      Well, moving to the consent agenda, the applicant that was on the consent agenda has requested a deferral.
    • 00:00:11
      So is there a motion to accept that deferral?
    • 00:00:15
      So moved.
    • 00:00:17
      I'll second.
    • SPEAKER_01
    • 00:00:23
      Mr. Van Der Werf?
    • Frank StonerMember, Architectural Review Board
    • 00:00:26
      Aye.
    • SPEAKER_01
    • 00:00:27
      Mr. Stoner?
    • Frank StonerMember, Architectural Review Board
    • 00:00:29
      Aye.
    • SPEAKER_01
    • 00:00:32
      Mr. Hancock.
    • Frank StonerMember, Architectural Review Board
    • 00:00:34
      Aye.
    • SPEAKER_01
    • 00:00:37
      Mr. Henningsen.
    • 00:00:41
      Aye.
    • 00:00:45
      Mr. Huntington.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:00:47
      Aye.
    • 00:00:51
      Thank you, Carolyn.
    • 00:00:53
      So we have no work session and no regular review items so moving to other business we need to adopt the 2021 meeting schedule.
    • Margaret MaliszewskiPlanning Manager
    • 00:01:07
      So actually what I'd like to do today is just get confirmation from you if possible that you're okay with maintaining the same schedule next year as we've had this year that would be meeting the first and third Mondays of the month
    • 00:01:22
      beginning at one o'clock unless the Monday is a holiday and then the meeting moves to the following Tuesday.
    • 00:01:30
      If that's acceptable with everyone, I'm seeing lots of nods, great.
    • 00:01:36
      Then that will be, we'll formally adopt that schedule at the first meeting in January when we will also be doing elections and adopting the bylaws as well.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:01:54
      Excuse me, thank you, Margaret.
    • 00:01:55
      We'll look forward to this same schedule next year.
    • Frank StonerMember, Architectural Review Board
    • 00:02:01
      So I don't know if everybody else got this email, but the email I got had this 1230 time every today and every month.
    • 00:02:13
      And I guess that's the, so I don't, did anybody else get that?
    • SPEAKER_02
    • 00:02:17
      I did, yeah.
    • 00:02:20
      Would you,
    • Frank StonerMember, Architectural Review Board
    • 00:02:21
      So a Zoom invite went out.
    • 00:02:24
      And so there was a Zoom invite for 1230 and a Zoom invite for one.
    • 00:02:28
      And I tried to reach out to Carolyn because I didn't know whether maybe we were meeting earlier today or but it also has that same invite time on all the future meetings.
    • 00:02:43
      So if we can just have that.
    • SPEAKER_01
    • 00:02:45
      I will update that.
    • 00:02:50
      Sorry, I tried to give myself a buffer and Zoom only allows me 30 minute increments.
    • 00:02:56
      I can't do it in 15 minute increments.
    • 00:02:59
      So that's why it said 1230.
    • 00:03:01
      But I will change that to one o'clock.
    • Frank StonerMember, Architectural Review Board
    • 00:03:04
      Yeah, I just thought I'd point it out.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:03:10
      And Carolyn, for logistics, will that still allow you to get the meeting up and running and do the administrative things that you need to be ready to serve on?
    • SPEAKER_01
    • 00:03:19
      Absolutely, yes.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:03:21
      OK, great.
    • 00:03:22
      Thank you.
    • 00:03:23
      Thanks for catching that, Frank.
    • 00:03:28
      Okay, well turning to the EC guidelines and picking up on the discussion we started last week about the proposed review schedule and methodology.
    • 00:03:38
      Chris, just as background for you, we've talked about dividing up really among the board members.
    • 00:03:44
      We've all signed up for various corridors to take a look and really just identify additional buildings and landscapes that we think contribute to the character of those areas for a number of years.
    • 00:03:57
      There's been some thought about starting to develop specific guidelines that recognize the different character of the different corridors.
    • 00:04:06
      And so I think initially what we've talked about is just this being more of a study phase for the board members to get a better understanding of the elements of these corridors and then from that discussion to start to formulate guidelines.
