Architectural Review Board Meeting   10/3/2022

Attachments
  • Final Agenda.pdf
  • Final Action Memo.pdf
  • Final Action Memo Minutes.pdf
  • ARB2022-78 5th Street Landing Self Storage Initial Site Plan Staff Report.pdf
  • Attach. 1 ARB2022-78 Fifth Street Landing Self Storage Narrative.pdf
  • Attach. 2 ARB2022-78 Fifth Street Landing Self Storage Site Plan.pdf
  • Attach. 3 ARB2022-78 Fifth Street Landing Self Storage Architectural Drawings.pdf
  • Attach. 4 ARB2022-78 Fifth Street Landing Self Storage Site Section.pdf
  • Entrance Corridor Design Guidelines Addenda.pdf
  • ARB rules 2022 with remote participation.pdf
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:00:02
      Hold on to it.
    • SPEAKER_01
    • 00:00:03
      That's great.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:04
      Okay, Vivian, are you ready to start?
    • SPEAKER_01
    • 00:00:09
      Yes, we are recording.
    • SPEAKER_10
    • 00:00:10
      We have to switch the inputs over to actually here.
    • SPEAKER_11
    • 00:00:35
      We're recording.
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:36
      OK, great.
    • 00:00:38
      It's 1.01 PM.
    • 00:00:40
      So I'm calling the October 3, 2022 meeting of the Albemarle County Architecture Review Board to order.
    • SPEAKER_10
    • 00:00:48
      Margaret, could you call the roll, please?
    • 00:00:52
      Sure.
    • SPEAKER_11
    • 00:00:55
      Mr. Van Der Werf?
    • SPEAKER_10
    • 00:00:57
      Present.
    • Margaret MaliszewskiPlanning Manager
    • 00:00:58
      Mr. Henningsen?
    • Chris HenningsenChair, Architectural Review Board
    • 00:00:59
      Present.
    • Margaret MaliszewskiPlanning Manager
    • 00:01:00
      Mr. Matsuno?
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:01
      Present.
    • Margaret MaliszewskiPlanning Manager
    • 00:01:02
      I'll just note that Mr. Hancock and Mr. Stoner are absent.
    • Chris HenningsenChair, Architectural Review Board
    • 00:01:06
      All right, thank you.
    • 00:01:08
      Today's meeting is a hybrid meeting.
    • 00:01:10
      The public may access and participate in the meeting electronically.
    • 00:01:14
      Instructions for doing so are posted on the Albemarle County website at the Albemarle County calendar.
    • 00:01:21
      The public has real-time audio-visual access to this meeting over Zoom and real-time audio access over telephone.
    • 00:01:28
      Both is provided in the lawfully posted meeting notice.
    • 00:01:32
      This meeting is being recorded and will be made available on the county's website.
    • 00:01:37
      This meeting is a public record and subject to disclosure under the Freedom of Information Act.
    • 00:01:44
      All speakers, when it is your turn to speak, please first state your name for the record.
    • 00:01:49
      Applicants who are making presentations note that your presentation is limited to a total of 15 minutes, which you can divide among your team members.
    • 00:01:58
      Carolyn or Vivian will let us know when the 15 minutes are up.
    • 00:02:03
      If applicants in the meeting room have team members attending virtually who will need to present, please make that known when you come to the podium.
    • 00:02:11
      Everyone who is participating virtually, please mute your microphone until it is your turn to speak.
    • 00:02:19
      Do any ARB members have anything to disclose?
    • 00:02:22
      No, no.
    • 00:02:24
      I actually have a disclosure for
    • 00:02:29
      Item ARB 2022-78 5th Street Landing South Storage Site Plan.
    • 00:02:37
      I don't have anything to do with that building.
    • 00:02:40
      However, a building that my firm designed is referenced in the staff report, which is Building A of that development.
    • SPEAKER_10
    • 00:02:53
      Thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:02:54
      Are there any members of the public that want to make a comment about a project that is not on the agenda for review?
    • SPEAKER_01
    • 00:03:01
      I'm just going to check in with Vivian and see.
    • 00:03:06
      Not at this, not at this time.
    • Chris HenningsenChair, Architectural Review Board
    • 00:03:08
      All right, thank you.
    • 00:03:12
      We have no consent agenda items today.
    • 00:03:15
      We'll move into our regular review item, which we have one, will be presented by Chris Taggart.
    • 00:03:23
      It is ARB 2022-78 5th Street Landing self-storage site plan.
    • 00:03:30
      Chris, are you ready?
    • SPEAKER_10
    • 00:03:32
      Yes.
    • SPEAKER_09
    • 00:03:32
      Thanks.
    • Khris TaggartSenior Planner
    • 00:03:34
      The application I'm presenting on today is a review architecture and site plan to construct a self-storage facility in addition to associated site improvements.
    • 00:03:48
      The overall site is located along Fifth Street with the Prose building southeast of 601 Fifth Street Landing and north of I-64.
    • 00:03:55
      ARB approved a final site plan for the overall parcel in 2018 with one of the buildings since constructed.
    • 00:04:05
      To summarize the staff report, there are minor comments on the site plan that need to be addressed, but the focus is largely on the building design and it's viewed from the Fifth Street and I-64 entrance quarters.
    • 00:04:16
      The building design is largely reflective of contemporary commercial design.
    • 00:04:20
      However, the use of tower-like elements, storefront windows would top with metal canopies, and the variation of materials provide minimal connections to the historic architecture of the county.
    • 00:04:31
      The use of the brick is another tie.
    • 00:04:33
      However, while the tower elements were fully phased with brick, brick proposed non-tower wall areas is limited to the first floor of the building, which will have limited visibility impact on entrance quarters.
