accomplished primarily through landscaping and by choosing a compatible color for the walls of the building.
    • 00:18:40
      There is some mature landscaping on this parcel.
    • 00:18:43
      The proposal includes the removal of three trees.
    • 00:18:45
      Those are the ones that are circled in red.
    • 00:18:47
      There are five trees along the perimeter of the parking lot facing Rio Road.
    • 00:18:52
      Two trees are existing along the perimeter of the parking area that faces the parsonage.
    • 00:18:57
      There are two interior parking lot trees and there are four trees near the parsonage that are shown as to remain.
    • 00:19:03
      And that includes a 24-inch mulberry, that's the one that's highlighted in yellow, which is located very close to the proposed building site.
    • 00:19:12
      The parking lot and frontage trees do not meet entrance quarter guidelines standards.
    • 00:19:16
      That's not unusual.
    • 00:19:17
      This site predates the establishment of the entrance quarter.
    • 00:19:22
      The proposal does add landscaping to the site.
    • 00:19:24
      It's a mixed group of trees and shrubs located between the parsonage and the modular building.
    • 00:19:30
      In this image, the evergreens are marked in the darker green.
    • 00:19:36
      The layout of that proposed planting does seem a bit crowded.
    • 00:19:40
      Trees are typically spaced about 10 to 12 feet apart, and it looks particularly cramped between the two buildings.
    • 00:19:48
      Our recommendation is that the landscaping along the modular building be limited to evergreens placed to mitigate visibility of the mechanical equipment and that trees and shrubs be added along the western property line.
    • 00:19:59
      That is the one fronting the entrance quarter.
    • 00:20:03
      That would bring the landscaping there up to guideline standards while reducing visibility of the modular building.
    • 00:20:09
      Landscaping there would do more to increase the orderly appearance of the site and would help integrate the development into the overall corridor.
    • 00:20:16
      Adding trees and shrubs along the eastern perimeter of the parking lot and along Old Brook Road would bring those other elements of the site up to guidelines standards and increase screening as well.
    • 00:20:27
      We've also made some recommendations for minor changes to the site and architectural drawings for consistency and for standard information.
    • 00:20:33
      Our recommendation is to make the revisions listed in the staff report.
    • 00:20:39
      Happy to try to answer any questions that you might have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:20:41
      All right.
    • 00:20:41
      Thanks a lot, Margaret.
    • 00:20:44
      I guess we'll start with Frank Hancock.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:20:47
      I don't have any questions.
    • 00:20:48
      Thank you, Margaret.
    • 00:20:50
      Dade?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:20:51
      No questions either.
    • 00:20:52
      Thanks, Margaret.
    • 00:20:54
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:20:55
      The only question I have relates to whether this would be considered a temporary or permanent use, given that it's a modular building.
    • Margaret MaliszewskiPlanning Manager
    • 00:21:04
      I think I will defer that question to the applicant.
    • Chris HenningsenChair, Architectural Review Board
    • 00:21:11
      All right.
    • 00:21:12
      I don't have any questions.
    • 00:21:14
      So if the applicant has a presentation.
    • Kelsey SchleinPlanner
    • 00:21:31
      All right, good evening.
    • 00:21:32
      Sorry, typically here in the evening.
    • 00:21:33
      Good afternoon, Chair Henningsen and members of the ARB.
    • 00:21:37
      My name is Kelsey Schlein.
    • 00:21:38
      I'm a planner with Shimp Engineering.
    • 00:21:41
      I'm here today representing Community Christian Academy.
    • 00:21:44
      Also here with me is my colleague, Julia Moore.
    • 00:21:47
      She's a landscape designer in our office.
    • 00:21:51
      Kimberly Moore, who is the director of Community Christian Academy, and Todd Cothran, who is the pastor at Cross Life Community Church, which is the property where Community Christian Academy is located.
    • 00:22:05
      I dragged this up, but maybe try this again.
    • 00:22:16
      Okay, that needs to be dragged.
    • 00:22:20
      Oh my bad, I dragged to the wrong one.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:22:22
      Thank you.
    • Kelsey SchleinPlanner
    • 00:22:25
      Okay, try this again.
    • 00:22:28
      All right, thank you, Margaret, for the presentation.
    • 00:22:31
      So we're looking at this property here, as Margaret said, off of that's at the intersection of Rio Road East and Old Brook Road.
    • 00:22:38
      Rio Road is the entrance corridor here.
    • 00:22:40
      Before kind of hopping into some more details of our
    • 00:22:46
      Proposal, I wanted to just go over a brief timeline and Community Christian Academy's needs for this modular structure.
    • 00:22:52
      So in September, they obtained an amendment approval to their special use permit application.
    • 00:23:02
      Shortly thereafter, two weeks after their approval, we filed at the next filing deadline their ARB and site plan amendment application showing this modular structure to be constructed on the property.
    • 00:23:14
      The goal here is to have this modular structure operational by August of 2025.
    • 00:23:20
      So the next school year and Kimberly and her team are very much on a time crunch to make that happen.
    • 00:23:26
      So just looking at the timeline going forward, we're at the ARB initial review today.
    • 00:23:31
      We'll be working on revisions and resubmitting as soon as possible but are really hopeful that we can get this installed and off the ground and so that that Kimberley can utilize these classrooms in the upcoming school year.
    • 00:23:47
      And so looking at the site overview here, so this is the location of the existing parsonage.
    • 00:23:52
      This is the approximate new modular location.
    • 00:23:56
      And then this is the location of Cross Life Church and also where Community Christian Academy currently operates out of.
    • 00:24:07
      and this is the site plan that we submitted showing the new proposed modular building as well as some new ADA parking spaces and ADA routes to the proposed entrances to the modular building.
    • 00:24:21
      I wanted to go over kind of future plans for this property because I think it'll really help us to frame our discussion about
    • 00:24:27
      in specific a landscape on the site.
    • 00:24:31
      We really kind of hope to be very intentional about the placement of landscaping on this site to mitigate visual impacts from this proposed modular structure, but also to ensure that the landscaping we install can remain in place throughout future phases
    • 00:24:45
      and hopeful future development on this site to continue to serve Community Christian Academy and Cross Life.
    • 00:24:52
      So I'm going to talk through kind of some of these site improvements and general expansion plans that we've worked through on the site and that we anticipate moving forward in the next few years.
    • 00:25:04
      So what you're looking at here in the orange is a potential area for a future parking lot expansion to work through rearranging the existing parking layout and adding additional parking spaces to have a better drop-off loop for Community Christian Academy and also just to have some additional parking on site as it's currently pretty tight in this parking lot on Sundays.
    • 00:25:30
      You can see the location of the proposed modular building here and then a potential future building expansion.
    • 00:25:37
      So none of these future proposal other than the modular building is on the site plan before you today.
    • 00:25:43
      I just felt it was important as we discussed landscaping and the placement of landscaping that we can also discuss about future plans and
    • 00:25:54
      making sure that the landscaping we install can just remain on the site in the future.
    • 00:26:00
      So this is showing the parsonage location and so with a future parking expansion that would be removed at some point.
    • 00:26:09
      And so talking about landscaping and especially some of the recommendations that ARB staff put forward in the staff report, you know, we
    • 00:26:19
      I would really like to focus on landscaping along the entrance corridor to mitigate visual impacts.
    • 00:26:26
      There is an existing cedar grove here, just a kind of few little patches of cedars that will remain as part of this site plan.
    • 00:26:34
      But additional landscaping plan or additional landscaping directly on this eastern side
    • 00:26:40
      of the parking lot.
    • 00:26:42
      We would like to discuss maybe mitigating the impacts from the corridor elsewhere on the site as we imagine that the parking lot will be expanded and that landscaping will be compromised in the future.
    • 00:26:53
      As far as the landscape recommendation for mitigating impacts of the HVAC equipment and adjacent to the modular building, we definitely think we can accommodate that, but we really would
    • 00:27:04
      I appreciate keeping the landscape focused close to the modular building and then along the entrance corridor here.
