  • Architectural Review Board Meeting 5/15/2023
  • Auto-scroll

Architectural Review Board Meeting   5/15/2023

Attachments
  • Final Agenda.pdf
  • Final Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB2023-35 UVA CCU staff report.pdf
  • Attach. 1 ARB2023-35 UVA CCU Initial Site Plan.pdf
  • ARB2023-33 Home Depot initial site plan staff report.pdf
  • Attach. 1 ARB2023-33 Home Depot Site Plan.pdf
  • ARB2023-32 BMW Sales and Service Building Renovation Staff Report.pdf
  • Attach. 1 ARB2023-32 BMW Sales and Service Buildings Renovation Site Diagram.pdf
  • Attach. 2 ARB2023-32 BMW Sales and Service Buildings Renovation Architectural Drawings.pdf
  • Attach. 3 ARB2023-32 BMW Sales and Service Buildings Renovation Line Drawings.pdf
  • Entrance Corridor Design Guidelines Addenda Rt. 22 231.pdf
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:01
      I guess we'll get things started and hopefully Frank Stoner will be here shortly.
    • SPEAKER_12
    • 00:00:08
      Are we ready to start electronically speaking?
    • SPEAKER_11
    • 00:00:18
      OK. OK.
    • 00:00:24
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:27
      All right, it's 1.04.
    • 00:00:31
      I'm calling the May 15th, 2023 meeting of the Albemarle County Architecture Review Board to order.
    • SPEAKER_12
    • 00:00:41
      Could we call the roll, please?
    • Khris TaggartSenior Planner
    • 00:00:44
      Sure.
    • 00:00:45
      Mr. Van Der Werf?
    • 00:00:47
      Here.
    • 00:00:48
      Mr. Stoner is not present yet.
    • 00:00:50
      Mr. Matsuno?
    • SPEAKER_12
    • 00:00:52
      Here.
    • Khris TaggartSenior Planner
    • 00:00:52
      Mr. Hancock?
    • SPEAKER_12
    • 00:00:54
      Here.
    • Khris TaggartSenior Planner
    • 00:00:55
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:56
      Here.
    • 00:00:58
      Today's meeting is a hybrid meeting.
    • 00:01:01
      The public may access and participate in the meeting electronically.
    • 00:01:05
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:01:12
      The public has real-time audio-visual access to this meeting over Zoom and real-time audio access over telephone.
    • 00:01:21
      Both is provided in the lawfully posted meeting notice.
    • 00:01:26
      This meeting is being recorded and will be made available on the county's website.
    • 00:01:30
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:40
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:01:46
      Applicants who are making presentations, note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:55
      Staff will let us know when the 15 minutes are up.
    • 00:01:59
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:02:08
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:02:16
      Do any ARB members have anything to disclose?
    • Taro MatsunoMember, Architectural Review Board
    • 00:02:22
      Yes, I am employed by the firm.
    • 00:02:24
      We'll be presenting on ARB 2023, item 32, the BMW renovation.
    • 00:02:31
      So I will not be participating in that conversation.
    • 00:02:34
      All right, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:35
      I do not have anything to disclose.
    • 00:02:37
      And I don't either.
    • 00:02:40
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • 00:02:48
      We currently don't have any members of the public.
    • SPEAKER_12
    • 00:02:51
      Thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:54
      There's one consent agenda item today.
    • 00:02:56
      It is ARB 2023-35, UVA Community Credit Union Initial Site Plan.
    • 00:03:06
      Do any ARB members want to move the credit union application off the consent agenda for discussion?
    • SPEAKER_12
    • 00:03:12
      No.
    • Chris HenningsenChair, Architectural Review Board
    • 00:03:17
      And I don't have it, so anyone like to move to approve the consent agenda?
    • 00:03:26
      We'll move for approval of the consent agenda.
    • 00:03:29
      Second.
    • SPEAKER_02
    • 00:03:30
      All right, thanks.
    • 00:03:31
      Let's put it to a vote.
    • 00:03:38
      Van Der Werf?
    • Khris TaggartSenior Planner
    • 00:03:39
      Aye.
    • 00:03:40
      Mr. Stoner is absent.
    • 00:03:42
      Mr. Matsuno?
    • SPEAKER_12
    • 00:03:43
      Aye.
    • Khris TaggartSenior Planner
    • 00:03:44
      Mr. Hancock?
    • SPEAKER_12
    • 00:03:45
      Aye.
    • Chris HenningsenChair, Architectural Review Board
    • 00:03:49
      Alright, thanks a lot.
    • 00:03:52
      On to the regular review items.
    • 00:03:54
      We have two regular review items today.
    • 00:03:56
      First is ARB 2023-33 Home Depot.
    • SPEAKER_12
    • 00:04:03
      Margaret, do you have your presentation?
    • SPEAKER_11
    • 00:04:07
      Yes.
    • SPEAKER_02
    • 00:04:09
      Set up for you here.
    • Margaret MaliszewskiPlanning Manager
    • 00:04:26
      This is a proposal for a Home Depot store to be located at the Fashion Square Mall property.
    • 00:04:32
      The new structure would replace the Sears building that stands currently at the north end of the mall.
    • 00:04:39
      The site falls within two entrance corridors.
    • 00:04:41
      It's Route 29 to the west and Rio Road to the north, and the site is visible from both of those corridors.
    • 00:04:50
      These photos are recent views from the Rio Road corridor.
    • 00:04:53
      Rio is elevated above the site approximately 20 feet, and that allows for views down onto the roof of the existing building, also likely onto the roof of the proposed building.
    • 00:05:06
      This is a view showing that change in elevation from the site looking out.
    • 00:05:11
      Another view of the development from Rio Road.
    • 00:05:14
      It shows more of the parking lots of the overall development and views through to Route 29 and to the mountains in the distance.
    • 00:05:22
      There are existing mature trees along Rio Road that are to remain, but views are available between and through those trees and along the frontage where there aren't any trees at this time.
    • 00:05:33
      This is a view from Route 29 where the site is elevated above the street.
    • 00:05:39
      Visibility increases
    • 00:05:41
      when you move westward away from the grass strip that's shown in that slide.
    • 00:05:45
      There are two entrances into the mall property from Route 29, and the north end of the building becomes visible in the vicinity of the northern entrance into the site.
    • 00:05:57
      And it remains visible further north as you move towards Rio Road.
    • 00:06:03
      As you can see, there's no landscaping along the northernmost section of the Route 29 frontage.
    • 00:06:07
      and currently the site plan shows no landscaping to be added there.
    • 00:06:13
      No architectural designs were submitted with the initial plan, so there's no architecture to discuss today, but the degree to which the design meets the guidelines will need to be addressed in a future review and it's anticipated that that design will be a version of a standard trademark design.
    • 00:06:32
      As you know, the site has already been developed and the proposed site layout is generally consistent with the existing condition.
    • 00:06:38
      The new building would be located generally in the same place as the existing Sears building.