    • 00:04:45
      The ethos on the upper three floors will have greater visibility and scale is monumental in nature.
    • 00:04:52
      Four story buildings in the zoning district require a step back above the third story on the street facing elevation.
    • 00:04:59
      A special exception has been quested by the applicant to waive this requirement.
    • 00:05:03
      A step back could help with the scale of the ethos as viewed from the entrance corridor.
    • 00:05:08
      However, design that does not include a step back but revises the distribution of materials and architectural elements could be appropriate.
    • 00:05:16
      An item not mentioned in the staff report is the potential visibility of the rear of the tower elements from the entrance quarter.
    • 00:05:22
      The lack of detailing on the rear of these forms gives them an unfinished appearance not appropriate for the entrance quarter.
    • 00:05:29
      Revising the rear of these elements to provide detailing that gives more finished appearance would be appropriate.
    • 00:05:35
      Staff recommends the following points of discussion, and staff recommends the changes listed in the staff report be addressed and reviewed at a future ARB meeting.
    • 00:05:45
      I'd be happy to answer any questions you all may have.
    • Chris HenningsenChair, Architectural Review Board
    • 00:05:47
      All right, thanks, Chris.
    • 00:05:50
      Tara, do you have any questions for staff?
    • Taro MatsunoMember, Architectural Review Board
    • 00:05:54
      I was curious about the previously approved landscaping plan, because I noticed in the staff report that the landscaping plan presented for this project and the previously approved one were set side by side, and I was just curious how they
    • 00:06:05
      related to each other.
    • 00:06:07
      And maybe this is a question for the applicant can speak to as well.
    • Khris TaggartSenior Planner
    • 00:06:10
      The previous approved landscape plan was brought up in the aspect of the landscaping and the base of the retaining wall that has not yet been planted.
    • 00:06:18
      We haven't figured it out staff-wise why this landscaping has been planted, but it was supposed to be included in phase one, which would have been part of the building of the site.
    • SPEAKER_10
    • 00:06:34
      Dave, do you have any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:06:36
      No, thank you.
    • 00:06:37
      Thank you, Chris, for your report and presentation.
    • SPEAKER_10
    • 00:06:40
      Yeah, thanks for me.
    • 00:06:41
      I don't have any questions either.
    • 00:06:43
      Thank you.
    • 00:06:47
      The applicant, are you ready with the presentation?
    • SPEAKER_00
    • 00:06:59
      Good afternoon members of the ARB.
    • 00:07:01
      My name is Kelsey Schlein.
    • 00:07:03
      I'm a planner with Shimp Engineering.
    • 00:07:05
      I'm just going to bring up my slides here for you all.
    • 00:07:14
      So as I said, I'm a planner with Shimp Engineering.
    • 00:07:16
      We're the civil firm working with Centennial American Properties, who's the contract purchaser of this property.
    • 00:07:24
      Here with me today is Rachel Moon, one of my colleagues.
    • 00:07:27
      And joining us remotely is Barry Bird with Barry Bird Architecture, who is the architect for the project.
    • 00:07:34
      So I'm going to go over a quick intro to the project, a few revisions that our firm has made in response to staff comments from the civil side.
    • 00:07:43
      and then turn it over to Barry for the primary points of discussion.
    • 00:07:50
      So the context of the site here, so the property has frontage, currently has frontage on Fifth Street.
    • 00:07:57
      In total, it's a four acre property.
    • 00:08:00
      However, concurrently with the major site plan amendment, we'll be pursuing a subdivision for just this portion of the property.
    • 00:08:08
      So it will have visibility from both Fifth Street and I-64 that you can see down here.
    • 00:08:15
      This was the previously approved site plan for the property.
    • 00:08:21
      So you can see this is kind of the original program that was imagined for that site.
    • 00:08:27
      So with this application we're pursuing a site plan amendment to the previously approved plan.
    • 00:08:33
      This is just a quick concept showing the overall plan.
    • 00:08:37
      So the building footprint here, primary access to the site from 5th Street Landing Way, and then a loading area is accessed through the building with a few parking spaces outside.
    • 00:08:51
      This area here is the portion that was referenced in the staff report about the landscaping at the base of the retaining wall.
    • 00:09:00
      And so that is outside of our limits and disturbance.
    • 00:09:03
      But we will be coordinating with staff through the site plan on that landscaping in that area.
    • 00:09:09
      And so what we showed inside our limits of disturbance is the new landscaping that we're proposing.
    • 00:09:17
      Just a few site sections of the property just to call attention to the elevation changes.
    • 00:09:23
      So the proposed building is proposed at a finished floor of 390.
    • 00:09:26
      The 64 elevation, Route 64 elevation is quite a bit higher in a few areas around 408.
    • 00:09:35
      The elevation of Fifth Street is about 392.
    • 00:09:41
      So we're just a bit higher with our finished floor from Fifth Street, but just calling attention
    • 00:09:45
      to a few vistas and sections and how the grade works in this area.
    • 00:09:53
      This is the north and west elevation, so as viewed from 5th Street, north and east, and the south elevation from 64.
    • 00:10:05
      A few revisions that we've incorporated in response to staff comments.
    • 00:10:12
      Changing out the ornamental trees from ornamental to medium deciduous.
    • 00:10:17
      So we changed from a dogwood to a European hornbeam and revised that to a two and a half caliper planting.
    • 00:10:23
      We swapped out our interior parking trees to note that they will be two and a half caliper planting.
    • 00:10:29
      And then a revised note here that approximately 11,000 square feet of
    • 00:10:34
      I guess what should have been planted within the property boundary to remain outside of the limits of disturbance.
    • 00:10:38
      And again, so we'll be coordinating with staff on that with the site plan amendment of that landscaping in that particular area at the base of the retaining wall.