    • 00:27:12
      And additionally, any landscaping that we need to discuss on Old Brook Road.
    • 00:27:19
      And this is just kind of conceptually showing there is some existing landscaping here along the edge of the parking lot.
    • 00:27:25
      And so these existing trees, which exceed entrance corridor spacing would be supplemented to meet the 35 on center.
    • 00:27:32
      And then also supplemented with ornamentals and some additional shrubs to screen the parking lot.
    • 00:27:42
      and this is just kind of showing the view from Rio Road and the approximate location of the modular building here.
    • 00:27:51
      Another item that we just wanted to bring up since the release of the staff report, we were able to talk with the modular supplier about proposed building treatments.
    • 00:28:03
      Hardy panel is a facade treatment that they often install on these modular buildings.
    • 00:28:10
      And this modular building, I would say is largely the same that we see on public school sites across the county.
    • 00:28:15
      And so Kimberly and her team are interested in doing a Hardy panel siting.
    • 00:28:21
      I know in the staff report it was mentioned that we might do some type of metal siding.
    • 00:28:25
      I think we're definitely interested in a hardy panel here and some type of beige tone.
    • 00:28:31
      And so we've identified a steamed trie for that color.
    • 00:28:35
      And we can present these all with our recent metal, but I just wanted to bring up an alternative material that we're considering.
    • 00:28:43
      and that is all that I have for you.
    • 00:28:46
      I, along with the other members of our team are available for any questions you have and I appreciate the opportunity to present this project to you.
    • 00:28:51
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:28:53
      Thanks for your presentation.
    • 00:28:54
      I guess we'll start with Frank Hancock.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:29:01
      Great presentation.
    • 00:29:03
      Good to see the future plans and the kind of reaction to some of the comments.
    • 00:29:09
      It's always good to see that.
    • 00:29:10
      I don't think I have
    • 00:29:13
      Maybe a question about the Hardy panel, and maybe that's not as developed, but the orientation of that, will it be horizontal or vertical?
    • 00:29:24
      I don't know if there's any.
    • Kelsey SchleinPlanner
    • 00:29:26
      I think so I've been told by the manufacturer and I could also let Kimberly weigh in on this as well as whether she has a preference but I know he said that he in the thousands of structures that he's installed he's never done he's only done the hardy plank once with the you know horizontal and so we're definitely gonna stay away from the plank he said that's really difficult to do on these structures but then as far as the orientation of the hardy panel vertical or horizontal we haven't gotten into that just yet.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:29:56
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:29:58
      All right, Dade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:30:00
      Thank you for your presentation.
    • 00:30:01
      And appreciate the color option you present.
    • 00:30:06
      Question, is it possible to get the mechanical units painted to match?
    • Kelsey SchleinPlanner
    • 00:30:12
      That's a good question.
    • 00:30:12
      I'd have to run that by the manufacturer.
    • 00:30:15
      But we can definitely ask that of them and with our resubmitted materials respond to that.
    • 00:30:20
      Thank you.
    • 00:30:22
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:30:23
      Thanks for the presentation.
    • 00:30:24
      Same question I asked Margaret before.
    • 00:30:27
      Is this building conceived of as a permanent structure or is this sort of a temporary solution with the idea that at some point in the future there would be a stick build?
    • Kelsey SchleinPlanner
    • 00:30:38
      Yeah so definitely it will be in place for at least five years and you know I think the idea is that with this future building expansion back here that the additional classroom space can be accommodated that they need so I would say it's the intent that it's temporary but I think as you know we often see the lifetimes of these structures you know might last a little longer than original intent because they do serve a purpose in much needed space but at the onset it's five years that we're looking at.
    • Frank StonerMember, Architectural Review Board
    • 00:31:09
      Okay, great, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:31:14
      I guess my only question is the proposed landscaping that's going kind of right in front of the building, that's mostly evergreen.
    • 00:31:24
      And if the parking lot expansion occurs, would there be additional infill in that row of evergreens?
    • 00:31:37
      Right now it seems like
    • 00:31:39
      Half of the building is already, or half of the building location's already screened by existing trees.
    • 00:31:48
      And the proposed screening is kind of like filling in the gap of that.
    • 00:31:54
      But if the existing trees are removed as part of the parking lot expansion, would there be, in your mind, kind of an infill of that screening that's right in front of the building site?
    • Kelsey SchleinPlanner
    • 00:32:08
      Yeah absolutely especially because you know once we expand the parking lot we kind of fall under making all the improvements necessary for interior parking lot trees and perimeter trees and so certainly there will definitely a bunch of additional landscaping with future phases.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:25
      All right thank you.
    • 00:32:26
      Are there any members of the public that want to make a comment?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:32:34
      I have no one online.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:36
      It doesn't seem like there's anybody in person, so the ARB will now go into discussion.
    • 00:32:44
      I guess we'll start with Dave.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:32:50
      Yes, I appreciate the application presentation.
    • 00:32:53
      I appreciate the applicant's transparency about the potential future developments of the site.
    • 00:33:00
      I think the location further back from the entrance corridor is probably positive to the degree it mitigates visibility more, and the parsonage will at least initially mitigate visibility.
    • 00:33:12
      I think I will be interested to see in the resubmission the specific landscape proposal and understand how that screens the, in particular the mechanical equipment, but the development in general, but it seems like a suitable signing and proposal otherwise.
    • 00:33:28
      Great, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:33:29
      Frank Stoner?
    • Frank StonerMember, Architectural Review Board
    • 00:33:32
      Yeah, I'm in agreement with Dade.
    • 00:33:33
      I am sensitive to the possibility that a lot of the existing vegetation, particularly around the existing building, could go away in the future.
    • 00:33:45
      And also sensitive to the fact that if the building's only there for let's say five years, the ability to effectively screen in five years is somewhat limited, just given the growth rate.
    • 00:33:59
      Most of the species you'd probably plant.
    • 00:34:03
      I think it's a reasonable proposal.
    • 00:34:06
      I think the reality is the visibility, at least from the entrance corridor now, is gonna be very restricted just because of what's there.
    • 00:34:16
      Old Brook Road, it'd be nice to see some additional landscaping there.
    • 00:34:22
      But otherwise, you know, no comments.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:34:27
      Thanks, Frank.
    • 00:34:29
      I'll agree with my colleagues.
    • 00:34:31
      I think staff's comment about adding plantings along the entrance corridor and the applicant's willingness to do that, I think really helped the application.
    • 00:34:44
      I think screening closer to the road where your vantage point will be, I think will help.
    • 00:34:55
      So I feel good about that and I agree that it's pretty far back and I think you'll just get glimpses of it.
    • 00:35:03
      I don't think you'll have this full facade view in any one spot.
    • 00:35:13
      Yes, those are my comments.
    • Chris HenningsenChair, Architectural Review Board
    • 00:35:14
      Thanks.
    • 00:35:15
      Yeah, I agree.
    • 00:35:17
      I think the landscaping closer to the entrance corridor is going to be the best place because that's the added benefit of screening the parking lot itself also.
    • 00:35:32
      So I guess if we can take a look at the recommended motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:35:49
      As we switch screens, I'll be able to show you.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:35:52
      I'm sorry.
    • Margaret MaliszewskiPlanning Manager
    • 00:36:12
      So our recommendation was for changes to be made to the plans as listed in the staff report to come back to you for another review.
    • 00:36:23
      Based on the conversation,
    • 00:36:30
      I have struck through number 10 which said consider adding trees and shrubs along the eastern perimeter of the parking lot and through the portion of number 11 that also talked about parking lot landscaping but I amended number 7 which
    • 00:36:52
      is the requirement for the entrance corridor frontage trees along the west side of the parking lot and added the shrub requirement there.
    • 00:37:05
      I'll just point out that number nine references trees along Old Brook.
    • 00:37:14
      Just not sure if everyone was on board with that one.
    • Kelsey SchleinPlanner
    • 00:37:23
      I don't need to interrupt.