    • 00:06:43
      It's shifted a bit further to the east, so it would be set back several feet from the building that would be remaining.
    • 00:06:49
      And the main building of the Home Depot extends a bit further to the north than the existing Sears building.
    • 00:06:56
      A garden center is also proposed at the north end of the main Home Depot building.
    • 00:07:00
      It would occupy most of what is now that northern parking lot.
    • 00:07:05
      Landscaping and lighting were also not included in the initial plan, so those details will also need to be addressed in a future review.
    • 00:07:14
      The primary issues identified at this time fall under the accessory structures and equipment guidelines.
    • 00:07:21
      Those guidelines state that loading areas, storage areas, and mechanical equipment, among other things, should be located to eliminate visibility.
    • 00:07:29
      And if after appropriate siting the features still have a negative impact, then screening should be added to eliminate visibility.
    • 00:07:37
      The areas highlighted in yellow on this slide are loading areas and a generator and they're located so that the building and topography provides screening from the quarters.
    • 00:07:51
      The plan doesn't show rooftop equipment at this time, but rooftop equipment is expected.
    • 00:07:56
      This is an image from an online search showing an elevated view of a Home Depot store with rooftop equipment.
    • 00:08:03
      Given the elevated position of Ryar Road, it's anticipated that standard parapet walls will not provide sufficient screening for that rooftop equipment.
    • 00:08:13
      The plan also shows areas for outdoor display.
    • 00:08:16
      They're mostly organized along the front elevation of both the main store building and the garden center.
    • 00:08:22
      These display areas would be visible from the entrance corridors.
    • 00:08:25
      Sales, storage, and display areas visible from the corridors require a special use permit.
    • 00:08:31
      The applicant has not yet applied for that permit.
    • 00:08:34
      Without details explaining how the outdoor display will be designed to achieve an appropriate appearance for the corridors, staff cannot support approval of the outdoor display areas with the initial plan.
    • 00:08:50
      Already noted, a garden center is proposed.
    • 00:08:53
      If items for sales, storage, or display in the garden center will be visible from one or both corridors, then special use permit approval will be required for the garden center as well.
    • 00:09:07
      An online search of Home Depot images reveals a range of garden center designs with a variety of roof and screening treatments.
    • 00:09:15
      Some have no roof,
    • 00:09:17
      A design with no roof in this location would allow the items within to be viewed from the Rio Road entrance corridor.
    • 00:09:24
      Some of the roof treatments appear to be fabric or plastic or similar materials.
    • 00:09:29
      Some appear to be seasonal and are removed from the metal frames for periods of time.
    • 00:09:34
      These have a temporary utilitarian appearance that may not be appropriate for the entrance corridors.
    • 00:09:40
      A garden center enclosed with walls and roof and constructed of permanent materials would be appropriate for the corridors.
    • 00:09:47
      Because appropriateness of the garden center design cannot be confirmed with the information submitted with the initial plan, we've recommended a condition of approval to address that.
    • 00:09:58
      So our recommendation on the initial plan is for approval with two conditions.
    • 00:10:03
      One, that the garden center must be a fully enclosed structure using permanent materials, the design of which would require ARB review and approval until a special use permit is approved for the use showing an alternate design and materials acceptable to the ARB.
    • 00:10:18
      Second condition would be none of the areas identified for outdoor display on the initial site plan are included in this approval.
    • SPEAKER_11
    • 00:10:28
      That's all I have for a formal presentation.
    • Margaret MaliszewskiPlanning Manager
    • 00:10:31
      Happy to answer any questions you might have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:10:33
      All right, thanks a lot, Margaret.
    • 00:10:36
      All right, we'll go to questions from board members.
    • 00:10:42
      Tara, do you have any questions?
    • Taro MatsunoMember, Architectural Review Board
    • 00:10:44
      I just wanted to refer back to the staff report that was provided and connection with the recommended items at the end for discussion.
    • 00:10:55
      It just had mentioned that the yellow items, including the landscaping, had been the items highlighted in yellow.
    • 00:11:06
      Landscaping was included in the things that we could
    • 00:11:08
      The presence of landscaping is something we could include in this discussion for this hearing.
    • 00:11:14
      Is that correct?
    • Margaret MaliszewskiPlanning Manager
    • 00:11:17
      I think that you can discuss.
    • 00:11:21
      It would be helpful to bring up any items that you think are of concern and we have an opportunity to discuss them.
    • 00:11:28
      There might be areas that you can't make a condition of approval, though.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:11:32
      Right.
    • 00:11:32
      OK, thanks for clarifying.
    • Chris HenningsenChair, Architectural Review Board
    • 00:11:36
      Thanks, Frank.
    • 00:11:37
      Do you have any questions?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:11:38
      Sure.
    • 00:11:38
      Thanks, Margaret.
    • 00:11:39
      Maybe if you could elaborate on the outdoor display and the special use permit requirement.
    • 00:11:49
      Thinking back to like the sheets that I think had some things outside that maybe are not the scale of what this would be.
    • 00:11:56
      But just thinking, I mean, in my mind, I'm thinking lawn mowers and all that sort of thing, but
    • 00:12:05
      If you could help me understand the process and when a special use permit comes into play.
    • Margaret MaliszewskiPlanning Manager
    • 00:12:12
      So the special use permit is required for any outdoor sales storage display in the entrance quarters specifically.
    • 00:12:19
      The sheets example, I don't believe that came up in our review of that.
    • 00:12:27
      If there are items that are for sale there, we can take a look at that and see if that's...
    • Frank HancockVice Chair, Architectural Review Board
    • 00:12:32
      I don't want to get sheets in trouble.
    • 00:12:34
      I was just thinking that kind of reminded me.
    • 00:12:38
      I mean, I think at that point it was like windshield wiper fluid and maybe not the same scale as this, but that's helpful.
    • 00:12:48
      Thank you.
    • 00:12:49
      And then I don't, this might be a question for the applicant.
    • 00:12:54
      Just knowing the specifics of the plan about how far from 29 is this building.
    • 00:13:00
      It seems a pretty big distance.
    • 00:13:05
      I was going to scale it with my finger on the screen.
    • Margaret MaliszewskiPlanning Manager
    • 00:13:10
      While you're in discussion, we can try and get that measurement for you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:13:15
      Thank you.
    • 00:13:16
      I don't have any other questions.
    • 00:13:17
      Thanks.
    • 00:13:18
      Thanks, David.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:13:20
      Thanks, Chris.
    • 00:13:20
      Thanks, Margaret.
    • 00:13:21
      Picking up on Taro's question, you highlighted that there weren't street trees proposed or accident on 29.
    • 00:13:28
      Is that requirement applicable to this application, or is there a mechanism for it to be?
    • Margaret MaliszewskiPlanning Manager
    • 00:13:42
      The review would apply to whatever is within the limits of disturbance, but when we get to the point of having enough information to determine what's visible regarding the outdoor display, the applicant could choose to add landscaping or change the limits of display to include an area that would help them provide screening.
    • 00:14:08
      Does that make sense?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:14:09
      Yes, yeah, thank you.