    • 00:10:47
      Some additional revisions, just calling attention to the 3000 Kelvin note.
    • 00:10:53
      And we did have a few locations that were foot candles in excess of 20.
    • 00:11:00
      And so just revised that by adjusting the spacing between a few light poles on the site to get it below 20 foot candles.
    • 00:11:08
      And added a note that the proposed pole finish is a proposed bronze.
    • 00:11:15
      So those are kind of the extent of the changes that we made in response to the staff report from the civil side.
    • 00:11:20
      And Barry, if you're on, I'll turn it over to you to talk about the architecture and focus this on the two primary points of discussion that staff noted in the staff report.
    • SPEAKER_09
    • 00:11:34
      Okay, I'm on.
    • 00:11:40
      Is it possible to be able to share my screen?
    • 00:11:45
      Yes, it should be.
    • 00:11:47
      Okay.
    • 00:12:00
      All right.
    • 00:12:01
      Obviously, being remote, can you see that?
    • SPEAKER_04
    • 00:12:04
      We have two items and we have reviewed the comments made and have made some revisions to accommodate the comments.
    • 00:12:19
      One of the main comments referenced a project that
    • 00:12:23
      We brought before you a few months ago.
    • 00:12:26
      That was a Hollymead project and it was asked that maybe we change the brick here and also increase the amount of brick for the project.
    • 00:12:38
      So we have revised our elevations and renderings to take the brick up three stories.
    • 00:12:47
      which is similar to what we did at Hollymead.
    • 00:12:50
      I think that's referenced in this list of requested items.
    • 00:12:57
      So we have done that.
    • 00:13:00
      All HVAC units on the building will be on the roof.
    • 00:13:05
      They will not be visible from view due to the line of sight.
    • 00:13:13
      We have a
    • 00:13:15
      Color board that we've attached.
    • 00:13:20
      And I think those were the major comments that had to do with the building itself.
    • 00:13:28
      Let me see if I can pull up the renderings here.
    • SPEAKER_09
    • 00:14:09
      All right, is that visible?
    • SPEAKER_10
    • 00:14:12
      Yes.
    • SPEAKER_04
    • 00:14:13
      Okay.
    • 00:14:15
      This is as was mentioned earlier, this is a rendering from Fifth Street.
    • 00:14:23
      Again, we brought the brick up, we have delineated what would appear to be windows in the brick in a three dimensional form all around on all four sides of the building.
    • 00:14:37
      This is the east elevation, which this is a partial, you would see this partially from the main highway.
    • SPEAKER_09
    • 00:14:49
      This again is the fifth street elevation.
    • SPEAKER_04
    • 00:15:08
      This would be the other elevator.
    • 00:15:09
      This would be looking from the main highway at the building in rendering form.
    • 00:15:21
      The glass or glazing on this would all be clear.
    • 00:15:25
      It would easily meet the requirements of your glazing.
    • 00:15:29
      We use a Solarband 70XL, which is a very, very clear glazing.
    • 00:15:36
      One of the more clear glazings on the market.
    • 00:15:39
      So that's what we propose to use for this facility.
    • 00:15:44
      The
    • 00:15:47
      These facilities typically, when you look through the glass in these tower elements, you would typically see the green doors, although we've rendered these with a white door, which might be more pleasing.
    • 00:16:10
      And I think that was one of the responses, or excuse me, one of the items on the list also, could that be toned down?
    • 00:16:34
      And I'm sorry, I was having a few computer problems before we got started.
    • 00:16:38
      So I'm really spread out on our conference room table.
    • 00:16:41
      So if I've missed anything, please, please ask me now.
    • Chris HenningsenChair, Architectural Review Board
    • 00:16:47
      All right, well, I guess we'll just go into questions.
    • 00:16:51
      If any board members have questions for the applicant.
    • 00:16:56
      Dave, do you have any questions?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:17:02
      I think there are two that come to mind.
    • 00:17:05
      One is in looking at the site plan.
    • 00:17:07
      It looks like there's additional area that could be planted at the east and the south.
    • 00:17:12
      Would there be any concern on the applicant's part with adding additional trees there just to deepen the planted buffer?
    • 00:17:19
      The second is I appreciate the applicant expanding the extent of brick.
    • 00:17:28
      In looking at the views, I think the tower element on the east side in the middle at the automotive entrance to the parking, not the parking to the storage, it is slightly different in its expression in the corner.
    • 00:17:45
      Windows, which have sort of a brick base, then has the smaller fenestrated portion on top.
    • 00:17:51
      I wonder if for consistency sake, it might take on a character and appearance somewhat more like the corner elements.
    • 00:18:01
      Be interested in the applicant's thoughts about that.
    • SPEAKER_04
    • 00:18:04
      Yes, that certainly is something that we could do.
    • 00:18:07
      To be honest, I'm not sure why we didn't think of it.
    • 00:18:11
      That's a very good comment.
    • 00:18:13
      That would be something that we could do for certain.
    • SPEAKER_00
    • 00:18:17
      And in response to your landscape comment, so we do, you know, on our site plan, we'll have some additional area to accommodate those plantings.
    • 00:18:25
      I think we could at the moment.
    • 00:18:28
      We are working through a stormwater amendment on the property and so
    • 00:18:33
      Since the stormwater plan was approved comprehensively for this entire site, we're just verifying our calculations, and so as long as we don't have to add some type of stormwater facility in there, then there's certainly enough room for planting along the south and east elevation.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:18:48
      Thank you.
    • 00:18:51
      No further questions.
    • Chris HenningsenChair, Architectural Review Board
    • 00:18:52
      Thanks.
    • 00:18:53
      Tara, do you have any questions for the applicant?