    • 00:37:32
      Kimberly actually just brought up a really good point.
    • 00:37:35
      For number 12, the mulberry, I know we have that shown as timber mains, but since we submitted, she's brought up to me that those berries before they ripen are toxic.
    • 00:37:44
      And so they've been planning to take that tree down regardless, but they've had a few kids get sick and it's caused them problems being right in the playground.
    • 00:37:53
      And so we will likely be removing that as a tree to remain from our site plan since we submitted.
    • 00:37:58
      I'm sorry, I forgot to mention that in my presentation.
    • 00:38:02
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:38:03
      Thanks.
    • 00:38:03
      I guess we just write the reference to that Mulberry.
    • 00:38:13
      I'll just run through and see if anybody has any tweaks, starting with Dade.
    • Margaret MaliszewskiPlanning Manager
    • 00:38:19
      I'm sorry to interrupt.
    • 00:38:20
      I'm sorry.
    • 00:38:21
      I added number 13.
    • 00:38:22
      Also, consider painting the mechanical units to match the side in color.
    • 00:38:27
      Thanks.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:38:28
      You know, I appreciate Margaret's updates and I think it looks good.
    • 00:38:34
      Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:38:35
      Yeah, it looks fine to me as well.
    • Chris HenningsenChair, Architectural Review Board
    • 00:38:38
      Frank?
    • 00:38:39
      No, it's me either.
    • 00:38:42
      So, anybody want to make a motion?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:38:48
      I'll move to provide the applicant with the comments listed in the staff report for ARB 2024-59 Community Christian Academy amended as follows to be addressed with the next submittal.
    • 00:39:04
      Update number seven with added language and shrubs 24 inch in height at planting, strike item number 10, revise item number 11,
    • 00:39:19
      Revise item number 12 and add item number 13, consider painting the mechanical units to match the siding.
    • 00:39:27
      All right, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:28
      Anybody want to second that?
    • 00:39:32
      I'll second.
    • 00:39:33
      Thanks.
    • 00:39:34
      We could put that to a vote.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:39:37
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:38
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:39:39
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:40
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:39:40
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:42
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:39:42
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:43
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 00:39:44
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:39:44
      All right, thanks a lot.
    • 00:39:48
      All right, our next review item is ARB 2024-61, Holly Hills.
    • 00:39:55
      And Chris, whenever you're ready.
    • Khris TaggartSenior Planner
    • 00:40:07
      Good afternoon again.
    • 00:40:09
      The proposal you're now reviewing is to construct a first phase of residential development consisting of 318 apartment units in six buildings and associated site improvements.
    • 00:40:21
      The site is located on the east side of Route 29 just south of Hollymead Drive.
    • 00:40:27
      ARB recommended approval of the initial site plan on August 19th of this year.
    • 00:40:33
      The primary focus of staff reports is on the architectural design of the apartment buildings, landscaping the site, and site improvements.
    • 00:40:44
      There are three visually similar architectural designs proposed for the apartment buildings.
    • 00:40:48
      The overall designs are contemporary in style, but feature forms and building materials that reflect those used historically within the county.
    • 00:40:55
      The elevation of these buildings use forms, colors, and material changes in projections and recesses to help reduce the uniformity and break up the massing of the building.
    • 00:41:06
      The height of the building is varied with changes in materials and colors, but the length remains somewhat uniform.
    • 00:41:13
      Horizon designed to use contrasting colored down sprouts would provide visual breaks that would further reduce the apartment building's massing.
    • 00:41:23
      A landscape plan has been provided with the final site plan.
    • 00:41:26
      The plan identifies trees that were planted with the construction of the existing shared use path along Route 29 and trees in the landscape buffer there to ring.
    • 00:41:36
      Due to existing utilities, the plan does not show a row of street trees, but the proposed landscaping within the buffer exceeds the spacing required by ordinance and similar to the surrounding context.
    • 00:41:49
      Land also shows trees along Art Drive and Biola Drive along some of the buildings and along the parking lots.
    • 00:41:59
      However, the trees provided along the interior roads and sidewalks does not meet some of the guidelines, including tree size and spacing.
    • 00:42:07
      The pedestrian trees are positioned behind buildings and are unlikely to be seen from the entrance quarter.
    • 00:42:13
      However, the trees along Archer Road will be visible from the entrance to the site.
    • 00:42:18
      Staff recommends revising the landscape plan to show proper spacing and caliber size to meet the interior road tree requirements.
    • 00:42:27
      The site plan has also been updated to show a small portion of the retaining wall west of Building 3 terrace with landscaping between the wall and the parking lot and existing trees to remain west and south of the wall.
    • 00:42:37
      However, the wall is largely un-terrace.
    • 00:42:40
      The maximum height of the lower wall is 12 feet and trees at the base of the wall are expected to provide minimal mitigation.
    • 00:42:47
      Staff recommends revising the site plan to terrace the wall so no portion exceeds six feet in height.
    • 00:42:55
      Regarding the townhouse blocks located to the rear of the site to be constructing phase two and three due to the intervening apartment buildings in the first phase distance in topography, the townhouses are not expected to be visible and staff recommends that ARB review of these blocks not be required.
    • 00:43:16
      Are recommendations approval of the final site plans with the revisions listed in the staff report?
    • 00:43:22
      I'd be happy to answer any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:43:24
      All right.
    • 00:43:24
      Thanks a lot, Chris.
    • 00:43:27
      We'll start with Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 00:43:31
      Thanks, Chris.
    • 00:43:32
      I don't think I have any questions at this time.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:43:37
      Thanks, Frank.
    • 00:43:39
      I don't have any questions.
    • 00:43:40
      Thanks, Chris.
    • 00:43:42
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:43:43
      So I guess with the stormwater management facility that's in the tree buffered, is there an illustration or an exhibit that makes it clear to what extent there are or are not trees or can be trees in that zone?
    • Khris TaggartSenior Planner
    • 00:44:10
      Landscape plan probably gives the clearest illustration.
    • 00:44:12
      There is also a noted plan that plantings would be planted in the stormwater facility as allowed by county, DEQ, and I believe another agency.
    • 00:44:24
      So I believe what's shown on the landscape land is probably the stint of the plantings that are currently proposing.
    • 00:44:30
      I'm not sure if that's the stint of what's allowed within the facility.
    • 00:44:35
      The applicant would probably be better answer that question.
    • 00:44:40
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:44:44
      All right.
    • 00:44:44
      Thanks.
    • 00:44:45
      I don't have any questions.
    • 00:44:48
      So if the applicant has a presentation, now would be the time.
    • Chuck RappLandscape Architect
    • 00:44:56
      Thank you, Chris.
    • 00:44:57
      Good afternoon, ARB members.
    • 00:45:24
      I'm Chuck Rapp, the Collins Engineering.
    • 00:45:26
      I also have Dustin Hsu here from the architecture team and Joe Murray from the development side.
    • 00:45:33
      Give you a bit of an overview of the project.
    • 00:45:35
      I think Chris did a great job explaining everything.
    • 00:45:37
      This is an overall illustrative rendering, shows the multifamily, shows the buffer, and then the townhome units to the faces two and three that'll come later.
    • 00:45:48
      This is Archer Avenue that does run right through this development.
    • 00:45:51
      It'll connect to Archer North.
    • 00:45:53
      formerly known as RST, that has a rezoning application to amend that plan now with Riverbend development and then that Archer Avenue continues across over to the Brookhill development and all the way down to Polo Grounds Road, so kind of a new parallel road that runs along 29 on that one.
    • 00:46:14
      A couple of existing photos of the site with trees on this one.
    • 00:46:17
      This is from earlier in the summer.
    • 00:46:20
      This is that storm pond.
    • 00:46:21
      It is a VDOT storm pond.
    • 00:46:22
      I'll speak to that.
    • 00:46:23
      Hopefully answer your question on some of that stuff.
    • 00:46:27
      There's kind of this wooded berm from when they did the 29 Solutions project.