    • 00:04:23
      We haven't yet articulated what the plan would be
    • 00:04:26
      to translate the study into the guidelines to Mr. Williamson's point earlier in his comments.
    • 00:04:32
      And so we welcome thoughts that others may have.
    • 00:04:34
      I don't have that schedule in front of me, Margaret, but as I recall, we were going to complete, if we follow that one successfully, we would complete the study of all the corridors early next fall.
    • Margaret MaliszewskiPlanning Manager
    • 00:04:47
      Pull that up.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:05:00
      I would welcome others' thoughts and discussion about when and how to involve the public.
    • 00:05:08
      Obviously, it's critical.
    • 00:05:13
      We've talked about this as a study phase.
    • 00:05:14
      Just thinking out loud, I would imagine it may be good to complete some portion of the study before moving to promulgate specific guidelines.
    • 00:05:23
      And it seems like it would be in that promulgation period that we'd want to find a way to incorporate
    • 00:05:29
      public participation.
    • Margaret MaliszewskiPlanning Manager
    • 00:05:32
      Are you able to see the spreadsheet?
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:05:35
      I can see Tuscany right now.
    • Chris HenningsenMember, Architectural Review Board
    • 00:05:36
      Yeah.
    • 00:05:38
      It was up a minute ago.
    • 00:05:40
      There it is.
    • 00:05:42
      Yes.
    • Margaret MaliszewskiPlanning Manager
    • 00:05:43
      It's hard to break away from Tuscany.
    • Chris HenningsenMember, Architectural Review Board
    • 00:05:45
      Okay.
    • Margaret MaliszewskiPlanning Manager
    • 00:05:46
      Yes.
    • 00:05:46
      This is the part of the spreadsheet that lists the assignments and the meeting dates.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:05:57
      So we would have that in July.
    • 00:05:59
      potentially through July.
    • 00:06:06
      So any initial thoughts from other board members?
    • 00:06:09
      If we were able to keep that schedule, could we begin after July targeting developing a specific corridor, promulgating a specific corridor guideline?
    • Fred MisselVice Chair, Architectural Review Board
    • 00:06:25
      I will throw out an idea and I hope this isn't already existing and I just have missed it.
    • 00:06:31
      But, you know, thinking about the incredibly important public involvement process and also how to communicate what we're doing to the public in appropriate ways and at the right time.
    • 00:06:49
      I feel like it would be helpful to have an overarching sort of schedule or an outline of work that not only captures this preliminary work, but fits this preliminary work into a larger kind of strategic plan on how we're gonna get things done and when we're gonna get them done.
    • 00:07:09
      And what is our overarching mission or goal
    • 00:07:14
      and then one of the steps it takes to get there and then I think when we fully understand that and again I hope this doesn't exist and I've just missed it but when we do fully understand that we can figure out the dates to actually include the public some of those may be required or you know just in terms of communication some of them probably more of them are the ones that we think
    • 00:07:41
      fit with specific milestones that fit into the overall outline.
    • 00:07:46
      Right.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:07:47
      I think that's a very good point, Fred, and to my knowledge, it doesn't exist.
    • Margaret MaliszewskiPlanning Manager
    • 00:07:50
      I think we covered some of those points previously, but we did not put them into a concise document that's easy to refer to.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:08:00
      Yeah, just something that will help us plan, right?
    • 00:08:05
      Because then we'll also be able to know
    • 00:08:09
      Margaret, you'll be able to know if we have a full Monday coming up and you've got 10 agenda items, we're not going to get a whole lot done on the corridor piece.
    • 00:08:17
      But if we have a day like today, you know, we're not ready for it yet.
    • 00:08:21
      But if we do in six months, we'll know that we can get a lot of work done and you can have a sort of a plan on how to fit that into the schedule.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:08:34
      Yes, I think that makes good sense, Fred.
    • 00:08:40
      I guess just in terms of how to sort out which corridors to prioritize and a reasonable timeframe for each, it does seem like it would be a lengthy effort to address each of them.