    • Taro MatsunoMember, Architectural Review Board
    • 00:18:55
      Yeah, I guess I have two.
    • 00:18:56
      So the first is, I noticed in the staff report, there was a question of coordinating the color of brick with the previous, the building A, I believe.
    • 00:19:06
      Could you just speak to how you selected the color for the brick and whether any modifications were made to coordinate it with the adjacent buildings?
    • SPEAKER_04
    • 00:19:17
      We did change on our boards, and when you get forward to this in your final, we have changed to the RIC that was listed in the comments.
    • 00:19:28
      It was actually very close to what we had already rendered, but we have switched to that General Shale brick that was in the report.
    • Taro MatsunoMember, Architectural Review Board
    • 00:19:37
      Okay, great.
    • 00:19:38
      And then I think my comment speaks a little bit to this question of sort of scale and the appearance of blankness.
    • 00:19:46
      And I kind of agree with staff's assessment that increasing the amount of brick, especially on those sides facing Route 64 or I-64 makes sense.
    • 00:19:57
      But looking at the elevation from Fifth Street or the perspective, could you go to the perspective, please?
    • 00:20:06
      Yeah, that one.
    • 00:20:07
      I kind of wonder if maybe this one tended to feel a little bit less big when the brick was brought down and the ephus was there with the color contrasting panels.
    • 00:20:24
      And to me, I didn't have as much of an issue with that version.
    • 00:20:28
      It was more that there was this corner, the corner that's not
    • 00:20:33
      sort of detailed like a tower, that to me, that portion in Ephis was made a pretty prominent statement of that sort of less, I don't know, that material.
    • 00:20:50
      So I actually wondered if this one might be more successful retaining the Ephis as before, but detailing that corner to be consistent with the others.
    • 00:21:01
      and that that would sort of both add a little bit more visual interest because the brick with those recesses doesn't communicate the same level of contrast with the Eastis panels and sort of detailing that corner differently
    • 00:21:17
      would help it to read less like monolithic, I guess.
    • 00:21:21
      That was kind of my thought.
    • 00:21:23
      So it might net out being about the same or maybe even less brick on that side.
    • 00:21:29
      So I wonder if that's something that the other board members would be amenable to, if that's something that could be possible from the applicant side, if it would be weird to have sides with different quantities of brick, but that was sort of my reaction looking at this perspective.
    • SPEAKER_10
    • 00:21:49
      All right, thanks.
    • 00:21:52
      I just have one question.
    • Chris HenningsenChair, Architectural Review Board
    • 00:21:57
      I appreciate the increase in the amount of brick, but there's now a lot of kind of what I would call bricked in window statements in the brick portion.
    • 00:22:10
      And I was wondering, are those recessed at all?
    • 00:22:15
      from the rest of the brick or how are they differentiated from the rest of the brick?
    • SPEAKER_04
    • 00:22:23
      They are three-dimensional.
    • 00:22:25
      The brick band around the outside comes out to put texture in the building there basically.
    • 00:22:36
      One item that we could do, which really maybe addresses the comment from the previous panelists, and I apologize for not getting your name, but we could take these brick windows, if you will, and put a different color brick inside that frame.
    • 00:22:57
      And it would kind of do a similar thing to what the EIFS does.
    • Taro MatsunoMember, Architectural Review Board
    • 00:23:09
      Yeah, because I think that that's sort of, that was my reaction is that in expanding the brick, it reduced the amount of color contrast that was happening on that facade.
    • 00:23:20
      So if there were a color contrasting brick that was maybe similar to the Ephus or some other color that you could pull, I think that would work.
    • 00:23:32
      I don't know that it would necessarily even have to be the whole panel.
    • 00:23:36
      Maybe if you could do like a,
    • 00:23:39
      A different soldier course at the head of the window or something.
    • 00:23:43
      I don't know that would could help define the window brick recesses a little bit more or an alternating pattern or something like that.
    • SPEAKER_11
    • 00:23:58
      We could certainly do that.
    • Chris HenningsenChair, Architectural Review Board
    • 00:24:02
      All right.
    • 00:24:03
      Are there any other questions from board members?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:06
      Well, I guess I would just follow up on yours, Chris, just to, yeah, I had assumed maybe and incorrectly that there was some recess to the brick within the described window, but it sounds like it's intended to be flush with the other brick and then the brick around it is projected.
    • 00:24:22
      I guess a follow-up question for the applicant would be, is it possible, would it be possible to recess the brick in those false openings some dimension?
    • SPEAKER_04
    • 00:24:30
      It would, the reason we pulled that border out was to make it appear to be recessed, so it would have the appearance of being recessed.
    • 00:24:41
      We can certainly recess the brick a little bit also, not a problem.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:45
      Okay, so you could have both the projection of the articulation of the false window frame and further recess of the brick within it.
    • SPEAKER_04
    • 00:24:55
      Absolutely, yes.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:24:56
      Okay, excellent.
    • Chris HenningsenChair, Architectural Review Board
    • 00:24:59
      All right, thank you.
    • 00:25:00
      Are there any members of the public that have any questions?
    • SPEAKER_01
    • 00:25:05
      Not at this time.
    • Chris HenningsenChair, Architectural Review Board
    • 00:25:06
      All right, thank you.
    • 00:25:10
      The ARB will now go into discussion.
    • 00:25:14
      Tara, do you have any comments?
    • Taro MatsunoMember, Architectural Review Board
    • 00:25:16
      Oh, no, I guess we're, I think those all, it seems like we've gotten pretty close to those changes.
    • Chris HenningsenChair, Architectural Review Board
    • 00:25:25
      Dave, do you have any comments?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:25:28
      No, I don't believe so.
    • 00:25:29
      I appreciate the applicant's updates and the discussion today and my fellow member suggestions for further refinements.