    • 00:14:11
      Let's see, I also appreciate you highlighting the elevation position of Rio relative to the building.
    • 00:14:20
      I guess not for this application, but for our future consideration of the ultimate architectural application.
    • 00:14:26
      Are there any guidelines for the membrane roof or the roof scape if ultimately that's visible?
    • Margaret MaliszewskiPlanning Manager
    • 00:14:33
      There's nothing specific to that other than the broad guideline we have about, you know, materials and textures and scale and appearance.
    • 00:14:41
      But if it's visible, then it would be part of your review.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:14:46
      Thank you.
    • 00:14:47
      No further questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:14:49
      All right.
    • 00:14:49
      Thanks, Dave.
    • 00:14:51
      I came in with some questions, but they've been addressed by the discussion.
    • 00:14:55
      So we'll move on to the applicant's presentation.
    • SPEAKER_11
    • 00:15:11
      Good morning, Mr. Chairman, members of the board.
    • Valerie LongAttorney
    • 00:15:12
      I'm Valerie Long with Williams-Mullen.
    • 00:15:15
      We're here representing, supporting the applicant here today.
    • 00:15:18
      We do have at least one of our team members participating remotely, the project architect.
    • 00:15:25
      I'm not certain if the civil engineer is on remotely or not, I hopefully, but so if there's specific engineering type questions, I would ask to defer to him.
    • 00:15:35
      We really don't have an official presentation today.
    • 00:15:37
      We're obviously happy to answer questions.
    • 00:15:39
      As Margaret indicated, we know we are going to need most likely a special use permit for outdoor storage and display.
    • 00:15:47
      There is a small chance that the garden center can be completely enclosed.
    • 00:15:51
      They're still studying that issue and thinking about designs and so forth.
    • 00:15:57
      But very likely we'll be back hopefully fairly soon with a full package of application on outdoor storage to address the concerns there.
    • 00:16:06
      And I'm here to answer any questions that you all may have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:09
      Thank you.
    • 00:16:12
      So we will go into questions for the applicant.
    • 00:16:18
      Dave, do you have any questions?
    • SPEAKER_02
    • 00:16:22
      Not at this time, thank you.
    • 00:16:25
      Tara?
    • SPEAKER_12
    • 00:16:30
      No, I don't have any questions, thank you.
    • 00:16:33
      Frank, do you have any questions?
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:34
      I don't, thank you.
    • 00:16:36
      And I don't have any questions either.
    • 00:16:42
      So are there any members of the public that would like to make a comment?
    • 00:16:47
      No, there's no members of the public currently that would like to speak on this item.
    • 00:16:52
      All right, thank you.
    • 00:16:53
      ARB will now go into discussion.
    • 00:16:58
      Tara, do you have any comments?
    • Taro MatsunoMember, Architectural Review Board
    • 00:17:00
      Just that one of the things that I would be looking for as the process continues is landscaping and clarification on the presence of the trees and screening, all that sort of thing.
    • 00:17:12
      My other thought was just around the visibility of the rooftop equipment, because most of the cases where we're dealing with them on the entrance corridor, they're elevated and parapets and other strategies can really mitigate the appearance of the rooftop equipment.
    • 00:17:27
      But I think for future
    • 00:17:30
      sort of reviews of this project.
    • 00:17:34
      I'd be interested in understanding the materiality and the proposed strategies of both visualizing and mitigating the appearance of the rooftop equipment from Rio Road.
    • SPEAKER_12
    • 00:17:47
      All right, thanks.
    • Chris HenningsenChair, Architectural Review Board
    • 00:17:50
      Frank, do you have any comments?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:17:52
      Thanks, Taro.
    • 00:17:54
      I think those are great points and the visualization would be helpful.
    • 00:17:59
      I think especially with the gray change there, it's good to know that those existing trees along Rile Road are staying.
    • 00:18:07
      Do we have a distance?
    • 00:18:13
      Maybe now is the time we can talk about that.
    • Margaret MaliszewskiPlanning Manager
    • 00:18:15
      Yeah, the measurement for what's shown in the red line there is about 670 feet.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:18:21
      Okay, so pretty far back.
    • 00:18:25
      But I'll just add, I think overall, I think it's a really nice project as a redevelopment of a site instead of, you know, doing this on a greenfield site somewhere else in the county.
    • 00:18:35
      So and I'm confident, I think, you know, given the distance from the corridor on 29 and kind of the grade change condition that we have there now that, you know, this
    • 00:18:51
      won't have an overwhelming impact on either corridor.
    • 00:18:55
      So I don't really have anything else to add.
    • 00:19:00
      Thank you.
    • 00:19:00
      All right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:19:01
      Thanks.
    • 00:19:03
      I agree.
    • 00:19:03
      I think as a redevelopment, that really is kind of a benefit.
    • 00:19:09
      And I think the real challenge comes from more the Briar Road corridor than 29.
    • 00:19:18
      I think that's trying to,
    • 00:19:22
      Based on the photos of the existing conditions, to a large extent, you're going to be looking down on the roof and it's going to be a challenge to hide the equipment and make that look, you know, not bad, you know, not like better than a normal roof.
    • 00:19:41
      So, but in terms of
    • 00:19:45
      what we've seen in terms of the layout of the site.
    • 00:19:49
      I don't have any adverse comments, so.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:19:56
      Yeah, and I agree with what all of you have said.
    • 00:19:58
      I think it's great that it's a redevelopment, but I think like Taro, like Chris, would be interested as this moves forward to understand and hopefully see more landscape and
    • 00:20:11
      You know, roof forms or other strategies that might mitigate an otherwise extensive expanse of membrane roof visible from railroad.
    • SPEAKER_12
    • 00:20:27
      All right, so if we could review the recommended motion and see if I'll pull that up.
    • Margaret MaliszewskiPlanning Manager
    • 00:20:41
      This is the standard format for an initial plan with the ARB with the first bullet being the recommendation for approval of the initial plan with the two comments we discussed.
    • Chris HenningsenChair, Architectural Review Board
    • 00:21:05
      I guess I'll just go through and see if anyone has any
    • 00:21:09
      suggested modifications to make and then we'll go for a motion.
    • 00:21:15
      Dade, do you have any?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:21:21
      I don't have any recommendations.
    • Taro MatsunoMember, Architectural Review Board
    • 00:21:25
      Tara?
    • 00:21:27
      The only thought I have is with the first clause of the the garden center must be a fully enclosed structure using permanent materials and I think that it definitely makes sense for the
    • 00:21:39
      Garden Center to not have the sort of temporary appearance that Margaret was alluding to, but I don't know if they'd necessarily go together.
    • 00:21:46
      Like, is there a theoretical, non-enclosed structure that has permanent materials?
    • 00:21:53
      Or are they kind of intrinsically linked?
    • 00:21:57
      Other than that, I think for me, the question is more the appearance and the materiality of it.
    • 00:22:03
      I'm open to whether or not it needs to be.