    • 00:08:54
      So I guess I would invite folks, if you have thoughts, perhaps email me or call me with suggestions and I'll try and synthesize the thoughts into a potential draft schedule that we could use to expand this.
    • 00:09:08
      Does that sound acceptable?
    • 00:09:09
      and Margaret, would that be acceptable for folks to contact me individually with?
    • Margaret MaliszewskiPlanning Manager
    • 00:09:14
      Individually, sure.
    • 00:09:17
      If it's going to be email, it would be, I think, helpful if you just copy me on it as well.
    • 00:09:23
      OK. And then maybe, Dave, maybe you and I can talk a little bit more about that overarching strategic plan and how to deal with that.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:09:37
      OK. That sounds great, Margaret.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:09:41
      Sorry, go ahead, Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:09:44
      Could we talk at a conceptual level to your earlier point about how we get from this sort of study phase, we've identified significant contributing elements to a quarter, how we get from there to quarter guidelines?
    • 00:10:06
      Just at a very high level, what that process looks like.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:10:23
      Frank, was that a question?
    • Frank StonerMember, Architectural Review Board
    • 00:10:25
      Yeah, that was a question.
    • 00:10:26
      OK. Yeah.
    • 00:10:30
      Sorry.
    • Margaret MaliszewskiPlanning Manager
    • 00:10:34
      Well, I mean, it could take probably a couple of different formats.
    • 00:10:40
      I think the difficulty right now in being able to answer that is that it's something that would normally fall to staff in large part to get that done.
    • 00:10:56
      And there is not staff time available at this point in time.
    • 00:11:01
      So it's a little bit difficult to answer that question.
    • Frank StonerMember, Architectural Review Board
    • 00:11:07
      So I think it's important that if we're going to do this work that we have a product at the end of it that makes everybody's life easier.
    • 00:11:21
      And so if it's something that we need to take on as board members, then I think it is really important just to, I mean, it might even be helpful for us just to pick one and just kind of walk through the process a little bit
    • 00:11:38
      I mean, there are some quarters that are gonna be pretty easy in my view, but I'm much less clear about how we get from, gee, there are two significant architectural features along this corridor.
    • 00:11:51
      And what does that mean just in terms of how we approach quarter guidelines for that?
    • 00:12:02
      I'm struggling.
    • SPEAKER_02
    • 00:12:05
      Just, I feel like we've had the conversation at some point during this study period that we've talked about not necessarily revising the guidelines, but more thinking about it as an addendum or something that is, you know, a part or kind of maybe some sort of manual that helps us and helps the applicant with corridor specific review.
    • 00:12:35
      Am I remembering that correctly?
    • Margaret MaliszewskiPlanning Manager
    • 00:12:37
      Yeah, Frank, I think that comes out of the idea that I was trying to move forward with identifying the significant features that we'd be referring to when we look at those guidelines that talk about
    • 00:12:56
      compatibility with the historic architecture of the area.
    • 00:13:00
      If we can identify those features for the individual corridors, we might find that the guidelines don't need a complete overhaul and that an addendum sort of a document might suffice.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:13:20
      So it's more of a reference tool really than guidance.
    • Margaret MaliszewskiPlanning Manager
    • 00:13:25
      So choosing one corridor that might be relatively easy and doing it as a test case seems like a good idea.
    • Frank StonerMember, Architectural Review Board
    • 00:13:37
      Yeah, that would be really helpful for me because it may also impact the things that I pay attention to in other corridors as you start to work through the list here.
    • Margaret MaliszewskiPlanning Manager
    • 00:13:54
      You mentioned
    • 00:13:55
      A couple that you thought might be easiest, which would they be?
    • Frank StonerMember, Architectural Review Board
    • 00:14:01
      If you could scroll up just a little bit so I can see the whole list.
    • 00:14:40
      I mean, in some ways, 64 feels like it could be really easy or just because I think it would be less relevant contextually.