    • Chris HenningsenChair, Architectural Review Board
    • 00:25:37
      Yeah, I also appreciate the updated version that we saw.
    • 00:25:44
      And I guess just to address something that Chris mentioned that was not in the staff report, but I also noticed when I was looking at the elevations,
    • 00:25:56
      was the kind of unfinished appearance of the backside of some of those tower elements.
    • 00:26:03
      In looking at the site sections that were provided, it didn't appear that those would be readily visible, but if there's any kind of further demonstration that they wouldn't be visible,
    • 00:26:25
      or if they would be, if there was some way you could treat that, I think that would be good in a subsequent submission.
    • 00:26:40
      I think the combination of a recess and the kind of band around the windows would help creating a shadow line and some interest on those brick facades.
    • SPEAKER_09
    • 00:26:55
      So I guess if we could look at the motion.
    • Margaret MaliszewskiPlanning Manager
    • 00:27:07
      So what we've recommended for today is a list of comments to be addressed to have the design returned to you.
    • 00:27:16
      So we have not prepared a motion, but we have the comments are now being displayed on the screen.
    • Chris HenningsenChair, Architectural Review Board
    • 00:27:34
      All right, Dave or Tara, do you have any suggestion changes to the motion as it's presented?
    • 00:27:41
      And now everybody's probably still reading.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:27:45
      Reminding Margaret, so this is recommendations to be incorporated and returned in a
    • Margaret MaliszewskiPlanning Manager
    • 00:27:52
      Yes, so let me just scroll down a little bit.
    • 00:27:54
      So staff was recommending a list of changes to be made to the proposal so that the applicant would return again and you'd see the project again the second time for a final review.
    • SPEAKER_11
    • 00:28:11
      Could you scroll down to just look at the the red
    • Taro MatsunoMember, Architectural Review Board
    • 00:28:22
      I guess if to Chris's point could we because I know that the site section was taken at that particular point but I'm just trying to think about that section of 64 I wonder if you go higher further back I guess it would be great to verify with a rendering from the height of 64 to address the unfinished sides of the towers and the mechanical equipment
    • 00:28:51
      Sort of following on item 10, the standard mechanical equipment note.
    • SPEAKER_09
    • 00:29:15
      It makes sense to me, Taro.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:29:16
      And then to your question about the one corner that doesn't have a tower expression, would you like to include a comment that requests the applicant consider expressing a tower at that corner?
    • SPEAKER_10
    • 00:29:32
      Sure.
    • 00:29:32
      Yeah.
    • 00:29:33
      Yeah.
    • 00:29:34
      I thought that was a good comment.
    • Margaret MaliszewskiPlanning Manager
    • 00:29:37
      Is there a way to describe what corner that is?
    • Taro MatsunoMember, Architectural Review Board
    • 00:29:42
      One from the Fifth Street.
    • SPEAKER_09
    • 00:29:46
      It's the one corner that isn't detailed, it's the other.
    • SPEAKER_11
    • 00:30:04
      So what I added was consider adding a tower at the undetailed corner that is visible from 5th Street.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:30:17
      It might be helpful if the applicant could provide a detailed view of the proposed brick bonding and coursing pattern at the window, at the false window openings.
    • Margaret MaliszewskiPlanning Manager
    • 00:30:39
      I'm going to provide a detail of the brick coursing and patterning at the vault.
    • SPEAKER_09
    • 00:30:42
      Yeah, I think just a detailed elevation.
    • SPEAKER_11
    • 00:30:44
      A detailed elevation?
    • Margaret MaliszewskiPlanning Manager
    • 00:31:08
      What I added as 21 was add more trees on the east and south sides of the site.
    • 00:31:12
      Was that sufficient for your...
    • Taro MatsunoMember, Architectural Review Board
    • 00:31:15
      Yes, thank you.
    • SPEAKER_09
    • 00:31:16
      I guess as coordinated with the stormwater issues.
    • 00:32:00
      All right, any other concerns or amendments?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:32:05
      None for me.
    • 00:32:06
      Thank you, Chris.
    • 00:32:07
      Thank you, Margaret.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:08
      Yeah, thank you, everyone.
    • 00:32:10
      All right, well, would anybody like to make a motion?
    • Margaret MaliszewskiPlanning Manager
    • 00:32:14
      Since these are just comments that you're giving the applicant to return with a revised design, you don't need to do a motion today.
    • Chris HenningsenChair, Architectural Review Board
    • 00:32:23
      Well, no motion then.
    • 00:32:25
      I'm good.
    • 00:32:26
      Thank you.
    • 00:32:28
      All right, well, thanks a lot.
    • 00:32:30
      That concludes the regular review items.
    • 00:32:35
      So we have one work session today, which is on the entrance corridor design guidelines addenda.
    • 00:32:43
      Mariah, do you have a presentation ready?
    • SPEAKER_11
    • 00:32:47
      Yes.
    • 00:33:11
      Today we just have one corridor to present to you.
    • 00:33:13
      It's the Route 29 bypass.
    • Mariah GleasonUrban Designer
    • 00:33:19
      So we integrated with the map design the intersections of other entrance corridors shown in the dashed line.
    • 00:33:26
      And an 11 by 17 version, I think they blend nicely into
    • 00:33:34
      into the map image to communicate that there is a entrance corridor there.
    • 00:33:42
      So we're trying to stay away from needing a legend, but we might need to include a legend if much more gets added.
    • 00:33:57
      So for the most part, what we found with this entrance corridor was that the condition is pretty much the same all the way through.
    • 00:34:05
      So we thought that we would just do a corridor spread and include two images at the bottom.
    • 00:34:12
      What we could do if you would like to see more white space is do these two images blown up on a second sheet.