    • 00:22:06
      Fully enclosed year round, I guess.
    • Margaret MaliszewskiPlanning Manager
    • 00:22:10
      So the part of the issue with the being fully enclosed is that if you can look down into it and see what's inside, then it needs a special permit.
    • 00:22:19
      We don't have that application yet.
    • 00:22:20
      So this would take care of that issue until the time that a special permit application has come in and reviewed.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:22:27
      And just to clarify is that, you know, I realized when I read it, I was thinking fully enclosed roof.
    • 00:22:33
      Are you, but this is walls and roof, a full enclosure in order to avoid that special use permit.
    • SPEAKER_12
    • 00:22:38
      Okay.
    • SPEAKER_02
    • 00:22:38
      Thank you.
    • 00:22:43
      Okay.
    • 00:22:43
      So thanks for clarifying.
    • 00:22:44
      I think that makes sense.
    • Chris HenningsenChair, Architectural Review Board
    • 00:22:46
      All right, Frank, do you have any, uh, suggestion changes?
    • Khris TaggartSenior Planner
    • 00:22:49
      No edits from me.
    • Chris HenningsenChair, Architectural Review Board
    • 00:22:51
      All right.
    • Khris TaggartSenior Planner
    • 00:22:53
      We have, um, um,
    • 00:22:54
      A member from the Home Depot side that would like to speak virtually.
    • SPEAKER_02
    • 00:23:07
      You're unmuted, John.
    • SPEAKER_08
    • 00:23:09
      Thank you very much.
    • 00:23:11
      Members of board, thank you very much.
    • 00:23:13
      John Karakas from the firm, Greenberg Farrow.
    • 00:23:16
      We're the site development managers for the for the overall project.
    • 00:23:21
      I believe the my question was about once it was about the fully enclosed garden center.
    • 00:23:26
      But the comments that I heard answered all my questions.
    • 00:23:32
      So I'm good understanding what Margaret explained that what needed to happen was because we didn't have an SUP that the recommendation that it be fully enclosed.
    • 00:23:42
      We'll work forward on the SUP and then, and the other part of that was there's two, and I think someone else had mentioned it.
    • 00:23:49
      I was just trying to also get some clarification, whether that was on the vertical plane or end or the horizontal, vertical being the sidewalls, the horizontal being a roof over the top.
    • SPEAKER_11
    • 00:24:05
      Just to further clarify, so it is the vertical and the horizontal at this point.
    • SPEAKER_12
    • 00:24:10
      Okay.
    • 00:24:10
      Thank you.
    • SPEAKER_02
    • 00:24:12
      All right, Valerie, did you have a question?
    • Valerie LongAttorney
    • 00:24:19
      Thank you, Mr. Chairman.
    • 00:24:20
      I appreciate the opportunity.
    • 00:24:20
      I just want to clarify, and I think we're all on the same page here, but just for the record for future, as Home Depot and its designers move forward with the design of the garden center and any future outdoor storage and display, we anticipate that possibly those conditions would change as the special use permit, assuming it's needed, works its way through the process, such that at final site plan,
    • 00:24:45
      Perhaps a portion of it would be not fully enclosed as a permanent structure if that were approved as part of the special use permit.
    • 00:24:53
      So I just want to clarify that that we're not getting too locked in at this stage, but want to let that process work through.
    • Chris HenningsenChair, Architectural Review Board
    • 00:25:00
      I was going to ask if so a special use permit is kind of maybe not in the works, at least like contemplated that that may be the route you decide to go on.
    • Valerie LongAttorney
    • 00:25:12
      It's very likely we'll be back to you hopefully soon with a special use permit application.
    • 00:25:17
      They're just working on it now.
    • 00:25:19
      And there's a possibility the entire building could be fully enclosed with permanent materials.
    • 00:25:25
      I think that's not very likely, but we recognize that anything that's not would have to be approved as part of the special use permit.
    • 00:25:37
      So I hope that's clear.
    • 00:25:39
      Thank you for the opportunity to clarify.
    • SPEAKER_12
    • 00:25:41
      Thanks a lot.
    • Chris HenningsenChair, Architectural Review Board
    • 00:25:45
      All right, I don't have any suggestions or edits or anything.
    • 00:25:51
      So anyone like to make a motion based on what we have?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:26:00
      I'll move to forward the recommendations outlined in the staff report to the agent for the site review committee as shown on the screen.
    • SPEAKER_02
    • 00:26:11
      I'll second.
    • 00:26:15
      Mr. Van Der Werf?
    • 00:26:17
      Aye.
    • Khris TaggartSenior Planner
    • 00:26:18
      Mr. Matsuno?
    • 00:26:20
      Aye.
    • 00:26:20
      Mr. Hancock?
    • 00:26:21
      Aye.
    • 00:26:22
      Mr. Henningsen?
    • 00:26:23
      Aye.
    • 00:26:24
      And Mr. Stoner is absent.
    • Chris HenningsenChair, Architectural Review Board
    • 00:26:27
      All right, thanks a lot.
    • 00:26:30
      The next regular review item is ARB 2023-32, BMW renovation.
    • SPEAKER_02
    • 00:26:41
      It's going to take us a second to switch over.
    • 00:27:23
      The stuff waiting for me.
    • SPEAKER_11
    • 00:27:26
      She's just closing the door.
    • Khris TaggartSenior Planner
    • 00:27:50
      The application I'm presenting on today is the preliminary review of a renovation plan submitted for BMW of Charlottesville's sales and service buildings.
    • 00:27:59
      Subject properties are located on the south side of Route 250 east of the intersection People Place and Route 250.
    • 00:28:06
      The ARB has approved a number of applications for the site, including a special use permit in 1998 for outdoor display with vehicles.
    • 00:28:13
      ARB applications in 1998 and 2008 for the design of the current buildings and sell or sign applications.
    • 00:28:21
      Renovations of sales and service buildings revise the curved parapets to horizontal, paint the existing brick and ephos white, and add canopies over the main entrance and storefront windows of the sales building.
    • 00:28:34
      The change of the parapets from curved to horizontal help better connect the forms to historic architecture.
    • 00:28:39
      And the canopies help add to human scale to the building design.
    • 00:28:43
      How we're painting the earth tone brick and even this white will downplay the varying textures of building materials in existing design, weakening the base metal top pattern identified in the board's review of the existing design as aspects that increase the compatibility with the county's historic architecture.
    • 00:29:00
      Staff recommends revising the building design to one that maintains the existing base middle top pattern.
    • 00:29:08
      Staff offers the following recommendations on the proposal for the next middle.
    • SPEAKER_12
    • 00:29:12
      I'd be happy to try to answer any questions.
    • 00:29:16
      Thanks, Chris.
    • Chris HenningsenChair, Architectural Review Board
    • 00:29:20
      Frank, do you have any questions?
    • SPEAKER_12
    • 00:29:22
      I don't.
    • Chris HenningsenChair, Architectural Review Board
    • 00:29:22
      Thanks, Chris.