    • 00:15:06
      I don't think it's generally the focus of
    • 00:15:10
      Our driver experience is generally not on 64, so in some ways that feels like the lowest hanging fruit.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:15:24
      Would it be acceptable to you, Frank, and to others if we plan to complete the study of all the corridors and then targeted a summer start to try to focus on translating that to
    • 00:15:38
      to one or would folks like to do it in parallel?
    • Frank StonerMember, Architectural Review Board
    • 00:15:42
      Well, I'm just wondering whether it would make sense to pick one and to Margaret's point, kind of just work all the way through it and see where it takes us and how much work, what we end up with, like as a way of informing kind of how the rest of the process might be handled kind of most efficiently or effectively.
    • 00:16:06
      It's kind of understanding how much time and what the document, what that supplement, if that's what it is to Frank Hancock's point, what that supplement looks like.
    • 00:16:19
      It sounds like we're going to have to generate most of that because it sounds like staff doesn't, you know, is not going to have the time.
    • 00:16:26
      So.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:16:26
      Right.
    • 00:16:27
      I think my thought had been that with the study format that we've started to lay out that it might, I think through the study, ideally we'll identify some character defining elements and some characteristics that are kind of unifying or unique to each corridor.
    • 00:16:42
      And so I was kind of anticipating that there'd be a degree of data gathering just sort of through this study, looking at the things that are contributing.
    • 00:16:52
      And then after that, maybe just trying to distill from it
    • 00:16:56
      the characteristics.
    • 00:16:58
      And then from Matt trying to define the supplement a little bit more in terms of what characteristics folks should try to enhance or relate to specific to each corridor.
    • 00:17:15
      I feel like there might be value in looking, to the extent we can complete the study of all of them, I think there may be some overlap
    • 00:17:24
      influence, that would be informative.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:17:31
      I'll throw just a couple thoughts.
    • 00:17:34
      I think since we have kind of figured out a way to divide and conquer, and I'm not downplaying the need to figure out how we use all of this information, but
    • 00:17:47
      You know, I would be supportive of at least gathering the data using the second tab on your spreadsheet here and giving that a shot for the ones that we're each responsible for.
    • 00:17:56
      Yeah.
    • 00:17:57
      And then in parallel, I think, you know, I would be I think maybe Margaret, you and Chris and others can be thinking about let's say the document is simply a series of photographs with some characteristic design elements and
    • 00:18:17
      You know, let's say it's that.
    • 00:18:19
      How would you then use that?
    • 00:18:20
      Would that become attached to an applicant's staff report?
    • 00:18:25
      So if we got a, you know, if somebody was building a Wild Wings on 250 Pantops, we would get the staff report and then we would have an attachment which would be the reference document that we've used that would be applicable to that particular development on that corridor.
    • 00:18:44
      and maybe there's a section of the staff report that says, based on this reference tool, we're highlighting these specific areas for your consideration.
    • 00:18:55
      You know, so my point just is that maybe we can do these two things in parallel where we have discussions about how it will be used and we also have, we do the work to assess the corridors.
    • Frank StonerMember, Architectural Review Board
    • 00:19:07
      Right.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:19:08
      Right.
    • 00:19:09
      I think that's a good suggestion, Fred, and there may be a way to
    • 00:19:12
      Start a parallel step to the extent each of us is sort of doing a study phase, we could then begin trying to do a proposal phase after that.
    • 00:19:23
      I could try to indicate that on this schedule in some way that we could also start to understand when and how we would need to invite public comment and participation.
    • 00:19:34
      Chris also, you know, we distributed this and carved up the
    • 00:19:37
      the county before your membership certainly would welcome if you want to take a look over it.
    • Chris HenningsenMember, Architectural Review Board
    • 00:19:42
      Yeah, I'm happy to take on any of these if anyone is, you know, has more, you know, on their hands than they would like to have.
    • 00:19:57
      I'm certainly open to taking a few of these on.
    • 00:20:03
      I wonder, and I'm coming into this a little bit late in the discussion, has there been any discussion about establishing criteria for what would constitute a contributing or a structure that would be,
    • 00:20:29
      I guess influential.