    • 00:46:33
      It multi-use path.
    • 00:46:34
      Then you have this maybe five, six foot berm that's pretty grown up with all different types of stuff that runs along the frontage.
    • 00:46:44
      During the initial site plan review, I believe it was an ARB request to have us go out there and survey the trees within that buffer.
    • 00:46:49
      So you have a 70-foot buffer and then a 30-foot disturbed buffer that will be replanted.
    • 00:46:56
      So we went out there, surveyed all the trees, which you see in the light gray are the existing trees.
    • 00:47:00
      And then I've gone in and plan to, proposing to plant additional trees to fill in those gaps.
    • 00:47:06
      So we have a full buffer along that whole corridor there wherever possible.
    • 00:47:10
      There's really only one spot where we have a little bit of limitation where we had an existing storm pipe that runs underneath 29 and over so there's an easement on that obviously and you can kind of see the disturbance there but again still trying to plant as much as we could up against it to create a uniform buffer along that whole frontage there so you do have some pretty large mature trees throughout there but over time hopefully it'll all grow up to be a nice buffer and continue that pattern that we have running along Route 29 from prior projects.
    • 00:47:39
      with the Storm Pond.
    • 00:47:40
      So this is that existing Storm Pond that was built as part of that 29 Solutions Project, VDOT maintained, and this would be a similar approach to what happened in front of Brookhill, where the existing basin was expanded.
    • 00:47:56
      Our plan is to replace that chain link fence with more of a decorative aluminum picket fence, black picket fence.
    • 00:48:04
      and then add plantings.
    • 00:48:05
      I tried to kind of do something similar to what was done in front of Brookhill.
    • 00:48:10
      I figured that was a decent precedent of doing something a little more that would look better with some flowering shrubs and some evergreens and things like that, flowering trees along the frontage.
    • 00:48:22
      And then I put in some larger trees in the back.
    • 00:48:25
      It's a pretty steep slope, so we can plant this front side, you know, to an extent.
    • 00:48:30
      I don't want to get too extensive with the plantings because it is a two-to-one slope, so I don't want that to cause some issues in the future, but we just can't plant on this backside where we have the dam.
    • 00:48:40
      But on this front side, we can certainly add more stuff if desired.
    • 00:48:46
      Chris did mention this retaining wall.
    • 00:48:48
      We've been working with our civil team once that comment came out to see if we can reduce that.
    • 00:48:51
      I think by eliminating one or two parking spaces on the end here, we'll be able to get enough room to terrace that wall, another terrace to make it a little lower so it doesn't have that height issue.
    • 00:49:02
      We've also been working to try and adjust
    • 00:49:05
      So Archer Avenue is a curving road, so there are utilities that run down at stormwater, sewer, make it somewhat challenging with straight runs of those utilities to try and avoid them with all the trees and get the equal spacing.
    • 00:49:16
      But we've been able to do some creative stuff with the catch basins, I think, and pull those closer to the road, some of the piping underneath them, some minor adjustments.
    • 00:49:23
      So I think we can get a better spacing on those trees as well.
    • 00:49:26
      So no problem adjusting some of that.
    • 00:49:29
      We did work with Dustin and his architecture team to produce some of these views.
    • 00:49:35
      We have views showing the existing trees, and then with the proposed trees, so you can see that storm pond, some of the flowering trees, the shrubs that'll be up front, along with the topo of that area that dips down into where the outfall is.
    • 00:49:50
      Again, existing trees that would be remaining, and then with the planted trees along the street, trying to kind of dress up this entrance.
    • 00:49:59
      Make it much more inviting.
    • 00:50:00
      It is a road that will serve more than just this development, though.
    • 00:50:02
      So we want to keep that in mind.
    • 00:50:05
      But the idea is to really have an attractive front entrance here and eventually some kind of sign when you get closer to the apartment buildings.
    • 00:50:16
      And another view running down Archer Avenue there.
    • 00:50:18
      Do you have a nice median at the front there where I was able to put some some more columnar trees down front of that and then the larger shade trees on the side?
    • 00:50:28
      Again, another from 29.
    • 00:50:30
      The topography on the other side varies quite a bit.
    • 00:50:34
      It drops off on the other side here where that storm pipe comes out.
    • 00:50:37
      So you can kind of see a lot of new plantings here.
    • 00:50:39
      That's why it's kind of void of vegetation now.
    • 00:50:41
      So we'll replant that significantly and work through that.
    • 00:50:47
      With that, I think I will turn it over to Dustin to talk about the architecture and answer any questions you'll have on that.
    • SPEAKER_06
    • 00:50:58
      Thank you, Chuck.
    • 00:51:00
      Good afternoon.
    • 00:51:01
      My name is Dustin Hsu.
    • 00:51:02
      I'm with RJTR Architects in Atlanta, Georgia, architect for this project.
    • 00:51:07
      Thank you, ARB, for having me.
    • 00:51:09
      Beginning with the architecture of the apartment buildings where you're seeing on the screen is what we're calling a building type A.
    • 00:51:15
      There are two of these buildings on the site is a three, four split, three levels on one side, four levels on the other.
    • 00:51:22
      Starting with materials, we have predominantly
    • 00:51:26
      uh... fiber cement lab siding horizontal
    • 00:51:29
      in the gray and the light blue, horizontal blue.
    • 00:51:33
      As it goes up to the very top where it transitions to the white, we have fiber cement, board and batten.
    • 00:51:41
      We also have board and batten in these tower elements which delineates the entries to the buildings.
    • 00:51:48
      These tower elements also allows us to project a little higher so that it helps us break up the roof as well as the elevation and gives us a nice kind of bookmark to the buildings.
    • 00:51:59
      The roof material is asphalt shingles, and we really try to break up the facade as much as possible.
    • 00:52:07
      Windows are vinyl with pre-finished aluminum railing for the balconies and the juliettes.
    • 00:52:16
      This is building A.1.
    • 00:52:18
      We have one of these buildings on the site.
    • 00:52:19
      It is the exact same as building A, except instead of a 3-4 split, we just go to a 3, so three levels on this one.
    • 00:52:28
      This is our building B, we're calling building type B.
    • 00:52:32
      This is the larger building on site.
    • 00:52:35
      We have three of these buildings on site.
    • 00:52:39
      Same materials as building type A, with it being a longer elevation, we try to break it up by having these kind of undulations on the units.
    • 00:52:48
      And that helps us break up the roof elevations as well so that we can
    • 00:52:54
      We can try and not have one long facade.
    • 00:52:59
      I know there was a comment regarding, try to break this up with downspouts and gutters.
    • 00:53:05
      The gutters and downspouts being a different color, we can definitely look into that being like a bronze to match the aluminum railing to help that.
    • 00:53:14
      This is the back elevation of building B and then the front elevation, which is the three side.
    • 00:53:23
      This is our clubhouse.
    • 00:53:26
      One clubhouse on the site.
    • 00:53:27
      We try to make this one a little more contemporary to distinguish it from the apartment buildings.
    • 00:53:33
      Building materials is fiber cement boards with reveals.
    • 00:53:38
      The roof, main roof is a TPO flat roof and the side roofs are metal seam.
    • 00:53:45
      It's got a dark bronze color.
    • 00:53:47
      Here we've changed the colors of the windows from a white to a dark bronze color.
    • 00:53:55
      and this is just the other two elevations of the clubhouse.
    • 00:53:58
      There's two exterior fireplaces in the patio.
    • 00:54:01
      We recommend doing painted brick at those fireplace areas.
    • 00:54:09
      There was a note on the staff report for including the trash compactor enclosure to help screen the trash.
    • 00:54:19
      Wanted to let you guys know we were aware of that.
    • 00:54:23
      This is our compacted elevation.
    • 00:54:25
      Pretty straightforward.
    • 00:54:26
      It kind of goes into the site.
    • 00:54:28
      I think the site goes into a little bit.
    • 00:54:31
      So we have a cast-in-place retaining wall, concrete, recommended painting it gray to match the buildings.