    • 00:29:25
      Dave?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:29:26
      Thank you.
    • 00:29:27
      No questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:29:30
      And I don't have any questions either.
    • SPEAKER_02
    • 00:29:33
      So if an applicant has a presentation or
    • SPEAKER_09
    • 00:29:45
      Good afternoon.
    • 00:29:46
      My name is Bruce Wardell.
    • 00:29:47
      I'm the architect assisting the owner and the manufacturer with this application.
    • 00:29:53
      And I don't have a formal presentation.
    • 00:29:56
      You've seen just about everything that there is.
    • 00:29:57
      It's a relatively minor modification.
    • 00:30:01
      Well, there's minor work to the building.
    • 00:30:04
      There are a couple of things that I would mention.
    • 00:30:09
      One is that the idea of this building is a relatively, if we could get the perspective, I guess would be the best drawing to have up when we're looking at this right now.
    • SPEAKER_02
    • 00:30:29
      Sorry for throwing your curve ball.
    • SPEAKER_09
    • 00:30:36
      While he's getting that up I will introduce the other topic that when I sat on the board I hated when this happened and that is on Friday afternoon we got a call from the manufacturer
    • 00:30:53
      requesting that we present the building as a fully synthetic stucco building without taking the brick off and putting synthetic stucco on.
    • 00:31:04
      I informed them that that was kind of impossible at this point in time.
    • 00:31:10
      and that the precedent of keeping the brick in the entrance corridor was probably the preferred strategy at this point in time.
    • 00:31:23
      If you all decide to not consider the full stucco version of it, I would appreciate your articulation of that in your motion.
    • 00:31:39
      Secondly, the perspective is probably the best one.
    • 00:31:47
      because that's the major view of the building from the entrance corridor.
    • 00:31:52
      The only comment I would make is that while the sort of bottom, middle, and top typology for a traditional building of a classical building makes sense, a modern building oftentimes doesn't have that same kind of structure.
    • 00:32:12
      and same kind of organization and so our thought was that by painting the brick and keeping it as a natural material and there's precedent for painted brick in the localized entrance corridor up at the Atlantic Bank building and the
    • 00:32:31
      I think it's the UVA credit building that the painted brick fits in with the palette that's along this entrance corner and that the idea of not having the kind of base middle and top there's no cornice on a modern building and so concurrently there usually isn't a base on a modern building so I would request that the application be considered as is and that
    • 00:32:58
      that if that becomes an issue we can have a conversation about it.
    • 00:33:03
      Other than that, I think we've presented the
    • 00:33:08
      The limited changes to the building in terms of its configuration, the windows and doors will stay the same.
    • 00:33:14
      The profile of the parapets I think is the major improvement to the building as well as the more consistent appearance of the exterior materials.
    • 00:33:27
      It sort of takes it out of the late 80s and gets it back closer to where we are.
    • 00:33:36
      Happy to answer any questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:33:39
      All right, Dave, do you have any questions for the applicant?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:33:43
      Sure, thank you for the presentation, Bruce.
    • 00:33:45
      I guess, conversely for the manufacturer or for you, was it in consideration given to extending brick everywhere?
    • SPEAKER_09
    • 00:33:52
      That was not considered.
    • 00:33:57
      We had what we thought was the, we had back in March,
    • 00:34:03
      We had put this configuration together.
    • 00:34:05
      We ran it back through the food chain, the owner and the manufacturer.
    • 00:34:09
      And you guys know that sometimes the owner and the manufacturer aren't on the same page in these things.
    • 00:34:15
      But we had run it back through the whole food chain.
    • 00:34:18
      And this thing coming in on Friday afternoon was a bit of a curveball for us.
    • 00:34:24
      And it went against any
    • 00:34:28
      Consultation or advice we gave the owner and the manufacturer that most likely the preferred approach is going to be keeping the brick in one form or another and that taking a real material and sort of substituting it with a synthetic material wasn't really the way we would prefer to go.
    • Chris HenningsenChair, Architectural Review Board
    • 00:34:54
      Thank you.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:34:56
      Thanks, Frank.
    • Chris HenningsenChair, Architectural Review Board
    • 00:34:57
      Do you have any questions?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:34:58
      I don't.
    • 00:34:58
      Thank you, Bruce.
    • 00:35:00
      Great presentation and great application.
    • 00:35:02
      I think, as always, your drawings are very legible and easy for us to understand.
    • SPEAKER_09
    • 00:35:08
      Good short words and, you know, lots of pictures.
    • Chris HenningsenChair, Architectural Review Board
    • 00:35:15
      Large print.
    • 00:35:17
      Yeah, I agree.
    • 00:35:18
      I don't have any questions either.
    • 00:35:21
      Are there any members of the public that would like to make a comment?
    • 00:35:35
      No, there are no members in the public who would like to comment.
    • 00:35:40
      Thanks.
    • 00:35:41
      The ARB will now go into discussion.
    • 00:35:46
      Dave, do you have any comments?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:35:49
      I think I'm comfortable with the original proposal.
    • 00:35:54
      While the current variation in color and material breaks up the scale somewhat, it's a rather diminutive building.
    • 00:36:01
      And I think in some ways, actually, the form is a little bit
    • 00:36:05
      clearer when the color is unified.
    • 00:36:08
      So sympathetic to Bruce's statements about a modern building, and I think the application is acceptable.
    • 00:36:15
      I think normally, if it were a new one, I'd be concerned about the extent of stucco.
    • 00:36:21
      But given the extent that's extant there, this seems acceptable to me.
    • 00:36:27
      Thanks, Frank.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:36:29
      Thanks, I agree.
    • 00:36:31
      I think you got to look at this contextually too and think about this corridor, what's, you know, with the Toyota VW, there's white or light, definitely lighter colors.
    • 00:36:45
      And then if there's a place for contemporary architecture, it's definitely here, you know, knowing what BRW did across the street with the new flow complex,
    • 00:36:58
      I think it fits in.
    • 00:37:01
      I think maybe some of the conversations about the white being the dominant material is maybe more impactful on some of these multifamily residential projects that we see and kind of their location, maybe a little further out and more kind of suburban, rural context.
    • 00:37:21
      But
    • 00:37:22
      I think here, given the adjacent other similar uses and contemporary architectural styles, I think it works.
    • 00:37:33
      I agree, I think Dade started his remarks with the proposal before us, so I took that to mean the brick that we're reviewing would be preferable.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:37:46
      And actually because Bruce requested it, I would not be comfortable with removing the brick and further extending the scope of Stockholm.
    • SPEAKER_12
    • 00:37:58
      I agree.
    • Chris HenningsenChair, Architectural Review Board
    • 00:38:01
      Alright, thanks.
    • 00:38:03
      Yeah, I agree.
    • 00:38:04
      Also, I think the painted brick kind of would give a subtle textural difference between that and the stucco.
    • 00:38:15
      And I think considering the amount of stucco on the existing building,
    • 00:38:24
      Adding to it slightly by straightening the cornice line is acceptable but kind of wiping away that brick texture I think would be taking a step further.