    • 00:20:32
      Is there anything specific just so we would have some kind of a apples to apples comparison between these corridors?
    • 00:20:43
      If I was looking at one corridor and thought that any structure built before the year 1940 was notable and someone else
    • 00:20:59
      had a completely different frame of reference for that.
    • 00:21:03
      We might get a different result.
    • 00:21:08
      Just two different individuals even on the same corridor might identify a different set of contributing buildings.
    • 00:21:19
      You may have already talked about that, but it might be helpful to just, even just in terms of groundwork, if that hadn't been a consideration, just to kind of lay out a strategy for choosing.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:21:38
      Right.
    • 00:21:38
      No, I think that's a great question, Chris.
    • 00:21:40
      And I don't know that we've really articulated particular criteria.
    • 00:21:44
      I maybe had thought that
    • 00:21:47
      You're quite right.
    • 00:21:48
      There will be a fair degree of subjectivity.
    • 00:21:50
      I would imagine, to me, it makes sense that for each corridor, we should definitely note all the properties that are landmarked or otherwise recognized by the National Trust.
    • 00:22:03
      But I think that it's an opportunity for us as well to highlight structures from any era that we think successfully reflect the character of that corridor, the character that
    • 00:22:15
      We would try to define through that observation.
    • 00:22:17
      I don't know if that helps or if others would offer additional perspective on how to assess what is contributing.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:22:27
      Yeah, Chris, I think it's a great point.
    • 00:22:29
      And I don't know, I assume you've seen the spreadsheet in both tabs.
    • Chris HenningsenMember, Architectural Review Board
    • 00:22:36
      No, I don't think I have.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:22:38
      So maybe the second tab is starting to get to what you're suggesting.
    • 00:22:43
      But I think, yeah.
    • 00:22:45
      So we've talked a fair amount about this.
    • 00:22:50
      The way I was approaching it, and I got a head start a few months ago when we first started talking about this,
    • 00:22:56
      because I was taking this one route frequently.
    • 00:22:59
      I started thinking of it as sort of the top down, right?
    • 00:23:03
      A little more general.
    • 00:23:05
      What is the general feel of the corridor?
    • 00:23:07
      And then the next step is what transitions are there?
    • 00:23:10
      Does it go from commercial to residential to what's the general feel and makeup of the corridor by use and also by landscape character?
    • 00:23:21
      And then the third tier was more about the specific examples.
    • 00:23:25
      And some of those might be open space, right?
    • 00:23:28
      There also are specific structures that might have some architectural character that are noteworthy.
    • 00:23:34
      So that's the way I approached it.
    • 00:23:36
      And what that did for me was it helped me avoid my favorites.
    • 00:23:42
      So I wasn't just going, oh, I really like that one building on this.
    • 00:23:46
      So I'm going to focus on that and call out all its good characteristics.
    • 00:23:50
      It helped me kind of think broader and to try to avoid favoritism.
    • Chris HenningsenMember, Architectural Review Board
    • 00:23:54
      Right, okay.
    • 00:23:58
      Yeah, this second tab is exactly what I was talking about.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:24:04
      Great, yeah, and thank you, Fred, for highlighting it, and I guess the columns L through W or so are taking some of the guidelines that are in our overall guidelines, and the thought is that you could check those that the property seems to fulfill
    • 00:24:25
      or not.
    • 00:24:26
      We talked a little bit when we last met about the possibility of grading these on a scale, whether the example really fulfills that objective or partially does, but that's certainly a much finer grain than we necessarily need to get to on anything we nominate.
    • 00:24:45
      And then the notable characteristics is just available to start describing why we think it deserves consideration
    • 00:24:53
      from that can probably begin to distill some other characteristics.
    • 00:24:58
      I like, Fred, your suggestion of also thinking hierarchically from the really big picture of the corridor to its zones and transitions and then looking at how these elements contribute.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:25:12
      One thing to think about too is kind of, oh, go ahead, Frank.