    • 00:54:38
      We have a brick water table to help with some of the durability and then transitioning to white fiber cement, lap siding to match the rest of the buildings.
    • 00:54:47
      The front gates would be dark, bronze, metal, corrugated.
    • 00:54:54
      I believe that's it.
    • Chuck RappLandscape Architect
    • 00:55:00
      Happy to answer any questions you all may have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:55:03
      All right, thanks a lot for that presentation.
    • 00:55:05
      I guess we'll start with David.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:55:09
      Sure, this may be more for your architectural colleague.
    • 00:55:12
      Could you clarify which building faces are three and which are four stories in relation to the entrance corridor?
    • SPEAKER_06
    • 00:55:24
      These are, yeah.
    • 00:55:27
      So rule of thumb, I guess, is where the parking is, where the parking locations are is three sides.
    • 00:55:32
      So building one, this is three and four.
    • 00:55:37
      Building two, this is a three and four.
    • 00:55:41
      Building three is three stories.
    • 00:55:44
      Four is three and four.
    • 00:55:47
      And five and six are three, three, four, four.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:55:51
      Okay, thank you very much.
    • 00:55:54
      And then one follow up, appreciate for your civil colleague, appreciate that there may be a way to step the retaining walls.
    • 00:56:02
      Would there be room to add any additional parking lot trees in that parking lot?
    • Chuck RappLandscape Architect
    • 00:56:07
      Certainly.
    • 00:56:07
      It kind of just depends if we can get enough room in that retaining wall.
    • 00:56:16
      What we're pinched in is a stream buffer.
    • 00:56:19
      where you have these outfall pipes.
    • 00:56:21
      And then we also have the retention ponds.
    • 00:56:24
      So I'm kind of wedged in between the two.
    • 00:56:25
      So I think I want to make sure we get the retaining wall terraced.
    • 00:56:30
      And then we have some undisturbed vegetation we're trying to keep here just to create a little more of a screen.
    • 00:56:37
      But I'm certainly will try to fit whatever I can in there without damaging the wall and whatnot.
    • 00:56:43
      Thank you.
    • 00:56:44
      Yep.
    • 00:56:45
      Yeah, there were a few comments, staff comments about additional landscaping on the side of these buildings.
    • 00:56:49
      That's not a problem at all.
    • Chris HenningsenChair, Architectural Review Board
    • 00:56:50
      So I plan to do that.
    • 00:56:56
      Frank Stoner.
    • Frank StonerMember, Architectural Review Board
    • 00:56:59
      Yeah, thanks.
    • 00:57:02
      With regard to the retaining walls, Chuck, I don't recall seeing a rendering where they were visible.
    • 00:57:07
      Are they?
    • Chuck RappLandscape Architect
    • 00:57:08
      They're not really, just because
    • 00:57:11
      You have so much vegetation in between the two already planted or existing.
    • 00:57:16
      And then like I mentioned, this here is a whole undisturbed area, about a 50 foot strip.
    • 00:57:24
      And so you just there's a lot going to be in between.
    • 00:57:26
      I can get to those kind of renderings.
    • 00:57:28
      Let's see.
    • 00:57:30
      Yeah, I mean, you just can't see much back there by the time you get through it all.
    • 00:57:34
      This is that building we're talking about back here.
    • 00:57:38
      so you have the retention pond goes down then it comes back up more vegetation and then the retaining wall so they're pretty far back there they're about 150 feet back from the road.
    • Frank StonerMember, Architectural Review Board
    • 00:57:47
      Is the idea that you would have enough room between those if you terraced it in order to plant?
    • Chuck RappLandscape Architect
    • 00:57:53
      I think I would try to keep it either on the high or the low side rather than sticking in the middle of the terraces just because of the chance of root damage to those those will be segmental walls I assume so I don't want to
    • 00:58:04
      create a structural issue with them.
    • 00:58:06
      But if I can get something up on the high side, I think that would be the ideal situation.
    • 00:58:09
      You kind of see in that one.
    • 00:58:12
      Yes, I'm kind of thinking maybe there's enough room to get more of a strip on the top area.
    • 00:58:17
      If I can pull that back a little further, that way we could plant some trees up there that create a little more of a I mean, it wouldn't hide the walls, but it would hide the buildings a little more if that's the goal.
    • 00:58:25
      It would rather hide the walls, certainly plant some stuff on the low side.
    • Frank StonerMember, Architectural Review Board
    • 00:58:28
      And the elevation of that building relative to twenty nine is
    • Chuck RappLandscape Architect
    • 00:58:34
      trying to think here I mean I believe the building sits lower still at that point than 29 does you can just kind of see the amount of fall it doesn't seem to be coming up that much now this one view might show us I'm gonna see if the road
    • 00:59:03
      I mean it's relatively flat as it works its way around but you can kind of see that building is there you kind of have a natural right now there's an existing berm that's this whole area is built up that remains that'll remain yep I figure we'll plant it and kind of do a traditional subdivision entrance type landscape up top my only other question is architectural and it is sort of what the thinking was behind the blue that was chosen which feels like a really sort of coastal blue
    • SPEAKER_06
    • 00:59:34
      Yes, we were trying to keep a kind of a lighter feel to the project so it's not so heavy, but we are open to changing the blue if needed.
    • 00:59:46
      It was mainly just to try and keep a light sky.
    • 00:59:50
      Gotcha.
    • Chris HenningsenChair, Architectural Review Board
    • 00:59:51
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:59:52
      All right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:59:52
      Thanks, Frank Hancock.
    • 00:59:54
      I don't have any questions.
    • 00:59:56
      Thanks.
    • 00:59:57
      Thanks.
    • 00:59:57
      I don't have any questions that haven't already been asked.
    • 01:00:02
      So are there any members of the public that want to make a comment?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:00:08
      I don't have anyone online.
    • Chris HenningsenChair, Architectural Review Board
    • 01:00:11
      Nobody's physically in line.
    • 01:00:12
      So the ARB will now go into discussion.
    • 01:00:16
      I guess we'll start with Frank Hancock.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:00:20
      Sure.
    • 01:00:23
      It's a nice application.
    • 01:00:25
      I feel like there's so much variation along
    • 01:00:30
      the entrance corridor there with the berm, with the site plan, how it locates the buildings.
    • 01:00:37
      I think what's nice is the longer building type is oriented perpendicular to the entrance corridor.
    • 01:00:45
      So I think just given the siting of the buildings and then you have the clubhouse building that kind of steps down and it's a different feel.
    • 01:00:54
      I think there's gonna be a lot of variation and it's not gonna feel like a mass
    • 01:01:00
      Because there isn't a lot of detail in the elevations.
    • 01:01:04
      I think if one of these buildings, specifically the longer building form were just smack dab along the corridor, I think we'd be really zeroed in on more architectural detail or some ways to break it up.
    • 01:01:17
      But given the variation with
    • 01:01:23
      the stormwater facility, the berm, how you have the boulevard entrance I think is really nice and a pretty substantial buffer, planted buffer.
    • 01:01:33
      I feel like it's appropriate.
    • 01:01:38
      I did write down blue side in color and I didn't know if it was a function of the rendering and it was really pronounced in the shadow in the rendering because when you look at the color sample it almost looks like a super light gray with a tinge of blue but in that rendering in the shadow lines in the rendering it looks like I saw the same exact thing I was like this is something you'd see at the beach and I don't know how I feel about that so I think
    • 01:02:05
      if that's something we add maybe to consider an alternate color there.
    • 01:02:12
      But all in all, I think it's a nice application.
    • 01:02:14
      I don't have any additional comments.
    • 01:02:17
      All right, thanks.
    • 01:02:18
      Dade?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:02:19
      Great.
    • 01:02:19
      Yeah, I agree with my colleagues.
    • 01:02:21
      I appreciate the work the applicant did to document the trees and the buffer.
    • 01:02:25
      I think it's been an ongoing concern for some of these buffered areas is how actually the board and zoning ultimately assures that the buffers that are assumed actually remain and can be monitored.