    • 00:34:21
      like we've done with others.
    • 00:34:23
      There isn't a lot of development along this corridor, so there aren't really buildings to pick out.
    • 00:34:30
      So we're staying with kind of an image that communicates the experience along the route.
    • SPEAKER_09
    • 00:34:44
      OK.
    • Mariah GleasonUrban Designer
    • 00:34:48
      Are there any comments on information presented on this sheet?
    • Chris HenningsenChair, Architectural Review Board
    • 00:34:55
      I guess that first part of this corridor where the county is on one side and the city is on the other is where those sound barriers are located, which are mentioned in this page.
    • 00:35:10
      But they're very dominant over that section.
    • 00:35:17
      I was wondering if a shot of those should be included, but I don't know that that's really something we would want to duplicate anywhere else on the corridor, so maybe it's better to just leave that off.
    • 00:35:29
      That was my only, kind of my only thought about that was here's a very prominent thing, but it's not shown in here, and I didn't know if
    • 00:35:43
      wanted to show and say like, don't do this, but, or if it's better to leave it off, maybe it's just better to not show it.
    • Mariah GleasonUrban Designer
    • 00:35:52
      I think we struggled with the same thing.
    • 00:35:56
      They are, like you said, they are dominant, but do we want them repeated?
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:01
      Yeah.
    • Mariah GleasonUrban Designer
    • 00:36:01
      For consistency.
    • Chris HenningsenChair, Architectural Review Board
    • 00:36:02
      Right, exactly.
    • 00:36:03
      Because I think the rest of the corridor is pretty, it's really just buffer and foliage for the most part.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:36:13
      Yeah, I think it's a good point, Chris and Mariah.
    • 00:36:16
      I don't know if maybe it is worth noting it, just because on the one hand, I agree they're overly dominant and unrelieved, but they are fairly nice pre-cast barriers compared to what one can do.
    • 00:36:30
      There are some areas where I think I've seen some volunteer vines coming over the top and some volunteer trees coming up from the gravel buffer.
    • 00:36:39
      Even if we were just to include a note saying, you know, if future barriers occur, they should be at least as
    • 00:36:46
      have as much texture and variation as these and should have increased landscape buffer.
    • 00:36:57
      Because I guess with the scale of some of the development, like at the intersection of old Ivy, that may be of a density that in the future VDOT could justify additional barriers.
    • 00:37:13
      And I think the St. Anne's Lower School, I guess that's a roadway or is that part of St. Anne's property that adjoins the bypass?
    • Chris HenningsenChair, Architectural Review Board
    • 00:37:28
      I've never really been able to figure that out.
    • 00:37:30
      I know there are campuses right there and I don't know if that
    • 00:37:36
      because it's part of it or not.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:37:38
      An example of, I guess, a fairly large development that still has a decent, well, would it buffer, at least as I recall, it may be worth noting that and then either referencing a desire for greater or at least as much buffer as that in similar development.
    • SPEAKER_09
    • 00:38:03
      Those all sound like good additions.
    • Taro MatsunoMember, Architectural Review Board
    • 00:38:05
      And then I guess it just makes sense to push all those images onto the next page.
    • 00:38:10
      And then I think it seems good to me.
    • 00:38:14
      Nicely done.
    • 00:38:14
      It looks good.
    • SPEAKER_10
    • 00:38:15
      Yeah, as always.
    • Mariah GleasonUrban Designer
    • 00:38:17
      Thank you.
    • 00:38:21
      One interesting thing that we found with this was that the wooded buffers on the south side are much more extensive than on the north side.
    • 00:38:30
      I don't know that that's something to continue or not, but it was just an interesting find.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:38:36
      South of 250 West.
    • 00:38:38
      Yes, yeah.
    • 00:38:40
      I guess it's just a consequence.
    • 00:38:42
      I think that east of that is held by UVA and the foundation and west of it, most of it until recently, including just a strip between the subdivision, I think, and the road was held by the foundation.
    • 00:38:59
      And I think it may have at some point been in UVA's master plan as part of an overall green reserve.
    • 00:39:05
      So I don't know what the status of that is in the long term, but yeah, that's a nice feature of it.
    • Mariah GleasonUrban Designer
    • 00:39:18
      Okay, so moving on, we've been updating the maps to integrate the approximate entrance corridors.
    • 00:39:27
      So I just wanted to give you a look at what those are looking like.
    • 00:39:31
      Those are the updates that we're integrating into the previous corridors that you've seen.
    • 00:39:36
      And then the image to the bottom right is the image for Route 250 East, Richmond Road, which you have not reviewed yet.
    • 00:39:49
      And so I just wanted to note that.
    • 00:39:51
      And then I had a question for the ARB.
    • 00:39:53
      I've noticed in reading and sometimes writing, but also in laying out the information that there's a propensity to organize information in a way that radiates out from Charlottesville city.
    • 00:40:05
      Is there a direction of travel that we should be organizing these materials or is it something that's dismissible?
    • 00:40:18
      So for example, when we did the Route 250 West corridor, we really started from the edge of the county and worked back towards Charlottesville.
    • 00:40:31
      And in a lot of our others, we're starting at Charlottesville and radiating out.
    • 00:40:36
      So is there, for consistency's sake, is there a direction that we should be taking or is it fine either way?
    • Taro MatsunoMember, Architectural Review Board
    • 00:40:47
      Does it create additional work for you, like significant work to reorganize the segments?
    • Mariah GleasonUrban Designer
    • 00:40:55
      It could.
    • 00:40:56
      What we could do moving forward is organize our new corridors and segments in a way that takes one path.
    • 00:41:07
      in or out, but we would need to revise previous sections.
    • 00:41:14
      I'm not sure to what extent.