    • 00:38:37
      Regarding the white, I also agree it's a commercial building and what clearly is a commercial corridor and we've approved other examples that
    • 00:38:50
      Add a similar color scheme, so I don't have a problem with that either.
    • 00:38:59
      I guess if we could review the recommended motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:39:13
      So the recommendation was three comments, assuming that revised plan, a revised proposal would come back to you for review.
    • 00:39:26
      It sounds like number one, you want to, that leaves
    • 00:39:44
      Just two and three about lighting.
    • 00:39:46
      I've added a number four, which says the ARB does not support the request for walls fully covered with synthetic stucco.
    • 00:39:56
      If this looks like what you're thinking, then, well, as it was proposed, you wouldn't need a motion, but if this is what it now looks like, what you want to do, then a motion would be appropriate and you wouldn't need to see it back again, it sounds like.
    • Chris HenningsenChair, Architectural Review Board
    • 00:40:13
      Anybody have any additional?
    • SPEAKER_12
    • 00:40:17
      No, this looks good to me.
    • Margaret MaliszewskiPlanning Manager
    • 00:40:20
      All right.
    • 00:40:21
      The motion would be for approval with the conditions listed in the staff report and as revised during the discussion.
    • SPEAKER_12
    • 00:40:35
      All right.
    • 00:40:35
      Would anybody like to make that motion?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:40:38
      I'll make a motion for approval with the conditions listed in the staff report.
    • 00:40:42
      Amended as follows.
    • 00:40:46
      Strike item number one, add item number four.
    • 00:40:49
      The ARB does not support the request for walls fully covered with synthetic stucco.
    • SPEAKER_02
    • 00:40:56
      Second the motion.
    • 00:41:00
      Mr. Van Der Werf?
    • SPEAKER_12
    • 00:41:02
      Aye.
    • 00:41:04
      Mr. Hancock?
    • 00:41:05
      Aye.
    • 00:41:06
      And Mr. Hensing?
    • 00:41:08
      Aye.
    • 00:41:09
      Thanks a lot.
    • SPEAKER_02
    • 00:41:12
      Thank you.
    • SPEAKER_12
    • 00:41:13
      Thanks, Bruce.
    • SPEAKER_09
    • 00:41:14
      I brought the color sample of the RAL color that we specified there for your records.
    • Chris HenningsenChair, Architectural Review Board
    • 00:41:20
      Thank you.
    • SPEAKER_09
    • 00:41:21
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:41:24
      All right, so there is one work session today.
    • 00:41:26
      It's on the entrance corridor design guidelines addenda.
    • 00:41:31
      Mariah, do you have your, well, I guess in a minute.
    • SPEAKER_02
    • 00:41:53
      Sorry, I thought my computer died.
    • 00:41:55
      It did not.
    • SPEAKER_12
    • 00:42:02
      Is that an Albemarle County office or excuse me, water bottle?
    • Mariah GleasonUrban Designer
    • 00:42:08
      It is.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:42:08
      That is really nice for the record.
    • 00:42:11
      Spotted that logo.
    • Mariah GleasonUrban Designer
    • 00:42:13
      I think there are extras.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:42:16
      I wasn't saying that to try to get one.
    • Mariah GleasonUrban Designer
    • 00:42:20
      You don't want to rep the county?
    • Margaret MaliszewskiPlanning Manager
    • 00:42:24
      How about the next person to get their entrance corridor working?
    • Mariah GleasonUrban Designer
    • 00:42:45
      Good afternoon everyone and thank you again for your continued
    • 00:42:48
      Work and review of this effort to identify consistent and common elements and historic aspects along each of the county's entrance corridors.
    • 00:42:57
      Today we're going to be reviewing the draft entrance corridor addendum for two routes, route 231 and 22, Bordensville Road and Louisa Road.
    • 00:43:09
      respectively.
    • 00:43:11
      So these routes were combined in one spread because the traveler's experience along them is one of a continuous road, grouped them together.
    • 00:43:23
      This is the main, there's one spread, so two sheets.
    • 00:43:27
      This first sheet is the typical information.
    • 00:43:31
      So the location of these entrance corridors is in Eastern Albemarle, beginning at the top northeastern corner towards Gordon'sville and Orange.
    • 00:43:40
      going south on Route 231, Gordonville Road, and then continuing on Route 22, Louisa Road, south of the intersection at Cismont.
    • 00:43:51
      So Cismont is the turning point.
    • 00:43:54
      The experience along this roadway is extremely consistent in its scenic, rural, and agricultural character.
    • 00:44:02
      Most views are ones of undulating pastures, winding roads, mature trees, forested hills, tree-lined
    • 00:44:10
      Lanes and Board Fences.
    • 00:44:11
      So while there are a number of historic structures along the roadway, very few are visible from the road due to their distance from the road topography and vegetation.
    • 00:44:22
      All of the properties are in the rural areas zoning district, except for a small pocket of commercial development at the southern end of Route 22 at the intersection 50, which is the gas station.
    • 00:44:37
      Moving to the next sheet, this sheet contains more details regarding consistent structural and landscaping elements seen along the corridor and representatives' precedent images.
    • 00:44:49
      While pastoral lands are remarkably predominant, there are a few images of representative buildings that are visible from the corridors.
    • 00:44:58
      We gave the lower right image
    • 00:45:03
      More real estate on the sheet because I think it does a pretty good job of capturing and depicting many of the consistent attributes identified along the roadway.
    • 00:45:12
      This is the sheet spread that we have for your review today.
    • 00:45:20
      I'll just flip back to the first sheet for the discussion.
    • SPEAKER_02
    • 00:45:38
      Thanks for...
    • Taro MatsunoMember, Architectural Review Board
    • 00:45:41
      Putting this together and the historical information on this route is pretty interesting, so I appreciate that it's been provided.
    • 00:45:49
      Otherwise, I think it looks really good.
    • 00:45:50
      Actually, we were talking in the office today about just what other folks are up to when folks in our office who sit on boards and stuff, and I had showed some of your examples, and I think everybody was very into the layouts and the project itself, so thank you for
    • 00:46:10
      continued efforts on it.
    • Mariah GleasonUrban Designer
    • 00:46:12
      What a great compliment.
    • 00:46:13
      Thank you.
    • Taro MatsunoMember, Architectural Review Board
    • 00:46:15
      We were into the 29 North section, and there's a great two photo spread like the one you did here, but of the motel and that like Jeffersonian building on the side.
    • 00:46:27
      So, you know, it's been good.
    • 00:46:29
      Appreciate it.
    • SPEAKER_11
    • 00:46:30
      Thank you.
    • SPEAKER_12
    • 00:46:35
      Sure.
    • 00:46:35
      Okay.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:46:37
      Great work.
    • 00:46:38
      Definitely a favorite corridor.
    • 00:46:40
      This is an awesome corridor.
    • 00:46:42
      And what I was, my question, I don't know that contextually you would think about this, but at the I-64 end of this, is that gas station?