    • 01:02:36
      I appreciate the applicant's willingness to look at increasing within some limits the trees within the stormwater facility and adjacent to the parking by building three and those retaining walls I think just to assure even more that the building is screened effectively and similarly to the other areas behind the behind the buffer.
    • 01:03:00
      I'm glad my colleagues brought up the color.
    • 01:03:02
      I also felt like it was very coastal.
    • 01:03:04
      So I would similarly encourage the applicant to think about some alternative options.
    • 01:03:11
      And Frank, I agree with your comments about the siding and how that mitigates the length and detail of that building type.
    • 01:03:18
      But yeah, a nice presentation, lots of renderings that make it helpful to understand.
    • Chris HenningsenChair, Architectural Review Board
    • 01:03:26
      All right.
    • 01:03:26
      Thanks, Frank.
    • Frank StonerMember, Architectural Review Board
    • 01:03:29
      Yeah, overall, I think the landscaping plan is pretty effective.
    • 01:03:38
      I think Chuck raises an interesting question with regard to these walls, site walls, and we see them everywhere.
    • 01:03:45
      And while they do look better terraced, if you can't landscape those terraces, effectively, when you're looking at it from a distance, particularly if you're below the wall, it kind of looks like one wall.
    • 01:04:00
      So I don't know, Margaret, if there is landscaping that would be approved that wouldn't have structural implications, whether it's vines or whatever that could grow down the walls.
    • 01:04:10
      But if not, in this case, I don't think the wall is visible enough to make it really an issue.
    • 01:04:18
      But there are certainly sites where it has been an issue.
    • 01:04:21
      And it'd be nice if there was an alternative to landscaping.
    • 01:04:27
      I would also encourage you maybe to think about it a different color the only other thing they jumped out at me and it's not I wouldn't put it in as a requirement that there there didn't seem to be much of a connection between the architecture of the
    • 01:04:46
      of the clubhouse and the architecture of the rest of the project.
    • 01:04:51
      It's obviously your choice to do what you feel is appropriate, but it felt like it was from a different project.
    • 01:05:01
      So you might consider at least some elements that maybe tie together the two, but otherwise I thought it was a good application.
    • Chris HenningsenChair, Architectural Review Board
    • 01:05:11
      All right, thanks.
    • 01:05:12
      I don't really have much to add that wasn't already said by my colleagues.
    • 01:05:21
      But I think it was a good proposal.
    • 01:05:23
      And hopefully, with just a few minor tweaks, it'll be 100%.
    • 01:05:30
      So if we could take a look at the proposed motion.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:05:41
      I'm dragging it the other way.
    • 01:05:56
      There it is.
    • 01:06:00
      There it was.
    • Margaret MaliszewskiPlanning Manager
    • 01:06:01
      There it is.
    • 01:06:06
      Good technology day today.
    • 01:06:11
      The recommendation is for approval with the conditions listed in the staff report.
    • 01:06:16
      Based on the conversation, I've added a few items at the end.
    • 01:06:20
      17, add interior parking lot trees south of building 3.
    • 01:06:24
      18, consider adding trees at the VDOT stormwater facility.
    • 01:06:28
      19, consider revising the clubhouse to include elements that would tie it to the apartment building designs.
    • Chris HenningsenChair, Architectural Review Board
    • 01:06:46
      Okay, does anybody have any changes they'd like to make?
    • 01:06:51
      If not, does anybody feel like making a motion?
    • Frank StonerMember, Architectural Review Board
    • 01:06:59
      I'll move.
    • 01:07:02
      to approve ARB 2024-61 Holly Hills Development Phase 1 with conditions listed in the staff report amended as follows.
    • 01:07:10
      Add item 17 to add interior parking lot, trees, alpha building 3, 18, consider adding trees at the VDOT stormwater facility, and 19, consider revising the clubhouse to include elements that would tie it to the apartment building designs.
    • Margaret MaliszewskiPlanning Manager
    • 01:07:30
      I should just also point out that number one does say that the ARB review of townhouse blocks in phases two and three would not be required.
    • 01:07:42
      So just wanted to point that out and make sure everyone's in agreement with that event stays in.
    • Chris HenningsenChair, Architectural Review Board
    • 01:07:47
      I support that.
    • 01:07:48
      I guess.
    • 01:07:50
      Yes.
    • 01:07:51
      Yes.
    • 01:07:51
      Anyone?
    • 01:07:52
      All right.
    • 01:07:53
      Sounds like that's a consensus.
    • 01:07:55
      So I guess I'll second the motion.
    • 01:08:00
      So if we could put it to a vote.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:05
      Mr. Van Der Werf?
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:07
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:07
      Mr. Stoner?
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:08
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:09
      Mr. Hancock?
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:10
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:10
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:11
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:08:12
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 01:08:13
      All right.
    • 01:08:14
      Thanks a lot.
    • 01:08:15
      And since this is about when I have to go, we will move on to other business with Frank at the helm.
    • 01:08:26
      Thanks a lot.
    • 01:08:27
      Thanks Chris.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:08:28
      Could I have the gavel please?
    • 01:08:37
      We're down into other business.
    • 01:08:42
      Let's start with approval of the October 21st, 2024 minutes.
    • 01:08:49
      Do we have a motion to adopt the October 21st, 2024 minutes?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:08:54
      I'll move to adopt them.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:08:56
      Second.
    • 01:08:58
      Can we call the vote?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:09:00
      Mr. Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:09:02
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:09:02
      Mr. Stoner?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:09:03
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:09:03
      Mr. Van Der Werf?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:09:04
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:09:05
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:09:07
      Moving on to old business, SP 2024-20, Carter Machinery, outdoor storage, display and sales.
    • 01:09:18
      Chris, do you have an update?
    • Khris TaggartSenior Planner
    • 01:09:22
      Yeah, if you all recall this plan, this concept plan was reviewed at the last meeting and ARB recommended revisions to the concept plan to be reviewed prior to planning commission review.
    • 01:09:34
      These revisions are being reviewed today.
    • 01:09:38
      A couple of things, or a few things, or actually several things on the revised plan has been updated to show a staggered double row evergreen screen along the security fence between the parking lot and the frontage.
    • 01:10:02
      Increased planting area has been shown along the frontage in landscape islands along the west side of the building to remain.
    • 01:10:09
      The limits of the outdoor storage area has been updated to show the boundaries, and then notes have been added to show where chain link and security fencing would be proposed.
    • 01:10:24
      Just kind of a recap of staff's thoughts on these changes.
    • 01:10:32
      Alright, jumping back and forth between screens and getting stuck.
    • 01:10:41
      In the L-shaped plant the island along the western parcel boundary,
    • 01:10:46
      It has a node that says landscape material to remain.
    • 01:10:49
      However, based on a site visit, this vegetation has been removed with the establishment of the temporary building and the storage area onsite currently.
    • 01:11:02
      This status, the existing status is the vegetation being removed.
    • 01:11:11
      We need to be updating the concept plan.
    • 01:11:14
      The limits of the storage area have been defined, but the limits of where the taller equipment will be stored is unclear.
    • 01:11:19
      Staff has added a condition to the action to address this.
    • 01:11:23
      The planting area along the 13 space parking row is very narrow.
    • 01:11:27
      The existing planting area along the frontage could be used or should be used to make the space wider.
    • 01:11:34
      and it's also unclear if the security fencing remains the metal picket fencing originally proposed and the chain link fencing along the eastern side of the property will likely have visibility from Route 29 and will likely need to be security fencing and staff has also added a condition to the action to address this.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:11:56
      Thanks, Chris.
    • 01:11:58
      Do we have the applicant on?
    • 01:12:01
      We should.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:12:03
      We do.
    • 01:12:08
      Mr. Carter, please, or Mr. Berkeley, please.
    • 01:12:13
      Who do you want to talk to?
    • 01:12:15
      Connor?
    • 01:12:15
      Connor, sorry.