    • 00:41:16
      Some of them already follow certain paths.
    • 00:41:20
      So depending on the direction of travel.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:41:21
      And are the majority oriented from the county borders into the center or?
    • Mariah GleasonUrban Designer
    • 00:41:31
      For the most part, no.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:41:32
      No.
    • Mariah GleasonUrban Designer
    • 00:41:33
      They emanate from Charlottesville Center.
    • 00:41:38
      But then there are some like Route 250 east, sorry, west that move in.
    • 00:41:46
      That's the one that's coming to mind right now.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:41:50
      To the extent they are entrance corridors to the county.
    • 00:41:56
      Conceptually in my mind means they start at the county borders and come in.
    • 00:42:00
      But again, the enabling authority is related to their conveyance to historic sites.
    • 00:42:08
      And I imagine we could find historic sites in any direction and justify it that way.
    • 00:42:13
      So I mean, it makes sense to me that in our reviews, we contemplate the character of the corridor going both directions.
    • 00:42:25
      and then we'll just, you know, but obviously out of respect for staff time, we would be happy to choose whatever means is most economical.
    • Chris HenningsenChair, Architectural Review Board
    • 00:42:36
      Yeah, considering just my personal opinion is that it could go either way.
    • 00:42:42
      You know, it hadn't even occurred to me that this distinction that we're talking about, so I don't think it's necessary to like redo anything.
    • 00:42:54
      So, but maybe moving forward, if there was a preferred direction, we could establish that just as a way to keep things consistent.
    • Taro MatsunoMember, Architectural Review Board
    • 00:43:13
      Yeah, I think that makes sense.
    • 00:43:14
      I wouldn't want you to go back and redo a bunch of stuff you've already done.
    • 00:43:18
      But if you go forward with, I guess, exterior inward, did that seem appealing to both of you?
    • 00:43:27
      So that would be a good way to do it going forward.
    • 00:43:29
      And then if it looks really weird at the end of it, we can go back.
    • 00:43:32
      But I suspect it won't be that big of an issue.
    • Mariah GleasonUrban Designer
    • 00:43:37
      I think when we all perceive it, we kind of go along our own paths of travel, which is usually our homes out to the country or however you travel.
    • 00:43:51
      But what I've noticed is that it's mostly inward out.
    • 00:43:56
      So just a question to the ARB.
    • 00:43:58
      I very much thank you for your respective staff's time in putting these together.
    • 00:44:05
      So but I did want to put that up to the board if there was a decision to be made.
    • Taro MatsunoMember, Architectural Review Board
    • 00:44:12
      Yeah, I think I didn't make sense and that that sounds good.
    • 00:44:16
      Thanks for all your work on this.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:44:17
      But as Chris said, I don't know, no need for revision of anything completed.
    • Mariah GleasonUrban Designer
    • 00:44:22
      Right.
    • 00:44:23
      Right.
    • SPEAKER_11
    • 00:44:24
      Thank you.
    • 00:44:24
      Thanks.
    • 00:44:29
      I'm sorry, that's all I have for today.
    • SPEAKER_10
    • 00:44:31
      All right.
    • Chris HenningsenChair, Architectural Review Board
    • 00:44:32
      Thank you.
    • 00:44:34
      So we will move on to other business.
    • 00:44:39
      First of which is the draft rules of procedure and remote participation.
    • 00:44:46
      Are there any questions about the proposed rules of procedure?
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:44:54
      I had one which Margaret was good enough to look into the answer to, which I thought I would share with everybody, which is just that the limit on two absences is related to the specific personal matter item.
    • 00:45:07
      And you can have other unlimited effectively remote participations for personal illness or the other enumerated categories.
    • 00:45:17
      Did I understand that correctly, Margaret?
    • Margaret MaliszewskiPlanning Manager
    • 00:45:22
      Hmm.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:45:24
      Maybe I'm taking a leap of logic.
    • Margaret MaliszewskiPlanning Manager
    • 00:45:25
      I don't think we took the same leap.
    • 00:45:32
      Let me go back and find the email.
    • 00:45:36
      I thought that it was just limited to each person could have two, each board member could have two under that category.
    • 00:45:43
      And that was it.
    • 00:45:46
      That was my understanding.
    • 00:45:48
      It'll take too long to find that here.
    • 00:45:53
      Let me double check that again.
    • Chris HenningsenChair, Architectural Review Board
    • 00:45:55
      Yeah, I think it would be good to revisit this when Frank and Frank are here also just in case like
    • 00:46:05
      Just so we have the full board present for like something, you know, just to make sure every question is answered and all that.
    • Margaret MaliszewskiPlanning Manager
    • 00:46:11
      Sure.
    • 00:46:12
      Yeah.
    • 00:46:13
      There's no rush in adapting it.
    • 00:46:15
      It's, you know, just for your use whenever you might need it.
    • 00:46:19
      And you actually could, the way your rules of procedure are written, you couldn't adapt it today.
    • 00:46:25
      You would have the earliest you could do it would be the next meeting.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:46:29
      Actually, one question I hadn't asked, which I think one of the items is if you're residing more than 60 miles away or something, is county residency a condition of remaining appointed to the board or not?
    • Margaret MaliszewskiPlanning Manager
    • 00:46:42
      For most of the boards, it is a requirement.
    • 00:46:45
      I think there are a few committees that you do not have to be a county resident, but I think that's- Okay, because I don't know if it's possible to be 60 miles away in the county.
    • 00:46:56
      I think it's like,
    • 00:46:58
      If you're going to have your meeting in a
    • 00:47:00
      Unusable location and it makes it impossible for one person to attend.
    • 00:47:05
      That would be the case.
    • Taro MatsunoMember, Architectural Review Board
    • 00:47:07
      Yeah, I did the same.