    • Frank StonerMember, Architectural Review Board
    • 00:25:16
      Yeah, go ahead.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:25:18
      Well, I was just gonna bring us back to that one comment
    • 00:25:20
      where we were talking about kind of what this is and what it isn't.
    • 00:25:24
      So I'll hold off if you've got comments on this.
    • Frank StonerMember, Architectural Review Board
    • 00:25:33
      Yeah, my only comment was I'm assuming the sort of 500 foot boundary is what we would utilize in identifying significant contributing structures, things beyond that 500 foot
    • 00:25:51
      How do we judge the significance from a distance perspective?
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:26:04
      I think something that you think is perceivable from the corridor and shapes the perception of its character when one is in it, maybe is what I would suggest.
    • 00:26:14
      So things that they're 500 feet away and they really influence what the character of that corridor is,
    • Margaret MaliszewskiPlanning Manager
    • 00:26:20
      Certainly, it makes sense, but if they don't, then... Yeah, I would add that the current guidelines just reference traditional architecture of the area.
    • 00:26:32
      They don't, it doesn't say within 500 feet of the street.
    • 00:26:36
      And that 500 feet, just as a reminder, parcels that are within the entrance quarter overlay or the parcels that were adjacent to the street,
    • 00:26:49
      At the time, the street was designated an entrance quarter for the full depth of that parcel.
    • 00:26:56
      The 500 feet comes into play when the parcel was not adjacent to the street.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:27:04
      One thing that comes to mind is the Sentara Hospital.
    • 00:27:09
      I remember years ago, we were talking about that.
    • 00:27:11
      And you don't really see it from 64.
    • 00:27:14
      If you're right next to it, you see it when you're going eastbound back by Fifth Street.
    • 00:27:20
      So it's far in the distance, but it's a viewshed issue.
    • 00:27:24
      And it did determine, I think, the level of detail we used when we reviewed it.
    • 00:27:32
      But it also is way more than 500 feet.
    • 00:27:35
      So I think to Dave's point, I agree.
    • 00:27:38
      It's whatever is visually influencing the corridor.
    • 00:27:45
      That make sense, Frank?
    • Frank StonerMember, Architectural Review Board
    • 00:27:47
      Yeah, I think so.
    • 00:27:49
      I don't know how you determine when something is, I mean, I'll take Westminster Canterbury as an example, which is highly visible from 64, but it's nowhere near the corridor, but I would say it shapes my perception as I move through the corridor.
    • 00:28:05
      Should it be considered or is it irrelevant?
    • Fred MisselVice Chair, Architectural Review Board
    • 00:28:12
      I would note it.
    • 00:28:13
      I think I would say cast your net broadly on the corridor.
    • 00:28:17
      And whatever you see, put it down.
    • 00:28:19
      There may be another level of refinement where we may all look at this and go, that's just not worth really considering.
    • 00:28:27
      And it may be taken off the list.
    • 00:28:30
      But I think at this point, I would say cast your net broadly.
    • 00:28:34
      And if you see it, throw it on there.
    • 00:28:37
      You maybe wouldn't comment on roof material
    • 00:28:41
      or secondary materials or get into that kind of detail.
    • 00:28:44
      But you might note it for other reasons.
    • Frank StonerMember, Architectural Review Board
    • 00:28:48
      Gotcha.
    • 00:28:49
      OK, that's helpful.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:28:52
      One thing I was thinking about, too, I really thought someone made the comment, which is really helpful.
    • 00:28:57
      I think it was Frank Hancock about what this is and what it isn't.
    • 00:29:02
      And I think that's this whole effort.
    • 00:29:04
      And I think that's important to make clear to the public, to Neil, people like that, right?
    • 00:29:11
      that this is not a comprehensive rewrite of the design guidelines, if I'm hearing it correctly.
    • 00:29:15
      This is a reference tool.
    • 00:29:17
      And the reason that we're doing it is to acknowledge unique differences and characteristics of each of the corridors.
    • 00:29:24
      So, you know, it puts it into brackets.