    • 01:12:17
      Connor, I'm going to promote you and then you can unmute yourself and you can talk.
    • 01:12:23
      All right, go ahead, Connor.
    • Conor O'DonnellLand Use Planner
    • 01:12:32
      Good afternoon.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:12:35
      Good afternoon.
    • Conor O'DonnellLand Use Planner
    • 01:12:38
      Let's see if so I can just follow up with Chris's comments.
    • 01:12:44
      There were eight comments since following the previous meeting regarding the concept plan that we addressed.
    • 01:12:54
      I'll just stick to Chris's comments currently and then
    • 01:12:57
      Engage with any questions you all may have.
    • 01:13:00
      The proposed landscaping fronting Ryle Road, you can see that at the west side, it starts at about three feet in width and moves down to six feet in width.
    • 01:13:14
      So that's a really constrained area here.
    • 01:13:16
      The median is already very narrow.
    • 01:13:20
      While we
    • 01:13:21
      By ordinance don't need the number of parking spaces based on the retail square footage.
    • 01:13:28
      We really don't want to lose the parking on that side, especially for any future sale or renovations to the building or expanded retail square footage.
    • 01:13:41
      And so that's kind of our compromise in extending the median
    • 01:13:46
      on Rio Road while still maintaining the parking spaces there.
    • 01:13:51
      That's the maximum extent that we can do that while meeting minimum widths for the drive aisle and parking spaces.
    • 01:14:00
      The security fence will be the same as previously proposed.
    • 01:14:06
      The see-through black aluminum
    • 01:14:10
      The double row of evergreens we confirmed with our landscape architects.
    • 01:14:15
      That's a 9.5, nine and a half foot width that we'll be able to do a double screen there.
    • 01:14:24
      We will update the concept plan for the vegetation that's been removed on the western side.
    • 01:14:31
      And also the visual impacts from 29, wherever there's a see-through corridor, we can
    • 01:14:38
      add landscaping there and clarify that on the concept plan, or if it's already in the conditions, we'll stick with that.
    • 01:14:46
      But I'm happy to answer any specific questions.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:14:50
      Thank you.
    • 01:14:52
      Dave, do you have any questions for staff or the applicant?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:14:58
      No, none at this time.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:14:58
      Thank you.
    • 01:15:01
      Frank Stoner?
    • Frank StonerMember, Architectural Review Board
    • 01:15:03
      No, I don't have any either.
    • 01:15:04
      Thanks.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:15:06
      I don't have any questions either.
    • 01:15:09
      Is there any member of the public who would like to comment?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:15:15
      I don't have anyone online.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:15:18
      Nobody online.
    • 01:15:21
      The ARB will now go into discussion starting with Dade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:15:29
      Sure, I appreciate the applicants and staff's quick follow up from the last meeting.
    • 01:15:33
      And I think, in general, it looks like an improvement.
    • 01:15:37
      I can understand the commercial reasoning behind preserving some parking capacity and do feel like the proposed landscape enhancements are a nice gesture to improving the corridor.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:15:52
      Thank you, Frank.
    • Frank StonerMember, Architectural Review Board
    • 01:15:54
      Yeah, quick question for you, Margaret.
    • 01:15:57
      Is the county in position to approve a 24-foot wide travel aisle in a parking lot?
    • 01:16:03
      24, 18, and 18?
    • Khris TaggartSenior Planner
    • 01:16:04
      26 is what's shown, but 24 would be the ordinance, so it is two feet wider than what's required by an ordinance.
    • Frank StonerMember, Architectural Review Board
    • 01:16:17
      So they could pick up two feet in that landscape zone, either on the...
    • Khris TaggartSenior Planner
    • 01:16:24
      Correct.
    • Frank StonerMember, Architectural Review Board
    • 01:16:25
      And I think at our last hearing, somebody indicated they were going to make some changes to the building itself, but that would be a separate application.
    • 01:16:35
      Is that true as well?
    • 01:16:37
      Yeah.
    • 01:16:40
      Well, something to consider, given how squeezed they are at the west end, I guess, of that sort of little landscape buffer.
    • 01:16:51
      Otherwise, no real comments.
    • 01:16:53
      Appreciate the applicant's efforts to address our concerns.
    • 01:16:58
      And I'll turn it over to you.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:17:02
      Thank you.
    • 01:17:03
      I'll just add, I appreciate the applicant taking a look at the, I guess, west side of the building, the area between this building and the library.
    • 01:17:15
      I think formalizing that a little bit will make it feel
    • 01:17:21
      less like a kind of no man's land and more defined as to who goes where and also provide a little bit of screening on that elevation which I think will be nice.
    • 01:17:34
      I agree with Frank that the added two feet is just so narrow there if we could even get like a row of shrubs I think would go a long way so I would agree with that.
    • 01:17:49
      Are there any additional staff comments?
    • Chris HenningsenChair, Architectural Review Board
    • 01:17:57
      Frank and Frank, sorry for my own understanding.
    • 01:17:59
      We have an additional comment.
    • 01:18:00
      Yeah.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:18:01
      Are you proposing that those two feet be dedicated to some planting adjacent to the building or enhancing the width of the planting near Rio?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:18:09
      That's a good question.
    • 01:18:10
      Now that I see the site plan, I'm remembering, I think we had talked about that up against the building, didn't we?
    • 01:18:16
      Yeah.
    • 01:18:16
      There's also a sliver of planting along the road, too.
    • 01:18:21
      But I think, yeah, softening that edge of the building would make sense.
    • 01:18:26
      Sorry.
    • Frank StonerMember, Architectural Review Board
    • 01:18:27
      Is there low planting outside of the property line there?
    • Khris TaggartSenior Planner
    • 01:18:32
      Yeah, that was the kind of point, the thought staff brought up of, I'm not sure if it's just the concept plan rendering, but this seemingly includes the existing planting area outside the parcel boundary, but it would allow
    • 01:18:47
      an increase, so it could be an increase in planting area while a decrease in the travel wave potentially if it's shown overlaid correctly onto the site of, this is the, let me jump to, this area, namely corresponds with this area.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:19:16
      Thank you for clarifying.
    • 01:19:23
      Any additional questions or comments?
    • Khris TaggartSenior Planner
    • 01:19:25
      And one additional step that's been brought up in the list of thoughts was the proposed chain link fencing along this parcel boundary would also have the potential to be visible through entrances to the sites along Route 29.
    • Frank StonerMember, Architectural Review Board
    • 01:19:45
      How far off 29 would it be visible?
    • 01:19:52
      Any idea how far it is from 29 to the chain link fence?
    • Margaret MaliszewskiPlanning Manager
    • 01:20:08
      I think there's still potential to also see it from Rio, even with the landscaping added out along the front.
    • Frank StonerMember, Architectural Review Board
    • 01:20:18
      What's the security fencing look like?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:20:23
      Is it black chain link?
    • Frank StonerMember, Architectural Review Board
    • 01:20:26
      No, what's on the front though?
    • Khris TaggartSenior Planner
    • 01:20:30
      We haven't received a detail on what type of chain link fence it's proposed.
    • 01:20:38
      And it's about 378.
    • 01:20:39
      378 feet.
    • Frank StonerMember, Architectural Review Board
    • 01:20:44
      What about the other fencing that would be along Rio?
    • Khris TaggartSenior Planner
    • 01:20:47
      That would confirm just now in their presentation that would still be the black metal picket security fencing that was originally shown during the last meeting.
    • Frank StonerMember, Architectural Review Board
    • 01:21:02
      Which is not opaque, right?
    • 01:21:04
      Correct.
    • 01:21:17
      I don't know, I have less heart there to go.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:21:22
      I agree, I think you're looking through a lot of buildings and parking lots.
    • 01:21:29
      Any other questions, Margaret?
    • Margaret MaliszewskiPlanning Manager
    • 01:21:31
      I didn't hear those last two comments.