    • 00:46:56
      Like, I don't want to think about a gas station with this corridor, but I feel like that was maybe reviewed by the ARB at one time, just thinking about that canopy.
    • 00:47:06
      I don't know if that's an example, because this is largely about the landscape and the extended views, but at the same point, we often look for gas station examples, and that one's at a prominent intersection.
    • 00:47:26
      And then there's also these gray little buildings like the post office, or, you know, I don't know if there's one of the, I might be thinking of one of the side roads that comes off of this corridor, but like that kind of corner store, the county has so many of them, any of those types of buildings.
    • 00:47:46
      While we might not see an application that is the same scale and use, I think there are elements of those buildings that you can draw on.
    • Margaret MaliszewskiPlanning Manager
    • 00:47:56
      Actually the photo that's in the middle of that spread that was, if it's correct, originally a one-story store that was converted into a two-story commercial building.
    • 00:48:13
      But we can look at
    • Frank HancockVice Chair, Architectural Review Board
    • 00:48:15
      Another thought, we talk a lot about signage, the Keswick sign is new and contemporary but I feel like it fits within the context and we're often, I mean I think it's done with corten steel, it's got ornamental grass plantings, like there's some things that it could relate to with future applications.
    • Mariah GleasonUrban Designer
    • 00:48:40
      To your comment about, just to clarify the comment about the gas station at the corner of route 250, that gas station is actually in our 250, route 250 spread.
    • 00:48:52
      So it would be one of those conditions where what do we do at the intersection of two, which we have yet to have that, we've talked about a work session, that is coming in the future.
    • 00:49:02
      So is the comment that we should include that or should not include that here?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:49:08
      I'd forgotten that it was included in the other one.
    • 00:49:11
      I think as long as it's in one of these, because I think there's some good examples within that project building.
    • 00:49:19
      I think we're good.
    • 00:49:21
      But this quarter kind of ends in that I think there's like an office building or two.
    • 00:49:26
      So there's uses here other than residential and kind of state lands that might be
    • 00:49:36
      That might be what someone looks at, or if the development is focused on that end of the corridor, that's the context they might be looking within.
    • Mariah GleasonUrban Designer
    • 00:49:45
      In this image, Shadwell is actually covering the commercially zoned property, that label.
    • 00:49:56
      Most of the developments that you're referencing are, well, they're interesting in that they are little centers of activity, but they're isolated to a parcel.
    • 00:50:07
      Whereas when we get down to 250, a lot of the businesses start to orient towards 250, and it's almost the entrance into that corridor versus
    • 00:50:18
      and entrance onto this one, but entrances being seen as when you approach.
    • 00:50:25
      So the approach here would be from north to south and there would be little installations along the way.
    • 00:50:32
      We could highlight those more, the little isolated, more communal focused areas in the precedent imagery.
    • SPEAKER_12
    • 00:50:43
      Okay, thank you.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:50:47
      Looks really good.
    • Mariah GleasonUrban Designer
    • 00:50:48
      Thank you.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:50:50
      Yes, yeah, I'll add my thanks and compliments to Taro's and Frank's.
    • 00:50:54
      It's wonderful advancing.
    • 00:50:58
      I guess one question I had recognizing the really remarkable character of this corridor is I guess there's one example of the residential development shown that is not subject to our review, right?
    • 00:51:12
      It's just sort of accidental that they've planted screening trees.
    • 00:51:22
      Maybe just want to flag, not too much for the guidelines or for this survey, but for a guidelines update.
    • 00:51:29
      I think one issue I'd like us to consider is if there's a way to expand the application of the guidelines so that they apply to all development along these corridors.
    • 00:51:44
      And I think, Margaret, you had mentioned that maybe scenic entrance routes might provide more of that protection.
    • 00:51:52
      So maybe that's the most straightforward way is just to nominate these areas that we're interested in for that status.
    • Margaret MaliszewskiPlanning Manager
    • 00:52:01
      I think we can, I'll give you a little bit of update on the comp plan work at the end of the meeting today, but I think that's where we can, we have an opportunity to do that.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:52:12
      Great, yeah, thank you again.
    • Chris HenningsenChair, Architectural Review Board
    • 00:52:16
      Yeah, I was thinking all along the same lines.
    • 00:52:19
      I mean, this is one of the most gorgeous corridors and it feels a little similar to some of the sections of the 250 West in that
    • 00:52:31
      It's gorgeous, but like out of our purview.
    • 00:52:36
      And it's like, I'd almost like regret to see any application on a corridor like this.
    • 00:52:43
      Cause you kind of the best thing that could happen with this corridor is for nothing to happen to it.
    • 00:52:50
      So like what they had suggested some mechanism where the
    • 00:52:58
      Anything that happens along a corridor like this could be good, but seems like it would be a good thing.
    • Taro MatsunoMember, Architectural Review Board
    • 00:53:05
      The only thing is just I would second Frank's note about signage is like the one little thing that kind of intersects with stuff that we're considering.
    • 00:53:21
      That seems like a good idea to think about, but agreement with everybody here.
    • SPEAKER_11
    • 00:53:38
      That's all I have, thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:53:40
      All right, well, thanks a lot.
    • 00:53:44
      We'll move into other business now.
    • 00:53:48
      Would anyone like to move to adopt the April 17th, 23 ARB minutes?
    • SPEAKER_02
    • 00:54:01
      Okay.
    • SPEAKER_12
    • 00:54:02
      It's all good.
    • 00:54:03
      All right, I'll move for approval of the April 17th, 2023 minutes.
    • SPEAKER_02
    • 00:54:09
      I'll second.
    • 00:54:13
      Mr. Van Der Werf?
    • 00:54:14
      Aye.
    • 00:54:16
      Mr. Matsuno?
    • SPEAKER_12
    • 00:54:17
      Aye.
    • Khris TaggartSenior Planner
    • 00:54:18
      Mr. Hancock?
    • SPEAKER_12
    • 00:54:19
      Aye.
    • Khris TaggartSenior Planner
    • 00:54:20
      Mr. Henningsen?
    • SPEAKER_12
    • 00:54:21
      Aye.
    • Chris HenningsenChair, Architectural Review Board
    • 00:54:23
      All right, thanks a lot.
    • 00:54:26
      So do any board members or staff have any other items for discussion?
    • Margaret MaliszewskiPlanning Manager
    • 00:54:35
      Yes, I have two items as follow up to questions from the last meeting.
    • 00:54:44
      There was a question about when the ARB would be able to make some more comments or recommendations for the comp plan.
    • 00:54:53
      So we have some options there beginning from now until the end of the summer.
    • 00:54:59
      We could add an item to the agenda to talk specifically about goals and objectives that the ARB would like to see or to see updated.
    • 00:55:10
      Our staff who are directly involved in that work, we're happy to have your help in drafting goals and objectives for that entrance quarters.
    • 00:55:18
      Alternatively, we could wait until the fall when we could present you with
    • 00:55:24
      draft calls and objectives, or we could do both.