    • 00:47:08
      I measured.
    • 00:47:12
      But maybe if you didn't like not as the crow flies.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:47:15
      That's right.
    • 00:47:16
      If you include enough vertical distance.
    • Taro MatsunoMember, Architectural Review Board
    • 00:47:20
      OK, so I think that makes sense to check when the other board members are here.
    • 00:47:25
      And I had the same question as data actually about the medical and
    • 00:47:30
      Family Medical.
    • 00:47:32
      So I think that would be something that maybe we could all revisit the language again.
    • 00:47:35
      And in general, I'm pretty supportive of it.
    • 00:47:38
      So I look forward to answering those questions and talking about it at the next meeting.
    • SPEAKER_09
    • 00:47:45
      Okay.
    • SPEAKER_10
    • 00:47:48
      All right.
    • 00:47:49
      Good.
    • SPEAKER_09
    • 00:47:49
      Great.
    • Chris HenningsenChair, Architectural Review Board
    • 00:47:51
      Okay.
    • 00:47:51
      All right.
    • 00:47:52
      So we are now onto the approval of the September 19th minutes.
    • 00:47:59
      Is there anyone who would like to move to adopt them?
    • Taro MatsunoMember, Architectural Review Board
    • 00:48:06
      I'll make a motion to approve the minutes of September 17th.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:48:11
      I'll second the motion.
    • Taro MatsunoMember, Architectural Review Board
    • 00:48:13
      Alright, if we could go to a vote.
    • Margaret MaliszewskiPlanning Manager
    • 00:48:16
      Yes.
    • 00:48:18
      Mr. Van Der Werf.
    • SPEAKER_10
    • 00:48:20
      Aye.
    • Margaret MaliszewskiPlanning Manager
    • 00:48:21
      Mr. Henningsen.
    • SPEAKER_10
    • 00:48:22
      Aye.
    • SPEAKER_11
    • 00:48:22
      And Mr. Matsuno.
    • SPEAKER_10
    • 00:48:24
      Aye.
    • 00:48:28
      Alright, thank you.
    • Chris HenningsenChair, Architectural Review Board
    • 00:48:30
      So the next ARB meeting is currently scheduled for October 17, 2022, but we may be canceling that meeting in light of the fact that there are no regular review items.
    • Margaret MaliszewskiPlanning Manager
    • 00:48:51
      and despite what the agenda says, the meeting time and location would have to change for the 17th.
    • 00:49:00
      We would have to be in room 241 and it would have to start at 10 a.m.
    • 00:49:05
      There's a bunch of other things going on that day so this room is not available at your regular time.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:49:12
      No personal objection to canceling the meeting.
    • Chris HenningsenChair, Architectural Review Board
    • 00:49:15
      Yeah, my inclination would be to just cancel that one.
    • Taro MatsunoMember, Architectural Review Board
    • 00:49:19
      So then we'd be reviewing the new language, not two weeks from now, but four weeks in this room.
    • 00:49:29
      Yeah.
    • 00:49:30
      Or whenever the next one.
    • Margaret MaliszewskiPlanning Manager
    • 00:49:33
      So the next meeting would be November 7th.
    • SPEAKER_10
    • 00:49:35
      November 7th, okay.
    • 00:49:40
      Sounds good.
    • 00:49:41
      All right.
    • 00:49:43
      So are there any other items from board members or staff?
    • SPEAKER_09
    • 00:49:52
      Chris has an item he wants to bring up.
    • Khris TaggartSenior Planner
    • 00:50:45
      So we just had a quick question.
    • 00:50:49
      Staff has received an inquiry regarding adding some murals to the facade of 29 Place Shopping Center.
    • 00:50:56
      The current building design went through ARB review, so this would be considered a minor amendment.
    • 00:51:02
      Quick run through of kind of street view highlighting one of the locations and an example of one of the murals proposed.
    • 00:51:13
      and another street view at another location to highlight it.
    • 00:51:17
      And then another example of another one of the murals proposed.
    • 00:51:21
      We'd like to confirm how you all would like to proceed with this request.
    • Margaret MaliszewskiPlanning Manager
    • 00:51:28
      Just add that this building, this shopping center does have ARB action on it.
    • 00:51:34
      So whereas just painting a building itself wouldn't require a permit because there's a previous ARB action that deals with materials and colors.
    • 00:51:46
      That change would require some level of ARB approval.
    • 00:51:50
      Could possibly be a minor amendment done at staff level.
    • 00:51:56
      But hoping to get a little bit of direction from you all and see if there's any concern for this type of change.
    • Taro MatsunoMember, Architectural Review Board
    • 00:52:06
      Seems fine to me, especially the way that we had to zoom in very far to see it in the entrance corridor.
    • 00:52:13
      I think that this is totally fine.
    • Dade Van Der WerfMember, Architectural Review Board
    • 00:52:17
      Yes, similarly, as long as there's not supplemental lighting or other things proposed with it, no objection.
    • Chris HenningsenChair, Architectural Review Board
    • 00:52:24
      Yeah, it's very non-visible in my opinion, so I think staff level review would be fine in this case.
    • SPEAKER_09
    • 00:52:34
      Great.
    • SPEAKER_10
    • 00:52:34
      Thank you.
    • SPEAKER_09
    • 00:52:36
      Thanks.
    • 00:52:37
      Great.
    • Chris HenningsenChair, Architectural Review Board
    • 00:52:42
      All right, in that case, this meeting is adjourned until the next meeting on November 7th.
    • 00:52:49
      It is 1 54 by my watch.
    • 00:52:55
      Thank you all.
    • SPEAKER_10
    • 00:52:59
      Thank you.
    • 00:52:59
      Thank you.
    • 00:52:59
      See you next time.