    • 00:29:27
      It says, here's what it is.
    • 00:29:28
      So yeah, public involvement's important, but really what we're doing is we are creating an assessment or, you know, there's not a lot of subjectivity in this.
    • 00:29:38
      Hopefully it's more objective.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:29:43
      That's very well said, Fred.
    • 00:29:44
      Thank you.
    • 00:29:51
      Any other discussion about this item this afternoon?
    • SPEAKER_02
    • 00:29:58
      I think Frank Stoner got more than his fair share of the corridor, so maybe he would want to share with you, Chris.
    • 00:30:07
      Sure, yeah.
    • 00:30:08
      A lot of them.
    • Frank StonerMember, Architectural Review Board
    • 00:30:08
      I'd be happy to.
    • 00:30:09
      I think I've got six or seven of them in here.
    • 00:30:15
      Yeah, Chris, just look at that list, and if you see anything I got that you have a special interest in, please.
    • Margaret MaliszewskiPlanning Manager
    • 00:30:28
      Chris, when I shared this originally with the ARB members, I think you weren't on board yet, so I will add to that list.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:30:43
      Great.
    • 00:30:43
      Well, thank you, everybody.
    • 00:30:44
      A helpful discussion, I think, to clarify what our plans will be.
    • 00:30:51
      So moving on to the next meeting.
    • 00:30:52
      Our next meeting is a virtual meeting scheduled for January 4th.
    • Margaret MaliszewskiPlanning Manager
    • 00:30:57
      Oh, Dave.
    • 00:30:58
      I'm sorry.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:30:59
      Oh, go ahead.
    • Margaret MaliszewskiPlanning Manager
    • 00:31:00
      I realized that I left something out of your cheat sheet.
    • 00:31:03
      Sorry.
    • 00:31:05
      On the agenda is the approval of minutes.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:31:09
      Thank you.
    • 00:31:09
      Remind me of the date.
    • Margaret MaliszewskiPlanning Manager
    • 00:31:13
      December 7th.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:31:16
      So do we have a motion to approve the minutes of December 7th?
    • Fred MisselVice Chair, Architectural Review Board
    • 00:31:25
      I'll move.
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:31:27
      Second?
    • 00:31:29
      I'll second.
    • 00:31:32
      Thank you.
    • SPEAKER_01
    • 00:31:34
      Mr. Van Der Werf?
    • 00:31:37
      Aye.
    • 00:31:41
      Mr. Stoner?
    • Chris HenningsenMember, Architectural Review Board
    • 00:31:43
      Aye Mr. Hancock Aye Mr. Missel Aye And Mr. Henningsen Henningsen I guess I should abstain since I did not attend the last meeting
    • Dade Van Der WerfChair, Architectural Review Board
    • 00:32:15
      Yep, thank you, Karen.
    • 00:32:18
      Okay, our next meeting is scheduled virtually on January 4th.
    • 00:32:22
      Will everybody be present?
    • 00:32:24
      Anybody who'll be absent?
    • 00:32:27
      Great, all right, a full house.
    • 00:32:30
      Okay, and as Margaret noted, we will elect officers and set the meeting schedule and adopt the bylaws.
    • 00:32:37
      So I'm glad everybody will be able to be there.
    • 00:32:41
      There being no further business, we will adjourn now until our next meeting Monday, January 4th.
    • 00:32:46
      Thank you, everyone.
    • 00:32:48
      Happy holidays.
    • Frank StonerMember, Architectural Review Board
    • 00:32:49
      Thanks.
    • 00:32:50
      Thank you.
    • 00:32:50
      Thanks, everybody.
    • Chris HenningsenMember, Architectural Review Board
    • 00:32:52
      Happy holidays.
    • 00:32:53
      Thank you.
    • 00:32:54
      You too.
    • Fred MisselVice Chair, Architectural Review Board
    • 00:32:55
      Take care.
    • Frank StonerMember, Architectural Review Board
    • 00:32:56
      Take care.
    • 00:32:56
      See you.