    • 00:55:29
      So whatever your preference is, I'd be happy to pass that along and try to get it scheduled.
    • Taro MatsunoMember, Architectural Review Board
    • 00:55:39
      So when you say, would it just be the folks we usually see at these meetings?
    • 00:55:44
      Were there other people involved in the process that would be included in that conversation?
    • 00:55:48
      Or is it just kind of us in the room plus Frank?
    • Margaret MaliszewskiPlanning Manager
    • 00:55:54
      It would be us plus I'm not sure how many of the staff that are directly involved with the comp plan update, but one or more of them.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:56:09
      Might be most helpful for them if they heard our comments and then incorporated or drafted the plan accordingly versus if we come up with anything after it's been drafted.
    • Margaret MaliszewskiPlanning Manager
    • 00:56:26
      So at some point, between now and the end of the summer, we can have staff come and just have a discussion.
    • 00:56:33
      And then from that discussion, we can draft the goals and objectives and come back and present you with those drafts and get your comments again.
    • 00:56:43
      That sound good?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:56:45
      Yeah.
    • 00:56:46
      Thank you, Margaret.
    • Margaret MaliszewskiPlanning Manager
    • 00:56:46
      OK, great.
    • 00:56:49
      The second item that I wanted to update you on was
    • 00:56:55
      At the last meeting, Neil Williamson had stated that he had heard from somebody who had contacted him to talk about somebody else just driving the entrance quarters looking at signs.
    • 00:57:17
      And so
    • 00:57:21
      The code compliance officer, or there is a code compliance officer that does travel the county's streets to look for
    • 00:57:36
      illegal signs in the right of way.
    • 00:57:38
      So that is a proactive thing that the code compliance officers do.
    • 00:57:42
      When Neil made his statement, I thought he and because he was here, I assumed he was talking about signs that like you all would approve or that we would approve for you.
    • 00:57:54
      That's not really the case.
    • 00:57:55
      So but there is, in most cases, we're waiting for
    • 00:58:00
      You know, a complaint to be made and a code compliance officer will go out, but that this is a different situation for the illegal signs in the right of way.
    • 00:58:08
      So that is a proactive thing that's happening.
    • 00:58:12
      And if one of them is out of the site, and they happen to see something else that really looks like it's not not in line with what's supposed to be there, then they would pursue that as well.
    • 00:58:25
      So
    • 00:58:26
      I can follow up with Neil since he's not here today.
    • 00:58:29
      But do you have any questions on that?
    • Frank HancockVice Chair, Architectural Review Board
    • 00:58:31
      That doesn't seem out of the ordinary, right?
    • 00:58:34
      I mean, other municipalities have.
    • 00:58:35
      Is that through zoning, just a zoning enforcement?
    • SPEAKER_02
    • 00:58:38
      Yes.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:58:43
      Yeah, I appreciate the follow up, Margaret.
    • 00:58:44
      It makes sense to me.
    • Taro MatsunoMember, Architectural Review Board
    • 00:58:47
      And just the illegal signs of the entry in the right of way, that's like,
    • 00:58:53
      Trying to imagine what those other infractions would be.
    • 00:58:56
      Are they usually like business owners putting stuff out that they shouldn't?
    • Margaret MaliszewskiPlanning Manager
    • 00:59:00
      Yep.
    • 00:59:00
      Like sales or maybe even some of those, you know, apartment signs, but the, you know.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:59:14
      Okay, makes sense.
    • 00:59:15
      Thank you.
    • 00:59:16
      Sad we won't get a dedicated ARB enforcer.
    • 00:59:21
      Hoping you were going to bring us a description that we can review.
    • Margaret MaliszewskiPlanning Manager
    • 00:59:25
      We'd give them a water bottle.
    • 00:59:28
      So I think that maybe the other way to look at is the the ones that are I think that they're focusing on are those that are really temporary, they're real easy to put in and take out.
    • 00:59:37
      And so it's not like the permanent signs that were that are attached to a wall or
    • 00:59:44
      Concrete Foundation or anything.
    • SPEAKER_02
    • 00:59:49
      Okay.
    • 00:59:49
      That's all the updates I've got.
    • SPEAKER_12
    • 00:59:51
      All right.
    • Frank HancockVice Chair, Architectural Review Board
    • 00:59:52
      Well, thanks.
    • 00:59:54
      One quick question.
    • 00:59:56
      If you have any sense for next meeting's agenda, if there's, we have some applications.
    • Margaret MaliszewskiPlanning Manager
    • 01:00:04
      We have at least, I think we have three regular review items.
    • SPEAKER_12
    • 01:00:08
      Wow.
    • SPEAKER_11
    • 01:00:13
      I think it's three regular review items, but it could be two regular, one consent.
    • SPEAKER_12
    • 01:00:18
      Okay.
    • Dade Van Der WerfMember, Architectural Review Board
    • 01:00:20
      Nice.
    • 01:00:23
      Looking further ahead, I guess we'll check for the 19th at the next meeting.
    • 01:00:26
      I think I will be away on the 19th.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:00:30
      That is, so we have, is the next meeting June 5th?
    • 01:00:35
      Oh, sorry.
    • 01:00:35
      I was skipping a month.
    • Margaret MaliszewskiPlanning Manager
    • 01:00:38
      That's way ahead.
    • 01:00:40
      Thank you for the advance notice.
    • Frank HancockVice Chair, Architectural Review Board
    • 01:00:42
      But that's a good point.
    • 01:00:43
      That's Juneteenth.
    • 01:00:44
      Is the county open on Juneteenth?
    • 01:00:46
      I know UVA is closed.
    • 01:00:47
      That meeting will be on Tuesday.
    • SPEAKER_02
    • 01:00:50
      Oh, that's a Tuesday.
    • 01:00:51
      OK.
    • SPEAKER_12
    • 01:00:51
      Yes, so that'll be on the 20th.
    • SPEAKER_02
    • 01:00:57
      Holidays on Monday, but the meeting will be on Tuesday.
    • SPEAKER_12
    • 01:01:00
      OK.
    • Chris HenningsenChair, Architectural Review Board
    • 01:01:03
      Does anybody anticipate not being here for the June 5th?
    • SPEAKER_12
    • 01:01:12
      I plan to be here.
    • SPEAKER_02
    • 01:01:14
      Yeah, I think I'll be here.
    • 01:01:16
      I should be here.
    • 01:01:17
      Yeah, me too.
    • 01:01:18
      Great, thank you.
    • SPEAKER_12
    • 01:01:23
      All right, well, any further questions or comments?
    • Chris HenningsenChair, Architectural Review Board
    • 01:01:28
      All right, well, in that case, this meeting is adjourned until our next meeting on June 5th, 2023.
    • 01:01:34
      It's 2.04 by my watch.
    • 01:01:40
      Thanks a lot.
    • SPEAKER_12
    • 01:01:41
      Thanks everybody.
    • Chris HenningsenChair, Architectural Review Board
    • 01:01:42
      Thank you, everybody.