    • Frank StonerMember, Architectural Review Board
    • 01:21:34
      Oh, sorry, I was just saying to Frank, I have less heartburn over the visibility from 29 just because I think it's far enough away and it's broken up with buildings and cars and
    • 01:21:53
      I assume part of the reason why they want this type of metal fencing is initially they wanted people to be able to see the equipment.
    • 01:22:02
      I kind of wonder why you wouldn't put an opaque fence on Rio.
    • 01:22:06
      You're putting all that double row of evergreens.
    • Margaret MaliszewskiPlanning Manager
    • 01:22:13
      I think that this fence design looks like something very similar that's in our guidelines for screening and security fencing and so since chain link is typically used for security fencing and guidelines say no chain link then this would be a more decorative option that similar to
    • 01:22:36
      Security Fencing that's been approved in the entrance quarters previously.
    • 01:22:40
      If you get a solid fence for screening then there are additional guidelines for making that work and I think that's probably harder to achieve.
    • Khris TaggartSenior Planner
    • 01:22:52
      And thank you to add
    • 01:22:56
      conjunction with other site development.
    • 01:22:58
      This site highlighted here is the site of the former Wendy's that if you recall, a discount tire was approved and building permits have been reviewed and are submitted and reviewed and approved.
    • 01:23:12
      So that it's also potentially increased the visibility of that area between kind of site construction and construction of that discount tire.
    • 01:23:26
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:23:29
      If there are no additional comments or questions, could we look at the recommended motion?
    • Margaret MaliszewskiPlanning Manager
    • 01:23:48
      So what we have is an updated recommendation for conditions of approval for the special use permit.
    • 01:23:58
      One through four, which is the black text, is the same as what you saw previously.
    • 01:24:03
      And based on the conversation today, we've added five through eight.
    • 01:24:11
      Five limits the storage of the taller equipment to the area towards the back of the site.
    • 01:24:20
      Six is the requirement to adjust that note that talks about existing vegetation that's already been removed.
    • 01:24:29
      Seven would reduce the travelway to 24 feet to increase frontage planning area or to add landscaping along the building.
    • 01:24:38
      and eight is a standard entrance quarter guideline chain link fence must not be visible from the entrance quarters.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:24:53
      Any other questions from me?
    • 01:24:58
      No.
    • 01:25:01
      Do we have a motion?
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:25:04
      I'll move to recommend no objection to the proposed outdoor storage display and sales as shown on the revised concept plan with the following revised conditions.
    • 01:25:13
      Items one through four as originally proposed by staff with the additions of item five storage of equipment taller than screening fence height is limited to the area labeled existing gravel area at the rear of the site.
    • 01:25:24
      Add item six, update the plan to address the existing vegetation to remain.
    • 01:25:27
      Note where landscaping has already been removed.
    • 01:25:30
      Add item seven, reduce travelway to 24 feet to increase the frontage planting area or to add landscaping along with building.
    • 01:25:36
      Add item eight, chain link fence must not be visible from the ECs.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:25:42
      Thank you.
    • 01:25:42
      Do we have a second?
    • 01:25:44
      I'll second.
    • 01:25:46
      Can we call the vote?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:25:48
      Mr. Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:25:50
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:25:50
      Mr. Stoner?
    • 01:25:51
      Aye.
    • 01:25:51
      Mr. Van Der Werf?
    • 01:25:52
      Aye.
    • 01:25:53
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:25:54
      Thank you.
    • 01:25:56
      Moving on to other items.
    • 01:25:59
      Any other items from staff or board members?
    • 01:26:03
      I have one other item.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:26:04
      I think members are aware that the... Mr. O'Donnell has his hand raised now.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:26:11
      Is there something from the public?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:26:14
      Well, he's the one that was speaking to you earlier.
    • 01:26:15
      I can...
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:26:16
      Yes, yeah.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:26:21
      Mr. O'Connor, just unmute yourself and you can talk.
    • 01:26:30
      Mr. O'Donnell.
    • Conor O'DonnellLand Use Planner
    • 01:26:32
      Yes, can you hear me now?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:26:34
      Yes.
    • Conor O'DonnellLand Use Planner
    • 01:26:35
      I apologize.
    • 01:26:35
      I was trying to get in before that vote was taken.
    • 01:26:37
      I just had one request on the reduction of the 26 feet to the 24 feet.
    • 01:26:44
      If we could remove that from these conditions, our engineer, because we've not had a survey, we're on the ground, he spaced it at 26 feet because we're not 100% certain yet on the actual distance and what we'll be allowed to do.
    • 01:27:03
      And so I just want to be careful about being constrained within those actual measurements.
    • 01:27:11
      And this will,
    • 01:27:14
      come before you again for your review as part of the site plan approval for the major site plan amendment.
    • 01:27:22
      At that point, we would have
    • 01:27:25
      exact dimensions prepared.
    • 01:27:28
      And this these two feet in front of the drive aisle I'm hoping is not so directly relevant to the outdoor storage and screening that that that's a condition that we could remove.
    • 01:27:41
      And then again, you all would see at site plan approval and more directly related to the facade of the building.
    • 01:27:49
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:27:53
      Thank you for that.
    • 01:27:57
      Could we leave it and then review it at site plan?
    • 01:28:01
      Do we need to go back and address that now?
    • Margaret MaliszewskiPlanning Manager
    • 01:28:03
      If you're okay with waiting until the site plan and you
    • 01:28:13
      Don't think it needs to be a condition of the special use permit.
    • 01:28:18
      I think you should just make a motion to take that comment from the SP conditions and move it to the final site plan comments.
    • 01:28:26
      And we can.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:28:29
      I'll move to remove that comment from the motion and move it to the final site plan comments.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:28:35
      I'll second.
    • 01:28:36
      Can we call the vote?
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:28:38
      Mr. Van Der Werf?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:28:39
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:28:40
      Mr. Hancock?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:28:41
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:28:42
      Mr. Stoner?
    • Frank HancockVice Chair, Architectural Review Board
    • 01:28:43
      Aye.
    • Carolyn ShafferClerk, Planning Commission/Boards
    • 01:28:43
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:28:50
      Moving on, any items from staff or board members?
    • 01:28:55
      Dade.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:28:55
      Sure.
    • 01:28:56
      So briefly, I'll just share I think recently the Central Virginia chapter of the American Institute of Architects honored the Architectural Review Board with the Community Service Award.
    • 01:29:05
      So I'll just briefly read the text of the award.
    • 01:29:08
      The Community Service Award is awarded to celebrate an individual's or organization's significant contribution to the built environment or towards the public's awareness of the built environment within Central Virginia.
    • 01:29:17
      The County of Albemarle Architectural Review Board has contributed remarkably through public advocacy,
    • 01:29:22
      and by upholding the integrity of design in Albemarle County, making an undeniable mark on the spaces in which we live, work and gather.
    • 01:29:30
      So on behalf of board members, I'll express my thanks and if folks would not object, I would love to dedicate the award actually to the county staff who really make all this work quite possible on whose efforts underlie that recognition.
    • 01:29:48
      Agreed.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:29:49
      I agree 100%.
    • Margaret MaliszewskiPlanning Manager
    • 01:29:50
      Thank you all.
    • 01:29:52
      That's very kind.
    • 01:29:53
      And we would be happy to display that in our offices.
    • 01:29:55
      Thank you very much.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:30:00
      For the record, there was lots of applause.
    • 01:30:02
      I'll include that in a minute.
    • Frank StonerMember, Architectural Review Board
    • 01:30:06
      Scanning ovation.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:30:09
      Thank you, Dade.
    • 01:30:11
      Any other items from staff or board members?
    • 01:30:15
      The next ARB meeting is scheduled for November 18th.
    • 01:30:21
      Do we know if board members can attend or planning to attend?
    • 01:30:25
      I'm here.
    • 01:30:26
      I will not be able to attend.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:30:33
      I believe I'll be here.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:30:36
      Then let's see, the meeting is adjourned to the next meeting on Monday, November 18th, 2024.
    • 01:30:45
      It is 2.51 p.m.